1284t11

1284t11.xlsx

NSPS for Polymeric Coating of Supporting Substrates Facilities (40 CFR Part 60, Subpart VVV) (Renewal)

1284t11

OMB: 2060-0181

Document [xlsx]
Download: xlsx | pdf

Overview

Table 1
Table 2


Sheet 1: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for Polymeric Coating of Supporting Substrates Facilities (40 CFR Part 60, Subpart VVV) (Renewal)















108.28 144.33 53.34



Burden Item (A) (B) (C) (D) (E) (F) (G) (H)


Technical person-hours per occurrence No. of occurrences per respondent per year Technical person-hours per respondent per year
(C=AxB)
Respondents per year a Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.10)
Total cost per year ($) b


1. Applications N/A              


2. Surveys and studies N/A              


3. Reporting requirements                


A. Familiarize with the regulatory requirements c 1 1 1 62 62 3.1 6.2 $7,491.49


B. Required activities










Initial performance test 280 1 280 5 1,400 70 140 $169,162.70


Repeat performance test d 280 1 280 1 280 14 28 $33,832.54


Monthly compliance test e 90 12 1080 1 1,080 54 108 $130,496.94


C. Create information See 3B









D. Gather existing information See 3E









E. Write report










Notification of construction/ reconstruction 2 1 2 5 10 0.5 1 $1,208.31


Notification of actual startup 2 1 2 5 10 0.5 1 $1,208.31


Notification of initial performance test 2 1 2 5 10 0.5 1 $1,208.31


Notification of VOC use at end of initial year f 2 1 2 1 2 0.1 0.2 $241.66


Report of performance test See 3B









Report of monitoring exceedances and non-compliance periods g 16 4 64 12 768 38.4 76.8 $92,797.82


Report of no excess emissions h 8 2 16 50 800 40 80 $96,664.40


Report when 1st projected VOC use exceeds cutoff 2 1 2 2 4 0.2 0.4 $483.32


Report when 1st actual 12-month VOC use exceeds cutoff i 2 1 2 0 0 0 0 $0


Notification of changes j 4 1 4 5 20 1 2 $2,416.61


Subtotal for Reporting Requirements    
  5,113 $537,212


4. Recordkeeping requirements    
         


A. Read instructions See 3A  
         


B. Plan activities See 3B  
         


C. Implement activities See 3B  
         


D. Develop record system N/A  
         


E. Time to enter information    
         


Records of startups, shutdowns, malfunctions, etc. k 1.5 25 37.5 62 2325 116.25 232.5 $280,930.91


Records of operating parameters l 0.25 350 87.5 62 5,425.00 271.25 542.5 $655,505.46


Records of semiannual projected VOC use estimate m 1 2 2 12 24 1.2 2.4 $2,899.93


Records of 12-month actual VOC use m 1 12 12 12 144 7.2 14.4 $17,399.59


F. Train personnel N/A              


G. Audits N/A              


Subtotal for Recordkeeping Requirements         9,106 $956,736
responses hr/response
TOTAL ANNUAL BURDEN AND COST (rounded) n



14,200 $1,490,000
177 80.225988700565
TOTAL CAPITAL AND O&M COST (rounded) n






$700,000


GRAND TOTAL (rounded) n






$2,190,000














Assumptions:










a On average, EPA estimates 58 existing plants and 1 new plant per year will be subject to the NSPS over the next 3 years. This ICR assumes 4 existing plants per year will install new coating lines.










b This ICR uses the following labor rates: $108.28 (technical), $144.33 (managerial), and $53.34 (clerical). These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2016, “Table 2. Civilian workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” They have been increased by 110 percent to account for the benefit packages available to those employed by private industry.










c This ICR assumes all respondents will have to familiarize with the regulatory requirements each year.










d This ICR assumes 20 percent of initial performance tests must be repeated due to failure (5 × 20% = 1).










e This ICR assumes one coating line per year will demonstrate compliance by the liquid material balance method, which requires monthly compliance testing.










f This ICR assumes one plant per year will be required to submit this notification.










g This ICR assumes 20 percent of existing and new plants will report monitoring exceedances or non-compliance periods on a quarterly basis (62×20% = 12, after rounding). These plants will comply though either the emission reduction, alternative, or coating mix preparation equipment standards.










h This ICR assumes 80 percent of existing and new plants will report no excess emissions (62×80% = 50, after rounding).










i This ICR assumes no coating lines at any existing or new plants will exceed the cutoff value.










j This burden applies to new plants and existing plants that modify or reconstruct coating operations or coating mix preparation equipment. Per footnote a, EPA estimates 1 new plant per year and 4 existing plants with new coating lines per year.










k This ICR assumes there will be one malfunction or shutdown every 2 weeks over 50 weeks per year, or 25 occurrences per year (50/2 = 25).










l This ICR assumes operating parameters will be recorded over 350 days per year.










m This assumes 20 percent of existing and new plants will record VOC use estimates (62×20% = 12, after rounding).










n Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.











Sheet 2: Table 2

Table 2: Average Annual EPA Burden and Cost – NSPS for Polymeric Coating of Supporting Substrates Facilities (40 CFR Part 60, Subpart VVV) (Renewal)












48.08 64.8 26.02
Burden Item (A) (B) (C) (D) (E) (F) (G) (H)
Technical person-hours per occurrence No. of occurrences per respondent per year Technical person-hours per respondent per year
(C=AxB)
Respondents per year a Technical hours per year
(E=CxD)
Management hours per year
(F=Ex0.05)
Clerical hours per year
(G=Ex0.10)
Total cost per year ($) b
New facilities                
Notification of construction/ reconstruction 2 1 2 5 10 0.5 1 $539.22
Notification of actual startup 2 1 2 5 10 0.5 1 $539.22
Notification of initial performance test 2 1 2 5 10 0.5 1 $539.22
Notification of VOC use at end of initial year 2 1 2 1 2 0.1 0.2 $107.84
Performance test results 8 1 8 5 40 2 4 $2,156.88
New and existing facilities    





Report of monitoring exceedances and non-compliance periods c 8 4 32 12 384 19.2 38.4 $20,706.05
Report of no excess emissions d 2 2 4 50 200 10 20 $10,784.40
Report when 1st projected VOC use exceeds cutoff 2 1 2 2 4 0.2 0.4 $215.69
Report when 1st actual 12-month VOC use exceeds cutoff e 2 1 2 0 0 0 0 $0
Notification of changes f 2 1 2 5 10 0.5 1 $539.22
TOTAL ANNUAL BURDEN AND COST (ROUNDED) g



771 $36,100









Assumptions:







a On average, EPA estimates 58 existing plants and 1 new plant per year will be subject to the NSPS over the next 3 years. This ICR assumes 4 existing plants per year will install new coating lines.







b This ICR uses the following labor rates: $48.08 (technical), $64.80 (managerial), and $26.02 (clerical). These rates are from the Office of Personnel Management (OPM), 2017 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.







c This ICR assumes 20 percent of existing and new plants will report monitoring exceedances or non-compliance periods on a quarterly basis (62×20% = 12, after rounding). These plants will comply though either the emission reduction, alternative, or coating mix preparation equipment standards.







d This ICR assumes 80 percent of existing and new plants will report no excess emissions (62×80% = 50, after rounding).







e This ICR assumes no coating lines at any existing or new plants will exceed the cutoff value.







f This burden applies to new plants and existing plants that modify or reconstruct coating operations or coating mix preparation equipment. Per footnote a, EPA estimates 1 new plant per year and 4 existing plants with new coating lines per year.







g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy