Appendix F:
Burden and Cost for General Stationary Combustion Sources
(Subpart C)
June 2019
Appendix F-1. Detailed Unit Burden and Costs for GHGRP Reporters Subject to Subpart C Only—Year 1 3
Appendix F-2. Detailed Unit Burden and Costs for GHGRP Reporters Subject to Subpart C Only—Year 2 6
Appendix F-3. Detailed Unit Burden and Costs for GHGRP Reporters Subject to Subpart C Only—Year 3 9
Appendix F-4. Footnotes Applicable to Appendix F-1, Appendix F-2, and Appendix F-3 12
Appendix F-8. Footnotes Applicable to Appendix F-5, Appendix F-6, and Appendix F-7 24
Year 1 |
(A) Hours per Occurrence |
(B) Occurrences/ Respondent/Year |
(C) Hours/ Respondent/ |
(D) Respondents/ Year |
(E) Technical Hours/ |
Legal Hours/Year |
Clerical Hours/ |
Manager Hours/ |
(H) Cost/ Year |
|
|||||
Year (A x B) |
Year |
Year |
Year |
|
|||||||||||
|
(C x D) |
|
|
|
|||||||||||
1. APPLICATIONS (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
|||||
2. SURVEY AND STUDIES (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
|||||
3. ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS |
|
|
|
|
|
|
|
|
|
|
|||||
4. REPORT REQUIREMENTS |
|
|
|
|
|
|
|
|
|
|
|||||
|
A1. Read Rule, Instructions, Guidance Documents for Subpart C 1,2,3 |
5 |
1 |
5 |
1,998 |
9,990 |
|
|
|
$713,786 |
|
||||
|
A2. Read Rule, Instructions, Guidance Documents for Subpart A 2,3,4 |
2 |
1 |
2 |
1,998 |
3,996 |
|
|
|
$285,514 |
|
||||
|
B. Required Activities |
|
|
|
|
|
|
|
|
|
|
||||
|
|
Activity covering Tier 1 Methodology |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 2,5,6 |
5 |
1 |
5 |
1,016 |
5,078 |
|
|
|
$362,815 |
|
||
|
|
|
Conduct annual review of billing records to determine natural gas consumption in therms or mmBtu 2,5,6 |
5 |
1 |
5 |
811 |
4,056 |
|
|
|
$289,778 |
|
||
|
|
Activity covering Tier 2 Methodology |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 5,7 |
5 |
1 |
5 |
661 |
3,304 |
|
|
|
$236,086 |
|
||
|
|
Activity covering Tier 3 Methodology |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 5,8 |
5 |
1 |
5 |
76 |
381 |
|
|
|
$27,241 |
|
||
|
|
Tier 1 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-1, C-1a, or C-1b, using default high heat values and/or default emission factors 6,9,10 |
0.2 |
2.6 |
0.4 |
1,568 |
690 |
|
|
|
$49,296 |
|
||
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-8, Eq C-8a, or Eq C-8b 6,10,11 |
0.3 |
2.6 |
0.9 |
1,568 |
1,380 |
|
|
|
$98,593 |
|
||
|
|
Tier 2 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct sampling to determine high heat value for each type of fuel or fuel mixture 7,12 |
|
2.4 |
|
621 |
|
|
|
|
|
|
||
|
|
|
|
Daily measurements 14,15 |
0 |
2.1 |
0.0 |
62 |
0 |
|
|
|
$0 |
|
|
|
|
|
|
Hourly measurements 15,17 |
0 |
2.0 |
0.0 |
7 |
0 |
|
|
|
$0 |
|
|
|
|
|
|
Monthly measurements 18,19 |
6 |
2.2 |
13.0 |
401 |
5,222 |
|
|
|
$373,110 |
|
|
|
|
|
|
Quarterly measurements 20,21 |
2 |
3.6 |
7.3 |
18 |
131 |
|
|
|
$9,358 |
|
|
|
|
|
|
Semiannual measurements 22,23 |
1 |
3.9 |
3.9 |
18 |
70 |
|
|
|
$4,981 |
|
|
|
|
|
|
|
Weekly measurements 23,24 |
26 |
1.7 |
43.3 |
10 |
412 |
|
|
|
$29,432 |
|
|
|
|
|
Other measurement methods 18,26 |
6 |
5.1 |
30.7 |
105 |
3,206 |
|
|
|
$229,050 |
|
|
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-2a, along with Eq C-2b or Eq C-2c. 9,12 |
0.2 |
2.6 |
0.4 |
661 |
282 |
|
|
|
$20,148 |
|
||
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-9a or Eq 9b 11,12 |
0.3 |
2.6 |
0.9 |
661 |
564 |
|
|
|
$40,295 |
|
||
|
|
Tier 3 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct sampling to determine carbon content for each type of fuel or fuel mixture 8,27 |
|
2.1 |
|
76 |
|
|
|
|
|
|
||
|
|
|
|
Daily measurements 15,28 |
0 |
1.0 |
0.0 |
2 |
0 |
|
|
|
$0 |
|
|
|
|
|
|
Hourly measurements 15,29 |
0 |
2.0 |
0.0 |
2 |
0 |
|
|
|
$0 |
|
|
|
|
|
|
Monthly measurements 18,30 |
6 |
1.9 |
11.3 |
25 |
283 |
|
|
|
$20,215 |
|
|
|
|
|
|
Quarterly measurements 20,31 |
2 |
1.1 |
2.3 |
7 |
16 |
|
|
|
$1,147 |
|
|
|
|
|
|
Semiannual measurements 22,32 |
1 |
3.4 |
3.4 |
5 |
17 |
|
|
|
$1,219 |
|
|
|
|
|
|
Weekly measurements 24,33 |
26 |
1.8 |
45.5 |
8 |
365 |
|
|
|
$26,094 |
|
|
|
|
|
|
Other measurement methods 18,34 |
6 |
8.0 |
48.1 |
27 |
1,304 |
|
|
|
$93,182 |
|
|
|
|
|
Determine annual volume of liquid or gaseous fuel using fuel flow meters 35,36,37 |
0.5 |
1.3 |
0.6 |
45 |
29 |
|
|
|
$2,064 |
|
||
|
|
|
Determine annual average molecular weight of gaseous fuel 35,38,39 |
0.5 |
0.7 |
0.3 |
24 |
8 |
|
|
|
$566 |
|
||
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-3, Eq C-4, or Eq C-5. 8,9,27 |
0.2 |
2.1 |
0.4 |
76 |
27 |
|
|
|
$1,934 |
|
||
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-8 11,27 |
0.3 |
2.1 |
0.7 |
76 |
54 |
|
|
|
$3,869 |
|
||
|
|
Tier 4 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Gather CEMS data for e-GGRT reporting and QA 40,41 |
20 |
4 |
80 |
70 |
5,570 |
|
|
|
$397,951 |
|
||
|
|
Alternative Part 75 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Perform engineering calculation to determine CO2 emissions using Appendix D and G (98.33(a)(5)(i)), LME calculation method (98.33(a)(5)(ii), or CEMS calculation method (98.33(a)(5)(iii)) 9,42 |
0.2 |
3.1 |
0.5 |
34 |
18 |
|
|
|
$1,263 |
|
||
|
C. Create Information (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
||||
|
D. Gather Existing Information (Included in 4E) |
|
|
|
|
|
|
|
|
|
|
||||
|
E. Write Report |
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
Annual Compliance Reporting through e-GGRT and data QA 3,43 |
10 |
1 |
10 |
1,998 |
19,980 |
|
1998 |
1998 |
$1,674,784 |
|
||
5. RECORDKEEPING REQUIREMENTS |
|
|
|
|
|
|
|
|
|
|
|||||
|
A. Read Instructions (Included in 4A) |
|
|
|
|
|
|
|
|
|
|
||||
|
B. Plan Activities (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
||||
|
C. Implement Activities (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
||||
|
D. Recordkeeping 3,44 |
5 |
1 |
5 |
1,998 |
9,990 |
|
999 |
999 |
$837,392 |
|
||||
|
E. Time to Transmit or Disclose Information (included in 4E) |
|
|
|
|
|
|
|
|
|
|
||||
|
F. Time to Train Personnel (included in 4A) |
|
|
|
|
|
|
|
|
|
|
||||
|
G. Time for Audits (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
||||
TOTAL ANNUAL LABOR BURDEN AND COST |
|
|
|
|
76,422 |
|
2997 |
2997 |
$5,831,163 |
|
|||||
|
|||||||||||||||
ANNUAL O&M COSTS |
|
|
|
|
|
|
|
|
|
|
|||||
|
Sampling costs for Tier 2 units 7,15,46 |
|
|
|
|
|
|
|
|
|
|
||||
|
|
Monthly samples and analyses 19 |
|
2.2 |
|
401 |
|
|
|
|
$348,131 |
|
|||
|
|
Quarterly samples and analyses 21 |
|
3.6 |
|
18 |
|
|
|
|
$26,194 |
|
|||
|
|
Semiannual samples and analyses 23 |
|
3.9 |
|
18 |
|
|
|
|
$27,884 |
|
|||
|
|
Weekly samples and analyses 25 |
|
1.7 |
|
10 |
|
|
|
|
$6,337 |
|
|||
|
|
Other measurement methods samples and analyses 26 |
|
5.1 |
|
105 |
|
|
|
|
$213,716 |
|
|||
|
Sampling costs for Tier 3 units 8,15,27,46 |
|
|
|
|
|
|
|
|
|
|
||||
|
|
Monthly samples and analyses 30 |
|
1.9 |
|
25 |
|
|
|
|
$18,862 |
|
|||
|
|
|
Quarterly samples and analyses 31 |
|
1.1 |
|
7 |
|
|
|
|
$3,211 |
|
||
|
|
|
Semiannual samples and analyses 32 |
|
3.4 |
|
5 |
|
|
|
|
$6,822 |
|
||
|
|
|
Weekly samples and analyses 33 |
|
1.8 |
|
8 |
|
|
|
|
$5,619 |
|
||
|
|
|
Other measurement methods samples and analyses 34 |
|
8.0 |
|
27 |
|
|
|
|
$86,943 |
|
||
|
Flow meter costs for Tier 3 units 47,48 |
|
1.3 |
|
2 |
|
|
|
|
$6,594 |
|
||||
|
Sampling costs for Biogenic Testing |
|
|
|
|
|
|
|
|
|
|
||||
|
|
Annual gas samples and analyses 49,50 |
|
2.3 |
|
85 |
|
|
|
|
$1,125,864 |
|
|||
|
Recordkeeping 51 |
|
1 |
|
1998 |
|
|
|
|
$99,900 |
|
||||
|
|||||||||||||||
ANNUALIZED CAPITAL COSTS |
|
|
|
|
|
|
|
|
|
|
|||||
|
CEMS costs for Tier 4 units 52,53 |
|
2.0 |
|
3 |
|
|
|
|
$115,030 |
|
||||
|
|||||||||||||||
TOTAL ANNUAL COSTS (Labor, O&M, and annualized capital) |
|
|
|
|
|
|
|
|
$7,922,272 |
|
Year 2 |
(A) Hours per Occurrence |
(B) Occurrences/ Respondent/Year |
(C) Hours/ Respondent/ |
(D) Respondents/ Year |
(E) Technical Hours/ |
Legal Hours/Year |
Clerical Hours/ |
Manager Hours/ |
(H) Cost/ Year |
|
|||||
Year (A x B) |
Year |
Year |
Year |
|
|||||||||||
|
(C x D) |
|
|
|
|||||||||||
1. APPLICATIONS (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
|||||
2. SURVEY AND STUDIES (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
|||||
3. ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS |
|
|
|
|
|
|
|
|
|
|
|||||
4. REPORT REQUIREMENTS |
|
|
|
|
|
|
|
|
|
|
|||||
|
A1. Read Rule, Instructions, Guidance Documents for Subpart C 1,2,3 |
5 |
1 |
5 |
2,093 |
10,465 |
|
|
|
$747,724 |
|
||||
|
A2. Read Rule, Instructions, Guidance Documents for Subpart A 2,3,4 |
2 |
1 |
2 |
2,093 |
4,186 |
|
|
|
$299,090 |
|
||||
|
B. Required Activities |
|
|
|
|
|
|
|
|
|
|
||||
|
|
Activity covering Tier 1 Methodology |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 2,5,6 |
5 |
1 |
5 |
1,064 |
5,319 |
|
|
|
$380,066 |
|
||
|
|
|
Conduct annual review of billing records to determine natural gas consumption in therms or mmBtu 2,5,6 |
5 |
1 |
5 |
850 |
4,249 |
|
|
|
$303,556 |
|
||
|
|
Activity covering Tier 2 Methodology |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 5,7 |
5 |
1 |
5 |
692 |
3,461 |
|
|
|
$247,311 |
|
||
|
|
Activity covering Tier 3 Methodology |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 5,8 |
5 |
1 |
5 |
80 |
399 |
|
|
|
$28,536 |
|
||
|
|
Tier 1 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-1, C-1a, or C-1b, using default high heat values and/or default emission factors 6,9,10 |
0.2 |
2.6 |
0.4 |
1,643 |
723 |
|
|
|
$51,640 |
|
||
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-8, Eq C-8a, or Eq C-8b 6,10,11 |
0.3 |
2.6 |
0.9 |
1,643 |
1,445 |
|
|
|
$103,281 |
|
||
|
|
Tier 2 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct sampling to determine high heat value for each type of fuel or fuel mixture 7,12 |
|
2.4 |
|
651 |
|
|
|
|
|
|
||
|
|
|
|
Daily measurements 14,15 |
0 |
2.1 |
0.0 |
65 |
0 |
|
|
|
$0 |
|
|
|
|
|
|
Hourly measurements 15,17 |
0 |
2.0 |
0.0 |
8 |
0 |
|
|
|
$0 |
|
|
|
|
|
|
Monthly measurements 18,19 |
6 |
2.2 |
13.0 |
420 |
5,470 |
|
|
|
$390,850 |
|
|
|
|
|
|
Quarterly measurements 20,21 |
2 |
3.6 |
7.3 |
19 |
137 |
|
|
|
$9,803 |
|
|
|
|
|
|
Semiannual measurements 22,23 |
1 |
3.9 |
3.9 |
19 |
73 |
|
|
|
$5,218 |
|
|
|
|
|
|
|
Weekly measurements 23,24 |
26 |
1.7 |
43.3 |
10 |
432 |
|
|
|
$30,832 |
|
|
|
|
|
Other measurement methods 18,26 |
6 |
5.1 |
30.7 |
110 |
3,358 |
|
|
|
$239,941 |
|
|
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-2a, along with Eq C-2b or Eq C-2c. 9,12 |
0.2 |
2.6 |
0.4 |
692 |
295 |
|
|
|
$21,106 |
|
||
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-9a or Eq 9b 11,12 |
0.3 |
2.6 |
0.9 |
692 |
591 |
|
|
|
$42,211 |
|
||
|
|
Tier 3 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct sampling to determine carbon content for each type of fuel or fuel mixture 8,27 |
|
2.1 |
|
80 |
|
|
|
|
|
|
||
|
|
|
|
Daily measurements 15,28 |
0 |
1.0 |
0.0 |
2 |
0 |
|
|
|
$0 |
|
|
|
|
|
|
Hourly measurements 15,29 |
0 |
2.0 |
0.0 |
2 |
0 |
|
|
|
$0 |
|
|
|
|
|
|
Monthly measurements 18,30 |
6 |
1.9 |
11.3 |
26 |
296 |
|
|
|
$21,177 |
|
|
|
|
|
|
Quarterly measurements 20,31 |
2 |
1.1 |
2.3 |
7 |
17 |
|
|
|
$1,202 |
|
|
|
|
|
|
Semiannual measurements 22,32 |
1 |
3.4 |
3.4 |
5 |
18 |
|
|
|
$1,277 |
|
|
|
|
|
|
Weekly measurements 24,33 |
26 |
1.8 |
45.5 |
8 |
383 |
|
|
|
$27,334 |
|
|
|
|
|
|
Other measurement methods 18,34 |
6 |
8.0 |
48.1 |
28 |
1,366 |
|
|
|
$97,612 |
|
|
|
|
|
Determine annual volume of liquid or gaseous fuel using fuel flow meters 35,36,37 |
0.5 |
1.3 |
0.6 |
47 |
30 |
|
|
|
$2,163 |
|
||
|
|
|
Determine annual average molecular weight of gaseous fuel 35,38,39 |
0.5 |
0.7 |
0.3 |
25 |
8 |
|
|
|
$593 |
|
||
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-3, Eq C-4, or Eq C-5. 8,9,27 |
0.2 |
2.1 |
0.4 |
80 |
28 |
|
|
|
$2,026 |
|
||
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-8 11,27 |
0.3 |
2.1 |
0.7 |
80 |
57 |
|
|
|
$4,053 |
|
||
|
|
Tier 4 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Gather CEMS data for e-GGRT reporting and QA 40,41 |
20 |
4 |
80 |
73 |
5,834 |
|
|
|
$416,873 |
|
||
|
|
Alternative Part 75 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Perform engineering calculation to determine CO2 emissions using Appendix D and G (98.33(a)(5)(i)), LME calculation method (98.33(a)(5)(ii), or CEMS calculation method (98.33(a)(5)(iii)) 9,42 |
0.2 |
3.1 |
0.5 |
36 |
19 |
|
|
|
$1,323 |
|
||
|
C. Create Information (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
||||
|
D. Gather Existing Information (Included in 4E) |
|
|
|
|
|
|
|
|
|
|
||||
|
E. Write Report |
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
Annual Compliance Reporting through e-GGRT and data QA 3,43 |
10 |
1 |
10 |
2,093 |
20,930 |
|
2093 |
2093 |
$1,754,415 |
|
||
5. RECORDKEEPING REQUIREMENTS |
|
|
|
|
|
|
|
|
|
|
|||||
|
A. Read Instructions (Included in 4A) |
|
|
|
|
|
|
|
|
|
|
||||
|
B. Plan Activities (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
||||
|
C. Implement Activities (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
||||
|
D. Recordkeeping 3,44 |
5 |
1 |
5 |
2,093 |
10,465 |
|
1046.5 |
1046.5 |
$877,208 |
|
||||
|
E. Time to Transmit or Disclose Information (included in 4E) |
|
|
|
|
|
|
|
|
|
|
||||
|
F. Time to Train Personnel (included in 4A) |
|
|
|
|
|
|
|
|
|
|
||||
|
G. Time for Audits (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
||||
TOTAL ANNUAL LABOR BURDEN AND COST |
|
|
|
|
80,056 |
|
3139.5 |
3139.5 |
$6,108,421 |
|
|||||
|
|||||||||||||||
ANNUAL O&M COSTS |
|
|
|
|
|
|
|
|
|
|
|||||
|
Sampling costs for Tier 2 units 7,15,46 |
|
|
|
|
|
|
|
|
|
|
||||
|
|
Monthly samples and analyses 19 |
|
2.2 |
|
420 |
|
|
|
|
$364,684 |
|
|||
|
|
Quarterly samples and analyses 21 |
|
3.6 |
|
19 |
|
|
|
|
$27,440 |
|
|||
|
|
Semiannual samples and analyses 23 |
|
3.9 |
|
19 |
|
|
|
|
$29,210 |
|
|||
|
|
Weekly samples and analyses 25 |
|
1.7 |
|
10 |
|
|
|
|
$6,639 |
|
|||
|
|
Other measurement methods samples and analyses 26 |
|
5.1 |
|
110 |
|
|
|
|
$223,878 |
|
|||
|
Sampling costs for Tier 3 units 8,15,27,46 |
|
|
|
|
|
|
|
|
|
|
||||
|
|
Monthly samples and analyses 30 |
|
1.9 |
|
26 |
|
|
|
|
$19,759 |
|
|||
|
|
|
Quarterly samples and analyses 31 |
|
1.1 |
|
7 |
|
|
|
|
$3,363 |
|
||
|
|
|
Semiannual samples and analyses 32 |
|
3.4 |
|
5 |
|
|
|
|
$7,147 |
|
||
|
|
|
Weekly samples and analyses 33 |
|
1.8 |
|
8 |
|
|
|
|
$5,886 |
|
||
|
|
|
Other measurement methods samples and analyses 34 |
|
8.0 |
|
28 |
|
|
|
|
$91,077 |
|
||
|
Flow meter costs for Tier 3 units 47,48 |
|
1.3 |
|
2 |
|
|
|
|
$6,594 |
|
||||
|
Sampling costs for Biogenic Testing |
|
|
|
|
|
|
|
|
|
|
||||
|
|
Annual gas samples and analyses 49,50 |
|
2.3 |
|
89 |
|
|
|
|
$1,179,396 |
|
|||
|
Recordkeeping 51 |
|
1 |
|
2093 |
|
|
|
|
$104,650 |
|
||||
|
|||||||||||||||
ANNUALIZED CAPITAL COSTS |
|
|
|
|
|
|
|
|
|
|
|||||
|
CEMS costs for Tier 4 units 52,53 |
|
2.0 |
|
7 |
|
|
|
|
$230,059 |
|
||||
|
|||||||||||||||
TOTAL ANNUAL COSTS (Labor, O&M, and annualized capital) |
|
|
|
|
|
|
|
|
$8,408,203 |
|
Year 3 |
(A) Hours per Occurrence |
(B) Occurrences/ Respondent/Year |
(C) Hours/ Respondent/ |
(D) Respondents/ Year |
(E) Technical Hours/ |
Legal Hours/Year |
Clerical Hours/ |
Manager Hours/ |
(H) Cost/ Year |
|
|||||
Year (A x B) |
Year |
Year |
Year |
|
|||||||||||
|
(C x D) |
|
|
|
|||||||||||
1. APPLICATIONS (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
|||||
2. SURVEY AND STUDIES (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
|||||
3. ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS |
|
|
|
|
|
|
|
|
|
|
|||||
4. REPORT REQUIREMENTS |
|
|
|
|
|
|
|
|
|
|
|||||
|
A1. Read Rule, Instructions, Guidance Documents for Subpart C 1,2,3 |
5 |
1 |
5 |
2,188 |
10,940.00 |
|
|
|
$781,663 |
|
||||
|
A2. Read Rule, Instructions, Guidance Documents for Subpart A 2,3,4 |
2 |
1 |
2 |
2,188 |
4,376.00 |
|
|
|
$312,665 |
|
||||
|
B. Required Activities |
|
|
|
|
|
|
|
|
|
|
||||
|
|
Activity covering Tier 1 Methodology |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 2,5,6 |
5 |
1 |
5 |
1,112 |
5,560.76 |
|
|
|
$397,317 |
|
||
|
|
|
Conduct annual review of billing records to determine natural gas consumption in therms or mmBtu 2,5,6 |
5 |
1 |
5 |
888 |
4,441.35 |
|
|
|
$317,334 |
|
||
|
|
Activity covering Tier 2 Methodology |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 5,7 |
5 |
1 |
5 |
724 |
3,618.43 |
|
|
|
$258,537 |
|
||
|
|
Activity covering Tier 3 Methodology |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 5,8 |
5 |
1 |
5 |
84 |
417.51 |
|
|
|
$29,831 |
|
||
|
|
Tier 1 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-1, C-1a, or C-1b, using default high heat values and/or default emission factors 6,9,10 |
0.2 |
2.6 |
0.4 |
1,717 |
755.55 |
|
|
|
$53,984 |
|
||
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-8, Eq C-8a, or Eq C-8b 6,10,11 |
0.3 |
2.6 |
0.9 |
1,717 |
1,511.11 |
|
|
|
$107,969 |
|
||
|
|
Tier 2 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct sampling to determine high heat value for each type of fuel or fuel mixture 7,12 |
|
2.4 |
|
680 |
|
|
|
|
|
|
||
|
|
|
|
Daily measurements 14,15 |
0 |
2.1 |
0.0 |
68 |
0.00 |
|
|
|
$0 |
|
|
|
|
|
|
Hourly measurements 15,17 |
0 |
2.0 |
0.0 |
8 |
0.00 |
|
|
|
$0 |
|
|
|
|
|
|
Monthly measurements 18,19 |
6 |
2.2 |
13.0 |
440 |
5,718.56 |
|
|
|
$408,591 |
|
|
|
|
|
|
Quarterly measurements 20,21 |
2 |
3.6 |
7.3 |
20 |
143.43 |
|
|
|
$10,248 |
|
|
|
|
|
|
Semiannual measurements 22,23 |
1 |
3.9 |
3.9 |
20 |
76.34 |
|
|
|
$5,454 |
|
|
|
|
|
|
|
Weekly measurements 23,24 |
26 |
1.7 |
43.3 |
10 |
451.10 |
|
|
|
$32,231 |
|
|
|
|
|
Other measurement methods 18,26 |
6 |
5.1 |
30.7 |
115 |
3,510.59 |
|
|
|
$250,832 |
|
|
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-2a, along with Eq C-2b or Eq C-2c. 9,12 |
0.2 |
2.6 |
0.4 |
724 |
308.80 |
|
|
|
$22,064 |
|
||
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-9a or Eq 9b 11,12 |
0.3 |
2.6 |
0.9 |
724 |
617.59 |
|
|
|
$44,127 |
|
||
|
|
Tier 3 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Conduct sampling to determine carbon content for each type of fuel or fuel mixture 8,27 |
|
2.1 |
|
84 |
|
|
|
|
|
|
||
|
|
|
|
Daily measurements 15,28 |
0 |
1.0 |
0.0 |
2 |
0.00 |
|
|
|
$0 |
|
|
|
|
|
|
Hourly measurements 15,29 |
0 |
2.0 |
0.0 |
2 |
0.00 |
|
|
|
$0 |
|
|
|
|
|
|
Monthly measurements 18,30 |
6 |
1.9 |
11.3 |
27 |
309.84 |
|
|
|
$22,138 |
|
|
|
|
|
|
Quarterly measurements 20,31 |
2 |
1.1 |
2.3 |
8 |
17.58 |
|
|
|
$1,256 |
|
|
|
|
|
|
Semiannual measurements 22,32 |
1 |
3.4 |
3.4 |
5 |
18.68 |
|
|
|
$1,335 |
|
|
|
|
|
|
Weekly measurements 24,33 |
26 |
1.8 |
45.5 |
9 |
399.93 |
|
|
|
$28,575 |
|
|
|
|
|
|
Other measurement methods 18,34 |
6 |
8.0 |
48.1 |
30 |
1,428.17 |
|
|
|
$102,043 |
|
|
|
|
|
Determine annual volume of liquid or gaseous fuel using fuel flow meters 35,36,37 |
0.5 |
1.3 |
0.6 |
50 |
31.64 |
|
|
|
$2,261 |
|
||
|
|
|
Determine annual average molecular weight of gaseous fuel 35,38,39 |
0.5 |
0.7 |
0.3 |
27 |
8.68 |
|
|
|
$620 |
|
||
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-3, Eq C-4, or Eq C-5. 8,9,27 |
0.2 |
2.1 |
0.4 |
84 |
29.65 |
|
|
|
$2,118 |
|
||
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-8 11,27 |
0.3 |
2.1 |
0.7 |
84 |
59.30 |
|
|
|
$4,237 |
|
||
|
|
Tier 4 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Gather CEMS data for e-GGRT reporting and QA 40,41 |
20 |
4 |
80 |
76 |
6,099.29 |
|
|
|
$435,794 |
|
||
|
|
Alternative Part 75 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Perform engineering calculation to determine CO2 emissions using Appendix D and G (98.33(a)(5)(i)), LME calculation method (98.33(a)(5)(ii), or CEMS calculation method (98.33(a)(5)(iii)) 9,42 |
0.2 |
3.1 |
0.5 |
38 |
19.36 |
|
|
|
$1,383 |
|
||
|
C. Create Information (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
||||
|
D. Gather Existing Information (Included in 4E) |
|
|
|
|
|
|
|
|
|
|
||||
|
E. Write Report |
|
|
|
|
|
|
|
|
|
|
||||
|
|
|
Annual Compliance Reporting through e-GGRT and data QA 3,43 |
10 |
1 |
10 |
2,188 |
21,880.00 |
|
2188 |
2188 |
$1,834,047 |
|
||
5. RECORDKEEPING REQUIREMENTS |
|
|
|
|
|
|
|
|
|
|
|||||
|
A. Read Instructions (Included in 4A) |
|
|
|
|
|
|
|
|
|
|
||||
|
B. Plan Activities (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
||||
|
C. Implement Activities (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
||||
|
D. Recordkeeping 3,44 |
5 |
1 |
5 |
2,188 |
10,940.00 |
|
1094 |
1094 |
$917,024 |
|
||||
|
E. Time to Transmit or Disclose Information (included in 4E) |
|
|
|
|
|
|
|
|
|
|
||||
|
F. Time to Train Personnel (included in 4A) |
|
|
|
|
|
|
|
|
|
|
||||
|
G. Time for Audits (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
||||
TOTAL ANNUAL LABOR BURDEN AND COST |
|
|
|
|
83,689.24 |
|
3282 |
3282 |
$6,385,678 |
|
|||||
|
|||||||||||||||
ANNUAL O&M COSTS |
|
|
|
|
|
|
|
|
|
|
|||||
|
Sampling costs for Tier 2 units 7,15,46 |
|
|
|
|
|
|
|
|
|
|
||||
|
|
Monthly samples and analyses 19 |
|
2.2 |
|
440 |
|
|
|
|
$381,237 |
|
|||
|
|
Quarterly samples and analyses 21 |
|
3.6 |
|
20 |
|
|
|
|
$28,685 |
|
|||
|
|
Semiannual samples and analyses 23 |
|
3.9 |
|
20 |
|
|
|
|
$30,536 |
|
|||
|
|
Weekly samples and analyses 25 |
|
1.7 |
|
10 |
|
|
|
|
$6,940 |
|
|||
|
|
Other measurement methods samples and analyses 26 |
|
5.1 |
|
115 |
|
|
|
|
$234,039 |
|
|||
|
Sampling costs for Tier 3 units 8,15,27,46 |
|
|
|
|
|
|
|
|
|
|
||||
|
|
Monthly samples and analyses 30 |
|
1.9 |
|
27 |
|
|
|
|
$20,656 |
|
|||
|
|
|
Quarterly samples and analyses 31 |
|
1.1 |
|
8 |
|
|
|
|
$3,516 |
|
||
|
|
|
Semiannual samples and analyses 32 |
|
3.4 |
|
5 |
|
|
|
|
$7,471 |
|
||
|
|
|
Weekly samples and analyses 33 |
|
1.8 |
|
9 |
|
|
|
|
$6,153 |
|
||
|
|
|
Other measurement methods samples and analyses 34 |
|
8.0 |
|
30 |
|
|
|
|
$95,211 |
|
||
|
Flow meter costs for Tier 3 units 47,48 |
|
1.3 |
|
2 |
|
|
|
|
$6,594 |
|
||||
|
Sampling costs for Biogenic Testing |
|
|
|
|
|
|
|
|
|
|
||||
|
|
Annual gas samples and analyses 49,50 |
|
2.3 |
|
93 |
|
|
|
|
$1,232,928 |
|
|||
|
Recordkeeping 51 |
|
1 |
|
2188 |
|
|
|
|
$109,400 |
|
||||
|
|||||||||||||||
ANNUALIZED CAPITAL COSTS |
|
|
|
|
|
|
|
|
|
|
|||||
|
CEMS costs for Tier 4 units 52,53 |
|
2.0 |
|
10 |
|
|
|
|
$345,089 |
|
||||
|
|||||||||||||||
TOTAL ANNUAL COSTS (Labor, O&M, and annualized capital) |
|
|
|
|
|
|
|
|
$8,894,134 |
|
Note: Figures may not add exactly due to rounding. |
1 Assumed 5 hours per reporter per year to read rule. |
2 Assumed activity occurs once per year per reporter. |
3 There are 1808 facilities that reported only subpart C in RY2017, with an additional 95 new reporters per year. |
4 Assumed 2 hours per reporter per year to read rule. |
5 Assumed 5 hours per year to review company records. |
6 There are 1419 facilities that reported only subpart C under Tier 1 in RY2017, with an additional 75 new reporters per year. 1016 of those facilities reported using Eq C-1 and 811 facilities reported using Eq C-1a and/or Eq C-1b. |
7 There are 598 facilities that reported only subpart C under Tier 2 in RY2017, with an additional 31 new reporters per year. 621 of those facilities reported using Eq C-2a and 52 facilities reported using Eq C-2c. |
8 There are 69 facilities that reported only subpart C under Tier 3 in RY2017, with an additional 4 new reporters per year. 38 of those facilities reported using Eq C-3, 21 facilities reported using Eq C-4, and 24 facilities reported using Eq C-5. |
9 Assumed 10 minutes per pollutant per fuel [1 pollutant]. |
10 Using RY2017 data, there are 0.56 fuels per facility using Eq C-1a; 0.37 fuels per facility using Eq C-1b; 1.71 fuels per facility using Eq. C-1. |
11 Assumed 10 minutes per pollutant per fuel [2 pollutants]. |
12 Using RY2017 data, there are 2.43 fuels per facility using Eq C-2a and 0.13 fuels per facility using Eq C-2c. |
13 [reserved] |
14 Using RY2017 data, 10% of Tier 2 Eqn. C-2a facilities perform daily measurements for an average of 2.1 fuels per facility. |
15 Assumed that hourly and daily sampling is done automatically via continuous, on-line equipment and, therefore, no lab analyses are required. |
16 [reserved] |
17 Using RY2017 data, 1.2% of Tier 2 Eq C-2a facilities perform hourly measurements for an average of 2 fuels per facility. |
18 Assumed 0.5 hour per fuel and 12 measurements per year. |
19 Using RY2017 data, 65% of Tier 2 Eq C-2a facilities perform monthly measurements for an average of 2.2 fuels per facility. |
20 Assumed 0.5 hour per fuel and 4 measurements per year. |
21 Using RY2017 data, 2.9% of Tier 2 Eq C-2a facilities perform quarterly measurements for an average of 3.6 fuels per facility. |
22 Assumed 0.5 hour per fuel and 2 measurements per year. |
23 Using RY2017 data, 2.9% of Tier 2 Eq C-2a facilities perform semiannual measurements for an average of 3.9 fuels per facility. |
24 Assumed 0.5 hour per fuel and 52 measurements per year. |
25 Using RY2017 data, 1.5% of Tier 2 Eq C-2a facilities perform weekly measurements for an average of 1.7 fuels per facility. |
26 Other measurement methods include once per fuel lot, upon addition of oil to the storage tank, and other specified measurement methods. Using RY2017 data, 17% of Tier 2 C-2a facilities perform measurements at one of these frequencies for an average of 5.1 fuels per facility." |
27 Using RY2017 data, there are 2.13 fuels per respondent using Tier 3 methodology. |
28 Using RY2017 data, 2.6% of Tier 3 facilities perform daily measurements for an average of 1 fuel per facility. |
29 Using RY2017 data, 2.6% of Tier 3 facilities perform hourly measurements for an average of 2 fuels per facility. |
30 Using RY2017 data, 33% of Tier 3 facilities perform monthly measurements for an average of 1.9 fuels per facility. |
31 Using RY2017 data, 9.2% of Tier 3 facilities perform quarterly measurements for an average of 1.1 fuels per facility. |
32 Using RY2017 data, 6.6% of Tier 3 facilities perform semiannual measurements for an average of 3.4 fuels per facility. |
33 Using RY2017 data, 11% of Tier 3 facilities perform weekly measurements for an average of 1.8 fuels per facility. |
34 Other measurement methods include once per fuel lot, upon addition of oil to the storage tank, and other specified measurement methods. Using RY2017 data, 36% of Tier 3 facilities perform measurements at one of these frequencies for an average of 8 fuels per facility. |
35 Assumed 0.5 hours per fuel to determine the annual volume of fuel or annual average molecular weight of gaseous fuel. |
36 Using RY2017 data, there are 1.28 liquid or gaseous fuels per respondent using Tier 3 methodology. |
37 Using RY2017 data, there are 41 facilities reporting only subpart C which used liquid or gaseous fuel, with an additional 2 new reporters per year. |
38 Using RY2017 data, there are 0.65 gaseous fuels per respondent using Tier 3 methodology. |
39 Using RY2017 data, there are 22 facilities reporting only subpart C used gaseous fuel, with an additional 1 new reporter per year. |
40 Assumed 20 hours per quarter to gather and QA the CEMS data. |
41 Using RY2017 data, there are 63 facilities reporting only subpart C used Tier 4, with an additional 3 new reporters per year. |
42 Using RY2017 data, there are 31 facilities reporting only subpart C used Alternative Part 75 methodology, with an additional 2 new reporters per year. There are 3.1 fuels per Alternative Part 75 facility. |
43 Assumed 10 technical hours, 1 clerical hour, and 1 manager hour per reporter per year to submit report through e-GGRT and QA the data. |
44 Assumed 5 technical hours, 0.5 clerical hours, and 0.5 manager hours per reporter per year to maintain records. |
45 Number of occurrences per respondent based on average number of fuels reported for Tier 2 C-2a units in RY2017. |
46 Assumed testing cost of $400 per fuel. |
47 Number of occurrences per respondent based on average number of fuels reported by segment for new Tier 3 C-4 and C-5 units in RY2017. Assumed meter is installed upon startup of new units. |
48 Assumed operational cost of $2,400 per fuel per flow meter. |
49 Number of occurrences per respondent based on average number of units with reported biogenic testing results per reporter in RY2017. |
50 Assumed testing cost of $5660 per unit. Assumed that direct emissions measurements infrastructure is already installed (e.g., ports and platforms). |
51 Assumed $50 per reporter per year, which includes the cost of file cabinets, hard drives, and cloud file storage for the GHGRP records required to be maintained. |
52 Number of occurrences per respondent based on average number of units reported per facility for new Tier 4 facilities in RY2017. Assumed facilities with units installed before Year 1 of this ICR have completed their annualized capital payments. |
53 Assumed capital cost of $124,000 per unit per CEMS device, which is an annualized cost of $17,654.81 (annualized at 10 years, 7% interest). Assumed new Tier 4 reporters would add both a CO2 analyzer and a volumetric flow monitor to an existing CEMS device. |
Year 1 |
(A) Hours per Occurrence |
(B) Occurrences/ Respondent/Year |
(C) Hours/ Respondent/ |
(D) Respondents/ Year |
(E) Technical Hours/ |
Legal Hours/Year |
Clerical Hours/ |
Manager Hours/ |
(H) Cost/ Year |
|
||||
Year (A x B) |
Year |
Year |
Year |
|
||||||||||
|
(C x D) |
|
|
|
||||||||||
1. APPLICATIONS (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
||||
2. SURVEY AND STUDIES (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
||||
3. ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS |
|
|
|
|
|
|
|
|
|
|
||||
4. REPORT REQUIREMENTS |
|
|
|
|
|
|
|
|
|
|
||||
|
A. Read Rule, Instructions, Guidance Documents 1,2,3 |
5 |
1 |
5 |
3,790 |
18,950 |
|
|
|
$1,353,978 |
|
|||
|
B. Required Activities |
|
|
|
|
|
|
|
|
|
|
|||
|
|
Activity covering Tier 1 Methodology |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 1,2,4 |
5 |
1 |
5 |
1,857 |
9,284 |
|
|
|
$663,324 |
|
|
|
|
|
Conduct annual review of billing records to determine natural gas consumption in therms or mmBtu 1,2,4 |
5 |
1 |
5 |
511 |
2,557 |
|
|
|
$182,717 |
|
|
|
|
Activity covering Tier 2 Methodology |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct annual review of billing records to determine natural gas consumption in therms or mmBtu 1,2,5 |
5 |
1 |
5 |
1,998 |
9,989 |
|
|
|
$713,688 |
|
|
|
|
Activity covering Tier 3 Methodology |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 1,2,6 |
5 |
1 |
5 |
256 |
1,279 |
|
|
|
$91,358 |
|
|
|
|
Tier 1 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-1, C-1a, or C-1b, using default high heat values and/or default emission factors 4,7,8 |
0.2 |
2.7 |
0.5 |
2,164 |
975 |
|
|
|
$69,690 |
|
|
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-8, Eq C-8a, or Eq C-8b 4,8,9 |
0.3 |
2.7 |
0.9 |
2,164 |
1,951 |
|
|
|
$139,380 |
|
|
|
|
Tier 2 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct sampling to determine high heat value for each type of fuel or fuel mixture 5,10 |
|
2.6 |
|
1,996 |
|
|
|
|
|
|
|
|
|
|
|
Daily measurements 12,13 |
0 |
2.0 |
0.0 |
325 |
0 |
|
|
|
$0 |
|
|
|
|
|
Hourly measurements 13,14 |
0 |
2.4 |
0.0 |
79 |
0 |
|
|
|
$0 |
|
|
|
|
|
Monthly measurements 15,16 |
6 |
2.8 |
16.8 |
1,031 |
17,357 |
|
|
|
$1,240,127 |
|
|
|
|
|
Quarterly measurements 17,18 |
2 |
2.3 |
4.6 |
139 |
641 |
|
|
|
$45,832 |
|
|
|
|
|
Semiannual measurements 19,20 |
1 |
1.7 |
1.7 |
194 |
335 |
|
|
|
$23,948 |
|
|
|
|
|
Weekly measurements 21,22 |
26 |
2.0 |
51.4 |
45 |
2,333 |
|
|
|
$166,677 |
|
|
|
|
|
Other measurement methods 15,23 |
6 |
8.0 |
47.8 |
182 |
8,668 |
|
|
|
$619,306 |
|
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-2a, along with Eq C-2b or Eq C-2c. 5,7,10 |
0.2 |
2.6 |
0.4 |
1,998 |
873 |
|
|
|
$62,389 |
|
|
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-9a or Eq 9b 5,9,10 |
0.3 |
2.6 |
0.9 |
1,998 |
1,746 |
|
|
|
$124,778 |
|
|
|
|
Tier 3 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct sampling to determine carbon content for each type of fuel or fuel mixture 6,24 |
|
6.3 |
|
256 |
|
|
|
|
|
|
|
|
|
|
|
Daily measurements 13,25 |
0 |
6.9 |
0.0 |
56 |
0 |
|
|
|
$0 |
|
|
|
|
|
Hourly measurements 13,26 |
0 |
12.3 |
0.0 |
9 |
0 |
|
|
|
$0 |
|
|
|
|
|
Monthly measurements 15,27 |
6 |
3.4 |
20.2 |
70 |
1,418 |
|
|
|
$101,342 |
|
|
|
|
|
Quarterly measurements 17,28 |
2 |
1.9 |
3.8 |
11 |
44 |
|
|
|
$3,139 |
|
|
|
|
|
Semiannual measurements 19,29 |
1 |
1.0 |
1.0 |
4 |
4 |
|
|
|
$314 |
|
|
|
|
|
Weekly measurements 21,30 |
26 |
7.0 |
181.6 |
65 |
11,813 |
|
|
|
$844,013 |
|
|
|
|
|
Other measurement methods 15,31 |
6 |
4.0 |
24.0 |
40 |
949 |
|
|
|
$67,812 |
|
|
|
|
Determine annual volume of liquid or gaseous fuel using fuel flow meters 32,33,34 |
0.5 |
5.9 |
2.9 |
213 |
625 |
|
|
|
$44,638 |
|
|
|
|
|
Determine annual average molecular weight of gaseous fuel 32,35,36 |
0.5 |
5.8 |
2.9 |
201 |
578 |
|
|
|
$41,322 |
|
|
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-3, Eq C-4, or Eq C-5. 6,7,24 |
0.2 |
6.3 |
1.1 |
256 |
270 |
|
|
|
$19,261 |
|
|
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-8 6,9,24 |
0.3 |
6.3 |
2.1 |
256 |
539 |
|
|
|
$38,521 |
|
|
|
|
Tier 4 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Gather CEMS data for e-GGRT reporting 37,38 |
20 |
4 |
80 |
69 |
5,508 |
|
|
|
$393,544 |
|
|
|
|
Alternative Part 75 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Perform engineering calculation to determine CO2 emissions using Appendix D and G (98.33(a)(5)(i)), LME calculation method (98.33(a)(5)(ii), or CEMS calculation method (98.33(a)(5)(iii)) 7,39 |
0.2 |
3.9 |
0.7 |
34 |
22 |
|
|
|
$1,588 |
|
|
|
C. Create Information (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
|||
|
D. Gather Existing Information (Included in 4E) |
|
|
|
|
|
|
|
|
|
|
|||
|
E. Write Report |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Annual Compliance Reporting through e-GGRT and QA 3,40 |
10 |
1 |
10 |
3,790 |
37,900 |
|
3790 |
3790 |
$3,176,892 |
|
|
5. RECORDKEEPING REQUIREMENTS |
|
|
|
|
|
|
|
|
|
|
||||
|
A. Read Instructions (Included in 4A) |
|
|
|
|
|
|
|
|
|
|
|||
|
B. Plan Activities (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
|||
|
C. Implement Activities (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
|||
|
D. Recordkeeping 3,41 |
5 |
1 |
5 |
3,790 |
18,950 |
|
1895 |
1895 |
$1,588,446 |
|
|||
|
E. Time to Transmit or Disclose Information (included in 4E) |
|
|
|
|
|
|
|
|
|
|
|||
|
F. Time to Train Personnel (included in 4A) |
|
|
|
|
|
|
|
|
|
|
|||
|
G. Time for Audits (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
|||
TOTAL ANNUAL LABOR BURDEN AND COST |
|
|
|
|
155,558 |
|
5685 |
5685 |
$11,818,024 |
|
||||
|
||||||||||||||
ANNUAL TESTING COSTS (O&M) |
|
|
|
|
|
|
|
|
|
|
||||
|
Sampling costs for Tier 2 units 5,13,43 |
|
|
|
|
|
|
|
|
|
|
|||
|
|
Monthly samples and analyses 16 |
|
2.8 |
|
1,031 |
|
|
|
|
$1,157,105 |
|
||
|
|
Quarterly samples and analyses 18 |
|
2.3 |
|
139 |
|
|
|
|
$128,292 |
|
||
|
|
Semiannual samples and analyses 20 |
|
1.7 |
|
194 |
|
|
|
|
$134,067 |
|
||
|
|
Weekly samples and analyses 22 |
|
2.0 |
|
45 |
|
|
|
|
$35,889 |
|
||
|
|
Other measurement methods samples and analyses 23 |
|
8.0 |
|
182 |
|
|
|
|
$577,845 |
|
||
|
Sampling costs for Tier 3 units 6,13,24,43 |
|
|
|
|
|
|
|
|
|
|
|||
|
|
Monthly samples and analyses 27 |
|
3.4 |
|
70 |
|
|
|
|
$94,557 |
|
||
|
|
Quarterly samples and analyses 28 |
|
1.9 |
|
11 |
|
|
|
|
$8,788 |
|
||
|
|
Semiannual samples and analyses 29 |
|
1.0 |
|
4 |
|
|
|
|
$1,758 |
|
||
|
|
Weekly samples and analyses 30 |
|
7.0 |
|
65 |
|
|
|
|
$181,733 |
|
||
|
|
Other measurement methods samples and analyses 31 |
|
4.0 |
|
40 |
|
|
|
|
$63,273 |
|
||
|
Flow meter costs for Tier 3 units 44,45 |
|
5.9 |
|
9 |
|
|
|
|
$127,389 |
|
|||
|
Sampling costs for Biogenic Testing |
|
|
|
|
|
|
|
|
|
|
|||
|
|
Annual gas samples and analyses 46,47 |
|
4.0 |
|
32 |
|
|
|
|
$717,521 |
|
||
|
Recordkeeping 48 |
|
1 |
|
3,790 |
|
|
|
|
$189,500 |
|
|||
|
||||||||||||||
ANNUALIZED CAPITAL COSTS |
|
|
|
|
|
|
|
|
|
|
||||
|
CEMS costs for Tier 4 units 49,50 |
|
1.8 |
|
3 |
|
|
|
|
$90,977 |
|
|||
|
||||||||||||||
TOTAL ANNUAL COSTS (Labor, O&M, and annualized capital) |
|
|
|
|
|
|
|
|
$15,326,718 |
|
Year 2 |
(A) Hours per Occurrence |
(B) Occurrences/ Respondent/Year |
(C) Hours/ Respondent/ |
(D) Respondents/ Year |
(E) Technical Hours/ |
Legal Hours/Year |
Clerical Hours/ |
Manager Hours/ |
(H) Cost/ Year |
|
||||
Year (A x B) |
Year |
Year |
Year |
|
||||||||||
|
(C x D) |
|
|
|
||||||||||
1. APPLICATIONS (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
||||
2. SURVEY AND STUDIES (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
||||
3. ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS |
|
|
|
|
|
|
|
|
|
|
||||
4. REPORT REQUIREMENTS |
|
|
|
|
|
|
|
|
|
|
||||
|
A. Read Rule, Instructions, Guidance Documents 1,2,3 |
5 |
1 |
5 |
3951 |
19,755 |
|
|
|
$1,411,495 |
|
|||
|
B. Required Activities |
|
|
|
|
|
|
|
|
|
|
|||
|
|
Activity covering Tier 1 Methodology |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 1,2,4 |
5 |
1 |
5 |
1936 |
9,678 |
|
|
|
$691,502 |
|
|
|
|
|
Conduct annual review of billing records to determine natural gas consumption in therms or mmBtu 1,2,4 |
5 |
1 |
5 |
533 |
2,666 |
|
|
|
$190,479 |
|
|
|
|
Activity covering Tier 2 Methodology |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct annual review of billing records to determine natural gas consumption in therms or mmBtu 1,2,5 |
5 |
1 |
5 |
2083 |
10,413 |
|
|
|
$744,006 |
|
|
|
|
Activity covering Tier 3 Methodology |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 1,2,6 |
5 |
1 |
5 |
267 |
1,333 |
|
|
|
$95,239 |
|
|
|
|
Tier 1 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-1, C-1a, or C-1b, using default high heat values and/or default emission factors 4,7,8 |
0.2 |
2.7 |
0.5 |
2256 |
1,017 |
|
|
|
$72,650 |
|
|
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-8, Eq C-8a, or Eq C-8b 4,8,9 |
0.3 |
2.7 |
0.9 |
2256 |
2,034 |
|
|
|
$145,301 |
|
|
|
|
Tier 2 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct sampling to determine high heat value for each type of fuel or fuel mixture 5,10 |
|
2.6 |
|
2080 |
|
|
|
|
|
|
|
|
|
|
|
Daily measurements 12,13 |
0 |
2.0 |
0.0 |
339 |
0 |
|
|
|
$0 |
|
|
|
|
|
Hourly measurements 13,14 |
0 |
2.4 |
0.0 |
83 |
0 |
|
|
|
$0 |
|
|
|
|
|
Monthly measurements 15,16 |
6 |
2.8 |
16.8 |
1075 |
18,094 |
|
|
|
$1,292,808 |
|
|
|
|
|
Quarterly measurements 17,18 |
2 |
2.3 |
4.6 |
145 |
669 |
|
|
|
$47,779 |
|
|
|
|
|
Semiannual measurements 19,20 |
1 |
1.7 |
1.7 |
202 |
349 |
|
|
|
$24,965 |
|
|
|
|
|
Weekly measurements 21,22 |
26 |
2.0 |
51.4 |
47 |
2,432 |
|
|
|
$173,757 |
|
|
|
|
|
Other measurement methods 15,23 |
6 |
8.0 |
47.8 |
189 |
9,036 |
|
|
|
$645,614 |
|
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-2a, along with Eq C-2b or Eq C-2c. 5,7,10 |
0.2 |
2.6 |
0.4 |
2083 |
910 |
|
|
|
$65,039 |
|
|
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-9a or Eq 9b 5,9,10 |
0.3 |
2.6 |
0.9 |
2083 |
1,821 |
|
|
|
$130,079 |
|
|
|
|
Tier 3 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct sampling to determine carbon content for each type of fuel or fuel mixture 6,24 |
|
6.3 |
|
267 |
|
|
|
|
|
|
|
|
|
|
|
Daily measurements 13,25 |
0 |
6.9 |
0 |
59 |
0 |
|
|
|
$0 |
|
|
|
|
|
Hourly measurements 13,26 |
0 |
12.3 |
0 |
9 |
0 |
|
|
|
$0 |
|
|
|
|
|
Monthly measurements 15,27 |
6 |
3.4 |
20.2 |
73 |
1,479 |
|
|
|
$105,647 |
|
|
|
|
|
Quarterly measurements 17,28 |
2 |
1.9 |
3.8 |
12 |
46 |
|
|
|
$3,273 |
|
|
|
|
|
Semiannual measurements 19,29 |
1 |
1.0 |
1.0 |
5 |
5 |
|
|
|
$327 |
|
|
|
|
|
Weekly measurements 21,30 |
26 |
7.0 |
181.6 |
68 |
12,314 |
|
|
|
$879,867 |
|
|
|
|
|
Other measurement methods 15,31 |
6 |
4.0 |
24.0 |
41 |
989 |
|
|
|
$70,693 |
|
|
|
|
Determine annual volume of liquid or gaseous fuel using fuel flow meters 32,33,34 |
0.5 |
5.9 |
2.9 |
222 |
651 |
|
|
|
$46,534 |
|
|
|
|
|
Determine annual average molecular weight of gaseous fuel 32,35,36 |
0.5 |
5.8 |
2.9 |
210 |
603 |
|
|
|
$43,077 |
|
|
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-3, Eq C-4, or Eq C-5. 6,7,24 |
0.2 |
6.3 |
1.1 |
267 |
281 |
|
|
|
$20,079 |
|
|
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-8 6,9,24 |
0.3 |
6.3 |
2.1 |
267 |
562 |
|
|
|
$40,158 |
|
|
|
|
Tier 4 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Gather CEMS data for e-GGRT reporting 37,38 |
20 |
4 |
80 |
72 |
5,742 |
|
|
|
$410,261 |
|
|
|
|
Alternative Part 75 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Perform engineering calculation to determine CO2 emissions using Appendix D and G (98.33(a)(5)(i)), LME calculation method (98.33(a)(5)(ii), or CEMS calculation method (98.33(a)(5)(iii)) 7,39 |
0.2 |
3.9 |
0.7 |
35 |
23 |
|
|
|
$1,655 |
|
|
|
C. Create Information (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
|||
|
D. Gather Existing Information (Included in 4E) |
|
|
|
|
|
|
|
|
|
|
|||
|
E. Write Report |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Annual Compliance Reporting through e-GGRT and QA 3,40 |
10 |
1 |
10 |
3,951 |
39,510 |
|
3951 |
3951 |
$3,311,847 |
|
|
5. RECORDKEEPING REQUIREMENTS |
|
|
|
|
|
|
|
|
|
|
||||
|
A. Read Instructions (Included in 4A) |
|
|
|
|
|
|
|
|
|
|
|||
|
B. Plan Activities (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
|||
|
C. Implement Activities (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
|||
|
D. Recordkeeping 3,41 |
5 |
1 |
5 |
3,951 |
19,755 |
|
1976 |
1976 |
$1,655,923 |
|
|||
|
E. Time to Transmit or Disclose Information (included in 4E) |
|
|
|
|
|
|
|
|
|
|
|||
|
F. Time to Train Personnel (included in 4A) |
|
|
|
|
|
|
|
|
|
|
|||
|
G. Time for Audits (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
|||
TOTAL ANNUAL LABOR BURDEN AND COST |
|
|
|
|
162,166 |
|
5926.5 |
5926.5 |
$12,320,056 |
|
||||
|
||||||||||||||
ANNUAL TESTING COSTS (O&M) |
|
|
|
|
|
|
|
|
|
|
||||
|
Sampling costs for Tier 2 units 5,13,43 |
|
|
|
|
|
|
|
|
|
|
|||
|
|
Monthly samples and analyses 16 |
|
2.8 |
|
1,075 |
|
|
|
|
$1,206,259 |
|
||
|
|
Quarterly samples and analyses 18 |
|
2.3 |
|
145 |
|
|
|
|
$133,742 |
|
||
|
|
Semiannual samples and analyses 20 |
|
1.7 |
|
202 |
|
|
|
|
$139,763 |
|
||
|
|
Weekly samples and analyses 22 |
|
2.0 |
|
47 |
|
|
|
|
$37,413 |
|
||
|
|
Other measurement methods samples and analyses 23 |
|
8.0 |
|
189 |
|
|
|
|
$602,392 |
|
||
|
Sampling costs for Tier 3 units 6,13,24,43 |
|
|
|
|
|
|
|
|
|
|
|||
|
|
Monthly samples and analyses 27 |
|
3.4 |
|
73 |
|
|
|
|
$98,574 |
|
||
|
|
Quarterly samples and analyses 28 |
|
1.9 |
|
12 |
|
|
|
|
$9,161 |
|
||
|
|
Semiannual samples and analyses 29 |
|
1.0 |
|
5 |
|
|
|
|
$1,832 |
|
||
|
|
Weekly samples and analyses 30 |
|
7.0 |
|
68 |
|
|
|
|
$189,453 |
|
||
|
|
Other measurement methods samples and analyses 31 |
|
4.0 |
|
41 |
|
|
|
|
$65,960 |
|
||
|
Flow meter costs for Tier 3 units 44,45 |
|
5.9 |
|
9 |
|
|
|
|
$127,389 |
|
|||
|
Sampling costs for Biogenic Testing |
|
|
|
|
|
|
|
|
|
|
|||
|
|
Annual gas samples and analyses 46,47 |
|
4.0 |
|
33 |
|
|
|
|
$748,001 |
|
||
|
Recordkeeping 48 |
|
1 |
|
3,951 |
|
|
|
|
$197,550 |
|
|||
|
||||||||||||||
ANNUALIZED CAPITAL COSTS |
|
|
|
|
|
|
|
|
|
|
||||
|
CEMS costs for Tier 4 units 49,50 |
|
1.8 |
|
6 |
|
|
|
|
$181,955 |
|
|||
|
||||||||||||||
TOTAL ANNUAL COSTS (Labor, O&M, and annualized capital) |
|
|
|
|
|
|
|
|
$16,059,501 |
|
Year 3 |
(A) Hours per Occurrence |
(B) Occurrences/ Respondent/Year |
(C) Hours/ Respondent/ |
(D) Respondents/ Year |
(E) Technical Hours/ |
Legal Hours/Year |
Clerical Hours/ |
Manager Hours/ |
(H) Cost/ Year |
|
||||
Year (A x B) |
Year |
Year |
Year |
|
||||||||||
|
(C x D) |
|
|
|
||||||||||
1. APPLICATIONS (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
||||
2. SURVEY AND STUDIES (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
||||
3. ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS |
|
|
|
|
|
|
|
|
|
|
||||
4. REPORT REQUIREMENTS |
|
|
|
|
|
|
|
|
|
|
||||
|
A. Read Rule, Instructions, Guidance Documents 1,2,3 |
5 |
1 |
5 |
4112 |
20,560 |
|
|
|
$1,469,012 |
|
|||
|
B. Required Activities |
|
|
|
|
|
|
|
|
|
|
|||
|
|
Activity covering Tier 1 Methodology |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 1,2,4 |
5 |
1 |
5 |
2015 |
10,073 |
|
|
|
$719,680 |
|
|
|
|
|
Conduct annual review of billing records to determine natural gas consumption in therms or mmBtu 1,2,4 |
5 |
1 |
5 |
555 |
2,775 |
|
|
|
$198,240 |
|
|
|
|
Activity covering Tier 2 Methodology |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct annual review of billing records to determine natural gas consumption in therms or mmBtu 1,2,5 |
5 |
1 |
5 |
2167 |
10,837 |
|
|
|
$774,324 |
|
|
|
|
Activity covering Tier 3 Methodology |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct annual review of company records to determine mass or volume of fuel combusted 1,2,6 |
5 |
1 |
5 |
277 |
1,387 |
|
|
|
$99,120 |
|
|
|
|
Tier 1 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-1, C-1a, or C-1b, using default high heat values and/or default emission factors 4,7,8 |
0.2 |
2.7 |
0.5 |
2348 |
1,058 |
|
|
|
$75,611 |
|
|
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-8, Eq C-8a, or Eq C-8b 4,8,9 |
0.3 |
2.7 |
0.9 |
2348 |
2,116 |
|
|
|
$151,222 |
|
|
|
|
Tier 2 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct sampling to determine high heat value for each type of fuel or fuel mixture 5,10 |
|
2.6 |
|
2165 |
|
|
|
|
|
|
|
|
|
|
|
Daily measurements 12,13 |
0 |
2.0 |
0.0 |
352 |
0 |
|
|
|
$0 |
|
|
|
|
|
Hourly measurements 13,14 |
0 |
2.4 |
0.0 |
86 |
0 |
|
|
|
$0 |
|
|
|
|
|
Monthly measurements 15,16 |
6 |
2.8 |
16.8 |
1119 |
18,831 |
|
|
|
$1,345,489 |
|
|
|
|
|
Quarterly measurements 17,18 |
2 |
2.3 |
4.6 |
151 |
696 |
|
|
|
$49,726 |
|
|
|
|
|
Semiannual measurements 19,20 |
1 |
1.7 |
1.7 |
210 |
364 |
|
|
|
$25,982 |
|
|
|
|
|
Weekly measurements 21,22 |
26 |
2.0 |
51.4 |
49 |
2,531 |
|
|
|
$180,838 |
|
|
|
|
|
Other measurement methods 15,23 |
6 |
8.0 |
47.8 |
197 |
9,404 |
|
|
|
$671,922 |
|
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-2a, along with Eq C-2b or Eq C-2c. 5,7,10 |
0.2 |
2.6 |
0.4 |
2167 |
947 |
|
|
|
$67,690 |
|
|
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-9a or Eq 9b 5,9,10 |
0.3 |
2.6 |
0.9 |
2167 |
1,895 |
|
|
|
$135,380 |
|
|
|
|
Tier 3 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Conduct sampling to determine carbon content for each type of fuel or fuel mixture 6,24 |
|
6.3 |
|
277 |
|
|
|
|
|
|
|
|
|
|
|
Daily measurements 13,25 |
0 |
6.9 |
0.0 |
61 |
0 |
|
|
|
$0 |
|
|
|
|
|
Hourly measurements 13,26 |
0 |
12.3 |
0.0 |
10 |
0 |
|
|
|
$0 |
|
|
|
|
|
Monthly measurements 15,27 |
6 |
3.4 |
20.2 |
76 |
1,539 |
|
|
|
$109,952 |
|
|
|
|
|
Quarterly measurements 17,28 |
2 |
1.9 |
3.8 |
12 |
48 |
|
|
|
$3,406 |
|
|
|
|
|
Semiannual measurements 19,29 |
1 |
1.0 |
1.0 |
5 |
5 |
|
|
|
$341 |
|
|
|
|
|
Weekly measurements 21,30 |
26 |
7.0 |
181.6 |
71 |
12,816 |
|
|
|
$915,721 |
|
|
|
|
|
Other measurement methods 15,31 |
6 |
4.0 |
24.0 |
43 |
1,030 |
|
|
|
$73,574 |
|
|
|
|
Determine annual volume of liquid or gaseous fuel using fuel flow meters 32,33,34 |
0.5 |
5.9 |
2.9 |
231 |
678 |
|
|
|
$48,431 |
|
|
|
|
|
Determine annual average molecular weight of gaseous fuel 32,35,36 |
0.5 |
5.8 |
2.9 |
218 |
627 |
|
|
|
$44,833 |
|
|
|
|
|
Perform engineering calculation to determine CO2 emissions using Eq C-3, Eq C-4, or Eq C-5. 6,7,24 |
0.2 |
6.3 |
1.1 |
277 |
292 |
|
|
|
$20,897 |
|
|
|
|
|
Perform engineering calculation to determine CH4 and N2O emissions using Eq C-8 6,9,24 |
0.3 |
6.3 |
2.1 |
277 |
585 |
|
|
|
$41,794 |
|
|
|
|
Tier 4 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Gather CEMS data for e-GGRT reporting 37,38 |
20 |
4 |
80 |
75 |
5,976 |
|
|
|
$426,979 |
|
|
|
|
Alternative Part 75 Methodology for combustion emissions reported under subpart C |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Perform engineering calculation to determine CO2 emissions using Appendix D and G (98.33(a)(5)(i)), LME calculation method (98.33(a)(5)(ii), or CEMS calculation method (98.33(a)(5)(iii)) 7,39 |
0.2 |
3.9 |
0.7 |
37 |
24 |
|
|
|
$1,723 |
|
|
|
C. Create Information (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
|||
|
D. Gather Existing Information (Included in 4E) |
|
|
|
|
|
|
|
|
|
|
|||
|
E. Write Report |
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
Annual Compliance Reporting through e-GGRT and QA 3,40 |
10 |
1 |
10 |
4,112 |
41,120 |
|
4112 |
4112 |
$3,446,802 |
|
|
5. RECORDKEEPING REQUIREMENTS |
|
|
|
|
|
|
|
|
|
|
||||
|
A. Read Instructions (Included in 4A) |
|
|
|
|
|
|
|
|
|
|
|||
|
B. Plan Activities (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
|||
|
C. Implement Activities (Included in 4B) |
|
|
|
|
|
|
|
|
|
|
|||
|
D. Recordkeeping 3,41 |
5 |
1 |
5 |
4,112 |
20,560 |
|
2056 |
2056 |
$1,723,401 |
|
|||
|
E. Time to Transmit or Disclose Information (included in 4E) |
|
|
|
|
|
|
|
|
|
|
|||
|
F. Time to Train Personnel (included in 4A) |
|
|
|
|
|
|
|
|
|
|
|||
|
G. Time for Audits (Not Applicable) |
|
|
|
|
|
|
|
|
|
|
|||
TOTAL ANNUAL LABOR BURDEN AND COST |
|
|
|
|
168,774 |
|
6168 |
6168 |
$12,822,088 |
|
||||
|
||||||||||||||
ANNUAL TESTING COSTS (O&M) |
|
|
|
|
|
|
|
|
|
|
||||
|
Sampling costs for Tier 2 units |
|
|
|
|
|
|
|
|
|
|
|||
|
|
Monthly samples and analyses 16 |
|
2.8 |
|
1,119 |
|
|
|
|
$1,255,413 |
|
||
|
|
Quarterly samples and analyses 18 |
|
2.3 |
|
151 |
|
|
|
|
$139,192 |
|
||
|
|
Semiannual samples and analyses 20 |
|
1.7 |
|
210 |
|
|
|
|
$145,458 |
|
||
|
|
Weekly samples and analyses 22 |
|
2.0 |
|
49 |
|
|
|
|
$38,938 |
|
||
|
|
Other measurement methods samples and analyses 23 |
|
8.0 |
|
197 |
|
|
|
|
$626,939 |
|
||
|
Sampling costs for Tier 3 units 6,13,24,43 |
|
|
|
|
|
|
|
|
|
|
|||
|
|
Monthly samples and analyses 27 |
|
3.4 |
|
76 |
|
|
|
|
$102,591 |
|
||
|
|
Quarterly samples and analyses 28 |
|
1.9 |
|
12 |
|
|
|
|
$9,534 |
|
||
|
|
Semiannual samples and analyses 29 |
|
1.0 |
|
5 |
|
|
|
|
$1,907 |
|
||
|
|
Weekly samples and analyses 30 |
|
7.0 |
|
71 |
|
|
|
|
$197,173 |
|
||
|
|
Other measurement methods samples and analyses 31 |
|
4.0 |
|
43 |
|
|
|
|
$68,648 |
|
||
|
Flow meter costs for Tier 3 units 44,45 |
|
5.9 |
|
9 |
|
|
|
|
$127,389 |
|
|||
|
Sampling costs for Biogenic Testing |
|
|
|
|
|
|
|
|
|
|
|||
|
|
Annual gas samples and analyses 46,47 |
|
4.0 |
|
34 |
|
|
|
|
$778,482 |
|
||
|
Recordkeeping 48 |
|
1 |
|
4,112 |
|
|
|
|
$205,600 |
|
|||
|
||||||||||||||
ANNUALIZED CAPITAL COSTS |
|
|
|
|
|
|
|
|
|
|
||||
|
CEMS costs for Tier 4 units 49,50 |
|
1.8 |
|
9 |
|
|
|
|
$272,932 |
|
|||
|
||||||||||||||
TOTAL ANNUAL COSTS (Labor, O&M, and annualized capital) |
|
|
|
|
|
|
|
|
$16,792,284 |
|
Note: Figures may not add exactly due to rounding. |
1 Assumed 5 hours per reporter per year to read rule. |
2 Assumed activity occurs once per year per reporter. |
3 There are 3468 facilities that reported subpart C plus another subpart(s) in RY2017, with an additional 161 new reporters per year. |
4 There are 1980 facilities that reported subpart C plus another subpart(s) under Tier 1 in RY2017, with an additional 92 new reporters per year. 1857 of those facilities reported using Eq C-1 and 511 facilities reported using Eq C-1a and/or Eq C-1b. |
5 There are 1828 facilities that reported subpart C plus another subpart(s) under Tier 2 in RY2017, with an additional 85 new reporters per year. 1996 of those facilities reported using Eq C-2a and 3 facilities reported using Eq C-2c. |
6 There are 234 facilities that reported subpart C plus another subpart(s) under Tier 3 in RY2017, with an additional 11 new reporters per year. 56 of those facilities reported using Eq C-3, 12 facilities reported using Eq C-4, and 201 facilities reported using Eq C-5. |
7 Assumed 10 minutes per pollutant per fuel [1 pollutant]. |
8 Using RY2017 data, there are 0.18 fuels per facility using Eq C-1a; 0.15 fuels per facility using Eq C-1b; 2.37 fuels per facility using Eq. C-1. |
9 Assumed 10 minutes per pollutant per fuel [2 pollutants]. |
10 Using RY2017 data, there are 2.62 fuels per facility using Eq C-2a and 0.002 fuels per facility using Eq C-2c. |
11 [reserved] |
12 Using RY2017 data, 16% of Tier 2 Eqn. C-2a facilities perform daily measurements for an average of 2 fuels per facility. |
13 Assumed that hourly and daily sampling is done automatically via continuous, on-line equipment and, therefore, no lab analyses are required. |
14 Using RY2017 data, 4% of Tier 2 Eq C-2a facilities perform hourly measurements for an average of 2.4 fuels per facility. |
15 Assumed 0.5 hour per fuel and 12 measurements per year. |
16 Using RY2017 data, 52% of Tier 2 Eq C-2a facilities perform monthly measurements for an average of 2.8 fuels per facility. |
17 Assumed 0.5 hour per fuel and 4 measurements per year. |
18 Using RY2017 data, 7% of Tier 2 Eq C-2a facilities perform quarterly measurements for an average of 2.3 fuels per facility. |
19 Assumed 0.5 hour per fuel and 2 measurements per year. |
20 Using RY2017 data, 9.7% of Tier 2 Eq C-2a facilities perform semiannual measurements for an average of 1.7 fuels per facility. |
21 Assumed 0.5 hour per fuel and 52 measurements per year. |
22 Using RY2017 data, 2.3% of Tier 2 Eq C-2a facilities perform weekly measurements for an average of 2 fuels per facility. |
23 Other measurement methods include once per fuel lot, upon addition of oil to the storage tank, and other specified measurement methods. Using RY2017 data, 9% of Tier 2 C-2a facilities perform measurements at one of these frequencies for an average of 8 fuels per facility. |
24 Using RY2017 data, there are 6.32 fuels per respondent using Tier 3 methodology. |
25 Using RY2017 data, 22% of Tier 3 facilities perform daily measurements for an average of 6.9 fuel per facility. |
26 Using RY2017 data, 3.4% of Tier 3 facilities perform hourly measurements for an average of 12.3 fuel per facility. |
27 Using RY2017 data, 27% of Tier 3 facilities perform monthly measurements for an average of 3.4 fuel per facility. |
28 Using RY2017 data, 4.5% of Tier 3 facilities perform quarterly measurements for an average of 1.9 fuel per facility. |
29 Using RY2017 data, 1.7% of Tier 3 facilities perform semiannual measurements for an average of 1 fuel per facility. |
30 Using RY2017 data, 25% of Tier 3 facilities perform weekly measurements for an average of 7 fuel per facility. |
31 Other measurement methods include once per fuel lot, upon addition of oil to the storage tank, and other specified measurement methods. Using RY2017 data, 15% of Tier 3 facilities perform measurements at one of these frequencies for an average of 4 fuel per facility. |
32 Assumed 0.5 hours per fuel to determine the annual volume of fuel or annual average molecular weight of gaseous fuel. |
33 Using RY2017 data, there are 5.86 liquid or gaseous fuels per respondent using Tier 3 methodology. |
34 Using RY2017 data, there are 195 facilities reporting subpart C plus another subpart(s) which used liquid or gaseous fuel, with an additional 9 new reporters per year. |
35 Using RY2017 data, there are 5.75 gaseous fuels per respondent using Tier 3 methodology. |
36 Using RY2017 data, there are 184 facilities reporting subpart C plus another subpart(s) used gaseous fuel, with an additional 9 new reporters per year. |
37 Assumed 20 hours per quarter to gather and QA the CEMS data. |
38 Using RY2017 data, there are 63 facilities reporting subpart C plus another subpart(s) used Tier 4, with an additional 3 new reporters per year. |
39 Using RY2017 data, there are 31 facilities reporting subpart C plus another subpart(s) used Alternative Part 75 methodology, with an additional 1 new reporter per year. There are 3.94 fuels per Alternative Part 75 facility. |
40 Assumed 10 technical hours, 1 clerical hour, and 1 manager hour per reporter per year to submit report through e-GGRT and QA the data. |
41 Assumed 5 technical hours, 0.5 clerical hours, and 0.5 manager hours per reporter per year to maintain records. |
42 Number of occurrences per respondent based on average number of fuels reported for Tier 2 C-2a units in RY2017. |
43 Assumed testing cost of $400 per fuel. |
44 Number of occurrences per respondent based on average number of fuels reported by segment for new Tier 3 C-4 and C-5 units in RY2017. Assumed meter is installed upon startup of new units. |
45 Assumed capital cost of $2,400 per fuel per flow meter. |
46 Number of occurrences per respondent based on average number of units with reported biogenic testing results per reporter in RY2017. |
47 Assumed testing cost of $5660 per unit. Assumed that direct emissions measurements infrastructure is already installed (e.g., ports and platforms). |
48 Assumed $50 per reporter per year, which includes the cost of file cabinets, hard drives, and cloud file storage for the GHGRP records required to be maintained. |
49 Number of occurrences per respondent based on average number of units reported per facility for new Tier 4 facilities in RY2017. Assumed facilities with units installed before Year 1 of this ICR have completed their annualized capital payments. |
50 Assumed capital cost of $124,000 per unit per CEMS device, which is an annualized cost of $17,654.81 (annualized at 10 years, 7% interest). Assumed new Tier 4 reporters would add both a CO2 analyzer and a volumetric flow monitor to an existing CEMS device. |
Year |
No. Respondents |
Total Labor Cost |
Capital Cost |
O&M Cost |
Total Cost |
Year 1 |
5,788 |
$17,649,187 |
$206,007 |
$3,529,895 |
$23,248,989 |
Year 2 |
6,044 |
$18,428,476 |
$412,014 |
$3,682,063 |
$24,467,704 |
Year 3 |
6,300 |
$19,207,766 |
$618,021 |
$3,834,232 |
$25,686,418 |
Total |
18,132 |
$55,285,429 |
$1,236,042 |
$11,046,190 |
$73,403,112 |
Average |
6,044 |
$18,428,476 |
$412,014 |
$3,682,063 |
$24,467,704 |
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
Author | Icenhour, Melissa K. |
File Modified | 0000-00-00 |
File Created | 2021-01-15 |