Form EIA-757 A EIA-757 A Natural Gas Processing Plant Survey Schedule A Baseline

Natural Gas Data Collection Program

EIA-757A form

Natural Gas Processing Plant Survey

OMB: 1905-0175

Document [pdf]
Download: pdf | pdf
OMB No. 1905-0175
Expiration Date: 01/31/2024
Version No.: 2021.01
Burden: 0.5 hours
NATURAL GAS PROCESSING PLANT SURVEY
FORM EIA-757
Schedule A: Baseline Report
This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties
and other sanctions as provided by law. For the sanctions and the provisions concerning the confidentiality of information submitted on this form, see instructions.
Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,
fictitious, or fraudulent statements as to any matter within its jurisdiction.

PART 1. PLANT IDENTIFICATION DATA

PART 2. SUBMISSION INFORMATION
##

DATE (mm-dd-yyyy):

-

- 2 0

### ### ###

Form may be submitted using one of the following methods:

###

If this is a resubmission, enter an "X" in the box:

Secure File Transfer:
https://signon.eia.doe.gov/upload/notice757.jsp

If any Plant Identification Data has changed since the last report,

Fax:

EIA ID NUMBER:

(202) 586-1076

enter an "X" in the box:
Questions?

Plant Name:

Call: (877) 800-5261

Plant Address 1:
Plant Address 2:
City:
County:

State:
Zip:

-

Plant Owner Companies (Top Three):
1
2
3
Operator Company:
PART 3. CONTACTS
Section A: Contact information during an emergency (such as a hurricane):
Processing Plant Operations Contact:

Secondary Contact:

Contact Name:

Contact Name:

Title:

Title:

Company:

Company:

Primary Phone No.:

Ext:

Secondary Phone No.:

Ext:

Primary Phone No.:

Ext:

Secondary Phone No.:

Ext:

Fax Number.:

Fax Number.:

Email address:

Email address:

Section B: Contact person regarding the submission of this form:
Contact Name:
Phone No.:

Ext:

Email Address:
Comments: (To separate one comment from another, press ALT+ENTER)

Page 1

OMB No. 1905-0175
Expiration Date: 01/31/2021
Version No.: 2018.01
NATURAL GAS PROCESSING PLANT SURVEY

Burden: 0.5 hours

FORM EIA-757
Schedule A: Baseline Report
DATE:

2 0

Resubmission

EIA ID NUMBER:
PART 4. BASELINE PIPELINE CONNECTION DATA
List all primary pipelines connected to the plant and check all boxes that apply.
Name:
Capacity (list amount and check units):
Pipeline Type:

Entering

Wet Gas

Gas

Liquids

Exiting

Wet Gas

Gas

Liquids

MMcf/Day

Bbls/Day

MMcf/Day

Bbls/Day

MMcf/Day

Bbls/Day

MMcf/Day

Bbls/Day

MMcf/Day

Bbls/Day

If exiting, check this box if the pipeline is able to accept raw, unprocessed gas.
Name:
Capacity (list amount and check units):
Pipeline Type:

Entering

Wet Gas

Gas

Liquids

Exiting

Wet Gas

Gas

Liquids

If exiting, check this box if the pipeline is able to accept raw, unprocessed gas.
Name:
Capacity (list amount and check units):
Pipeline Type:

Entering

Wet Gas

Gas

Liquids

Exiting

Wet Gas

Gas

Liquids

If exiting, check this box if the pipeline is able to accept raw, unprocessed gas.
Name:
Capacity (list amount and check units):
Pipeline Type:

Entering

Wet Gas

Gas

Liquids

Exiting

Wet Gas

Gas

Liquids

If exiting, check this box if the pipeline is able to accept raw, unprocessed gas.
Name:
Capacity (list amount and check units):
Pipeline Type:

Entering

Wet Gas

Gas

Liquids

Exiting

Wet Gas

Gas

Liquids

If exiting, check this box if the pipeline is able to accept raw, unprocessed gas.

Page 2

NATURAL GAS PROCESSING PLANT SURVEY
FORM EIA-757
Schedule A: Baseline Report
DATE:

2 0

OMB No. 1905-0175
Expiration Date: 01/31/2021
Version No.: 2018.01
Burden: 0.5 hours

Resubmission

EIA ID NUMBER:
PART 5. BASELINE PLANT OPERATIONAL STATUS
What is the plant’s annual average total plant capacity?
(Please enter the inlet capacity level at which the plant is able to operate.)
MMcf/Day
What is the annual average natural gas flow at the plant inlet?
MMcf/Day
What is the average annual Btu content of natural gas at the plant inlet?
Btu/Cf
Which functions is the plant able to perform? (Please check all that apply.)
Dehydration
Contamination Removal (i.e.: CO2, N2, H2S, Hg, …)
NGL Extraction
Fractionation
Other (please describe):
Which functions does the plant actually perform? (Please check all that apply.)
Dehydration
Contamination Removal (i.e.: CO2, N2, H2S, Hg, …)
NGL Extraction
Fractionation
Other (please describe):
What is the storage capacity at the plant?
Dry Natural Gas

MMcf

Natural Gas Liquids

Bbls

Page 3


File Typeapplication/pdf
File TitleFORM EIA-757 NATURAL GAS PROCESSING PLANT SURVEY - form_a.pdf
AuthorMKO
File Modified2020-01-31
File Created2020-01-31

© 2024 OMB.report | Privacy Policy