Information Collection Request

30 CFR 250, Subpart D, Oil and Gas Drilling Operations

ICR 201905-1014-005 · OMB 1014-0018 · Active

Forms and Documents

IC Document Collections

Information collection document groups
IC IDCollectionTypeStatusForm
234266 250.427(b) - Proposed remedial actions Unchanged
228138 250.400-490 NTL - USCG Unchanged
228137 250.490(q)(12) - Disposed Water/H2S Unchanged
228135 250.490(q)(9) - Instrument Gas Unchanged
228134 250.490(o)(5) - Drill Pipe Unchanged
228133 250.490(l) - Unplanned H2S releases - Written Unchanged
228132 250.490(l) - Unplanned H2S releases - Oral Unchanged
228131 250.490(j)(7-8) - H2S Detection Unchanged
228130 250.490(h)(2) - H2S Drills Unchanged
228129 250.490(g) - Safety Instructions Unchanged
228128 250.490(f); 418(d) - Contingency Plan for H2S areas Unchanged
228127 250.471(f) - Use of SCCE Unchanged
228126 250.471(e) - SCCE Testing Unchanged
228124 250.471(c); 470(f); 465(a) - Re-evaluation of SCCE Unchanged
228123 250.470(g); 418 - Best Practices Unchanged
228122 250.470(f); 471(c); 418 - SCCE Unchanged
228121 250.470(e); 472; 418 - Relief Rig Plans Unchanged
228120 250.470(d); 418 - Weather & Ice forecasting Unchanged
228119 250.470(c); 418 - Temp. Abandonment Unchanged
228118 250.470(b); 418 - Repair Plans Unchanged
228117 250.470(b); 418 - Transitioning Rig Unchanged
228116 250.470(a); 418 - Environmental Conditions Unchanged
228115 250.463(b) - Field Drilling Rules Unchanged
228114 250.462(e)(1) - Pressure Testing Unchanged
228113 250.462(d) - Re-evaluation Unchanged
228112 250.462(c) - Source Control/Containment Unchanged
228111 250.461(e) - Well Directional Survey/Leaseholder Unchanged
228110 250.461(a-b); NTL - Core Analyses Unchanged
228109 250.461(a-b); NTL - Velocity Profiles Unchanged
228108 250.461(a-b); NTL - Directional/Vertical-Well surveys Unchanged
228106 250.461(a-b); NTL - Well Logs Unchanged
228105 250.458(b) - Fluid & Materials inventory Unchanged
228093 250.456(c), (f) - Varies Calculations Unchanged
228092 250.456(b), (i) - Drilling Fluid results Unchanged
228091 250.452(a), (b) - Real-time monitoring/Alaska Only Unchanged
228090 250.434 - Diverter Actuations Unchanged
228087 250.428(k) - Cement Returns Unchanged
228086 250.428(k) - Maintain Drilling Report Unchanged
228085 250.428(d) - PE Cert. Unchanged
228084 250.428(d) - Immediate Actions Unchanged
228083 250.428(d) - Remedial Actions Unchanged
228081 250.428(c)(3); 428(k); ref in A, D, G - Daily Drilling Reports/Pacific & Alaska Form Unchanged
228080 250.428(c)(3); 428(k); ref in Subparts A, D, G - Weekly Drilling Reports/GOMR Form Unchanged
228079 250.427(a) - Pressure Integrity tests Unchanged
228078 250.423(c)(2) - Test Results Unchanged
228077 250.423(a) - Repair Unchanged
228076 250.421(b) - Alaska Only/cement fill Unchanged
228075 250.420(b)(3) - Alternative Options Unchanged
228074 250.420(b)(3) - Dual Mech. Barrier Unchanged
228073 420(b)(3); 423(b)(7); 465(a), (b)(3); plus various ref in A, D, E, F, G, P, and Q - End of Operations Report Form Unchanged
228072 250.404 - Crown Block Unchanged

ICR Details

Reginfo record details
table that charts list comparision
  Inventory as of this Action Requested Previously Approved
03/31/2021 36 Months From Approved 03/31/2021
63,367 0 63,347
83,528 0 83,488
16,000 0 0





Reginfo record details
51
table that charts list of burden
IC Title Form No. Form Name
250.461(a-b); NTL - Directional/Vertical-Well surveys
250.462(c) - Source Control/Containment
250.462(d) - Re-evaluation
250.462(e)(1) - Pressure Testing
250.463(b) - Field Drilling Rules
250.470(a); 418 - Environmental Conditions
250.470(b); 418 - Transitioning Rig
250.470(b); 418 - Repair Plans
250.470(d); 418 - Weather & Ice forecasting
250.470(e); 472; 418 - Relief Rig Plans
250.470(f); 471(c); 418 - SCCE
250.470(g); 418 - Best Practices
250.490(l) - Unplanned H2S releases - Written
250.461(a-b); NTL - Well Logs
250.470(c); 418 - Temp. Abandonment
250.490(f); 418(d) - Contingency Plan for H2S areas
250.490(l) - Unplanned H2S releases - Oral
250.490(o)(5) - Drill Pipe
250.490(q)(12) - Disposed Water/H2S
250.400-490 NTL - USCG
250.427(b) - Proposed remedial actions
250.421(b) - Alaska Only/cement fill
250.428(c)(3); 428(k); ref in Subparts A, D, G - Weekly Drilling Reports/GOMR BSEE-0133 Well Activity Report
250.428(c)(3); 428(k); ref in A, D, G - Daily Drilling Reports/Pacific & Alaska BSEE-0133S Supplement to the Well Activity Report
250.428(k) - Maintain Drilling Report
250.456(c), (f) - Varies Calculations
250.461(a-b); NTL - Velocity Profiles
250.461(a-b); NTL - Core Analyses
250.461(e) - Well Directional Survey/Leaseholder
250.471(c); 470(f); 465(a) - Re-evaluation of SCCE
250.471(e) - SCCE Testing
250.471(f) - Use of SCCE
250.490(h)(2) - H2S Drills
250.490(g) - Safety Instructions
250.490(j)(7-8) - H2S Detection
250.490(q)(9) - Instrument Gas
250.404 - Crown Block
250.423(a) - Repair
250.423(c)(2) - Test Results
250.428(d) - Remedial Actions
250.428(d) - Immediate Actions
420(b)(3); 423(b)(7); 465(a), (b)(3); plus various ref in A, D, E, F, G, P, and Q - End of Operations Report BSEE-0125 End of Operations Report
250.420(b)(3) - Dual Mech. Barrier
250.420(b)(3) - Alternative Options
250.427(a) - Pressure Integrity tests
250.428(d) - PE Cert.
250.428(k) - Cement Returns
250.434 - Diverter Actuations
250.452(a), (b) - Real-time monitoring/Alaska Only
250.456(b), (i) - Drilling Fluid results
250.458(b) - Fluid & Materials inventory

table that charts list of burden
  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 63,367 63,347 0 20 0 0
Annual Time Burden (Hours) 83,528 83,488 0 40 0 0
Annual Cost Burden (Dollars) 16,000 0 0 16,000 0 0


Reginfo record details
  No