FERC-725U 30-day notice

FERC-725U 30-day notice.pdf

FERC-725U, Mandatory Reliability Standards: Reliability Standard CIP-014

FERC-725U 30-day notice

OMB: 1902-0274

Document [pdf]
Download: pdf | pdf
Federal Register / Vol. 82, No. 210 / Wednesday, November 1, 2017 / Notices
Applicants: Otter Tail Power
Company, NorthWestern Corporation,
Montana-Dakota Utilities Co.
Description: § 205(d) Rate Filing:
Filing and Restatement of Big Stone
Plant Transmission Facilities Agreement
to be effective 7/30/2010.
Filed Date: 10/24/17.
Accession Number: 20171024–5155.
Comments Due: 5 p.m. ET 11/14/17.
Docket Numbers: ER18–154–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: SCE
2018 TRBAA Update to be effective
1/1/2018.
Filed Date: 10/24/17.
Accession Number: 20171024–5157.
Comments Due: 5 p.m. ET 11/14/17.
Docket Numbers: ER18–155–000.
Applicants: EnPowered.
Description: Baseline eTariff Filing:
EnPowered USA, Inc. Market Based
Rate Tariff to be effective 10/31/2017.
Filed Date: 10/25/17.
Accession Number: 20171025–5000.
Comments Due: 5 p.m. ET 11/15/17.

sradovich on DSK3GMQ082PROD with NOTICES

The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 25, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017–23772 Filed 10–31–17; 8:45 am]
BILLING CODE 6717–01–P

VerDate Sep<11>2014

18:16 Oct 31, 2017

Jkt 244001

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC17–14–000]

Commission Information Collection
Activities (FERC–725U); Comment
Request
Federal Energy Regulatory
Commission.
ACTION: Comment request.
AGENCY:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is submitting its
information collection (FERC–725U,
Mandatory Reliability Standards:
Mandatory Reliability Standard CIP–
014) to the Office of Management and
Budget (OMB) for review of the
information collection requirements.
Any interested person may file
comments directly with OMB and
should address a copy of those
comments to the Commission as
explained below. The Commission
previously issued a Notice in the
Federal Register (82 FR 41618, 9/1/
2017) requesting public comments. The
Commission received no comments on
the FERC–725U and is making this
notation in its submittal to OMB.
DATES: Comments on the collection of
information are due by December 1,
2017.
ADDRESSES: Comments filed with OMB,
identified by the OMB Control No.
1902–0274, should be sent via email to
the Office of Information and Regulatory
Affairs: [email protected].
Attention: Federal Energy Regulatory
Commission Desk Officer. The Desk
Officer may also be reached via
telephone at 202–395–0710.
A copy of the comments should also
be sent to the Commission, in Docket
No. IC17–14–000, by either of the
following methods:
• eFiling at Commission’s Web site:
http://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
[email protected], or by phone
SUMMARY:

PO 00000

Frm 00038

Fmt 4703

Sfmt 4703

50645

at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at [email protected], by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
Title: Mandatory Reliability
Standards: Reliability Standard CIP–
014.
OMB Control No.: 1902–0274.
Type of Request: Three-year extension
of the FERC–725U information
collection requirements with no changes
to the reporting requirements.
Abstract: Reliability Standard CIP–
014–2 1 requires applicable transmission
owners and transmission operators to
identify and protect transmission
stations and transmission substations,
and their associated primary control
centers that if rendered inoperable or
damaged as a result of a physical attack
could result in instability, uncontrolled
separation, or cascading within an
Interconnection.
Transmission owners and
transmission operators must keep data
or evidence to show compliance with
the standard for three years unless
directed by its Compliance Enforcement
Authority. If a responsible entity is
found non-compliant, it must keep
information related to the noncompliance until mitigation is complete
and approved, or for the three years,
whichever is longer.
Type of Respondents: Transmission
owners (TO) and transmission operators
(TOP).
Estimate of Annual Burden: 2 The
Commission estimates the annual public
reporting burden for the information
collection as:
1 Reliability Standard CIP–014–2 was
implemented by the letter Order in Docket No.
RD15–4–000 issued on 7/14/2015. Docket No.
RD15–4–000 was not submitted to OMB because it
did not implicate the Paperwork Reduction Act.
The revised standard became effective on 10/2/2015
and is now being included in the FERC–725U
information collection.
2 Burden is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
explanation of what is included in the information
collection burden, reference 5 Code of Federal
Regulations 1320.3.

E:\FR\FM\01NON1.SGM

01NON1

50646

Federal Register / Vol. 82, No. 210 / Wednesday, November 1, 2017 / Notices
FERC–725U—MANDATORY RELIABILITY STANDARDS: RELIABILITY STANDARD CIP–014 3

Year 1:
R1 ...................................................................
R2 ...................................................................
R3 ...................................................................
R4 ...................................................................
R5 ...................................................................
R6 ...................................................................
Record Retention ...........................................
Year 2:
Record Retention ...........................................
Year 3:
R1 ...................................................................
R2 ...................................................................
R3 ...................................................................
R4 ...................................................................
R5 ...................................................................
R6 ...................................................................
Record Retention ...........................................
Year 1 Total ............................................
Year 2 Total ............................................
Year 3 Total ............................................
Total (for Years 1–3) ........................
Average Annual Burden and Cost
(for Years 1–3).

sradovich on DSK3GMQ082PROD with NOTICES

Jkt 244001

Total
number of
responses

Average burden hours
and cost per response 4

Total burden hours
and total cost

(1)

(2)

(1) * (2) = (3)

(4)

(3) * (4)

1
1
1
1
1
1
1

334
334
2
32
32
32
336

20 hrs.; $1,280 ...............
34 hrs; $2,448 ................
1 hrs.; $129 ....................
80 hrs.; $5,120 ...............
320 hrs.; $20,480 ...........
304 hrs.; $19,456 ...........
2 hrs.; $76 ......................

6,680 hrs.; $427,520.
11,356 hrs.; $817,632.
2 hrs.; $258.
2,560 hrs.; $163,840.
10,240 hrs.; $655,360.
9,728 hrs.; $622,592.
672 hrs.; $25,536.

334 TO and 2 TOP .......

1

336

2 hrs.; $76 ......................

672 hrs.; $25,536.

30 TO ............................
30 TO ............................
2 TOP ............................
30 TO and 2 TOP .........
30 TO and 2 TOP .........
30 TO and 2 TOP .........
334 TO and 2 TOP .......
.......................................
.......................................
.......................................
.......................................
.......................................

1
1
1
1
1
1
1
........................
........................
........................
........................
........................

30
30
2
32
32
32
336
........................
........................
........................
........................
........................

20 hrs.; $1,280 ...............
34 hrs.; $2,436 ...............
1 hrs.; $129 ....................
80 hrs.; $5,120 ...............
80 hrs.; $5,120 ...............
134 hrs.; $8,576 .............
2 hrs.; $76 ......................
........................................
........................................
........................................
........................................
........................................

600 hrs.; $38,400.
1,020 hrs.; $73,080.
2 hrs.; $258.
2,560 hrs.; $163,840.
2,560 hrs.; $163,840.
4,288 hrs.; $274,432.
672 hrs.; $25,536.
41,238 hrs.; $2,712,738.
672 hrs.; $25,536.
11,702 hrs.; $739,386.
53,612 hrs.; $3,477,660.
17,871 hrs.; $1,159,220.

3 For each Reliability Standard, the Measure
shows the acceptable evidence for the associated
Reporting Requirement (R numbers), and the
Compliance section details the related
Recordkeeping Requirement.
4 The estimates for cost per response are derived
using the following formula: Average Burden Hours
per Response * XX per Hour = Average Cost per
Response.
The hourly cost figures are based on data for
wages plus benefits from the Bureau of Labor
Statistics (as of 11/9/2016) at https://www.bls.gov/
oes/current/naics2_22.htm and http://www.bls.gov/
news.release/ecec.nr0.htm. The figures are rounded
for the purposes of calculations in this table and
are:
1. For electrical engineers (occupation code: 17–
2071), $64.29/hr., rounded to $64/hr.
2. For attorneys (occupation code: 23–0000),
$129.12/hr., rounded to $129/hr.
3. For administrative staff (occupation code: 43–
0000), $37.75/hr., rounded to $38/hr.
The record retention cost is based on the
administrative staff category; R3 is based on the
attorney category; Requirements R1, R4, R5 and R6
are based on the electrical engineer category; and
R2 is a mix of the electrical engineer and related
engineering review process (30 hrs. at $64/hr.) and

19:17 Oct 31, 2017

Number of
responses per
respondent

334 TO ..........................
334 TO ..........................
2 TOP ............................
30 TO and 2 TOP .........
30 TO and 2 TOP .........
30 TO and 2 TOP .........
334 TO and 2 TOP .......

Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.

VerDate Sep<11>2014

Number
and type
of respondents

Dated: October 25, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–23723 Filed 10–31–17; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–6–000]

RH energytrans, LLC; Notice of
Application
Take notice that on October 16, 2017,
RH energytrans, LLC (RH), 558 West 6th
Street, Erie, PA 16507, filed an
application pursuant to section 7(c) of
the Natural Gas Act (NGA) and Parts
157 and 284 of the Commission’s
Regulations requesting authority to
construct and operate a new interstate
natural gas pipeline system (referred to
as the Risberg Line), including pipeline
facilities, two compressor stations,
metering and regulating stations and
appurtenant facilities in Pennsylvania
and Ohio.
Specifically, the project would
include a total of 59.9 miles of pipeline
incorporating 31.6 miles of existing 8inch and 12-inch diameter gas pipeline
currently used as gathering facilities and
28 miles of new 12-inch diameter
pipeline. The pipeline facilities begin at
attorney (4 hrs. at $129/hr.) categories. The
resulting average hourly figure is $71.65, rounded
to $72/hr.

PO 00000

Frm 00039

Fmt 4703

Sfmt 4703

a new point of interconnection with
Tennessee Gas Pipeline Company, LLC
adjacent to the Meadville Compressor
Station in Crawford County,
Pennsylvania and extend to a new
delivery point interconnection with the
distribution facilities of Dominion
Energy Ohio (DEO) in North Kingsville
in Ashtabula County, Ohio. The project
also includes the reconstruction and
conversion of two compressor stations
totaling 1,862 hp. The Risberg Line
would provide for 55,000 Dth/d of firm
transportation service to northeast Ohio
markets. The estimated cost to construct
the project and to acquire the existing
gathering pipeline is about $88 million.
The filing may be viewed on the Web
at http://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at [email protected] or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to James F.
Bowe, Jr., King & Spalding LLP, 1700
Pennsylvania Avenue, Suite 200,
Washington, DC 20006, Phone (202)
626–9601, email [email protected].
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for

E:\FR\FM\01NON1.SGM

01NON1


File Typeapplication/pdf
File Modified2017-11-01
File Created2017-11-01

© 2024 OMB.report | Privacy Policy