NESHAP for Polyvinyl Chloride and Copolymers Production Area Sources (40 CFR part 63, subpart DDDDDD (Renewal)
Extension without change of a currently approved collection
No
Regular
Approved without change
07/05/2024
05/31/2022
In accordance with 5 CFR 1320, the information collection is approved for three years. As terms of clearance, upon renewal of this collection, EPA is required to include the following in its supporting statement for this and other NESHAP ICRs: (1) a description of the regulatory text applicable to the ICR including submission specifications; (2) a clear description of the data elements being collected under the ICR; (3) screen shots of the electronic portal where the reporting requirements are submitted to EPA (with the control number and burden statement); (4) a detailed discussion of how information is submitted and the extent to which electronic reporting is available; (5) evidence of consultation with respondents (by actively reaching out to stakeholders as permitted by the PRA) to ensure the supporting statement's accuracy on availability of data, frequency of collection, clarity of instructions, accuracy of burden estimate, relevance of data elements, and similar PRA matters; and (6) discussion of how EPA addressed substantive concerns raised by respondents and other stakeholders during consultation and in response to comments received on FR notices. In addition, please convert the supporting statement to the standard 18 question SS-A format upon renewal.
table that charts list comparision
Inventory as of this Action
Requested
Previously Approved
07/31/2027
36 Months From Approved
07/31/2024
9
0
12
73,300
0
92,300
1,000,000
0
1,440,000
The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Polyvinyl Chloride and Copolymers Production Area Sources (40 CFR Part 63, Subpart DDDDDD) apply to existing facilities and new PVC and copolymer production facilities that are an area source of hazardous air pollutants (HAP). This ICR includes burden estimates for area sources only. Major sources are regulated under NESHAP Subpart HHHHHHH and their burdens are included in a separate ICR (OMB Control Number 2060-0666). New facilities include those that commenced construction or reconstruction after the date of proposal. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP. This information is being collected to assure compliance with 40 CFR Part 63, Subpart DDDDDD.
The decrease in burden from the most-recently approved ICR is due to three adjustments. There is an adjustment decrease in the total estimated burden as currently identified in the OMB Inventory of Approved Burdens. The adjustment decrease in burden from the most-recently approved ICR is due to a decrease in the number of respondents. The most- recently approved ICR estimated 4 area source facilities; however, one facility has ceased operations, as reflected in the ICR for the most recent proposed rule (85 FR 71490, November 9, 2020), which was previously submitted to OMB for approval. Therefore, this ICR renewal considers there to be 3 area source facilities.
The adjustment decrease is offset by corrections to burden estimates for resin sampling, PRD electronic monitor review, gasholders, storage vessels, and ongoing inspections of bypasses and to the number of occurrences per year for recordkeeping requirements to more accurately reflect facility activities as shown in Table 1: Annual Respondent Burden and Cost NESHAP for Polyvinyl Chloride and Copolymers Production Area Sources (40 CFR Part 63, Subpart DDDDDD) (Renewal).
There is a decrease in the operation and maintenance (O&M) costs as calculated in section 6(b)(iii) compared with the costs in the previous ICR. This decrease in costs is due to a decrease in the number of respondents and corrections made to the annual O&M costs for VC ambient monitoring and resin sampling and monitoring to more accurately reflect the number of monitors per facility and cost of monthly maintenance and service of a lab GC. The decrease is offset somewhat by corrections made to the cost estimates for uncontrolled wastewater testing and uncontrolled wastewater Non-VC TOHAP testing to more-accurately reflect the number of waste streams sampled per facility.
$8,100
No
No
No
No
No
No
No
Muntasir Ali 919 541-0833
Reginfo record details
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.