NSPS for Secondary Brass/Bronze Production, Primary Copper/Zinc/Lead Smelters, Primary Aluminum Reduction Plants and Ferroalloy Production Facilities (40 CFR part 60, subparts M,P,Q,R,S, Z) (Renewal)
Extension without change of a currently approved collection
No
Regular
Approved without change
06/28/2024
11/28/2022
ln accordance with 5 CFR 1320, the information collection is approved for three years. As terms of clearance, however, the Agency is asked to ensure that clear and complete instructions exist for the forms included in this collection as part of its renewal request. Screenshots of the form must be included in the document for review. In addition, supporting statement A should use the standard 18 question SS-A format. More information can be found at https://pra.digital.gov/clearance-process/supporting-statement/.
table that charts list comparision
Inventory as of this Action
Requested
Previously Approved
06/30/2027
36 Months From Approved
06/30/2024
24
0
83
2,008
0
3,882
107,100
0
127,000
The New Source Performance Standards (NSPS) for Secondary Brass and Bronze Production (40 CFR Part 60, Subpart M) apply to both existing facilities and new facilities that commenced either construction or modification after June 11, 1973. These standards apply to the following facilities in secondary brass or bronze production plants: reverberatory and electric furnaces of 1,000 kg or greater production capacity and blast (cupola) furnaces of 250 kg/hr or greater production capacity. Furnaces from which molten brass or bronze are cast into the shape of finished products, such as foundry furnaces, are not considered to be affected facilities.
The NSPS for Primary Copper Smelters (40 CFR Part 60, Subpart P) apply to both existing facilities and new facilities that commenced either construction or modification after October 16, 1974. These standards apply to the following facilities in primary copper smelters: dryer, roaster, smelting furnace, and copper converter.
The NSPS for Primary Zinc Smelters (40 CFR Part 60, Subpart Q) apply to both existing facilities and new facilities that commenced either construction or modification after October 16, 1974. These standards apply to the following facilities in primary zinc smelters: roaster and sintering machines.
The NSPS for Primary Lead Smelters (40 CFR Part 60, Subpart R) apply to both existing facilities and new facilities that commenced either construction or modification after October 16, 1974. These standards apply to the following facilities in primary lead smelters: sintering machine, sintering machine discharge end, blast furnace, dross reverberatory furnace, electric smelting furnace, and converter.
The NSPS for Primary Aluminum Reduction Plants (40 CFR Part 60, Subpart S) apply to both existing facilities and new facilities that commenced either construction or modification after October 23, 1974. These standards apply to the following facilities in primary aluminum reduction plants: potroom groups and anode bake plants.
The NSPS for Ferroalloy Production Facilities (40 CFR Part 60, Subpart Z) apply to both existing facilities and new facilities that commenced either construction or modification after October 21, 1974. These standards apply to the following facilities in ferroalloy production plants: electric submerged arc furnaces which produce silicon metal, ferrosilicon, calcium silicon, silicomanganese zirconium, ferrochrome silicon, silvery iron, high-carbon ferrochrome, charge chrome, standard ferromanganese, silicomanganese, ferromanganese silicon, or calcium carbide; and dust-handling equipment.
In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.
.
The decrease in burden from the most-recently approved ICR is due to an adjustment(s). The decrease in burden is not due to a program change. Based on information collected by the Agency, all facilities subject to 40 CFR Part 60, Subpart S are complying with MACT Subpart LL for potroom groups and anode back furnaces as an alternative to the NSPS requirements. In addition, the MACT rule requirements for anode bake plants are more stringent and superseded the NSPS requirements for such affected facility. We assume all facilities subject to this NSPS will continue to comply with the MACT instead; therefore, this ICR adjusts the burden for Subpart S to reflect no respondents. In addition, Capital/Startup vs. O&M costs have decreased due to the same reasons as stated above.
$4,230
No
No
No
No
No
No
No
Muntasir Ali 919 541-0833
Reginfo record details
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.