FERC-725S (OMB Control No.: 1902-0270),

NOPR in Docket No. RM17-12-000

RIN: 1902-AF42


Supporting Statement for

FERC-725S, Mandatory Reliability Standards: Emergency Preparedness

and Operations (EOP) Reliability Standards,

as modified by the NOPR in RM17-12



The Federal Energy Regulatory Commission (FERC or Commission) requests that the Office of Management and Budget (OMB) review the information collection requirements in the Notice of Proposed Rulemaking (NOPR) under Docket RM17-12-000 under OMB Control No. 1902-0270 (FERC-725S). This supporting statement covers the requirements of the FERC-725S information collection as modified by the NOPR in RM17-12. The reporting requirements in the FERC-725S are contained in FERC’s regulations in 18 Code of Federal Regulations (CFR) Part 40.


  1. CIRCUMSTANCES THAT MAKE THE COLLECTION OF INFORMATION NECESSARY


On August 8, 2005, The Electricity Modernization Act of 2005, which is Title XII of the Energy Policy Act of 2005 (EPAct 2005), was enacted into law. EPAct 2005 added a new Section 215 to the Federal Power Act (FPA), which requires a Commission-certified Electric Reliability Organization (ERO) to develop mandatory and enforceable Reliability Standards, which are subject to Commission review and approval. Once approved, the Reliability Standards may be enforced by the ERO, subject to Commission oversight. In 2006, the Commission certified the North American Electric Reliability Corporation (NERC) as the ERO pursuant to FPA section 215.1


  1. HOW, BY WHOM, AND FOR WHAT PURPOSE THE INFORMATION IS TO BE USED AND THE CONSEQUENCES OF NOT COLLECTING THE INFORMATION


The NOPR in Docket No. RM17-12-000 proposes to approve the following changes to Reliability Standards EOP-004-4 (Event Reporting), EOP-005-3 (System Restoration from Blackstart Resources), EOP-006-3 (System Restoration), and EOP-008-2 (Loss of Control Center Functionality).


The proposed EOP Reliability Standards are intended to:

  • provide accurate reporting of events to NERC’s event analysis group to analyze the impact on the reliability of the bulk electric system (EOP-004-4);

  • delineate the roles and responsibilities of entities that support system restoration from blackstart resources which generate power without the support of the grid (EOP-005-3);

  • clarify the procedures and coordination requirements for reliability coordinator personnel to execute system restoration processes (EOP-006-3); and

  • refine the required elements of an operating plan used to continue reliable operations of the bulk electric system if that primary control functionality is lost (EOP-008-2). The Commission also proposes to approve the associated violation risk factors, violation severity levels, implementation plans, and effective dates.


In addition, the Commission proposes to retire currently-effective Reliability Standards EOP-004-3, EOP-005-2, EOP-006-2, and EOP-008-1 immediately prior to the effective dates of the proposed EOP Reliability Standards


  1. DESCRIBE ANY CONSIDERATION OF THE USE OF IMPROVED INFORMATION TECHNOLOGY TO REDUCE THE BURDEN AND TECHNICAL OR LEGAL OBSTACLES TO REDUCING BURDEN


These collections do not require industry to file the information with the Commission. However, they do contain information collection and record retention requirements for which using current technology is an option.


  1. DESCRIBE EFFORTS TO IDENTIFY DUPLICATION AND SHOW SPECIFICALLY WHY ANY SIMILAR INFORMATION ALREADY AVAILABLE CANNOT BE USED OR MODIFIED FOR USE FOR THE PURPOSE(S) DESCRIBED IN INSTRUCTION NO. 2


The Commission periodically reviews filing requirements concurrent with OMB review or as the Commission deems necessary to eliminate duplicative filing and to minimize the filing burden. Under this proceeding, Reliability Standards EOP-004-4, EOP-005-3, EOP-006-3, and EOP-008-2 do not duplicate any filing requirements (other than those being proposed for replacement as described in this NOPR).


  1. METHODS USED TO MINIMIZE THE BURDEN IN COLLECTION OF INFORMATION INVOLVING SMALL ENTITIES


FERC considers the impact of the rule to be minimal. In general, small entities may reduce their burden by taking part in a joint registration organization or a coordinated functional registration. These options allow a small entity to share the compliance burden with other entities and, thus, to minimize their own compliance burden. Detailed information regarding these options is available in NERC’s Rule of Procedure at Sections 507 and 5082.


  1. CONSEQUENCE TO FEDERAL PROGRAM IF COLLECTION WERE CONDUCTED LESS FREQUENTLY


If industry performed the requirements of these standards less frequently, NERC would not have access to any information to allow assessment of the compliance with the requirements of each of these standards, thereby nullifying the purpose of the standard. Adequate planning for operating emergencies and responding to those emergencies is critical for the reliable operation of the bulk power system. Proposed Reliability Standard EOP-004-4 requires reporting of events by responsible entities. The reportable events under the proposed Reliability Standard are collected and used to examine the underlying causes of events, track subsequent corrective action to prevent recurrence of such events, and develop lessons learned for industry. Proposed Reliability Standard EOP-005-3 ensures plans, facilities, and personnel are prepared to enable system restoration from blackstart resources to ensure reliability is maintained during restoration and priority is placed on restoring the Interconnection. Proposed Reliability Standard EOP-006-3 establishes how personnel should prepare, execute, and coordinate system restoration processes to maintain reliability and to restore the Interconnection. Proposed Reliability Standard EOP-008-2 ensures continued reliable operations of the bulk electric system if a control center becomes inoperable.


  1. EXPLAIN ANY SPECIAL CIRCUMSTANCES RELATING TO THE INFORMATION COLLECTION


There are no special circumstances related to the FERC-725S information collection as it is affected by the RM17-12-000 NOPR.


  1. DESCRIBE EFFORTS TO CONSULT OUTSIDE THE AGENCY: SUMMARIZE PUBLIC COMMENTS AND THE AGENCY’S RESPONSE


The ERO process to establish Reliability Standards is a collaborative process with the ERO, Regional Entities, and other stakeholders developing and reviewing drafts and providing comments.3 The NERC-approved Reliability Standards were then submitted by NERC to the FERC for review and approval.


In addition, each FERC rulemaking (both proposed and final rules) is published in the Federal Register thereby providing public utilities and licensees, state commissions, Federal agencies, and other interested parties an opportunity to submit data, views, comments or suggestions concerning the approved collections of data. The NOPR was published in the Federal Register4 on 9/26/2017.


  1. EXPLAIN ANY PAYMENT OR GIFTS TO RESPONDENTS


There are no gifts or payments given to the respondents.


  1. DESCRIBE ANY ASSURANCE OF CONFIDENTIALITY PROVIDED TO RESPONDENTS


According to the NERC Rules of Procedure5, “…a Receiving Entity shall keep in confidence and not copy, disclose, or distribute any Confidential Information or any part thereof without the permission of the Submitting Entity, except as otherwise legally required.” This serves to protect confidential information submitted to NERC or Regional Entities.


Responding entities do not submit the information collected under the Reliability Standard to FERC. Rather, they maintain it internally. Since there are no submissions made to FERC, FERC provides no specific provisions in order to protect confidentiality.


  1. PROVIDE ADDITIONAL JUSTIFICATION FOR ANY QUESTIONS OF A SENSITIVE NATURE, SUCH AS SEXUAL BEHAVIOR AND ATTITUDES, RELIGIOUS BELIEFS, AND OTHER MATTERS THAT ARE COMMONLY CONSIDERED PRIVATE.


This collection does not include any questions of a sensitive nature.


  1. ESTIMATED BURDEN OF COLLECTION OF INFORMATION


The estimated public reporting burden due to this NOPR in Docket RM17-12-000:


RM17-12-000 (Emergency Preparedness and Operations Reliability Standards)


Number of Respondents
(1)

Annual Number of Responses per Respondent

(2)

Total Number of Responses (1)*(2)=(3)

Average Burden & Cost Per Response6

(4)

Total Annual Burden & Total Annual Cost7

(3)*(4)=(5)

Cost per Respondent

($)

(5)÷(1)

EOP-008-2


One-time Review and Revision of Plan

215


1

215

20 hrs. (Eng.);

$1,286

4,300 hrs. (Eng.);

$276,447

$1,286 (Eng.)


Updating, Approving, and Maintaining Records

215

1

215

6 hrs. (Eng.);

$386

2 hrs. (R.K.);

$76

1,290 hrs. (Eng.);

$82,934

430 hrs. (R.K.);

$16,233

$386 (Eng.);

$76 (R.K.)

One-time Contracting

27

1

27

120 hrs. (Eng.)

$7,715

3,240 hrs.

$208,300 (Eng.)

$7,715 (Eng.)

EOP-005-3 & EOP-006-3







RC Data Retention

26

2

52

8 hrs. (R.K.)

$514

416 hrs. (R.K.);

$26,745

$514 (R.K.)

TOP Reporting Data

176

1

176

116 hrs. (Eng.);

$7,458

16 hrs. (R.K.);

$604

20,416 hrs. (Eng.);

$1,312,545

2,816 hrs. (R.K.);

$106,304

$7,458 (Eng.);

$604 (R.K.)

GOP Testing

230

1

230

80 hrs. (Eng.);

$5,143

18,400 hrs. (Eng.);

$1,182,936

$5,143 (Eng.)

TO and DP Training

678

1

678

8 hrs. (Eng.);

$514

5,424 hrs. (Eng.);

$348,709

$514 (Eng.)

EOP-004-4







One-Time Review and Revision of Plan

1,400

1

1,400

2 hrs. (Eng.);

$129

2,800 hrs. (Eng.)

$180,012

$129

Reporting Events

350

1

350

0.17 hrs. (Eng.);

$11

59.5 hrs. (Eng.);

$3,825

$11

TOTAL


3,343


55,929.5 (Eng.)

3,662 (R.K.)

$3,595,708 (Eng.)

$149,282 (R.K.)



Commission staff is submitting a total annual burden of 59,542 hours to FERC-725S (due to the RM17-12 NOPR). However, 49,202 hours of that burden will be duplicated here (in FERC-725S) and in FERC-725A (OMB Control No. 1902-0244). This is due to FERC-725A being currently under OMB review8 and unavailable to have this hourly burden removed. Commission staff will remove the burden at a later time when FERC-725A is available.


  1. ESTIMATE OF THE TOTAL ANNUAL COST BURDEN TO RESPONDENTS


There are no start-up or other non-labor costs.


Total Capital and Start-up cost: $0

Total Operation, Maintenance, and Purchase of Services: $0


All of the costs in the NOPR are associated with burden hours (labor) and described in Questions #12 and #15 in this supporting statement.


  1. ESTIMATED ANNUALIZED COST TO FEDERAL GOVERNMENT


The Regional Entities and NERC do most of the data processing, monitoring and compliance work for Reliability Standards. Any involvement by the Commission is covered under the FERC-725 collection (OMB Control No. 1902-0225) and is not part of this request or package.


The estimated annualized cost to the Federal Government for FERC-725S (as related to the requirements in the NOPR in RM17-12-000 follows:


FERC-725S

Number of Employees (FTEs)

Estimated Annual Federal Cost

FERC-725S Analysis and Processing of filings

0

$0

Paperwork Reduction Act Administrative Cost9


$5,723

TOTAL


$5,723



  1. REASONS FOR CHANGES IN BURDEN INCLUDING THE NEED FOR ANY INCREASE


The increase in burden hours associated with the revisions to the Reliability Standard account for changing and updating of existing plan/procedures entities use to demonstrate meeting the requirements of the revised standards.


The total annual burden hours requested in 59,592 hours. However, 49,202 hours of that burden will be duplicated in relation to previously active Reliability Standards. Those previous Reliability Standards (and their related burden) are currently contained in the FERC-725A information collection (OMB Control No. 1902-0244). However, FERC-725A is already under review by OMB8 and, thus, is not available to have this burden removed. Commission staff will remove the hourly burden associated with the previous standards when FERC-725A is available.


FERC-725S

Total Request

Previously Approved

Change due to Adjustment in Estimate

Change Due to Agency Discretion

Annual Number of Responses

3,553

210

0

3,343

Annual Time Burden (Hr.)

80,072

20,480

0

59,592

Annual Cost Burden ($)

$0

$0

$0

$0



  1. TIME SCHEDULE FOR PUBLICATION OF DATA


There are no tabulating, statistical or tabulating analysis or publication plans for the collection of information.


  1. DISPLAY OF EXPIRATION DATE


The expiration dates are displayed in a table posted on ferc.gov at http://www.ferc.gov/docs-filing/info-collections.asp.


  1. EXCEPTIONS TO THE CERTIFICATION STATEMENT


The Commission does not use the data collected for this reporting requirement for statistical purposes.


1 North American Electric Reliability Corp., 116 FERC ¶ 61,062, order on reh’g & compliance, 117 FERC ¶ 61,126 (2006), aff’d sub nom. Alcoa, Inc. v. FERC, 564 F.3d 1342 (D.C. Cir. 2009).

3 Details of the ERO standards development process are available on the NERC website at http://www.nerc.com/pa/Stand/Documents/Appendix_3A_StandardsProcessesManual.pdf.

4 82 FR 44746

5 Section 1502, Paragraph 2, available at NERCs website.

6 Eng.: engineering; R.K.: record-keeping.

7 The estimates for cost per hour are based on 2015 wage figures and derived as follows:

The results of calculations are rounded to the nearest dollar within the burden table.

8 OMB is currently reviewing the unrelated Final Rule in RM16-13-000 (ICR Reference No. 201709-1902-003) which is occupying the FERC-725A information collection. Only one item per OMB Control No. can be pending OMB review at a time.

9 The PRA Administrative Cost is a Federal Cost associated with preparing, issuing, and submitting materials necessary to comply with the Paperwork Reduction Act (PRA) for rulemakings, orders, or any other vehicle used to create, modify, extend, or discontinue an information collection.   This average annual cost includes requests for extensions, all associated rulemakings (not just this NOPR or Final Rule), and other changes to the collection.

7


File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File TitleRM17-12 supporting statement
Authorferc
File Modified0000-00-00
File Created2021-01-21

© 2024 OMB.report | Privacy Policy