Table 1: Annual Respondent Burden and Cost – Emission Guidelines for Sewage Sludge Incinerators (40 CFR Part 60, Subpart MMMM) (Renewal) | |||||||||||
108.28 | 144.33 | 53.34 | |||||||||
Burden Item | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||
Respondent Hours per Occurrence | Number of Occurrences Per Respondent Per Year | Hours Per Respondent Per Year (C=AxB) |
Number of Respondents Per Year a | Technical Hours Per Year (E=CxD) |
Management Hours Per Year (F=Ex0.05) |
Clerical Hours Per Year (G=Ex0.1) |
Total Costs, $ b | ||||
1. Applications | N/A | ||||||||||
2. Surveys and Studies | N/A | ||||||||||
3. Reporting Requirements | |||||||||||
A. Familiarize with the regulatory requirements c, d | 40 | 1 | 40 | 86 | 3,440 | 172 | 344 | $415,657 | |||
B. Required Activities | |||||||||||
1) Initial stack test and report e | 40 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | |||
2) Annual stack test and test report f, g | 40 | 0.33 | 13.2 | 170 | 2,244 | 112.2 | 224.4 | $271,143.64 | |||
3) Operator training and qualification | |||||||||||
a) Establish and teach operator qualification course d, e | 64 | 1 | 64 | 0 | 0 | 0 | 0 | $0 | |||
b) Obtain operator qualification d, e | 72 | 1 | 72 | 0 | 0 | 0 | 0 | $0 | |||
c) Annual refresher course d, f | 12 | 1 | 12 | 86 | 1,032 | 51.6 | 103.2 | $124,697.08 | |||
d) Initial review of site-specific information | See 3B 3) a) | ||||||||||
e) Annual review of site-specific information d, f | 8 | 1 | 8 | 86 | 688 | 34.4 | 68.8 | $83,131.38 | |||
4) Establish operating parameters (maximum and minimum) e | 40 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | |||
5) Continuous parameter monitoring (including CEMS) | |||||||||||
a) Initial monitoring e | 11 | 1 | 11 | 0 | 0 | 0 | 0 | $0 | |||
b) Annual monitoring f | 11 | 1 | 11 | 170 | 1,870 | 93.5 | 187 | $225,953.04 | |||
C. Create Information | See 3B | ||||||||||
D. Gather Information | See 3E | ||||||||||
E. Report Preparation | |||||||||||
1) Notification of initial performance test e | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
2) Notification of initial CMS Demonstration d, e | 2 | 1 | 2 | 0 | 0 | 0 | 0 | $0 | |||
3) Final Control Plan e | 20 | 1 | 20 | 0 | 0 | 0 | 0 | $0 | |||
4) Initial Compliance Report e | 40 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | |||
5) Report for site-specific parameter petition e, h | 14 | 1 | 14 | 0 | 0 | 0 | 0 | $0 | |||
6) Annual Compliance Report | 40 | 1 | 40 | 170 | 6,800 | 340 | 680 | $821,647.40 | |||
7) Notification for operators that are off-site for more than 2 weeks i | 8 | 1 | 8 | 9 | 72 | 3.6 | 7.2 | $8,699.80 | |||
8) Status report for operators that are off-site for more than 2 weeks i | 8 | 2 | 16 | 9 | 144 | 7.2 | 14.4 | $17,399.59 | |||
9) Semiannual Deviation Report j | 24 | 2 | 48 | 9 | 432 | 21.6 | 43.2 | $52,198.78 | |||
Subtotal for Reporting Requirements | 19,230 | $2,020,528 | |||||||||
4. Recordkeeping Requirements | |||||||||||
A. Familiarize with the regulatory requirements | See 3A | ||||||||||
B. Plan Activities | N/A | ||||||||||
C. Implement Activities | N/A | ||||||||||
D. Develop Record System | N/A | ||||||||||
E. Record Information | |||||||||||
1) Records of operating parameters | 2 | 52 | 104 | 86 | 8,944 | 447.2 | 894.4 | $1,080,708 | |||
2) Records of exceedances of the operating parameters j | 2 | 1 | 2 | 9 | 18 | 0.9 | 1.8 | $2,174.95 | |||
3) Records of stack tests g | 2 | 0.33 | 0.66 | 86 | 56.76 | 2.84 | 5.68 | $6,858.34 | |||
4) Records of persons who have reviewed operating procedures | 2 | 1 | 2 | 86 | 172 | 8.6 | 17.2 | $20,782.85 | |||
5) Records of persons who have completed operator training | 2 | 1 | 2 | 86 | 172 | 8.6 | 17.2 | $20,782.85 | |||
6) Records of persons who meet operator qualification criteria | 2 | 1 | 2 | 86 | 172 | 8.6 | 17.2 | $20,782.85 | |||
7) Records of monitoring device calibration | 2 | 1 | 2 | 86 | 172 | 8.6 | 17.2 | $20,782.85 | |||
8) Records of site-specific documentation | 24 | 1 | 24 | 86 | 2,064 | 103.2 | 206.4 | $249,394.15 | |||
F. Personnel Training | See 3B | ||||||||||
G. Time for Audits | N/A | ||||||||||
Subtotal for Recordkeeping Requirements | 13,536 | $1,422,267 | responses | hr/response | |||||||
TOTAL ANNUAL BURDEN AND COST (rounded) k | 32,800 | $3,440,000 | 271 | 121.033210332103 | |||||||
TOTAL CAPITAL AND O&M COST (rounded) k | $1,350,000 | ||||||||||
GRAND TOTAL (rounded) k | $4,790,000 | ||||||||||
Assumptions: | |||||||||||
a We have assumed that there will be an average of 170 units at 86 facilities that will be subject to the rule. Because the standard only affects existing units constructed on or before October 14, 2010; there will be no new units subject to the rule. | |||||||||||
b This ICR uses the following labor rates: $144.33 per hour for Executive, Administrative, and Managerial labor; $108.28 per hour for Technical labor, and $53.34 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2016, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry. | |||||||||||
c We have assumed that all existing respondents will have to familiarize with the regulatory requirements each year. | |||||||||||
d Cost incurred by a facility regardless of the number of affected units at the plant. | |||||||||||
e This is a one-time only costs. | |||||||||||
f Annual costs are not incurred until the second year of operation. | |||||||||||
g Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements. | |||||||||||
h Assumed that none of the facilities will petition for site-specific parameters. | |||||||||||
i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year (86 x 10% = 8.6, rounded to 9 facilities). Assumed that this required only two status reports. | |||||||||||
j Assumed that 10 percent of the facilities would have an exceedance during the year (86 x 10% = 8.6, rounded to 9 facilities). | |||||||||||
k Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Table 2: Average Annual EPA Burden and Cost – Emission Guidelines for Sewage Sludge Incinerators (40 CFR Part 60, Subpart MMMM) (Renewal) | ||||||||
48.08 | 64.8 | 26.02 | ||||||
Burden Item | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) |
EPA Hours per Occurrence | Number of Occurrences Per Respondent Per Year | EPA Hours Per Respondent Per Year (C=AxB) |
Number of Respondents Per Year a | Technical Hours Per Year (E=CXD) |
Management Hours Per Year (F=Ex0.05) |
Clerical Hours Per Year (G=Ex0.1) |
Total Costs, $ b | |
1. Applications | N/A | |||||||
2. Read and Understand Rule Requirements | 40 | 1 | 40 | 0 | 0 | 0 | 0 | $0 |
3. Required Activities | ||||||||
A. Observe stack tests a | 48 | 1 | 48 | 11 | 528 | 26.4 | 52.8 | $28,470.82 |
B. Excess emissions -- Enforcement Activities b | 24 | 1 | 24 | 9 | 216 | 10.8 | 21.6 | $11,647.15 |
C. Create Information | N/A | |||||||
D. Gather Information | N/A | |||||||
E. Report Reviews | ||||||||
1) Review initial notifications | 20 | 1 | 20 | 0 | 0 | 0 | 0 | $0 |
2) Review initial compliance report | 40 | 1 | 40 | 0 | 0 | 0 | 0 | $0 |
3) Review annual compliance report | 8 | 1 | 8 | 170 | 1,360 | 68 | 136 | $73,333.92 |
4) Review semiannual excess emission and parameter exceedance report b | 16 | 2 | 32 | 9 | 288 | 14.4 | 28.8 | $15,529.54 |
5) Review notification and status reports for operators off-site c | 4 | 3 | 12 | 9 | 108 | 5.4 | 10.8 | $5,823.58 |
F. Prepare annual summary report | 200 | 1 | 200 | 1 | 200 | 10 | 20 | $10,784.40 |
5. Travel expenses: (1 person * 48 hours per trip / 8 hours per day * $75 per diem) + ($600 per round trip) = $1,050 per trip ($1,050 per trip x 11 trips) = $11,550 | $11,550.00 | |||||||
TOTAL ANNUAL BURDEN AND COST (rounded) d | 3,110 | $157,000 | ||||||
Assumptions | ||||||||
a We assume that EPA personnel attends 20 percent of the stack tests. Facilities may test every three years if certain requirements are met, thus annual testing is divided by three to give a per year cost. It is assumed most facilities would meet the requirements. (170 units per year x 0.33 stack test/unit x 20%) = 11.33, rounded to 11 stack tests per year) | ||||||||
b We assume that 10 percent of the facilities would have an exceedance during the year (86 x 10% = 8.6, rounded to 9 facilities). | ||||||||
c We assume that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. We assume that this will require only two status reports, resulting in a total of 3 reports (1 notification and 2 status reports). | ||||||||
d Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Capital/Startup vs. Operation and Maintenance (O&M) Costs | ||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) |
Continuous Monitoring Device | Capital/Startup Cost for One Respondent | Number of New Respondents | Total Capital/Startup Cost, (B X C) | Annual O&M Costs for One Respondent | Number of Respondents with O&M | Total O&M, (E X F) |
Fluidized Bed | ||||||
PBS parameter monitors | $24,300 | 0 | $0 | $5,600 | 6 | $33,600 |
SNCR monitors | $10,300 | 0 | $0 | $3,200 | 2 | $6,400 |
Initial and annual stack test | $61,740 | 0 | $0 | $21,348 | 18 | $384,264 |
Multiple Hearth | ||||||
PBS parameter monitors | $24,300 | 0 | $0 | $5,600 | 8 | $44,800 |
Initial and annual stack test | $61,740 | 0 | $0 | $23,302 | 38 | $885,476 |
Total | $0 | $1,350,000 |