Supporting Statement for

FERC-725J, Definition of Bulk Electric System


The Federal Energy Regulatory Commission (FERC or Commission) requests that the Office of Management and Budget (OMB) review and approve FERC-725J, Definition of Bulk Electric System, for a three-year period. FERC-725J (OMB Control Number 1902-0259) is an existing Commission data collection, as stated by 18 Code of Federal Regulations (CFR), Part 39. (The reporting and recordkeeping requirements are not changing.)


  1. CIRCUMSTANCES THAT MAKE THE COLLECTION OF INFORMATION NECESSARY


On December 20, 2012, the Commission issued Order No. 773, a Final Rule approving NERC’s modification to the definition of “bulk electric system” (i.e. BES) and the Rules of Procedure exception process to be effective July 1, 2013. On April 18, 2013, in Order No. 773-A, the Commission largely affirmed its findings in Order No. 773. In Order Nos. 773 and 773-A, the Commission directed NERC to modify the definition of bulk electric system in two respects: (1) modify the local network exclusion (exclusion E3) to remove the 100 kV minimum operating voltage to allow systems that include one or more looped configurations connected below 100 kV to be eligible for the local network exclusion; and (2) modify the exclusions to ensure that generator interconnection facilities at or above 100 kV connected to bulk electric system generators identified in inclusion I2 are not excluded from the bulk electric system.1


Both orders recognized that the first two years of implementation would include a higher burden associated with the work all the Registered Entities would need to accomplish. Those orders also illustrated that a reduction would occur by the third year since at that point the ongoing burden would be an amount dependent on exception requests and implementation of newly identified bulk electric system elements. These reductions also included the harmonization of all the register entities following the same definition for BES2.


  1. HOW, BY WHOM, AND FOR WHAT PURPOSE THE INFORMATION IS TO BE USED AND THE CONSEQUENCES OF NOT COLLECTING THE INFORMATION


FERC-725J requests information from respondents for four purposes: to support local distribution determinations, to provide a list of elements that are part of the bulk electric system, to create implementation plans, and to submit requests for exceptions to remove from or add to the bulk electrical system.


The information that FERC requires to support requests for local distribution determinations is listed below:

  • Electronic petition to request a local distribution determination.

    • Detailed narrative of the request for local distribution determination.

    • Power system drawings of the elements identified.

    • Power system analysis justifying the request including results and assumptions.

    • Other pertinent information to support the justification such as previous regulatory orders related to the elements.


The information that NERC requests from entities to apply the definition of bulk electric system is listed below:

  • Electronic forms providing a list of elements that are part of the bulk electric system.

  • Create implementation plans for newly identified elements in the bulk electric system to comply with applicable Reliability Standards associated with those elements.


The information that NERC requests from entities that, after applying the bulk electric system definition, wish to request exceptions by adding elements to or removing elements from the bulk electric system through the NERC Rules of Procedure Exception Process:

  • Fill out menu-based electronic forms identifying the elements and a request to add or remove the elements from the bulk electric system.

  • Upload supporting information to justify the request.

    • Power system drawings of the elements identified.

    • Power system analysis justifying the request including results and assumptions.


The Commission uses the information filed for local distribution determinations to decide whether facilities are used for local distribution as set forth in the Federal Power Act. Entities who own elements that they believe should be classified as local distribution must electronically submit a petition to the FERC Commission for such a determination. The information needed in the petition may include a detailed narrative of the request for local distribution determination; power system drawings of the elements identified; power system analysis justifying the request including results and assumptions; and other pertinent information to support the justification such as previous regulatory orders related to the elements.


During the first two years of implementation, July 1, 2014 through June 30, 2016, owners of equipment reviewed their system configuration to determine which elements are part of the bulk electric system under the revised definition and created a list of these elements that is available to other parties on request. For any newly identified bulk electric system elements, owners and other entities worked together to create implementation plans to ensure compliance with Reliability Standards for the new elements. The lists and implementation plans were used by the owners of the equipment, entities where the operation of those elements is part of their scope of responsibility, NERC, and FERC. For some entities, part of the implementation includes compliance responsibility of information collection requirements that are part of existing approved Reliability Standards.


The option to request an exception from NERC is available to owners of elements and certain entities responsible for wide areas of the system.3 The NERC Rules of Procedure (ROP) exception process requires entities to electronically provide technical data to support an exception request. This technical data consists of a power system analysis to technically justify removing elements from or adding elements to the bulk electric system. The analysis could include power flow models, short-circuit models, and dynamic stability models and analysis. Data includes power system data assumptions and results of the analysis. All of this is managed and received by NERC.


Failure to properly perform the initial review described above in the first two years of implementation and an ongoing review of newly constructed elements could result in the failure to properly classify elements as being part of the bulk electric system which are needed for operating the interconnected transmission network and could jeopardize electric system reliability.


  1. DESCRIBE ANY CONSIDERATION OF THE USE OF IMPROVED INFORMATION TECHNOLOGY TO REDUCE THE BURDEN AND TECHNICAL OR LEGAL OBSTACLES TO REDUCING BURDEN


All of the information in this collection is being submitted in an electronic format. The NERC compliance information and reports are filed using a separate electronic filing system than is used for collecting information on bulk electric system definition and NERC ROP exception process. Both of these filing systems are owned and managed by NERC and the Regional Entities.


Petitions for local distribution determinations are submitted through the FERC electronic filing system.


Each of the six Regional Entities has a well-established compliance portal for registered entities to electronically submit compliance information and reports. The compliance portals allow documents developed by the registered entities to be attached and uploaded to the Regional Entity’s portal. Compliance data can also be submitted via data forms on the portals. These portals are accessible through an internet browser password protected user interface.

In preparation for the implementation of the bulk electric system definition and ROP exception process, NERC and the six regional entities worked together to develop a new data collection system called the BESNet. This new system will contain all of the information required for the definition and exception process into one database. All owners of bulk electric system elements will follow the same procedures for submitting electronic data. The BESNet software is accessible through an internet browser password protected user interface.


  1. DESCRIBE EFFORTS TO IDENTIFY DUPLICATION AND SHOW SPECIFICALLY WHY ANY SIMILAR INFORMATION ALREADY AVAILABLE CANNOT BE USED OR MODIFIED FOR USE FOR THE PURPOSE(S) DESCRIBED IN INSTRUCTION NO. 2


Commission filings and data requirements are periodically reviewed in conjunction with OMB clearance expiration dates. This includes a review of the Commission's regulations and data requirements to identify any duplication.


Entities filing requests for local distribution determinations may use the Commission’s eFiling system.


For information collected by NERC and the regional entities, the BESNet software will prevent the need for duplication of submittals. This data has not been collected in the past and is part of the implementation of the revised bulk electric system definition and ROP exception process that took effect July 1, 2014.


  1. METHODS USED TO MINIMIZE THE BURDEN IN COLLECTION OF INFORMATION INVOLVING SMALL ENTITIES


Generally, small entities do not have critical elements that are included in the bulk electric system. A small entity could pursue an exception request to have an element removed and it will be evaluated by the Regional Entities and NERC.


  1. CONSEQUENCE TO FEDERAL PROGRAM IF COLLECTION WERE CONDUCTED LESS FREQUENTLY


Failure to properly perform an ongoing review of newly constructed elements could result in the failure to properly classify elements as being part of the bulk electric system which are needed for operating the interconnected transmission network and could jeopardize electric system reliability.


  1. EXPLAIN ANY SPECIAL CIRCUMSTANCES RELATING TO THE INFORMATION COLLECTION


There are no special circumstances as described in 5 CFR 1320.5(d)(2) related to the FERC-725J information collection. Typically, OMB guidelines in 5 CFR 1320.5(d)(2)(iv) prohibiting the retention of records for longer than three years pertain to information collections affecting NERC registered entities. However, there are no record retention requirements within the BES definition.


  1. DESCRIBE EFFORTS TO CONSULT OUTSIDE THE AGENCY: SUMMARIZE PUBLIC COMMENTS AND THE AGENCY’S RESPONSE


In accordance with OMB requirements, the Commission published a 60-day notice4 in the Federal Register on 8/13/2019, providing the public with an opportunity to comment. The Commission noted that it would be requesting a three-year extension of the reporting and recordkeeping requirements. The Commission received no comments from the public regarding this information collection.

A 30-day notice was issued on 10/28/19 (at https://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=15392335) and will be published in the Federal Register, providing another opportunity for public comment.

  1. EXPLAIN ANY PAYMENT OR GIFTS TO RESPONDENTS


The Commission does not make payments or provide gifts for respondents related to FERC-725J information collection.


  1. DESCRIBE ANY ASSURANCE OF CONFIDENTIALITY PROVIDED TO RESPONDENTS


The Commission does not consider the filings within the FERC-725J to be confidential. Information provided with the filing may be submitted with a specific request for confidential treatment to the extent permitted by law and pursuant to FERC's regulations.


  1. PROVIDE ADDITIONAL JUSTIFICATION FOR ANY QUESTIONS OF A SENSITIVE NATURE, SUCH AS SEXUAL BEHAVIOR AND ATTITUDES, RELIGIOUS BELIEFS, AND OTHER MATTERS THAT ARE COMMONLY CONSIDERED PRIVATE


The Commission does not consider any of the questions within the FERC-725J of a sensitive nature that would be considered private.


  1. ESTIMATED BURDEN OF COLLECTION OF INFORMATION


The burden5 and cost6 of the FERC-725J information collection requirements are:


FERC-725J (Definition of the Bulk Electric System)


Number of Respondents
(1)

Annual Number of Responses per Respondent

(2)

Total Number of Responses (1)*(2)=(3)

Average Burden (Hrs.) & Cost ($)Per Response

(4)

Total Annual Burden Hours & Total Annual Cost ($)

(3)*(4)=(5)

Cost per Respondent

($)

(5)÷(1)

Generator Owners, Distribution Providers, and Transmission Owners (Exception Request)

20


1

20

94 hrs.;

$7,708

1,880 hrs.;

$154,160

$7,708

All Registered Entities (Implementation Plans and Compliance)

186

1

186

350 hrs.;

$28,700

65,100 hrs.;

$5,338,200

$28,700

Local Distribution Determinations

1

1

1

92 hrs.;

$7,544

92 hrs.;

$7,544

$7,544

TOTAL


207


67,072 hrs.;

$5,499,904



  1. ESTIMATE OF THE TOTAL ANNUAL COST BURDEN TO RESPONDENTS


There is no non-labor start-up cost. All costs are related to burden hours and are addressed in Questions #12 and #15.


  1. ESTIMATED ANNUALIZED COST TO FEDERAL GOVERNMENT


The Commission bases its estimate of the “Analysis and Processing of filings” cost to the Federal Government on salaries and benefits for professional and clerical support. This estimated cost represents staff analysis, decision making, and review of any actual filings made in response to the information collection.


The Regional Entities and NERC do most of the data processing, monitoring and compliance work for Reliability Standards. The only filings submitted to FERC under FERC-725J are the local distribution determinations. Federal effort is enumerated below:


The Commission incurs the costs associated with obtaining OMB clearance for the collection under the Paperwork Reduction Act of 1995 (PRA). The PRA Administrative Cost is a Federal Cost associated with preparing, issuing, and submitting materials necessary to comply with the PRA for rulemakings, orders, or any other vehicle used to create, modify, extend, or discontinue an information collection. This average annual cost includes requests for extensions, all associated rulemakings and orders, other changes to the collection, and associated publications in the Federal Register.


The estimated annualized cost to the Federal Government for FERC-725J follows:



Number of Federal Employees (FTE)

Estimated Annual Federal Cost

FERC-725J Analysis and Processing of filings7

1

$167,091

PRA8 Administrative Cost9


$4,832

FERC Total


$171,923


  1. REASONS FOR CHANGES IN BURDEN INCLUDING THE NEED FOR ANY INCREASE


There is a change in burden due to a reduction in the estimated number of respondents for the portions of FERC-725J that pertain to requests for local distribution determinations. This change is based on the fact that only two local distribution determinations have been requested in the last five years.


The following table shows the total burden for the collection of information. The format, labels, and definitions of the table follow the ROCIS submission system’s “Information Collection Request Summary of Burden” for the metadata.


FERC-725J

Total Request

Previously Approved

Change due to Adjustment in Estimate

Change Due to Agency Discretion

Annual Number of Responses

207

214

-7

0

Annual Time Burden (Hr.)

67,072

67,716

-644

0

Annual Cost Burden ($)

0

0

0

0


  1. TIME SCHEDULE FOR PUBLICATION OF DATA


There is no publication data associated with FERC-725J information collection.

  1. DISPLAY OF EXPIRATION DATE


The expiration dates are available on ferc.gov at http://www.ferc.gov/docs-filing/info-collections.asp.


  1. EXCEPTIONS TO THE CERTIFICATION STATEMENT


There are no exceptions.





1 Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of Procedure, Order No. 773, 141 FERC ¶ 61,236 (2012); order on reh’g, Order No. 773-A, 143 FERC ¶ 61,053 (2013); order on reh’g and clarification, 144 FERC ¶ 61,174 (2013); aff’d sub nom., People of the State of New York and the Pub. Serv. Comm’n of New York v. FERC, No. 13-2316 (2d. Cir. 2015).  On June 13, 2013, the Commission granted NERC’s request for extension of time and extended the effective date for the revised definition of bulk electric system and the Rules of Procedure exception process to July 1, 2014.  Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of Procedure, 143 FERC ¶ 61,231, at P 13 (2013). On March 20, 2014, the Commission approved NERC’s revisions to the definition of bulk electric system and determined the revisions either adequately address the Commission’s Order Nos. 773 and 773-A directives or provide an equally effective and efficient approach. See order approving revised definition, 146 FERC ¶ 61,199 (2014).

2 The NPCC Regional Entity had a different threshold of what a BES element would be based on the original definition and the flexibility given to Regional Entities on this matter.

3 The NERC Rules Of Procedure exception process allows entities to request elements to be included or excluded from the bulk electric system based on technical analysis. The exception process occurs after the bulk electric system definition is applied.

4 84 FR 40038

5 Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a federal agency. See 5 CFR 1320 for additional information on the definition of information collection burden.

6The estimated hourly cost (salary plus benefits) is based on the figures for May 2018 posted by the Bureau of Labor Statistics for the Utilities sector (available at http://www.bls.gov/oes/current/naics2_22.htm) and updated March 2019 for benefits information (at http://www.bls.gov/news.release/ecec.nr0.htm). The hourly estimates for salary plus benefits are:

-Legal (code 23-0000), $142.86

-File Clerks (code 43-4071), $34.50

-Electrical Engineer (code 17-2071), $68.17

The average hourly burden cost for this collection is $81.84 [($142.86 + $34.50 + $68.17)/3 = $81.84] and is rounded to $82.00 an hour


7 Based upon 2019 FTE average salary plus benefits ($167,091).

8 Paperwork Reduction Act of 1995 (PRA)

9 The cost estimate was updated effective 7/1/2019.

5


File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File TitleDefinition of Bulk Electric System
AuthorMichele Chambers
File Modified0000-00-00
File Created2021-01-15

© 2024 OMB.report | Privacy Policy