NSPS for Polymeric Coating of Supporting Substrates Facilities (40 CFR Part 60, Subpart VVV) (Renewal)

ICR 202108-2060-004

OMB: 2060-0181

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2021-08-13
Supporting Statement A
2021-08-13
ICR Details
2060-0181 202108-2060-004
Received in OIRA 201808-2060-005
EPA/OAR 1284.12
NSPS for Polymeric Coating of Supporting Substrates Facilities (40 CFR Part 60, Subpart VVV) (Renewal)
Extension without change of a currently approved collection   No
Regular 08/31/2021
  Requested Previously Approved
36 Months From Approved 10/31/2021
207 177
16,400 14,200
826,000 700,000

The New Source Performance Standards (NSPS) for Polymeric Coating of Supporting Substrates Facilities (40 CFR Part 60, Subpart VVV) apply to each existing and new coating operation and any on-site coating mix preparation equipment used to prepare coatings for the polymeric coating of supporting substrates. New facilities include those that commenced construction, modification, or reconstruction after the date of proposal. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR Part 60, Subpart VVV.

US Code: 42 USC 7401 et seq Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  86 FR 8634 02/08/2021
86 FR 44711 08/13/2021
No

1
IC Title Form No. Form Name
NSPS for Polymeric Coating of Supporting Substrates Facilities (40 CFR Part 60, Subpart VVV) (Renewal)

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 207 177 0 0 30 0
Annual Time Burden (Hours) 16,400 14,200 0 0 2,200 0
Annual Cost Burden (Dollars) 826,000 700,000 0 0 126,000 0
No
No
There is an increase in burden from the most-recently approved ICR as currently identified in the OMB Inventory of Approved Burdens. This is due to an increase in the number of respondents subject to the rule. An examination of EPAs Enforcement and Compliance History Online (ECHO) database indicated that there are 72 sources currently reporting under NSPS Subpart VVV, an increase of 10 sources from the previous ICR. The regulations have not changed over the past three years and are not anticipated to change over the next three years. The increase in the operation and maintenance (O&M) costs is due to the increase in the number of respondents performing monitoring activities. The rate of increase in the number of new respondents remains steady at one new source per year, so the capital/startup cost will not increase.

$46,100
No
    No
    No
No
No
No
No
Muntasir Ali 919 541-0833

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
08/31/2021


© 2024 OMB.report | Privacy Policy