Form EIA-757B Natural Gas Processing Plant Survey

Natural Gas Data Collection Program

EIA-757B form

EIA-757 B Natural Gas Processing Plant Survey

OMB: 1905-0175

Document [pdf]
Download: pdf | pdf
OMB No. 1905-0175
Expiration Date: 1/31/2024
Version No.: 2021.01
Burden: 1.5 hours
NATURAL GAS PROCESSING PLANT SURVEY
FORM EIA-757
Schedule B: Emergency Status Report
This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil
penalties and other sanctions as provided by law. For the sanctions and the provisions concerning the confidentiality of information submitted on this
form, see instructions. Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or
Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction.

PART 1. PLANT IDENTIFICATION DATA
DATE:

-

PART 2. SUBMISSION INFORMATION
Form may be submitted using one of the following
methods:

- 2 0

If this is a resubmission, enter an "X" in the box:

Secure File Transfer:
https://signon.eia.doe.gov/upload/notice757.jsp

If any Plant Identification Data has changed since the last report,

Fax:

EIA ID NUMBER:

(202) 586-1076

Questions?

enter an "X" in the box:

Call:

(877) 800-5261

Plant Name:
Plant Address 1:
Plant Address 2:
City:
County:

State:
Zip:

-

Plant Owner Companies (Top Three):
1
2
3
Operator Company:
PART 3. CONTACTS
Contact information during an emergency (such as a hurricane) :

Processing Plant Operations Contact:

Secondary Contact:

Contact Name:

Contact Name:

Title:

Title:

Company:

Company:

Primary Phone No.:

Ext:

Primary Phone No.:

Ext:

Secondary Phone No.:

Ext:

Secondary Phone No.:

Ext:

Fax Number.:

Fax Number.:

Email address:

Email address:

Comments: (To separate one comment from another, press ALT+ENTER)

Page 1

NATURAL GAS PROCESSING PLANT SURVEY
FORM EIA-757
Schedule B: Emergency Status Report
DATE:

-

- 2 0

OMB No. 1905-0175
Expiration Date: 1/31/2021
Version No.: 2018.01
Burden: 1.5 hours

Resubmission

EIA ID NUMBER:
PART 4. CURRENT POST-EMERGENCY PLANT OPERATIONAL STATUS
What is the plant’s current total capacity?
(Please enter the inlet capacity level at which the plant is able to operate.)
MMcf/Day
What is the current daily natural gas flow at the plant inlet?
MMcf/Day
Which functions is the plant able to perform currently? (Please check all that apply.)
Dehydration
Contamination Removal (for example, CO2, N2, H2S, Hg, …)
NGL Extraction
Fractionation
Other (please describe):
Which functions is the plant actually performing currently? (Please check all that apply.)
Dehydration
Contamination Removal (for example, CO2, N2, H2S, Hg, …)
NGL Extraction
Fractionation
Other (please describe):
What is the current storage level at the plant?
Natural Gas

MMcf

Natural Gas Liquids

Bbls

If the plant is partially or totally unable to operate, is there an alternate means of transporting the gas to market?
Yes

No

If yes, please explain the alternate means (for example, raw natural gas is able to bypass plant, or upstream natural gas can be
rerouted to another processing facility):

Page 2

NATURAL GAS PROCESSING PLANT SURVEY
FORM EIA-757
Schedule B: Emergency Status Report
DATE:

-

- 2 0

OMB No. 1905-0175
Expiration Date: 1/31/2021
Version No.: 2018.01
Burden: 1.5 hours

Resubmission

EIA ID NUMBER:
PART 5. CURRENT PLANT OPERATING CONSTRAINTS
Which of the following internal constraints currently apply? (Please check all that apply.)
Building infrastructure (including plant/facility, buildings)
Employee or operator availability, or access to plant
Damage to equipment (electronic, operational)
Communications (for example, SCADA, interpersonal devices)
Debris or foreign matter
Flooding
Other (please describe):
None
Which of the following external constraints currently apply? (Please check all that apply.)
Upstream supply
Downstream infrastructure
Downstream demand
Power source (for example, electricity)
Other (please describe):
None
Please explain your answers, if applicable:

PART 6. CURRENT ESTIMATE OF PLANT RESTORATION
(Please complete this only if you checked constraints in Part 5).
What is the expected restoration time for fully restoring the plant dehydration function?
(The time frame is relative to the date of this survey response.)
Up to two weeks
More than 2 weeks and up to 1 month
More than 1 month and up to 2 months
More than 2 months and up to 3 months
More than 3 months and up to 4 months
More than 4 months and up to 6 months
More than 6 months and up to one year
Other (please describe):
Please explain the reasons for the expected time frames for fully restoring, at least, the dehydration function.

Page 3


File Typeapplication/pdf
File TitleFORM EIA-757 NATURAL GAS PROCESSING PLANT SURVEY - form_b.pdf
AuthorMKO
File Modified2020-01-31
File Created2020-01-31

© 2024 OMB.report | Privacy Policy