Information Collection Request

30 CFR 250, Subpart D, Oil and Gas Drilling Operations

ICR 201811-1014-004 · OMB 1014-0018 · Historical Inactive

IC Document Collections
IC IDCollectionTypeStatusForm
234266 250.427(b) - Proposed remedial actions New
228138 250.400-490 NTL - USCG Unchanged
228137 250.490(q)(12) - Disposed Water/H2S Unchanged
228135 250.490(q)(9) - Instrument Gas Unchanged
228134 250.490(o)(5) - Drill Pipe Unchanged
228133 250.490(l) - Unplanned H2S releases - Written Unchanged
228132 250.490(l) - Unplanned H2S releases - Oral Unchanged
228131 250.490(j)(7-8) - H2S Detection Unchanged
228130 250.490(h)(2) - H2S Drills Unchanged
228129 250.490(g) - Safety Instructions Unchanged
228128 250.490(f); 418(d) - Contingency Plan for H2S areas Unchanged
228127 250.471(f) - Use of SCCE Unchanged
228126 250.471(e) - SCCE Testing Unchanged
228124 250.471(c); 470(f); 465(a) - Re-evaluation of SCCE Unchanged
228123 250.470(g); 418 - Best Practices Unchanged
228122 250.470(f); 471(c); 418 - SCCE Unchanged
228121 250.470(e); 472; 418 - Relief Rig Plans Unchanged
228120 250.470(d); 418 - Weather & Ice forecasting Unchanged
228119 250.470(c); 418 - Temp. Abandonment Unchanged
228118 250.470(b); 418 - Repair Plans Unchanged
228117 250.470(b); 418 - Transitioning Rig Unchanged
228116 250.470(a); 418 - Environmental Conditions Unchanged
228115 250.463(b) - Field Drilling Rules Unchanged
228114 250.462(e)(1) - Pressure Testing Modified
228113 250.462(d) - Re-evaluation Unchanged
228112 250.462(c) - Source Control/Containment Unchanged
228111 250.461(e) - Well Directional Survey/Leaseholder Unchanged
228110 250.461(a-b); NTL - Core Analyses Unchanged
228109 250.461(a-b); NTL - Velocity Profiles Unchanged
228108 250.461(a-b); NTL - Directional/Vertical-Well surveys Unchanged
228106 250.461(a-b); NTL - Well Logs Unchanged
228105 250.458(b) - Fluid & Materials inventory Unchanged
228093 250.456(c), (f) - Varies Calculations Unchanged
228092 250.456(b), (i) - Drilling Fluid results Unchanged
228091 250.452(a), (b) - Real-time monitoring/Alaska Only Unchanged
228090 250.434 - Diverter Actuations Unchanged
228087 250.428(k) - Cement Returns Unchanged
228086 250.428(k) - Maintain Drilling Report Unchanged
228085 250.428(d) - PE Cert. Unchanged
228084 250.428(d) - Immediate Actions Unchanged
228083 250.428(d) - Remedial Actions Unchanged
228081 250.428(c)(3); 428(k); ref in A, D, G - Daily Drilling Reports/Pacific & Alaska Form Unchanged
228080 250.428(c)(3); 428(k); ref in Subparts A, D, G - Weekly Drilling Reports/GOMR Form Unchanged
228079 250.427(a) - Pressure Integrity tests Unchanged
228078 250.423(c)(2) - Test Results Unchanged
228077 250.423(a) - Repair Unchanged
228076 250.421(b) - Alaska Only/cement fill Unchanged
228075 250.420(b)(3) - Alternative Options Unchanged
228074 250.420(b)(3) - Dual Mech. Barrier Unchanged
228073 420(b)(3); 423(b)(7); 465(a), (b)(3); plus various ref in A, D, E, F, G, P, and Q - End of Operations Report Form Unchanged
228072 250.404 - Crown Block Unchanged
ICR Details
1014-0018 201811-1014-004
Historical Inactive 201701-1014-005
DOI/BSEE 1014-0018 Sub D - WCR
30 CFR 250, Subpart D, Oil and Gas Drilling Operations
Revision of a currently approved collection   No
Regular
Comment filed on proposed rule and continue 03/11/2019
Retrieve Notice of Action (NOA) 12/13/2018
In accordance with 5 CFR 1320, OMB is filing comment and withholding approval at this time. The agency shall examine public comment in response to the proposed rulemaking and will include in the supporting statement of the next ICR--to be submitted to OMB at the final rule stage--a description of how the agency has responded to any public comments on the ICR, including comments on maximizing the practical utility of the collection and minimizing the burden.
  Inventory as of this Action Requested Previously Approved
03/31/2021 36 Months From Approved 03/31/2021
63,347 0 63,347
83,488 0 83,488
0 0 0

The BSEE uses the information to ensure safe drilling operations and to protect the human, marine, and coastal environment. Among other things, BSEE specifically uses the information to ensure: the drilling unit is fit for the intended purpose; the lessee or operator will not encounter geologic conditions that present a hazard to operations; equipment is maintained in a state of readiness and meets safety standards; each drilling crew is properly trained and able to promptly perform well-control activities at any time during well operations; compliance with safety standards; and the current regulations will provide for safe and proper field or reservoir development, resource evaluation, conservation, protection of correlative rights, safety, and environmental protection. We also review well records to ascertain whether drilling operations have encountered hydrocarbons or H2S and to ensure that H2S detection equipment, personnel protective equipment, and training of the crew are adequate for safe operations in zones known to contain H2S and zones where the presence of H2S is unknown.

US Code: 43 USC 1334 Name of Law: OCS Lands Act
   US Code: 43 USC 1751 Name of Law: Federal Oil and Gas Royalty Management Act
   US Code: 33 USC 1321 Name of Law: Federal Water Pollution Control Act
  
None

1014-AA39 Proposed rulemaking 83 FR 22128 05/11/2018

Yes

51
IC Title Form No. Form Name
250.427(b) - Proposed remedial actions
250.421(b) - Alaska Only/cement fill
250.428(c)(3); 428(k); ref in Subparts A, D, G - Weekly Drilling Reports/GOMR BSEE-0133 Well Activity Report
250.428(c)(3); 428(k); ref in A, D, G - Daily Drilling Reports/Pacific & Alaska BSEE-0133S Supplement to the Well Activity Report
250.428(k) - Maintain Drilling Report
250.456(c), (f) - Varies Calculations
250.461(a-b); NTL - Velocity Profiles
250.461(a-b); NTL - Core Analyses
250.461(e) - Well Directional Survey/Leaseholder
250.471(c); 470(f); 465(a) - Re-evaluation of SCCE
250.471(e) - SCCE Testing
250.471(f) - Use of SCCE
250.490(g) - Safety Instructions
250.490(j)(7-8) - H2S Detection
250.490(q)(9) - Instrument Gas
250.404 - Crown Block
250.423(a) - Repair
250.423(c)(2) - Test Results
250.428(d) - Remedial Actions
250.428(d) - Immediate Actions
420(b)(3); 423(b)(7); 465(a), (b)(3); plus various ref in A, D, E, F, G, P, and Q - End of Operations Report BSEE-0125 End of Operations Report
250.420(b)(3) - Dual Mech. Barrier
250.420(b)(3) - Alternative Options
250.427(a) - Pressure Integrity tests
250.428(d) - PE Cert.
250.428(k) - Cement Returns
250.434 - Diverter Actuations
250.452(a), (b) - Real-time monitoring/Alaska Only
250.456(b), (i) - Drilling Fluid results
250.458(b) - Fluid & Materials inventory
250.461(a-b); NTL - Directional/Vertical-Well surveys
250.462(c) - Source Control/Containment
250.462(d) - Re-evaluation
250.462(e)(1) - Pressure Testing
250.463(b) - Field Drilling Rules
250.470(a); 418 - Environmental Conditions
250.470(b); 418 - Transitioning Rig
250.470(b); 418 - Repair Plans
250.470(d); 418 - Weather & Ice forecasting
250.470(e); 472; 418 - Relief Rig Plans
250.470(f); 471(c); 418 - SCCE
250.470(g); 418 - Best Practices
250.490(l) - Unplanned H2S releases - Oral
250.490(l) - Unplanned H2S releases - Written
250.461(a-b); NTL - Well Logs
250.470(c); 418 - Temp. Abandonment
250.490(f); 418(d) - Contingency Plan for H2S areas
250.490(h)(2) - H2S Drills
250.490(o)(5) - Drill Pipe
250.490(q)(12) - Disposed Water/H2S
250.400-490 NTL - USCG

Yes
Changing Regulations
No
The current OMB inventory includes 83,488 burden hours. In this submission, we are requesting a total of 83,528 hours. This represents a program increase of 40 hours due to this final rulemaking, 1014-AA39, Blowout Preventer Systems and Well Control Revisions. BSEE is also requesting a program increase of $16,000 in non-hour costs burdens for Independent Third Party costs due to this final rulemaking, 1014-AA39, Blowout Preventer Systems and Well Control Revisions.

$3,714,752
No
    Yes
    No
No
No
No
Uncollected
Nicole Mason 703 787-1605 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
12/13/2018