30 CFR 585 - Renewable Energy and Alternate Uses of Existing Facilities on the OCS
Extension without change of a currently approved collection
No
Regular
Approved without change
01/10/2023
11/07/2022
In accordance with 5 CFR 1320, the information collection is approved.
table that charts list comparision
Inventory as of this Action
Requested
Previously Approved
01/31/2026
36 Months From Approved
03/31/2023
265
0
265
18,783
0
18,783
3,816,000
0
3,816,000
Respondents operating under these regulations conduct commercial and noncommercial technology projects that include installation, construction, operation and maintenance, and decommissioning of offshore facilities, as well as possible onshore support facilities. The BOEM must ensure that these activities and operations on the OCS are carried out in a safe and environmentally sound manner, do not interfere with the rights of other users on the OCS, and balance the protection and development of OCS resources. To do this, BOEM needs information concerning the proposed activities, facilities, safety equipment, inspections and tests, and natural and manmade hazards near the site, as well as assurance of fiscal responsibility.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.