NESHAP for Integrated Iron and Steel Manufacturing (40 CFR Part 63, Subpart FFFFF)(Renewal)

ICR 201903-2060-009

OMB: 2060-0517

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2019-03-08
Supporting Statement A
2019-03-08
IC Document Collections
ICR Details
2060-0517 201903-2060-009
Active 201510-2060-001
EPA/OAR 2003.07
NESHAP for Integrated Iron and Steel Manufacturing (40 CFR Part 63, Subpart FFFFF)(Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 04/15/2019
Retrieve Notice of Action (NOA) 03/15/2019
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
04/30/2022 36 Months From Approved 04/30/2019
30 0 44
11,800 0 18,500
52,700 0 67,000

The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Integrated Iron and Steel Manufacturing Facilities (40 CFR Part 63, Subpart FFFFF)apply to new and existing sinter plants, blast furnaces, and basic oxygen process furnace shops at integrated iron and steel manufacturing facilities that are major sources of hazardous air pollutants (HAPs) or are co-located at major sources. New facilities include those that commenced either construction or reconstruction after the date of proposal. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP. This information is being collected to assure compliance with 40 CFR Part 63, Subpart FFFFF.

US Code: 44 USC 3501 et.seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  83 FR 24785 05/30/2018
84 FR 9517 03/15/2019
No

1
IC Title Form No. Form Name
NESHAP for Integrated Iron and Steel Manufacturing (40 CFR Part 63, Subpart FFFFF)(Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 30 44 0 0 -14 0
Annual Time Burden (Hours) 11,800 18,500 0 0 -6,700 0
Annual Cost Burden (Dollars) 52,700 67,000 0 0 -14,300 0
No
No
There is a decrease in burden from the most-recently approved ICR. The decrease in burden is due to a decrease in the number of respondents due to more accurate estimates of existing and anticipated new sources. The decrease in the number of sources also results in a decrease in the operation and maintenance costs. The overall result is a decrease in burden hours and costs.

$16,000
No
    No
    No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
03/15/2019