All facilities | 1/3 of facilities | 2/3 of facilities | |||
# MON Facilities | 201 | 67 | 134 | ||
# ETO Facilities | 8 | 3 | 5 | ||
# Facilities w/Tank Scrubbers | 3 | 1 | 2 | ||
# Facilities w/PV Scrubbers | 3 | 1 | 2 | ||
# Facilities w/Flares | 21 | 7 | 14 | ||
Flare Management Plan - One-time cost | |||||
Parameter | Value | ||||
Avg. Cost Per Facility | $13,576 | ||||
Process Vents and Tanks - Scrubber Monitoring & Testing | |||||
Parameter | Value | ||||
Monitor Capital Cost | $23,200 | ||||
Monitor Annual Cost | $4,900 | ||||
Initial Scrubber Testing | $38,302 | one-time | |||
Scrubber Testing: 5-yr Re-test | $19,151 | every 5 yrs, not included in burden as not in 3-yr window | |||
Flare Monitor Costs | |||||
Monitoring Equipment | Capital Equipment Cost ($/flare) | Annualized Cost ($/yr/flare) | Number of Flares Impacted | Nationwide Capital Equipment Cost ($) | Nationwide Total Annualized Cost ($/yr) |
H2 Analyzer | 35,405 | 22,502 | 16 | $566,480 | $360,038 |
Calorimeter | 103,265 | 28,017 | 16 | $1,652,240 | $448,275 |
Flare Gas Flow Monitor | 432,731 | 73,184 | 16 | $6,923,696 | $1,170,952 |
Steam Controls/Flow Monitor | 672,699 | 112,461 | 11 | $7,399,689 | $1,237,070 |
Air Controls/Flow Monitor | 161,290 | 48,818 | 3 | $483,870 | $146,455 |
Avg. Cost Per Facility | $810,761 | $160,133 | |||
PRD Monitor | |||||
Parameter | Capital Cost | Annual Cost | |||
Total | $12,693,240 | $1,678,123 | |||
# facilities with atmospheric PRDs | 201 | ||||
Avg. Cost Per Facility | $63,150 | $8,349 | |||
HEX El Paso Method Monitor | |||||
Parameter | Capital Cost | Annual Cost | |||
Total | $1,483,221 | $342,624 | |||
# facilities with atmospheric PRDs | 201 | ||||
Avg. Cost Per Facility | $7,379 | $1,705 | |||
Industry Wages | |||||
May 2016 National Industry-Specific Occupational Employment and Wage Estimates | |||||
NAICS 325000 - Chemical Manufacturing | |||||
Category | Occupation Code | Title | 2016 Wage | Loaded Wage | |
Technical | 17-2081 | Environmental Engineer | 49.95 | 104.90 | |
Clerical | 43-0000 | Office and Administrative Support Occupations | 20.66 | 43.39 | |
Managerial | 11-9041 | Architectural and Engineering Managers | 68.36 | 143.56 | |
https://www.bls.gov/oes/2016/may/naics3_325000.htm | |||||
EPA Wages | |||||
Hourly Mean Wage | With Fringe & Overhead | ||||
(GS- 12, step 1) - Tech. | 29.76 | $47.62 | |||
(GS- 13, step 5) - Mgmt. | 40.1 | $64.16 | |||
(GS-6, step 3) - Cler. | 16.1 | $25.76 | |||
https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2016/GS_h.pdf | |||||
or https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/ | |||||
Capital/Startup and O&M Costs | ||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) |
Source & Monitor Type | Capital/Startup Costs for One Respondent | Number of Respondents with Capital/Startup Costs | Total Capital/ Startup Cost (B X C) |
Annual Cost (O&M and Capital) for One Respondent | Number of Respondentsa | Total Annual Cost, (E X F) |
Flare Monitors | $810,761 | 21 | $17,025,981 | $160,133 | 28 | $4,483,724 |
PRD Monitor | $63,150 | 201 | $12,693,150 | $8,349 | 268 | $2,237,532 |
Heat Exchangers - El Paso Method | $7,379 | 201 | $1,483,179 | $1,705 | 268 | $456,940 |
Ethylene Oxide Process Vents & Storage Tanks - Scrubber Monitor | $23,200 | 6 | $139,200 | $4,900 | 12 | $58,800 |
Ethylene Oxide Process Vents & Storage Tanks - Scrubber Testing | $38,302 | 6 | $229,812 | NA | NA | NA |
TOTAL | $31,571,322 | $7,236,996 | ||||
(a) Within a given year, there are a maximum of 201 respondents per information collection activity, however the values in column F reflect the sum of these respondents for years 2 and 3. | ||||||
Total Annual Responses | ||||||
(A) | (B) | (C) | (D) | (E) | ||
Information Collection Activity | Number of Respondents | Number of Responses | Number of Existing Respondents That Keep Records But Do Not Submit Reports | Total Annual Responses E=(BxC)+D |
||
Notification of Compliance Status | ||||||
Flares | 21 | 1 | 0 | 21 | ||
PRDs | 201 | 1 | 0 | 201 | ||
Ethylene Oxide Process Vents & Storage Tanks | 6 | 1 | 0 | 6 | ||
Equipment Leaks | 8 | 1 | 0 | 8 | ||
Periodic Reports | ||||||
Flares | 28 | 2 | 0 | 56 | ||
PRDs | 268 | 2 | 0 | 536 | ||
Maintenance Vents | 268 | 2 | 0 | 536 | ||
Bypass Lines | 268 | 2 | 0 | 536 | ||
HEX El Paso Method | 268 | 2 | 0 | 536 | ||
Ethylene Oxide Process Vents & Storage Tanks | 12 | 2 | 0 | 24 | ||
Ethylene Oxide Equipment Leaks | 16 | 2 | 0 | 32 | ||
TOTAL | 2492 |
Table 1 - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the MON RTR - Year 1 | |||||||||||||
Burden Item | (A) Respondent Hours per Occurrence (Technical hours) |
(B) Non-Labor Costs Per Occurrence |
(C) Number of Occurrences Per Respondent Per Year |
(D) Technical Hours per Respondent Per Year (A X C) |
(E) Number of Respondents Per Year |
(F) Technical Hours per Year (D X E) |
(G) Clerical Hours per Year (F X 0.1) |
(H) Management Hours per Year (F X .05) |
(I) Total Hours per Year (F + G + H) |
(J) Total Labor Costs Per Year |
(K) Total Non-Labor Costs Per Year (B x C x E) |
(L) Total Number of Responses per Year (C X E) |
Footnotes |
1. Applications | NA | ||||||||||||
2. Surveys and Studies | NA | ||||||||||||
3. Reporting Requirements | |||||||||||||
A. Read Rule | 24 | $0 | 1 | 24 | 201 | 4,824 | 482 | 241 | 5,548 | $561,596 | $0 | 0 | a |
B. Required Activities | |||||||||||||
1. Flare Monitors | b,f | ||||||||||||
a. Capital Cost | 0 | $810,761 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
b. Annualized Cost | 0 | $160,133 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
2. PRD Monitor | f | ||||||||||||
a. Capital Cost | 0 | $63,150 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
b. Annualized Cost | 0 | $8,349 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
3. HEX El Paso Method | f | ||||||||||||
a. Capital Cost | 0 | $7,379 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
b. Annualized Cost | 0 | $1,705 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
4. Ethylene Oxide Process Vents & Storage Tanks - Scrubber Monitor | c,f | ||||||||||||
a. Capital Cost | 0 | $23,200 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
b. Annualized Cost | 0 | $4,900 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
5. Ethylene Oxide Process Vents & Storage Tanks - Scrubber Testing | c,f | ||||||||||||
a. Initial Testing | 0 | $38,302 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
b. Re-Testing | 0 | $19,151 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |
C. Create Information | Inc. in 3B | ||||||||||||
D. Gather Information | Inc. in 3E | ||||||||||||
E. Report Preparation | |||||||||||||
1. Notification of Compliance Status | |||||||||||||
a. Flares | 5 | $0 | 1 | 5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | f |
b. PRDs | 15 | $0 | 1 | 15 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | f |
c. Ethylene Oxide Process Vents & Tanks | 4 | $0 | 1 | 4 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c |
d. Ethylene Oxide Eq. Leaks | 4 | $0 | 1 | 4 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c |
2. Periodic Report | |||||||||||||
a. Flares | 5 | $0 | 2 | 10 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | f |
b. PRDs | 10 | $0 | 2 | 20 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | f |
c. Maintenance Vents | 4 | $0 | 2 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | f |
d. Bypass Lines | 4 | $0 | 2 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | d,f |
e. HEX El Paso Method | 3 | $0 | 2 | 6 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | f |
f. Ethylene Oxide Process Vents & Tanks | 4 | $0 | 2 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c |
g. Ethylene Oxide Eq. Leaks | 4 | $0 | 2 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c |
Reporting Subtotal | 4,824 | 482 | 241 | 5,548 | $561,596 | $0 | 0 | ||||||
4. Recordkeeping Requirements | |||||||||||||
A. Read Instructions | Inc. in 3.A | ||||||||||||
B. Implement Activities | NA | ||||||||||||
C. Develop Record System | NA | ||||||||||||
D. Record information | |||||||||||||
1. Flares | 0.4 | $0 | 365 | 146 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | f |
2. PRDs | 10 | $0 | 1 | 10 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | f |
3. HEX El Paso Method | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e |
4. Maintenance Vents | 1 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | f |
5. Bypass Lines | 0 | $0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | d |
6. Ethylene Oxide Process Vents & Tanks | 2 | $0 | 1 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c |
7. Flare Management Plan | 75 | $0 | 1 | 75 | 21 | 1,575 | 158 | 79 | 1,811 | $183,357 | $0 | 0 | a |
E. Personnel Training | 16 | $0 | 1 | 16 | 201 | 3,216 | 322 | 161 | 3,698 | $374,397 | $0 | 0 | |
F. Time for Audits | NA | ||||||||||||
Recordkeeping Subtotal | 4,791 | 479 | 240 | 5,510 | $557,754 | $0 | 0 | ||||||
TOTAL | 9,615 | 962 | 481 | 11,057 | $1,119,350 | $0 | 0 | ||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||
Summary of Respondent Burden | 11,057 | $1,119,350 | $0 | $1,119,350 | |||||||||
Initial Capital and Startup | $0 | ||||||||||||
Annualized Capital/Start-up and O & M | $0 | ||||||||||||
Footnotes: | |||||||||||||
(a) This is a one-time cost (e.g., to read rule or develop plan). | |||||||||||||
(b) Includes costs for the following monitoring equipment: H2 analyzer, calorimeter, flare gas flow monitor, steam controls/flow monitor, and air controls/flow monitor. | |||||||||||||
(c) Only applicable to facilities with ethylene oxide emissions. Assumed facilities would begin complying in year 2. Note, there are not new monitoring or recordkeeping costs for ethylene oxide equipment leaks (there are only reporting costs), as these activities are already conducted under the original MON requirements. | |||||||||||||
(d) Assumed that bypass lines were not used during the 3-year period, so costs for bypass lines would not be incurred. | |||||||||||||
(e) Assumed recordkeeping hours are comparable to previously required water methods, and assigned 0 additional hours to implement the El Paso Method. | |||||||||||||
(f) Assumed that one-third of the facilities would begin complying in year 2 and the remaining two-thirds of the facilities in year 3. |
Table 2 - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the MON RTR - Year 2 | |||||||||||||||
Burden Item | (A) Respondent Hours per Occurrence (Technical hours) |
(B) Non-Labor Costs Per Occurrence |
(C) Number of Occurrences Per Respondent Per Year |
(D) Technical Hours per Respondent Per Year (A X C) |
(E) Number of Respondents Per Year |
(F) Technical Hours per Year (D X E) |
(G) Clerical Hours per Year (F X 0.1) |
(H) Management Hours per Year (F X .05) |
(I) Total Hours per Year (F + G + H) |
(J) Total Labor Costs Per Year |
(K) Total Non-Labor Costs Per Year (B x C x E) |
(L) Total Number of Responses per Year (C X E) |
Footnotes | ||
1. Applications | NA | ||||||||||||||
2. Surveys and Studies | NA | ||||||||||||||
3. Reporting Requirements | |||||||||||||||
A. Read Rule | 24 | $0 | 1 | 24 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a | ||
B. Required Activities | |||||||||||||||
1. Flare Monitors | b,f | ||||||||||||||
a. Capital Cost | 0 | $810,761 | 1 | 0 | 7 | 0 | 0 | 0 | 0 | $0 | $5,675,327 | 0 | 1/3 in year 2 and 2/3 in year 3 | ||
b. Annualized Cost | 0 | $160,133 | 1 | 0 | 7 | 0 | 0 | 0 | 0 | $0 | $1,120,931 | 0 | |||
2. PRD Monitor | f | ||||||||||||||
a. Capital Cost | 0 | $63,150 | 1 | 0 | 67 | 0 | 0 | 0 | 0 | $0 | $4,231,050 | 0 | 1/3 in year 2 and 2/3 in year 3 | ||
b. Annualized Cost | 0 | $8,349 | 1 | 0 | 67 | 0 | 0 | 0 | 0 | $0 | $559,383 | 0 | |||
3. HEX El Paso Method | f | ||||||||||||||
a. Capital Cost | 0 | $7,379 | 1 | 0 | 67 | 0 | 0 | 0 | 0 | $0 | $494,393 | 0 | 1/3 in year 2 and 2/3 in year 3 | ||
b. Annualized Cost | 0 | $1,705 | 1 | 0 | 67 | 0 | 0 | 0 | 0 | $0 | $114,235 | 0 | |||
4. Ethylene Oxide Process Vents & Storage Tanks - Scrubber Monitor | c,f | ||||||||||||||
a. Capital Cost | 0 | $23,200 | 1 | 0 | 6 | 0 | 0 | 0 | 0 | $0 | $139,200 | 0 | |||
b. Annualized Cost | 0 | $4,900 | 1 | 0 | 6 | 0 | 0 | 0 | 0 | $0 | $29,400 | 0 | |||
5. Ethylene Oxide Process Vents & Storage Tanks - Scrubber Testing | c,f | ||||||||||||||
a. Initial Testing | 0 | $38,302 | 1 | 0 | 6 | 0 | 0 | 0 | 0 | $0 | $229,812 | 0 | |||
b. Re-Testing | 0 | $19,151 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |||
C. Create Information | Inc. in 3B | ||||||||||||||
D. Gather Information | Inc. in 3E | ||||||||||||||
E. Report Preparation | |||||||||||||||
1. Notification of Compliance Status | |||||||||||||||
a. Flares | 5 | $0 | 1 | 5 | 7 | 35 | 4 | 2 | 40 | $4,075 | $0 | 7 | f | 1/3 in year 2 and 2/3 in year 3 | |
b. PRDs | 15 | $0 | 1 | 15 | 67 | 1005 | 101 | 50 | 1156 | $116,999 | $0 | 67 | f | 1/3 in year 2 and 2/3 in year 3 | |
c. Ethylene Oxide Process Vents & Tanks | 4 | $0 | 1 | 4 | 6 | 24 | 2 | 1 | 28 | $2,794 | $0 | 6 | c | ||
d. Ethylene Oxide Eq. Leaks | 4 | $0 | 1 | 4 | 8 | 32 | 3 | 2 | 37 | $3,725 | $0 | 8 | c | ||
2. Periodic Report | |||||||||||||||
a. Flares | 5 | $0 | 2 | 10 | 7 | 70 | 7 | 4 | 81 | $8,149 | $0 | 14 | f | 1/3 in year 2 and 2/3 in year 3 | |
b. PRDs | 10 | $0 | 2 | 20 | 67 | 1340 | 134 | 67 | 1541 | $155,999 | $0 | 134 | f | 1/3 in year 2 and 2/3 in year 3 | |
c. Maintenance Vents | 4 | $0 | 2 | 8 | 67 | 536 | 54 | 27 | 616 | $62,400 | $0 | 134 | f | 1/3 in year 2 and 2/3 in year 3 | |
d. Bypass Lines | 4 | $0 | 2 | 8 | 67 | 536 | 54 | 27 | 616 | $62,400 | $0 | 134 | d,f | 1/3 in year 2 and 2/3 in year 3 | |
e. HEX El Paso Method | 3 | $0 | 2 | 6 | 67 | 402 | 40 | 20 | 462 | $46,800 | $0 | 134 | f | 1/3 in year 2 and 2/3 in year 3 | |
f. Ethylene Oxide Process Vents & Tanks | 4 | $0 | 2 | 8 | 6 | 48 | 5 | 2 | 55 | $5,588 | $0 | 12 | c | ||
g. Ethylene Oxide Eq. Leaks | 4 | $0 | 2 | 8 | 8 | 64 | 6 | 3 | 74 | $7,451 | $0 | 16 | c | ||
Reporting Subtotal | 4,092 | 409 | 205 | 4,706 | $476,380 | $1,823,949 | 666 | ||||||||
4. Recordkeeping Requirements | |||||||||||||||
A. Read Instructions | Inc. in 3.A | ||||||||||||||
B. Implement Activities | NA | ||||||||||||||
C. Develop Record System | NA | ||||||||||||||
D. Record information | |||||||||||||||
1. Flares | 0.4 | $0 | 365 | 146 | 7 | 1,022 | 102 | 51 | 1,175 | $118,978 | $0 | 0 | f | 1/3 in year 2 and 2/3 in year 3 | |
2. PRDs | 10 | $0 | 1 | 10 | 67 | 670 | 67 | 34 | 771 | $77,999 | $0 | 0 | f | 1/3 in year 2 and 2/3 in year 3 | |
3. HEX El Paso Method | 0 | $0 | 1 | 0 | 67 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | ||
4. Maintenance Vents | 1 | $0 | 1 | 1 | 67 | 67 | 7 | 3 | 77 | $7,800 | $0 | 0 | f | 1/3 in year 2 and 2/3 in year 3 | |
5. Bypass Lines | 0 | $0 | 1 | 0 | 67 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | d | ||
6. Ethylene Oxide Process Vents & Tanks | 2 | $0 | 1 | 2 | 6 | 12 | 1 | 1 | 14 | $1,397 | $0 | 0 | c | ||
7. Flare Management Plan | 75 | $0 | 3 | 225 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a | ||
E. Personnel Training | 16 | $0 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||
F. Time for Audits | NA | ||||||||||||||
Recordkeeping Subtotal | 1,771 | 177 | 89 | 2,037 | $206,174 | $0 | 0 | ||||||||
TOTAL | 5,863 | 586 | 293 | 6,742 | $682,554 | $1,823,949 | 666 | ||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||
Summary of Respondent Burden | 6,742 | $682,554 | $1,823,949 | $2,506,503 | |||||||||||
Initial Capital and Startup | $10,769,782 | ||||||||||||||
Annualized Capital/Start-up and O & M | $1,823,949 | ||||||||||||||
Footnotes: | |||||||||||||||
(a) This is a one-time cost (e.g., to read rule or develop plan). | |||||||||||||||
(b) Includes costs for the following monitoring equipment: H2 analyzer, calorimeter, flare gas flow monitor, steam controls/flow monitor, and air controls/flow monitor. | |||||||||||||||
(c) Only applicable to facilities with ethylene oxide emissions. Assumed facilities would begin complying in year 2. Note, there are not new monitoring or recordkeeping costs for ethylene oxide equipment leaks (there are only reporting costs), as these activities are already conducted under the original MON requirements. | |||||||||||||||
(d) Assumed that bypass lines were not used during the 3-year period, so costs for bypass lines would not be incurred. | |||||||||||||||
(e) Assumed recordkeeping hours are comparable to previously required water methods, and assigned 0 additional hours to implement the El Paso Method. | |||||||||||||||
(f) Assumed that one-third of the facilities would begin complying in year 2 and the remaining two-thirds of the facilities in year 3. |
Table 3 - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the MON RTR - Year 3 | |||||||||||||||
Burden Item | (A) Respondent Hours per Occurrence (Technical hours) |
(B) Non-Labor Costs Per Occurrence |
(C) Number of Occurrences Per Respondent Per Year |
(D) Technical Hours per Respondent Per Year (A X C) |
(E) Number of Respondents Per Year |
(F) Technical Hours per Year (D X E) |
(G) Clerical Hours per Year (F X 0.1) |
(H) Management Hours per Year (F X .05) |
(I) Total Hours per Year (F + G + H) |
(J) Total Labor Costs Per Year |
(K) Total Non-Labor Costs Per Year (B x C x E) |
(L) Total Number of Responses per Year (C X E) |
Footnotes | ||
1. Applications | NA | ||||||||||||||
2. Surveys and Studies | NA | ||||||||||||||
3. Reporting Requirements | |||||||||||||||
A. Read Rule | 24 | $0 | 1 | 24 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a | ||
B. Required Activities | |||||||||||||||
1. Flare Monitors | b,f | ||||||||||||||
a. Capital Cost | 0 | $810,761 | 1 | 0 | 14 | 0 | 0 | 0 | 0 | $0 | $11,350,654 | 0 | 1/3 in year 2 and 2/3 in year 3 | ||
b. Annualized Cost | 0 | $160,133 | 1 | 0 | 21 | 0 | 0 | 0 | 0 | $0 | $3,362,793 | 0 | |||
2. PRD Monitor | f | ||||||||||||||
a. Capital Cost | 0 | $63,150 | 1 | 0 | 134 | 0 | 0 | 0 | 0 | $0 | $8,462,100 | 0 | 1/3 in year 2 and 2/3 in year 3 | ||
b. Annualized Cost | 0 | $8,349 | 1 | 0 | 201 | 0 | 0 | 0 | 0 | $0 | $1,678,149 | 0 | |||
3. HEX El Paso Method | f | ||||||||||||||
a. Capital Cost | 0 | $7,379 | 1 | 0 | 134 | 0 | 0 | 0 | 0 | $0 | $988,786 | 0 | 1/3 in year 2 and 2/3 in year 3 | ||
b. Annualized Cost | 0 | $1,705 | 1 | 0 | 201 | 0 | 0 | 0 | 0 | $0 | $342,705 | 0 | |||
4. Ethylene Oxide Process Vents & Storage Tanks - Scrubber Monitor | c,f | ||||||||||||||
a. Capital Cost | 0 | $23,200 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |||
b. Annualized Cost | 0 | $4,900 | 1 | 0 | 6 | 0 | 0 | 0 | 0 | $0 | $29,400 | 0 | |||
5. Ethylene Oxide Process Vents & Storage Tanks - Scrubber Testing | c,f | ||||||||||||||
a. Initial Testing | 0 | $38,302 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |||
b. Re-Testing | 0 | $19,151 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | |||
C. Create Information | Inc. in 3B | ||||||||||||||
D. Gather Information | Inc. in 3E | ||||||||||||||
E. Report Preparation | |||||||||||||||
1. Notification of Compliance Status | |||||||||||||||
a. Flares | 5 | $0 | 1 | 5 | 14 | 70 | 7 | 4 | 81 | $8,149 | $0 | 14 | f | 1/3 in year 2 and 2/3 in year 3 | |
b. PRDs | 15 | $0 | 1 | 15 | 134 | 2010 | 201 | 101 | 2312 | $233,998 | $0 | 134 | f | 1/3 in year 2 and 2/3 in year 3 | |
c. Ethylene Oxide Process Vents & Tanks | 4 | $0 | 1 | 4 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | ||
d. Ethylene Oxide Eq. Leaks | 4 | $0 | 1 | 4 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c | ||
2. Periodic Report | |||||||||||||||
a. Flares | 5 | $0 | 2 | 10 | 21 | 210 | 21 | 11 | 242 | $24,448 | $0 | 42 | f | 1/3 in year 2 and 2/3 in year 3 | |
b. PRDs | 10 | $0 | 2 | 20 | 201 | 4020 | 402 | 201 | 4623 | $467,996 | $0 | 402 | f | 1/3 in year 2 and 2/3 in year 3 | |
c. Maintenance Vents | 4 | $0 | 2 | 8 | 201 | 1608 | 161 | 80 | 1849 | $187,199 | $0 | 402 | f | 1/3 in year 2 and 2/3 in year 3 | |
d. Bypass Lines | 4 | $0 | 2 | 8 | 201 | 1608 | 161 | 80 | 1849 | $187,199 | $0 | 402 | d,f | 1/3 in year 2 and 2/3 in year 3 | |
e. HEX El Paso Method | 3 | $0 | 2 | 6 | 201 | 1206 | 121 | 60 | 1387 | $140,399 | $0 | 402 | f | 1/3 in year 2 and 2/3 in year 3 | |
f. Ethylene Oxide Process Vents & Tanks | 4 | $0 | 2 | 8 | 6 | 48 | 5 | 2 | 55 | $5,588 | $0 | 12 | c | ||
g. Ethylene Oxide Eq. Leaks | 4 | $0 | 2 | 8 | 8 | 64 | 6 | 3 | 74 | $7,451 | $0 | 16 | c | ||
Reporting Subtotal | 10,844 | 1,084 | 542 | 12,471 | $1,262,427 | $5,413,047 | 1,826 | ||||||||
4. Recordkeeping Requirements | |||||||||||||||
A. Read Instructions | Inc. in 3.A | ||||||||||||||
B. Implement Activities | NA | ||||||||||||||
C. Develop Record System | NA | ||||||||||||||
D. Record information | |||||||||||||||
1. Flares | 0.4 | $0 | 365 | 146 | 21 | 3,066 | 307 | 153 | 3,526 | $356,935 | $0 | 0 | f | 1/3 in year 2 and 2/3 in year 3 | |
2. PRDs | 10 | $0 | 1 | 10 | 201 | 2,010 | 201 | 101 | 2,312 | $233,998 | $0 | 0 | f | 1/3 in year 2 and 2/3 in year 3 | |
3. HEX El Paso Method | 0 | $0 | 1 | 0 | 201 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | e | 1/3 in year 2 and 2/3 in year 3 | |
4. Maintenance Vents | 1 | $0 | 1 | 1 | 201 | 201 | 20 | 10 | 231 | $23,400 | $0 | 0 | f | 1/3 in year 2 and 2/3 in year 3 | |
5. Bypass Lines | 0 | $0 | 1 | 0 | 201 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | d | ||
6. Ethylene Oxide Process Vents & Tanks | 2 | $0 | 1 | 2 | 6 | 12 | 1 | 1 | 14 | $1,397 | $0 | 0 | c | ||
7. Flare Management Plan | 75 | $0 | 3 | 225 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a | ||
E. Personnel Training | 16 | $0 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||||
F. Time for Audits | NA | ||||||||||||||
Recordkeeping Subtotal | 5,289 | 529 | 264 | 6,082 | $615,730 | $0 | 0 | ||||||||
TOTAL | 16,133 | 1,613 | 807 | 18,553 | $1,878,157 | $5,413,047 | 1826 | ||||||||
Total Hours | Labor | Non-Labor | Total | ||||||||||||
Summary of Respondent Burden | 18,553 | $1,878,157 | $5,413,047 | $7,291,204 | |||||||||||
Initial Capital and Startup | $20,801,540 | ||||||||||||||
Annualized Capital/Start-up and O & M | $5,413,047 | ||||||||||||||
Footnotes: | |||||||||||||||
(a) This is a one-time cost (e.g., to read rule or develop plan). | |||||||||||||||
(b) Includes costs for the following monitoring equipment: H2 analyzer, calorimeter, flare gas flow monitor, steam controls/flow monitor, and air controls/flow monitor. | |||||||||||||||
(c) Only applicable to facilities with ethylene oxide emissions. Assumed facilities would begin complying in year 2. Note, there are not new monitoring or recordkeeping costs for ethylene oxide equipment leaks (there are only reporting costs), as these activities are already conducted under the original MON requirements. | |||||||||||||||
(d) Assumed that bypass lines were not used during the 3-year period, so costs for bypass lines would not be incurred. | |||||||||||||||
(e) Assumed recordkeeping hours are comparable to previously required water methods, and assigned 0 additional hours to implement the El Paso Method. | |||||||||||||||
(f) Assumed that one-third of the facilities would begin complying in year 2 and the remaining two-thirds of the facilities in year 3. |
Table 4 - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the MON RTR | |||||||
Year | Technical Hours | Clerical Hours | Management Hours | Total Labor Hours | Labor Costs | Non-Labor (Annualized Capital/Startup and O&M) Costs | Total Costs |
1 | 9,615 | 962 | 481 | 11,057 | $1,119,350 | $0 | $1,119,350 |
2 | 5,863 | 586 | 293 | 6,742 | $682,554 | $1,823,949 | $2,506,503 |
3 | 16,133 | 1,613 | 807 | 18,553 | $1,878,157 | $5,413,047 | $7,291,204 |
Total | 31,611 | 3,161 | 1,581 | 36,353 | $3,680,061 | $7,236,996 | $10,917,057 |
Average | 10,537 | 1,054 | 527 | 12,118 | $1,226,687 | $2,412,332 | $3,639,019 |
Table 5 - Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the MON RTR - Year 1 | ||||||||||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | |||||||||||||||||
Burden Item | Number of Occurrences Per Year | Technical Hours Per Occurrence | Tech Hours Per Year (C=A x B) |
Management Hours Per Year (D = C x 0.05) |
Clerical Hours Per Year (E = C x 0.1) |
Total Hours Per Year (C+D+E) | Total Cost Per Year | |||||||||||||||||
1. | Applications | not applicable | ||||||||||||||||||||||
2. | Read and Understand Rule Requirements | 45 | 24 | 1080 | 54 | 108 | 1242 | $57,672 | a | |||||||||||||||
3. | Required Activities | |||||||||||||||||||||||
A. | Observe stack tests | 0 | 16 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
B. | Excess emissions -- Enforcement Activities | 0 | 24 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
C. | Create Information | not applicable | ||||||||||||||||||||||
D. | Gather Information | not applicable | ||||||||||||||||||||||
E. | Report Reviews | |||||||||||||||||||||||
1. | Review notification of compliance status | |||||||||||||||||||||||
a. Flares | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
b. PRDs | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
c. Process Vents & Tanks | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
d. Eq. Leaks | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
2. | Review periodic reports | |||||||||||||||||||||||
a. Flares | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
b. PRDs | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
c. Maintenance Vents | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
d. Bypass Lines | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
e. HEX El Paso Method | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
f. Process Vents & Tanks | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
g. Eq. Leaks | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
3. | Review flare management plan | 21 | 5 | 105 | 5 | 11 | 121 | $5,607 | ||||||||||||||||
F. | Prepare annual summary report | 1 | 10 | 10 | 1 | 1 | 12 | $534 | ||||||||||||||||
4. | Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = | $0 | per trip | $0 | ||||||||||||||||||||
TOTAL | 1195 | 60 | 120 | 1374 | $63,813 | |||||||||||||||||||
Footnotes: | ||||||||||||||||||||||||
a | Number of occurrences is the number of states and EPA Regions with affected sources (35 states + 10 EPA regions = 45 respondents). | |||||||||||||||||||||||
Percent of Stack Tests Observed | 20% | |||||||||||||||||||||||
Estimated Percent Retesting | 10% | |||||||||||||||||||||||
Estimated Percent Emission Exceedences | 10% |
Table 6 - Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the MON RTR - Year 2 | ||||||||||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | |||||||||||||||||
Burden Item | Number of Occurrences Per Year | Technical Hours Per Occurrence | Tech Hours Per Year (C=A x B) |
Management Hours Per Year (D = C x 0.05) |
Clerical Hours Per Year (E = C x 0.1) |
Total Hours Per Year (C+D+E) | Total Cost Per Year | |||||||||||||||||
1. | Applications | not applicable | ||||||||||||||||||||||
2. | Read and Understand Rule Requirements | 0 | 24 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
3. | Required Activities | |||||||||||||||||||||||
A. | Observe stack tests | 6 | 16 | 96 | 5 | 10 | 110 | $5,126 | ||||||||||||||||
B. | Excess emissions -- Enforcement Activities | 0 | 24 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
C. | Create Information | not applicable | ||||||||||||||||||||||
D. | Gather Information | not applicable | ||||||||||||||||||||||
E. | Report Reviews | |||||||||||||||||||||||
1. | Review notification of compliance status | |||||||||||||||||||||||
a. Flares | 7 | 2 | 14 | 1 | 1 | 16 | $748 | |||||||||||||||||
b. PRDs | 67 | 2 | 134 | 7 | 13 | 154 | $7,156 | |||||||||||||||||
c. Process Vents & Tanks | 6 | 2 | 12 | 1 | 1 | 14 | $641 | |||||||||||||||||
d. Eq. Leaks | 8 | 2 | 16 | 1 | 2 | 18 | $854 | |||||||||||||||||
2. | Review periodic reports | |||||||||||||||||||||||
a. Flares | 14 | 2 | 28 | 1 | 3 | 32 | $1,495 | |||||||||||||||||
b. PRDs | 134 | 2 | 268 | 13 | 27 | 308 | $14,311 | |||||||||||||||||
c. Maintenance Vents | 134 | 2 | 268 | 13 | 27 | 308 | $14,311 | |||||||||||||||||
d. Bypass Lines | 134 | 2 | 268 | 13 | 27 | 308 | $14,311 | |||||||||||||||||
e. HEX El Paso Method | 134 | 2 | 268 | 13 | 27 | 308 | $14,311 | |||||||||||||||||
f. Process Vents & Tanks | 12 | 2 | 24 | 1 | 2 | 28 | $1,282 | |||||||||||||||||
g. Eq. Leaks | 16 | 2 | 32 | 2 | 3 | 37 | $1,709 | |||||||||||||||||
3. | Review flare management plan | 0 | 5 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
F. | Prepare annual summary report | 1 | 10 | 10 | 1 | 1 | 12 | $534 | ||||||||||||||||
4. | Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = | $881 | per trip | $5,288 | ||||||||||||||||||||
TOTAL | 1438 | 72 | 144 | 1654 | $82,077 | |||||||||||||||||||
Footnotes: | ||||||||||||||||||||||||
a | Number of occurrences is the number of states and EPA Regions with affected sources (35 states + 10 EPA regions = 45 respondents). | |||||||||||||||||||||||
Percent of Stack Tests Observed | 20% | |||||||||||||||||||||||
Estimated Percent Retesting | 10% | |||||||||||||||||||||||
Estimated Percent Emission Exceedences | 10% |
Table 7 - Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the MON RTR - Year 3 | ||||||||||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | |||||||||||||||||
Burden Item | Number of Occurrences Per Year | Technical Hours Per Occurrence | Tech Hours Per Year (C=A x B) |
Management Hours Per Year (D = C x 0.05) |
Clerical Hours Per Year (E = C x 0.1) |
Total Hours Per Year (C+D+E) | Total Cost Per Year | |||||||||||||||||
1. | Applications | not applicable | ||||||||||||||||||||||
2. | Read and Understand Rule Requirements | 0 | 24 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
3. | Required Activities | |||||||||||||||||||||||
A. | Observe stack tests | 0 | 16 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
B. | Excess emissions -- Enforcement Activities | 0 | 24 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
C. | Create Information | not applicable | ||||||||||||||||||||||
D. | Gather Information | not applicable | ||||||||||||||||||||||
E. | Report Reviews | |||||||||||||||||||||||
1. | Review notification of compliance status | |||||||||||||||||||||||
a. Flares | 14 | 2 | 28 | 1 | 3 | 32 | $1,495 | |||||||||||||||||
b. PRDs | 134 | 2 | 268 | 13 | 27 | 308 | $14,311 | |||||||||||||||||
c. Process Vents & Tanks | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
d. Eq. Leaks | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
2. | Review periodic reports | |||||||||||||||||||||||
a. Flares | 42 | 2 | 84 | 4 | 8 | 97 | $4,486 | |||||||||||||||||
b. PRDs | 402 | 2 | 804 | 40 | 80 | 925 | $42,934 | |||||||||||||||||
c. Maintenance Vents | 402 | 2 | 804 | 40 | 80 | 925 | $42,934 | |||||||||||||||||
d. Bypass Lines | 402 | 2 | 804 | 40 | 80 | 925 | $42,934 | |||||||||||||||||
e. HEX El Paso Method | 402 | 2 | 804 | 40 | 80 | 925 | $42,934 | |||||||||||||||||
f. Process Vents & Tanks | 12 | 2 | 24 | 1 | 2 | 28 | $1,282 | |||||||||||||||||
g. Eq. Leaks | 16 | 2 | 32 | 2 | 3 | 37 | $1,709 | |||||||||||||||||
3. | Review flare management plan | 0 | 5 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
F. | Prepare annual summary report | 1 | 10 | 10 | 1 | 1 | 12 | $534 | ||||||||||||||||
4. | Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = | $0 | per trip | $0 | ||||||||||||||||||||
TOTAL | 3662 | 183 | 366 | 4211 | $195,551 | |||||||||||||||||||
Footnotes: | ||||||||||||||||||||||||
a | Number of occurrences is the number of states and EPA Regions with affected sources (35 states + 10 EPA regions = 45 respondents). | |||||||||||||||||||||||
Percent of Stack Tests Observed | 20% | |||||||||||||||||||||||
Estimated Percent Retesting | 10% | |||||||||||||||||||||||
Estimated Percent Emission Exceedences | 10% |
Table 8 - Summary of Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the MON RTR | |||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Hours | Labor Costs | Non-Labor Costs | Total Costs |
1 | 1,195 | 60 | 120 | 1,374 | $63,813 | $0 | $63,813 |
2 | 1,438 | 72 | 144 | 1,654 | $82,077 | $0 | $82,077 |
3 | 3,662 | 183 | 366 | 4,211 | $195,551 | $0 | $195,551 |
Total | 6,295 | 315 | 630 | 7,239 | $341,441 | $0 | $341,441 |
Average | 2,098 | 105 | 210 | 2,413 | $113,814 | $0 | $113,814 |