Federal Register / Vol. 83, No. 158 / Wednesday, August 15, 2018 / Notices
immaterial modifications and
omissions. The collection of this
information is critical to ensure that the
government has sufficient information
to determine whether applicants meet
the eligibility requirements to qualify
for a DOE loan guarantee under Title
XVII or TELGP, as the case may be, and
to provide DOE with sufficient
information to evaluate an applicant’s
project using the criteria specified in 10
CFR part 609 (for Title XVII
applications) or the applicable
solicitation (for TELGP applications); (5)
Annual Estimated Number of
Respondents: 20 Applications; (6)
Annual Estimated Number of Total
Responses: It is estimated that the total
number of annual responses will not
exceed 20; (7) Annual Estimated
Number of Burden Hours: 2,650 hours,
most of which is likely to be time
committed by firms that seek debt and/
or equity financing for their projects,
regardless of their intent to apply for a
DOE loan guarantee; (8) Annual
Estimated Reporting and Recordkeeping
Cost Burden: It is estimated that the
annual estimated reporting and
recordkeeping cost burden for
applicants will not exceed $26,296 per
annum, per applicant.
Authority: Title XVII and TELGP
authorize the collection of information.
Signed in Washington, DC, on August 9,
2018.
John Sneed,
Executive Director, Department of Energy
Loan Programs Office.
[FR Doc. 2018–17553 Filed 8–14–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Proposed Agency Information
Collection Extension
U.S. Department of Energy.
Notice and Request for
Comments.
AGENCY:
ACTION:
The Department of Energy
(DOE), pursuant to the Paperwork
Reduction Act of 1995, intends to
extend for three years an information
collection request with the Office of
Management and Budget (OMB).
Comments are invited on: (a) Whether
the extended collection of information
is necessary for the proper performance
of the functions of the agency; (b) the
accuracy of the agency’s estimate of the
burden of the proposed collection of
information, including the validity of
the methodology and assumptions used;
(c) ways to enhance the quality, utility,
and clarity of the information to be
collected; and (d) ways to minimize the
daltland on DSKBBV9HB2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
18:28 Aug 14, 2018
Jkt 244001
burden of the collection of information
on respondents, including through the
use of automated collection techniques
or other forms of information
technology.
DATES: Comments regarding this
proposed information collection must
be received on or before October 15,
2018. If you anticipate difficulty in
submitting comments within that
period, contact the person listed in
ADDRESSES as soon as possible.
ADDRESSES: Written comments may be
sent to Andrea Lachenmayr, U.S.
Department of Energy, LPO–70, Room
4B–170, 1000 Independence Avenue
SW, Washington, DC 20585 or by email
to LPO.PaperworkReduction
[email protected].
FOR FURTHER INFORMATION CONTACT:
Requests for additional information or
copies of the information collection
instrument and instructions should be
directed to Andrea Lachenmayr,
LPO.PaperworkReduction
[email protected].
SUPPLEMENTARY INFORMATION: This
information collection request contains:
(1) OMB No.: 1910–5130; (2)
Information Collection Request Title:
Application for Loans under the
Advanced Technology Vehicles
Manufacturing Incentive Program; (3)
Type of Request: Extension; (4) Purpose:
This information collection package
covers collection of information
necessary to evaluate applications for
loans submitted under Section 136 of
the Energy Independence and Security
Act of 2007, as amended (EISA) (42
U.S.C. 17013). Applications for loans
submitted to DOE under Section 136 of
EISA must contain certain information.
This information will be used to analyze
whether a project is eligible for a loan
and to evaluate the application under
criteria specified in the interim final
regulations implementing Section 136 of
EISA, located at 10 CFR part 611. The
collection of this information is critical
to ensure that the government has
sufficient information to determine
whether applicants meet the eligibility
requirements to qualify for a DOE loan
and to provide DOE with sufficient
information to evaluate an applicant’s
project using the criteria specified in 10
CFR part 611; (5) Annual Estimated
Number of Respondents: 7 Applications;
(6) Annual Estimated Number of Total
Responses: It is estimated that the total
number of annual responses will not
exceed 7; (7) Annual Estimated Number
of Burden Hours: 910 hours, most of
which is likely to be time committed by
firms that seek debt and/or equity
financing for their projects, regardless of
their intent to apply for a DOE loan; (8)
PO 00000
Frm 00006
Fmt 4703
Sfmt 4703
Annual Estimated Reporting and
Recordkeeping Cost Burden: It is
estimated that the annual estimated
reporting and recordkeeping cost
burden for applicants will not exceed
$26,296 per annum, per applicant.
Authority: Section 136 of the EISA
authorizes the collection of information.
Signed in Washington, DC on August 9,
2018.
John Sneed,
Executive Director, Department of Energy
Loan Programs Office.
[FR Doc. 2018–17552 Filed 8–14–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2977–007.
Applicants: Mesquite Power, LLC.
Description: Notice of Non-Material
Change in Status of Mesquite Power,
LLC.
Filed Date: 8/7/18.
Accession Number: 20180807–5151.
Comments Due: 5 p.m. ET 8/28/18.
Docket Numbers: ER18–2182–000.
Applicants: Minco IV & V
Interconnection, LLC.
Description: Baseline eTariff Filing:
Minco IV & V Interconnection, LLC
Application for Market-Based Rates to
be effective 10/6/2018.
Filed Date: 8/7/18.
Accession Number: 20180807–5141.
Comments Due: 5 p.m. ET 8/28/18.
Docket Numbers: ER18–2183–000.
Applicants: Tucson Electric Power
Company.
Description: § 205(d) Rate Filing:
Amendment to Gila River Ownership
Agreement to be effective 5/31/2018.
Filed Date: 8/8/18.
Accession Number: 20180808–5002.
Comments Due: 5 p.m. ET 8/29/18.
Docket Numbers: ER18–2184–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
MAIT submits three ECSAs, Service
Agreement Nos. 5011, 5029 and 5117 to
be effective 10/8/2018.
Filed Date: 8/8/18.
Accession Number: 20180808–5023.
Comments Due: 5 p.m. ET 8/29/18.
Docket Numbers: ER18–2185–000.
Applicants: Alabama Power
Company.
E:\FR\FM\15AUN1.SGM
15AUN1
File Type | application/pdf |