Document

Calculation Tables

ICR 201904-2060-012 · OMB 2060-0442 · Object 91216201.

Document Viewer [xlsx]

Status: Original and derived artifacts are available for this document.

Download: xlsx | pdf | html

Primary: spreadsheetSource: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
Loading document viewer…

Document Metadata

Record metadata
application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
Calculation Tables
Sean Layton
Calc
2019-03-07
2026-09-22
complete

Extracted Text

Table 1: Annual Respondent Burden and Cost – NSPS for Storage Vessels for Petroleum Liquids for Which Construction, Reco

Burden Item

1. Applications
2. Surveys and studies
3. Reporting requirements
A. Familiarize with regulatory requirements c
B. Required activities:
i. Monitoring of operations and emissions d

(C)
(B)
Technical
(A)
No. of
person(D)
Technical
occurences
hours per Respondents
person-hours
per
respondent per year a
per occurrence respondent
per year
per year
(C=AxB)
N/A
N/A
1
See 3D

1

1

69

1

4

0.69

1
1
1
1

1
0.5
0.5
1

69
69
69
69

See 3D

C. Gather existing information
See 3D and 4E
D. Write notification
i. Notification of reconstruction/modification
N/A
e
ii. Notification of physical or operational change
4
Subtotal for Reporting Requirements
4. Recordkeeping requirements
A. Familiarize with regulatory requirements c
See 3A
B. Plan activities
See 3E
C. Implement activities
See 3E
D. Develop record system
N/A
E. Time to enter and transmit information:
i. Records of startup, shutdown, or malfunction
1
ii. Record petroleum liquid stored
0.5
iii. Record of storage performance tests
0.5
iv. Record true vapor pressure of liquid stored
1
F. Time to train personnel
N/A
G. Time for audits
N/A
Subtotal for Recordkeeping Requirements
TOTAL ANNUAL BURDEN AND COST (rounded)
f

TOTAL CAPITAL AND O&M COST (rounded) f
GRAND TOTAL (rounded) f

Assumptions:
a
We assume there are approximately 69 sources currently subject to the standard, and that there will be no new sources over the three-year p

This ICR uses the following labor rates: $117.92 for technical, $147.40 for managerial, and $57.02 for clerical labor. These rates are from
Labor, Bureau of Labor Statistics, June 2018, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1
have been increased by 110 percent to account for the benefit packages available to those employed by private industry.
b

c

This ICR assumes all respondents will take 1 hour to familiarize with regulatory requirements.

Monitoring and recordkeeping operations include maintaining records of the petroleum liquid stored, the period of storage, and the maxim
liquid during the respective storage period, unless the affected facility is equipped with a vapor recovery and return or disposal system in acc
40 CFR 60.112, or stores liquid with a Reid vapor pressure of less than 6.9 kPa (1.0 psia), provided the true vapor pressure does not exceed t
d

We assume only one percent of respondents (i.e., 0.01 of 69, or 0.69 respondents) will make physical or operational changes to their tanks
reporting requirements under the standard.
e

f

Figures have been rounded 3 significant figures. Figures may not add exactly due to rounding.

uids for Which Construction, Reconstruction or Modification Commenced After June 11, 1973 and Prior to May 19, 1978 (40 CFR Part 60
117.92
147.4
57.02
(E)
(F)
(G)
Technical Managem
(H)
Clerical
person ent hours
Total Cost
hours per
hours per per year
per year
year
year
(F=Ex0.05
($) b
(G=Ex0.1)
(E=CxD)
)

69

3.45

6.9

$9,038.45

2.76

0.138
83

0.276

$361.54
$9,400

69
34.5
34.5
69

3.45
1.725
1.725
3.45

6.9
3.45
3.45
6.9

$9,038.45
$4,519.22
$4,519.22
$9,038.45

238
321

$27,115
$36,500
$0
$36,500

e no new sources over the three-year period of this ICR.

or clerical labor. These rates are from the United States Department of
y group.” The rates are from column 1, “Total compensation.” The rates
private industry.

the period of storage, and the maximum true vapor pressure of that
y and return or disposal system in accordance with the requirements in
true vapor pressure does not exceed that value.

or operational changes to their tanks in such way that will trigger

May 19, 1978 (40 CFR Part 60, Subpart K) (Renewal)

Table 2: Average Annual EPA Burden and Cost – NSPS for Storage Vessels for Petroleum Liquids for Which Construction, Rec
48.75

Burden Item

(C)
(B)
(E)
(A)
Technical
No. of
Technical
Technical
person(D)
occurences
person
personhours per Respondents
per
hours per
a
hours per
respondent per year
respondent
year
occurrence
per year
per year
(E=CxD)
(C=AxB)

Notification of reconstruction/modification
N/A
c
Notification of physical or operational change
2
TOTAL ANNUAL BURDEN AND COST
(rounded) d

1

2

0.69

1.38
2

Assumptions:
a
We assume there are approximately 69 sources currently subject to the standard, and that there will be no new sources over the three-year p
b
This ICR uses the following labor rates: $48.75 for technical, $65.71 for managerial, and $26.38 for clerical labor. These rates are from th
Management (OPM), 2018 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account f
available to government employees.
c
We assume only one percent of respondents (i.e., 0.01 of 69, or 0.69 respondents) will make physical or operational changes to their tanks
reporting requirements under the standard.
d
Figures have been rounded 3 significant figures. Figures may not add exactly due to rounding.

quids for Which Construction, Reconstruction or Modification Commenced After June 11, 1973 and Prior to May 19, 1978 (40 CFR Part 6
65.71
26.38
(F)
(G)
Management Clerical
(H)
hours per hours per Total Cost
year
year
per year ($) b
(F=Ex0.05) (G=Ex0.1)

0.069
2

0.138

$75.45
$75

be no new sources over the three-year period of this ICR.
clerical labor. These rates are from the Office of Personnel
en increased by 60 percent to account for the benefit packages

l or operational changes to their tanks in such way that will trigger

y 19, 1978 (40 CFR Part 60, Subpart K) (Renewal)