Part B Permit Application, Permit Modifications, and Special Permits (Renewal)

ICR 201905-2050-001

OMB: 2050-0009

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2020-01-29
IC Document Collections
IC ID
Document
Title
Status
44017
Modified
191417
Modified
ICR Details
2050-0009 201905-2050-001
Active 201603-2050-004
EPA/OLEM 1573.15
Part B Permit Application, Permit Modifications, and Special Permits (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved with change 01/29/2020
Retrieve Notice of Action (NOA) 05/21/2019
  Inventory as of this Action Requested Previously Approved
01/31/2023 36 Months From Approved 01/31/2020
159 0 159
20,086 0 24,926
5,697,625 0 5,735,647

Section 3005 of Subtitle C of RCRA requires treatment, storage or disposal facilities (TSDFs) to obtain a permit. To obtain the permit, the TSDFs must submit an application describing the facilities operation. There are two parts to the RCRA permit application - Part A and Part B. Part A defines the processes to be used for treatment, storage, and disposal of hazardous wastes; the design capacity of such processes; and the specific hazardous wastes to be handled at the facility. Part B requires detailed site-specific information such as geologic, hydro logic, and engineering data. In the event that permit modifications are proposed by the applicant or the EPA, modifications must conform to the requirements under Sections 3004 and 3005.This ICR provides a comprehensive discussion of the requirements for owner/operators of TSDFs submitting applications for a Part B permit or permit modification.

US Code: 42 USC 6925 Name of Law: Solid Waste Disposal Act
   US Code: 42 USC 6924 Name of Law: Solid Waste Disposal Act
  
None

Not associated with rulemaking

  83 FR 63498 12/10/2018
84 FR 23051 05/21/2019
No

2
IC Title Form No. Form Name
Private Sector (Permit Applicants)
State Agencies

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 159 159 0 0 0 0
Annual Time Burden (Hours) 20,086 24,926 0 -3 -4,837 0
Annual Cost Burden (Dollars) 5,697,625 5,735,647 0 0 -38,022 0
No
Yes
Miscellaneous Actions
There is decrease of 4,840 hours in the total estimated respondent burden compared with the ICR currently approved by OMB. This decrease is due to the smaller number of affected facilities, based on the current information and reporting requirements from the RCRAInfo database.

$0
No
    No
    No
No
No
No
Uncollected
Peggy Vyas 703 308-5477 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
05/21/2019


© 2024 OMB.report | Privacy Policy