NSPS for Automobile and Light Duty Truck Surface Coating Operations (40 CFR Part 60, Subpart MM) (Renewal)

ICR 201907-2060-012

OMB: 2060-0034

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2019-08-01
Supporting Statement A
2019-07-30
ICR Details
2060-0034 201907-2060-012
Received in OIRA 201605-2060-007
EPA/OAR 1064.19
NSPS for Automobile and Light Duty Truck Surface Coating Operations (40 CFR Part 60, Subpart MM) (Renewal)
Extension without change of a currently approved collection   No
Regular 08/01/2019
  Requested Previously Approved
36 Months From Approved 01/31/2021
438 390
214,000 192,000
128,000 114,000

The New Source Performance Standards (NSPS) for Automobile and Light Duty Truck Surface Coating Operations were proposed on October 5, 1979, promulgated on December 24, 1980, and amended on October 17, 2000. These regulations apply to the following automobile and light duty truck assembly plant operations: each prime coat operation, guide coat operation, and top coat operation commencing construction, modification or reconstruction after October 5, 1979. This information is being collected to assure compliance with 40 CFR Part 60, Subpart MM. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.

US Code: 42 USC 7401 et seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  83 FR 24785 05/30/2018
84 FR 36919 07/30/2019
No

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 438 390 0 0 48 0
Annual Time Burden (Hours) 214,000 192,000 0 0 22,000 0
Annual Cost Burden (Dollars) 128,000 114,000 0 0 14,000 0
No
No
There is an overall adjustment increase in the change in burden in this ICR compared to the previous renewal. The increase is not due to any program changes. The burden has been adjusted to reflect an increase in the estimated number of sources, based on a continued growth rate of 2 new facilities per year. The increase in the number of respondents also results in an increase in the number of responses and in the operation and maintenance costs.

$44,100
No
    No
    No
No
No
No
No
Patrick Yellin 202 564-2970

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
08/01/2019