NSPS for Equipment Leaks of VOC in Petroleum Refineries (40 CFR Part 60, Subparts GGG and GGGa) (Renewal)

ICR 202309-2060-001

OMB: 2060-0067

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2023-09-06
Supporting Statement A
2023-09-06
ICR Details
2060-0067 202309-2060-001
Received in OIRA 202007-2060-010
EPA/OAR 0983.17
NSPS for Equipment Leaks of VOC in Petroleum Refineries (40 CFR Part 60, Subparts GGG and GGGa) (Renewal)
Extension without change of a currently approved collection   No
Regular 09/27/2023
  Requested Previously Approved
36 Months From Approved 09/30/2023
324 324
183,700 183,700
0 0

The New Source Performance Standards (NSPS) for Equipment Leaks of VOC in Petroleum Refineries (40 CFR Part 60, Subpart GGG) were proposed on January 4, 1983; promulgated on May 30, 1984; amended on November 16, 2007 (to add the regulations published at 40 CFR Part 60, Subpart GGGa); and most-recently amended on June 2, 2008. The standards at Subpart GGG apply to compressors, valves, pumps, pressure relief devices, sampling connection systems, open-ended valves or lines, and flanges or other connectors in VOC service at petroleum refineries that commenced construction, reconstruction, or modification after January 4, 1983, and on or before November 7, 2006. The standards at Subpart GGGa apply to compressors, valves, pumps, pressure relief devices, sampling connection systems, open-ended valves or lines, and flanges or other connectors in VOC service at petroleum refineries that commence construction, reconstruction, or modification after November 7, 2006. This information is being collected to assure compliance with 40 CFR Part 60, Subparts GGG and GGGa. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.

US Code: 42 USC 7401 et seq Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  87 FR 43843 07/22/2022
88 FR 61591 09/07/2023
No

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 324 324 0 0 0 0
Annual Time Burden (Hours) 183,700 183,700 0 0 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No

$76,100
No
    No
    No
No
No
No
No
Muntasir Ali 919 541-0833

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
09/27/2023


© 2024 OMB.report | Privacy Policy