Table 1: Annual Respondent Burden and Cost – NESHAP for Steel Pickling, HCl Process Facilities and Hydrochloric Acid Regeneration Plants (40 CFR Part 63, Subpart CCC) (Renewal)














Burden item (A) (B) (C) (D) (E) (F) (G) (H)






Person hours per occurrence No. of occurrences per respondent per year Person hours per respondent per year
(C=AxB)
Respondents per year a Technical person- hours per year
(E=CxD)
Management person hours per year
(Ex0.05)
Clerical person hours per year
(Ex0.1)
Total Cost per year b
Total Number of Respondents
Respondant Rates
(Source: United States Department of Labor, Bureau of Labor Statistics, March 2021, “Table 2. Civilian Workers, by occupational and industry group.”)
1. Applications N/A







Number of sources established in 2012 final rule amendments 100
Labor Type Total Compensation ($/hr) Loaded Rate (Rate + 110%rate)
2. Survey and Studies N/A










Mgmt. $73.12 $153.55
3. Reporting requirements











Tech. $58.19 $122.20
A. Familiarization with regulatory requirements 1 1 1 100 100 5 10 $13,603



Cler. $29.29 $61.51
B. Required activities














Initial performance test c 125 1 125 0 0 0 0 $0






Repeat initial performance test c 125 0.2 25 0 0 0 0 $0






Periodic performance tests d, e 125 1 125 100 12,500 625 1,250 $1,700,343.75
Operation and maintenance plan 40 1 40 0 0 0 0 $0






Operation and maintenance plan revision f 20 1 20 10 200 10 20 $27,205.50






C. Create information See 3B













D. Gather existing information See 3B













E. Write Report














Notification of applicability g 2 1 2 0 0 0 0 $0






Notification of construction/reconstruction g 2 1 2 0 0 0 0 $0






Notification of anticipated startup g 2 1 2 0 0 0 0 $0






Notification of actual startup g 2 1 2 0 0 0 0 $0






Notification of special compliance requirements N/A













Notification of initial performance test g 2 1 2 0 0 0 0 $0






Notification of compliance status g 4 1 4 0 0 0 0 $0






NESHAP waiver application h N/A













Report of initial and periodic performance tests See 3B













Report of monitoring exceedances, including malfunctions i 16 2 32 20 640 32 64 $87,057.60






Report of no excess emissions j 8 2 16 80 1,280 64 128 $174,115.20






Reporting Subtotal



16,928 $2,002,325






4. Recordkeeping requirements














A. Familiarization with regulatory requirements See 3A













B. Plan activities See 3B













C. Implement Activities See 3B













D. Develop record system N/A













E. Time to enter information














Records of all information required by standards k 3 52 156 100 15,600 780 1,560 $2,122,029.00






F. Time to train personnel 4 1 4 0 0 0 0 $0






G. Time to transmit or disclose information l 0.25 3 0.75 100 75 3.75 7.5 $10,202.06






H. Time for audits N/A













Recordkeeping Subtotal



18,026 $2,132,231






TOTAL LABOR BURDEN AND COST (rounded) m



35,000 $4,130,000






TOTAL CAPITAL and O&M COSTS (rounded) m






$10,600






GRAND TOTAL (rounded) m






$4,140,000





























total # Responses 300













hr/response 117






Assumptions:














a We have assumed that there are approximately 100 respondents subject to the standard (95 steel pickling and 5 acid regeneration facilities). We have further assumed that no additional respondent per year will become subject to the regulation in the next three years. Since there are no new respondents estimated, initial performance tests, initial operation and maintenance plans, and initial notifications do not apply.






[Threaded comment] Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924 Comment: Changed Table 12 to Table 2 b This ICR uses the following labor rates: $153.55 per hour for Executive, Administrative, and Managerial labor; $122.20 per hour for Technical labor, and $61.51 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, March 2021 “Table 2: Civilian workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.






c We have assumed that each new respondent will be required to conduct an initial performance test and 20 percent will have to repeat this test. Since there are no new respondents estimated, these requirements do not apply.






d Each respondent is required to conduct a periodic performance test to measure either: (1) the HCl mass flows at the control device inlet and outlet or (2) the concentration of HCl exiting the control device. The test results must be reported within 2 months of the test date. Periodic performance tests must be conducted either annually or according to an alternative schedule that is approved by the applicable permitting authority, but no less frequently than every 2.5 years or twice per title V permit term. We are assuming that all periodic performance tests are conducted annually.






e We have assumed that it will take 125 hours for each respondent to complete the periodic performance test and report.














f We have assumed that 10 percent of respondents must write a revised operation and maintenance plan for each emission control device.














g We have assumed that all new sources will be required to meet initial notification requirements. Since there are no new respondents estimated, these requirements do not apply.














h We have assumed that no respondent will request a NESHAP waiver application.














i We have assumed that 20 percent of respondents will report excess emissions on a semiannual basis.














j We have assumed that 80 percent of respondents will report no excess emissions on a semiannual basis.














k We have assumed that each respondent will take three hours each week to record all information required by the standard.














l We have assumed that each respondent will take 15 minutes three times per year to transmit or disclose information.














m Totals have been rounded to 3 significant values. Figures may not add exactly due to rounding.















Sheet 2: Agency - Table 2

Table 2: Average Annual EPA Burden and Cost − NESHAP for Steel Pickling, HCl Process Facilities and Hydrochloric Acid Regeneration Plants (40 CFR Part 63, Subpart CCC) (Renewal)












Activity (A) (B) (C) (D) (E) (F) (G) (H)




EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year
(C=AxB)
Plants per year a Technical person- hours per year
(E=CxD)
Management person-hours per year
(Ex0.05)
Clerical person-hours per year
(Ex0.1)
Cost, $ b

Hourly Mean Wage With Fringe & Overhead Agency Rates
Source: Office of Personnel Management (OPM), 2021 General Schedule
Report Review








(GS- 12, step 1) - Tech. 32.02 $51.23
New Sources








(GS- 13, step 5) - Mgmt. 43.15 $69.04
Notification of applicability c 2 1 2 0 0 0 0 $0
(GS-6, step 3) - Cler. 17.33 $27.73
Notification of construction/ reconstruction c 2 1 2 0 0 0 0 $0




Notification of actual startup c 2 1 2 0 0 0 0 $0




Notification of special compliance requirements N/A











Notification of initial performance test c 2 1 2 0 0 0 0 $0




Notification of compliance status c 2 1 2 0 0 0 0 $0




Review of initial performance test report d 4 1 4 0 0 0 0 $0




Review of repeat initial performance test report d, e 4 0.2 0.8 0 0 0 0 $0




Existing Sources












Review of excess emissions report f 4 2 8 20 160 8 16 $8,749.44




Review of no excess emissions report g 2 2 4 80 320 16 32 $18,386.18




Review of periodic performance test report h 4 1 4 100 400 20 40 $22,982.72




Review of waiver application i 2 1 2 0 0 0 0 $0




TOTAL (rounded) j



1,010 $50,100
































Assumptions:












a We have assumed that there are approximately 100 respondents subject to the standard. We have further assumed that no additional respondent per year will become subject to the regulation in the next three years. Since there are no new respondents estimated, initial performance tests and initial notifications do not apply.




b This cost is based on the following hourly labor rates times a 1.6 benefits multiplication factor to account for government overhead expenses: $69.04 for Managerial (GS-13, Step 5), $51.23 for Technical (GS-12, Step 1) and $27.73 Clerical (GS-6, Step 3). These rates are from the Office of Personnel Management (OPM) “2021 General Schedule”, which excludes locality rates of pay.




c We have assumed that all new sources will be required to meet initial notification requirements. Since there are no new respondents estimated, these requirements do not apply.




d We have assumed that the Agency will take 4 hours to participate in the performance tests. Since there are no new respondents estimated, these requirements do not apply.












e We have assumed that 20 percent of new respondents will have to repeat the performance tests due to failure. Since there are no new respondents estimated, these requirements do not apply.












f We have assumed that 20 percent of respondents will report excess emissions on a semiannual basis.












g We have assumed that 80 percent of respondents will report no excess emissions on a semiannual basis.












h Periodic performance tests are submitted at least twice every 5 years (title V permit term), but may be required by the permitting authority to be submitted as frequently as annually. We assume that all periodic performance tests are conducted annually.




i We have assumed that no waiver application is expected.












j Totals have been rounded to 3 significant values. Figures may not add exactly due to rounding.













Sheet 3: Respondents - O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs
(A) (B) (C) (D) (E) (F) (G)
Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of New Respondents Total Capital/Startup Cost (B X C) Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M Costs (E X F)
Flow-meters with high/low alarms $830 0 $0 $106 100 $10,600