NSPS for Flexible Vinyl and Urethane Coating and Printing (40 CFR part 60, subpart FFF) (Renewal)

ICR 202209-2060-009

OMB: 2060-0073

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2022-09-20
Supporting Statement A
2022-09-20
IC Document Collections
IC ID
Document
Title
Status
24134
Modified
ICR Details
2060-0073 202209-2060-009
Received in OIRA 201907-2060-013
EPA/OAR 1157.13
NSPS for Flexible Vinyl and Urethane Coating and Printing (40 CFR part 60, subpart FFF) (Renewal)
Extension without change of a currently approved collection   No
Regular 09/22/2022
  Requested Previously Approved
36 Months From Approved 11/30/2022
85 83
1,340 1,308
385,000 376,000

The New Source Performance Standards (NSPS) for Flexible Vinyl and Urethane Coating and Printing were proposed on January 18, 1983, promulgated on June 29, 1984, and amended on October 17, 2000. These regulations apply to facilities with rotogravure printing lines used to print or coat flexible vinyl or urethane products for which construction, modification or reconstruction commenced after January 18, 1983. This information is being collected to assure compliance with 40 CFR Part 60, Subpart FFF. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.

US Code: 42 USC 7401 et seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  87 FR 20487 04/08/2022
87 FR 57897 09/22/2022
No

1
IC Title Form No. Form Name
NSPS for Flexible Vinyl and Urethane Coating and Printing

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 85 83 0 0 2 0
Annual Time Burden (Hours) 1,340 1,308 0 0 32 0
Annual Cost Burden (Dollars) 385,000 376,000 0 0 9,000 0
No
No
There is an adjustment increase in the total estimated burden as currently identified in the OMB Inventory of Approved Burdens. This increase is not due to any program changes. The adjustment increase in burden is due to more accurate estimates of existing and anticipated new sources. This ICR assumes a continuous growth rate of one new facility every three years. There is an increase in the operation and maintenance (O&M) costs due to an increase in the number of existing respondents from the currently approved ICR; there is no change in capital costs.

$10,510
No
    No
    No
No
No
No
No
Muntasir Ali 919 541-0833

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
09/22/2022


© 2024 OMB.report | Privacy Policy