5900-613 065 Emissions Laboratory Audit Checklist

Emissions Certification and Compliance Requirements for Nonroad Compression-Ignition Engines and On-Highway Heavy Duty Engines (Revision)

?1065 Lab Audit Checklist 5900-613.xlsx

Certification

OMB: 2060-0287

Document [xlsx]
Download: xlsx | pdf


OMB No. 2060-0392
Approval Expires on
3/31/2023
EPA Form 5900-613


This collection of information is approved by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. (OMB Control No. 2060-0287). Responses to this collection of information are mandatory [40 CFR 1068.20 and 40 CFR 1068 Section E]”. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The public reporting and recordkeeping burden for this collection of information is estimated to [“be” or “range from” xx hours or minutes] per response. Send comments on the Agency’s need for this information, the accuracy of the provided burden estimates and any suggested methods for minimizing respondent burden to the Regulatory Support Division Director, U.S. Environmental Protection Agency (2821T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address.
Office of Transportation and Air Quality, Office of Air and Radiation
US Environmental Protection Agency
§1065 Emissions Laboratory Audit Checklist









Version Number: 1.0; Last Revision: February 2023













Manufacturer:
Date:





Laboratory Name:
Inspected By:














Laboratory Address:
Type of tests performed:




































Manufacturer's Contacts Associated with this Checklist:









































Information & Comments Regulations
Audit Observations Manufacturer's Follow-up Action
1
Laboratory Equipment Description





1.1
Dynamometer - make & model
§1065.110



1.2
Exhaust Analyzers make, model
§1065 subpart C



1.3
Gas Divider make & model





1.4
Sample collection







Batch sampling containers Material, number






Heated sample lines
§1065.145(c)





Sample line path Length kept to a minimum? 90° Bends avoided? Good engineering judgement excercised? §1065.145(c)






1.5
CVS Considerations










Make & model










Dilution ratio










Pressure control Static pressure within ±1.2 kPa at initial dilution point? §1065.140(c)(2)








Temperature control Dilution air temp? §1065.140(a)






1.6
Mixing Calculated Re of diluted exhaust stream >4000? §1065.140(c)(3)








Flow measurement Does flow measurement device meet §1065.240? How is aqueous condensation addressed upstream of flow measurement? Are there any preconditioning devices? §§1065.140(c)(4)-(6)








Flow compensation method How is a nominally constant flow maintained? §1065.140(c)(7)






1.7
Diltution Air










How is dilution air preconditioned? Filters, etc









Dilution Air How is it controlled? What is HC background level? §1065.140






1.8
Particulate measurement










Filter specifications 47mm OD? PTFE? §1065.170(c)








Diltuion ratio Primary DR at least 2:1; overall 5:1 - 7:1? Proportionality check §1065.140(e)(2)








Filter loading What is the expected filter loading? §1065.170(a)(2)








Sample temperature Filter face temp 47±5°C? §1065.140(e)(4)








Filter face velocity Basis for expecting near 100 cm/s? §1065.170(c)(1)(vi)








Is a pre-classifier used? If so, what type?









PM Sample Handling Filter holder specifications meeting 1065? Leak check method? Filter/sample storage? §1065.170(c)








Filter conditioning requirements Min 30 minutes in env meeting §1065.190? §1065.590(e)








Microbalance specifications
§1065.190(f)








Measurement report Report supplied including pre/post weights, referencefilter weight, times, etc? §1065.590






2
Gas Audit:








2.1
Analyze EPA-supplied gases: As lab injects gas, observe the gas flow and pressures for zero, span and audit gas. All should flow at the same pressure and flow rate. Analyzers should read EPA gases within 2%.







2.2
Engine Intake Air How are humidity, temperature, HC, CO, Nox, etc. controlled? §1065.125






2.3
Zero gas for analyzers Check pressure & expiration date; must have < 1ppmC, <1ppm CO; <400ppm CO2, <0.1ppm Nox. §1065.750






2.4
Nitrogen for analyzers Check pressure & expiration date; must have < 1ppmC, <1ppm CO; <400ppm CO2, <0.1ppm Nox. §1065.750






2.5
Lab Calibration/Span Gases: Check pressure & expiration date; 200 psi min §1065.750






3
Calibration Equipment:








3.1
Gas Divider Every 370 days; calib 15,30,45,60,75,90% on all ranges; rename all span gases initially & if monthly curve changes; recheck w/15-50% gas; §1065.248; §1065.307 §1065.750






4
Exhaust Calibration Records:








4.1
HC analyzer methane response 185 Days: FID response to methane, ethanol §1065.360






4.2
HC analyzer linearity 35 Days: calibrate each range w/gas divider (+2% each point) §1065.307






4.3
CH4 analyzer linearity 35 Days: calibrate each range w/gas divider (+2% each point) §1065.307






4.4
CO analyzer linearity 35 Day: calibrate each range w/gas divider (+2% each point) §1065.307






4.5
CO analyzer interference After installation and major maintenance: water vapor & CO2 interference (<1% or 3ppm); §1065.355






4.6
CO2 analyzer linearity 35 Day: calibrate each range w/gas divider (+2% each point) §1065.307






4.7
CO2 analyzer interference After installation and major maintenance: water vapor interference (<1% or 3ppm); §1065.350






4.8
NOx analyzer linearity 35 Day: calibrate each range w/gas divider (+2% each point) §1065.307






4.9
NOx analyzer conversion verification 35 Day; Efficiency > 95% . §1065.378






4.9.1
O2 analyzer linearity 35 Day: calibrate each range w/gas divider (+2% each point) §1065.307






4.10
CVS propane injections 35 Day: one range (e.g. 100ppm) all analyzers, all commonly used venturis (may rotate venturis thru successive weeks); (+2%); Calibration report available? CFO or Mass balance calibration records? §1065.341






4.11
Flow meters










Fuel Flow (if used) Off-site cal or through carbon/oxygen balance §1065.320








Intake Flow (if used) Off-site cal or LFE, subsonic venturi, or ultrasonic flow meter §1065.325








Exhaust Flow (if used) Off-site cal, subsonic venturi, or ultrasonic flow meter §1065.330








CVS Flow On site reference flow meter or calibration certificate §1065.340







4.12
Dynamometer verifications Annually: In-line torque sensor §1065.310






4.13
Ambient monitors ambient temperature, humidity §1065.315






4.14
Maintenance Records: Must calibrate analyzers after maintenance. Recommend keeping a separate maintenance log. §1065.503






5
Engine Setup & Test Observations:








5.1
Engine serial number POGHG766AJ, Code 1 (cert engine)







5.2
Service accumulation










Method/duty cycle










Maintenance Unscheduled or scheduled?







5.3
Fuel supply temperature/pressure Representative of in-use operation? §1065.120(c)






5.4
Oil/engine block cooling provisions Are engine oil and block temperatures representative of in-use conditions? §1065.122(a)






5.5
Engine intake air temperature 25±5°C? §1065.125






5.6
Intake system Is the intake system production representative? §1065.125(d)






5.7
Charge air cooler Is the CAC production representative? If not does CAC simulator meet §1065.125(e)? §1065.125(e)






5.8
Exhaust system Representative of production? Are A/T devices located in production represntative locations? §1065.130






5.9
Laboratory tubing Minimized length between exit of in-use exhaust system or last A/T device and first point of dilution? §1065.130(c)






5.10
Exhaust restriction Typical of in-use operation? §1065.130(h)






5.11
Crankcase emissions Self-contained or routed to dilution tunnel? §1065.130(i)






5.12
Simulated inputs Are any simulated engine loads applied during testing? §1065.110








Accessories Are all acessories present? If not, how are loads simulated?









Vehicle speed input Is a simulated vehicle speed supplied?









Other Are other special inputs required to simulate vehicle functionality?







5.13
Ambient conditions Approximate temperature, pressure, and RH during testing







5.14
Regeneration identification How are regeneration events identified during testing?







5.15
Low idle speed & torque?








5.16
Maximum test speed Observed or declared?







5.17
A, B, C Speeds








6
Test Validation








6.1
Transient cycle trace Review a speed-load trace §1065.514






6.2
Cycle validation report Does test meet cycle regression statistics? Is report available? §1065.514






6.3
Analyzer range, drift validation, and drift correction ±4% uncorrected vs corrected §1065.550






6.4
Proportional sampling validation SEE <3.5% of mean sample flow rate or each flow rate within 2.5% of mean or target flow rate. Is report available? §1065.545






7
Calculations








7.1
Emission Calculations: Review calculations. Calcs should not use negative emission (bag) values. §1065 subpart G






7.2
Brake specific calculation method Total mass divided by total work? §1065.650






7.3
NOx Correction Factor (KH) KH=1/(9.953 x XH2O + 0.832)? §1065.670






8
Test Results








8.1
QA/QC Documentation How are tests reviewed for accuracy, completeness?







8.2
Torque/power








8.3
Maximum test speed Is the maximum test speed calculated correctly? §1065.610






8.4
Speed vs torque map Has report been supplied including a speed vs torque map? §1065.510






8.5
Test Report Has a test report been supplied includng emission results for each test cycle/test interval?







8.6
Final calculated emissions Do emissions results indicated compliance with standards (with DFs and IRAFs applied)? [EPA calculated]







9
Fuel Analysis monthly; Obtain copy of lab fuel analysis; Take fuel samples of test fuel. §1065.710






10
DEF Analysis








10.1
AUS32 Commerical brand meeting ISO-22241?







10.2
Urea concentration 31.8 < Urea Concentration < 33.2% ISO22241-2 Annex C






10.3
Sample drawn 1L sample taken for full chemical analysis?







11
Other/General Observations










DEF Dosing










NTE Point Evaluation





















File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy