FERC-725U, Mandatory Reliability Standards: Reliability Standard CIP-014

ICR 201710-1902-010

OMB: 1902-0274

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2017-12-19
Supplementary Document
2017-12-18
Supplementary Document
2017-11-27
Supplementary Document
2017-11-27
Supplementary Document
2017-11-24
Supplementary Document
2017-11-24
Supplementary Document
2017-11-24
Supplementary Document
2017-11-24
Supplementary Document
2017-11-24
IC Document Collections
IC ID
Document
Title
Status
212410
Modified
ICR Details
1902-0274 201710-1902-010
Active 201410-1902-001
FERC FERC-725U
FERC-725U, Mandatory Reliability Standards: Reliability Standard CIP-014
Extension without change of a currently approved collection   No
Regular
Approved without change 04/03/2018
Retrieve Notice of Action (NOA) 12/19/2017
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
04/30/2021 36 Months From Approved 04/30/2018
336 0 359
10,991 0 18,331
0 0 0

The Reliability Standard CIP-014-2 requires Transmission Owners and Transmission Operators to identify and protect Transmission stations and Transmission substations, and their associated primary control centers, that if rendered inoperable or damaged as a result of a physical attack could result in widespread instability, uncontrolled separation, or cascading within an Interconnection. In terms of information collection requirements, there are two main types of PRA activities: 1) Create or maintain documentation showing performance of a certain task; and 2) Develop a physical security plan.

US Code: 16 USC 824o Name of Law: Federal Power Act
  
None

Not associated with rulemaking

  82 FR 41618 09/01/2017
82 FR 50645 11/01/2017
No

1
IC Title Form No. Form Name
Reliability Standard CIP-014-2

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 336 359 0 0 -23 0
Annual Time Burden (Hours) 10,991 18,331 0 0 -7,340 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
The reporting and recordkeeping requirements have not changed. Each requirement (including record-keeping requirements) in CIP-014-2 retains the same related hourly burden per response. There are decreases (adjustments) in both the annual number of responses and the total annual burden hours, as follows. • The decrease in the number of responses is due to normal industry fluctuations in NERC registration for the TO and TOP roles . • The changes in burden and cost are due to (1)the decrease of 23 affected entities, with their related burden and (2) our modification of the calculations to average the annual burden and cost over the entire 5-year cycle of the Reliability Standard’s requirements (rather than having extreme increases or decreases depending on where in the 5-year cycle the PRA 3-year cycle and clearance fall).

$5,723
No
    No
    No
No
No
No
Uncollected
Mary Nimis 202 502-8235

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
12/19/2017


© 2024 OMB.report | Privacy Policy