Document

TAB D - BIP Annual Progress Report

ICR 202206-0660-002 · OMB 0660-0049 · Object 122085401.

Document Viewer [xlsx]

Status: Original and derived artifacts are available for this document.

Download: xlsx | pdf | html

Primary: spreadsheetSource: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
Loading document viewer…

Document Metadata

Record metadata
application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
TAB D - BIP Annual Progress Report
Toriola, Olabode
Calc
2022-06-08
2026-09-01
complete

Extracted Text

Broadband Infrastructure Program
Data Report Form
This Broadband Infrastructure Program (BIP) report form will serve as a tool to capture indicators highlighting broadband infrastructure from the award's inception to the
award's closeout. The form contains three separate reports: Baseline Report, Performance (Technical) Report, and Annual Report.
Baseline Report:
The Baseline Report is submitted once at the beginning of your project and is based on anticipated figures and schedules. You will use the Baseline Report to provide your
projected goals and planned activities from the award start date to closeout. Some metrics will also ask you to provide data on the current state of your program before
expending BIP grant funds. The Baseline Report is due 45 calendar days after NEPA approval.
Performance (Technical) Report:
The Performance (Technical) Report is submitted semi-annually for periods ending March 31 and September 30 and captures project performance and outcomes. You will use
the Performance (Technical) Report to provide your actual completed goals and planned activities from award inception to the current reporting period. You will submit the
semi-annual report twice a year until you expend all BIP grant funds, as well as upon closeout of the award. The Performance Report is due 30 calendar days after the closing
period. The final closeout report is due 120 calendar days after the last Performance Technical Report.
Annual Report:
The Annual Report captures narrative data on your project. You will use the Annual Report to provide necessary information on BIP grant-funded project activities from award
inception to the current reporting period. You will submit the annual report once a year until you expend all BIP grant funds. The Annual Report is due 30 calendar days after
the closing period.
Click on the links below to view the report forms.

Baseline Report
Performance (Technical) Report
Annual Report

BROADBAND INFRASTRUCTURE PROGRAM BASELINE REPORT

OMB Control No. XXX-XXXX Expiration Date: TBD

BROADBAND INFRASTRUCTURE PROGRAM BASELINE REPORT
GENERAL

GENERAL INFORMATION
Recipient Organization
Recipient Street Address
City, State, Zip Code
Performance Period Start Date (MM/DD/YYYY)

Award Identification Number
Report Date (MM/DD/YYYY)
DUNS/UEI Number
Performance Period End Date (MM/DD/YYYY)

INFRASTRUCTURE MILESTONE CATEGORIES

7. Network Build (all components - owned, leased, Indefeasible
Rights of Use, etc.)
8. Equipment Deployment
9. Network Testing
10. Other (please specify):
Please use the table provided to indicate your anticipated percentage of completion on a semi-annual basis for each year of the milestone category. Year One begins with your award start date.
The percentage of completion should be based primarily on the expenditure of your project budget and should be reported cumulatively from award inception through the end of each semi-annual reporting period. For example, if you expect to
complete a particular milestone within the first three periods of your project, Year Two Period One and all subsequent Year and Period should state 100%.

Year 1
MILESTONES

Period 1 Projected

Period 2 Projected

Year 2
Period 1 Projected

Year 3

Period 2 Projected

Period 1 Projected

Period 2 Projected

Year N
Period 1 Projected

Period 2 Projected

1. Overall Project
1b 2. Environmental Assessment
3. Network Design
4. Rights Of Way
5. Construction Permits And Other Approvals
6. Site Preparation
7. Equipment Procurement
8. Network Build (all components - owned, leased, Indefeasible Rights of Use, etc.)
9. Equipment Deployment
10. Network Testing
11. Other (please specify):
NETWORK BUILD PROGRESS
Please use the following table to provide anticipated key indicators and progress of your infrastructure project. Please select the appropriate drop-down option to indicate if the network build progress item is either middle-mile, last-mile, both, or
not applicable. Information should be reported cumulatively from award inception through the end of the semi-annual period. Please write “N/A” if your project does not include this indicator.

NETWORK BUILD PROGRESS
a. Number of new fiber miles (aerial or underground)

Middle Mile or Last Mile

Year 1
Period 1 - Period 2 Projected Projected

Year 2
Period 1 - Period 2 Projected Projected

Year 3
Period 1 - Period 2 Projected Projected

Year N
Period 1 - Period 2 Projected Projected

Middle Mile

b. Number of fiber miles leased
c. Number of existing fiber miles upgraded
2 d. Number of new wireless links
e. Number of new towers
f. Number of new interconnection points
g. Number of signed agreements with broadband wholesalers or last mile providers
h. Number of potential agreements (i.e., agreements currently being negotiated) with
broadband wholesalers or last-mile providers (This number should NOT be reported
cumulatively)
i. Number of wireless licenses obtained
j. Other (please specify):
BROADBAND ACCESS KEY INDICATORS
Please use the following table to provide anticipated key indicators with the projected totals for each beneficiary and access type for your infrastructure service or project. Information should be reported cumulatively from award inception through
the end of the semi-annual period. Please write “N/A” if your project does not include this indicator.

PROJECTED NUMBER OF SUBSCRIBERS AND SPEED

Year 1

Year 2

Year 3

2

Year N

March-25

February-25

January-25

December-24

November-24

October-24

September-24

August-24

July-24

June-24

May-24

April-24

March-24

February-24

January-24

December-23

November-23

October-23

September-23

August-23

July-23

June-23

May-23

April-23

March-23

February-23

January-23

December-22

November-22

October-22

September-22

August-22

July-22

June-22

May-22

END DATE (MM/DD/YYYY)

April-22

START DATE
(MM/DD/YYYY)

MILESTONE CATEGORIES
1. Environmental Assessment
2. Network Design
1a 3. Rights Of Way
4. Construction Permits And Other Approvals
5. Site Preparation
6. Equipment Procurement

March-22

Please use the chart below to provide the start dates and end dates for each milestone category of your project. If necessary, please add an additional milestone category at the bottom of the chart and specify.

BROADBAND INFRASTRUCTURE PROGRAM BASELINE REPORT

BENEFICIARY TYPE

ACCESS TYPE

Period 1 Projected

Period 2 Projected

Period 1 Projected

Period 2 Projected

Period 1 Projected

Period 2 Projected

Period 1 Projected

Period 2 Projected

0

0

0

0

0

0

0

0

1. Number of Households passed/serviceable
2. Households with new access

3a. Unserved Households

3. Households with improved access
Total number of Households served
4. Number of Households served with speeds of at least 25/3
5. Number of Households served with speeds of at least 100/20

Using the Excel spreadsheet template titled "BIP Reports Addendum A", please provide an updated count of Households within each of the eligible census block groups along
with their Location ID that you plan to connect to your network in column titled '# of Units'. The locations should match and conform to the Federal Communications
Commission (FCC) Broadband Serviceable Location Fabric, which is a unique identifier the geographic coordinates, and where available, the address(es) associated with each
location. Please be sure to select 'Baseline Report' checkbox when completing the addendum.

3b. Businesses

1. Number of Businesses passed/serviceable
2. Businesses with new access
3. Businesses with improved access
Total number of Businesses served
4. Number of Businesses served with speeds of at least 25/3
5. Number of Businesses served with speeds of at least 100/20

0

0

0

0

0

0

0

0

Using the Excel spreadsheet template titled "BIP Reports Addendum B", please provide an updated count of Businesses within each of the eligible census block groups along
with their Location ID that you plan to connect to your network in column titled '# of Units'. The locations should match and conform to the Federal Communications
Commission (FCC) Broadband Serviceable Location Fabric, which is a unique identifier the geographic coordinates, and where available, the address(es) associated with each
location. Please be sure to select 'Baseline Report' checkbox when completing the addendum.

3

3c. Community Anchor Institutions (CAIs)

1. Number of CAIs passed/serviceable
2. CAIs with new access
3. CAIs with improved access
Total number of CAIs served
4. Number of CAIs served with speeds of at least 25/3
5. Number of CAIs served with speeds of at least 100/20

0

0

0

0

0

0

0

0

Using the Excel spreadsheet template titled "BIP Reports Addendum C", please provide an updated count of Community Anchor Institutions (CAIs) within each of the census
block groups along with their Location ID that you plan to connect to your network in column titled '# of Units'. The locations should match and conform to the Federal
Communications Commission (FCC) Broadband Serviceable Location Fabric, which is a unique identifier the geographic coordinates, and where available, the address(es)
associated with each location. Please be sure to select 'Baseline Report' checkbox when completing the addendum.
1. Number of Broadband wholesalers or last-mile providers passed/serv
2. Broadband wholesalers or last-mile providers with new access
3. Broadband wholesalers or last-mile providers with improved
access
3d. Broadband Wholesalers or Last-Mile Providers

Total number of Broadband wholesalers or last-mile providers served
4. Number of Broadband wholesalers or last-mile providers served
with speeds of at least 25/3

0

0

0

0

0

0

0

0

5. Number of Broadband wholesalers or last-mile providers served
with speeds of at least 100/20
OTHER INDICATORS
Please use the following table to provide the total for each workforce indicator. List the projected total for each period. The projected totals should be cumulative from the award inception. Please write "N/A" if your project does not include this
indicator.

Workforce Indicator
4

Outcome
4a. New positions available and funded through BIP grant

Questions

Year 1
Period 1 - Period 2 Projected Projected

Year 2
Period 1 - Period 2 Projected Projected

Year 3
Period 1 - Period 2 Projected Projected

1. Number of new positions created
2. Number of new positions filled

CERTIFICATION

CERTIFICATION
I certify to the best of knowledge and belief that this report is correct and complete for performance of activities for the purposes set forth in the award documents.
Telephone (area
code, number
Typed or printed name and title of Authorized Certifying Official:
and extension):
Email Address:
Signature of Certifying Official:
Date:

3

Year N
Period 1 - Period 2 Projected Projected

BROADBAND INFRASTRUCTURE PROGRAM PERFROMANCE (TECHNICAL) REPORT

OMB Control No. XXX-XXXX Expiration Date: TBD

BROADBAND INFRASTRUCTURE PROGRAM PERFORMANCE (TECHNICAL) REPORT

GENERAL

GENERAL INFORMATION
Recipient Organization
Recipient Street Address
City, State, Zip Code
DUNS/UEI Number
Performance Period Start Date (MM/DD/YYYY)
Report Period Start Date (MM/DD/YYYY)

Award Identification Number
Report Date (MM/DD/YYYY)
Yes

Final Report

No

Performance Period End Date (MM/DD/YYYY)
Report Period End Date (MM/DD/YYYY)

INFRASTRUCTURE MILESTONE CATEGORIES
Please provide the percent complete for the following key milestones of your project. Write “0” in the Percent Complete column and "N/A" in the Narrative column if your project does not include this activity. If you provided additional milestones in your
baseline plan, please include them at the bottom of the table and specify.
Unless otherwise indicated in the instructions, figures should be reported cumulatively from award inception to the end of the most recent reporting period. Please provide a narrative description if the percent complete is 5% more or less from the target
provided in your baseline plan. (300 words or less)

MILESTONES

Percent Complete

Narrative (Describe reasons for variances of 5% or more from the baseline
plan)

1. Overall Project
2. Environmental Assessment
1a 3. Network Design
4. Rights Of Way
5. Construction Permits And Other Approvals
6. Site Preparation
7. Equipment Procurement
8. Network Build (all components - owned, leased, Indefeasible Rights of Use, etc.)
9. Equipment Deployment
10. Network Testing
11. Other (please specify):
Please describe significant project accomplishments during this reporting period funded through BIP grant. (600 words or less)

1b

Please describe any challenges to achieving project accomplishments during this reporting period funded through BIP grant. (600 words or less)

1c

NETWORK BUILD PROGRESS
Please report the following information regarding network build progress. Write “0” in the Total column and "N/A" in the Narrative column if your project does not include this activity. Please select the appropriate drop-down option to indicate if the network
build progress item is either middle-mile, last-mile, both, or not applicable. Unless otherwise indicated in the instructions, figures should be reported cumulatively from award inception to the end of the most recent reporting semi-annual period. Please provide
a narrative description if the total is 5% more or less from the target provided in your baseline plan. (300 words or less)

NETWORK BUILD PROGRESS

2

Middle Mile or Last Mile

Total

Narrative (Describe reasons for variances of 5% or more from the baseline
plan)

2a. Number of new fiber miles (aerial or underground)
2b. Number of fiber miles leased
2c. Number of existing fiber miles upgraded
2d. Number of new wireless links
2e. Number of new towers
2f. Number of new interconnection points
2g. Number of signed agreements with broadband wholesalers or last-mile providers (include
names of broadband wholesalers or last-mile providers in the narrative column)
2h. Number of potential agreements (i.e., agreements currently being negotiated) with
broadband wholesalers or last-mile providers (This number should NOT be reported
cumulatively)
2i. Number of wireless licenses obtained
2j. Other (please specify):

BROADBAND ACCESS KEY INDICATORS
Please use the following table to provide anticipated key indicators with the cumulative totals for each beneficiary category and access type for your infrastructure service or project. Information should be reported cumulatively from award inception through
the end of the semi-annual period. Please write “N/A” if your project does not include this indicator. Please provide a narrative description if the total is 5% more or less from the target provided in your baseline plan. (300 words or less)

PROJECTED NUMBER OF SUBSCRIBERS AND SPEED
ACCESS TYPE
1. Number of Households passed/serviceable
2. Households with new access
3. Households with improved access
3a. Unserved Households
Total number of Households served
4. Number of Households served with speeds of at least 25/3
5. Number of Households served with speeds of at least 100/20

BENEFICIARY TYPE

3b. Businesses

3

1. Number of Businesses passed/serviceable
2. Businesses with new access
3. Businesses with improved access
Total number of Businesses served
4. Number of Businesses served with speeds of at least 25/3
5. Number of Businesses served with speeds of at least 100/20
1. Number of CAIs passed/serviceable
2. CAIs with new access

3c. Community Anchor Institutions (CAIs)
4

Total

Narrative (Describe reasons for variances of 5% or more from the baseline
plan)

3

BROADBAND INFRASTRUCTURE PROGRAM PERFROMANCE (TECHNICAL) REPORT

3c. Community Anchor Institutions (CAIs)

3. CAIs with improved access
Total number of CAIs served
4. Number of CAIs served with speeds of at least 25/3
5. Number of CAIs served with speeds of at least 100/20
1. Number of Broadband wholesalers or last-mile providers passed/servicea
2. Broadband wholesalers or last-mile providers with new access
3. Broadband wholesalers or last-mile providers with improved access

3d. Broadband Wholesalers or Last Mile Providers

Total number of Broadband wholesalers or last-mile providers served
4. Number of Broadband wholesalers or last-mile providers served with
speeds of at least 25/3
5. Number of Broadband wholesalers or last-mile providers served with
speeds of at least 100/20

INFRASTRUCTURE BUDGET EXECUTION DETAILS
Please provide details below on your total budget and total fund expended to date for each budget element, including detailed disbursements of both matching funds approved and federal funds obligated from project inception through end of this reporting
period. Figures should be reported cumulatively from award inception to the end of the applicable reporting period.

Projected Budget Element

4

Federal Funds

4a. Administrative and legal expenses
4b. Land, structures, rights-of-way, appraisals, etc.
4c. Relocation expenses and payments
4d. Architectural and engineering fees
4e. Other architectural and engineering fees
4f. Project inspection fees
4g. Site work
4h. Demolition and removal
4i. Construction
4j. Equipment
4k. Miscellaneous
4l. Subtotal
4m. Contingencies
4n. Totals

$
$
$
$
$
$
$
$
$
$
$
$
$
$

Total Budget (Federal
plus Non Federal)

Non Federal Funds
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$

- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $

Federal Funds Expended
to Date
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $

Non Federal Funds
Expended to Date

- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $

Total Funds Expended
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $
- $

-

OTHER INDICATORS
Please use the following table to provide the total for each question. List the projected total for the number of new position created and or filled this reporting period. Information should be reported cumulatively from award inception through the end of the
semi-annual period. Please write "N/A" if your project does not include this indicator.

Workforce Indicator

5

Outcome
5a. New positions available and funded through BIP grant

Total

Questions
1. Number of new positions created
2. Number of new positions filled

Narrative (Describe reasons for variances of 5% or more from the baseline
plan)

Please use the following table to provide the maximum upload and download speed for each question. Information should be reported as of the report date. Please write "N/A" if your project does not include this indicator.

Broadband Speed
6

Outcome
6a. Maximum available speed upon project completion

Upload

Questions
1. What is the maximum available speeds for HH in your eligible area
2. What is the maximum available speeds for Businesses in your eligible area
3. What is the maximum available speeds for CAIs in your eligible area

CERTIFICATION

CERTIFICATION

I certify to the best of knowledge and belief that this report is correct and complete for performance of activities for the purposes set forth in the award documents.
Telephone (area
code, number and
extension):

Typed or printed name and title of Authorized Certifying Official:

Email Address:
Signature of Certifying Official:
Date:

5

Download

BROADBAND INFRASTRUCTURE PROGRAM ANNUAL REPORT

OMB Control No. XXX-XXXX Expiration Date: TBD

BROADBAND INFRASTRUCTURE PROGRAM ANNUAL REPORT

GENERAL

GENERAL INFORMATION
Recipient Organization
Recipient Street Address
City, State, Zip Code
Performance Period Start Date (MM/DD/YYYY)
Report Period Start Date (MM/DD/YYYY)
Please describe significant project accomplishments during this period. (600 words or less)

Award Identification Number
Report Date (MM/DD/YYYY)
DUNS/UEI Number
Performance Period End Date (MM/DD/YYYY)
Report Period End Date (MM/DD/YYYY)

1

Please describe each service provided with BIP grant funds. (600 words or less)

2

Provide the number of locations or geographic areas at which broadband service was provided using the grant funds. (Please attach associated shapefiles of geographic areas) (600 words or less)

3a

Using the Excel spreadsheet template titled "BIP Reports Addendum A", please provide an updated count of Households within each of the eligible census block groups along with their Location ID that you connected to your network in column
3b titled '# of Units'. The locations should match and conform to the Federal Communications Commission (FCC) Broadband Serviceable Location Fabric, which is a unique identifier the geographic coordinates, and where available, the address(es)
associated with each location. Please be sure to select 'Annual Report' checkbox when completing the addendum.
Using the Excel spreadsheet template titled "BIP Reports Addendum B", please provide an updated count of Businesses within each of the eligible census block groups along with their Location ID that you connected your network in column titled
3c '# of Units'. The locations should match and conform to the Federal Communications Commission (FCC) Broadband Serviceable Location Fabric, which is a unique identifier the geographic coordinates, and where available, the address(es)
associated with each location. Please be sure to select 'Annual Report' checkbox when completing the addendum.
Using the Excel spreadsheet template titled "BIP Reports Addendum C", please provide an updated count of Community Anchor Institutions (CAIs) within each of the eligible census block groups along with their Location ID that you connected to
3d your network in column titled '# of Units'. The locations should match and conform to the Federal Communications Commission (FCC) Broadband Serviceable Location Fabric, which is a unique identifier the geographic coordinates, and where
available, the address(es) associated with each location. Please be sure to select 'Annual Report' checkbox when completing the addendum.
If applicable, please list each subrecipient that received a subgrant from the covered partnership and a description of the specific project for which the grant funds were provided. (600 words or less)

4

CERTIFICATION

I certify to the best of knowledge and belief that this report is correct and complete for performance of activities for the purposes set forth in the award documents.
Typed or printed name and title of Authorized
Certifying Official:

Telephone (area code, number
and extension):

Email Address:
Signature of Certifying Official:
Date:

6

BROADBAND INFRASTRUCTURE PROGRAM REPORTS ADDENDUM A

OMB Control No. XXX-XXXX Expiration Date: TBD

BROADBAND INFRASTRUCTURE PROGRAM ANNUAL REPORT ADDENDUM A
Recipient Organization
Recipient Street Address
City, State, Zip Code
Performance Period Start Date (MM/DD/YYYY)
Performance Period End Date (MM/DD/YYYY)

Award Identification Number
Report Date (MM/DD/YYYY)
DUNS/UEI Number
Report Type

Baseline Report
Annual Report

Household Locations in the Service Area
The Location ID is the Fabric ID associated with the Federal Communications Commission maps required by the Broadband Deployment Broadband Deployment Accuracy and Technology Availability (DATA) Act, Pub. L. No. 116-130, 134 Stat. 228 (2020)
(codified at 47 U.S.C. §§ 641-646) (Broadband DATA Maps). The “location_id” data element is a unique identifier for the location served. A Location ID should be included for each location in the Broadband Serviceable Location Fabric when the Fabric is
made available to filers. Number of units refers to one location that has multiple units within that one location. Please insert rows at the bottom of the table to report additional location data if needed.
Location ID
Street Address
City
State
ZIP
Latitude
Longitude
Census Block
# of Units

7

BROADBAND INFRASTRUCTURE PROGRAM REPORTS ADDENDUM A

CERTIFICATION

I certify to the best of knowledge and belief that this report is correct and complete for performance of activities for the purposes set forth in the award documents.
Typed or printed name and title of Authorized
Certifying Official:

Telephone (area code, number
and extension):

Email Address:
Signature of Certifying Official:
Date:

8

BROADBAND INFRASTRUCTURE PROGRAM REPORTS ADDENDUM B

OMB Control No. XXX-XXXX Expiration Date: TBD

BROADBAND INFRASTRUCTURE PROGRAM ANNUAL REPORT ADDENDUM B
Recipient Organization
Recipient Street Address
City, State, Zip Code
Performance Period Start Date (MM/DD/YYYY)
Performance Period End Date (MM/DD/YYYY)

Award Identification Number
Report Date (MM/DD/YYYY)
DUNS/UEI Number
Report Type

Baseline Report
Annual Report

Business Locations in the Service Area
The Location ID is the Fabric ID associated with the Federal Communications Commission maps required by the Broadband Deployment Broadband Deployment Accuracy and Technology Availability (DATA) Act, Pub. L. No. 116-130, 134 Stat. 228 (2020)
(codified at 47 U.S.C. §§ 641-646) (Broadband DATA Maps). The “location_id” data element is a unique identifier for the location served. A Location ID should be included for each location in the Broadband Serviceable Location Fabric when the Fabric is
made available to filers. Number of units refers to one location that has multiple units within that one location. Please insert rows at the bottom of the table to report additional location data if needed.
Location ID
Street Address
City
State
ZIP
Latitude
Longitude
Census Block
# of Units

9

BROADBAND INFRASTRUCTURE PROGRAM REPORTS ADDENDUM B

CERTIFICATION

I certify to the best of knowledge and belief that this report is correct and complete for performance of activities for the purposes set forth in the award documents.
Typed or printed name and title of Authorized
Certifying Official:

Telephone (area code, number
and extension):

Email Address:
Signature of Certifying Official:
Date:

10

BROADBAND INFRASTRUCTURE PROGRAM REPORTS ADDENDUM C

OMB Control No. XXX-XXXX Expiration Date: TBD

BROADBAND INFRASTRUCTURE PROGRAM ANNUAL REPORT ADDENDUM C
Recipient Organization
Recipient Street Address
City, State, Zip Code
Performance Period Start Date (MM/DD/YYYY)
Performance Period End Date (MM/DD/YYYY)

Award Identification Number
Report Date (MM/DD/YYYY)
DUNS/UEI Number
Report Type

Baseline Report
Annual Report

Community Anchor Institutions (CAIs) Locations in the Service Area
The Location ID is the Fabric ID associated with the Federal Communications Commission maps required by the Broadband Deployment Broadband Deployment Accuracy and Technology Availability (DATA) Act, Pub. L. No. 116-130, 134 Stat. 228 (2020)
(codified at 47 U.S.C. §§ 641-646) (Broadband DATA Maps). The “location_id” data element is a unique identifier for the location served. A Location ID should be included for each location in the Broadband Serviceable Location Fabric when the Fabric is
made available to filers. Number of units refers to one location that has multiple units within that one location. Please insert rows at the bottom of the table to report additional location data if needed.
Location ID
Street Address
City
State
ZIP
Latitude
Longitude
Census Block
# of Units

11

BROADBAND INFRASTRUCTURE PROGRAM REPORTS ADDENDUM C

CERTIFICATION

I certify to the best of knowledge and belief that this report is correct and complete for performance of activities for the purposes set forth in the award documents.
Typed or printed name and title of Authorized
Certifying Official:

Telephone (area code, number
and extension):

Email Address:
Signature of Certifying Official:
Date:

12