EG for Sewage Sludge Incinerators (40 CFR part 60, subpart MMMM) (Renewal)

ICR 202201-2060-006

OMB: 2060-0661

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2022-01-25
Supporting Statement A
2022-01-25
ICR Details
2060-0661 202201-2060-006
Received in OIRA 201808-2060-007
EPA/OAR 2403.06
EG for Sewage Sludge Incinerators (40 CFR part 60, subpart MMMM) (Renewal)
Extension without change of a currently approved collection   No
Regular 01/27/2022
  Requested Previously Approved
36 Months From Approved 03/31/2022
309 271
34,646 32,800
1,361,550 1,350,000

Owners and operators of sewage sludge incineration units are required to comply with reporting and record keeping requirements for the General Provisions (40 CFR Part 60, Subpart A), as well as for the applicable standards in 40 CFR Part 60, Subpart MMMM and 40 CFR Part 62 Subpart LLL. This includes submitting initial notifications, performance tests and periodic reports and results, and maintaining records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These reports are used by the EPA to determine compliance with the standards.

US Code: 42 USC 7429 Name of Law: Solid Waste Combustion
   US Code: 42 USC 7411 Name of Law: Standards of performance for new stationary sources
  
None

Not associated with rulemaking

  86 FR 8634 02/08/2021
87 FR 4237 01/27/2022
No

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 309 271 0 0 38 0
Annual Time Burden (Hours) 34,646 32,800 0 0 1,846 0
Annual Cost Burden (Dollars) 1,361,550 1,350,000 0 0 11,550 0
No
No
There are only minor corrections made to the burden from the most-recently approved ICR as currently identified in the OMB Inventory of Approved Burdens. This situation is due to two considerations: 1) the regulations have not changed over the past three years and are not anticipated to change over the next three years; and 2) the growth rate for this industry is very low or non-existent, so there is no significant change in the overall burden. Since there are no changes in the regulatory requirements and there is no significant industry growth, there are also no changes in the capital/startup and/or operation and maintenance (O&M) costs.

$78,800
No
    No
    No
No
No
No
No
Muntasir Ali 919 541-0833

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
01/27/2022