Exhibit 1a. Year 1 Respondent Burden of Reporting and Recordkeeping Requirements |
|
Labor Rates |
Labor rates were obtained from http://www.bls.gov/news.release/ecec.toc.htm (September 2015) |
|
Federal Implementation Plan for Oil and Natural Gas Well Production Facilities; Fort Berthold Indian Reservation (Mandan, Hidatsa, and Arikara Nation), North Dakota |
|
Technical |
35.92 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Managerial |
59.86 |
|
Year |
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
(I) |
(J) |
(K) |
|
Clerical |
26.5 |
|
Person-Hours per Occurrence |
Number of Occurences per Respondent per Year |
Person-Hours per Respondent per Year (A*B) |
Respondents per Year |
Technical Person-Hours per Year (C*D) |
Managerial Person-Hours per Year (0.05*E) |
Clerical Person-Hours per Year (0.10*E) |
Capital/Startup Costa |
O&M Costa,i |
Labor Costb |
Total Cost per Year |
|
FIP Requirement |
|
|
1. APPLICATIONS (Not Applicable) |
|
Inflation to 2018 dollars |
1.068 |
or 6.8% |
2. SURVEY AND STUDIES (Not Applicable) |
|
|
|
|
3. ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS |
|
|
|
|
|
|
Continous pilot or auto-ignition system with continous monitoring/recordingc |
24 |
1 |
24 |
2221 |
53,304 |
2,665 |
5,330 |
$3,470 |
$5,073 |
$2,215,474 |
$21,189,477.15 |
|
§ 49.4165(c)(6)(iv) |
|
|
4. RECORDKEEPING REQUIREMENTS |
|
|
|
|
|
A. Read Instructions |
|
|
|
|
|
|
|
|
Existing sourcesd |
1 |
0.059 |
0.059 |
2000 |
118 |
6 |
12 |
$0 |
$0 |
$4,904 |
$4,904 |
|
|
|
|
|
|
New affected sourcese |
1 |
0.059 |
0 |
221 |
13 |
1 |
1 |
$0 |
$0 |
$542 |
$542 |
|
|
|
|
|
B. Required Activities |
|
|
|
|
|
|
|
|
Measure barrels of oil producedf |
0 |
1 |
0 |
2221 |
0 |
0 |
0 |
$0 |
$0 |
$0 |
$0 |
|
§ 49.4167(a)(1) |
|
|
|
|
Volume of produced natural gas sent to control devicef |
0 |
1 |
0 |
2221 |
0 |
0 |
0 |
$0 |
$0 |
$0 |
$0 |
|
§ 49.4167(a)(2) |
|
|
|
|
Volume of natural gas emissions sent to control device |
1 |
1 |
1 |
2221 |
2,221 |
111 |
222 |
$0 |
$0 |
$92,311 |
$92,311 |
|
§ 49.4167(a)(3) |
|
|
|
|
Well completion and recompletion operations |
2 |
1 |
2 |
2221 |
4,442 |
222 |
444 |
$0 |
$0 |
$184,623 |
$184,623 |
|
§ 49.4167(a)(4) |
|
|
|
|
Control device monitoring and deviations |
8 |
1 |
8 |
2221 |
17,768 |
888 |
1,777 |
$0 |
$0 |
$738,491 |
$738,491 |
|
§ 49.4167(a)(5) |
|
|
|
|
Restricted use of pit flaresg |
0.5 |
0.059 |
0 |
2221 |
66 |
3 |
7 |
$0 |
$0 |
$2,723 |
$2,723 |
|
§ 49.4167(a)(6) |
|
|
|
|
Closed-vent system or control device not operatingg |
0.5 |
0.059 |
0 |
2221 |
66 |
3 |
7 |
$0 |
$0 |
$2,723 |
$2,723 |
|
§ 49.4167(a)(7) |
|
|
|
|
Produced oil and water storage tank inspections |
4 |
1 |
4 |
2221 |
8,884 |
444 |
888 |
$0 |
$0 |
$369,246 |
$369,246 |
|
§ 49.4167(a)(8) |
|
|
|
|
Records retention requirements |
0.25 |
1 |
0 |
2221 |
555 |
28 |
56 |
$0 |
$0 |
$23,078 |
$23,078 |
|
§ 49.4167(b) and (c) |
|
|
|
C. Train Personnel |
|
Included in 3 |
|
|
|
|
|
Recordkeeping Requirement Subtotal |
87,436 |
4,372 |
8,744 |
$3,470 |
$5,073 |
$1,418,642 |
$22,608,119 |
|
|
|
|
|
100,552 |
$8,543 |
|
|
|
|
5. REPORTING REQUIREMENTS |
|
|
|
|
|
A. Read Instructions |
|
Included in 4A |
|
|
|
|
|
B. Required Activities |
|
|
|
|
|
|
|
|
Annual reporth |
20 |
0.059 |
1.18 |
937 |
1,106 |
55 |
111 |
$0 |
$0 |
$45,955 |
$45,955 |
|
§ 49.4168(b) |
|
|
|
C. Create information |
|
Included in 5B |
|
|
|
|
|
D. Gather existing information |
|
Included in 5B |
|
|
|
|
|
E. Write report |
|
Included in 5B |
|
|
|
|
|
Reporting Requirement Subtotal |
1,106 |
55 |
111 |
$0 |
$0 |
$45,955 |
$45,955 |
|
|
|
|
|
1,272 |
$0 |
|
|
|
|
TOTAL REPORTING AND RECORDKEEPING LABOR AND COST |
88,542 |
4,427 |
8,854 |
$3,470 |
$5,073 |
$3,680,071 |
$22,654,074 |
|
|
|
|
101,823 |
$8,543 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a Capital and O&M Costs are per respondent (1 respondent = 1 oil and natural gas production facility) |
|
|
|
|
b Costs are based on September 2018 Bureau of Labor Statistics, Employer Costs for Employee Compensation total compensation index which includes wages, salaries, and benefits. Costs are estimated using the following hourly rates: technical at $35.92, management at $59.82, and clerical at $26.50. (Source: http://www.bls.gov/news.release/ecec.toc.htm, Table 2) |
|
|
|
|
c Annual total capital investment costs were determined using cost information and the appropriate CRF factor for the life expectancy of equipment provided by 2 of the FBIR operators. Additionaly, annual O&M cost specific to auto-ignition systems and continuous pilot flame systems were provided by the 2 operators. There is no "purchase of services component" cost for the monitoring requirements in this FIP. |
|
|
|
|
d Existing sources in Year 1 are estimated to be 2,000 oil and natural gas facilities. This number was calculated using the total estimated number of existing sources subject to the FIP in April 2019. (Source: https://info.drillinginfo.com) |
|
|
|
|
e New sources for Year 1 are estimated to be 221 oil and natural gas facilities. This is based on data available at https://info.drillinginfo.com/ for 2016-2018. This estimate is consistent with the number of new facilities reported in annual reports and therefore suffices as an appropriate and accurate data source rather than manually tallying data from hard copy reports. |
|
|
|
|
f Burden for recordkeeping of measured barrels of oil and produced natural gas vented to flare is covered under another ICR for OMB Control Number 1012-0004. |
|
|
|
|
g Recordkeeping only required under specific circumstances which are not expected to occur regularly at each facility. The number of occurences per respondent per year has been reduced to 0.059 to reflect this assumption. |
|
|
|
|
h The rule allows each owner/operator to submit a combined annual report for all of their respective facilities in 1 submittal once per year. Currently there are 17 known owners/operators subject to the FIP requirements. Therefore, we have reduced the number of occurences per respondent per year to 0.059 to conservatively account for 1 submittal per each owner/operator for all of facilities subject to the FIP. |
|
|
|
|
i O&M costs were adjusted from 2015 dollars to 2018 dollars for the ICR renewal |
|
|
|
|
Exhibit 1b. Year 2 Respondent Burden of Reporting and Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Labor Rates |
Labor rates were obtained from http://www.bls.gov/news.release/ecec.toc.htm (September 2015) |
|
Federal Implementation Plan for Oil and Natural Gas Well Production Facilities; Fort Berthold Indian Reservation (Mandan, Hidatsa, and Arikara Nation), North Dakota |
|
Technical |
35.92 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Managerial |
59.86 |
|
Year |
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
(I) |
(J) |
(K) |
|
Clerical |
26.5 |
|
Person-Hours per Occurrence |
Number of Occurences per Respondent per Year |
Person-Hours per Respondent per Year (A*B) |
Respondents per Year |
Technical Person-Hours per Year (C*D) |
Managerial Person-Hours per Year (0.05*E) |
Clerical Person-Hours per Year (0.10*E) |
Capital/Startup Costa |
O&M Costa,i |
Labor Costb |
Cost per Year |
|
FIP Requirement |
|
|
1. APPLICATIONS (Not Applicable) |
|
Inflation to 2018 dollars |
1.068 |
or 6.8% |
2. SURVEY AND STUDIES (Not Applicable) |
|
|
|
|
3. ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS |
|
|
|
|
|
|
Continous pilot or auto-ignition system with continous monitoring/recordingc |
24 |
1 |
24 |
2,442 |
58,608 |
2,930 |
5,861 |
$3,470 |
$5,073 |
$2,435,924 |
$23,297,930 |
|
§ 49.4165(c)(6)(iv) |
|
|
4. RECORDKEEPING REQUIREMENTS |
|
|
|
|
|
A. Read Instructions |
|
|
|
|
|
|
|
|
Existing sourcesd |
0 |
0 |
0 |
2221 |
0 |
0 |
0 |
$0 |
$0 |
$0 |
$0 |
|
|
|
|
|
|
New affected sourcese |
1 |
0.059 |
0 |
221 |
13 |
1 |
1 |
$0 |
$0 |
$542 |
$542 |
|
|
|
|
|
B. Required Activities |
|
|
|
|
|
|
|
|
Measure barrels of oil producedf |
0 |
1 |
0 |
2,442 |
0 |
0 |
0 |
$0 |
$0 |
$0 |
$0 |
|
§ 49.4167(a)(1) |
|
|
|
|
Volume of produced natural gas sent to control devicef |
0 |
1 |
0 |
2,442 |
0 |
0 |
0 |
$0 |
$0 |
$0 |
$0 |
|
§ 49.4167(a)(2) |
|
|
|
|
Volume of natural gas emissions sent to control device |
1 |
1 |
1 |
2,442 |
2,442 |
122 |
244 |
$0 |
$0 |
$101,497 |
$101,497 |
|
§ 49.4167(a)(3) |
|
|
|
|
Well completion and recompletion operations |
2 |
1 |
2 |
2,442 |
4,884 |
244 |
488 |
$0 |
$0 |
$202,994 |
$202,994 |
|
§ 49.4167(a)(4) |
|
|
|
|
Control device monitoring and deviations |
8 |
1 |
8 |
2,442 |
19,536 |
977 |
1,954 |
$0 |
$0 |
$811,975 |
$811,975 |
|
§ 49.4167(a)(5) |
|
|
|
|
Restricted use of pit flaresg |
0.5 |
0.059 |
0 |
2,442 |
72 |
4 |
7 |
$0 |
$0 |
$2,994 |
$2,994 |
|
§ 49.4167(a)(6) |
|
|
|
|
Closed-vent system or control device not operatingg |
0.5 |
0.059 |
0 |
2,442 |
72 |
4 |
7 |
$0 |
$0 |
$2,994 |
$2,994 |
|
§ 49.4167(a)(7) |
|
|
|
|
Produced oil and water storage tank inspections |
4 |
1 |
4 |
2,442 |
9,768 |
488 |
977 |
$0 |
$0 |
$405,987 |
$405,987 |
|
§ 49.4167(a)(8) |
|
|
|
|
Records retention requirements |
0.25 |
1 |
0 |
2,442 |
611 |
31 |
61 |
$0 |
$0 |
$25,374 |
$25,374 |
|
§ 49.4167(b) and (c) |
|
|
|
C. Train Personnel |
|
Included in 3 |
|
|
|
|
|
Recordkeeping Requirement Subtotal |
96,006 |
4,800 |
9,601 |
$3,470 |
$5,073 |
$1,554,357 |
$24,852,287 |
|
|
|
|
|
110,406 |
$8,543 |
|
|
|
|
68 |
|
|
|
|
|
A. Read Instructions |
|
Included in 4A |
|
|
|
|
|
B. Required Activities |
|
|
|
|
|
|
|
|
Annual reporth |
20 |
0.059 |
1.18 |
1,094 |
1,291 |
65 |
129 |
$0 |
$0 |
$53,655 |
$53,655 |
|
§ 49.4168(b) |
|
|
|
C. Create information |
|
Included in 5B |
|
|
|
|
|
D. Gather existing information |
|
Included in 5B |
|
|
|
|
|
E. Write report |
|
Included in 5B |
|
|
|
|
|
Reporting Requirement Subtotal |
1,291 |
65 |
129 |
$0 |
$0 |
$53,655 |
$53,655 |
|
|
|
|
|
1,485 |
$0 |
|
|
|
|
TOTAL REPORTING AND RECORDKEEPING LABOR AND COST |
97,297 |
4,865 |
9,730 |
$3,470 |
$5,073 |
$4,043,936 |
$24,905,942 |
|
|
|
|
111,891 |
$8,543 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a Capital and O&M Costs are per respondent (1 respondent = 1 oil and natural gas production facility) |
|
|
|
|
b Costs are based on September 2018 Bureau of Labor Statistics, Employer Costs for Employee Compensation total compensation index which includes wages, salaries, and benefits. Costs are estimated using the following hourly rates: technical at $35.92, management at $59.82, and clerical at $26.50. (Source: http://www.bls.gov/news.release/ecec.toc.htm, Table 2) |
|
|
|
|
c Annual total capital investment costs were determined using cost information and the appropriate CRF factor for the life expectancy of equipment provided by 2 of the FBIR operators. Additionaly, annual O&M cost specific to auto-ignition systems and continuous pilot flame systems were provided by the 2 operators. There is no "purchase of services component" cost for the monitoring requirements in this FIP. |
|
|
|
|
d Existing sources in Year 2 are estimated to be 2,221 oil and natural gas facilities based on Year 1 numbers. There is no cost for existing sources to read instructons because it is covered under prior year. |
|
|
|
|
e New sources for Year 2 are estimated to be 221 oil and natural gas facilities. This is based on data available at https://info.drillinginfo.com/ for 2016-2018. This estimate is consistent with the number of new facilities reported in annual reports and therefore suffices as an appropriate and accurate data source rather than manually tallying data from hard copy reports. |
|
|
|
|
f Burden for recordkeeping of measured barrels of oil and produced natural gas vented to flare is covered under another ICR for OMB Control Number 1012-0004. |
|
|
|
|
g Recordkeeping only required under specific circumstances which are not expected to occur regularly at each facility. The number of occurences per respondent per year has been reduced to 0.059 to reflect this assumption. |
|
|
|
|
h The rule allows each owner/operator to submit a combined annual report for all of their respective facilities in 1 submittal once per year. Currently there are 17 known owners/operators subject to the FIP requirements. Therefore, we have reduced the number of occurences per respondent per year to 0.059 to conservatively account for 1 submittal per each owner/operator for all of facilities subject to the FIP. |
|
|
|
|
i O&M costs were adjusted from 2015 dollars to 2018 dollars for the ICR renewal |
|
|
|
|
Exhibit 1c. Year 3 Respondent Burden of Reporting and Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Labor Rates |
Labor rates were obtained from http://www.bls.gov/news.release/ecec.toc.htm (September 2015) |
|
Federal Implementation Plan for Oil and Natural Gas Well Production Facilities; Fort Berthold Indian Reservation (Mandan, Hidatsa, and Arikara Nation), North Dakota |
|
Technical |
35.92 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Managerial |
59.82 |
|
Year |
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
(I) |
(J) |
(K) |
|
Clerical |
26.5 |
|
Person-Hours per Occurrence |
Number of Occurences per Respondent per Year |
Person-Hours per Respondent per Year (A*B) |
Respondents per Year |
Technical Person-Hours per Year (C*D) |
Managerial Person-Hours per Year (0.05*E) |
Clerical Person-Hours per Year (0.10*E) |
Capital/Startup Costa |
O&M Costa,i |
Labor Costb |
Cost per Year |
|
FIP Requirement |
|
|
1. APPLICATIONS (Not Applicable) |
|
Inflation to 2018 dollars |
1.068 |
or 6.8% |
2. SURVEY AND STUDIES (Not Applicable) |
|
|
|
|
3. ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS |
|
|
|
|
|
|
Continous pilot or auto-ignition system with continous monitoring/recordingc |
24 |
1 |
24 |
2,663 |
63,912 |
3,196 |
6,391 |
$3,470 |
$5,073 |
$2,656,247 |
$25,406,255.63 |
|
§ 49.4165(c)(6)(iv) |
|
|
4. RECORDKEEPING REQUIREMENTS |
|
|
|
|
|
A. Read Instructions |
|
|
|
|
|
|
|
|
Existing sourcesd |
0 |
0 |
0 |
2442 |
0 |
0 |
0 |
$0 |
$0 |
$0 |
$0 |
|
|
|
|
|
|
New affected sourcese |
1 |
0.059 |
0 |
221 |
13 |
1 |
1 |
$0 |
$0 |
$542 |
$542 |
|
|
|
|
|
B. Required Activities |
|
|
|
|
|
|
|
|
Measure barrels of oil producedf |
0 |
1 |
0 |
2,663 |
0 |
0 |
0 |
$0 |
$0 |
$0 |
$0 |
|
§ 49.4167(a)(1) |
|
|
|
|
Volume of produced natural gas sent to control devicef |
0 |
1 |
0 |
2,663 |
0 |
0 |
0 |
$0 |
$0 |
$0 |
$0 |
|
§ 49.4167(a)(2) |
|
|
|
|
Volume of natural gas emissions sent to control device |
1 |
1 |
1 |
2,663 |
2,663 |
133 |
266 |
$0 |
$0 |
$110,677 |
$110,677 |
|
§ 49.4167(a)(3) |
|
|
|
|
Well completion and recompletion operations |
2 |
1 |
2 |
2,663 |
5,326 |
266 |
533 |
$0 |
$0 |
$221,354 |
$221,354 |
|
§ 49.4167(a)(4) |
|
|
|
|
Control device monitoring and deviations |
8 |
1 |
8 |
2,663 |
21,304 |
1,065 |
2,130 |
$0 |
$0 |
$885,416 |
$885,416 |
|
§ 49.4167(a)(5) |
|
|
|
|
Restricted use of pit flaresg |
0.5 |
0.059 |
0 |
2,663 |
79 |
4 |
8 |
$0 |
$0 |
$3,265 |
$3,265 |
|
§ 49.4167(a)(6) |
|
|
|
|
Closed-vent system or control device not operatingg |
0.5 |
0.059 |
0 |
2,663 |
79 |
4 |
8 |
$0 |
$0 |
$3,265 |
$3,265 |
|
§ 49.4167(a)(7) |
|
|
|
|
Produced oil and water storage tank inspections |
4 |
1 |
4 |
2,663 |
10,652 |
533 |
1,065 |
$0 |
$0 |
$442,708 |
$442,708 |
|
§ 49.4167(a)(8) |
|
|
|
|
Records retention requirements |
0.25 |
1 |
0 |
2,663 |
666 |
33 |
67 |
$0 |
$0 |
$27,669 |
$27,669 |
|
§ 49.4167(b) and (c) |
|
|
|
C. Train Personnel |
|
Included in 3 |
|
|
|
|
|
Recordkeeping Requirement Subtotal |
104,693 |
5,235 |
10,469 |
$3,470 |
$5,073 |
$1,694,895 |
$27,101,151 |
|
|
|
|
|
120,397 |
$8,543 |
|
|
|
|
5. REPORTING REQUIREMENTS |
|
|
|
|
|
A. Read Instructions |
|
Included in 4A |
|
|
|
|
|
B. Required Activities |
|
|
|
|
|
|
|
|
Annual reporth |
20 |
0.059 |
1.18 |
1,251 |
1,476 |
74 |
148 |
$0 |
$0 |
$61,352 |
$61,352 |
|
§ 49.4168(b) |
|
|
|
C. Create information |
|
Included in 5B |
|
|
|
|
|
D. Gather existing information |
|
Included in 5B |
|
|
|
|
|
E. Write report |
|
Included in 5B |
|
|
|
|
|
Reporting Requirement Subtotal |
1,476 |
74 |
148 |
$0 |
$0 |
$61,352 |
$61,352 |
|
|
|
|
|
1,698 |
$0 |
|
|
|
|
TOTAL REPORTING AND RECORDKEEPING LABOR AND COST |
106,169 |
5,308 |
10,617 |
$3,470 |
$5,073 |
$4,412,493 |
$27,162,502 |
|
|
|
|
122,094 |
$8,543 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a Capital and O&M Costs are per respondent (1 respondent = 1 oil and natural gas production facility) |
|
|
|
|
b Costs are based on September 2018 Bureau of Labor Statistics, Employer Costs for Employee Compensation total compensation index which includes wages, salaries, and benefits. Costs are estimated using the following hourly rates: technical at $35.92, management at $59.82, and clerical at $26.50. (Source: http://www.bls.gov/news.release/ecec.toc.htm, Table 2) |
|
|
|
|
c Annual total capital investment costs were determined using cost information and the appropriate CRF factor for the life expectancy of equipment provided by 2 of the FBIR operators. Additionaly, annual O&M cost specific to auto-ignition systems and continuous pilot flame systems were provided by the 2 operators. There is no "purchase of services component" cost for the monitoring requirements in this FIP. |
|
|
|
|
d Existing sources in Year 3 are estimated to be 2,442 oil and natural gas facilities based on Year 3 numbers. There is no cost for existing sources to read instructions because it is covered under the prior year. |
|
|
|
|
e New sources for Year 3 are estimated to be 221 oil and natural gas facilities. This is based on data available at https://info.drillinginfo.com/ for 2016-2018. This estimate is consistent with the number of new facilities reported in annual reports and therefore suffices as an appropriate and accurate data source rather than manually tallying data from hard copy reports. |
|
|
|
|
f Burden for recordkeeping of measured barrels of oil and produced natural gas vented to flare is covered under another ICR for OMB Control Number 1012-0004. |
|
|
|
|
g Recordkeeping only required under specific circumstances which are not expected to occur regularly at each facility. The number of occurences per respondent per year has been reduced to 0.059 to reflect this assumption. |
|
|
|
|
h The rule allows each owner/operator to submit a combined annual report for all of their respective facilities in 1 submittal once per year. Currently there are 17 known owners/operators subject to the FIP requirements. Therefore, we have reduced the number of occurences per respondent per year to 0.059 to conservatively account for 1 submittal per each owner/operator for all of facilities subject to the FIP. |
|
|
|
|
i O&M costs were adjusted from 2015 dollars to 2018 dollars for the ICR renewal |
|
|
|
|
Exhibit 2a. Year 1 Agency Burden and Cost |
|
|
|
|
|
|
|
|
|
|
Labor Rates |
Labor rates based on 2018 federal salary table including locality pay for Denver, Colorado at https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2018/DEN_h.pdf |
|
Federal Implementation Plan for Oil and Natural Gas Well Production Facilities; Fort Berthold Indian Reservation (Mandan, Hidatsa, and Arikara Nation), North Dakota |
|
Technical |
$72.75 |
(Includes multiplier of 1.6) |
|
|
|
|
|
|
|
|
|
|
|
Managerial |
$97.42 |
(Includes multiplier of 1.6) |
Activity - Year 1 |
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
Clerical |
$36.78 |
(Includes multiplier of 1.6) |
EPA Hours per Occurrence |
Number of Occurences per Respondent per Year |
EPA Hours per Respondent per Year (A*B) |
Respondents per Year |
EPA Technical Hours per Year (C*D) |
EPA Managerial Hours per Year (0.05*E) |
EPA Clerical Hours per Year (0.10*E) |
EPA Cost per Yeara |
|
FIP Requirement |
|
|
REPORTING REQIUREMENTS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Review annual reportsb |
1 |
1 |
1 |
2,221 |
2,221 |
111 |
222 |
$180,565 |
|
§ 49.4168(b) |
|
|
Total Annual Hours |
2,221 |
111 |
222 |
$180,565 |
|
|
|
|
2,554 |
|
|
|
|
a Costs are based on January 2018 Office of Personnel Management salary table for General Schedule (GS) federal employees including locality payment of 25.47% for the Denver, Colorado area and have been increased by 60% to account for benefit packages. Costs are estimated using the following rates: technical at $72.75, management at $97.42, and clerical at $36.78. |
|
|
|
|
b Assumes 1,338 oil and natural gas production facilities will submit annual reports in Year 1. |
|
|
|
|
Exhibit 2b. Year 2 Agency Burden and Cost |
|
|
|
|
|
|
|
|
|
|
Labor Rates |
Labor rates based on 2018 federal salary table including locality pay for Denver, Colorado at https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2018/DEN_h.pdf |
|
Federal Implementation Plan for Oil and Natural Gas Well Production Facilities; Fort Berthold Indian Reservation (Mandan, Hidatsa, and Arikara Nation), North Dakota |
|
Technical |
$72.75 |
(Includes multiplier of 1.6) |
|
|
|
|
|
|
|
|
|
|
|
Managerial |
$97.42 |
(Includes multiplier of 1.6) |
Activity - Year 2 |
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
Clerical |
$36.78 |
(Includes multiplier of 1.6) |
EPA Hours per Occurrence |
Number of Occurences per Respondent per Year |
EPA Hours per Respondent per Year (A*B) |
Respondents per Year |
EPA Technical Hours per Year (C*D) |
EPA Managerial Hours per Year (0.05*E) |
EPA Clerical Hours per Year (0.10*E) |
EPA Cost per Yeara |
|
FIP Requirement |
|
|
REPORTING REQIUREMENTS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Review annual reportsb |
1 |
1 |
1 |
2,442 |
2,442 |
122 |
244 |
$198,532 |
|
§ 49.4168(b) |
|
|
Total Annual Hours |
2,442 |
122 |
244 |
$198,532 |
|
|
|
|
2,808 |
|
|
|
|
a Costs are based on January 2018 Office of Personnel Management salary table for General Schedule (GS) federal employees including locality payment of 25.47% for the Denver, Colorado area and have been increased by 60% to account for benefit packages. Costs are estimated using the following rates: technical at $72.75, management at $97.42, and clerical at $36.78. |
|
|
|
|
b Assumes 1,475 oil and natural gas production facilities will submit annual reports in Year 2. |
|
|
|
|
Exhibit 2c. Year 3 Agency Burden and Cost |
|
|
|
|
|
|
|
|
|
|
Labor Rates |
Labor rates based on 2018 federal salary table including locality pay for Denver, Colorado at https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2018/DEN_h.pdf |
|
Federal Implementation Plan for Oil and Natural Gas Well Production Facilities; Fort Berthold Indian Reservation (Mandan, Hidatsa, and Arikara Nation), North Dakota |
|
Technical |
$72.75 |
(Includes multiplier of 1.6) |
|
|
|
|
|
|
|
|
|
|
|
Managerial |
$97.42 |
(Includes multiplier of 1.6) |
Activity - Year 3 |
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
Clerical |
$36.78 |
(Includes multiplier of 1.6) |
EPA Hours per Occurrence |
Number of Occurences per Respondent per Year |
EPA Hours per Respondent per Year (A*B) |
Respondents per Year |
EPA Technical Hours per Year (C*D) |
EPA Managerial Hours per Year (0.05*E) |
EPA Clerical Hours per Year (0.10*E) |
EPA Cost per Yeara |
|
FIP Requirement |
|
|
REPORTING REQIUREMENTS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Review annual reportsb |
1 |
1 |
1 |
2,663 |
2,663 |
133 |
266 |
$216,499 |
|
§ 49.4168(b) |
|
|
Total Annual Hours |
2,663 |
133 |
266 |
$216,499 |
|
|
|
|
3,062 |
|
|
|
|
a Costs are based on January 2018 Office of Personnel Management salary table for General Schedule (GS) federal employees including locality payment of 25.47% for the Denver, Colorado area and have been increased by 60% to account for benefit packages. Costs are estimated using the following rates: technical at $72.75, management at $97.42, and clerical at $36.78. |
|
|
|
|
b Assumes 1,695 oil and natural gas production facilities will submit annual reports in Year 3. |
|
|
|
|
Calculated Information from tables included in text of Supporting Statement (used 3 significant figures) |
|
|
Use for background info. only, not meant for inclusion as table in supporting statement |
|
|
|
|
|
Section of Suporting Statement |
Calculation |
Result |
1b |
average annual hours burden - respondent |
111,936 |
1b |
average annual total costs - respondent |
24,907,506 |
1b |
Annual average capital/startup costs |
$8,473,740 |
1b |
annual average O&M costs |
$12,388,266 |
6a |
year 1 labor costs |
$3,680,071 |
6a |
year 2 labor costs |
$4,043,936 |
6a |
year 3 labor costs |
$4,412,493 |
6a |
total labor costs |
$12,136,500 |
6a |
average annual labor costs |
$4,045,500 |
6d |
average # of respondents |
2,442 |
6e |
average annual agency hours |
2,808 |
6e |
average annual agency costs |
$198,532 |
6g |
average hours per response |
45.8 |