  • Summary of Changes Davis Bacon Wage Survey Form (WD-10) The title of the form was changed for simplicity and easier recognition of the forms purpose.


The proposed form is divided into four main sections:

  • Project Information

  • Contractor or Subcontractor Information

  • Wage Survey Information

  • Classification and Subclassification Directory

The proposed form also identifies with an asterisk (*) which questions are required


Project Information Section

  • The proposed form replaces question 1 on the current WD-10, which asks for contractor/subcontractor information, with a “Project Information” section.

  • The proposed form now requests contractor/subcontractor information in the “Contractor or Subcontractor Information” section.

  • The proposed form asks for information similar to that requested in questions 3, 4, and 5B on the current WD-10.

  • The proposed form now asks for project type and whether the project value exceeds

$2,000 section.


Contractor or Subcontractor Information

  • The proposed form asks for information similar to that requested in questions 1 and 2 on the current WD-10.

  • The revised form now requests the type of work performed by the contractor/subcontractor on the project.

  • The proposed form deletes the options to indicate whether the submitter is a contractor, association, union, agency, and other. Similar information is captured on the revised form in the “Wage Survey Information” section.

  • The revised WD-10 form no longer requests the names of other subcontractors on the project. This information is instead requested in a supplemental form “Davis- Bacon Wage Survey Subcontractor Contact Information (WD-10A).”


Wage Survey Information

  • The proposed form asks for information similar to that requested in question 8 on the current WD-10 form.

  • The proposed form replaces the classification and type of work performed requests in question 7 on the current WD-10 with a directory, or picklist, of labor classifications and subclassifications.

  • The proposed form allows for users to input a labor classification that does not appear in the Classification and Subclassification Directory by offering an “other classification” option.

  • The proposed form allows for users to input a labor subclassification that does not appear in the Classification and Subclassification Directory by offering an “other” option.

  • The proposed form deletes requests for information on peak week ending date (and instead asks submitters to list the number of workers at each wage/fringe benefit rate paid) and whether the contractor supplied materials only.

  • The proposed form replaces the “additional” fringes request in question 7 on the current WD-10 with a request for “other” fringes.

  • The proposed form now requests the submitter’s organization section.


Classification and Subclassification Directory


  • The proposed form includes a new directory that contains a list of labor classifications and subclassifications and, for the paper form, a corresponding numerical code identifier for each. The electronic version of the proposed form will not contain a separate directory and instead will utilize a “drop-down” picklist of the same classifications and subclassifications.

  • In addition to the predetermined classifications and subclassifications in the directory, the directory contains an “other classification” and “other” subclassification option for submitter who want to submit a classification or subclassification that is not identified in the directory (paper) or drop-down list (electronic).

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document