NSPS for Incinerators (40 CFR part 60, subpart E) (Renewal)
Extension without change of a currently approved collection
No
Regular
Approved without change
08/30/2024
04/04/2023
This ICR request is approved for only one year due to failure to comply to prior terms of clearance.
In accordance with 5 CFR 1320, EPA is required to include the following information in its submission for information collection request review and approval: (1) supporting statements to show compliance with PRA requirements and other associated laws; (2) a description of the regulatory text applicable to the ICR including submission specifications; (3) a clear description of the data elements being collected under the ICR; (4) copies of the data collection instrument(s) and/or screen shots of the electronic portal where the reporting requirements are submitted to EPA (with the control number and burden statement included); (5) a detailed discussion of how information is submitted and the extent to which electronic reporting is available; (6) evidence of consultation with respondents (by actively reaching out to stakeholders as permitted by the PRA) to ensure the supporting statement's accuracy on availability of data, frequency of collection, clarity of instructions, accuracy of burden estimate, relevance of data elements, and similar PRA matters; and (7) discussion of how EPA addressed substantive concerns raised by respondents and other stakeholders during consultation and in response to comments received on FR notices. In addition, supporting statement A should use the standard 18 question SS-A format. More information can be found at https://pra.digital.gov/clearance-process/supporting-statement/.
table that charts list comparision
Inventory as of this Action
Requested
Previously Approved
02/28/2025
36 Months From Approved
08/31/2024
72
0
164
3,730
0
8,490
128,100
0
247,200
The New Source Performance Standards (NSPS) for Incinerators (40 CFR Part 60, Subpart E) apply to existing incinerators that charge more than 45 metric tons per day (50 tons per day) of solid waste, and that commenced either construction or modification after August 17, 1971. Solid waste is defined as refuse, more than 50 percent of which is municipal type waste consisting of a mixture of paper, wood, yard wastes, food wastes, plastics, leather, rubber, and other combustibles, and noncombustible materials such as glass and rock.
Owners and operators of existing incinerators that charge more than 45 metric tons per day (50 tons per day) of solid waste, and that commenced construction or modification after August 17, 1971 are required to comply with reporting and record keeping requirements for the General Provisions (40 CFR Part 60, Subpart A), as well as for the applicable standards in 40 CFR Part 60, Subpart E. This includes submitting initial notifications, performance tests and periodic reports and results, and maintaining records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These reports are used by EPA to determine compliance with 40 CFR Part 60, Subpart E.
The total decrease in burden from the most-recently approved ICR is due to adjustments. The adjustment decrease in burden from the most-recently approved ICR is due to a decrease in the number of sources. To identify the number of respondents subject to subpart E, we reviewed facilities identified in EPAs Enforcement and Compliance History Online (ECHO) database and the EPAs Large Municipal Waste Combustor and Small Municipal Waste Combustor Inventory (collected in 2019) to identify sources not subject to subpart E. The total number of respondents decreased from 87 in the previous ICR to 36 respondents. These changes reflect a more accurate estimate of the existing universe of incinerators subject to subpart E, which were last updated in 2007. In the previous ICR, estimates for Capital costs were in $2007 dollars, and the O&M costs were adjusted to $2018 dollars. For this ICR, the Capital and O&M costs were adjusted to $2021 dollars based on annual CEPCI values.
$1,410
No
No
No
No
No
No
No
Muntasir Ali 919 541-0833
Reginfo record details
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.