NESHAP for the Manufacture of Amino/Phenolic Resins (40 CFR part 63, subpart OOO) (Renewal)
Extension without change of a currently approved collection
No
Regular
Approved without change
07/11/2023
01/31/2023
table that charts list comparision
Inventory as of this Action
Requested
Previously Approved
07/31/2026
36 Months From Approved
07/31/2023
115
0
115
23,321
0
23,504
2,280,000
0
2,210,000
The National Emission Standards for Hazardous Air Pollutants (NESHAP) for the regulations published at 40 CFR Part 63, Subpart OOO were proposed on December 14, 1998, promulgated on January 20, 2000, and amended on April 20, 2006, October 8, 2014, and October 15, 2018. These regulations apply to existing facilities and new facilities that engage in the manufacture of amino/phenolic resins with HAP emissions points that include: (1) reactor batch process vents; (2) nonreactor batch process vents; (3) continuous process vents; (4) equipment leaks; (5) wastewater; (6) storage vessels; and (7) heat exchangers. New facilities include those that commenced construction or reconstruction after the date of proposal of the 2014 rule amendment. This information is being collected to assure compliance with 40 CFR Part 63, Subpart OOO.
The October 15, 2018 amendments (83 FR 51842) responded to petitions for reconsideration regarding the NESHAP rule revisions that were promulgated on October 8, 2014 and revised the standards for continuous process vents (CPVs) at existing affected sources, revised the requirements for storage vessels at new and existing sources during periods when an emission control system used to control vents on fixed roof storage vessels is undergoing planned routine maintenance, and included minor technical corrections to improve rule clarity. This renewal incorporates revised costs and burden from activities from these final rule amendments.
In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP.
There is no appreciable change in burden from the most recently approved ICR as currently identified in the OMB Inventory of Approved Burdens. This is due to two considerations: 1) the regulations have not changed over the past three years and are not anticipated to change over the next three years; and 2) the growth rate for this industry is either very low or non-existent, so there is no significant change in the overall burden. Since there are no changes in the regulatory requirements and there is no significant industry growth, there are also no changes in the capital/startup or operation and maintenance (O&M) activities. This ICR also updates the capital/startup and O&M costs from 2014 to 2020, using the annual Chemical Engineering Plant Cost Index (CEPCI).
$19,300
No
No
No
No
No
No
No
Muntasir Ali 919 541-0833
Reginfo record details
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.