Application for Witnessed or Supervised Testing Laboratory (W/SMTL) Version 1.19 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: This Data Entry Sheet shall be used to submit first-party laboratories to EPA for a certification body's Witnessed or Supervised Manufacturer's Testing Laboratory Program (W/SMTL).Lighting categories which require Proficiency Testing (PT) are found on the second tab of this application. Completed forms should be sent to [email protected]. |
Laboratory Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Laboratory Name: |
|
|
|
|
|
|
Laboratory Address |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Address Line 1: |
|
|
|
|
|
|
Address Line 2: |
|
|
|
|
|
|
City: |
|
|
|
|
|
|
State / Province: |
|
|
|
|
|
|
Country: |
|
|
|
|
|
|
Postal Code: |
|
|
|
|
|
|
Laboratory Contact |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
First Name: |
|
|
|
|
|
|
Last Name: |
|
|
|
|
|
|
Job Title: |
|
|
|
|
|
|
Email Address: |
|
|
|
|
|
|
Telephone Number: |
|
Ext: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Laboratory Category (please select one, not both): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Supervised |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Witnessed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ENERGY STAR Manufacturing Partner Affiliated with Laboratory (please provide Org ID): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Manufacturer name (if different from ENERGY STAR partner): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Certification Body Supervising or Witnessing Laboratory: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Describe any lab limitations here (be as descriptive as possible): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Product Categories Testing (Select all that apply): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Appliances |
|
|
|
|
|
|
|
|
|
|
|
|
|
Clothes Dryers |
|
|
|
|
|
Dishwashers |
|
|
|
|
|
Clothes Washers |
|
|
|
|
|
|
Refrigerators and/or Freezers |
|
|
|
|
|
|
Commercial Clothes Washers |
|
|
|
|
|
|
Optional: Connected Functionality
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Heating and Cooling |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Boilers |
|
|
|
|
|
|
Geothermal Heat Pumps |
|
|
|
|
|
|
Central Air Conditioners and Air-Source Heat Pumps |
|
|
|
|
|
Light Commercial HVAC |
|
|
|
|
|
|
Commercial Packaged Boilers |
|
|
|
|
|
Room Air Cleaners and Purifiers |
|
|
|
|
|
|
Commercial Water Heaters |
|
|
|
|
|
Room Air Conditioners |
|
|
|
|
|
|
Connected Thermostats |
|
|
|
|
|
Residential Water Heaters - Solar |
|
|
|
|
|
|
Dehumidifiers |
|
|
|
|
|
Residential Water Heaters - Non-Solar |
|
|
|
|
|
|
Furnaces |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Electronics and Office Equipment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Audio/Video |
|
|
|
|
|
Large Network Equipment |
|
|
|
|
|
|
Computers |
|
|
|
|
|
Set-top Boxes & Cable Boxes |
|
|
|
|
|
|
Data Center Storage |
|
|
|
|
|
Small Network Equipment |
|
|
|
|
|
|
Displays |
|
|
|
|
|
Telephony |
|
|
|
|
|
|
Enterprise Servers |
|
|
|
|
|
Televisions |
|
|
|
|
|
|
Imaging Equipment |
|
|
|
|
|
Uninterruptible Power Supplies |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Lighting and Fans |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Lamps |
|
|
|
|
|
|
Luminaires |
|
|
|
|
|
|
Decorative Light Strings |
|
|
|
|
|
Residential Ventilating Fans |
|
|
|
|
|
|
Ceiling Fans |
|
|
|
|
|
|
|
|
|
|
|
|
LED Package, Module or Array (IES LM-80-2008): please contact EPA before applying for LM-80 recognition |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Commercial Food Service |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Commercial Coffee Brewers |
|
|
|
|
|
|
Commercial Combination Ovens |
|
|
|
|
|
|
Commercial Dishwashers |
|
|
|
|
|
|
Commercial Convection Ovens |
|
|
|
|
|
|
Commercial Fryers |
|
|
|
|
|
Commercial Rack Ovens |
|
|
|
|
|
|
Commercial Griddles |
|
|
|
|
|
Commercial Refrigerators and Freezers |
|
|
|
|
|
|
Commercial Hot Food Holding Cabinets |
|
|
|
|
|
Commercial Steam Cookers |
|
|
|
|
|
|
Commercial Ice Machines |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Home Building Materials |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Storm Windows |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pool Pumps |
|
|
|
|
|
|
Water Coolers |
|
|
|
|
|
|
Vending Machines |
|
|
|
|
|
Lab-grade Refrigerators/Freezers |
|
|
|
|
|
|
Electrical Vehicle Supply Equipment |
|
|
|
|
|
|
|
|
|
|
The public reporting and recordkeeping burden for this collection of information is estimated to average 4.7 hours per response.Send comments on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including through the use of automated collection techniques to the Director, Collection Strategies Division, U.S. Environmental Protection Agency (2822T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address. |
Application for Witnessed or Supervised Manufacturers' Testing Laboratory (W/SMTL) requiring Proficiency Testing (IES LM-79-08) |
W/SMTL Lighting Laboratory Information Version 1.19 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Laboratory Name: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Laboratory Address: |
|
|
|
|
|
|
|
|
|
|
|
Address Line 1 |
|
|
|
|
|
Address Line 2 |
|
|
|
|
|
City |
|
|
|
|
|
State / Province |
|
|
|
|
|
Country |
|
|
|
|
|
Postal Code |
|
|
|
|
|
|
|
|
|
|
|
|
|
Laboratory Contact: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
First Name |
|
|
|
|
|
Last Name |
|
|
|
|
|
Job Title |
|
|
|
|
|
Email Address |
|
|
|
|
|
Telephone Number |
|
Ext. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Laboratory Category: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Supervised |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Witnessed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ENERGY STAR Manufacturing Partner Affiliated with Laboratory: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Manufacturer name (if different from ENERGY STAR partner): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Certification Body Supervising or Witnessing Laboratory: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Product Categories Testing (check all that apply): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Lamps: Solid State LED Lamps (Directional) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Lamps: Solid State LED Lamps (Omnidirectional and Decorative) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Luminaires: Solid State (Non-directional and subcomponents) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Luminaires: Solid State (Directional) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Proficiency Testing Checklist |
|
|
|
|
|
|
|
|
|
|
|
|
EPA-recognized certification bodies (CBs) should complete this checklist and submit it to [email protected] as part of the application for laboratories seeking EPA recognition within the CB's W/SMTL program for ENERGY STAR lighting product categories that require proficiency testing to IES LM-79-08: ILL Omnidirectional/Directional and Decorative, Luminaires - Solid State (Directional) and Solid State (Non-directional and subcomponents) available once LM-82 is published, and Lamps, once released. |
|
|
|
|
|
|
|
|
|
|
|
|
1. |
|
|
|
|
|
|
2. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
If Laboratory has not completed NIST Proficiency Testing, please complete the following: |
|
|
|
|
|
|
|
|
|
|
|
|
3. |
|
|
|
Laboratory has registered with NIST for Proficiency Testing. |
|
|
|
|
4. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9. |
|
|
|
|
|
|
10. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Round 1: |
|
|
|
|
|
|
|
|
|
|
Round 2: |
|
|
|
|
|
|
|
|
|
|
Round 3: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Note: Extensions beyond Round 3 require approval from EPA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Name of CB: |
|
|
|
|
|
|
ICF Initials: |
|
Signature of CB contact: |
|
|
|
|
|
|
|
|
Date of Signature: |
|
|
|
|
|
|
ICF Date: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The public reporting and recordkeeping burden for this collection of information is estimated to average 4.7 hours per response. Send comments on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including through the use of automated collection techniques to the Director, Collection Strategies Division, U.S. Environmental Protection Agency (2822T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address. |