0229ss25m

0229ss25.docm

National Pollutant Discharge Elimination System (NPDES) Program (Renewal)

OMB: 2040-0004

Document [docx]
Download: docx | pdf



ICR Supporting Statement
Information Collection Request for
National Pollutant Discharge Elimination
System Program (Renewal)


OMB Control No. 2040-0004, EPA ICR No. 0229.25









December 2021







Table of Contents

Page

A. Justification 1

1. Explain the circumstances that make the collection necessary and explain the legal or administrative requirements relevant to the collection and attach a copy of the statute or regulation authorizing the collection 1

1.1 Short Characterization/Abstract 1

1.2 Need/Authority for the Collection 2

2. Indicate how, by whom and for what purpose the information is to be used 7

3. Describe whether and to what extent the collection involves the use of automated processes or information technology to aid with the collection 14

4. Describe the efforts to identify duplication 15

5. Explain whether or not the collection impacts small entities 16

6. Describe the consequences to the program if the collection is not conducted or is conducted less frequently 19

7. Explain any special circumstances associated with “extraordinary burden” placed on respondents 21

8. Provide a copy and identify the date and page number of the notice in the Federal Register and describe efforts to consult with persons outside the agency 21

9. Explain any decision to provide compensation to respondents 22

10. Describe any assurance of confidentiality provided to respondents 22

11. Provide additional justification for any questions of a sensitive nature 22

12. Provide estimates of the hour burden of the collection of information 23

13. Provide an estimate of the total annual cost burden to respondents 23

14. Provide an estimate of the annualized cost to the federal government 24

15. Explain the reasons for adjustments reported in items 13 or 14 of OMB Form 83-I 25

16. Outline any plans for tabulation and publication of the information 27

17. Explain any requests to not display the expiration date of OMB approval 28

18. Explain any exceptions to the certification statement 5 CFR 1320.9, “Agency Certifications for Proposed Collections of Information.” 28

B. Statistical Methods (Used for Collection of Information Employing Statistical Methods) 28





List of Appendices



List of Tables

Page



  1. Justification

              1. Explain the circumstances that make the collection necessary and explain the legal or administrative requirements relevant to the collection and attach a copy of the statute or regulation authorizing the collection

      1. Short Characterization/Abstract

This consolidated Information Collection Request (ICR) renews the National Pollutant Discharge Elimination System (NPDES) Program ICR. It calculates the burden and costs associated with the NPDES program, identifies the types of activities regulated under the NPDES program, describes the roles and responsibilities of state governments and the Agency, and presents the program areas that address the various types of regulated activities.

This ICR being renewed (Office of Management and Budget [OMB] control no. 2040-0004, EPA ICR no. 0229.24, expiration date 03/31/2022) consolidates the burden and costs associated with activities previously reported in 18 of the NPDES program or NPDES-related ICRs. Once this renewal ICR is approved, the following ICRs will be discontinued (each originally would have been effective for three years) as this renewal ICR will account for their burden and costs:

  • Public Notification Requirements for CSOs in the Great Lakes Basin (OMB control no. 2040-0293, EPA ICR 2562.03, expiration date 04/30/2024)

  • Effluent Limitation Guidelines and Standards for the Dental Category (OMB control no. 2040-0287, EPA ICR no. 2514.01, expiration 11/30/2023)

  • 2020 National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit (MSGP) for Industrial Stormwater Discharges (OMB control no. 2040-0300, EPA ICR no. 2612.02, expiration 03/31/2024)

  • NPDES Electronic Reporting Rule – Phase 2 Extension (OMB Control No.: 2020-0037, EPA ICR No. 2617.02, expiration 12/31/2023)

The Clean Water Act (CWA) authorizes the Agency to issue permits for the discharge of pollutants to waters of the United States; the Agency uses the NPDES program to regulate point source discharges. CWA section 402(b) allows states (defined to include Indian tribes and U.S. territories) to acquire authority for the NPDES program, enabling them to issue and administer NPDES permits. At present, 47 states and the U.S. Virgin Islands are authorized to administer the NPDES permit program. In states that do not have authority for these programs, the Agency administers the program and issues NPDES permits. Because some permit applications are processed by states and some by EPA, this ICR calculates government burden and cost for both authorized states and EPA. See Appendix F.1 for a copy of the authorizing regulation.

      1. Need/Authority for the Collection

General Description of the NPDES Program

Section 402(a) of the CWA authorizes the EPA Administrator to issue permits for the discharge of pollutants if those discharges meet:

  • All applicable requirements of CWA sections 301, 302, 306, 307, 308, and 403; or

  • Any conditions the Administrator determines are necessary to carry out the provisions and objectives of the CWA.

The initial step in ensuring that the permits are adequately protective of those requirements is the permit application process. CWA section 402(a)(2) requires EPA to prescribe permit conditions to ensure compliance with requirements “including conditions on data and information collection, reporting and such other requirements as [the Administrator] deemed appropriate.” EPA’s application forms require applicants to submit data that help determine what those permit conditions should be.

CWA section 402(b) authorizes states to administer the NPDES program. Table 1‑1 summarizes the number of states authorized for each major program element. Authorized states are considered permitting authorities and are responsible for issuing, administering, and enforcing permits for most point source discharges within their borders. In states without authorized NPDES programs, EPA is the permitting authority and undertakes all permitting activities. CWA section 401 requires states to certify that EPA-issued NPDES permits establish “effluent limitations…and monitoring requirements necessary to assure that any applicant...will comply with any applicable effluent limitations and other limitations [pursuant to the CWA] and with any other appropriate requirement of state law…” (States, tribes, and U.S. territories may waive their right to certify permits). CWA section 510 provides that states, tribes, and territories may adopt requirements equal to or more stringent than standards established pursuant to CWA provisions.

Table 1‑1. States with Program Authorization as of December 2020

Type

Number

NPDES Base Permit Program

48a

General Permits Program

48a

Pretreatment Program

37

Biosolids Program

9

Federal Facilities

44

a Includes the U.S Virgin Islands.

CWA section 405 prohibits the discharge of pollutants caused by the disposal of sewage sludge, except in accordance with an NPDES permit (or an authorized state permit issued to control such disposal of sewage sludge). It also establishes a comprehensive sewage sludge permitting program and requires EPA to develop technical criteria for controlling sewage sludge disposal and use. CWA section 405 allows states with sludge management authority to issue and modify permits that regulate the use and disposal of sewage sludge. EPA implements CWA section 405 through its NPDES biosolids program.

CWA section 402(p) gives EPA the authority to permit stormwater discharges and identifies the applicable requirements, which in some instances are different from the requirements applicable to other NPDES permittees. The NPDES program requires permits for stormwater discharges from certain municipal separate storm sewer systems (MS4s), industrial activities, and construction activities disturbing one acre or more.

The NPDES program procedures and requirements are codified in Title 40 of the Code of Federal Regulations (CFR) Parts 122, 123, 124, and 125 (and in Parts 501 and 503 for biosolids, and Part 403 for pretreatment). EPA has developed its NPDES discharge, intake, and sewage sludge permit application requirements to ensure that the permitting authority obtains adequate information about applicants before the permitting authority issues permits. Most application requirements are contained in forms developed by EPA. Table 2‑1 in the next section provides an overview of the types of respondents required to submit NPDES application forms and identifies the form(s) that they must submit.

The specific monitoring, reporting, and recordkeeping requirements for NPDES and biosolids permits are applicable to both EPA and state-administered NPDES permit programs, NPDES permittees (including stormwater), and treatment works that treat, use, or dispose of sewage sludge. CWA section 308 gives EPA the authority to request this type of information from permittees. While these provisions establish EPA’s authority and requirement to collect pollutant information, EPA has specific needs for collecting the data. These needs include the following:

  • To provide information on pollutant discharge trends for performance measures;

  • To provide information to permitting authorities to prioritize permit activities;

  • To determine whether permittees are in compliance with their permit conditions; and

  • To provide information to the permit writer to determine the need for, and develop, permit limits.

Provisions for permit modifications and variances from technology standards are found in CWA sections 301(c), (g), (h), (k), (n); 302(b); and 316(a). Additionally, 40 CFR 122.21, 122.24, 122.41, 122.42, 122.47, 122.62, 122.63, 122.64, 124.5, 125.3, 403 and 501.15 give permitting authorities the flexibility to respond quickly and efficiently to the dynamic nature of facility operation, technology advancements, and regulatory changes.

Effluent limitations guidelines and standards (ELGs) are national wastewater limitations that apply to specific categories of industrial dischargers. The regulations are promulgated by EPA under the authority of CWA sections 301, 304, 306, and 307 and implemented through NPDES permits. In some instances, EPA establishes requirements for permittees to provide certification to the permitting authority or develop pollution prevention plans to demonstrate compliance with certain aspects of the ELGs, often in lieu of monitoring for one or more pollutants. This ICR also integrates those certifications and planning documents.

Specific NPDES Program Areas

Some NPDES program areas have specific components that require unique data. These are described in greater detail below.

Stormwater. The NPDES stormwater program regulates some stormwater discharges from three potential sources (MS4s, construction activities, and industrial activities) and those designated by EPA or the permitting authority. CWA section 402(p) establishes the authority for EPA to permit stormwater discharges and identifies the applicable requirements, which in some instances are different from the requirements applicable to other NPDES permittees.

Combined sewer overflows (CSOs). CWA section 402(q) requires that permits, orders, and decrees that include discharges from combined sewer systems conform to the 1994 Combined Sewer Overflow Control Policy (59 FR 18688, April 19, 1994). The information collection activities described in this ICR will provide the minimum data necessary for EPA to ensure that (1) all municipalities with combined sewer systems are developing and implementing CSO control programs that are consistent with the CSO Control Policy and (2) these CSO control programs will meet the requirements of the CWA and will achieve compliance with applicable state water quality standards (WQS).

On January 8, 2018, EPA finalized a rule to establish public notification requirements for CSO discharges to the Great Lakes, as required by Section 425 of the Consolidated Appropriations Act of 2016 (Pub. L. 114–113). In response, EPA has established public notification requirements for permittees authorized to discharge from a CSO to the Great Lakes Basin [82 FR 4233]. More information about this rule is discussed in the Program Components Consolidated in This ICR section below.

Great Lakes. The CWA directs EPA to publish water quality guidance for the Great Lakes System. Provisions of the Guidance are codified in 40 CFR Part 132. The Guidance establishes minimum water quality criteria, implementation procedures, and antidegradation provisions for the Great Lakes System.

Vessels. The NPDES Vessel General Permit (VGP) covering discharges incidental to the normal operation of a vessel operating as a means of transportation (“incidental discharges”). Specifically, the VGP is available for (1) incidental discharges from vessels longer than 79 feet and (2) ballast water discharges from vessels of any size. The VGP defines effluent limits for multiple discharge categories and specifies certain practices for various vessel categories. The types of vessels eligible for coverage under the VGP include, but are not limited to: cruise ships; ferries; barges; oil, petroleum, and chemical tankers; bulk carriers, container ships, and other cargo ships; refrigerant ships; research vessels; commercial fishing vessels; and emergency response vessels.


On December 4, 2018 the Vessel Incidental Discharge Act (VIDA) was signed, which requires EPA to develop national standards of performance for incidental discharges and subsequently for the USCG to develop corresponding implementation, compliance, and enforcement regulations for those standards.  The VIDA specifies that conditions of the 2013 Vessel General Permit (VGP) remain in effect until both EPA and the USCG regulations are final, effective, and enforceable with respect to every vessel incidental discharge.  Paperwork burden associated with those new VIDA requirements will be addressed as part of the new EPA and USCG regulations. Until the new EPA and USCG incidental discharge regulations are final, collection burden associated with the VGP remains in this ICR.  Consistent with the VIDA repealing the Small Vessel General Permit (sVGP) effectively immediately upon enactment, the collection burden associated with the administration of and compliance with the sVGP has been removed from this ICR.

Deicing ELG. In 2012, EPA promulgated an ELG at 40 CFR Part 449 for airports that conduct deicing operations. Aircraft are deiced by the spraying of deicing fluids, which contain pollutants. Airports also apply airfield pavement deicing chemicals to runways, taxiways, and ramps. The rule requires airports to either certify that they are not using deicers containing urea for airfield pavement deicing or monitor their effluent and provide monitoring reports once a year.

Pretreatment. EPA and authorized states implement the National Pretreatment Program. The CWA requires EPA to develop regulations to establish responsibilities among federal, state, and local government; industry; and the public to implement pretreatment standards to control pollutants that pass through or interfere with the treatment processes of publicly owned treatment works (POTWs) or that might contaminate sewage sludge.

Consolidated animals sector. Under the terms of the NPDES program, Concentrated Animal Feeding Operations (CAFOS) are defined as point sources (33 USC Section 1362). Under 33 USC Sections 1311 and 1342, a discharging CAFO must obtain an NPDES permit and comply with the terms of that permit, which may include appropriate conditions on data and information collection. EPA’s NPDES regulations also define when a hatchery, fish farm, or other facility is a concentrated aquatic animal production (CAAP) facility and, therefore, a point source subject to the NPDES permit program (40 CFR 122.24).

Cooling water intake structures. Section 316(b) of the CWA provides that “[a]ny standard established pursuant to [CWA section 301] or [CWA section 306] and applicable to a point source shall require that the location, design, construction, and capacity of cooling water intake structures reflect the best technology available for minimizing adverse environmental impact.” Rules establishing authority to regulate cooling water intake structures include:

  • The 316(b) New Facilities Final Rule (66 FR 65256; December 18, 2001) and minor amendments (68 FR 36749; June 19, 2003) implement section 316(b) as it applies to new facilities that use cooling water intake structures (CWISs). The burden associated with the CWIS New Facilities Rule, previously contained in a separate ICR (OMB control no. 2040-0241; EPA ICR no. 1973.06), is being incorporated into this ICR.

  • The 316(b) Phase III Facilities Final Rule (71 FR 35006; June 16, 2006) establishes requirements under Part 125, Subpart N, for new offshore oil and gas facilities that use CWISs. The burden associated with this rule, previously contained in a separate ICR (OMB control no. 2040-0268, EPA ICR no. 2169.05), is being incorporated into this ICR.

  • The 316(b) Existing Facilities Final Rule (79 FR 48300; August 15, 2014) implements section 316(b) as it applies to existing power generating and manufacturing facilities that use CWISs. The burden associated with this rule, previously contained in a separate ICR (OMB control no. 2040-0257; EPA ICR no. 2060.07), is being incorporated into this ICR.

Electronic reporting. On October 22, 2015, EPA published the final NPDES Electronic Reporting Rule (80 FR 64063) (eRule). The eRule replaces select existing paper-based reports with electronic reporting.

Program Components Consolidated in This ICR

This renewal incorporates into the consolidated ICR the burden and costs for several NPDES program components which were previously contained in separate ICRs. The remainder of this section describes those program components and their ICRs.

CSOs in the Great Lakes Basin. On January 8, 2018, EPA finalized a rule to establish public notification requirements for CSO discharges to the Great Lakes, as required by Section 425 of the Consolidated Appropriations Act of 2016 (Pub. L. 114–113). EPA has established public notification requirements for permittees authorized to discharge from a CSO to the Great Lakes Basin [82 FR 4233]. These requirements address: 1) signage; 2) notification to local public health department and other potentially affected public entities; 3) notification to the public; and 4) annual notice. The ongoing activities burden and burden reductions component associated with CSO discharges to the Great Lakes, previously contained in a separate ICR (OMB control no. 2040-0293; EPA ICR no. 2562.02), are being incorporated into this ICR.

Dental Amalgam ELGs. On June 4, 2017, EPA promulgated a regulation under the CWA to reduce discharges of mercury from dental offices into publicly owned treatment works. The Dental Office Category (40 CFR Part 441) regulation requires affected dental offices to control mercury discharges to POTWs by reducing their discharge of dental amalgam to a level achievable through the use of the best available technology or best available demonstrated control technology. The ongoing activities burden and burden reductions component associated with the Dental Office Category, previously contained in a separate ICR (OMB control no. 2040-0287; EPA ICR no. 2514.03), are being incorporated into this ICR.

2021 MSGP. In January 2021, EPA issued an updated NPDES Multi-Sector General Permit (MSGP) for stormwater discharges from industrial activity. The collection burden for the prior MSGP general permit was already consolidated into this ICR and therefore only the incremental increase in collection burden generated by the 2021 renewal has been consolidated into this ICR (OMB control no. 2040-0300; EPA ICR no. 2612.02).

NPDES eRule Phase 2 Extension. On September 23, 2020, the NPDES eRule Phase 2 Extension final rule was signed, extending the compliance deadline to December 21, 2025. The ICR associated with the rulemaking (OMB Control No.: 2020-0037, EPA ICR No. 2617.02, expiration 12/31/2023) addressed the burden associated with the submittal of alternative Phase 2 compliance deadlines requests to EPA and the sharing of information related to state-issued general permits and program reports. This burden has been consolidated into this ICR.

    1. Indicate how, by whom and for what purpose the information is to be used

This ICR includes information used primarily by EPA, permitting authorities, and permittees. EPA anticipates that other government agencies, as well as public interest groups, private companies, and individuals, will also use the data. Most data must be submitted to permitting authorities, while other information must be maintained on-site by the permittee. EPA will either submit separate ICRs for any regulatory or permitting changes requiring ICR approval that occur during this ICR’s coverage period or revise this ICR, as appropriate. The information collection provisions associated with the NPDES program described in Section 1 include the following:

  • Activities directly related to individual permit applications or notices of intent (NOIs) for coverage under general permits;

  • Activities associated with plan development or special studies;

  • Monitoring;

  • Reporting, including certification;

  • Recordkeeping;

  • Activities resulting from compliance assessments or enforcement actions; and

  • Activities resulting from NPDES program authorization, including modifications, transfer, or withdrawal of authorization.

Although different types of permittees submit widely differing information, this information can be categorized into two sets: identification information and information related to the facility’s discharges or practices. Identification information is primarily collected through permit application forms, NOIs, certifications, and other application requirements. Information related to the facility’s discharges or practices is most often collected through discharge monitoring reports but can also be included with submissions of application information, plans and studies, certification requests, inspection results, and other reports.

Application and identification information. Permitting authorities collect and use identification information—such as the names, locations, and descriptions of facilities—to uniquely identify each applicant seeking individual or general permit coverage and to establish a point of contact. This information varies in detail and scope according to the type of respondent. Discharges vary in complexity and character, indicating a need to collect a wide variety of information. However, discharges and activities from related industry groups or treatment works are often similar, allowing for common means of information collection. As a result, EPA has developed several different NPDES application forms. Table 2‑1 lists the application forms and other application requirements and the respondents to the request. Standardized application forms covered under this ICR include Forms 1, 2A, 2B, 2C, 2D, 2E, 2F, and 2S and the Uniform Federal Transportation/Utility System Application Form (see Appendix G).

Table 2‑1. Application Forms and Information Requests

Form/Request

Respondent Type

Form 1a

Nonmunicipal NPDES applicants not covered under Form 2A

Form 2Aa

All POTWs

Additional NPDES Application Requirements for Municipal Dischargers (Section 308 Request)

Municipal facilities (i.e., POTWs)

Additional NPDES Application Requirements for Nonmunicipal Dischargers (Section 308 Requests)

Nonmunicipal facilities

Form 2Ba

CAFOs and CAAP facilities

Form 2Ca

Existing manufacturing, commercial, mining, and silvicultural operations that discharge process wastewater

Form 2Da

New manufacturing and commercial facilities that discharge process wastewater

Form 2Ea

New or existing nonmunicipal facilities that discharge only non-process wastewater

Form 2Fa

Industrial stormwater dischargers applying for an individual permit

Form 2Sa

POTWs and other treatment works treating domestic sewage (covers sludge)

NOI—Industrial Activity (NOI—Stormwater) a

Industrial stormwater dischargers applying for the Multi-Sector General Permit (MSGP)

Application for Transportation and Utility Systems and Facilities on Federal Lands (Alaskan Lands Application)a

Builders and operators of transportation and utility projects on Alaskan public lands (substitutes for Forms 1, 2B, and 2C)

Application for Phase I Municipal Separate Storm Sewer Systems (MS4s)

Phase I MS4s

Petitions for Stormwater Individual Permit Coverage

Small MS4 operators or any person requesting that an industrial facility discharging through an MS4 to obtain coverage under an individual permit

NOI—State General Permits

Facility owners/operators applying under various state- or Federally-issued general permits (e.g., CAFOs, CAAPs)

NOI—Pesticide General Permit (PGP)a

Certain pesticide applicators applying under the PGP

NOI—Vessels General Permit (VGP)a

Vessels applying under the VGP

NOI—Construction General Permit (CGP)a

Construction site owners/operators applying under the construction general permit

NOI—MSGPa

Industrial facility owners/operators applying under the MSGP

Permit Consolidation Request

Facilities with multiple permits

Notification of Construction

Facilities classified as new sources

Ocean Discharge Information

Ocean dischargers

Notice of Termination (NOT)—PGPa

Certain pesticide applicators applying under the PGP

NOT—VGPa

Vessels covered under the VGP

NOT—CGPa

Construction permittees covered under the CGP

NOT—MSGPa

Industrial permittees covered under the MSGP

No Exposure Certification (NOE)

Industrial stormwater dischargers

Low Erosivity Waiver Certification

Construction stormwater dischargers

Annual Report

Vessels under the VGP; and certain pesticide applicators applying under the PGP

Permit Authorization and Record of Inspection (PARI)a

Vessels under the VGP

Adverse Incident Report

Pesticide applicators applying under the PGP

Nutrient Management Plan

CAFOs covered by an individual permit or general permit

Pesticide Discharge Management Plan

Certain pesticide applicators applying under the PGP

Cooling Water Intake Structures 122.21(r)(2)–4

Facilities with CWISs (Phase I, Phase III, and Existing)

Cooling Water Intake Structures 122.21(r)(5)–(8)

Existing facilities CWISs

Cooling Water Intake Structures 122.21(r)(9)–(13)

Existing facilities with CWISs with average intake flow greater than 125 million gallons per day

Cooling Water Intake Structures 122.21(r)(14)

New units at existing facilities with CWISs

One-Time Compliance Report for Dental Dischargers a

Dental offices that place or remove amalgam

Alternative Phase 2 Compliance Deadline Requesta

States - 48 authorized NPDES programs

General Permit and Program Report Inventory Updatea

States - 48 authorized NPDES programs

a These forms are included in Attachment G.

From the applications and requests for supplemental information, permitting authorities gather information about industrial processes, treatment systems, pollutant characteristics, discharge rates and volumes, sewage sludge use and disposal practices, sewage sludge quality, and other data such as pollution prevention practices. At times, permitting authorities require additional information, such as more detailed production information or maintenance and operating data for a treatment system, or additional monitoring data to characterize a discharge or receiving water quality, to inform the permitting process. Additional information collection requirements that might be necessary to implement state-, tribal-, or EPA-promulgated provisions consistent with the CWA, the Great Lakes Guidance, and other EPA regulatory requirements include monitoring (e.g., pollutant-specific and whole effluent toxicity), pollutant minimization programs, bioassays to support the development of water quality criteria, antidegradation policy/demonstrations, and regulatory relief options (e.g., variances from water quality criteria).

The information in applications is used to develop effluent limitations, compliance schedules, and other routine and special conditions in permits. EPA may also use these data to reevaluate testing requirements or to develop or revise effluent standards on a national basis. Permitting authorities may also use data from NOIs, Nutrient Management Plans (NMPs), Pesticide Discharge Management Plans (PDMPs), stormwater pollution prevention plans (SWPPPs), etc., as part of an evaluation to determine whether the permittee adheres to procedures laid out in the documents.

NPDES permits may not be issued for a period more than five years. The reapplication process is the primary mechanism for obtaining up-to-date information on discharges and sewage sludge quality, particularly for new pollutants. Although existing permittees provide pollutant data from self-monitoring activities in routine reports, these reports are usually limited to pollutants listed in existing permits. Permitting authorities use reapplication data to identify new pollutants or other information that could lead them to specify additional permit limitations, assess compliance with applicable effluent and sewage sludge limits, and develop appropriate special conditions in permits.

Routine data collection. Permittees use discharge monitoring data or sewage sludge quality data to support routine operations at their facilities and evaluate facility performance. In addition, they might need to collect this information to comply with state-specific program requirements or, in the case of POTWs, to administer pretreatment programs.

Discharge monitoring data give permitting authorities the information necessary to assess permittee compliance. Self-monitoring data also help the permitting authority modify or develop permit limits. Permitting authorities may also require other types of monitoring data, such as influent monitoring data to evaluate a plant’s operational aspects, ambient stream monitoring data to measure a permit’s effectiveness in protecting water quality, internal waste stream data when monitoring at the point of discharge is impractical or infeasible, or visual monitoring (including underwater surveys) that might be necessary to determine compliance with permit limits.

A permittee generally informs the permitting authority about its discharge through a discharge monitoring report (DMR). The DMR lists the results from the permittee’s required self-monitoring of pollutants. The permitting authority reviews this information and compares it with permit limits to determine compliance and if there is a need to develop additional limits. In addition to DMRs, permittees may be required to submit reports on violations of certain discharge limitations (e.g., maximum daily), as specifically required in their permits. This latter reporting requirement is intended to alert the permitting authority to potential health or environmental risks that could require a timely response. The data collected by this requirement are more incident-specific than the summary information provided on the DMR.

Data management. EPA uses the Integrated Compliance Information System (ICIS-NPDES) as its national system for managing data. ICIS-NPDES is used to track permit limits, permit expiration dates, monitoring data, enforcement and compliance data, and other data. It also provides EPA with a nationwide inventory of permit holders. EPA and most states store basic information for stormwater permittees in databases separate from ICIS-NPDES. EPA uses ICIS-NPDES information to develop reports on permit issuance, backlog, and compliance rates. EPA also uses the information to respond to public and congressional inquiries, develop and guide its policies, support enforcement action, and manage its programs to ensure national consistency in permitting. EPA, states, and territories incur similar types of burdens associated with data collection and management.

Data use. For individual permits, EPA and states analyze monitoring data when establishing permit conditions. NPDES permit writers may revise permit requirements based on data from monitoring reports. EPA and states have referred to DMR data on pollutants when developing lists of waters impaired by pollutants and point source dischargers that may cause or contribute to degradation of the quality of those waters. In addition, environmental groups, academicians, and others use monitoring data to estimate toxic pollutant loading to streams, lakes, oceans, and estuaries.

If noncompliance with permit conditions is detected, the permitting authority will use the data to help determine the appropriate enforcement response based on the nature and severity of the violation, the overall frequency of noncompliance, and the degree of seriousness of the violation.

There are variations in the conveyance of compliance-related data from the permittee to the permitting authority. EPA may require more information in the form of a section 308(a) letter. In the case of the NPDES stormwater permitting program, the regulatory requirement is for records retention rather than reporting. This type of activity is reflected in this ICR as a recordkeeping activity.

A permit may be modified to change its limits and conditions without affecting the permit’s term. Information supporting modification requests is collected during the effective term of the permit. Variances, alternatively, allow effluent limitation requirements or time deadlines to be modified or waived. During the permit development process, the permitting authority collects information from facilities to evaluate variance requests. In each case, the information collected is used to update or supplement permit application data.

Use of the data provided in each type of modification or variance request varies greatly because the information requirements of these items are so diverse. In general, EPA and authorized states use the information to determine whether the conditions or requirements that would warrant a modification or variance exist, and the progress toward achieving the goals of the CWA continues if the modification or variance is granted.

Reporting by municipalities under the CSO Control Policy gives NPDES permitting authorities the information they need to determine whether a municipality’s CSO control program is adequate to achieve compliance with CWA requirements and applicable state WQS, to establish permit terms and conditions for CSOs, to track performance, to identify and assess violations, and to target inspection and enforcement actions. The information is also used by EPA Regions and states to develop and evaluate the success of their CSO Control Strategies. EPA will also use these data to measure its performance in achieving the goals of the CSO Control Policy.

Oversight. Information collected by EPA is used to evaluate the adequacy of a state’s NPDES or sludge program, and to enable EPA to fulfill its statutory function of oversight over state program performance and individual permit actions. EPA will also use this information to evaluate states’ requests for full or partial program authorization and program modifications. To evaluate the adequacy of a state’s proposed program, EPA must have appropriate information to ensure that proper procedures, regulations, and statutes are in place and consistent with CWA requirements. EPA’s ongoing monitoring of authorized state programs ensures continued compliance with the goals and requirements of the CWA and state programs.

EPA uses information about permittees’ noncompliance to do the following:

  • Evaluate the effectiveness of state compliance enforcement programs;

  • Support its own enforcement actions, if any, against dischargers in authorized states; and

  • Generate and publish noncompliance rates to be used in reports to offices within EPA and to OMB and Congress.

In a Memorandum of Agreement, EPA Regions and authorized states define which permits the Region will and will not be provided for review. The Region must be given the opportunity to review all permits for major facilities, all general permits, and a small percentage of permits for minor facilities. The information submitted by states consists of all appropriate data necessary for permit review––application forms, fact sheets, draft permits, and other supporting documentation. EPA uses the information submitted by states to review state-issued permits for compliance with federal laws.

Other regulations. To meet its obligations under the CWA, National Historic Preservation Act (NHPA), and Endangered Species Act (ESA), EPA must ensure that discharges covered under EPA-issued NPDES permits are protective of historic properties, endangered and threatened species, and critical habitat. Applicants are required to assess the effects of their discharges on historic properties, federally listed endangered and threatened species, and designated critical habitat. Information from this assessment for stormwater or PGP applicants is provided in the NOI and therefore contained in the NOI database. Authorized states are not required to meet the ESA and NHPA obligations, and therefore no ESA or NHPA burden is associated with state-issued permits.

Recently added NPDES program components are discussed in more detail below.

Public Notification Requirements for CSOs in the Great Lakes Basin. The regulation is specific to CSO discharges in the Great Lakes Basin and is intended to alert the public, local public health departments, and other potentially affected public entities to the short- and long-term public health and environmental hazards associated with CSO discharges. Such notification will enable potentially affected parties to take action that may help prevent serious health effects that may otherwise occur if they were to remain unaware of the occurrence of CSO discharges.

Specific Provisions Affecting Applications and Program Updates. The use of this information is the same as for other NPDES activities directly related to individual NPDES permit applications, as the specific provisions affect the NPDES program requirements and application forms mentioned above.

Dental Amalgam ELGs. Control Authorities are responsible for oversight of the pretreatment standards. Control Authorities (including EPA) review the reports and records of compliance to assess dental facilities’ compliance with the pretreatment standards. These reports and records also allow Control Authorities to assess how many dentist offices within their jurisdiction discharge amalgam, what BMPs are used, when inspections occur, as well as what operation and maintenance activities are conducted.

2021 MSGP. EPA collects the information required in the MSGP to provide information supporting permittee eligibility to be covered by the permit; provide information on pollutant discharge trends for performance measures; provide information to the EPA and states to prioritize permit activities; determine whether permittees are in compliance with permit conditions; and provide information to the EPA to determine the need for and to help with development of permit limits.

Phase 2 Extension. State authorized NPDES programs will prepare and send a waiver request to EPA when they are seeking an alternative Phase 2 compliance deadline for general permits or program reports. They will also prepare and send basic information to EPA as they update or deploy their general permits and program reports and the related electronic reporting tools. Additionally, states will annually review EPA’s inventory of general permits and program reports and the related electronic reporting tools.

    1. Describe whether and to what extent the collection involves the use of automated processes or information technology to aid with the collection

The Electronic Reporting regulation requires electronic reporting of NPDES information rather than paper-based reports. (See section A.1.8.4 for details.) On September 23, 2020, EPA signed the final "Phase 2 Extension Rule," which extended the compliance deadline for implementation of Phase 2 of the eRule to December 21, 2025. This extension has been accounted for in this ICR.

For activities related to general permits, respondents for certain permits are currently required to submit NOIs electronically via EPA’s NPDES eReporting Tool (NeT), or similar state tools. All other EPA-issued general permits, and some state-issued permits will transition to submitting NOIs through NeT over the next several years. Other state-issued permits will require use of state electronic reporting tools. EPA’s legacy electronic Notice of Intent (eNOI) system, which was previously used for NOI submitted under several EPA-issued general permits will be decommissioned following the final transition of remaining functionality to NeT in FY22.

Currently, EPA maintains some general permit data in ICIS-NPDES. The use of this database is expanding as a result of implementation of the eRule. This eRule implementation reduces the burden to EPA and the states for gathering and analyzing national permit and water quality data.

In collecting and analyzing the information associated with NPDES individual permit applications, EPA will use ICIS-NPDES to ultimately store the relevant facility and permit information. EPA and the states will ensure accuracy and completeness of the information and are responsible for ensuring that applicable data are entered into ICIS-NPDES.

The public may access certain information via Enforcement and Compliance History Online (ECHO). Some of the information is available to the public through Web-based interfaces that pull data from ICIS-NPDES and other EPA data systems.

For activities related to requests for NPDES permit modifications and variances from technology standards, improved information technology does not appear to provide opportunities to minimize respondents’ burden because of the unique nature of the information that respondents must submit as needed.

For compliance reports, EPA and states are moving toward greater automation—for example, system-generated noncompliance reports in place of the existing Quarterly Noncompliance Reports. This advancement in information technology allows for states to efficiently provide a consistent and accurate set of data while using fewer resources and time.

    1. Describe the efforts to identify duplication

All information collection is authorized by the CWA and its implementing regulations. EPA has examined all other reporting and recordkeeping requirements in the CWA and 40 CFR Parts 122, 123, 124, 125, 403, 501, and 503. In prior versions of this ICR, EPA also consulted the following sources of information to determine if similar or duplicate information is available elsewhere:

  • The EPA inventory of ICRs;

  • The Government Information Locator Service;

  • The Toxics Release Inventory;

  • Resource Conservation and Recovery Act (RCRA); and

  • Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA)

Examination of these databases and discussions with other federal Agencies did not identify any application requirements that were duplicative with existing requirements.

    1. Explain whether or not the collection impacts small entities

Of the small businesses that discharge pollutants, many discharge indirectly to POTWs rather than directly to waters of the U.S. Indirect dischargers are not required to have NPDES permits and thus are subject only to the pollution control and reporting requirements associated with the Pretreatment Program. Although small businesses that are direct dischargers are not treated as a separate class under the NPDES program, efforts to minimize the burdens imposed on them by NPDES information collection activities are implicit in the existing monitoring/reporting framework. Monitoring and reporting requirements are based on many factors, including volume and environmental significance of a wastewater discharge. Because small permittees usually discharge small volumes of wastewater, their monitoring and reporting burdens tend to be smaller as well.

This ICR consolidates information collection activities from several other efforts, each of which sought to reduce impacts to small entities. EPA developed several application forms, and promulgated different application requirements to tailor the information collection demands considering, among other factors, the size and complexity of the facility, its discharge, and (where applicable) its intake structure.

Generally, as the size of a facility increases, the amount of required information increases correspondingly. EPA has regularly looked for ways to reduce reporting burdens on businesses of all sizes; approaches used to minimize the burden to small entities include the following:

  • Several of the applications (e.g., Form 1 and NOIs) request minimal information, such as the name and location of the facility, or merely direct the applicant to complete specific sections of the application (e.g., Forms 2A and 2S). Facilities submit applications once every five years. The burden represented by these applications cannot be further reduced for small businesses because permitting authorities need certain basic information to make permitting decisions.

  • EPA developed general permit procedures to reduce burdens associated with the application for coverage and administration of large numbers of dischargers, especially the burden associated with stormwater discharges and pesticide discharges. EPA and states also have made extensive use of general permits, which tend to have less burdensome monitoring and reporting requirements than individual permits. In fact, the majority of stormwater permittees, which compose more than 90 percent of all NPDES permittees, are covered under general permits.

  • NOIs for permit coverage for construction sites and pesticide discharge activities contain minimal information required to characterize the site and activity. NOIs are typically submitted once every five years. Construction sites typically submit an NOI once for each construction activity, or twice if the construction activity continues beyond the expiration date of the general permit, and a Notice of Termination (NOT). Most site-related information is contained in the SWPPP or PDMP if required, which need not be submitted to EPA. The CGP NOI (EPA Form 3510-9) was developed specifically to reduce the burden for construction activities. The current NOI is simplified and requests only relevant information for construction activities.

  • With regard to small MS4s regulated under the Phase II Rule, EPA believes that the application requirements provide the minimum information required to adequately assess the current and future effects of the small MS4 discharges on waters of the United States. The NOI requirements for regulated small MS4s are substantially less than those under the Phase I stormwater regulation for medium and large MS4s. The application requirements for the small subset requiring an individual permit are substantially reduced as well.

  • The no-exposure provision of the Stormwater Phase II Rule allows regulatory relief for small industrial entities that submit “no exposure” certifications. Small entities that take advantage of this provision to switch from a permitted facility to “no exposure” status experience a substantial reduction in burden.

  • Some industrial facilities that do not have toxic pollutants in their effluent are not required to provide as much monitoring information on Form 2C as those with toxic discharges. Under 40 CFR 122.21(g)(8), coal mines with a probable total annual production less than 100,000 tons per year and other applicants with gross total annual sales averaging less than $100,000 per year (in second quarter 1980 dollars) might qualify as a small business and be exempt from the reporting requirements for toxic pollutants.

  • EPA developed Form 2E specifically to reduce the reporting burden for certain small businesses. These businesses are new or existing manufacturing, commercial, mining, and silviculture NPDES permit applicants that do not discharge process wastewater. This form is easier to complete and requires the submission of existing sampling data.

  • All permittees are required to report instances of noncompliance and keep records of monitoring data. In most cases, these requirements do not impose a large burden on small businesses because the information required is simple and straightforward.

  • The burden incurred as a result of variance requests is voluntary. A small business that decides to request a variance from effluent limitations does so on the basis of its assessment that the benefits of receiving such a variance outweigh the burdens associated with preparing the request. The time and effort required to prepare a small facility’s variance request might be less than that required for a larger, more complex facility to prepare a similar request.

  • To help communities with combined sewer systems that serve populations of fewer than 75,000, the CSO Control Policy recommends that NPDES permitting authorities use flexibility when requiring these communities to develop an LTCP. In the Policy, EPA recommends that small systems be required to document implementation of the Nine Minimum Controls (NMC), prepare LTCPs that give high priority to controlling overflows to sensitive areas, and involve the public in their decision-making. The intent of this recommendation is to focus the limited resources of smaller communities on controlling CSOs. Compliance monitoring should be less extensive for small entities than large entities because the small systems have fewer CSOs. EPA developed an LTCP Template (LTCP EZ) to help small communities develop LTCPs. LTCP EZ builds on NMC implementation and provides step-by-step instructions for completing the simple forms in hard copy format or electronically.

The reporting requirements for pretreatment program development affect state governments and municipal governments (i.e., POTWs). Requirements for pretreatment program implementation and program/categorical determinations involve some small business industrial users (IUs). The information requested is not available from other sources and is essential for implementing the pretreatment program.

In 2001, EPA estimated that over the next 20 years 11 new CWIS facilities owned by small entities were projected to be subject to the final 316(b) regulation. The exact number of facilities owned by small entities that would be subject to the rule annually is difficult to quantify. If any small entities would be affected, it is estimated, one to two new respondents that are small entities will be added for this three-year ICR renewal period, resulting in an estimated total of 10 respondents that are small entities.

The 316(b) existing CWIS rule facility applicability requirements in 40 CFR section 125.91 exclude most existing small entities from the rule. As a result, the rule affects only a small absolute number of facilities owned by small entities, representing a very small percentage of all facilities owned by small entities in the electric power and manufacturing industries. EPA estimates that between 37 and 91 small entities in the electric power industry and six primary manufacturing industries own facilities subject to this rule. In addition, EPA estimates that five small entities own complying facilities in other industries.

The 316(b) Phase III Rule applies to new offshore oil and gas facilities, and the minimum design intake flow requirements exclude all but one small entity from the compliance requirements.

The information reported in this ICR related to state NPDES and sewage sludge programs is limited to state efforts, including EPA review of state information; it does not reflect the burden on the permittee. Therefore, these activities do not affect small businesses.

The Dental Office Category (40 CFR Part 441) regulation significantly reduces and streamlines the reporting requirements in EPA’s General Pretreatment Regulations that would otherwise apply to dental offices treated as CIUs. Most significantly, it requires dental dischargers to submit a One-Time Compliance Report rather than biannual reporting and wastewater sampling required of Categorical Industrial Users.

The public notification requirements for CSOs to the Great Lakes Basin apply to an estimated 122 small municipalities, which have aggregate populations of less than 50,000 and are classified as small governmental jurisdictions and thus are small entities. EPA evaluated the impact of this regulation on these small entities in relation to available financial data and concluded that this information collection will not have a significant impact on a substantial number of small entities.

    1. Describe the consequences to the program if the collection is not conducted or is conducted less frequently

Failure to collect the necessary data to implement these regulations would result in significant adverse impacts to the environment and to public health. Regulated facilities and/or control authorities that do not collect the data would be failing to comply with the NPDES regulations, which could result in enforcement actions including civil or criminal penalties.

EPA recognizes the importance of balancing the need for data collection efforts against respondent burden and costs. From the inception of the NPDES program, cost has been a major factor considered in establishing application requirements, monitoring conditions, report content, and reporting frequencies. The information needed to meet permitting, monitoring, reporting, and information collection requirements related to the NPDES program is submitted either once, regularly, or as needed. EPA and authorized states need current information about permittees, discharge characteristics, enforcement actions, and program performance to fulfill oversight responsibilities.

EPA must track permits, compliance activities, and enforcement actions to ensure that state programs are carrying out the provisions of the CWA in a timely manner. EPA has determined that the NPDES burden described in this ICR is necessary to provide sufficient data for EPA to effectively provide guidance for state programs, to review or comment on state actions, or to intervene in compliance or enforcement cases.

Permitted facilities must reapply for NPDES and sewage sludge management permits before their existing permits expire. The CWA prohibits NPDES permits from having terms longer than five years. Less frequent permit applications would not give the permitting authority current enough data to establish effective limitations or conditions when reissuing permits. Less frequent permit issuance would also hinder the ability of EPA and the regulated community to take advantage of technological improvements as they occur. Permits must contain conditions that reflect, for example, the following criteria:

  • New industrial processes and waste treatment technologies;

  • New kinds of discharges (such as toxic chemicals);

  • New detection methods; and

  • Changes in the quality of receiving waters.

EPA considers the reporting requirements associated with the pretreatment program to be the minimum necessary for effective administration of the pretreatment program as well as to ensure effective control of hazardous wastes and to implement RCRA section 3018(b). EPA considers the specific requirements for significant industrial users (SIUs) and for reporting the discharge of RCRA hazardous substances preferable to repealing the domestic sewage exclusion. The domestic sewage exclusion is a RCRA provision that excludes domestic sewage and any mixture of domestic sewage and other wastes that pass through a sewer system to a POTW for treatment from being classified as a RCRA hazardous waste.

Some of the information in this ICR that is required to be submitted is collected only after the permittee violates a permit condition or after a certain condition occurs. For example, noncompliance reports are submitted when the facility experiences a bypass, an upset, or a violation of a permit limit. Responses to section 308(a) letters are submitted only when requested by the Administrator in response to events such as a spill of oil or a hazardous substance, or whenever EPA has reason to believe it needs more information to determine compliance. Compliance schedule reports are submitted only when a permit contains a compliance schedule, and it is necessary to ascertain a permittee’s compliance with a milestone in the compliance schedule. Also, alternate level reports are submitted only when there is an expected change in the production level at the facility.

In certain instances, a permittee may choose to submit information when requesting a modification or variance from otherwise applicable requirements. The information collection and reporting requirements associated with NPDES permit modifications and variances are specific, would not be supplied in any other report or application, and are submitted as needed. In most cases, the decision to submit information is made by the NPDES permittee or permit applicant. The exceptions are (1) when outside events trigger the need for a permit modification and (2) when the Administrator decides to invoke a reporting requirement, such as a request for permit revocation and reissuance. Because information is submitted only when needed, less frequent data collection would not give the permitting authority enough information to meet its responsibilities under the CWA.

    1. Explain any special circumstances associated with “extraordinary burden” placed on respondents

No special circumstances place “extraordinary burden” on respondents. Information is collected in a manner consistent with the Paperwork Reduction Act (PRA) guidelines at 5 CFR 1320.5(d)(2). Requests for supplemental information for emergency response or enforcement are exempt from the PRA requirements.

    1. Provide a copy and identify the date and page number of the notice in the Federal Register and describe efforts to consult with persons outside the agency

In June 2020, EPA initiated a consultation with stakeholders in the National Association of Clean Water Agencies (NACWA), the Association of Clean Water Administrators (ACWA), and the Federal Water Quality Coalition (FWQC), representing municipal, state, and industrial respondents (respectively) for this ICR. With the consultation, EPA requested input on changes to estimated information collection burden due to program changes, incorporation of addition separate ICRs, and the following questions:

  1. Has EPA adequately and reasonably described recordkeeping requirements?

  2. Are the burden hours, as described, accurate?

  3. Are the burden costs, as described, accurate?

EPA received comments from one agency, the Louisiana Department of Environmental Quality (LADEQ) regarding burden hour estimates used for states to review and/or process NPDES application forms, notifications, certification for exceptions and NOIs.

Additionally, in compliance with the 1995 Paperwork Reduction Act, EPA solicited public comments for a 60-day period in part to determine realistic burden estimates for respondents. During this public comment period, EPA received one comment, which pertained to NPDES application Form 2A’s Section 3.7. EPA has considered this comment and in response is making minor edits to this section. These edits have no impact on the burden hours associated with completing application Form 2A.

    1. Explain any decision to provide compensation to respondents

No payments or gifts are provided to respondents.

    1. Describe any assurance of confidentiality provided to respondents

Permit applications and other respondent reports may contain confidential business information. If this is the case, the respondent may request that such information be treated as confidential. All confidential data will be handled in accordance with 40 CFR 122.7, 40 CFR Part 2, and EPA’s Security Manual Part III, Chapter 9, dated August 9, 1976. Any claim of confidentiality must be asserted at the time of submission. However, CWA section 308(b) specifically states that effluent data may not be treated as confidential.

    1. Provide additional justification for any questions of a sensitive nature

Questions of a sensitive nature (including personally identifiable information) are not found in this information collection.

    1. Provide estimates of the hour burden of the collection of information

The estimate of respondent burden hours covers facilities subject to NPDES program requirements (permittees) and authorized states. Appendix A describes the information collected and the methodology for estimating respondent burden and costs. Appendix B presents a calculated respondent burden estimate grouped by activity type and respondent type. Table 12‑1 summarizes the labor burden and associated labor costs for permittees and states with NPDES program authority.

Table 12‑1. Summary of Labor Burden and Costs


Average Annual Respondents

Average Annual Total Burden (hours)

Average Annual Total Labor Costs (2020$)

Permittees

826,543

28,672,085

$1,579,756,982

States, tribes, territories, and D.C.a

637

2,471,418

$129,530,855

Totals

827,180

31,143,503

$1,709,287,837

a 591 of these 637 are not authorized to administer the NPDES program and respond to only one information item (certification of EPA-issued permits).

    1. Provide an estimate of the total annual cost burden to respondents

This section presents an estimate of annual operating and maintenance (O&M) and capital and start-up costs. The majority of the burden and cost calculations in this ICR are the result of labor costs only. The ICR accounts for O&M costs for certain testing/analysis plus certain capital and start-up costs incurred by respondents that perform activities outside the normal operation practices. All costs presented have been adjusted using the Consumer Price Index to September 2020 dollars. This ICR estimates that there are no O&M or capital and start-up costs for state agencies or the federal government.

Permittee O&M costs. The permittee O&M costs are linked to the following activities:

  • NPDES permit application and renewal requirements;

  • Monitoring and reporting;

  • Baseline determination and estimate of the incremental monitoring burden and cost for remining sites;

  • Minimum monitoring requirements for direct discharging mills in the “bleached papergrade kraft and soda” and “papergrade sulfite” subcategories of the “pulp, paper, and paperboard” point source category;

  • Animal sector testing/analysis and public notice costs;

  • SIU discharge monitoring under the Pretreatment Program;

  • CWIS Phase I and existing facility annual activities such as operation and upkeep of capital equipment, as well as purchase of contracted services such as laboratory analyses and other direct costs (ODCs);

  • CWIS Phase III (offshore oil and gas) facility entrainment monitoring sample analysis if performed by an outside laboratory;

  • CWIS existing facility equipment O&M, contract services, and ODCs;

  • Postage costs for mailing in permit applications and dental office reporting.

Details on the methodology used to derive these costs are provided in section A.2.2 of Appendix A.

Permittee capital and start-up costs. The permittee capital and start-up costs are linked to the activities listed below:

  • CSO notification;

  • Baseline determination and estimate of the incremental monitoring burden and cost for remining sites;

  • Start-up costs for the animal sector;

  • CWIS Phase I purchase and installation of pilot study technology;

  • CWIS Phase III (offshore oil & gas) cost for installing remote monitoring devices

Details on the methodology used to derive these costs are provided in section A.2.3 of Appendix A. Table 13‑1 summarizes annual O&M and capital and start-up costs.

Table 13‑1. Summary of Annual O&M and Capital and Start-up Costs


Permittees

States/Tribes/Territories

Costs (capital and start-up)

$840,692

$0

Costs (O&M)

$21,642,469

$577,756

Total annual costs

$22,421,425

$577,756

    1. Provide an estimate of the annualized cost to the federal government

The federal government burden includes activities related to administration of NPDES permits in non-authorized states, territories, and federal Indian lands as well as oversight of NPDES programs. In states without approved NPDES programs, the federal government issues and administers NPDES permits. These burdens are similar to those incurred by the states and are calculated using the same methodology and assumptions. Appendix A provides program administration burden estimates for authorized states; in many cases, these also apply to the federal government in non-authorized states. Appendix C, Table C-1, presents calculated respondent burden estimates grouped by activity type. Details of the federal government burden and costs associated with general oversight of the NPDES program and the approved state programs are presented in Appendix C, Table C-2. Table 14‑1 summarizes the average annual Agency burden hours and costs.

Table 14‑1. Summary of Agency Annualized Burden and Costs


NPDES Program Administration in Non-authorized States

(Appendix C, Table C-1)

NPDES Program Oversight

(Appendix C, Table C-2)

Total

Responses (number)

171,627

5,761

177,388

Burden (hours)

142,732

27,342

170,073

Costs (labor)

$6,545,937

$1,247,535

$7,793,472

Costs (capital)

$0

$0

$0

Costs (O&M)

$316,458

$312

$316,770

Total costs

$6,862,395

$1,247,846

$8,110,242

    1. Explain the reasons for adjustments reported in items 13 or 14 of OMB Form 83-I

The current OMB-approved burden for the existing NPDES ICR (OMB control no. 2040-0004, EPA ICR no. 0229.24) is 28,221,350 hours. The current combined OMB-approved burden for the existing NPDES ICR and the four ICRs being consolidated into today’s ICR is 28,672,085 hours. The combined burden requested in this ICR renewal is 31,143,503 hours. Overall, the burden requested in this ICR is 2,482,185 hours (9 percent) more than the combined previously approved burdens of the component ICRs. No adjustments to the burden estimates occurred within the four new component ICRs. The approved burden was consolidated into the NPDES ICR with no changes except to update, as appropriate, the numbers of respondents.

The majority of this burden hour increase occurred as a result of an increase in EPA’s estimates of permittee respondents. The increases in EPA’s estimates of the number of permittee respondents is largely attributed to greater accuracy in the number of permittee respondents as a result of increased electronic data collection improvements in the NPDES Integrated Compliance Information System (ICIS-NPDES) database, implementation of the Electronic Reporting Rule Phase 1, and refined estimates. Other significant changes in estimates of burden hours are the result of the following adjustments:

  • This ICR eliminates the initial permit application and compliance activities for existing Cooling Water Intake Structure (CWIS) facilities as these activities have been completed by all existing CWIS facilities, resulting in a decrease in estimated burden hours for CWIS facilities.

  • The collection burden associated with compliance with and administration of small vessels general permit (sVGP) has been removed. Eliminating the sVGP also decreased the number of vessel respondents significantly.

  • The estimated number of respondents in some of the categories (shown in Appendix D of the ICR Supporting Statement) both increased and decreased per the current NPDES Integrated Compliance Information System (ICIS-NPDES) database and based on refined EPA estimates.

  • This ICR accounts for adjustments to inflation to September 2021 dollars that updated the presumed capital and O&M cost burden.

  • The burden associated with Electronic Reporting Rule Phase I implementation activities has been removed. This includes the burden associated with Discharge Monitoring Report (DMR) mailing by permittees, and all state and federal DMR processing previously included in the ICR.


Table 15‑1, Table 15‑2, and Table 15‑3 summarize adjustments in the number of responses, burden hours, and cost burden. For greater clarity, burden estimates and the adjustments relative to the source ICR for each contributing ICR listed above are presented separately.

Table 15‑1. Summary of Adjustment in Number of Responses

Source ICR

Previously Approved

Total Responses Requested

Change Due to:

Total Change (Percent)

New Statute

Agency Actions (New Rules, Etc.)

Revised Estimates

Consolidated NPDES 2018 Component (Specific Provisions Affecting Applications and Program Updates)

10,297,857

9,157,677

-1,103,735

-11%

CSOs in the Great Lake Basin

10,941

10,941

0

0

0

0%

Dental Amalgam ELG

124,378

124,378

0

0

0

0%

2020 MSGP

17,060

17,060

0

0

0

0%

eRule Phase 2 Extension

221

221

0

0

0

0%

Total

10,450,457

9,310,277

0

0

-1,103,735

-11%

Table 15‑2. Summary of Adjustment in Number of Burden Hours

Source ICR

Previously Approved

Total Hours Requested

Change Due to:

Total Change (Percent)

New Statute

Agency Actions (New Rules, Etc.)

Revised Estimates

Consolidated NPDES 2018 Component (Specific Provisions Affecting Applications and Program Updates)

28,221,350

30,703,535

0

0

2,482,185

9%

CSOs in the Great Lake Basin

8,694

8,694

0

0

0

0%

Dental Amalgam ELG

392,646

392,646

0

0%

2020 MSGP

38,210

38,210

0

0

0

0%

eRule Phase 2 Extension

418

418

0

0

0

0%

Total

28,661,318

31,143,503

0

0

2,482,185

9%



Table 15‑3. Summary of Adjustment in the Capital/Startup and O&M Cost Burden

Source ICR

Previously Approved

Total Cost Burden Requested

Change due to:

Total Change (Percent)

Previous ICR Cost Basis

New Statute

Agency Actions (New Rules, Etc.)

Revised Estimates

Consolidated NPDES 2018 Component (Specific Provisions Affecting Applications and Program Updates)

$43,158,437

$22,958,862

-20,199,575

-47%

June 2018

CSOs in the Great Lake Basin

$5,412

$5,412

0

0%

March 2020

Dental Amalgam ELG

$9,489

$9,489

0

0%

May 2018

2020 MSGP

0

0%

November 2020

eRule Phase 2 Extension

$25,418

$25,418

0

0

0

0%

June 2019

Total

$43,198,756

$22,999,181

-20,199,575

-47%

NA

    1. Outline any plans for tabulation and publication of the information

ICIS is the national computerized management information system that automates entry of, updates, and facilitates retrieval of NPDES data and tracks permit issuance, permit limits and monitoring data, and other data on facilities regulated under NPDES. The public can access permit data by:

  • Using EPA’s Envirofacts Data Warehouse and Applications website at https://enviro.epa.gov/. Envirofacts lets users combine ICIS-NPDES data with other EPA databases and mapping tools.

  • Using EPA’s Enforcement and Compliance History Online (ECHO) website at https://echo.epa.gov/. ECHO gives the public access to compliance-history-related data for permittees by geographic area.

    1. Explain any requests to not display the expiration date of OMB approval

EPA has not made a request regarding display of the expiration date.

    1. Explain any exceptions to the certification statement 5 CFR 1320.9, “Agency Certifications for Proposed Collections of Information.”

EPA is able to certify compliance with all provisions under item 19 of OMB Form 83-I.B.

  1. Statistical Methods (Used for Collection of Information Employing Statistical Methods)

Statistical methods are not used with this collection.

Appendix A
Table of Contents

Page





Appendix A
List of Table

Page


Table A-1. Summary of Burden Assumptions Related to IUs A-13

Table A-2. Summary of Burden Assumptions Related to POTWs A-14

Table A-3. Summary of Burden Assumption Related to States A-14

Table A-4. Summary of Burden Assumption Related to EPA Program Oversight A-15

Table A-5. Assumptions for Pesticide Applicator Reports A-24

Table A-6. Underlying Assumptions for Animal Sector Permittees A-25

Table A-7. Summary of Burden Assumption for CAFO and CAAP Facilities A-26

Table A-8. Summary of State/Federal Burden Assumption for Animal Sector A-26

Table A-9. Estimated Facility Burden Hours for Initial Application and Compliance Activities for New CWIS Facilities A-27

Table A-10. Estimated Facility Burden for Recurring Activities for New CWIS Facilities A-28

Table A-11. Estimated State Agency and EPA Activity Burden Associated with New CWIS Facilities A-28

Table A-12. Estimated Facility Burden for Initial Permit Renewal Applications and Compliance Activities A-29

Table A-13. Estimated Facility Burden for Recurring Activities A-29

Table A-14. Estimated Facility Burden for Federal Oversight A-30

Table A-15. Estimated per facility burden hours and frequency for recurring activities that apply to all existing CWIS facilities A-31

Table A-16. Estimated annual number of responses and burden by facility type for state agencies and EPA A-31

Table A-17. Estimated Percent of POTWs that Perform Form 2A Pollutant Testing In-House A-37

Table A-18. Estimated Percent of POTWs that Perform Form 2S pollutant Testing In-House A-38

Table A-19. Testing/Contractor Costs (O&M costs) A-38

Table A-20. Summary of CWIS Phase I O&M and ODC Average Annual Costs per Permit A-40

Table A-21. Summary of Estimated Annual Total O&M Costs for All CWIS Phase III Facilities A-40

Table A-22. Estimated Annual O&M Costs for Existing Facility A-40





              1. Description of the Information Collected and Methodology for Estimating Respondent Burden and Cost of Collection

This appendix provides detailed information regarding the methodology for estimating respondent burden and costs. Section A.1 provides the methodology for deriving respondent burden and breakdown of capital/start-up cost, while the derivation of costs is provided in section A.2.

                1. Estimating Respondent Burden

This section describes the methodology for estimating respondent burden for the information requests. Facilities subject to NPDES program requirements (also referred to as permit holders or permittees) and authorized states are included as respondents in this section. Methodologies that apply to NPDES-authorized states also apply to federal burden associated with EPA Regions acting as permitting authority in non-NPDES-authorized states. However, the EPA permitting authority burden and costs are not included in the respondent burden and cost estimates.

This ICR calculates annual burden and costs to respondents. These calculations are complicated because there are two types of permittee respondents discussed in this section: permittees renewing existing permits and applicants for new permits. Applications for NPDES permit renewal must be submitted every five years. For these respondents, the ICR assumes that the number of applicants renewing per year equals one-fifth of the total number of existing permitted facilities. For new permits, respondents will apply for each type of new permit only once and the annual number is estimated based on the expected average number of new permit applications that will be submitted over the three-year period covered by this ICR. In subsequent ICRs, new permits will transition to renewal permits.

This section summarizes the input data and assumptions for each category of respondent activity shown in Appendix B. In some cases, the “total number of respondents” and “annual number of respondents” shown in Appendix B may reflect double-counting of individual respondents because the respondent values are summed values within the category which may include multiple activities for the same respondent. For example, a permittee may be required to submit different types of notices to the permitting authority. This is particularly true for recordkeeping, which can involve multiple types of recordkeeping activities.

To simplify the burden estimation process, Appendix A identifies respondent categories that can be used as input values to adjust the burden estimates during each ICR cycle. For each respondent input category, estimates for number of responses, labor hours, O&M costs, and capital/start-up costs are derived from previous ICR estimates. These previous ICR estimates are then adjusted based on revisions to the number of respondents in each respondent input category and wherever underlying assumptions change. The revised number of respondents in each input category are listed in Appendix D and represent various subsets of the unique respondents listed in Appendix E. The basic assumptions used to derive the ICR estimates are described below.

                  1. Recordkeeping

Permittees. Recordkeeping activities include those associated with data collected, DMRs, permit documents, notices, and correspondence. NPDES regulations require permittees to maintain records and periodically report on monitoring activities. NPDES permits, in accordance with 40 CFR 122.41(j), require permittees to retain permit records for at least three years. Recordkeeping requirements for sewage sludge and CAFOs require records must be kept for five years. NPDES regulations at 40 CFR 122.41(l)(4)(i) require that monitoring results must be reported on a DMR. In addition, regulations at 40 CFR 122.44(i)(2) require permittees to submit reports (on discharges and sludge use or disposal) at least annually; however, because NPDES regulations state that monitoring and reporting frequencies should be dependent on the nature of the discharge, reporting may be more frequent than annually. NPDES permits may require the submittal of other required information, e.g., notices and permit documents (aside from reports on discharge and sludge use/disposal), on other frequencies. Frequency may range from ongoing to once every five years. The estimated time required per response ranges from 10 minutes (0.17 hours) for sludge permits to 6-7 hours for general stormwater and major industrial NPDES permits.

States. The estimated time required for state respondents for permit oversight recordkeeping ranges from a per-state aggregate of 0.33 hours for the CSO program to 50 hours for sludge programs to 300 hours for the NPDES program.

                  1. Individual Permits

A.1.2.3 Application Forms

Below are NPDES application forms that are submitted initially for new permits and resubmitted upon permit renewal every five years. NPDES regulations at 40 CFR 122.21(a) require that any person, except those covered by general permits, who discharges pollutants or proposes to discharge pollutants to waters of the United States must apply for a permit. Further, 40 CFR 122.21(e) prohibits the permitting authority from issuing an individual permit until and unless a prospective discharger provided a complete application. These forms and the facilities that submit them are included in Table 2‑1 in Item 2 of Section A (Justification) above. 40 CFR 122, Subpart B establishes NPDES permit application requirements. Application requirements are specific to the type of facility and discharge.

Due to the Specific Provisions Affecting Applications and Program Updates regulation, application Forms 1 through 2S and the accompanying instructions for each form have been updated to reflect revised regulations and enhanced for improved readability and clarity. Due to the wide variety in response times, the revised burdens for different types of application forms are discussed separately below.

Form 1

Permittees. Form 1 requirements apply to all nonmunicipal individual permits and individual stormwater permits. The estimated time required per permittee respondent for Form 1 ranges from 0.9 to 2.9 hours.

States/Federal. The estimated burden hours for state/federal respondents to review Form 1 is 0.25 hours per form.

Form 2B

Permittees. Form 2B requirements apply to CAFOs and CAAP facilities covered under individual permits. The estimated time required per permittee respondent for Form 2B is 9.2 hours for CAFOs (8.7 hours to complete and submit the application and 0.5 hours to submit a nutrient management plan) and 5.5 hours for CAAP facilities.

States/Federal. The estimated burden hours for state/federal respondents to review Form 2B is 0.5 hours per form.

Forms 2C-2F

Permittees. The estimated time required per permittee respondent for Forms 2C-2F ranges from 13.5 hours for Form 2E to 45.5 hours for Form 2D.

States/Federal. Estimated burden hours for state/federal respondents to review Forms 2C-2F ranges from 0.5 hours to 2 hours per form.

Form 2A

Permittees. The estimated time required per permittee respondent for Forms for POTWs and PrOTWs (Form 2A - Basic, Form 2A - Part D, Form 2A - Part E, Form 2A - Part F, Form 2A - Part G) ranges from 4.7 to 24.7 hours. There are non-labor operating costs associated with Forms for POTWs and PrOTWs due to requirements for testing and analysis. See section A.2 for details.

States. Estimated burden hours for a state respondent to review Forms for POTWs and PrOTWs ranges from 0.67 hours to 4 hours per application.

Form 2S

Permittees. Form 2S requirements apply to POTWs and other treatment works treating domestic sewage. The estimated time required per permittee respondent for Form 2S is 9.1 hours.

States/Federal. The estimated burden hours for state/federal respondents to review Form 2S ranges from 0.42 to 1.17 hours per form.

Ocean Discharge Application

Permittees. The estimated total hours per permittee respondent for applications for ocean discharges is 778 hours but no applications are anticipated for the three year-period for this ICR renewal.

States/Federal. Estimated burden hours for state/federal respondents to review applications for ocean discharges is 88 hours per application. As stated above, no applications are anticipated for the three years covered by this ICR renewal.

A.1.2.2 DMRs

Permittees. NPDES regulations at 40 CFR 122.41(l)(4)(i) require that monitoring results must be reported on a DMR. In addition, regulations at 40 CFR 122.44(i)(2) require permittees to submit reports (on discharges and sludge use or disposal) at least annually; however, because NPDES regulations state that monitoring and reporting frequencies should be dependent on the nature of the discharge, reporting may be more frequent than annually. DMR preparation is expected to require about 2 hours per outfall. Some permittees, especially industrial facilities, have multiple outfalls. The required frequency of DMR reporting (monthly, bimonthly, quarterly, semi-annually, or yearly) depends on facility type and permit type. The implementation of the Electronic Reporting Rule did not change the time necessary to prepare the DMR.

States/Federal. The implementation of the eRule eliminated all DMR processing burden for state and federal respondents. Remaining burden to be phased out is addressed in A.1.8.4.

A.1.2.3 Reports

NPDES permits may require the submittal of other reports or required information, e.g., notices and permit documents (aside from reports on discharge and sludge use/disposal). Report activities in this category can include submission of notices to the permitting authority concerning the following:

  • Facility and Permit Transfer Report;

  • Permittee Report of Inaccurate Previous Information;

  • Alternate Level Reports;

  • Permittee Report of Planned Facility Changes;

  • Request for Water Quality-Based Effluent Limitations Modification;

  • Non-compliance Reports;

  • Compliance Schedule Reports; and

  • Unanticipated Bypass/Upset Reports.

Permittees. In general, the estimated time required per response for these activities ranges from 1 to 5 hours. There is no set frequency because these activities are often triggered by unplanned events. The frequencies used to derive the burden estimates are based on experience and assumptions regarding expected occurrence of each. The estimated time required per respondent for preparing and submitting compliance schedule reports is 0.75 hours and occurs on an annual basis.

States/Federal. The estimated time required for state/federal respondents to review and process notifications is typically 4 hours per notification but can take up to 20 hours for Permittee Report of Planned Facility Changes. The estimated time required for state/federal respondents to review and process compliance schedule reports is 0.25 hours for municipal and 4 hours for nonmunicipal permits.

A.1.2.4 Permittee Monitoring

Sampling

Permittees. NPDES regulations at 40 CFR 122.44(i) and 122.48 require facilities discharging pollutants to waters of the United States to periodically evaluate compliance with the effluent limitations established in their permits and provide the results to the permitting authority. Estimates of the hours per response for DMR sampling are generally based on number of outfalls, reporting frequency, and duration and number of sampling episodes per reporting period. Typical sampling episodes are estimated to require about 2 to 2.75 hours each.

States. Any state activities related to monitoring data are covered under the analyses section below.

Analyses

Permittees. This category refers to chemical analyses that are conducted in-house. Estimates of the hours per response for DMR analyses are generally based on 0.5 hours per parameter analyzed multiplied by the estimated number of outfalls, number of samples per response and number of parameters per sample.

States/Federal. The estimated time required for state/federal respondents to review and process monitoring reports is 10 minutes and 0.5 hours for follow-up. The estimate of 10 hours for state respondents applies only to review of post-baseline monitoring data for coal remining permits.

CSO Permittee Monitoring

Permittees. EPA’s CSO Policy requires monitoring to characterize the combined sewer system, support development of a long-term control plan, and demonstrate compliance with permit requirements. The estimated time required per respondent for CSO monitoring is 27 hours, 18 hours, 20 hours, and 2 hours for sampling, analysis, estimating flow parameters, and reporting, respectively. The frequency is semi-annually.

States. Any state activities related to CSO monitoring data are covered under section A.1.2.2 (DMRs).

A.1.2.5 CSO Notification

Permittees. The estimated time required per respondent for CSO notification is 0.5 hours per sign for inspection and maintenance of notification signs and 5 hours for public advisories with a frequency of 10 times per year for public advisories. There are capital costs for replacement of signs (see section A.2 for details).

States. The estimated time for state oversight of CSO notification is 4 hours per permit every 5 years.

A.1.2.5.1 CSO Notification for Overflows to the Great Lakes Basin

Permittees. The estimated time required per respondent is 2 hours for the initial and supplemental notifications through public alerts per event. Maintenance of the alert system is estimated at 24 hours a year per permittee. Preparation and release of the annual notices is estimated to be 8, 16, and 24 hours for very small, small, and large facilities, respectively.

States. The estimated time for state review of the annual notice is 1 hours per notice.

A.1.2.6 Other

Activities in this category include:

  • Request for Modification, Revocation and Reissuance, or Termination;

  • Section 308(a) Letters;

  • New Introduction of Pollutants to POTWs;

  • Notification of New or Increased Discharge;

  • Permittee Notice of Regulated Discharge Cessation;

  • Variance Request;

  • Certifications;

  • Documenting Nine Minimum Control Measures;

  • Writing Long-term Control Plans;

  • Part 435 Certification Oil and Gas Extraction; and

  • BMP Development.

Request for Modification, Revocation and Reissuance, or Termination

Permittees. Permittees may make a request for modification, revocation and reissuance, or termination of the NPDES permit. The estimated time required per respondent for preparing and submitting a request for modification, revocation and reissuance, or termination is 5 hours and occurs on an as-needed basis.

States/Federal. The estimated time required for state/federal respondents to review and process request for modification, revocation and reissuance, or termination is 40 hours for each request.

Section 308 Requests

Permittees. Section 308 of the CWA authorizes EPA to require the owner or operator of any point source to make reports and provide information as may be reasonably required to carry out the objectives of the CWA, including but not limited to developing effluent limitations, determining compliance with any such effluent limitation or standard. The time required per respondent for preparing responses to Section 308 requests can vary considerably and is estimated to be 5-8 hours, 50 hours, and 1,000 hours for routine requests and letters, medium complexity requests, and complex municipal facility requests, respectively. The frequency is on an as-needed basis.

States/Federal. The estimated time required for state/federal respondents to review and process submitted information ranges from 1 to 20 hours depending on permit type.

New Introduction of Pollutants to POTWs

Permittees. NPDES regulations at 40 CFR 122.42(b)(1) require notification of any new introduction of pollutants into the POTW. The time required per respondent to prepare and submit to the permitting authority a notice of substantial change in the volume or character of pollutants being introduced into that POTW is estimated to be 3 hours and occurs at an approximate frequency of 200 per year.

States/Federal. The time required to review and process each notice is 4 hours.

Notification of New or Increased Discharge

Permittees. NPDES regulations at 40 CFR 122.41(l) require permittees to provide notification of a new or increased discharge. The time required per respondent to prepare and submit to the permitting authority a notice of new or increased discharge is estimated to be 4 hours and occurs for 5 percent of all major and 3 percent of all minor nonmunicipal permits.

States/Federal. The time required to review and process each notice is 4 hours.

Permittee Notice of Regulated Discharge Cessation

Permittees. Permittees are required to notify the permitting authority when a discharge has ceased. The time required per respondent to prepare and submit to the permitting authority a notice of cessation of a regulated discharge is estimated to be 4 hours and occurs annually for 2 percent of all major and 0.8 percent of all minor nonmunicipal permits.

States/Federal. The time required to review and process each notice is 4 hours.

Variance Request

Permittees. NPDES regulations allow permittees to request variances from technology or water quality standards. Variance requests for individual permits include the following:

  • Great Lakes Modification and Variance Request. The estimated burden is 418 hours.

  • Variance Request for Fundamentally Different Factors. The estimated burden is 160 hours.

  • Variance Request for Nonconventional Pollutants. The estimated burden is 150 hours.

  • Variance Request for Innovative Pollution Control Technology. The estimated burden is 60 hours.

  • Variance Request Regarding Thermal Discharges (New). The estimated burden is 400 hours.

  • Variance Request Regarding Thermal Discharges (Renewal). The estimated burden is 4 hours.

The number of respondents for each type is based on assumed percentages of different types of permits. The frequency of occurrence is on an as-needed basis.

States/Federal. The estimated time required for state/federal respondents to review and process variance requests ranges from 44 to 520 hours for each type of variance request. Time for review and processing of thermal discharge variance renewals is 1 hour.

Long-term Control Plans (LTCPs)

Permittees. Consistent with EPA’s CSO Policy, permittees are responsible for developing and implementing LTCPs that will ultimately result in compliance with the requirements of the CWA. The estimated time required per respondent to write an LTCP varies considerably depending on system size and on whether the system has already conducted studies. Respondent time can range from 300 hours for a small system that has existing studies to 6,000 hours for a large system without existing studies.

States/Federal. The estimated time required for state/federal respondents to review and process LTCPs is 20, 33, and 53 hours for small, medium, and large combined sewer systems, respectively.

Documenting Nine Minimum Control (NMC) Measures

Permittees. Consistent with EPA’s CSO Policy, permittees should submit appropriate documentation demonstrating implementation of the NMC measures. The estimated time required per respondent for collecting necessary information for small, medium and large systems is 29 hours, 43 hours and 200 hours, respectively. EPA estimates that no municipalities will submit NMC documentation in the next 3 years.

States. No state respondent burden is anticipated for this activity.

Certification for Exemption from Monitoring and Notification of Process Changes

The effluent limitations guidelines and standards regulations for 14 industrial categories (12 categories and 2 subcategories) allow dischargers to submit a certification to exempt them from monitoring one or more pollutants.

Permittees. The estimated time required per respondent for preparing certification for exemption documents will typically be one hour and with a frequency of once per year.

States/Federal. The estimated time required for state/federal respondents to review and process certification documents is 1 hour for each certification.

Part 435 Certification Oil and Gas Extraction (Synthetic Based Drilling Fluid)

Permittees. Under 40 CFR Part 435, operators may elect to use BMPs for control of discharges of synthetic-based drilling fluids cuttings. Permittees are required to certify that its BMP plan is complete, on-site, and available upon request to EPA or the NPDES permitting authority. The estimated time required per respondent for activities associated with certification of preparation and implementation of BMP plans for control of discharges of synthetic-based drilling fluids cuttings under 40 CFR Part 435 for oil and gas extraction permits is 787 hours and occurs at a frequency of once per year.

Federal. The estimated time required for federal respondents to review and process certification documents is 5.7 hour for each certification.

Pollution Prevention Alternative Certification (Pesticides Packaging and Repackaging)

Permittees. The ELGs for the Pesticides Formulating Packaging & Repackaging (PFPR) industry includes an option for a pollution prevention alternative discharge allowance. In accordance with 40 CFR 455.41, permittees are required to provide certifications that the pollution prevention alternative is being implemented in the manner set forth in the permit. The estimated time required per respondent for preparing pollution prevention alternative certifications for pesticides formulating, packaging, and repackaging category facilities is 20 hours and occurs annually.

States/Federal. The estimated time required for state/federal respondents to review and process certification documents is 1 hour for each certification.

BMP Development

Permittees. NPDES permits for certain industrial facilities may require the development and implementation of BMP Plans, which may include review and amendment of the BMP Plan as well as refresher training. The estimated time required per respondent is 50 hours for amendment and review of BMP Plans for certain industrial permits and 40 hours for associated refresher training. Recurrence is on an as-needed basis for the BMP plan and semi-annually for the training.

States. The estimated time required for state respondents for BMP plan review is 5 hours.

A.1.2.7 Great Lakes

The activities in this category apply to NPDES permittees that discharge within the Great Lakes watershed and are subject to EPA’s Great Lakes Water Quality Guidance.

Permittees. Activities include:

  • Great Lakes Antidegradation Demonstration with bioaccumulative chemicals of concern (BCCs).1 The estimated burden is 22.2 hours and 11.1 hours for municipal and nonmunicipal permits, respectively.

  • Great Lakes Antidegradation Demonstration without BCCs. The estimated burden is 14.8 hours and 7.4 hours for municipal and nonmunicipal permits, respectively.

  • Great Lakes pollutant minimization plan (PMP) Implementation. The estimated burden is 1.2 hours and 1.4 hours for municipal and nonmunicipal permits, respectively.

  • Great Lakes Approvable Strategy. The estimated burden is 104 hours and 142 hours for municipal and nonmunicipal permits, respectively.

  • Great Lakes Annual Report. The estimated burden is 20.9 hours and 32.4 hours for municipal and nonmunicipal permits, respectively.

  • Great Lakes Bioconcentration Studies. The estimated burden is 73 hours.

  • Great Lakes Collecting Data and Monitoring for WET Limits. The estimated burden is 10,877 hours total and 6,841 hours total for all municipal and nonmunicipal permits, respectively.

  • Great Lakes WQBEL Compliance Monitoring. The estimated burden is 0.5 hours.

Frequency ranges from ongoing for PMP implementation to annually for monitoring and strategies/studies/reports to once every 5 years for antidegradation demonstrations.

States. The burden applies only to the 7 Great Lake states and the estimated time required per state respondent ranges from 4 to 8 hours for each item.

                  1. National Pretreatment Program

The activities in this category are related to the administration of the pretreatment program and all activities were grouped and allocated on the basis of the type of respondent. Below is a list of the possible types of input variables:

  • Total number of SIUs;

  • Total number of CIUs;

  • Total number of dental offices;

  • Total number of approved pretreatment programs;

  • Number of approved states; and

  • Estimated number of new pretreatment programs over the next three years.

Burden estimates for each respondent type in the Pretreatment ICR were updated using the current estimate of the number of each respondent type listed above (see Appendix D). ICIS currently does not contain information necessary to quantify pretreatment program burden; however, the implementation of e-reporting Phase II may provide the information necessary to quantify pretreatment program burden. Burden estimates for POTWs, IUs, state, and federal government are associated with the following types of activities related to the Pretreatment Program:

  • Program development (POTWs and state/federal);

  • Program implementation (POTWs, IUs and state/federal);

  • Limits modification requests and removal credits (POTWs and IUs);

  • POTWs as users of the data (POTWs);

  • Recordkeeping (EPA, POTWs, IUs and states);

  • EPA and States as users of the data; and

  • Reporting (States, POTWs and IUs).

Industrial Users. The underlying assumptions regarding burden estimates for IUs are summarized in Table A-1. Certain IU activities are presented as percentages to reflect that they are projections, based on the IU universe.

Table A-1. Summary of Burden Assumptions Related to IUs

Industrial User Activity

Frequency

Burden (hours)

Baseline monitoring and report

New sources equivalent to 2 percent of CIUs per year

42.3

IU compliance schedule progress report

25 percent of new sources per year

4

IU compliance attainment analysis and report

New sources equivalent to 2 percent of CIUs per year

34.3

IU resampling compliance report

10 percent of all IUs per year excluding 1,500 PFPR facilities

17

IU self-monitoring compliance sampling and reporta

Once every 5 years excluding PFPR facilities

14.5–16.6

Pollution prevention plans

10 percent of PFPR facilities per year

20

Minimum monitoring requirements for Paper Mills in specific categories

10 mills per year

826

Pollution prevention compliance alternative; transportation equipment cleaning

84 facilities per year

209 - 235

Best management practices for Paper Mills in specific categories

10 facilities per year

617

Request for coverage under a general control mechanism

Once every 5 years for two percent of all IUs

0.5

Periodic certifications

7,770 IUs per year in 12 categoriesb

1

IU slug load notification

100 SIUs per year

2

Notification of changed discharge

1,000 SIUs per year

4

Bypass notification

1,427 SIUs per year

5 - 7

Notification of changed monitoring location

50 SIUs per year

1

Slug control plan

10 percent of all new CIUs and 5 percent of new non-categorical SIUs per year

2

Alternative limits modification request

10 percent of all new CIUs

2

Net/gross adjustment request

2 per year

50

Dental office one-time compliance report

Once per new office and office transferring ownership

1.27

a These assumptions are carried forward from the Pretreatment Streamlining ICR.

b Industrial categories include but are not limited to, Electroplating and Metal Finishing; Electrical and Electrical Components; Steam Electric Power Generating; Pulp, Paper, and Paperboard; Centralized Waste Treatment; Pharmaceutical Manufacturing; Pesticide Chemicals; Aluminum Forming.


POTWs. The underlying assumptions regarding burden estimates for POTWs are summarized in Table A-2.

Table A-2. Summary of Burden Assumptions Related to POTWs

POTW Activity

Frequency

Burden (hours)

POTW pretreatment program approval request

Once per request. See Appendix D.

250

POTW pretreatment compliance schedule progress report

46 per year

5

Annual POTW report

One per year for each POTW with an approved pretreatment program

40

Issuance of discharge permits or other control mechanisms for SIUs

Once every 5 years for each POTW (with an approved pretreatment program)-regulated IU

20

Inspection and sampling of CIU and SIUs

One per year for SIUs; one per 2 years for CIUs

8

CIU and SIU effluent analysis

One per year for SIUs; one per 2 years for CIUs

15.2

Establish mass limits

One percent of estimated 12,000 facilities in 14 industrial categories with pretreatment standards

8

Establish equivalent concentration limits

4 percent of estimated 420 CIUs in categories eligible for concentration-based limits

8

Public notification of significant noncompliance

One third of POTWs with approved pretreatment programs per year

3

Evaluation of the need to revise local limits

Once every 5 years for each POTW with an approved pretreatment program

50

Removal credit applications

1.3 per year

125

Removal credit self-monitoring reports

1.3 per year

40

Recordkeeping

One per year for each POTW with an approved pretreatment program

100

Review dental office one-time compliance reports

Once per new office and office transferring ownership

0.75


States/Federal. Some activities performed by authorized states are performed by EPA Regions where EPA is the Control Authority. Table A-3 includes assumptions for both.

Table A-3. Summary of Burden Assumption Related to Control Authorities (States and EPA)

State Activity

State Frequency

EPA Frequency

Burden (hours)

Issuance of SIU discharge permits

Once every 5 years for each IU with a permit

Same

20

Inspection and sampling of CIU and SIUs

One per year for 8.5 percent of SIUs; one per 2 year for CIUs

NA

8

CIU and SIU effluent analysis

One per year for 8.5 percent of SIUs; one per 2 year for CIUs

NA

15.2

Public notification of significant noncompliance

One third of 85 POTWs in 5 states per year

NA

3

Evaluation of the need to revise local limits

Once per 5 years for 85 POTWs in 5 states

NA

50

POTW pretreatment compliance schedule progress report

34 per year

NA

2

POTW pretreatment program approval request

2.3 per year

NA

40

POTW pretreatment program modification approval request

234 per year

NA

20

Baseline monitoring report-new sources

17 per year

5 per year

24

IU compliance schedule progress report-new sources

4 per year

1 per year

1

CIU compliance attainment report-new sources

17 per year

5 per year

2

IU resampling compliance report

176 per year

56 per year

4

IU/SIU self-monitoring compliance report categorical SIUs

882 twice per year

280 twice per year

2

IU/SIU self-monitoring compliance report non-categorical SIUs

1,074 twice per year

341 twice per year

1

PFPR P2 Plan-modifications

13 per year

4 per year

3

Periodic certifications

1,269 per year

406 per year

1

IU slug load notification

47 per year

15 per year

0.25

Notification of changed discharge

85 per year

27 per year

2

Annual POTW reports

1,171 per year

NA

20

Review of Inspection and sampling of IU and SIU effluent data

16,449 per year

599 per year

0.5

Pretreatment Compliance Inspection (PCI)

937 per year

NA

24

Evaluation of the need to revise local limits

234 per year

NA

1

Net/Gross adjustment request

2 per year

NA

10

Removal credit approval

2 per year

NA

80

Removal credit self-monitoring report review

19 per year

NA

1

Maintenance of records by Approval Authority

36 approved states per year

1 per year

50

Maintenance of monitoring records by Approval Authority

Once per year for each SIU in non-approved states1

1 per year

5

Dental office one-time compliance reports

Once per new office and office transferring ownership

Once per new office and office transferring ownership

0.75

Alternative Phase 2 Compliance Deadline Request

Once for states that build their own electronic reporting tools

Once per received report

16

General Permit and Program Report Inventory Update

145 per year for each renewal of a general permit

12 per month

1

Annual Review of General Permit and Program Report Information

Once per year

Once per year

4

NA” indicates there is no burden to EPA for the activity.

1 There is additional burden due to States that act as Control Authorities.



Federal. Table A-4 below presents the assumptions related to EPA pretreatment program oversight activities.

Table A-4. Summary of Burden Assumption Related to EPA Program Oversight

Federal Activity

Frequency

Burden (hours)

State pretreatment program approval request

Once per request. See Appendix D.

325

POTW pretreatment compliance schedule progress reporta

12 per year

2

POTW pretreatment program approval requesta

2 per year

40

POTW pretreatment program modification approval requesta

2 per year

20

Annual POTW reportsa

405 per year

20

Pretreatment compliance inspection (PCI)

324 per year

24

Review of Inspection and sampling of IU and SIU effluent dataa

5,690 per year

0.5

Evaluation of the need to revise local limitsa

81 per year

1

Categorical determination request

0 per year

20

Fundamentally different factors variance request

0 per year

400

Removal credit approval requesta

1 per year

80

Removal credit self-monitoring reporta

6 per year

1

a For these activities, burden is apportioned to the Federal Government only where the Federal Government is the Approval Authority.

                  1. Stormwater

A.1.4.1 Phase I MS4s

NPDES regulations at 40 CFR 122.26 require Phase I MS4s to file applications, submit reports, conduct monitoring, and develop and update stormwater management plans. Specific activities related to Phase I MS4s include:

  • Applications;

  • Reports;

  • Monitoring; and

  • Other activities.

Underlying assumptions regarding burden estimates are described below.

Applications

Permittees. The estimated time per permittee required to prepare and submit an MS4 permit application is 60 hours and 80 hours for small and large MS4 systems, respectively. The frequency is once every 5 years.

States/Federal. The estimated time required for state/federal respondents to review and process MS4 permit applications is 20 hours for both small and large MS4 systems.

Reports

Permittees. Reports under this category include compliance schedule reports at 0.75 hours per response, facility and permit transfer reports at 3 hours per response, permittee report of inaccurate previous information at 2 hours per response, and permittee report of planned facility changes at 4 hours per response. The estimated time required per respondent for preparing and submitting annual reports is 250 hours.

States/Federal. The estimated time required for state/federal respondents to review and process permit reports is 8 hours, 1.6 hours, and 40 hours for petitions, small MS4 reports and Phase I MS4 reports, respectively.

Permittee Monitoring

Permittees. The estimated time per permittee required for each sampling response is 73 hours. The estimated time per required sampling analysis is 41 hours. Both are estimated to occur 20 times per year.

States. State activities related to permittee monitoring data are covered under section A.1.2.3.

Other Activities

Permittees. Activities and time required in this category include updating stormwater management plans (SWMPs) at 200 hours per response and Section 308(a) Letters at 8 hours per response. SWMPs are updated once every 5 years and EPA estimates that the Agency will receive 24 petitions for EPA to require industrial facilities discharging through the MS4 to obtain individual NPDES permits and 31 Section 308(a) Letters per year.

States/Federal. The estimated time required for state/federal respondents to review and process SWMPs is 20 hours.

A.1.4.2. Non-municipal Stormwater Permits

Activities in this category include only individual permit applications submitted by industrial stormwater dischargers.

Permittees. The estimated time per permittee to complete a Form 1 application is 2.9 hours for a new permit and 0.9 hour for a renewal. The estimated time to complete a Form 2F application is 28.1 hours.

States/Federal. The estimated time required for state/federal respondents to review and process a Form 1 application is 0.5 hours.

                  1. General Permits

A.1.5.1. Phase II MS4s

NPDES regulations at 40 CFR 122.30 through 122.37 establishes requirements for Phase II MS4s. Permittee activities related to Phase II MS4s include:

  • NOIs; and

  • Reports.

NOIs

Permittees. The estimated time per permittee to prepare and submit an NOI is 60 hours and occurs once every 5 years.

States/Federal. The estimated time required for state/federal respondents to review and process each NOI is 4 hours.

Reports

Permittees. Reports under this category include compliance schedule reports at 0.75 hours per response, facility and permit transfer reports at 3 hours per response, permittee report of inaccurate previous information at 2 hours per response, permittee report of planned facility changes at 4 hours per response, and annual reports at 100 hours per response. EPA estimates that 5 percent of MS4 permittees will submit compliance schedule reports and all permittees will submit an annual report. Other reports are submitted infrequently.

States/Federal. The estimated time required for state/federal respondents to review and process permit reports ranges from 1 to 20 hours per report.

A.1.5.2. Stormwater Industrial Permits

NPDES regulations at 40 CFR 122.44 and 122.48 establish certain requirements related to stormwater industrial permits. Activities related to Stormwater Industrial General Permits (i.e. the 2021 MSGP and all state-issued stormwater industrial general permits) include:

  • NOIs/NOTs;

  • DMRs;

  • Monitoring/Inspections;

  • Reports; and

  • Other activities.

NOIs/NOTs

Permittees. The estimated average time per permittee to prepare and submit an NOI is 3.7 hours for state-administered permits and 4.1 hours for EPA-administered permits that includes additional time for the permittees that report endangered species and new NOI questions present in the 2021 MSGP. Frequency is once every 5 years. The estimated time per permittee to prepare and submit an NOT is 0.5 hours and it is presumed that 15 percent of permittees submit an NOT every year.

States/Federal. The estimated time required for state/federal respondents to process NOIs is 0.25 hours and 0.25 hours for NOTs.

DMRs

Permittees. The estimated average time per permittee to prepare and submit a DMR is 2 hours and occurs 4 times every 5 years for 25 percent of permitters and 8 times every 5 years for the other 75 percent of permittees.

States/Federal. The implementation of the eRule eliminated all DMR processing burden for state and federal respondents. Remaining burden to be phased out is addressed in A.1.8.4.

Permittee Monitoring and Inspections

Permittees. The estimated average time per permittee to conduct sampling is 2.25 hours and another 1.5 hours to conduct the sampling analyses. The frequency is the same as for DMRs for permittees covered by state-administered permits. However, due to 2021 MSGP benchmark sampling requirements, EPA assumes that permittees covered under EPA-administered permittees will conduct some type of sampling quarterly every year of the permit term.

The estimated average time to conduct annual site inspections and visual assessments is 4 hours.

States/Federal. State/federal activities related to monitoring and inspection data are covered under the DMRs and Reports sections.

Reports

Permittees: Reports under this category include an annual report at 1 hour per response, permittee report of inaccurate previous information at 2 hours per response, permittee report of planned facility changes at 4 hours per response, permittee report of anticipated noncompliance at 5 hours per response, and permittee report of numeric effluent limit exceedance at 2 hours per response.

States/Federal. The estimated time required for state/federal respondents to review and process permit reports ranges from 4 to 20 hours. The estimated time required for state/federal respondents to assist permittees that are required to submit numeric effluent limit exceedance report is 2 hours. Approximately 5 percent of annual reports will require 1 hour of EPA follow-up.

Other Activities

Activities in this category include developing new SWPPPs, updating existing SWPPPs, and Section 308 requests.

Permittees. The estimated average time per permittee to update an existing SWPPP or a Section 302 request is 8 hours each. The average time to develop a new SWPPP is estimated at 80 hours.

States/Federal. The estimated average time required for state/federal respondents to review a SWPPP is 1 hour.

A.1.5.3. Stormwater Construction

Activities related to Stormwater Construction General Permits include:

  • NOIs/NOTs;

  • Inspections;

  • Reports; and

  • Other activities.

NPDES regulations at 40 CFR 122.28(b)(2) require submission of an NOI for permit coverage. Preparation and submission of NOTs are required by general permits. Stormwater site inspections and other activities are required by the general permit. Specific reports are required by NPDES regulations at 40 CFR 122.41.

Underlying assumptions regarding burden estimates are described below.

NOIs/NOTs

Permittees. The estimated average time per permittee to prepare and submit an NOI is 1.5 hours for large sites and 3.7 hours for small sites and occurs once. Those requiring an ESA evaluation will require 6 and 20 hours for informal and formal evaluations, respectively. The estimated average time to prepare and submit a NOT is 0.5 hours.

States/Federal. The estimated average time to process and review is 1 hour for NOIs and 0.25 hours for NOTs.

Permittee Inspections

Permittees. The estimated average time per permittee to conduct stormwater site inspections is 0.25 hours for small and 0.5 hours for large construction sites.

States/Federal. Site inspection data is normally stored at the construction site. Any related state/federal activities are covered under the Reports section below.

Reports

Permittees. Reports in this category include permittee report of planned facility changes, facility and permit transfer report, permittee report of inaccurate previous information, permittee report of anticipated noncompliance, unanticipated bypass/upset reports, maximum daily violation reports, and other noncompliance reports. The estimated average time per permittee to prepare these reports ranges from 2 to 5 hours.

States/Federal. The estimated time required for state/federal respondents to review and process permit reports ranges from 4 to 20 hours.

Other Activities

Activities in this category include requesting waiver certification, development of SWPPPs, monitoring, and Section 308(a) letters.

Permittees. The estimated average time per permittee to prepare a waiver certification request is 1 hour. The estimated average time to prepare an SWPPP is 22.7 and 36.4 hours for small and large construction sites, respectively.

States/Federal. The estimated average time to process and review waver certification requests and SWPPPs is 1 hour each.

A.1.5.4. Non-Stormwater

The activities in this category apply to general permits issued to cover classes of facilities with similar type discharges with different permits tailored to the class of facility. Activities related to non-stormwater general permits include:

  • NOI;

  • DMR;

  • Monitoring and inspection;

  • Reports; and

  • Other activities.

NPDES regulations at 40 CFR 122.28(b)(2) require submission of an NOI for permit coverage. Preparation and submission of NOTs, DMRs, conducting stormwater site inspections and other activities are required by general permits. Specific reports and DMRs are required by NPDES regulations at 40 CFR 122.41.

Underlying assumptions regarding burden estimates are described below.

NOIs

Permittees. The estimated average time per permittee to prepare and submit an NOI is 1 hour.

States/Federal. The estimated average time to process and review an NOI is 0.25 hours.

DMRs

Permittees. The estimated average time per permittee to prepare and submit a DMR is 2 hours with frequency ranging from monthly to annually.

States/Federal. The implementation of the eRule eliminated all DMR processing burden for state and federal respondents. Remaining burden to be phased out is addressed in A.1.8.4.

Permittee Monitoring and Inspections

Permittees. The estimated average time per permittee to conduct sampling and inspection is 2.25 hours and analysis is 1.5 hours. Frequency is the same as for DMRs.

States/Federal. State/federal activities related to permittee monitoring and inspection data are covered under the DMR section above.

Reports

Reports in this category include: permittee report of planned facility changes, facility and permit transfer report, permittee report of inaccurate previous information, permittee report of anticipated noncompliance, unanticipated bypass/upset reports, maximum daily violation reports, and other noncompliance reports.

Permittees. The estimated average time per permittee to prepare these reports ranges from 2 to 5 hours.

States/Federal. The estimated average time to process and review these reports ranges from 1 to 20 hours.

Other Activities

The only activity in this category is Permittee Notice of Regulated Discharge Cessation.

Permittees. The time required per permittee to prepare and submit to the permitting authority a notice of cessation is estimated to be 1 hour and occurs annually for 1 percent of all non-stormwater general permits.

States/Federal. The estimated average time to process each notice 4 hours.

A.1.5.5. Pesticides Applicators

The activities in this category are related to general permits for discharges from the application of pesticides Activities related to these discharges are:

  • Activities directly related to obtaining coverage under a general permit (e.g., NOI);

  • Activities associated with development of a plan (or worksheet);

  • Monitoring; and

  • Reporting.

Underlying assumptions regarding burden estimates are described below.

Pesticide Applicator General Permit NOI filing

Permittees. NPDES regulations at 40 CFR 122.28(b)(2) require submission of an NOI for coverage under a general permit. Pesticide applicators will take 2 hours to complete each NOI. EPA estimates 0.05 percent will require formal ESA-related evaluation by the Services (20 hours) and 0.1 percent requires an informal evaluation by the Services (6 hours). An estimated 2.5 percent of the regulated universe will need to file an NOI. The PGP designates specific applicators required to submit an NOI.

States/Federal. Permitting authorities will spend 0.5 hours processing each NOI.

Pesticide Applicator General Permit NOT filing

Permittees. The PGP requires submission of a Notice of Termination (NOT) form within 30 days of the occurrence of one of several different triggering events identified in the permit. Pesticide applicators will spend 0.5 hours filling out an NOT. As stated above, only certain applicators are required to file an NOI and thus an NOT; representing an estimated 2.5 percent of the regulated universe.

States/Federal. Permitting authorities will spend 0.25 hours processing each NOT.

Plan Development

Permittees. The PGP requires certain NOI filers to develop a Pesticide Discharge Management Plan. Fifty three percent of NOI filers will be required to develop a Pesticide Discharge Management Plan (40 hours). Twenty five percent of the plans will be updated annually with the average time of 2 hours.

States/Federal. State/federal activities related to Pesticide Discharge Management Plans are covered under the NOI section.

Permittee Monitoring

Permittees. Monitoring is required in any NPDES permit to demonstrate compliance with the permit conditions. Monitoring requirements apply from the time any authorized Operator begins discharging under the PGP. Estimated time to perform monitoring ranges from 1 to 16 times per year depending on size of operation. Each monitoring activity is estimated to take 0.25 hours.

States/Federal. State/federal activities related to monitoring data are covered under the reports section below.

Reports

Permittees/States/Federal. The PGP requires the submission of various reports, among them, an annual report, adverse incident report, reports of planned changes, and reports of noncompliance. Table A-5 below presents a summary of assumptions regarding report submissions.

Table A-5. Assumptions for Pesticide Applicator Reports

Report

Permittees

(Percent)

Permittee Hours

Permit Authority Hoursa

Annual report

1.4

8

1

Adverse incident

0.01

4

2

Corrective action

0.1

5

0

Planned facility changes

0.1

4

0.5

Anticipated noncompliance

0.1

5

2

Inaccurate previous information

0.05

2

1

Noncompliance

0.05

5

2

a States and federal

A.1.5.6. Large Vessels

Activities for large vessels include: NOI/NOT filing, permit authorization and record of inspection (PARI) submission, annual report, routine inspections, annual inspections, drydock inspections, and monitoring. NPDES regulations at 40 CFR 122.28(b)(2) require submission of an NOI for coverage under a general permit. The Vessels General Permit requires permittees wishing to terminate coverage under the permit to file a NOT as well as maintaining and submitting the PARI. Monitoring, reporting, and inspections are required in any NPDES permit to demonstrate compliance with the permit conditions.

Permittees. The estimated time required per respondent for performing the above items includes: 1 hour for an NOI, 0.25 hours for a PARI and occurs once every 5 years; 2 to 5 hours for various reports that occur on an as-needed basis; one hour for the annual report; 0.5 to 2 hours for self-inspections that occur on an annual basis; 2 to 4 hours for drydock inspections that occur once every 5 years; and 6 hours for semiannual monitoring.

Federal. Reviews are performed electronically at an estimated rate of 25 per hour.

                  1. Animal Sector

The activities in this category apply to activities related to NPDES permits for CAFO and CAAP facilities and all activities were divided and allocated on the basis of the type of respondent. Below is a list of the possible types of respondents.

  • Authorized states for CAFOs;

  • CAFO facilities;

  • New CAFOs per year;

  • Authorized states for CAAP; and

  • CAAP facilities.

Burden estimates were derived for each respondent type. These estimates were then updated using the current estimate of the number of each respondent type (see Appendix D). Burden estimates are associated with six types of activities related to the NPDES program:

  • Activities directly related to individual permit applications or permit coverage under a general permit (NOIs);

  • Activities associated with plan development or special studies;

  • Reporting, including certification;

  • Recordkeeping; and

  • Activities resulting from compliance assessments.

EPA has revised the burden estimates based on developments in the industry. Over time, many of the activities required as a result of the 2003 NPDES Permit Regulation and Effluent Limitation Guidelines and Standards for Concentrated Animal Feeding Operations (CAFOs) have become part of standard business practice and USDA standards and guidelines. USDA standards are specifically designed to guide farmers as they implement improved waste management practices to keep pace with the changing demands of the industry. USDA has issued extensive guidelines on these practices, including the requirements for Comprehensive Nutrient Management Plans, the practice standards developed by the USDA Natural Resources Conservation Service (NRCS), the Field Office Technical Guides, and the Agricultural Waste Management Field Handbook. Farmers are motivated to adhere to the USDA guidelines in part because of their own environmental stewardship goals, but also because operations that want to receive USDA financial or technical support are required to follow USDA guidelines to ensure continued eligibility for USDA programs. The combined effect of these external forces is that over time a number of activities required in EPA’s original CAFO regulations have become standard industry practice, including regular visual inspections and manure and soil sampling. Thus, EPA concluded that these activities are no longer directly attributable to the NPDES regulations and should not be included in the ICR burden estimates. As a result, the substantial reductions in CAFO burden estimates carried over in this ICR reflect the changes that have occurred since the implementation of the CAFO rule. In addition, there continues to be significant consolidation in the industry, so far fewer facilities exist that might be subject to regulation; this is reflected in the CAFO permit numbers in Appendix D.

Permittees. Table A-6 presents the underlying assumptions used to derive the source ICR burden estimates. Table A-7 presents burden assumptions for CAFO and CAAP facilities.

Table A-6. Underlying Assumptions for Animal Sector Permittees

Assumption

Value (Percent)

Percent CAFOs in non-CAFO authorized states (MA, NH, and NM)

6.3

Percent CAFOs covered by general permits

70

Annual CAFO inspection rate

20

Flow through and recirculating commercial facilities

166

Flow through and recirculating non-commercial facilities

178

Net pen facilities

15

Total number of CAAP permittees in non-authorized states

17

Percent of CAAP permittees seeking general permit coverage

52

Burden to develop/update NMP (hours)

170


Table A-7. Summary of Burden Assumption for CAFO and CAAP Facilities

Activity Description

Frequency

Hours per Response

CAFOs

Read rule, determine requirements and plan

Once

3

Complete notice of intent for general permit

Once every 5 years

9.2

Develop/update NMP

Once every 5 years

170

Prepare and submit annual report

Yearly

2

Recordkeeping

Yearly

80

Inspection

Once every 5 years

4

CAAPs

Complete notice of intent for general permit

Once every 5 years

2

BMP plan development

Once every 5 years

40

BMP training

Yearly

6

BMP plan

Once every 5 years

1.25

Investigational new animal drugs (INAD) program sign-up report

Occasionally/As Needed

1

INAD or extra-label use report

Occasionally/As Needed

1.5

Structural failure report

Occasionally/As Needed

5

Spill report

Occasionally/As Needed

2

Inspection, cleaning, maintenance & repair records

Ongoing

103 to 118


States/Federal. Table A-8 presents a summary of the burden assumptions for state/federal respondents.

Table A-8. Summary of State/Federal Burden Assumption for Animal Sector

Activity Description

Frequency

Hours per Response

Program modification

Occasionally/As Needed

80

Review/process permits and NMPs

Every 5 years

50

Public hearings/notice

Every 5 years

20

Other noncompliance reports (CAFO permittees)

Occasionally/As Needed

2

Report receipt (INAD program sign-up, spill, structural failure)

Occasionally/As Needed

0.5

CAFO facility inspection

Once every 5 years

16

Annual report review, all permitted CAFOs

Annual

4

Research on environmental effects of INAD

Occasionally/As Needed

3

Determination of site-specific limits for INAD

Occasionally/As Needed

3

Notify state fish & wildlife department

Occasionally/As Needed

0.5

Review cause of failure and past reports to evaluate effectiveness of practices

Occasionally/As Needed

1

                  1. Cooling Water Intake Structures

A.1.7.1. Cooling Water Intake Structures Phase I - New Facilities

The activities in this category are related to application and recordkeeping regulation established by the section 316(b) New Facility Rule (66 FR 65256; December 18, 2001). The regulation applies to industrial facilities constructed after January 2002 that withdraw significant quantities of cooling water from waters of the U.S. The rule requires new facilities to submit several distinct types of information as part of their NPDES permit application. In addition, the rule requires new facilities to maintain monitoring and reporting data as outlined by the permitting authority in their NPDES permits.

Below is a list of the types of respondents for which updated estimated respondent numbers were used to develop burden estimates:

  • Average annual number of new CWIS facilities;

  • Average annual number of new CWIS permits; and

  • Average annual CWIS permit renewals.

Burden estimates were derived for each respondent type from the previous ICR and were updated using the current estimate of the number of each respondent (see Appendix D).

Permittees. Table A-9 presents the estimated burden hours and frequency per facility for first-time permit renewal applications and initial compliance activities. Table A-10 presents the estimated burden hours and frequency per facility for recurring activities that apply to all new CWIS facilities.

Table A-9. Estimated Facility Burden Hours for Initial Application
and Compliance Activities for New CWIS Facilities

Permittee Application and
Initial Compliance Activity

Frequency

Burden (hours)

Start-up activities

Once per new permit

43

Permit application activities

Once per new permit

146

Source waterbody flow information

Once per new permit

104

Source water baseline biological characterization data

Once per new permit

265

CWIS flow reduction requirements (Track I)

Once per new permit with closed cycle recirculating system (CCRS)

108

CWIS velocity requirements (Track I)

Once per new permit with CCRS

138

Design and construction technology plan (Track I)

Once per new permit with CCRS

108

Comprehensive demonstration study plan (Track II)

Once per new permit without CCRS

271

Source water baseline biological characterization study (Track II)

Once per new permit without CCRS

5,196

Evaluation of potential CWIS effects (Track II)

Once per new permit without CCRS

1,626

Verification monitoring plan (Track II)

Once per new permit without CCRS

128

Freshwater verification study (Track II)

Once per new permit without CCRS with freshwater

92

Estuary verification study (Track II)

Once per new permit without CCRS with estuarine water

122

Initial biological monitoring for impingement (freshwater)

Two years per new permit with freshwater

379

Initial biological monitoring for impingement (estuary)

Two years per new permit with estuary

482

Initial biological monitoring for entrainment (freshwater)

Two years per new permit with freshwater

614

Initial biological monitoring for entrainment (estuary)

Two years per new permit with estuary

776


Table A-10. Estimated Facility Burden for Recurring Activities for New CWIS Facilities

Permittee Recurring Activity

Frequency

Burden (hours)

Permit renewal activities

Once every 5 years

72

Source waterbody flow information

Once every 5 years

31

Source water baseline biological characterization data

Once every 5 years

79

CWIS flow reduction requirements (Track I)

Once every 5 years

108

CWIS velocity requirements (Track I)

Once every 5 years

75

Design and construction technology plan (Track I)

Once every 5 years

43

Comprehensive demonstration study plan (Track II)

Once every 5 years

80

Source water baseline biological characterization study—freshwater (Track 2)

Once every 5 years

2,808

Source water baseline biological characterization study—marine (Track 2)

Once every 5 years

5,268

Reduced biological monitoring for impingement (freshwater)

Annual per permit with freshwater

191

Reduced biological monitoring for impingement (estuary)

Annual per permit with estuary

244

Reduced biological monitoring for entrainment (freshwater)

Annual per permit with freshwater

308

Reduced biological monitoring for entrainment (estuary)

Annual per permit with estuary

392

Velocity monitoring

Annual per permit

163

Inspection of installed technologies

Annual per permit with once-through cooling

253

Yearly status report activities

Annual per permit

348


States/Federal. Table A-11 presents the estimated burden hour and frequency for state agencies and EPA acting as the permit authority.

Table A-11. Estimated State Agency and EPA Activity Burden Associated with New CWIS Facilities

State/Federal Activities

Frequency

Burden (hours)

Permitting authority permit issuance activities (Track I)

Once per new permit with CCRS

188

Permitting authority permit issuance activities (Track II)

Once per new permit with once-through cooling

646

Verification study review

Once per new permit

21

Annual permitting authority activities

Annual per permit

50

A.1.7.2. Cooling Water Intake Structures Phase III - New Offshore Oil and Gas Facilities

The activities in this category are related to NPDES application, monitoring, and recordkeeping requirements established by the 316(b) Phase III Rule (71 FR 35006; June 16, 2006). This regulation applies to offshore oil and gas facilities that commence construction after July 17, 2006. The permitting authority for all offshore oil and gas facilities is the Federal Government and thus there is no burden for state or local governments.

Below is a list of the types of respondents for which updated estimated respondent numbers were used to develop burden estimates:

  • Average annual new offshore oil & gas facilities applying for an NPDES permit;

  • Average annual new offshore oil & gas re-applying for an NPDES permit; and

  • Average annual new offshore oil & gas facilities performing annual activities.

Burden estimates were derived from the previous ICR for each respondent type and were updated using the current estimate of the number of each respondent type (see Appendix D).

Permittees. Table A-12 presents the estimated burden hours and frequency per facility for permit renewal applications. Table A-13 presents the estimated burden hours and frequency per facility for recurring activities that apply to all new Phase III CWIS facilities.

Table A-12. Estimated Facility Burden for Initial Permit Renewal Applications and Compliance Activities

Permittee Initial Application Activity

Frequency

Burden (hours)

Start-up activities

Once per new permit

43

Permit application activities

Once per new permit

51

Source water body flow information

Once per new permit

38

CWIS velocity information

Once per new permit

150

Design and construction technology plan

Once per new permit

36

Source water baseline biological characterization study

Once per new permit

166


Table A-13. Estimated Facility Burden for Recurring Activities

Permittee Recurring Activity

Frequency

Burden (hours)

Start-up activities

Once every 5 years

13

Permit application activities

Once every 5 years

13

Source water body flow information

Once every 5 years

11

CWIS velocity information

Once every 5 years

45

Design and construction technology plan

Once every 5 years

20

Source water baseline biological characterization study

Once every 5 years

49

Biological monitoring for impingement

Annual per permit

530

Biological monitoring for entrainment

Annual per permit with entrainment requirements

370

Biological monitoring for entrainment (Alaska)

Annual per permit in AK with entrainment requirements

516

Velocity monitoring

Annual per permit

163

Visual inspections

Annual per permit

253

Yearly status report activities

Annual per permit

223


States. Offshore oil and gas facilities operate in federal waters, there is no state burden.

Federal. Table A-14 presents the estimated burden hours and frequency for federal oversight activities.

Table A-14. Estimated Facility Burden for Federal Oversight

Federal Permit Oversight

Frequency

Burden (hours)

Permitting authority permit issuance activities (per facility)

Once per new permit

229

Permitting authority permit renewal activities (per facility)

Once every 5 years

104

Annual Permitting authority activities (per facility)

Annual per permit

50



A.1.7.3. Cooling Water Intake Structures Existing Facilities

The activities in this category are related to NPDES application and recordkeeping requirements defined under the 316(b) Existing Facility regulation). This regulation applies to industrial facilities constructed prior to January 2002 that withdraw significant quantities of cooling water from waters of the U.S. The regulation became effective October 14, 2014. A major component of the burden is associated with the preparation of permit application materials required under 122.21(r)(2)-(13) which must be submitted during the first permit renewal that occurs during the five year period after October 2014. Once a permit has been renewed, the burden will be associated with annual monitoring and reporting activities and the subsequent permit renewal applications for which the burden is significantly reduced compared to the initial renewal. The initial CWIS Existing Facility Rule ICR covered the burden associated with the three-year period from October 2014 through October 2017. Because the initial permit renewal was spread out over a five-year period and the initial ICR assumed minimal application burden in the first year, the burden included in the previous ICR included the final three of the initial permit renewal years which corresponded to the period with the highest burdens. This ICR reflects permit renewal applications and ongoing annual monitoring and reporting activities and the subsequent permit renewal applications.

Below is a list of the types of respondents for which updated estimated respondent numbers were used to develop burden estimates:

  • Total power plants;

  • Total power plants with a design intake flow (DIF) greater than 50 MGD;

  • Total power plants with an actual intake flow (AIF) greater than 125 MGD;

  • Total manufacturers with cooling water;

  • Total manufacturers with an AIF greater than 125 MGD;

  • Annual new power plant units; and

  • Annual new manufacturer units.

Burden estimates were derived from the previous ICR for each respondent type and were updated using the current estimate of the number of each respondent type (see Appendix D).

Permittees. Table A-15 presents the estimated burden hours and frequency per facility for recurring activities that apply to all new CWIS facilities.

Table A-15. Estimated per facility burden hours and frequency for recurring
activities that apply to all existing CWIS facilities

Annual activities

Frequency

Burden (hours)

Permit renewal activities

Once every 5 years

72

Compliance monitoring - all existing facilities (power plants and manufacturing)

Annual

357

Recurring reporting and recordkeeping - existing facilities (power plants and manufacturing)

Annual

11

Compliance monitoring - new units

Annual

90

Recurring reporting and recordkeeping - new units

Annual

20


States/Federal. Table A-16 presents the estimated annual number of responses and burden hours per response for state agencies and EPA.

Table A-16. Estimated annual number of responses and burden
by facility type for state agencies and EPA

Facility type

Average responses/ year

Burden hours/ response

Permit application activities


States

EPA

States and EPA

All existing CWIS facilities

2,753

73.3

72.7

New units

16

2

11

Annual activities

All facilities

2,078

1,065

3

                  1. Other

A.1.8.1. Industrial Facility "No Stormwater Exposure" Certification

The no exposure provision of the stormwater regulations provides industrial facilities with industrial materials and activities that are sheltered from stormwater a simplified way of complying by certifying that there is no exposure to stormwater.

Permittees. The time to complete and submit an industrial facility “no exposure certification” is 0.75 hours.

States/Federal. Permitting authorities will spend 1 hour reviewing and processing each certification.

A.1.8.2. Airports

The Airport Deicing regulation allows airports to certify that they are not using deicers containing urea for airfield pavement deicing operations to become exempt from permitting requirements.

Permittees. The time to complete and submit the certification is 1 hour.

A.1.8.3. Alaska Lands

Permittees. The application for Transportation and Utility Systems and Facilities on Federal Lands will be used when applying for a right-of-way, permit, license, lease, or certificate for the use of Federal lands which lie within conservation system units and National Recreation or Conservation Areas as defined in the Alaska National Interest Lands Conservation Act. Conservation system units include the National Park System, National Wildlife Refuge System, National Wild and Scenic Rivers System, National Trails System, National Wilderness Preservation System, and National Forest Monuments. The estimated total hours per permittee respondent for submission of an application for Transportation and Utility Systems and Facilities on Federal Lands (Alaskan Lands Application) is 30 hours per application.

A.1.8.4. NPDES eRule Phase 2 Extension

The Electronic Reporting Rule includes both the initial one-time activities associated with the transition to electronic reporting (primarily in the first three years after promulgation) and ongoing activities, which reflect considerable burden reductions associated with data entry and document mailing. The Electronic Reporting Rule became effective December 21, 2015 and on September 23, 2020, the NPDES eRule Phase 2 Extension final rule was signed, which provides states and EPA additional time to implement electronic reporting for certain Clean Water Act discharge permitting requirements. In this final rule, EPA extended the compliance deadline for implementation of Phase 2 of the eRule by five years, from December 21, 2020 to December 21, 2025.

Phase 1 of the Electronic Reporting Rule required authorized state NPDES programs to electronically transmit basic facility and permit information to EPA within the first year. After one year (by December 21, 2016) authorized programs began electronically transmitting their state data, including information generated from compliance assessment (e.g., inspections), violation determinations, and enforcement actions. Also, starting on December 21, 2016 permittees began submitting DMRs electronically. In addition, by this deadline, facilities permitted under the NPDES biosolids program where EPA is the control authority, began submitting annual reports electronically. The one-time implementation activities associated with Phase 1 have been completed, therefore, only ongoing activities related to the Phase 1 and Phase 2 requirements will be included.

Under Phase 2, authorized programs have until December 21, 2025 to begin electronically collecting, managing, and sharing the Phase 2 NPDES program data. This information includes:

  • General permit reports (NOI, NOT, No Exposure Certification (NOE), and Low Erosivity Waiver and Other Waivers from Stormwater Controls (LEW));

  • Sewage Sludge/Biosolids Annual Program Report (where the state is the authorized NPDES biosolids program); and

  • Other NPDES program reports (CAFO Annual Report, MS4 Program Reports, Pretreatment Program Reports, SIU Compliance Reports in Municipalities without approved Pretreatment Programs, Sewer Overflow Event Reports, CWA Section 316(b) Annual Reports).

Thus, most of the remaining change in burden associated with conversion from paper to electronic reporting will occur within the three-year period covered by this ICR. As Phase 2 requirements for many other reports are phased in, EPA expects more reports will switch to electronic transmission. This ICR assumes the same rate of conversion from paper reports to electronic as was assumed in the prior ICR.

Permittees. The ongoing burden for permittees includes 0.4 hours per respondent per year to periodically reset the passcode and mailing some reports.

States. State agency activities include:

  • Transfer of report data from current state system to EPA system;

  • Training and technical support; and

  • Required programmatic data entry associated with submitting programmatic data to EPA.

  • Prepare and send a waiver request to EPA when they are seeking an alternative Phase 2 compliance deadline for general permits or program reports.

  • Prepare and send basic information to EPA as they update or deploy their general permits and program reports and the related electronic reporting tools.

  • Annually review EPA’s inventory of general permits and program reports and the related electronic reporting tools. Authorized NPDES programs will summarize this review in an email to EPA.



Underlying assumptions regarding burden estimates are described below.

  • The analysis assumes states currently operating their own systems will bear an ongoing annual cost to manage transfer of data between their system and EPA’s. The annual burden estimate per state is 2,080 hours 1 full-time equivalent (FTE) programmer/technical labor per state per year.

  • The analysis also assumes that each authorized NPDES state program, whether it operates its own system or uses EPA’s tools, will bear an ongoing annual cost to provide training and technical support to regulated entities. The estimated annual training and technical support burden per authorized state is 2 FTEs of programmer/technical labor per state per year or 4,160 hours of programmer/technical labor. This is a conservative estimate based on the upper end of the range reported in comments submitted by states.

  • Ongoing data entry associated with states submitting required programmatic data to EPA is estimated to have a total annual labor burden of 85,445 hours.

  • EPA estimates that fifteen states will submit a waiver during the ICR period and each waiver review will require 16 hours to prepare and send to EPA. 

  • EPA expects to receive 12 updates on general permits renewals each month. EPA estimates that these will be monthly updates and each update will take 1 hour to prepare and send to EPA. 

  • All 48 authorized NPDES programs will also need to annually review EPA’s inventory of general permits and program reports and the related electronic reporting tools. Authorized NPDES programs will summarize this review in an email to EPA. EPA estimates that these will be monthly updates and each update will take 4 hours to prepare and send to EPA. 



Federal. The estimated annual EPA burden for ongoing activities to operate and maintain the necessary changes in the ICIS-NPDES system required by the rule is estimated at 16,389 hours per year. EPA will also review all alternative Phase 2 compliance deadline requests submitted by state permitting authorities. Each review and approval process is estimated to take 16 hours.

In addition, when an authorized state, tribe, or territory has less than 90% participation rate for one or more data groups, EPA will use its CWA authority and ICR to issue targeted individual notices requiring NPDES-regulated entities to utilize their NPDES program’s electronic reporting system. It is estimated there will be 14,624 letters during the 3 year period or an average of 4,875 per year. It is estimated each letter will require 0.5 hours to prepare and send.

EPA Regions will need to prepare and send basic information to EPA as they update general permits and annually review EPA’s inventory of general permits and program reports. EPA assumes that Regions are re-issuing approximately 9 general permits each year and that each update will take one hour to complete. Each of the seven EPA Regions with general permits will also have to submit an annual review that will each take 4 hours to complete.

A.1.8.5. Dental Offices

Permittees. In the event a new dental office opens or a regulated dental discharger transfers ownership, the new owner must submit a One-Time Compliance Report (estimated to take 76 minutes or 1.27 hours per dental office).

Dental offices that use or remove amalgam would need to keep on-site records of inspections, cleaning, maintenance, repair, and recycling. EPA estimates that one percent of dental offices will need a repair for their amalgam separator and will need to keep a record of it. EPA estimates that recordkeeping will require 200 minutes (or 3.34 hours) of burden per dental office.

States and POTWs. EPA estimates a one-time burden of 45 minutes associated for Control Authorities (States and POTWs) to review and file each One-Time Compliance Report for ownership transfers and for newly opened dental offices.

                  1. General State Activities

This category applies to permitting authority activities that are not directly attributable to the individual categories described above.

A.1.9.1. Certification of EPA-issued Permits

When EPA issues NPDES permits, it must ensure that the permits are in compliance with state laws, including WQS. Under CWA Section 401, EPA may not issue a permit until the state certifies that the permit is in compliance with state laws. The respondents to this item are the estimated 637 entities including states, tribes, and U.S. territories that must certify EPA-issued permits. The average respondent burden is estimated to be 4 hours.

A.1.9.2. Inspection and Investigation

Authorized states are required to maintain a “program for periodic inspections of the facilities and activities subject to regulation.” 40 CFR 123.26(b)(2). Under EPA’s Clean Water Act National Pollutant Discharge Elimination System Compliance Monitoring Strategy (available at https://www.epa.gov/compliance/clean-water-act-national-pollutant-discharge-elimination-system-compliance-monitoring), authorized states prepare annual Compliance Monitoring Strategy (CMS) plans that articulate commitments for compliance assessment activities (e.g., inspections) and end-of-year reports that summarize CMS plan implementation over the prior year. EPA has developed a template for states to use when preparing CMS plans and end-of-year reports.

The various types of compliance monitoring activities conducted by permitting authorities include:

  • Compliance Sampling Inspection (CSI). The estimated burden for this inspection is 120 hours.

  • Compliance Evaluation Inspection (CEI). The estimated burden for this inspection is 24 hours.

  • Performance Audit Inspection (PAI). The estimated burden for this inspection is 96 hours.

  • Diagnostic Inspection (DI). The estimated burden for this inspection is 128 hours.

  • Compliance Biomonitoring Inspection (CBI). The estimated burden for this inspection is 240 hours.

  • Toxic Sampling Inspection (XSI). The estimated burden for this inspection is 280 hours.

  • Reconnaissance Inspection (RI). The RI is the briefest of all NPDES inspections; the estimated burden for this inspection is 8 hours.

The list of compliance monitoring activities described above is not the complete set of activities that EPA and states conduct pursuant to the CMS. EPA estimates that on an annual basis for major facilities 9 percent receive CSIs, 68 percent receive CEIs, 6 percent receive PAIs, 1 percent receive CBIs, 0.4 percent receive XSIs, 18 percent receive RIs, and an additional 0.3 percent of municipal major facilities receive DIs. Of the minor facilities, 3 percent receive CSIs and 17 percent receive CEIs. In addition, 10 percent of industrial stormwater general permittees, 5 percent of large (> 5 acres) construction stormwater general permittees, 2.5 percent of small (1-5 acres) construction stormwater general permittees, 20 percent of Phase I MS4s, and one-seventh of Phase II MS4s receive RIs.

A.1.9.3. Submittal of Permit Information to EPA

This item applies to requirements for authorized states to make available to EPA for review any information obtained or used in the administration of a state program. The burden estimate assumes that states must submit all major permits, about 5 percent of minor permits, and all general permits, as well as general program information collected as part of the application process. Time required is estimated to be 10 minutes each and applies to 70 percent of the major permits, 5 percent of the minor permits, and 100 percent of the general permits transmitted to EPA. The remaining 30 percent of major permits require 2 hours of transmittal time.

A.1.9.4. NPDES Program Authorization

This category includes: state requests that an authorized program be transferred back to EPA, with a burden estimate of 480 hours; state requests for NPDES program modifications, with a burden estimate of 250 hours; and state requests for sewage sludge program approval under Part 501, with a burden estimate of 750 hours. EPA estimates that one state will request program authorization, one authorized state over the three-year period will request that an authorized program or program component be transferred, 12 over the three-year period will request program modification to update their legal authorities in response to the regulatory changes (e.g., rulemakings, state water quality standards revisions, etc.) anticipated in the NPDES program, and one over the 3-year period will request a sewage sludge program approval.

                1. Estimating Respondent Costs

Once burden hours are estimated, the next step is to estimate the labor cost for respondents and the capital costs required to complete each activity. The total cost for each respondent activity is composed of the following:

  • Labor cost;

  • O&M cost; and

  • Capital/start-up cost.

The results of the respondents’ costs analysis are presented in the Detailed Respondent Burden Results by Category table in Appendix B.

                  1. Estimating Labor Costs

When calculating respondent labor costs, EPA makes the following assumptions:

  • EPA used a labor rate of $52.36 per hour for all authorized state and territory respondent activities defined in this ICR. This hourly rate was based on the average hourly wage for state and municipal employees as determined by the U.S. Department of Labor2.

  • The average hourly rate for municipal employees, which account for all POTW and MS4 costs, as determined by the U.S. Department of Labor, Bureau of Labor Statistics, is $43.77 (including overhead costs of 50 percent)3.

  • EPA assumes the average hourly rate in the private sector is $62.054.

  • EPA determined the hourly employment cost of federal employees using methodology established in previous ICRs. According to the U.S. Office of Personnel Management, 2020 General Schedule (2020-GS), the average annual salary of a government employee at the GS-9, Step 10 level is $59,316. At 2,080 hours per year, the hourly wage is $28.52. Assuming overhead costs of 60 percent, or $17.11 per hour, the fully loaded cost of employment for a federal employee is $45.63.

                  1. O&M Costs

Most calculations in this ICR account for labor costs only. A facility incurs O&M costs when it uses services, materials, or supplies needed to comply with the rule’s reporting and recordkeeping requirements that the facility will not use otherwise. Another type of O&M cost is for the purchase of contracted services such as laboratory analyses. The purchase of supplies such as filing cabinets and services such as photocopying or boat rental, is also considered O&M costs, and may also be referred to as ODCs. All costs presented in this section have been adjusted with the Consumer Price Index to September 2020 dollars. These costs are linked to the distinctive activities described below.

A.2.2.1. Application Requirements for NPDES Permits

A.2.2.1.1. Testing and Contractors Costs for POTWs and PrOTWs

Assumptions and estimates for these O&M costs (i.e., testing/contractor costs) are detailed in Tables A-17 to A-19.

Table A-17. Estimated Percent of POTWs that Perform Form 2A Pollutant Testing In-House

Facility type

Basic conventional and nonconventional

Additional conventional and nonconventional

Priority pollutants and state WQS

Multiple species biomonitoring

0.1 mgd, no priority pollutants.

60

-

-

-

0.1–1.0 mgd, no priority pollutants.

80

80

-

-

Minors, with priority pollutants.

85

85

50

85

Majors, no priority pollutants.

85

85

10

75

Majors, with priority pollutants.

90

90

70

85


Table A-18. Estimated Percent of POTWs that Perform Form 2S pollutant Testing In-House

Facility type

Basic conventional and nonconventional

NPDES POTWs

95

NPDES PrOTWs

95

Sludge Only POTWs

50

Sludge Only PrOTWs

50


Table A-19. Testing/Contractor Costs (O&M costs)


Tests/year

Cost per test ($)

Total $

Form 2A




Basic conventional and non-conventional

3

$128

$226,176

Additional conventional and non-conventional

3

$257

$287,583

Priority pollutants/state WQS

3

$1,475

$3,752,400

Multiple species biomonitoring

1

$10,262

$2,421,832

Form 2S




NPDES and sludge-only facilities

1

$257

$80,184

Section 308 Requests




Municipal (complex)

1

$1,475

$5,900

Nonmunicipal (medium)

1

$1,283

$5,774



A.2.2.1.2. Postage for all Application Forms Submittal

Permittees currently must mail permit applications to the permitting authority for processing. Application forms range from 3-5 pages to more than 30. Permittees may choose to include additional monitoring data pages as well. EPA assumes that it will cost $3.16 to mail each permit application (postage for an envelope with up to 60 sheets of paper).

A.2.2.2. Baseline Determination and Estimate of the Incremental Monitoring Burden and Cost for Remining Sites (DMR Sampling Analysis)

EPA assumes that baseline determination monitoring and annual monitoring costs will be required for all the reporting requirements for mining sites in Indiana (5), Kentucky (7), and Tennessee (9). EPA assumes a sample analysis and mileage cost of $37/sample adjusted to September 2020 using the CPI (Source: Baseline Standards and BMPs for the Coal Mining Point Source Category-Coal Remining Subcategory and Western Alkaline Coal Mining Subcategory ICR; OMB control no. 2040-0239; EPA ICR no. 1944.03).

A.2.2.3. Minimum Monitoring Requirements for Direct Discharging Mills in the Bleached Papergrade Kraft and Soda Subcategory and the Papergrade Sulfite Subcategory of the Pulp, Paper, and Paperboard Point Source Category (DMR Sampling Analysis)

To estimate O&M costs associated with these activities, EPA assumes that mills will send their collected samples to outside laboratories for analysis. Some facilities could perform in-house analysis for some pollutants (i.e., adsorbable organic halides (AOX) and/or chloroform). However, for the purposes of this ICR, EPA assumed that all analyses will be contracted to outside laboratories to express the full potential analytical costs of minimum monitoring on Subparts B and E mills. In the future, facilities might elect to conduct analysis in house, particularly AOX analyses, because the monitoring requirement is daily.

Analytical costs performed at outside laboratories were taken from the Minimum Monitoring Requirements for Direct Discharging Mills in the Bleached Papergrade Kraft and Soda Subcategory and the Papergrade Sulfite Subcategory of the Pulp, Paper, and Paperboard Point Source Category ICR (OMB control no. 2040-0243; EPA ICR no. 1878.02). These costs are $197 for AOX, $1,432 for TCDD/TCDF, $818 for chlorinated phenolics, and $441 for chloroform.

Seventy-five Subpart B Bleached Papergrade Kraft & Soda mills perform daily sampling for AOX, weekly sampling for chloroform, and monthly grab sampling for TCDD, TCDF, and chlorinated phenolics. Thirty-eight Subpart B Bleached Papergrade Kraft & Soda mills perform monthly composite sampling for TCDD, TCDF, and chlorinated phenolics. Five of the Subpart E Ca / Sodium / Mg Sulfite mills perform daily AOX sampling. Two each for the Subpart E Ammonium Sulfite and Specialty Grade perform monthly sampling for TCDD, TCDF, and chlorinated phenolics.

A.2.2.4. Animal Sector Testing/Analysis and Public Notice Costs

The Animal Sector includes O&M costs that account for state agencies issuing public notices and certain testing and analysis costs incurred by respondents that perform activities outside the normal operation practices. O&M costs are based on costs from the Consolidated Animal Sectors ICR (OMB control no. 2040-0250; EPA ICR no. 1989.10). The average cost for state agencies to issue a public notice was $1,524 per notice and the average testing and analysis cost was $82 per event. O&M for recordkeeping was assumed to be 10 percent of recordkeeping labor costs.

A.2.2.5. Pretreatment

There are O&M costs incurred by IUs for discharge monitoring. The total annual respondent O&M costs associated with this ICR are estimated to be $2,772,491.

A.2.2.6. CWIS O&M and ODC Costs

A.2.2.6.1 CWIS Phase I O&M and OCD Costs

O&M and ODC costs are associated with multiple activities including flow, velocity and biological monitoring. EPA assumes that samples taken for the Source Water Baseline Biological Characterization Study to be included with the application will be analyzed by a contracted laboratory. For annual O&M costs, EPA assumes that entrainment monitoring sampling analysis will be performed by an outside laboratory. Table A-20 presents a summary of average O&M and ODC costs per permit for each activity category.

Table A-20. Summary of CWIS Phase I O&M and ODC Average Annual Costs per Permit

Activity category

O&M/ODC Cost

Costs for NPDES permit application activities

$37,278

Costs for NPDES permit renewal activities

$32,225

Costs for NPDES permit annual activities

$11,729

A.2.2.6.2. CWIS Phase III - New Offshore Oil and Gas Facilities O&M Costs

Estimated O&M costs for permit application and permit renewal activities include $1,073 for various ODCs. For annual O&M costs, EPA assumed that the analysis of impingement monitoring samples will be done on-site, while entrainment monitoring samples is performed by an outside laboratory. Laboratory analysis for entrainment samples is estimated to cost $4,283 per year per facility. The ODCs associated with biological monitoring are estimated to be approximately $939 per facility. Table A-21 presents a summary of the estimated annual O&M costs across all CWIS Phase III Facilities

Table A-21. Summary of Estimated Annual Total O&M Costs for All CWIS Phase III Facilities

Activity Category

O&M/ODC Cost

Total facility cost estimates for NPDES permit application activities

$6,441

Total facility cost estimates for NPDES permit application activities (renewals)

$6,441

Total facility cost estimates for annual monitoring and inspection activities

$916,327


A.2.2.6.3. CWIS Existing Facility O&M Costs

O&M costs include costs for the operation and upkeep of capital equipment, cost for the purchase of contracted services, such as laboratory analyses, and the purchase of supplies such as filing cabinets and services such as photocopying or boat rental which are referred to as other direct costs (ODCs). Table A-22 presents a summary of the estimated annual O&M costs across all CWIS Existing Facilities.

Table A-22. Estimated Annual O&M Costs for Existing Facility

Activity Category

O&M/ODC Cost (September 2020 Dollars)

Total facility cost estimates for NPDES permit application activities

$6,441

Total facility cost estimates for NPDES permit application activities (renewals)

$6,441

Total facility cost estimates for annual monitoring and inspection activities

$916,327



A.2.2.7. Dental Amalgam O&M Costs

EPA estimates that annual O&M costs to dental offices for reporting postage will be an average of $6,735 and to State and POTW Control Authorities for storage of files will be an average of $2,754.

                  1. Capital/Start-up Costs

Most calculations in the ICR account for labor costs only. The ICR does, however, account for certain capital and start-up costs incurred by respondents that perform activities outside the normal operating practices. All costs presented in this section have been adjusted with the Consumer Price Index to September 2020 dollars. These costs are linked to several distinctive activities.

A.2.3.1. CSO Control Policy (CSO Notification)

The capital costs associated with public notification of CSO locations, events, and public health and environmental effects are included in this ICR. The costs are for municipalities to replace notification signs. From estimates presented in previous ICRs each sign will be replaced every 10 years which is equal to an average annual cost of $13.

A.2.3.2. Baseline Determination and Estimate of the Incremental Monitoring Burden and Cost for Remining Sites (DMR Sampling Analysis)

EPA assumes that flow metering from an installed weir is required for mining sites in Indiana and Tennessee. For all other states, EPA assumes that flow metering is already required and installed as part of the state Rahall remining permit program.

For Indiana and Tennessee, EPA assumes installed weir costs of $1,695 on the basis of an escalation of 2004 cost estimates from previous the Baseline Standards and BMPs for the Coal Mining Point Source Category-Coal Remining Subcategory and Western Alkaline Coal Mining Subcategory ICR (OMB control no. 2040-0239; EPA ICR no. 1944.03) (originally from Weir & Flume Sales Company and Tarco Tech Industries). Indiana will have 5 sites/year × 4 preexisting discharge points/site. Tennessee will have 9 sites/year × 4 preexisting discharge points/site. These costs are annualized using a 7 percent discount rate and an estimated 10-year life for the weir.

A.2.3.3. Start-up Costs for the Animal Sector

Start-up capital costs for Animal Sector facilities include the $39 purchase of a soil auger to collect soil samples and the $47 purchase of a manure sampler. CAFOs will also need pay $47 to install depth markers in their lagoons. All operations will need to expend an estimated $1,510 to develop the NMP elements that pertain to the production area, including performing an engineering analysis of the waste storage volume requirements needed to comply with the CAFO rule.

A.2.3.4. CWIS Phase I Purchase and Installation of Pilot Study Technology

EPA anticipates that Track II facilities that operate once-through cooling intakes will perform pilot studies to determine the effectiveness of their chosen technology. For costing purposes, EPA is assuming that a pilot study will be performed using a Gunderboom system. EPA estimated the pilot study would cost $331,000.

A.2.3.5. CWIS Phase III New Offshore Oil and Gas

EPA estimated that the initial permit application capital costs for installing a remote monitoring device for impingement monitoring at each facility was $27,440.



Appendix B — Detailed Respondent Burden Results by Category

Table B-1 presents the calculated respondent burden and cost estimates grouped by activity type and respondent type. This table includes a section for respondents that are permit holders (which can include both private and municipal entities) and a section for respondents which are states acting as the NPDES permitting authority.

(See attached PDF document)



Appendix C — Detailed Agency Burden Estimates

Table C-1 presents a summary of the Agency burden associated with administration of individual permits similar to the state activities in Appendix B. Table C-2 presents a summary of the Agency burden that is associated with NPDES program oversight.

(See attached PDF document)



Appendix D — Number of Respondents in Each Input Category

Table D-1 presents the number of respondents in each respondent input category. These values were used to derive the adjusted burden estimates to account for changes in the number of respondents from the previous ICR. Estimates for the number of respondents for each type of permit are based on data from either queries to the ICIS-NPDES database conducted in November 2020, EPA estimates, or values from previous ICRs.

(See attached PDF document)

Appendix E — Number of Unique Respondents

Table E-1 presents a summary of the number of respondents in each permit category. Based on 2019 U.S. Census data, an estimated 96.34 percent of the U.S. population resides in the 48 states and 1 territory authorized to issue individual and general permits. This population percentage has been applied to the respondent values to estimate the distribution of those individual and general permittees that report directly to authorized states. As with the number of respondents in Appendix D, estimates for the number of unique respondents for each type of permit are based on data from either queries of the ICIS-NPDES-database conducted in November 2020, EPA estimates, or values from previous ICRs.

(See attached PDF document)



Appendix F — Copy of Regulation Authorizing Data Collection and Federal Register Notice

F.1 Clean Water Act Section 402

(See attached PDF document)

F.2 ICR Federal Register Notice

(See attached PDF document)



Appendix G — Application Forms

Forms included:

Application Forms 1, 2A, 2B, 2C, 2D, 2E, 2F, 2S;

Construction General Permit NOI, NOT;

Pesticide General Permit NOI, NOT, Annual Report;

Multi Sector General Permit NOI, NOT, DMR, Annual Report, No Exposure Certification Form;

Vessel General Permit NOI, NOT, PARI;

Uniform Federal Transportation/Utility System Application Form

One-Time Compliance Reporting Form for Dental Dischargers

(See attached PDF document)

1 The criteria for when an antidegradation demonstration must be performed are different for bioaccumulative chemicals of concern (BCCs) and non-BCCs.

2 Based on U.S. Department of Labor, Bureau of Labor Statistics, Table 3. Employer costs per hour worked for employee compensation and costs as a percent of total compensation: State and local government workers, by major occupational and industry group, June 2020.

3 Updated rates are derived from the U.S. Department of Labor, Bureau of Labor Statistics, in a table titled May 2015 National Industry-Specific Occupational Employment and Wage Estimates NAICS 999300 - Local Government, excluding schools and hospitals (OES Designation), and adjusted to June 2020 dollars using the not seasonally adjusted Employment Cost Index (ECI) for state and local government employees.

4 Determined by the U.S. Department of Labor, Bureau of Labor Statistics, Total Compensation for Management, professional, and related; Table 5. Employer costs per hour worked for employee compensation and costs as a percent of total compensation: Private industry workers, by major occupational group and bargaining unit status, June 2020.

December 2021

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy