Section |
Description |
NRC licensee respondents |
Responses per Respondent |
Responses |
Burden per Response |
Total Annual Burden Hours |
Uranium Recovery Active Program |
40.9(b) |
Notification to the Commission of information with significant implication for public health and safety or common defense and security |
0 |
1 |
0 |
1 |
0 |
40.14 |
Exemption request |
0 |
1 |
0 |
1 |
0 |
40.26(c)(2) |
Notification of of any failure in a tailings or waste retention system |
0 |
1 |
0 |
2 |
0 |
40.41(f) |
Notification of a voluntary or involuntary petition for bankruptcy |
0 |
1 |
0 |
1 |
0 |
40.42(d) |
Notification of ceasing activities due to expiration of license or not conducting activities for 24 months |
1 |
1 |
1 |
8 |
8 |
40.42(f) |
Request to delay or postpone decommissioning process |
1 |
1 |
1 |
40 |
40 |
40.42(g)(2) |
Request for alternate schedule for decomissioning |
1 |
3 |
3 |
40 |
120 |
40.42(j)(2) |
Radiation survey |
0 |
1 |
0 |
100 |
0 |
40.46(b) |
Application for transfer of license |
1 |
1 |
1 |
0.5 |
0.5 |
40.60(a) |
Report within 4 hours the discovery of an event that prevents immediate protective actions necessary to avoid exposures to radiation or radioactive materials that could exceed regulatory limits |
0 |
1 |
0 |
4 |
0 |
40.60(b) |
Notification within 24 hours of unplanned contamination event, equipment failure, the discovery of an event that prevents immediate protective actions necessary to avoid exposures to radiation or radioactive materials that could exceed regulatory limits, or unplanned fire or explosion |
1 |
1 |
1 |
4 |
4 |
40.60(c)(2) |
Event notification by telephone |
0 |
1 |
0 |
4 |
0 |
40.65 |
Effluent monitoring reports |
1 |
2 |
2 |
15 |
30 |
Appendix A and 40.31(h) |
Submittal by mill operators of definitive programs meeting specified criteria in five major categories |
0 |
0 |
0 |
0 |
0 |
Criterion 5A(3) |
Exemption request for placing a liner to prevent migration of wastes |
0 |
1 |
0 |
10 |
0 |
Criterion 5D |
Submittal of proposed corrective action program and supporting rationale for exceeding ground water protection standards under Criterion 5b(1) |
1 |
1 |
1 |
5 |
5 |
Criterion 5G [includes 40.26(d)] |
Information in support of applicant's tailings disposal system |
1 |
1 |
1 |
20 |
20 |
Criterion 5H |
Steps taken during stockpiling of ore to minimize penetration of radionuclides into underlying soils |
0 |
1 |
0 |
1 |
0 |
Criterion 6(4) |
90-day report of verification of effectiveness of final radon barrier over uranium mill tailings in controlling radon emissions |
0 |
1 |
0 |
5 |
0 |
Criterion 6A |
Reclamation plan for impoundments containing uranium byproduct materials |
0 |
1 |
0 |
20 |
0 |
Criterion 8 |
Notification of cessations, corrective actions, and restarts of yellowcake stack emission control equipment operation |
1 |
1 |
1 |
10 |
10 |
Criterion 8A |
Records of daily inspections of tailings or waste retention systems |
1 |
1 |
1 |
5 |
5 |
Criterion 9(b) |
Financial assurance arrangements for decontamination and decommissioning |
1 |
3 |
3 |
20 |
60 |
Criterion 12 |
90-day report of results of annual inspections of all sites under licensee's jurisdiction |
1 |
1 |
1 |
20 |
20 |
Subtotal |
|
3 |
|
17 |
|
322.5 |
Uranium Recovery Decommissioning Program |
40.9(b) |
Notification to the Commission of information with significant implication for public health and safety or common defense and security |
2 |
1 |
2 |
1 |
2 |
40.14 |
Exemption request |
2 |
1 |
2 |
1 |
2 |
40.25(d)(4) |
30-day report of transfer of depleted uranium under 40.25 |
0 |
1 |
0 |
1 |
0 |
40.27(c)(3) |
Changes to Long-Term Surveillance Plan (LTSP) by GLs for custody of long-term care of a residual radioactive material disposal site |
0 |
1 |
0 |
8 |
0 |
40.27(c)(5) |
Significant construction, actions, or repairs related to the disposal site by GLs for custody of long-term care of a residual radioactive material disposal site |
0 |
1 |
0 |
2 |
0 |
40.28(c)(3) |
Changes to LTSP by GLs for custody of long-term care of uranium or thorium product material disposal site |
0 |
1 |
0 |
8 |
0 |
40.28(c)(5) |
Significant construction, actions, or repairs related to the disposal site by GLs for custody of long-term care of uranium or thorium product material disposal site |
0 |
1 |
0 |
2 |
0 |
40.31(I) (Burden included under 40.36) |
Applicant's provision for liability insurance |
0 |
0 |
0 |
0 |
0 |
40.35(f) |
Submittal of emergency plan under 40.31 within 6 months for any change to the plan which decreases effectiveness of plan |
0 |
1 |
0 |
80 |
0 |
40.36(a)&(b) DFPs |
DFP for licensees with more than 100 mCi of source mateiral in readily dispersible form; DFP for licensees between 10 mCi and 100 mCi or source material in readily dispersible form |
0 |
1 |
0 |
160 |
0 |
40.36(c)(1)&(2) |
FA for decommissioning (before 7/27/1990); DFP & FA for decommissioning (after 7/27/1990) |
5 |
1 |
5 |
4 |
20 |
40.36(c)(5) |
Submittal of DFP if surveys under 20.1501(a) would prevent site from meeting 20.1402 (for licensees switching from cert. to DFP) |
0 |
1 |
0 |
40 |
0 |
40.36(c)(5) |
Licensees amending DFPs |
0 |
1 |
0 |
16 |
0 |
40.36(d) |
Updates to cost estimates for decommissioning |
5 |
1 |
5 |
8 |
40 |
40.36(e) Certification |
Acceptable methods for providing FA through cert or funding plan |
0 |
1 |
0 |
40 |
0 |
40.41(f) |
Notification of bankruptcy under Title 11 |
0 |
1 |
0 |
1 |
0 |
40.42(d) |
60-day notification to being decommissioning site or 12-month notification of decommissioning plan |
0 |
1 |
0 |
8 |
0 |
40.42(e)(2) |
Reduction of FA |
0 |
1 |
0 |
40 |
0 |
40.42(f) |
Request to delay or postpone initiation of decommissioning process |
0 |
1 |
0 |
40 |
0 |
40.42(g)(1) |
Submittal of DFP if required by license condition or if decommissioning procedures not previously approved by NRC |
0 |
1 |
0 |
1,000 |
0 |
40.42(g)(2) |
Request for approval of an alternate schedule for submittal of a decommissioning plan |
0 |
1 |
0 |
40 |
0 |
40.42(j)(2) |
Submittal of report on results of radiation surveys of premises where activities were carried out |
5 |
1 |
5 |
100 |
500 |
40.46(b) |
Submittal of identity, technical and financial qualifications of the proposed transferee, and the information on financial assurance for decommissioning required by 10 CFR 40.36 or Appendix A |
0 |
1 |
0 |
0.5 |
0 |
40.60(a) |
4-hour notification of of events or conditions that threaten the health and safety of individuals using licensed material or that prevent the performance of surveys or other safety-related duties |
0 |
1 |
0 |
1 |
0 |
40.60(b) |
24-hour notification of unplanned contamination event; event where equipment is disabled or failed to function as designed; events requiring unplanned medical treatment of contaminated individual; unplanned fires or explosions of devices/containers/equipment containing licensed material |
0 |
1 |
0 |
4 |
0 |
40.60(c)(2) |
Event notification by telephone |
0 |
1 |
0 |
1 |
0 |
Subtotal |
|
5 |
|
19.0 |
|
564.0 |
Fuel Cycle Program |
40.9(b) |
Notification to the Commission of information with significant implication for public health and safety or common defense and security |
0 |
1 |
0 |
1 |
0 |
40.14 |
Exemption request |
0 |
1 |
0 |
1 |
0 |
40.23 |
DFP or Certification of FA for DFP under 40.36 |
0 |
1 |
0 |
2 |
0 |
40.31(j)(1)& (3)(viii) |
Emergency plans & maximum intake evaluations for UF6 possession applications |
1 |
1 |
1 |
160 |
160 |
40.35(f) |
Submittal of emergency plan under 40.31 within 6 months for any change to the plan which decreases effectiveness of plan |
0 |
1 |
0 |
80 |
0 |
40.36(a)&(b) |
DFP for licensees with more than 100 mCi of source mateiral in readily dispersible form; DFP for licensees between 10 mCi and 100 mCi or source material in readily dispersible form |
0 |
1 |
0 |
160 |
0 |
40.36(c)(1)&(2) |
FA for decommissioning (before 7/27/1990); DFP & FA for decommissioning (after 7/27/1990) |
0 |
1 |
0 |
4 |
0 |
40.36(c)(5) |
Submittal of DFP if surveys under 20.1501(a) would prevent site from meeting 20.1402 (for licensees switching from cert. to DFP) |
0 |
1 |
0 |
40 |
0 |
40.36(c)(5) |
Licensees amending DFPs |
0 |
1 |
0 |
16 |
0 |
40.36(d) |
Updates to cost estimates for decommissioning |
0 |
1 |
0 |
8 |
0 |
40.36( e) |
Acceptable methods for providing FA through cert or funding plan |
0 |
1 |
0 |
40 |
0 |
40.41(f) |
Notification of bankruptcy under Title 11 |
0 |
1 |
0 |
1 |
0 |
40.42(g)(2) |
Request for approval of an alternate schedule for submittal of a decommissioning plan |
0 |
1 |
0 |
40 |
0 |
40.42(j)(2) |
Submittal of report on results of radiation surveys of premises where activities were carried out |
0 |
1 |
0 |
100 |
0 |
40.46(b) |
Submittal of identity, technical and financial qualifications of the proposed transferee, and the information on financial assurance for decommissioning required by 10 CFR 40.36 or Appendix A |
2 |
1 |
2 |
0.5 |
1 |
40.60(a) |
4-hour notification of of events or conditions that threaten the health and safety of individuals using licensed material or that prevent the performance of surveys or other safety-related duties |
0 |
1 |
0 |
4 |
0 |
40.60(b) |
24-hour notification of unplanned contamination event; event where equipment is disabled or failed to function as designed; events requiring unplanned medical treatment of contaminated individual; unplanned fires or explosions of devices/containers/equipment containing licensed material |
1 |
4 |
4 |
4 |
16 |
40.60(c)(2) |
Event notification by telephone |
0 |
1 |
0 |
1 |
0 |
40.64(b) |
Yearly statement of foreign origin source material inventory for licensee's possessing more than 1000 kg of uranium/thorium/combination of both |
0 |
1 |
0 |
2 |
0 |
40.64(c) |
Notifications of theft to NRC/HOO and follow-up notifications |
0 |
1 |
0 |
2.5 |
0 |
40.65 |
Semiannual reports of quantities of radioactive materials released to unrestricted areas (for source material in uranium milling, UF6 production, uranium enrichment facility) |
0 |
1 |
0 |
15 |
0 |
40.66 (Burden included in 40.23, above) |
Notification of export of natural uranium other than ore/ore residue |
0 |
1 |
0 |
|
0 |
Subtotal |
|
2 |
|
7 |
|
177 |
Materials Program |
40.9(b) |
Notification to the Commission of information with significant implication for public health and safety or common defense and security |
1 |
1 |
1 |
1 |
1 |
40.13(a) |
Voluntary notification of transfer of source material (less than 0.05% by weight) to persons exempt from licensing |
2 |
1 |
2 |
100 |
200 |
40.14 |
Exemption request |
0 |
1 |
0 |
1 |
0 |
40.22(b)(4) |
Response to NRC written request by GLs |
4 |
1 |
4 |
1 |
4 |
40.22(c) |
Notification of significant contamination identified by GL when activities permanently ceased |
0 |
1 |
0 |
20 |
0 |
40.23, 40.66, & 40.67 |
GL report of transient shipment; Advanced notifications of import/export of natural uranium; |
0 |
1 |
0 |
1 |
0 |
40.25(d)(4) |
30-day report of transfer of depleted uranium under 40.25 |
1 |
1 |
1 |
1 |
1 |
40.31(i) [included in 40.36] |
Applicant's provision for liability insurance |
0 |
1 |
0 |
1 |
0 |
40.35(b) |
Labeling requirement for devices containing DU |
0 |
1 |
0 |
0.5 |
0 |
40.35(e) |
Transfer reports of industrial product & devices containing DU |
0 |
1 |
0 |
0.75 |
0 |
40.35(f) |
Submittal of emergency plan under 40.31 within 6 months for any change to the plan which decreases effectiveness of plan |
0 |
1 |
0 |
80 |
0 |
40.36 |
Submittals of DFPs and FA |
30 |
1 |
30 |
1 |
30 |
40.41(f) |
Notification of bankruptcy under Title 11 |
1 |
1 |
1 |
1 |
1 |
40.42(d) |
60-day notification to being decommissioning site or 12-month notification of decommissioning plan |
1 |
1 |
1 |
8 |
8 |
40.42(e) |
Reduction of FA |
0 |
1 |
0 |
40 |
0 |
40.42(f) |
Request to delay or postpone initiation of decommissioning process |
0 |
1 |
0 |
40 |
0 |
40.42(g)(1) |
Submittal of DFP if required by license condition or if decommissioning procedures not previously approved by NRC |
0 |
3 |
0 |
1,000 |
0 |
40.42(g)(2) |
Request for approval of an alternate schedule for submittal of a decommissioning plan |
1 |
1 |
1 |
40 |
40 |
40.42(j)(2) |
Submittal of report on results of radiation surveys of premises where activities were carried out |
6 |
1 |
6 |
100 |
600 |
40.46(b) |
Submittal of identity, technical and financial qualifications of the proposed transferee, and the information on financial assurance for decommissioning required by 10 CFR 40.36 or Appendix A |
3 |
1 |
3 |
0.5 |
1.5 |
40.53(c) |
Exempt distribution reports |
15 |
1 |
15 |
0.5 |
7.5 |
40.55(d)(1) |
Source material transfers to 40.22 GLs |
0 |
1 |
0 |
0.6 |
0 |
40.55(d)(2) |
Source material transfers to 40.22 GLs |
0 |
5 |
0 |
0.3 |
0 |
40.60(a) |
4-hour notification of of events or conditions that threaten the health and safety of individuals using licensed material or that prevent the performance of surveys or other safety-related duties |
2 |
1 |
2 |
4 |
8 |
40.60(b) |
24-hour notification of unplanned contamination event; event where equipment is disabled or failed to function as designed; events requiring unplanned medical treatment of contaminated individual; unplanned fires or explosions of devices/containers/equipment containing licensed material |
3 |
1 |
3 |
4 |
12 |
40.60(c)(2) |
Submittal of telephone reports under 40.60(a) and 40.60(b) |
2 |
1 |
2 |
1 |
2 |
40.64(b) |
Yearly statement of foreign origin source material inventory for licensee's possessing more than 1000 kg of uranium/thorium/combination of both |
0 |
1 |
0 |
2 |
0 |
40.64(c) |
Notifications of theft to NRC/HOO and follow-up notifications |
0 |
1 |
0 |
2.5 |
0 |
Subtotal |
|
72 |
|
72 |
|
916 |
|
|
|
|
|
|
|
TOTAL |
|
82 |
|
115.0 |
|
1979.5 |
Section |
Description |
AS licensee respondents |
Responses per Respondent |
Responses |
Burden per Response |
Total Annual Burden Hours |
Uranium Recovery Active Program |
40.9(b) |
Notification to regulatory authority of information with significant implication for public health and safety or common defense and security |
17 |
1 |
17 |
1 |
17 |
40.14 |
Exemption request |
0 |
1 |
0 |
1 |
0 |
40.26(c)(2) |
Notification of of any failure in a tailings or waste retention system |
17 |
1 |
17 |
2 |
34 |
40.27(c)(3) |
Changes to Long-Term Surveillance Plan (LTSP) by GLs for custody of long-term care of a residual radioactive material disposal site |
0 |
1 |
0 |
8 |
0 |
40.27(c)(5) |
Significant construction, actions, or repairs related to the disposal site by GLs for custody of long-term care of a residual radioactive material disposal site |
0 |
1 |
0 |
2 |
0 |
40.28(c)(3) |
Changes to LTSP by GLs for custody of long-term care of uranium or thorium product material disposal site |
0 |
1 |
0 |
8 |
0 |
40.28(c)(5) |
Significant construction, actions, or repairs related to the disposal site by GLs for custody of long-term care of uranium or thorium product material disposal site |
0 |
1 |
0 |
2 |
0 |
40.41(f) |
Notification of a voluntary or involuntary petition for bankruptcy |
0 |
1 |
0 |
1 |
0 |
40.42(d) |
Notification of ceasing activities due to expiration of license or not conducting activities for 24 months |
2 |
1 |
2 |
8 |
16 |
40.42(f) |
Request to delay or postpone initiation of decommissioning process |
17 |
1 |
17 |
40 |
680 |
40.42(g)(2) |
Request for approval of an alternate schedule for submittal of a decommissioning plan |
2 |
1 |
2 |
100 |
200 |
40.42(j)(2) |
Submittal of report on results of radiation surveys of premises where activities were carried out |
0 |
1 |
0 |
100 |
0 |
40.46(b) |
Submittal of identity, technical and financial qualifications of the proposed transferee, and the information on financial assurance for decommissioning required by 10 CFR 40.36 or Appendix A |
0 |
1 |
0 |
0.5 |
0 |
40.60(a) |
4-hour notification of of events or conditions that threaten the health and safety of individuals using licensed material or that prevent the performance of surveys or other safety-related duties |
8 |
1 |
8 |
4 |
32 |
40.60(b) |
24-hour notification of unplanned contamination event; event where equipment is disabled or failed to function as designed; events requiring unplanned medical treatment of contaminated individual; unplanned fires or explosions of devices/containers/equipment containing licensed material |
8 |
1 |
8 |
4 |
32 |
40.60(c)(2) |
Event notification by telephone |
8 |
1 |
8 |
4 |
32 |
40.65 |
Semiannual reports of quantities of radioactive materials released to unrestricted areas (for source material in uranium milling, UF6 production, uranium enrichment facility) |
17 |
1 |
17 |
15 |
255 |
Appendix A and 40.31(h) |
Submittal by mill operators of definitive programs meeting specified criteria in five major categories |
0 |
1 |
0 |
100 |
0 |
Criterion 5A(3) |
Exemption request for placing a liner to prevent migration of wastes |
17 |
1 |
17 |
10 |
170 |
Criterion 5D |
Submittal of proposed corrective action program and supporting rationale for exceeding ground water protection standards under Criterion 5b(1) |
17 |
1 |
17 |
5 |
85 |
Criterion 5G [includes 40.26(d)] |
Information in support of applicant's tailings disposal system |
1 |
1 |
1 |
20 |
20 |
Criterion 6(4) |
90-day report of verification of effectiveness of final radon barrier over uranium mill tailings in controlling radon emissions |
1 |
1 |
1 |
5 |
5 |
Criterion 6A |
Reclamation plan for impoundments containing uranium byproduct materials |
1 |
1 |
1 |
20 |
20 |
Criterion 8 |
Notification of cessations, corrective actions, and restarts of yellowcake stack emission control equipment operation |
17 |
1 |
17 |
10 |
170 |
Criterion 8A |
Records of daily inspections of tailings or waste retention systems |
17 |
1 |
17 |
5 |
85 |
Criterion 9(b) |
Financial assurance arrangements for decontamination and decommissioning |
17 |
1 |
17 |
20 |
340 |
Criterion 12 |
90-day report of results of annual inspections of all sites under licensee's jurisdiction |
1 |
1 |
1 |
20 |
20 |
Subtotal |
|
17 |
|
185 |
|
2213 |
Uranium Recovery Decommissioning Program |
40.9(b) |
Notification to regulatory authority of information with significant implication for public health and safety or common defense and security |
0 |
1 |
0 |
1 |
0 |
40.14 |
Exemption request |
0 |
1 |
0 |
1 |
0 |
40.25(d)(4) |
30-day report of transfer of depleted uranium under 40.25 |
0 |
1 |
0 |
0.5 |
0 |
40.28(c)(5) |
Significant construction, actions, or repairs related to the disposal site by GLs for custody of long-term care of uranium or thorium product material disposal site |
4 |
1 |
4 |
2 |
8 |
40.35(f) |
Submittal of emergency plan under 40.31 within 6 months for any change to the plan which decreases effectiveness of plan |
0 |
1 |
0 |
80 |
0 |
40.36(a)&(b) DFPs, and 40.31(i) |
DFP for licensees with more than 100 mCi of source mateiral in readily dispersible form; DFP for licensees between 10 mCi and 100 mCi or source material in readily dispersible form |
2 |
1 |
2 |
160 |
320 |
40.36(c)(1)&(2), one time only |
FA for decommissioning (before 7/27/1990); DFP & FA for decommissioning (after 7/27/1990) |
3 |
1 |
3 |
4 |
12 |
40.36(c)(5) Licensees switching from cert. to DFP |
Submittal of DFP if surveys under 20.1501(a) would prevent site from meeting 20.1402 (for licensees switching from cert. to DFP) |
0 |
1 |
0 |
40 |
0 |
40.36(c)(5) Licensees amending DFPs |
Licensees amending DFPs |
2 |
1 |
2 |
16 |
32 |
40.36(d), once every three years |
Updates to cost estimates for decommissioning |
4 |
1 |
4 |
8 |
32 |
40.36(e) Certification |
Acceptable methods for providing FA through cert or funding plan |
2 |
1 |
2 |
40 |
80 |
40.41(f) |
Notification of bankruptcy under Title 11 |
0 |
1 |
0 |
1 |
0 |
40.42(d) |
60-day notification to being decommissioning site or 12-month notification of decommissioning plan |
0 |
1 |
0 |
8 |
0 |
40.42(e)(2) |
Reduction of FA |
3 |
1 |
3 |
40 |
120 |
40.42(f) |
Request to delay or postpone initiation of decommissioning process |
0 |
1 |
0 |
40 |
0 |
40.42(g)(1) |
Submittal of DFP if required by license condition or if decommissioning procedures not previously approved by NRC |
0 |
1 |
0 |
1,000 |
0 |
40.42(g)(2) |
Request for approval of an alternate schedule for submittal of a decommissioning plan |
0 |
1 |
0 |
40 |
0 |
40.42(j)(2) |
Submittal of report on results of radiation surveys of premises where activities were carried out |
4 |
1 |
4 |
100 |
400 |
40.46(b) |
Submittal of identity, technical and financial qualifications of the proposed transferee, and the information on financial assurance for decommissioning required by 10 CFR 40.36 or Appendix A |
4 |
1 |
4 |
0.5 |
2 |
40.60(a) |
4-hour notification of of events or conditions that threaten the health and safety of individuals using licensed material or that prevent the performance of surveys or other safety-related duties |
0 |
1 |
0 |
4 |
0 |
40.60(b) |
24-hour notification of unplanned contamination event; event where equipment is disabled or failed to function as designed; events requiring unplanned medical treatment of contaminated individual; unplanned fires or explosions of devices/containers/equipment containing licensed material |
1 |
1 |
1 |
15 |
15 |
40.60(c)(2) |
Event notification by telephone |
0 |
1 |
0 |
40 |
0 |
Subtotal |
|
14 |
|
29.0 |
|
1021.0 |
Materials Program |
40.9(b) |
Notification to regulatory authority of information with significant implication for public health and safety or common defense and security |
7 |
1 |
7 |
1 |
7 |
40.13(a) |
Voluntary notification of transfer of source material (less than 0.05% by weight) to persons exempt from licensing |
13 |
1 |
13 |
100 |
1300 |
40.14 |
Exemption request |
0 |
1 |
0 |
1 |
0 |
40.22(b)(4) |
Response to NRC written request by GLs |
26 |
1 |
26 |
1 |
26 |
40.22(c) |
Notification of significant contamination identified by GL when activities permanently ceased |
3 |
1 |
3 |
20 |
60 |
40.25(d)(4) |
30-day report of transfer of depleted uranium under 40.25 |
7 |
1 |
7 |
0.5 |
3.5 |
40.35(b) |
Labeling requirement for devices containing DU |
2 |
1 |
2 |
0.5 |
1 |
40.35(e) |
Transfer reports of industrial product & devices containing DU |
2 |
1 |
2 |
0.75 |
1.5 |
40.35(f) |
Submittal of emergency plan under 40.31 within 6 months for any change to the plan which decreases effectiveness of plan |
0 |
1 |
0 |
80 |
0 |
40.36 |
Submittals of DFPs and FA |
195 |
1 |
195 |
1 |
195 |
40.41(f) |
Notification of bankruptcy under Title 11 |
7 |
1 |
7 |
1 |
7 |
40.42(d) |
60-day notification to being decommissioning site or 12-month notification of decommissioning plan |
7 |
1 |
7 |
8 |
56 |
40.42(e)(2) |
Reduction of FA |
0 |
1 |
0 |
40 |
0 |
40.42(f) |
Request to delay or postpone initiation of decommissioning process |
0 |
1 |
0 |
40 |
0 |
40.42(g)(1) |
Submittal of DFP if required by license condition or if decommissioning procedures not previously approved by NRC |
0 |
1 |
0 |
1,000 |
0 |
40.42(g)(2) |
Request for approval of an alternate schedule for submittal of a decommissioning plan |
7 |
1 |
7 |
40 |
280 |
40.42(j)(2) |
Submittal of report on results of radiation surveys of premises where activities were carried out |
39 |
1 |
39 |
100 |
3900 |
40.46(b) |
Submittal of identity, technical and financial qualifications of the proposed transferee, and the information on financial assurance for decommissioning required by 10 CFR 40.36 or Appendix A |
20 |
1 |
20 |
0.5 |
10 |
40.55(d)(1) |
Source material transfers to 40.22 GLs |
0 |
1 |
0 |
0.6 |
0 |
40.55(d)(2) |
Source material transfers to 40.22 GLs |
0 |
5 |
0 |
0.3 |
0 |
40.60(a) |
4-hour notification of of events or conditions that threaten the health and safety of individuals using licensed material or that prevent the performance of surveys or other safety-related duties |
13 |
1 |
13 |
4 |
52 |
40.60(b) |
24-hour notification of unplanned contamination event; event where equipment is disabled or failed to function as designed; events requiring unplanned medical treatment of contaminated individual; unplanned fires or explosions of devices/containers/equipment containing licensed material |
20 |
3 |
60 |
4 |
240 |
40.60(c)(2) |
Submittal of telephone reports under 40.60(a) and 40.60(b) |
13 |
1 |
13 |
1 |
13 |
Subtotal |
|
381 |
|
421 |
|
6152 |
|
|
|
|
|
|
|
TOTAL |
|
412 |
|
635.0 |
|
9386.0 |
Section |
Description |
NRC Licensee recordkeepers |
Hours per Recordkeeper |
Total Annual Burden Hours |
Uranium Active Recovery Program |
40.26(c)(2) |
Daily tailings or waste retention system inspections (3 years after inspection is conducted) |
3 |
4.3 |
12.9 |
40.51(c)&(d) |
(Until license termination) |
3 |
4.5 |
13.5 |
40.61(a)&(b) |
Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination |
3 |
5.1 |
15.3 |
40.61(d) |
Forwarding records of unsealed source material to Regional Office prior to license termination |
3 |
3.2 |
9.6 |
40.61(e) |
Forwarding records of unsealed source material to new licensee prior to license transfer |
3 |
2 |
6 |
40.61(f) |
Forwarding FA records to Regional Office prior to license termination |
3 |
6.4 |
19.2 |
Appendix A |
Records relating to operation of uranium mills & disposition of tailings or wastes (until license termination) |
3 |
96 |
288 |
Subtotal |
|
3 |
|
364.5 |
Uranium Recovery Decommissioning Program |
40.36(f) |
Records maintained until site released for unrestricted use |
5 |
12.2 |
61 |
40.51(c)&(d) |
(Until license termination) |
5 |
4.5 |
22.5 |
40.61(a)&(b) |
Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination |
5 |
5.1 |
25.5 |
40.61(d) |
Forwarding records of unsealed source material to Regional Office prior to license termination |
5 |
3.2 |
16 |
40.61(e) |
Forwarding records of unsealed source material to new licensee prior to license transfer |
5 |
2 |
10 |
40.61(f) |
Forwarding FA records to Regional Office prior to license termination |
5 |
6.4 |
32 |
Subtotal |
|
5 |
|
167 |
Fuel Cycle Program |
40.51(c)&(d) |
(Until license termination) |
2 |
4.5 |
9 |
40.61(a)&(b) |
Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination |
2 |
5.1 |
10.2 |
40.61(d) |
Forwarding records of unsealed source material to Regional Office prior to license termination |
2 |
3.2 |
6.4 |
40.61(e) |
Forwarding records of unsealed source material to new licensee prior to license transfer |
2 |
2 |
4 |
40.61(f) |
Forwarding FA records to Regional Office prior to license termination |
2 |
6.4 |
12.8 |
Subtotal |
|
2 |
|
42.4 |
Materials Program |
40.35(e)(3) |
3 year retention for reports under 40.35( e) |
0 |
0.3 |
0 |
40.51(c)&(d) |
(Until license termination) |
79 |
1.5 |
118.5 |
40.53(c)(6) |
1 year retention for exempt distribution reports |
15 |
4 |
60 |
40.55(e) |
Record retained for 1 year after event included in report to NRC or Agreement State |
0 |
4 |
0 |
40.61(a)&(b) |
Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination |
79 |
1 |
79 |
40.61(d) |
Forwarding records of unsealed source material to Regional Office prior to license termination |
0 |
3.2 |
0 |
40.61(e) |
Forwarding records of unsealed source material to new licensee prior to license transfer |
0 |
2 |
0 |
40.61(f) |
Forwarding FA records to Regional Office prior to license termination |
79 |
1.5 |
118.5 |
Subtotal |
|
79 |
|
376 |
|
|
|
|
|
TOTAL |
|
89 |
|
949.9 |
Section |
Description |
AS Licensee recordkeepers |
Hours per Recordkeeper |
Total Annual Burden Hours |
Uranium Active Recovery Program |
40.26(c)(2) |
Daily tailings or waste retention system inspections (3 years after inspection is conducted) |
17 |
4.3 |
73.1 |
40.51(c)&(d) |
(Until license termination) |
17 |
4.5 |
76.5 |
40.61(a)&(b) |
Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination |
17 |
5.1 |
86.7 |
40.61(d) |
Forwarding records of unsealed source material to Regional Office prior to license termination |
17 |
3.2 |
54.4 |
40.61(e) |
Forwarding records of unsealed source material to new licensee prior to license transfer |
17 |
2 |
34.0 |
40.61(f) |
Forwarding FA records to Regional Office prior to license termination |
17 |
6.4 |
108.8 |
Appendix A |
Records relating to operation of uranium mills & disposition of tailings or wastes (until license termination) |
17 |
96 |
1632.0 |
Subtotal |
|
17 |
|
2065.5 |
Uranium Recovery Decommissioning Program |
40.36(f) |
Records maintained until site released for unrestricted use |
14 |
12.3 |
172.2 |
40.51(c)&(d) |
(Until license termination) |
14 |
4.5 |
63 |
40.61(a)&(b) |
Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination |
14 |
5.1 |
71.4 |
40.61(d) |
Forwarding records of unsealed source material to Regional Office prior to license termination |
14 |
3.2 |
44.8 |
40.61(e) |
Forwarding records of unsealed source material to new licensee prior to license transfer |
14 |
2 |
28 |
40.61(f) |
Forwarding FA records to Regional Office prior to license termination |
14 |
6.4 |
89.6 |
Subtotal |
|
14 |
|
469 |
Materials Program |
40.35(e)(3) |
3 year retention for reports under 40.35( e) |
0 |
0.3 |
0 |
40.51(c)&(d) |
(Until license termination) |
514 |
1.5 |
771 |
40.55 (e) |
Record retained for 1 year after event included in report to NRC or Agreement State |
1 |
4 |
4 |
40.61(a)&(b) |
Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination |
514 |
1 |
514 |
40.61(d) |
Forwarding records of unsealed source material to Regional Office prior to license termination |
0 |
3.2 |
0 |
40.61(e) |
Forwarding records of unsealed source material to new licensee prior to license transfer |
0 |
2 |
0 |
40.61(f) |
Forwarding FA records to Regional Office prior to license termination |
514 |
1.5 |
771 |
Subtotal |
|
514 |
|
2060 |
|
|
|
|
|
TOTAL |
|
545 |
|