NSPS for Grain Elevators (40 CFR part 60, subpart DD) (Renewal)

ICR 202209-2060-011

OMB: 2060-0082

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2022-09-21
Supporting Statement A
2022-09-21
IC Document Collections
ICR Details
2060-0082 202209-2060-011
Received in OIRA 201905-2060-017
EPA/OAR 1130.13
NSPS for Grain Elevators (40 CFR part 60, subpart DD) (Renewal)
Extension without change of a currently approved collection   No
Regular 09/26/2022
  Requested Previously Approved
36 Months From Approved 11/30/2022
200 200
460 460
0 0

The New Source Performance Standards (NSPS) for Grain Elevators (40 CFR part 60, subpart DD) apply to each affected facility at any grain terminal elevator or any grain storage elevator. The facilities are each truck unloading station, truck loading station, barge and ship loading station, railcar loading station, railcar unloading station, grain dryer and all grain handling operations that commenced construction, modification or reconstruction after August 3, 1978. Owners or operators of the affected facilities must make a one-time-only report of the date of construction or reconstruction; notification of the actual date of startup; notification of any physical or operational change to existing facility that may increase the rate of emission of the regulated pollutant; notification of initial performance test; and results of initial performance test. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction, or any period during which the monitoring system is inoperative. This information is being collected to assure compliance with 40 CFR Part 60, Subpart DD.

US Code: 42 USC 7401 et seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  87 FR 20487 04/08/2022
87 FR 58084 09/23/2022
No

1
IC Title Form No. Form Name
NSPS for Grain Elevators (40 CFR Part 60, Subpart DD)(Renewal)

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 200 200 0 0 0 0
Annual Time Burden (Hours) 460 460 0 0 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No

$0
No
    No
    No
No
No
No
No
Muntasir Ali 919 541-0833

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
09/26/2022


© 2024 OMB.report | Privacy Policy