Download:
pdf |
pdfOMB No. 1905-0175
Expiration Date: 01/31/2024
Version No.: 2021.01
Burden: 0.5 hours
NATURAL GAS PROCESSING PLANT SURVEY
FORM EIA-757
Schedule A: Baseline Report
This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties
and other sanctions as provided by law. For the sanctions and the provisions concerning the confidentiality of information submitted on this form, see instructions.
Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,
fictitious, or fraudulent statements as to any matter within its jurisdiction.
PART 1. PLANT IDENTIFICATION DATA
PART 2. SUBMISSION INFORMATION
##
DATE (mm-dd-yyyy):
-
- 2 0
### ### ###
Form may be submitted using one of the following methods:
###
If this is a resubmission, enter an "X" in the box:
Secure File Transfer:
https://signon.eia.doe.gov/upload/notice757.jsp
If any Plant Identification Data has changed since the last report,
Fax:
EIA ID NUMBER:
(202) 586-1076
enter an "X" in the box:
Questions?
Plant Name:
Call: (877) 800-5261
Plant Address 1:
Plant Address 2:
City:
County:
State:
Zip:
-
Plant Owner Companies (Top Three):
1
2
3
Operator Company:
PART 3. CONTACTS
Section A: Contact information during an emergency (such as a hurricane):
Processing Plant Operations Contact:
Secondary Contact:
Contact Name:
Contact Name:
Title:
Title:
Company:
Company:
Primary Phone No.:
Ext:
Secondary Phone No.:
Ext:
Primary Phone No.:
Ext:
Secondary Phone No.:
Ext:
Fax Number.:
Fax Number.:
Email address:
Email address:
Section B: Contact person regarding the submission of this form:
Contact Name:
Phone No.:
Ext:
Email Address:
Comments: (To separate one comment from another, press ALT+ENTER)
Page 1
OMB No. 1905-0175
Expiration Date: 01/31/2021
Version No.: 2018.01
NATURAL GAS PROCESSING PLANT SURVEY
Burden: 0.5 hours
FORM EIA-757
Schedule A: Baseline Report
DATE:
2 0
Resubmission
EIA ID NUMBER:
PART 4. BASELINE PIPELINE CONNECTION DATA
List all primary pipelines connected to the plant and check all boxes that apply.
Name:
Capacity (list amount and check units):
Pipeline Type:
Entering
Wet Gas
Gas
Liquids
Exiting
Wet Gas
Gas
Liquids
MMcf/Day
Bbls/Day
MMcf/Day
Bbls/Day
MMcf/Day
Bbls/Day
MMcf/Day
Bbls/Day
MMcf/Day
Bbls/Day
If exiting, check this box if the pipeline is able to accept raw, unprocessed gas.
Name:
Capacity (list amount and check units):
Pipeline Type:
Entering
Wet Gas
Gas
Liquids
Exiting
Wet Gas
Gas
Liquids
If exiting, check this box if the pipeline is able to accept raw, unprocessed gas.
Name:
Capacity (list amount and check units):
Pipeline Type:
Entering
Wet Gas
Gas
Liquids
Exiting
Wet Gas
Gas
Liquids
If exiting, check this box if the pipeline is able to accept raw, unprocessed gas.
Name:
Capacity (list amount and check units):
Pipeline Type:
Entering
Wet Gas
Gas
Liquids
Exiting
Wet Gas
Gas
Liquids
If exiting, check this box if the pipeline is able to accept raw, unprocessed gas.
Name:
Capacity (list amount and check units):
Pipeline Type:
Entering
Wet Gas
Gas
Liquids
Exiting
Wet Gas
Gas
Liquids
If exiting, check this box if the pipeline is able to accept raw, unprocessed gas.
Page 2
NATURAL GAS PROCESSING PLANT SURVEY
FORM EIA-757
Schedule A: Baseline Report
DATE:
2 0
OMB No. 1905-0175
Expiration Date: 01/31/2021
Version No.: 2018.01
Burden: 0.5 hours
Resubmission
EIA ID NUMBER:
PART 5. BASELINE PLANT OPERATIONAL STATUS
What is the plant’s annual average total plant capacity?
(Please enter the inlet capacity level at which the plant is able to operate.)
MMcf/Day
What is the annual average natural gas flow at the plant inlet?
MMcf/Day
What is the average annual Btu content of natural gas at the plant inlet?
Btu/Cf
Which functions is the plant able to perform? (Please check all that apply.)
Dehydration
Contamination Removal (i.e.: CO2, N2, H2S, Hg, …)
NGL Extraction
Fractionation
Other (please describe):
Which functions does the plant actually perform? (Please check all that apply.)
Dehydration
Contamination Removal (i.e.: CO2, N2, H2S, Hg, …)
NGL Extraction
Fractionation
Other (please describe):
What is the storage capacity at the plant?
Dry Natural Gas
MMcf
Natural Gas Liquids
Bbls
Page 3
File Type | application/pdf |
File Title | FORM EIA-757 NATURAL GAS PROCESSING PLANT SURVEY - form_a.pdf |
Author | MKO |
File Modified | 2020-01-31 |
File Created | 2020-01-31 |