April 15, 2022, 30-Day FRN

April 15 2022_30-Day FRN.pdf

Certification of Glazing Materials

April 15, 2022, 30-Day FRN

OMB: 2130-0525

Document [pdf]
Download: pdf | pdf
jspears on DSK121TN23PROD with NOTICES1

22618

Federal Register / Vol. 87, No. 73 / Friday, April 15, 2022 / Notices

(Aug. 29, 1995). OMB believes the 30day notice informs the regulated
community to file relevant comments
and affords the agency adequate time to
digest public comments before it
renders a decision. 60 FR 44983 (Aug.
29, 1995). Therefore, respondents
should submit their respective
comments to OMB within 30 days of
publication to best ensure having their
full effect.
Comments are invited on the
following ICRs regarding: (1) Whether
the information collection activities are
necessary for FRA to properly execute
its functions, including whether the
information will have practical utility;
(2) the accuracy of FRA’s estimates of
the burden of the information collection
activities, including the validity of the
methodology and assumptions used to
determine the estimates; (3) ways for
FRA to enhance the quality, utility, and
clarity of the information being
collected; and (4) ways to minimize the
burden of information collection
activities on the public, including the
use of automated collection techniques
or other forms of information
technology.
The summaries below describe the
ICRs that FRA will submit for OMB
clearance as the PRA requires:
Title: Locomotive Certification (Noise
Compliance Regulations).
OMB Control Number: 2130–0527.
Abstract: Under authority granted by
the Noise Control Act of 1972, the
Environmental Protection Agency (EPA)
has established limits for noise
emissions related to rail carriers in 40
CFR part 201. Those limits are enforced
by FRA under 49 CFR part 210. In
particular, the information FRA collects
under § 210.27 is necessary to ensure
compliance with EPA noise standards
for new locomotives. Although railroads
no longer need to display a certification
badge or tag in the locomotive cab, as
was previously required by nowremoved § 210.27(d), the locomotives
still need to be tested and certified to
comply with the noise emission
standards, as required under
§ 210.27(a)–(c).
Type of Request: Extension without
change (with changes in estimates) of a
currently approved collection.
Affected Public: Businesses.
Form(s): N/A.
Respondent Universe: 4 locomotive
manufacturers.
Frequency of Submission: On
occasion.
Total Estimated Annual Responses: 4.
Total Estimated Annual Burden: 2
hours.
Total Estimated Annual Burden Hour
Dollar Cost Equivalent: $155.

VerDate Sep<11>2014

18:08 Apr 14, 2022

Jkt 256001

Title: Use of Locomotive Horns at
Highway-Rail Grade Crossings.
OMB Control Number: 2130–0560.
Abstract: Under 49 CFR part 222, FRA
seeks to collect information from
railroads and public authorities in order
to increase safety at public highway-rail
grade crossings nationwide by requiring
that locomotive horns be sounded when
trains approach and pass through these
crossings or by ensuring that a safety
level at least equivalent to that provided
by routine locomotive horn sounding
exists for quiet zone corridors in which
such horn sounding is silenced. FRA
reviews applications by public
authorities intending to establish new
quiet zones by implementing alternative
safety measures and approves the
effectiveness rate assigned to them.
FRA made several adjustments to its
estimated paperwork burdens in this
ICR extension.
Type of Request: Extension without
change (with changes in estimates) of a
currently approved collection.
Affected Public: Businesses.
Form(s): N/A.
Respondent Universe: 754 railroads/
645 public authorities.
Frequency of Submission: On
occasion.
Total Estimated Annual Responses:
3,620.
Total Estimated Annual Burden:
7,253 hours.
Total Estimated Annual Burden Hour
Dollar Cost Equivalent: $452,585.
Under 44 U.S.C. 3507(a) and 5 CFR
1320.5(b) and 1320.8(b)(3)(vi), FRA
informs all interested parties that it may
not conduct or sponsor, and a
respondent is not required to respond
to, a collection of information that does
not display a currently valid OMB
control number.
Authority: 44 U.S.C. 3501–3520.
Brett A. Jortland,
Deputy Chief Counsel.
[FR Doc. 2022–08141 Filed 4–14–22; 8:45 am]
BILLING CODE 4910–06–P

DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket No. FRA–2022–0002–N–8]

Proposed Agency Information
Collection Activities; Comment
Request
Federal Railroad
Administration (FRA), Department of
Transportation (DOT).
ACTION: Notice of information collection;
request for comment.
AGENCY:

PO 00000

Frm 00120

Fmt 4703

Sfmt 4703

Under the Paperwork
Reduction Act of 1995 (PRA) and its
implementing regulations, this notice
announces that FRA is forwarding the
Information Collection Requests (ICRs)
abstracted below to the Office of
Management and Budget (OMB) for
review and comment. These ICRs
describe the information collections and
their expected burdens. On February 2,
2022, FRA published a notice providing
a 60-day period for public comment on
the ICRs.
DATES: Interested persons are invited to
submit comments on or before May 16,
2022.
ADDRESSES: Written comments and
recommendations for the proposed ICRs
should be sent within 30 days of
publication of this notice to
www.reginfo.gov/public/do/PRAMain.
Find the particular ICR by selecting
‘‘Currently under 30-day Review—Open
for Public Comments’’ or by using the
search function.
FOR FURTHER INFORMATION CONTACT: Ms.
Hodan Wells, Information Collection
Clearance Officer at email:
[email protected] or telephone:
(202) 493–0440.
SUPPLEMENTARY INFORMATION: The PRA,
44 U.S.C. 3501–3520, and its
implementing regulations, 5 CFR part
1320, require Federal agencies to issue
two notices seeking public comment on
information collection activities before
OMB may approve paperwork packages.
See 44 U.S.C. 3506, 3507; 5 CFR 1320.8
through 1320.12. On February 2, 2022,
FRA published a 60-day notice in the
Federal Register soliciting comment on
the ICRs for which it is now seeking
OMB approval. See 87 FR 5933. FRA
received no comments in response to
this notice.
Before OMB decides whether to
approve the proposed collections of
information, it must provide 30 days for
public comment. Federal law requires
OMB to approve or disapprove
paperwork packages between 30 and 60
days after the 30-day notice is
published. 44 U.S.C. 3507(b)–(c); 5 CFR
1320.12(a); see also 60 FR 44978, 44983
(Aug. 29, 1995). OMB believes the 30day notice informs the regulated
community to file relevant comments
and affords the agency adequate time to
digest public comments before it
renders a decision. 60 FR 44983 (Aug.
29, 1995). Therefore, respondents
should submit their respective
comments to OMB within 30 days of
publication to best ensure having their
full effect.
Comments are invited on the
following ICRs regarding: (1) Whether
the information collection activities are
SUMMARY:

E:\FR\FM\15APN1.SGM

15APN1

jspears on DSK121TN23PROD with NOTICES1

Federal Register / Vol. 87, No. 73 / Friday, April 15, 2022 / Notices
necessary for FRA to properly execute
its functions, including whether the
information will have practical utility;
(2) the accuracy of FRA’s estimates of
the burden of the information collection
activities, including the validity of the
methodology and assumptions used to
determine the estimates; (3) ways for
FRA to enhance the quality, utility, and
clarity of the information being
collected; and (4) ways to minimize the
burden of information collection
activities on the public, including the
use of automated collection techniques
or other forms of information
technology.
The summaries below describe the
ICRs that FRA will submit for OMB
clearance as the PRA requires:
Title: Certification of Glazing
Materials.
OMB Control Number: 2130–0525.
Abstract: The collection of
information is set forth under 49 CFR
part 223, which requires the
certification and permanent marking of
glazing materials by the manufacturer.
The manufacturer is also responsible for
making available test verification data to
railroads and to FRA upon request.
Type of Request: Extension without
change (with changes in estimates) of a
currently approved collection.
Affected Public: Businesses (railroads
and manufacturers of glazing materials).
Form(s): N/A.
Respondent Universe: 704 railroads
and 5 manufacturers.
Frequency of Submission: On
occasion.
Total Estimated Annual Responses:
25,439.
Total Estimated Annual Burden: 314
hours.
Total Estimated Annual Burden Hour
Dollar Cost Equivalent: $21,983.
Title: Disqualification Proceedings.
OMB Control Number: 2130–0529.
Abstract: FRA regulations at 49 CFR
part 209, subpart D, explain FRA’s
responsibilities, and the rights and
responsibilities of railroads and railroad
employees, regarding disqualification
procedures. For example, § 209.331,
enforcement of a disqualification order,
requires: (a) A railroad employing or
formerly employing a disqualified
individual to disclose the terms and
conditions of the order to the
individual’s new or prospective
employer railroad; (b) a railroad
considering hiring an individual in a
safety-sensitive position to inquire from
the individual’s prior employer railroad
whether the individual is serving under
a disqualification order; and (c) a
disqualified individual to inform the
individual’s employer of the

VerDate Sep<11>2014

18:08 Apr 14, 2022

Jkt 256001

disqualification order, provide a copy of
the order to the employer, inform a
prospective employer railroad of the
disqualification order, and provide a
copy of the order.
Type of Request: Extension without
change (with changes in estimates) of a
currently approved collection.
Affected Public: Businesses.
Form(s): N/A.
Respondent Universe: 86,000 railroad
employees and 754 railroads.
Frequency of Submission: On
occasion.
Total Estimated Annual Responses:
22.
Total Estimated Annual Burden: 41
hours.
Total Estimated Annual Burden Hour
Dollar Cost Equivalent: $2,549.
In accordance with 44 U.S.C. 3507(a)
and 5 CFR 1320.5(b) and
1320.8(b)(3)(vi), FRA informs all
interested parties that it may not
conduct or sponsor, and a respondent is
not required to respond to a collection
of information that does not display a
currently valid OMB control number.
Authority: 44 U.S.C. 3501–3520.
Brett A. Jortland,
Deputy Chief Counsel.
[FR Doc. 2022–08140 Filed 4–14–22; 8:45 am]
BILLING CODE 4910–06–P

DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket No. FRA–2010–0032]

Metro-North Commuter Railroad’s
Request To Amend Its Positive Train
Control Safety Plan and Positive Train
Control System
Federal Railroad
Administration (FRA), Department of
Transportation (DOT).
ACTION: Notice of availability and
request for comments.
AGENCY:

This document provides the
public with notice that, on April 4,
2022, Metro-North Commuter Railroad
(MNR) submitted a request for
amendment (RFA) to its FRA-approved
Positive Train Control Safety Plan
(PTCSP). As this RFA may involve a
request for FRA’s approval of proposed
material modifications to an FRAcertified positive train control (PTC)
system, FRA is publishing this notice
and inviting public comment on the
railroad’s RFA to its PTCSP.
DATES: FRA will consider comments
received by May 5, 2022. FRA may
consider comments received after that
date to the extent practicable and
SUMMARY:

PO 00000

Frm 00121

Fmt 4703

Sfmt 4703

22619

without delaying implementation of
valuable or necessary modifications to a
PTC system.
ADDRESSES:
Comments: Comments may be
submitted by going to https://
www.regulations.gov and following the
online instructions for submitting
comments.
Instructions: All submissions must
include the agency name and the
applicable docket number. The relevant
PTC docket number for this host
railroad is Docket No. FRA–2010–0032.
For convenience, all active PTC dockets
are hyperlinked on FRA’s website at
https://railroads.dot.gov/train-control/
ptc/ptc-annual-and-quarterly-reports.
All comments received will be posted
without change to https://
www.regulations.gov; this includes any
personal information.
FOR FURTHER INFORMATION CONTACT:
Gabe Neal, Staff Director, Signal, Train
Control, and Crossings Division,
telephone: 816–516–7168, email:
[email protected].
SUPPLEMENTARY INFORMATION: In general,
Title 49 United States Code (U.S.C.)
section 20157(h) requires FRA to certify
that a host railroad’s PTC system
complies with 49 CFR part 236, subpart
I, before the technology may be operated
in revenue service. Before making
certain changes to an FRA-certified PTC
system or the associated FRA-approved
PTCSP, a host railroad must submit, and
obtain FRA’s approval of, an RFA to its
PTCSP under Title 49 Code of Federal
Regulations (CFR) Section 236.1021.
Under 49 CFR 236.1021(e), FRA’s
regulations provide that FRA will
publish a notice in the Federal Register
and invite public comment in
accordance with 49 CFR part 211, if an
RFA includes a request for approval of
a material modification of a signal and
train control system. Accordingly, this
notice informs the public that, on April
4, 2022, MNR submitted an RFA to its
PTCSP for its Advanced Civil Speed
Enforcement System II (ACSES II) and
that RFA is available in Docket No.
FRA–2010–0032.
Interested parties are invited to
comment on MNR’s RFA to its PTCSP
by submitting written comments or data.
During FRA’s review of this railroad’s
RFA, FRA will consider any comments
or data submitted within the timeline
specified in this notice and to the extent
practicable, without delaying
implementation of valuable or necessary
modifications to a PTC system. See 49
CFR 236.1021; see also 49 CFR
236.1011(e). Under 49 CFR 236.1021,
FRA maintains the authority to approve,
approve with conditions, or deny a

E:\FR\FM\15APN1.SGM

15APN1


File Typeapplication/pdf
File Modified2022-04-15
File Created2022-04-15

© 2024 OMB.report | Privacy Policy