New collection (Request for a new OMB Control Number)
No
Regular
Comment filed on proposed rule
05/25/2023
12/28/2022
OMB files this comment in accordance with 5 CFR 1320.11( c ). This OMB action is not an
approval to conduct or sponsor an information collection under the Paperwork Reduction Act
of 1995. This action has no effect on any current approvals. If OMB has assigned this ICR a
new OMB Control Number, the OMB Control Number will not appear in the active inventory.
For future submissions of this information collection, reference the OMB Control Number
provided. The agency shall examine public comment in response to the proposed rulemaking and
include in the supporting statement of the next ICR--to be submitted to OMB at the final rule
stage--a description of how the agency has responded to any public comments on the ICR,
including comments on maximizing the practical utility of the collection and minimizing the
burden
table that charts list comparision
Inventory as of this Action
Requested
Previously Approved
36 Months From Approved
0
0
0
0
0
0
0
0
0
The regulations at 18 CFR Part 380 assist the Commission in implementing NEPA. Part 380 includes regulations pertaining to applications under section 3 and 7 of the NGA. Any such application must include an environmental report that consists of 13 âResource Reportsâ that are described at 18 CFR 380.12. The proposed rule would revise the requirements for Resource Reports 6 and 13.
Resource Report 6 â At present, the regulation at 18 CFR 380.12(h)(5) provides that Resource Report 6 (âGeological Resourcesâ) include data on earthquake hazards and engineering that conforms to NBSIR 84â2833 if the applicant proposes to construct and operate LNG facilities located in zones 2, 3, or 4 of the UBC map, or where there is potential for surface faulting or liquefaction. The proposed rule would revise 18 CFR 380.12(h)(5) and paragraph 4 of Appendix A to 380 by simply requiring that Resource Report 6 include âa report on earthquake hazards and engineering design.â
Resource Report 13 âAt present, the regulation at 18 CFR 380.12(o)(14) requires that Resource Report 13 ("Engineering and Design Material" for a proposed LNG facility) requires an applicant to identify how it will comply with the applicable U.S. Department of Transportation (DOT) regulations, including its siting requirements, the National Fire Protection Association 59A LNG Standards (NFPA 59A), and, if applicable, U.S. Coast Guardâs regulations pertaining to vapor dispersion calculations from LNG spills over water. The regulation at 18 CFR 380.12(o)(15) currently requires applicants to provide seismic information specified in NBSIR 84-2833 for LNG facilities that would be located in zone 2, 3, or 4 of the UBC map.
The proposed rule would revise paragraphs 14 and 15 of 380.12(o). Proposed paragraph 14 would require applicants to identify all applicable federal, state, and local regulations and requirements and explain how the proposed project will comply with each applicable federal regulation and requirement. The Commission has determined that current paragraph 14 results in confusion about the informational requirements that the Commission applies to its review of applications for the construction and operation of LNG facilities. For example, not all LNG facilities under the Commissionâs jurisdiction must meet the design criteria specified in NFPA 59A, 49 CFR Part 193, or 33 CFR Part 127. On the other hand, LNG facilities may be subject to federal regulations that are not currently mentioned in paragraph 14, such as the Environmental Protection Agencyâs regulations pertaining to its chemical accidental prevention program (40 CFR Part 68) or the Occupational Safety and Health Administrationâs regulations regarding the safe management of highly hazardous chemicals (29 CFR 1910.119).
Proposed paragraph 15 would prevent confusion caused by codified references to the UBC map and NBSIR 84-2833, and would add new regulatory text that requires applicants to provide the engineering and design information that they have typically provided in accordance with the 2017 Guidance. Specifically, proposed section 380.12(o)(15)(i) would require applicants to provide general site-specific engineering information used in the geotechnical and structural design of all structures, systems, and components. This information would: (1) address occupancy and risk categorization; (2) clarify applicantsâ interpretation of risk and reliability tolerances; (3) ensure an application discusses how the project design would withstand load combinations.
US Code:
15 USC 717f
Name of Law: Natural Gas Act
US Code:
42 USC 4332
Name of Law: National Environmental Policy Act
US Code:
15 USC 717b
Name of Law: Natural Gas Act
All of the estimated burdens for FERC-577A in the NOPR are for a new control number. All of these burdens would be program changes that are due to agency discretion and are in accordance with the Commission's determination that these changes are necessary to update the Commissionâs regulations and reduce confusion related to the preparation and filing of applications to certificate LNG terminals, or to site, design, construct, operate, or modify facilities for the import or export of LNG.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.