Table 2 - Annual Respondent Burden and Cost for SI Engine Certification |
|
Hours and Cost per Application |
Total Hours and Cost |
Information Collection Activity |
Engineer $97.82/hr |
Manager $143.81/hr |
Legal $197.72/hr |
Test Cell Operator $65.08/hr |
Transport $38.58/hr |
Clerical $40.72/hr |
Respondents hr/yr |
Labor Cost/yr |
Capital Startup Cost |
O&M Cost, Annualized (1) |
Applications/Respondent (2) |
Number of Respondents |
Total hr/yr |
Total Cost/yr |
Review of regulations and guidance documents |
18.0 |
9.0 |
10.0 |
4.0 |
0.0 |
1.0 |
42 |
$5,333.29 |
$0.00 |
$15.00 |
1.0 |
620 |
26,040 |
3,315,940 |
Developing eng families groups |
15.0 |
3.0 |
1.0 |
0.0 |
0.0 |
1.0 |
20 |
$2,137.17 |
$0.00 |
$0.00 |
1.0 |
354 |
7,080 |
756,558 |
Gathering durability data |
12.0 |
5.0 |
0.0 |
38.0 |
2.0 |
3.0 |
60 |
$4,565.25 |
$0.00 |
$0.00 |
2.9 |
187 |
32,538 |
2,475,735 |
Testing/Gathering emission data on test engines |
30.0 |
14.0 |
0.0 |
22.0 |
2.0 |
14.0 |
82 |
$7,026.94 |
$0.00 |
$0.00 |
2.9 |
187 |
44,469 |
3,810,710 |
Laboratory maintenance(1) |
200.0 |
150.0 |
0.0 |
400.0 |
200.0 |
0.0 |
950 |
$74,883.50 |
$0.00 |
$73,300.00 |
1.0 |
42 |
39,900 |
6,223,707 |
Cert, Durability & Evap Testing (annualized)(1) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Small SI |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0 |
$0.00 |
$0.00 |
$5,666.67 |
2.4 |
146 |
0 |
1,985,600 |
Large SI |
|
|
|
|
|
|
0 |
$0.00 |
|
$11,836.67 |
1.4 |
44 |
0 |
729,139 |
Rec Veh Test |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0 |
$0.00 |
$0.00 |
$7,333.33 |
1.7 |
85 |
0 |
1,059,667 |
Marine SI Test |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0 |
$0.00 |
$0.00 |
$15,000.00 |
1.7 |
27 |
0 |
688,500 |
Components (per manufacturer) |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0 |
$0.00 |
$0.00 |
$333.33 |
2.2 |
318 |
0 |
233,200 |
Analyze data to determine compliance |
6.0 |
4.0 |
1.0 |
0.0 |
0.0 |
1.0 |
12 |
$1,400.60 |
$0.00 |
$0.00 |
2.9 |
187 |
6,508 |
759,545 |
Preparing and submitting certification application |
2.0 |
0.5 |
1.0 |
0.0 |
0.0 |
1.0 |
5 |
$505.99 |
$0.00 |
$6.00 |
2.9 |
187 |
2,440 |
277,649 |
Preparing and submitting "carry over" applications |
1.0 |
0.5 |
0.0 |
0.0 |
0.0 |
2.0 |
4 |
$251.17 |
$0.00 |
$3.00 |
3.9 |
354 |
4,832 |
350,900 |
Paying Certification Fee |
0.5 |
0.5 |
0.0 |
0.0 |
0.0 |
0.5 |
3 |
$141.18 |
$0.00 |
$1.00 |
5.3 |
620 |
9,858 |
467,187 |
Certification Fee (3) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Components |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0 |
$0.00 |
$0.00 |
$241.00 |
1.7 |
171 |
0 |
70,059 |
All Other SI Engines |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0 |
$0.00 |
$0.00 |
$563.00 |
5.8 |
249 |
0 |
813,085 |
Post Bond |
1.0 |
1.0 |
0.5 |
0.0 |
0.0 |
1.0 |
4 |
$381.21 |
$0.00 |
$20.00 |
5.4 |
76 |
1,432 |
164,095 |
Apply for Bond Waivers |
2.0 |
0.5 |
0.5 |
0.0 |
0.0 |
1.0 |
4 |
$407.13 |
$0.00 |
$2.00 |
1.0 |
20 |
80 |
8,183 |
Preparing and supporting running changes |
3.0 |
2.0 |
1.0 |
3.0 |
0.0 |
2.0 |
11 |
$1,055.48 |
$0.00 |
$6.00 |
3.9 |
354 |
15,187 |
1,465,479 |
Store, file and maintain records |
3.0 |
1.0 |
1.0 |
0.0 |
0.0 |
7.0 |
12 |
$920.03 |
$0.00 |
$6.00 |
1.0 |
354 |
4,248 |
327,815 |
Preparing and Submitting Annual Production Report |
12.0 |
2.0 |
1.0 |
0.0 |
0.0 |
2.0 |
17 |
$1,740.62 |
0 |
$3 |
1.0 |
354 |
6,018 |
617,241 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total per respondent |
305.5 |
193 |
17 |
467 |
204 |
36.5 |
1,224.5 |
$100,750 |
0 |
varies |
varies |
N/A |
N/A |
N/A |
Total for the industry |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
$17,902,473 |
0 |
$8,697,520 |
varies |
620 |
200,628.8 |
$26,599,993 |
(1) See section 6(b)ii for details. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(2) See section 6(d) for details. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(3) See section 6(b)(ii) for details. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
*2.1 multiplier |
|
|
|
|
|
|
|
|
|
|
|
|
Engineer |
46.58 |
97.82 |
|
|
|
|
|
|
|
|
|
|
|
|
Managers |
68.48 |
143.81 |
|
|
|
|
|
|
|
|
|
|
|
|
Legal |
94.15 |
197.72 |
|
|
|
|
|
|
|
|
|
|
|
|
Administrative, except legal, medical and executive |
19.39 |
40.72 |
|
|
|
|
|
|
|
|
|
|
|
|
Mech Tech |
30.99 |
65.08 |
|
|
|
|
|
|
|
|
|
|
|
|
Engine and other machine assemblers |
20.21 |
42.44 |
|
|
|
|
|
|
|
|
|
|
|
|
Truck Drivers, heavy and tractor trailer |
18.37 |
38.58 |
|
|
|
|
|
|
|
|
|
|
|
|
Table 3 - Annual Respondent Burden and Cost - Average, Trading and Banking Program |
|
Hours and Cost per Application |
Total Hours and Cost |
Information Collection Activity |
Engineer $97.82/hr |
Manager $143.81/hr |
Legal $197.72/hr |
Clerical $40.72/hr |
Respondents hr/yr |
Labor Cost/yr |
Capital Startup Cost |
O&M Cost (1) |
Number of Respondents |
Total hr/yr |
Total Cost/yr |
Precertification activities/Submit info in cert application |
60 |
2 |
2 |
0 |
64 |
$841 |
$0 |
$25 |
50 |
3,200 |
$43,294 |
Gather Information regarding point of first retail sale (2) |
160 |
3 |
1 |
24 |
188 |
$1,864 |
$0 |
$100 |
50 |
9,400 |
$98,213 |
Develop and submit end-of-year-report |
35 |
2 |
2 |
4 |
43 |
$979 |
$0 |
$25 |
50 |
2,150 |
$50,188 |
Develop and submit final reports |
20 |
1 |
1 |
4 |
26 |
$622 |
$0 |
$14 |
50 |
1,300 |
$31,812 |
Recordkeeping (2) |
24 |
|
4 |
|
28 |
$913 |
$0 |
$14 |
50 |
1,400 |
$46,335 |
Total |
299 |
8 |
10 |
32 |
349 |
$4,828 |
$0 |
$178 |
N/A |
N/A |
N/A |
Total for the industry |
N/A |
N/A |
N/A |
N/A |
N/A |
$260,941 |
$0 |
$8,900 |
50 |
17,450 |
$269,841 |
(1) See section 6(b)ii for details. |
|
|
|
|
|
$5,219 |
|
|
|
|
|
(2) Numbers reflect one activity done four times a year. |
|
|
|
|
|
|
|
|
|
|
|
Table 4 - Annual Respondent Burden and Cost - Production Line Testing Program |
|
Hours and Cost per Engine Family |
Total Hours and Cost |
Information Collection Activity |
Engineer $97.82/hr |
Manager $143.81/hr |
Legal $197.72/hr |
Clerical $40.72/hr |
Test Cell Operator $65.08/hr |
Assembler $42.44/hr |
Transport $38.58/hr |
Respondents hr/yr |
Labor Cost/yr |
Capital Startup Cost |
O&M Cost(1) |
Frequency (2) |
Number of Respondents |
Total hr/yr |
Total Cost/yr |
Review of instructions and regulations |
45 |
5 |
8 |
0 |
0 |
0 |
0 |
58 |
$6,702.71 |
$0.00 |
$0.00 |
1 |
179 |
10,382 |
$1,199,785.09 |
Training |
8 |
0 |
0 |
0 |
1 |
0 |
0 |
9 |
$847.64 |
$0.00 |
$40.00 |
1 |
179 |
1,611 |
$158,887.56 |
Projecting testing needs and planning test schedules |
11 |
1 |
0 |
1 |
0 |
0 |
0 |
13 |
$1,260.55 |
$0.00 |
$20.00 |
1 |
179 |
2,327 |
$229,218.45 |
Engine selection and transport |
4 |
0 |
0 |
0 |
1 |
1 |
1 |
7 |
$537.38 |
$0.00 |
$20.00 |
1 |
179 |
1,253 |
$99,771.02 |
Engine inspection |
1 |
0 |
0 |
0 |
6 |
0 |
0 |
7 |
$488.30 |
$0.00 |
$0.00 |
4 |
179 |
5,012 |
$349,622.80 |
Testing (In-house) |
8 |
0 |
0 |
0 |
12 |
2 |
0 |
22 |
$1,648.40 |
$0.00 |
$300.00 |
Julian Maurice Davis:
Based on average respondent burden per year (2018).
10 |
37 |
8,140 |
$720,908.00 |
Data entry and analysis |
8 |
0 |
0 |
1 |
0 |
0 |
0 |
9 |
$823.28 |
$0.00 |
$30.00 |
4 |
37 |
1,332 |
$126,285.44 |
Other tasks (test equipment calibration, engine repair, etc.) |
4 |
0 |
0 |
0 |
60 |
0 |
0 |
64 |
$4,296.08 |
$0.00 |
$100.00 |
1 |
179 |
11,456 |
$786,898.32 |
Testing (Contract Out) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Small SI |
|
|
|
|
|
|
|
|
|
|
Nydia Yanira Reyes-Morales:
from Phil, annualized,
based on 125 hours of durability accumulation
$5,666.67 |
Nydia Yanira Reyes-Morales:
Used actual received
from comp dabase
2011. Revised for 2018 (julian Davis).
11 |
21 |
0 |
$1,360,000.00 |
Large SI |
|
|
|
|
|
|
|
|
|
|
Nydia Yanira Reyes-Morales:
SwRI 2007, adjusted from inflation
$11,836.67 |
6 |
7 |
0 |
$497,140.00 |
Marine SI |
|
|
|
|
|
|
|
|
|
|
Nydia Yanira Reyes-Morales:
adjusted from inflation from 2008: $1587
$15,000.00 |
3 |
12 |
0 |
$585,000.00 |
Setting up contract |
2 |
1 |
2 |
2 |
0 |
0 |
0 |
7 |
$816.33 |
$0.00 |
$21.00 |
1 |
142 |
994 |
$118,900.86 |
Preparing and submitting report |
8 |
1 |
1 |
2 |
0 |
0 |
0 |
12 |
$1,205.53 |
$0.00 |
$5.00 |
4 |
179 |
8,592 |
$866,739.48 |
Store, file and maintain records |
2 |
0 |
0 |
3 |
0 |
1 |
0 |
6 |
$360.24 |
$0.00 |
$2.00 |
4 |
179 |
4,296 |
$259,363.84 |
Total per manufacturer |
101 |
8 |
11 |
9 |
80 |
4 |
1 |
214 |
$18,986.44 |
$0.00 |
varies |
varies |
N/A |
N/A |
N/A |
Total for the industry |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
$4,760,726.86 |
$0.00 |
$2,597,794.00 |
N/A |
179 |
55,395 |
7,358,521 |
(1) Includes diskettes, photocopying, postage expenses, phone calls, and testing costs, annualized. See section 6(b)(iii) for details. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(2) 1 = one time tasks; 4 = tasks carried out quarterly; other # = number of engine families. Refer to Section 6(d) for further detail. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average Burden= total burden / # of respondents |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 5 - In-use Estimated Annual Respondent Burden and Cost |
|
Hours and cost per application |
Total hours and cost |
Information Collection Activity |
Engineer $97.82/hr |
Manager $143.81/hr |
Legal $197.72/hr |
Clerical $40.72/hr |
Test Cell Operator $65.08/hr |
Assembler $42.44/hr |
Transport $38.58/hr |
Respondent hr/yr |
Labor Cost/yr |
Capital Startup Cost |
O&M Cost(1) |
Frequency (2) |
Number of Respondents |
Total hr/yr |
Total Cost/yr |
Review of instructions and regulations |
7 |
1 |
1 |
0 |
0 |
0 |
0 |
9 |
$1,026 |
$0 |
$0 |
1 |
40 |
360 |
$41,051 |
Training |
2 |
0 |
0 |
0 |
1 |
0 |
0 |
3 |
$261 |
$0 |
$120 |
1 |
40 |
120 |
$15,229 |
Plan activities |
16 |
0 |
0 |
0 |
0 |
0 |
0 |
16 |
$1,565 |
$0 |
$20 |
1 |
40 |
640 |
$63,405 |
Procure engines |
2 |
1 |
0 |
2 |
0 |
0 |
0 |
5 |
$421 |
$0 |
$100 |
1 |
40 |
200 |
$20,836 |
Ship Engines |
1 |
0 |
0 |
0 |
0 |
0 |
4 |
5 |
$252 |
$0 |
$200 |
1 |
40 |
200 |
$18,086 |
Engine Maintenance |
1 |
0 |
0 |
0 |
3 |
33 |
0 |
37 |
$1,694 |
$0 |
$210 |
1 |
40 |
1,480 |
$76,143 |
Testing In-house |
8 |
0 |
0 |
0 |
38 |
1 |
1 |
48 |
$3,337 |
$0 |
$900 |
1 |
35 |
1,680 |
$148,282 |
Setting up contract |
2 |
1 |
2 |
2 |
0 |
0 |
0 |
7 |
$816 |
$0 |
$25 |
1 |
9 |
63 |
$7,572 |
Testing (Contracting out) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Small SI |
|
|
|
|
|
|
|
|
|
|
$5,667 |
16 |
8 |
0 |
$725,333 |
Large SI |
|
|
|
|
|
|
|
|
|
|
$11,837 |
2 |
4 |
0 |
$94,693 |
Marine SI |
|
|
|
|
|
|
|
|
|
|
$15,000 |
2 |
5 |
0 |
$150,000 |
Data entry and analysis |
22 |
0 |
0 |
5 |
2 |
0 |
0 |
29 |
$2,486 |
$0 |
$10 |
1 |
40 |
1,160 |
$99,832 |
Preparing and submitting report |
18 |
1 |
1 |
1 |
0 |
0 |
0 |
21 |
$2,143 |
$0 |
$15 |
1 |
40 |
840 |
$86,320 |
Store, file and maintain records |
8 |
0 |
0 |
1 |
0 |
0 |
0 |
9 |
$823 |
$0 |
$5 |
1 |
40 |
360 |
$33,131 |
Total per manufacturer |
95 |
4 |
4 |
11 |
82 |
35 |
6 |
237 |
$18,160 |
$0 |
varies |
varies |
N/A |
N/A |
N/A |
Total for the industry |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
$7,103 |
$550,961 |
$0 |
$1,028,952 |
N/A |
40 |
7,103 |
$1,579,913 |
(1) Includes diskettes, photocopying, postage expenses, phone calls, and testing costs, annualized. See section 6(b)(iii) for details. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(2) 1 = one time tasks; 4 = tasks carried out quarterly; other # = number of tests performed/eng manufacturer/model year. Refer to Section 6(d) for further detail. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average Burden= total burden/# of respondents |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average Burden In-use programs= (total burden Phase 1 + Phase 2) / (# of respondents Phase1 + Phase2) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 6 - Annual Respondent Burden and Cost - Selective Enforcement Auditing (SEA) Program |
|
Hours and Cost per Application |
Total Hours and Cost |
Information Collection Activity |
Engineer $97.82/hr |
Manager $143.81/hr |
Legal $197.72/hr |
Clerical $40.72/hr |
Test Cell Operator $65.08/hr |
Assembler $42.44/hr |
Transport $38.58/hr |
Respondent hr/yr |
Labor Cost/yr |
Capital Startup Cost |
O&M Cost(1) |
Frequency (2) |
Julian Maurice Davis:
A total of 8-SEAs were condiucted in 2017. However, the three year average was about 5 per year.
Number of Respondents (5) |
Total hr/yr |
Total Cost/yr |
Provide Pre-audit information |
20 |
10 |
2 |
5 |
0 |
0 |
0 |
37 |
$3,994 |
$0 |
$0 |
1 |
5 |
185 |
$19,968 |
Review of instructions and regulations |
7 |
1 |
1 |
0 |
0 |
0 |
0 |
9 |
$1,026 |
$0 |
$0 |
1 |
5 |
45 |
$5,131 |
Training |
3 |
1 |
0 |
0 |
1 |
0 |
0 |
5 |
$502 |
$0 |
$32 |
1 |
5 |
25 |
$2,672 |
Plan activities |
16 |
0 |
0 |
0 |
0 |
0 |
0 |
16 |
$1,565 |
$0 |
$32 |
1 |
5 |
80 |
$7,986 |
Testing In-house |
8 |
0 |
0 |
0 |
38 |
1 |
1 |
48 |
$3,337 |
$0 |
$200 |
1 |
3 |
144 |
$10,610 |
Testing Contract Out |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
$20,000 |
1 |
2 |
0 |
$40,000 |
Data entry and analysis |
22 |
0 |
0 |
5 |
2 |
0 |
0 |
29 |
$2,486 |
$0 |
$1 |
1 |
5 |
145 |
$12,434 |
Preparing and submitting report |
18 |
1 |
1 |
1 |
0 |
0 |
0 |
21 |
$2,143 |
$0 |
$3 |
1 |
5 |
105 |
$10,730 |
Store, file and maintain records |
8 |
0 |
0 |
1 |
0 |
0 |
0 |
9 |
$823 |
$0 |
$1 |
1 |
5 |
45 |
$4,121 |
Total per manufacturer |
95 |
5 |
2 |
8 |
79 |
2 |
2 |
174 |
$16,037 |
$0 |
varies |
varies |
N/A |
N/A |
N/A |
Total for the industry |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
$72,707 |
$0 |
$40,945 |
N/A |
5 |
774 |
$113,652 |
(1) Includes diskettes, photocopying, postage expenses, phone calls, and testing costs, annualized. See section 6(b)(iii) for details. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(2) 1 = one time tasks; other # = number of tests performed/eng manufacturer/model year. Refer to Section 6(d) for further detail. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(3) EPA estimates it will audit 14 manufacturers over the next 3 years. It might, however, request pre-audit information from several manufacturers each year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average burden = total burden / # of respondents |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total of 8 SEAs in 2017, though the three year average was about 5 per year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MY 2014 |
MY 2015 |
MY 2016 |
MY 2017 |
Number of manufacturers |
|
NRSI and Evaporative Certificates |
Nonroad Spark Ignition Engines |
Small SI: Small nonroad gasoline powered equipment, such as lawnmowers, string trimmers, chain saws, small compressors, pumps, utility vehicles < 25 mph, snow blowers, rammers, floor cleaners |
900 |
956 |
944 |
972 |
146 |
|
Lawn and Garden Equipment |
1084 |
Marine SI: Gasoline boats and personal watercraft |
169 |
189 |
172 |
178 |
27 |
|
Gasoline Boats and Personal Watercraft |
112 |
Large SI: Large nonroad gasoline powered equipment, such as forklifts, compressors, generators, and stationary equipment |
194 |
208 |
210 |
226 |
44 |
|
Forklifts, Generators, and Compressors |
34 |
Evaporative components (mostly intended for small nonroad gasoline and marine gasoline equipment) |
815 |
831 |
843 |
866 |
Julian Maurice Davis:
This number still needs verificaiton
318 |
|
Nonroad Spark Ignition Evaporative Components |
-- |
Recreational Vehicles |
All-terrain vehicles / utility vehicles |
197 |
205 |
206 |
232 |
85 |
91 |
All-Terrain Vehicles |
309 |
Off-highway motorcycles |
49 |
53 |
47 |
49 |
25 |
Nonroad Motorcycles |
106 |
Snowmobiles |
32 |
29 |
29 |
33 |
8 |
Snowmobiles |
37 |
Total |
2356 |
4424 |
4551 |
4736 |
|
|
Total |
1682 |
|
|
|
|
|
|
620 |
|
|
|
|
Heavy Duty Highway Vehicles |
|
|
|
|
36 |
|
|
|