West Coast Region Vessel Monitoring Requirement in the Pacific Coast Groundfish Fishery

ICR 202104-0648-003

OMB: 0648-0573

Federal Form Document

Forms and Documents
Document
Name
Status
Form and Instruction
Modified
Form
Modified
Supplementary Document
2021-04-15
Supporting Statement A
2021-04-07
Supplementary Document
2021-04-05
IC Document Collections
IC ID
Document
Title
Status
45264 Modified
45263
Unchanged
45247
Modified
240877 Modified
240809
Removed
240808
Modified
ICR Details
0648-0573 202104-0648-003
Received in OIRA 202003-0648-007
DOC/NOAA
West Coast Region Vessel Monitoring Requirement in the Pacific Coast Groundfish Fishery
Revision of a currently approved collection   No
Regular 04/15/2021
  Requested Previously Approved
36 Months From Approved 06/30/2021
11,750 25,051,916
2,021 3,665
2,172,750 2,266,900

The collection is being revised to remove the position report from the collection in order to accurately describe the number of annual responses. The position reports are automatically transmitted location signals from the VMS unit that do not require any action on the part of the captain or crew. The National Marine Fisheries Service (NMFS) requires vessel monitoring systems (VMS) and declaration reports to participate in the commercial sectors of the Pacific Coast groundfish fishery. These requirements allow NMFS to monitor vessel compliance with closed areas. The declaration reports also allow NMFS to determine with fishery a vessel is participating in to determine which regulations apply during a specific fishing trip.

PL: Pub.L. 94 - 265 303 Name of Law: Magnson-Stevens Fishery Management and Conservation Act
  
None

Not associated with rulemaking

  86 FR 1947 01/11/2021
86 FR 19875 04/15/2021
Yes

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 11,750 25,051,916 0 0 -25,040,166 0
Annual Time Burden (Hours) 2,021 3,665 0 0 -1,644 0
Annual Cost Burden (Dollars) 2,172,750 2,266,900 0 0 -94,150 0
No
No
The VMS installation and maintenance was previously calculated on a 3-year period, rather than a 4-year period which is more accurate. Additionally, the removal of the position reports reduces the response burden by 25,040,000. The Cost burden of the VMS installation was corrected as it was previously double counted, and the costs were adjusted from a 3-year renewal cycle to a 4-year renewal cycle for the equipment. The costs of the position reports (which have been removed from this collection) were migrated to the VMS maintenance line which is the proper line to capture this information.

$128,600
No
    No
    No
No
No
No
No
Karen Palmigiano 206 526-4491

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
04/15/2021


© 2024 OMB.report | Privacy Policy