10 CFR 20, Standards for Protection Against Radiation

ICR 202202-3150-003

OMB: 3150-0014

Federal Form Document

ICR Details
3150-0014 202202-3150-003
Received in OIRA 202107-3150-003
NRC
10 CFR 20, Standards for Protection Against Radiation
Revision of a currently approved collection   No
Regular 03/04/2022
  Requested Previously Approved
02/28/2025 02/28/2025
52,358 52,359
769,319 769,396
80,361 80,361

PROPOSED RULE: "REGULATORY IMPROVEMENTS FOR PRODUCTION AND UTILIZATION FACILITIES TRANSITIONING TO DECOMMISSIONING" - The proposed rule would result in changes in recordkeeping and reporting burden relative to existing rules by creating a regulatory framework for production and utilization facility licensees transitioning to decommissioning and amending existing regulations that relate to the decommissioning of production and utilization facilities. Decommissioning nuclear power reactor licensees and the NRC have expended substantial resources processing licensing actions for nuclear power reactors during their transition period to decommissioning status. Licensees that are currently transitioning to decommissioning have been requesting NRC review and approval of licensing actions, informed by the low risk of an offsite radiological release posed by a decommissioning reactor. Specifically, the licensees are seeking NRC approval of exemptions and license amendments to revise requirements to reflect the reduced operations and risks posed by a permanently shutdown and defueled reactor. The proposed rule would, on balance, reduce the paperwork burden imposed on production and utilization facility licensees transitioning to decommissioning by establishing a graded approach to the requirements imposed on these facilities. A graded approach would adjust the level of analysis, documentation, and actions necessary to comply with safety requirements and criteria commensurate with several factors, including magnitude of any credible hazard involved, and the balance between radiological and non-radiological hazards as applicable to the level within the decommissioning process. The NRC expects that these proposed changes would enhance the efficiency of the decommissioning process and reduce the overall burden on licensees.

PL: Pub.L. 83 - 703 1-311 Name of Law: Atomic Energy Act
  
None

3150-AJ59 Proposed rulemaking 87 FR 12254 03/03/2022

No

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 52,358 52,359 0 -1 0 0
Annual Time Burden (Hours) 769,319 769,396 0 -77 0 0
Annual Cost Burden (Dollars) 80,361 80,361 0 0 0 0
No
Yes
Changing Regulations
The estimated incremental burden reduction from the proposed rule is 77.5 hours. By extending the receipt notification window, the proposed rule would reduce the number of exemption requests submitted by licensees.

$2,514,612
No
    No
    No
No
No
No
No
Dan Doyle 301 415-3748

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
03/04/2022