Download:
pdf |
pdfOMB Control No. 2060-0328
Expires 03/31/2019
Company Information
Partner Address Label Here
Implementation
Plan
If the information provided above is incorrect,
please make corrections below.
Production
Sector
Company Name:
________________________
Gas Star Contact:
________________________
Position:
________________________
Address:
________________________
City, State, Zip Code:
________________________
Telephone:
________________________
Fax:
________________________
Email:
________________________
Implementation Plan Elements
ELEMENT 1
Best Management Practices (BMPs)
The following BMPs have been identified as significant opportunities to cost effectively reduce methane emissions from
the production sector. They were selected based on their applicability to the industry, economic feasibility, and costeffectiveness. There are two core BMPs for the production sector:
BMP 1
BMP 2
Identify and replace high-bleed pneumatic devices
Install flash tank separators on glycol dehydrators
For detailed information on these BMPs, please refer to the Lessons Learned publications on the Natural Gas STAR
website: https://www.epa.gov/natural-gas-star-program/recommended-technologies-reduce-methane-emissions.
ELEMENT 2
Additional Activities
Current partners have reported many processes and technologies that are considered additional Best Management
Practices by the program. New partners are encouraged to evaluate and report current and new practices or
technologies that cost effectively reduce methane emissions
ELEMENT 3
Inventory Past Reductions
Partners are encouraged to report past methane emission reductions back to 1990. Accounting for these historical
reductions will create a permanent record of your company's methane emission reduction efforts. In addition, reviewing
past activities will help guide companies' participation in Natural Gas STAR by creating a base of understanding of
current activities to facilitate planning of future activities.
The Implementation Plan is designed to be a dynamic tool for Natural Gas STAR Partners to plan their program activities. As
company priorities and plans shift over time, the Implementation Plan may be revised or updated by submitting a new form to the
program. The Partner should only share non-Confidential Business Information (CBI) to fulfill Gas STAR Program requirements.
EPA Form No. 5900-103
OMB Control No. 2060-0328
Expires 03/31/2019
ELEMENT 1
Best Management Practices
BMP 1
Identify and Replace High-Bleed Pneumatic Devices
Pneumatic devices used to control and monitor gas and liquid flows and levels in
dehydrators and separators, temperature in dehydrator regenerators, and pressure in
flash tanks emit large amounts of methane into the atmosphere. Replacing these with
low- or no-bleed devices reduces or eliminates emissions and improves safety.
Will you be implementing this BMP?
Yes
If no, why?
Not cost effective
May consider at a later date
Other ________________________
Please describe: ________________________
Estimated Reduction
Potential
124 Mcf/year/device
No
If yes, at what scale will you be implementing this BMP?
Company Wide
Pilot Project
Other
Please describe: ________________________
Activity Summary
Number of high-bleed pneumatic devices in system?
________________________
Number of high-bleed pneumatic devices to be replaced?
________________________
Replacement Schedule
Number of high-bleed pneumatic devices to be replaced by the end of:
Year 1:
Year 2:
Year 3:
Year 4:
Additional Information on Anticipated Plans and Projects
If additional space is needed, please continue on the back.
OMB Control No. 2060-0328
Expires 03/31/2019
BMP 2
Install Flash Tank Separators on Glycol Dehydrators
Installing a flash tank separator in a glycol dehydrator facilitates the removal of
methane and natural gas liquids from the glycol stream. The recovered gas can
be put back into the pipeline, used as a fuel on-site, or flared.
Will you be implementing this BMP?
Yes
If no, why?
Not cost effective
May consider at a later date
Other ________________________
Please describe: ________________________
Estimated Reduction
Potential
170 scf/MMcf of throughput
No
If yes, at what scale will you be implementing this BMP?
Company Wide
Pilot Project
Other ________________________
Please describe: ________________________
Activity Summary
Number of glycol dehydrators currently equipped with flash tank separators
Number of glycol dehydrators suitable for flash tank installation?
Replacement Schedule
Number of flash tank separators to be installed by the end of:
Year 1:
Year 2:
Year 3:
Year 4:
Additional Information on Anticipated Plans and Projects
If additional space is needed, please continue on the back.
OMB Control No. 2060-0328
Expires 03/31/2019
ELEMENT 2
Additional Activities
Additional Activities
Your company may take advantage of additional technologies or practices to reduce methane emissions. The following
is a list of some of the additional activities that have been reported by other Natural Gas STAR partners, which may be
applicable to your operations (for more information on these activities, please view: https://www.epa.gov/natural-gasstar-program/recommended-technologies-reduce-methane-emissions):
Install Vapor Recovery Units (VRUs)
on storage tanks
Artificial lift: Install plunger lifts in gas wells
Reduce venting from unlit pilot:
install electronic safety devices
Additional activities you will be implementing
Activity ________________________
At what scale will this activity be implemented?
Company Wide
Pilot Project
Other ________________________.
Activity ________________________
At what scale will this activity be implemented?
Company Wide
Pilot Project
Other ________________________
Activity ________________________
At what scale will this activity be implemented?
Company Wide
Pilot Project
Other ________________________
Activity ________________________
At what scale will this activity be implemented?
Company Wide
Pilot Project
Other ________________________
Install instrument air systems
Eliminate unnecessary equipment and/or systems
Perform reduced emissions completions
for hydraulically fractured natural gas wells
Please describe
OMB Control No. 2060-0328
Expires 03/31/2019
ELEMENT 3
Inventory Past Reductions
An inventory of past reductions will help to create a permanent record of your past efforts.
As a first step, many new partners find it useful to inventory and document past methane emission reduction
efforts. The inventory process helps companies quantify the success of their past activities and target future
emission reduction efforts. Historical methane emission reductions identified as part of the inventory process can
be reported to the Natural Gas STAR Program.
Will you inventory past activities to include in your annual report?
Yes
No
If yes, please describe your company’s plans for reviewing past methane emission reduction activities.
________________________
The Natural Gas STAR Program thanks you for your time.
Please send completed forms to:
Regular Mail
Natural Gas STAR Program
U.S. EPA (6207J)
1200 Pennsylvania Avenue, NW
Washington, DC 20460
Express/Overnight Mail
Natural Gas STAR Program
1201 Constitution Ave NW
Room Number 4353PP
Washington, DC 20004
Questions? Please call Jerome Blackman at (202) 343-9630, or send an email to [email protected].
The public reporting and recordkeeping burden for this collection of
information is estimated to average 25 hours for each new response and
12 hours for subsequent responses. Send comments on the Agency's
need for this information, the accuracy of the provided burden estimates,
and any suggested methods for minimizing respondent burden, including
through the use of automated collection techniques to the Director,
Collection Strategies Division, U.S. Environmental Protection Agency
(2822T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460.
Include the OMB control number in any correspondence. Do not send
the completed form to this address.
File Type | application/pdf |
File Modified | 0000-00-00 |
File Created | 0000-00-00 |