ICR Summary Information | |
Hours per Response | 79 |
Number of Respondents | 104 |
Total Estimated Burden Hours | 30,800 |
Total Estimated Costs | $4,470,000 |
Annualized Capital O&M | $766,000 |
Total Annual Responses | 389 |
Table 1: Annual Respondent Burden and Cost – NESHAP for Pulp and Paper Production (40 CFR Part 63, Subpart S) (Renewal) | |||||||||||||
Burden Item | (A) Person hours per occurrence |
(B) No. of occurrences per respondent per year |
(C) Person hours per respondent per year (C=AxB) |
(D) Respondents per year a |
(E) Technical person- hours per year (E=CxD) |
(F) Management person hours per year (Ex0.05) |
(G) Clerical person hours per year (Ex0.1) |
(H) Cost, $ b |
|||||
1. Applications | N/A | Labor Rates | 79 | hr/response | |||||||||
2. Surveys and Studies | N/A | Management | $157.61 | ||||||||||
3. Reporting Requirements | Technical | $123.94 | |||||||||||
A. Read and Understand Rule Requirements d | 4 | 1 | 4 | 104 | 416 | 20.8 | 41.6 | $57,438.16 | Clerical | $62.52 | |||
B. Required Activities | |||||||||||||
1.1) Pulping processes (Non-Sulfite) | |||||||||||||
a. Provide documentation that vent streams are introduced to the flame zone of a boiler, lime kiln, or recovery furnace, or c, e | 24 | 1 | 24 | 4 | 96 | 4.8 | 9.6 | $13,254.96 | |||||
b. Provide documentation that the control incinerator is operating at a minimum level of 1600 F and 0.75 sec residence time, or c, f | 60 | 1 | 60 | 1 | 60 | 3 | 6 | $8,284.35 | |||||
c. Performance test of control device - test method 308 c, f, g, n | 24 | 0 | 0 | 1 | 0 | 0 | 0 | $0.00 | |||||
1.2) Pulping Processes (Sulfite) c, g, i, n | |||||||||||||
a. Performance test of control device - test method 308 | 24 | 1 | 24 | 1 | 24 | 1 | 2 | $3,313.74 | |||||
2.1) Bleaching process vent scrubber c, g, j, n | |||||||||||||
a. Performance test of scrubber or control device - test method 26A | 24 | 1 | 24 | 4 | 96 | 4.8 | 9.6 | $13,254.96 | |||||
3.1) Pulping wastewater treatment (Non-Sulfite) | |||||||||||||
a. Performance test of condensate segregation and control device (test method 305), or c, h, k, n | 24 | 1 | 24 | 4 | 96 | 4.8 | 9.6 | $13,254.96 | |||||
b. Performance test of control device - test method 304 c, h, l, n | 24 | 1 | 24 | 3 | 72 | 3.6 | 7.2 | $9,941.22 | |||||
3.2) Pulping wastewater treatment (Sulfite) c, h, m, n | |||||||||||||
a. Performance test of control device - test method 305 | 24 | 1 | 24 | 1 | 24 | 1.2 | 2.4 | $3,313.74 | |||||
4.1) Repeat of performance test (5-yr intervals) g, n, t | |||||||||||||
a. Test method 308 - pulping | 24 | 1 | 24 | 6 | 144 | 7.2 | 14.4 | $19,882.44 | |||||
b. Test method 26A - bleaching | 24 | 1 | 24 | 30 | 720 | 36 | 72 | $99,412.20 | |||||
4.2) Inspection of enclosures, closed vent, wastewater conveyance system o | |||||||||||||
a. Initial/Annual inspection - test method 21 | 8 | 1 | 8 | 67 | 536 | 26.8 | 53.6 | $74,006.86 | |||||
b. Monthly visual inspection | 4 | 12 | 48 | 101 | 4,848 | 242.4 | 484.8 | $669,375.48 | |||||
C. Create Information | See 3.B | ||||||||||||
D. Gather Information | See 3.B | ||||||||||||
E. Report Preparation | |||||||||||||
1) Initial Notification Report (<45 days after promulgation) c, d | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | |||||
2) Notification of Compliance Status c, d | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | |||||
3) Initial Compliance Strategy Report c, p | 40 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | |||||
4) Compliance Strategy Report Update p | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | |||||
5) Semiannual Summary Report d | 16 | 2 | 32 | 104 | 3,328 | 166.4 | 332.8 | $459,505.28 | |||||
6) Continuous Monitoring/Exceedance Reports q | 24 | 2 | 48 | 16 | 768 | 38.4 | 76.8 | $106,039.68 | |||||
7) Notification of Performance Test (>75 days before test) c, r | 4 | 1 | 4 | 117 | 468 | 23.4 | 46.8 | $64,617.93 | |||||
8) Notification of Construction / Reconstruction (>180 days before) c, s | 4 | 1 | 4 | 16 | 64 | 3.2 | 6.4 | $8,836.64 | |||||
9) Notification of Actual Startup (<150 days after startup) c, s | 4 | 1 | 4 | 16 | 64 | 3.2 | 6.4 | $8,836.64 | |||||
10) Affirmative Defense u | 30 | 1 | 30 | 0 | 0 | 0 | 0 | $0 | |||||
Subtotal for Reporting Requirements | 13,598 | $1,632,569 | |||||||||||
4. Recordkeeping Requirements | |||||||||||||
A. Read Instructions | See 3.A | ||||||||||||
B. Plan Activities | See 3.B | ||||||||||||
C. Implement Activities | See 3.B | ||||||||||||
D. Develop Record System c, d, v | 40 | 1 | 40 | 0 | 0 | 0 | 0 | $0 | |||||
E. Record Information | |||||||||||||
Records of continuous monitoring for operating parameters d | 2 | 52 | 104 | 104 | 10816 | 540.8 | 1081.6 | $1,493,392.16 | |||||
Records of periodic inspections (monthly visual inspections and annual method 21) d | See 3.B | ||||||||||||
Records of malfunctions d | 2 | 12 | 24 | 104 | 2496 | 124.8 | 249.6 | $344,628.96 | |||||
F. Personnel Training | N/A | ||||||||||||
G. Time for Audits | 8 | 2 | 16 | 104 | 1664 | 83.2 | 166.4 | $229,752.64 | |||||
Subtotal for Recordkeeping Requirements | 17,222 | $2,067,774 | |||||||||||
Total Labor Burden and Costs (rounded) v | 30,800 | $3,700,000 | |||||||||||
Total Capital and O&M Cost (rounded) v | $766,000 | ||||||||||||
GRAND TOTAL (rounded) v | $4,470,000 | ||||||||||||
Assumptions: | |||||||||||||
a We assume that an average of 104 respondents (101 chemical pulp mills and 3 non-integrated paper mills) will be subject to this rule. We assume that one new source each year will become subject to the rule over the three-year period of the ICR. We also assume that 15% of facilities (15) will rebuild one or more existing process units in a given year. | |||||||||||||
b This ICR uses the following labor rates: Managerial $157.61 ($75.05 + 110%); Technical $123.94 ($59.02 + 110%); and Clerical $62.52 ($29.77 + 110%). These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2021, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry. | |||||||||||||
c One-time activity. In out years, after initial compliance date, assume that 5% of mills affected as a result of unexplained exceedances. | |||||||||||||
d All MACT I category mills are affected by this rule. The only MACT III category mills affected by this rule are those bleaching with chlorinated compounds (3 mills). Total number of mills affected by this rule is 101 + 3 = 102. | |||||||||||||
e Approximately 85% of mills use a recovery boiler, power boiler, or lime kiln for control of pulping vents. There are 97 non-sulfite pulping mills. (85% of 97 = 82). Per footnote "c," 5% of 82= 4. | |||||||||||||
f Approximately 15% of mills use incineration for pulping lines (assuming half of these provide acceptable design specs (7), and half conduct performance tests (7)). Per footnote "c", 5% of 7 = 1 | |||||||||||||
g Estimate includes test plan, test report, and parametric monitoring setup. Method 308 tests for pulping lines and method 26A tests for bleaching lines. | |||||||||||||
h Estimate includes test plan, test report, and parametric monitoring setup. Method 304 and 305 are for wastewater streams. | |||||||||||||
i. Assume that 4 sulfite pulping mills will conduct performance tests. Per footnote "c", 5% of 4 = 1. | |||||||||||||
j. 63 MACT I and 3 MACT III category mills have bleaching lines that use chlorinated compounds. Per footnote "c", 5% of 66 = 3 facilities. Per footnote "n", 15% of 3 = 1 facility. 3 + 1 = 4 facilities total. | |||||||||||||
k. Estimated that each kraft mill has one pulping wastewater control device, with 60% of mills using stream strippers (60% of 89 = 53). Per footnote "c," 5% of 53= 3. Per footnote "n", 15% of 3 = 1 facility. 3 + 1 = 4 facilities total. Facilities with steam strippers are assumed to perform initial condensate segregation and performance tests. | |||||||||||||
l. Approximately 40% of kraft mills use biotreatment. (40% of 89 = 36) Per footnote "c," 5% of 36 = 2. Per footnote "n", 15% of 2 = 1 facility. 2 + 1 = 3 facilities total. Facilities with biotreatment control will perform initial performance tests. | |||||||||||||
m. Assume sulfite mills will monitor gas scrubber parameters and use Water-9 Model for emission estimates. | |||||||||||||
n. Assumed that 15% of performance tests are failed and need to be repeated. | |||||||||||||
o. Initial and annual activity. Assumed that EPA is notified each year of the testing. Assumed 2/3 of all MACT I mills have positive pressure points in their vent systems and will have to test using method 21 (2/3 x 101 = 67). Monthly visual inspections are to be conducted by chemical pulp mills (101). | |||||||||||||
p. The requirement for a compliance strategy report is now obsolete (required before 2006 only). | |||||||||||||
q. Assumed that 15% of all affected mills during any one quarter will be required to submit an exceedance report in addition to the summary report. (15% of 104 = 16). | |||||||||||||
r. EPA must be notified of all tests including out-year repeat performance tests and tests conducted at 5-year intervals. | |||||||||||||
s. Assumed 15% of all affected mills conduct construction or reconstruction per year. (15% of 104 = 16). | |||||||||||||
t. Kraft/soda/semichemical mills using compliance options requiring testing (7 mills) are likely to have 3 emission points that would require 5-year repeat testing (LVHC, HVLC, and stripper off gases). Sulfite mills (4) are likely to have 1 emission point to be tested. Total no. M308 tests = [(7 mills x 3 points) + (4 mills x 1 point)] x 1.15 = 29. Annual no. of 5-year repeat M308 tests = 29/5 = 6 tests. Mills bleaching with chlorinated compounds (66 mills) are likely to have two emission points requiring M26A testing. Total no. of M26A tests = (66 x 2) x 1.15 = 152. Annual no. of 5-yr repeat M26A tests = 152/5=30 tests. | |||||||||||||
u. Assumes no affirmative defense review. | |||||||||||||
v Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Table 2: Average Annual EPA Burden and Cost – NESHAP for Pulp and Paper Production (40 CFR Part 63, Subpart S) (Renewal) | |||||||||||
Burden item | (A) Person hours per occurrence |
(B) No. of occurrences per respondent per year |
(C) Person hours per respondent per year (C=AxB) |
(D) Respondents per year a |
(E) Technical person- hours per year (E=CxD) |
(F) Management person hours per year (Ex0.05) |
(G) Clerical person hours per year (Ex0.1) |
(H) Cost, $ b |
|||
1. Applications | N/A | Labor Rates | |||||||||
2. Surveys and Studies | N/A | Management | $70.56 | ||||||||
3. Reporting Requirements | Technical | $52.37 | |||||||||
A. Read and Understand Rule Requirements a | 4 | 1 | 4 | 104 | 416 | 20.8 | 41.6 | $24,432.51 | Clerical | $28.34 | |
B. Required Activities | |||||||||||
Initial Performance Tests | |||||||||||
1.1) Pulping processes (Non-Sulfite) | |||||||||||
a. Review documentation that vent streams are introduced to the flame zone of a boiler, lime kiln, or recovery furnace, or c, d | 8 | 1 | 8 | 4 | 32 | 1.6 | 3 | $1,879.42 | |||
b. Review documentation that the control incinerator is operating at a minimum level of 1600 F and 0.75 sec residence time, or c, e | 8 | 1 | 8 | 1 | 8 | 0.4 | 0.8 | $469.86 | |||
c. Review performance test of control device - test method 308 c, e, j | 8 | 1 | 8 | 1 | 8 | 0.4 | 0.8 | $469.86 | |||
1.2) Pulping Processes (Sulfite) c, f, j | |||||||||||
a. Review performance test of control device | 8 | 1 | 8 | 1 | 8 | 0.4 | 0.8 | $469.86 | |||
2.1) Bleaching process vent scrubber c, g, j | |||||||||||
a. Review performance test of scrubber or control device | 8 | 1 | 8 | 4 | 32 | 1.6 | 3.2 | $1,879.42 | |||
3.1) Pulping wastewater treatment (Non-Sulfite) | |||||||||||
a. Review of performance test of condensate segregation and control device, or c, h, j | 8 | 1 | 8 | 4 | 32 | 1.6 | 3.2 | $1,879.42 | |||
b. Review of performance test of biotreatment unit c, i, j | 8 | 1 | 8 | 3 | 24 | 1.2 | 2.4 | $1,409.57 | |||
3.2) Pulping wastewater treatment (Sulfite) c, d, j | |||||||||||
a. Review performance test of control device | 8 | 1 | 8 | 1 | 8 | 0.4 | 0.8 | $469.86 | |||
4.1) Repeat of performance test (5-yr intervals) j, q | |||||||||||
a. Test method 308 - pulping | 8 | 1 | 8 | 6 | 48 | 2.4 | 4.8 | $2,819.14 | |||
b. Test method 26A - bleaching | 8 | 1 | 8 | 30 | 240 | 12 | 24 | $14,095.68 | |||
4.2) Inspection of enclosures, closed vent, wastewater conveyance system k | |||||||||||
a. Initial/Annual inspection - test method 21 | 0 | 1 | 0 | 67 | 0 | 0 | 0 | $0 | |||
b. Monthly visual inspection | 0 | 12 | 0 | 101 | 0 | 0 | 0 | $0 | |||
C. Create Information | See 3.B | ||||||||||
D. Gather Information | See 3.B | ||||||||||
E. Report Preparation | |||||||||||
1) Review Initial Notification Report c | 4 | 1 | 4 | 0 | 0 | 0 | 0 | $0 | |||
2) Review Notification of Compliance Status c | 4 | 1 | 4 | 0 | 0 | 0 | 0 | $0 | |||
3) Review Initial Compliance Strategy Report c, p | 4 | 1 | 4 | 0 | 0 | 0 | 0 | $0 | |||
4) Review Compliance Strategy Report Update c, p | 4 | 1 | 4 | 0 | 0 | 0 | 0 | $0 | |||
5) Review Semiannual Summary Report l | 2 | 2 | 4 | 104 | 416 | 20.8 | 41.6 | $24,432.51 | |||
6) Review Continuous Monitoring/Exceedance Reports m | 2 | 2 | 4 | 16 | 64 | 3.2 | 6.4 | $3,758.85 | |||
7) Review Notification of Performance Test c, n | 4 | 1 | 4 | 117 | 468 | 23.4 | 46.8 | $27,486.58 | |||
8) Review Notification of Construction / Reconstruction c, o | 4 | 1 | 4 | 16 | 64 | 3.2 | 6.4 | $3,758.85 | |||
9) Review Notification of Actual Startup c, o | 4 | 1 | 4 | 16 | 64 | 3.2 | 6.4 | $3,758.85 | |||
10) Review Affirmative Defense r | 8 | 1 | 8 | 0 | 0 | 0 | 0 | $0 | |||
4. Recordkeeping Requirements | |||||||||||
A. Read Instructions | See 3.A | ||||||||||
B. Plan Activities | See 3.B | ||||||||||
C. Implement Activities | See 3.B | ||||||||||
D. Record Information | |||||||||||
Review records of continuous monitoring for operating parameters l | 1 | 1 | 1 | 104 | 104 | 5.2 | 10.4 | $6,108.13 | |||
Review records of malfunctions l | 1 | 1 | 1 | 104 | 104 | 5.2 | 10.4 | $6,108.13 | |||
E. Personnel Training | N/A | ||||||||||
F. Time for Audits | 8 | 2 | 16 | 104 | 1664 | 83.2 | 166.4 | $97,730.05 | |||
TOTAL (rounded) s | 4,370 | $223,000 | |||||||||
Assumptions: | |||||||||||
a We assume that an average of 104 respondents (101 chemical pulp mills and 3 non-integrated paper mills) will be subject to this rule. We assume that one new source each year will become subject to the rule over the three-year period of the ICR. We also assume that 15% of facilities (16) will rebuild one or more existing process units in a given year. | |||||||||||
b This cost is based on the average hourly labor rate as follows: Managerial $70.56 (GS-13, Step 5, $44.10 + 60%); Technical $52.37 (GS-12, Step 1, $32.73 + 60%); and Clerical $28.34 (GS-6, Step 3, $17.17 + 60%). This ICR assumes that Managerial hours are 5 percent of Technical hours, and Clerical hours are 10 percent of Technical hours. These rates are from the Office of Personnel Management (OPM), 2021 General Schedule, which excludes locality, rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. | |||||||||||
c One-time activity. After initial compliance date, assume that 5% of mills affected as a result of unexplained exceedances. | |||||||||||
d Approximately 85% of mills use a recovery boiler, power boiler, or lime kiln for control of pulping vents. There are 97 non-sulfite pulping mills. (85% of 97 = 82). Per footnote "c," 5% of 82= 4. | |||||||||||
e Approximately 15% of mills use incineration for pulping lines (assuming half of these provide acceptable design specs (7), and half conduct performance tests (7)). Per footnote "c", 5% of 7 = 1 | |||||||||||
f Assume that 4 sulfite pulping mills will conduct performance tests. Per footnote "c", 5% of 4 = 1 | |||||||||||
g 63 MACT I and 3 MACT III category mills have bleaching lines that use chlorinated compounds. Per footnote "c", 5% of 66 = 3 facilities. Per footnote "n", 15% of 3 = 1 facility. 3 + 1 = 4 facilities total. | |||||||||||
h Estimated that each kraft mill has one pulping wastewater control device, with 60% of mills using stream strippers (60% of 89 = 53). Per footnote "c," 5% of 53= 3. Per footnote "n", 15% of 3 = 1 facility. 3 + 1 = 4 facilities total. Facilities with steam strippers are assumed to perform initial condensate segregation and performance tests. | |||||||||||
i Approximately 40% of kraft mills use biotreatment. (40% of 89 = 36) Per footnote "c," 5% of 36 = 2. Per footnote "n", 15% of 2 = 1 facility. 2 + 1 = 3 facilities total.Facilities with biotreatment control will perform initial performance tests. | |||||||||||
j Assumed that 15% of performance tests are failed and need to be repeated. | |||||||||||
k Initial and annual activity. Assumed that EPA is notified each year of the testing. Assumed 2/3 of all MACT I mills have positive pressure points in their vent systems and will have to test using method 21 (2/3 x 101 = 67). Monthly visual inspections are to be conducted by chemical pulp mills (101). | |||||||||||
l Performed for all affected mills. (104) | |||||||||||
m Assumed that 15% of all mills during any one quarter will be required to submit an exceedance report in addition to the summary report. (15% of 104 = 16) | |||||||||||
n EPA must be notified of all tests including out-year repeat performance tests and tests conducted at 5-year intervals. | |||||||||||
o Assumed 15% of mills conduct construction or reconstruction per year. (15% of 104 = 16) | |||||||||||
p The requirement for a compliance strategy report is now obsolete (required before 2006 only). | |||||||||||
q Kraft/soda/semichemical mills using compliance options requiring testing (7 mills) are likely to have 3 emission points that would require 5-year repeat testing (LVHC, HVLC, and stripper off gases). Sulfite mills (4) are likely to have 1 emission point to be tested. Total no. M308 tests = [(7 mills x 3 points) + (4 mills x 1 point)] x 1.15 = 29. Annual no. of 5-year repeat M308 tests = 29/5 = 6 tests. Mills bleaching with chlorinated compounds (66 mills) are likely to have two emission points requiring M26A testing. Total no. of M26A tests = (66 x 2) x 1.15 = 152. Annual no. of 5-yr repeat M26A tests = 152/5=30 tests. | |||||||||||
r Assumes no affirmative defense review. | |||||||||||
s Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Capital/Startup vs. Operation and Maintenance (O&M) Costs | ||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | ||
Continuous Monitoring Device | Capital/Startup Cost for One Respondent | Number of New Respondents a | Total Capital/Startup Cost, (B X C) | Annual O&M Costs for One Respondent | Number of Respondents with O&M | Total O&M, (E X F) |
Notes for EPA: | |
Method 308 b | $0 | 0 | $0 | $14,000 | 8 | $112,000 | <--totals match with rows 12, 14, and 23 of Table 1 | |
Method 26A c | $0 | 0 | $0 | $10,000 | 34 | $340,000 | <--totals match with rows 16 and 24 of Table 1 | |
Method 304 d | $0 | 0 | $0 | $11,000 | 3 | $33,000 | <--totals match with rows 19 of Table 1 | |
Method 305 e | $0 | 0 | $0 | $16,000 | 5 | $80,000 | <--totals match with rows 18 and 21 of Table 1 | |
Method 21 f | $0 | 0 | $0 | $3,000 | 67 | $201,000 | <--totals match with rows 26 of Table 1 | |
Totals (rounded) g | $0 | $766,000 | $766,000 | |||||
a Continuous monitoring requirements are for parametric monitoring and these systems are already in place; therefore, no new equipment would be required by the recordkeeping and reporting requirements. It is assumed that all mills will contract a testing company to provide sampling and analytical services for air and water tests. Based on EPA’s experience with the test methods required for this rule, the purchase of service for each method is estimated below. These estimates include labor, materials, and analytical costs. | ||||||||
b We estimate that 8 respondents need to complete Method 308 testing (1 pulping process (non-sulfite), 1 pulping process (sulfite), and 6 repeat performance tests). | ||||||||
c We estimate that 34 respondents need to complete Method 26A testing (4 bleaching process vent scrubbers and 30 repeat performance tests). | ||||||||
d We estimate that 3 respondents need to complete Method 304 testing (3 pulping wastewater treatment (non-sulfite)). | ||||||||
e We estimate that 5 respondents need to complete Method 305 testing (4 pulping wastewater treatment (non-sulfite) and 1 pulping wastewater treatment (sulfite)). | ||||||||
f We estimate that 67 respondents need to complete Method 21 testing (Inspection of enclosures, closed vents, and wastewater conveyance systems). | ||||||||
g Totals have been rounded to 3 significant digits. Figures may not add exactly due to rounding. |
Total Annual Responses | ||||
(A) | (B) | (C) | (D) | (E) |
Information Collection Activity | Number of Respondents a | Number of Responses | Number of Existing Respondents That Keep Records But Do Not Submit Reports | Total Annual Responses E=(BxC)+D |
Initial notification report | 0 | 1 | 0 | 0 |
Notification of compliance status | 0 | 1 | 0 | 0 |
Initial compliance strategy report | 0 | 1 | 0 | 0 |
Compliance strategy report update | 0 | 1 | 0 | 0 |
Semiannual summary report | 104 | 2 | 0 | 208 |
Continuous monitoring / exceedance report | 16 | 2 | 0 | 32 |
Notification of performance test | 117 | 1 | 0 | 117 |
Notification of construction / reconstruction | 16 | 1 | 0 | 16 |
Notification of actual startup | 16 | 1 | 0 | 16 |
Total | 389 | |||
a We estimate all respondents will submit semiannual reports, 15% of respondents will need to submit continuous monitoring/exceedance reorts, 15% of respondents will rebuild one or more process units in a given year and thus need to submit notifications of reconstruction, actual startup, and performance tests. In addition respondents need to perform repeat performance tests every five years. |
Number of Respondents | |||||
Respondents That Submit Reports | Respondents That Do Not Submit Any Reports | ||||
(A) | (B) | (C) | (D) | (E) | |
Year | Number of New Respondents a | Number of Existing Respondents | Number of Existing Respondents that keep records but do not submit reports | Number of Existing Respondents That Are Also New Respondents | Number of Respondents (E=A+B+C-D) |
1 | 16 | 104 | 0 | 16 | 104 |
2 | 16 | 104 | 0 | 16 | 104 |
3 | 16 | 104 | 0 | 16 | 104 |
Average | 16 | 104 | 0 | 16 | 104 |
a New respondents include sources with constructed and reconstructed, and modified affected facilities. 16 respondents will rebuild one or more process units in a given year. In this standard, existing respondents submit initial notifications. |
File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
File Modified | 0000-00-00 |
File Created | 0000-00-00 |