Burden Calculation Tables

1056t14.xlsx

NSPS for Nitric Acid Plants (40 CFR part 60, subparts G and Ga) (Renewal)

Burden Calculation Tables

OMB: 2060-0019

Document [xlsx]
Download: xlsx | pdf

Overview

Summary
Table 1
Table 2
Capital O&M
Respondents
Responses


Sheet 1: Summary

ICR Summary Information
Hours per Response 52
Number of Respondents 35
Total Estimated Burden Hours 2,840
Total Estimated Costs $4,690,000
Annualized Capital O&M $4,330,000
Total Annual Responses 55
Form Number Not Applicable

Sheet 2: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for Nitric Acid Plants (40 CFR Part 60, Subparts G and Ga) (Renewal)

















130.28 163.17 65.71





Burden Item (A)
Respondent Hours per Occurrence
(B)
Number of Occurrences per Respondent per Year
(C)
Hours per Respondent per Year
(C=AxB)
(D)
Number of Respondents per Year a
(E)
Technical Hours per Year
(E=CxD)
(F)
Management Hours per Year
(F=Ex0.05)
(G)
Clerical Hours per Year
(G=Ex0.1)
(H)
Total Labor Costs per Year, b





1. Applications N/A











2. Survey and Studies N/A











3. Reporting Requirements












Sources Constructed or Modified after 10/14/2011 – Subpart Ga












A. Familiarize with regulatory requirements c 1 1 1 11 11 0.55 1.1 $1,595.10




B. Required Activities












Initial performance test 180 1 180 1.2 216 10.8 21.6 $31,322.05




Demonstration of CERMS 180 1 180 1.2 216 10.8 21.6 $31,322.05




Repeat performance test d 180 1 180 0.24 43.2 2.16 4.32 $6,264.41




Daily monitoring of CERMS 0.5 330 165 1.2 198 9.9 19.8 $28,711.88




C. Create Information See 3B











D. Gather Existing Information See 3E











E. Write Report












Notification of construction/reconstruction 2 1 2 1.2 2.4 0.12 0.24 $348.02




Notification of actual startup 2 1 2 1.2 2.4 0.12 0.24 $348.02




Notification of initial performance test 2 1 2 1.2 2.4 0.12 0.24 $348.02




Notification of demonstration of CERMS 2 1 2 1.2 2.4 0.12 0.24 $348.02




Report of performance test 2 1 2 1.2 2.4 0.12 0.24 $348.02




Report of noncompliance with NOX emission standard e 2 1 2 1.1 2.2 0.11 0.22 $319.02




Subtotal for Reporting Requirements - Subpart Ga



803 $101,275




Existing Sources – Subpart G












A. Familiarize with regulatory requirements c 1 1 1 24 24 1.2 2.4 $3,480.23




B. Write Report












Notification of physical/operational changes f See 3E











Semiannual reports g 8 2 16 24 384 19.2 38.4 $55,683.65




Subtotal for Reporting Requirements- Subpart G



469 $59,164




Total Reporting Requirements for Subparts G and Ga



1,270 $160,000




4. Recordkeeping Requirements












A. Familiarize with regulatory requirements See 3A











B. Plan activities See 3B











C. Implement activities See 3B











D. Develop record system N/A











Subpart Ga: Sources Constructed or Modified after 10/14/2011












E Time to Enter Information












Records of noncompliance e 0.5 1 0.5 1.1 0.55 0.03 0.06 $79.76




Daily production and flow rates 8 1 8 11 88 4.4 8.8 $12,760.84




Data collection 0.13 330 41.25 11 453.75 22.69 45.38 $65,798.06




Records of occurrence of startup, shutdown and malfunctions 8 1 8 11 88 4.4 8.8 $12,760.84




F. Time to Train Personnel












Train personnel for CERMS maintenance 16 2 32 11 352 17.6 35.2 $51,043.34




Subtotal for Recordkeeping Requirements - Subpart Ga



1130 $142,443




Subpart G: Existing Sources












E. Time to Enter Information












Records of daily production rates and hours of operation 8 1 8 24 192 9.6 19.2 $27,841.82




Records of occurrence of startup, shutdown and malfunctions 8 1 8 24 192 9.6 19.2 $27,841.82




Records of performance test data 80 1 80 0 0 0 0 $0




G. Audits N/A











Subtotal for Recordkeeping Requirements - Subpart G



442 $55,684




Total Recordkeeping Requirements for Subparts G and Ga



1571 $198,100




Total Labor Burden and Cost for Subpart Ga (rounded) h



1,930 $244,000




Total Labor Burden and Cost for Subpart G (rounded) h



911 $115,000




TOTAL LABOR BURDEN AND COST (rounded) h



2,840 $359,000




TOTAL CAPITAL AND O&M COST (rounded) h






$4,330,000


52 hrs per response
GRAND TOTAL (rounded) h






$4,690,000


















Assumptions












a We have assumed there are approximately 35 respondents (24 subject to Subpart G and 11 subject to Subpart Ga), with 1.2 new sources per year becoming subject to the rule over the next three years.




b This ICR uses the following labor rates: $130.28 for technical, $163.17 for managerial, and $65.71 for clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2022, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.




c We have assumed that each respondent will have to familiarize with regulatory requirements each year.




d We assume that 20% of sources will have to repeat performance tests.




e We assume 10% of sources will report non-compliance.




f We assume 1 existing facility will be reconstructed or modified over the next 5 years (0.2 respondents per year).




g We assume it will take 8 hours to write semiannual reports.




h Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.





Sheet 3: Table 2

Table 2: Average Annual EPA Burden and Cost – NSPS for Nitric Acid Plants (40 CFR Part 60, Subparts G and Ga) (Renewal)












54.51 73.46 29.50
Burden Item (A)
EPA Hours per Occurrence
(B)
Number of Occurrences per Plant per Year
(C)
EPA Hours per Respondent per Year
(C=AxB)
(D)
Number of Respondents per Year a
(E)
Technical Hours per Year
(E=CxD)
(F)
Management Hours per Year
(F=Ex0.05)
(G)
Clerical Hours per Year
(G=Ex0.1)
(H)
Total Labor Costs per Year, b
Subpart Ga a   







Required Activities







Observe initial performance test 24 1 24 1.2 28.8 1.44 2.88 $1,760.63
Repeat performance test c 24 0.2 4.8 0.24 1.15 0.06 0.12 $70.43
Report Review



0 0 0 $0.00
Notification of construction/reconstruction 2 1 2 1.2 2.4 0.12 0.24 $146.72
Notification of actual startup 0.5 1 0.5 1.2 0.6 0.03 0.06 $36.68
Notification of initial performance test 0.5 1 0.5 1.2 0.6 0.03 0.06 $36.68
Review test results 8 1 8 1.2 9.6 0.48 0.96 $586.88
Review test NOX noncompliance reports d 8 1 8 1.1 8.8 0.44 0.88 $537.97
Subtotal for Subpart Ga



60 $3,176
Subpart G 







Report Review







Semiannual reports a 2 2 4 24 96 4.8 9.6 $5,868.77
Subtotal for Subpart G



110 $5,870
TOTAL ANNUAL BURDEN and COST (rounded) e



170 $9,050









Assumptions







a We have assumed there are approximately 35 respondents (24 subject to Subpart G and 11 subject to Subpart Ga), with 1.2 new sources per year becoming subject to the rule over the next three years.
b This ICR uses the following average hourly labor rates: $73.46 for managerial (GS-13, Step 5, $45.91 + 60%), $54.51 (GS-12, Step 1, $34.07 + 60%) for technical and $29.50 (GS-6, Step 3, $18.44 + 60%) for clerical. These rates are from the Office of Personnel Management (OPM), 2023 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.
c We assume that 20% of new sources will have to repeat performance tests.
d We assume 10% of sources will report non-compliance.
e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 4: Capital O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs 




(A) (B) (C) (D) (E) (F) (G)




Continuous Monitoring Device Capital/Startup Cost for One Respondent d Number of New Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent d Number of Respondents with O&M Total O&M,
(E X F)





Subpart G


816 2022 CE Index Value
NOx CMS $105,611 0 $0 $155,310 24 $3,727,446


567.3 2013 CE Index Value
Subpart Ga


525.4 2007 CE Index Value
NOx CERMSa,b $163,226 1.2 $195,871 $33,785 11 $371,635




CERMS testing $21,603 1.2 $25,924 NA 0 NA




Flow meter testing $8,960 1.2 $10,752 NA 0 NA




File cabinets $1,126 1.2 $1,352 NA 0 NA




Totals (rounded) c

$234,000

$4,100,000
$4,330,000














a We estimate an annual capital cost of $163,226 for NOx CERMS and $1,126 for file cabinets for all respondents. The capital cost per respondent is calculated by dividing the total capital cost by 1.2 new respondents.




b On average over the three-year period of this ICR, we estimate an average 11 respondents per year will be subject to Subpart Ga (a growth rate of 1.2 respondents per year).




c Totals have been rounded to 3 significant digits. Figures may not add exactly due to rounding.




d Costs have been updated to 2022 $ using the CEPCI Equipment Cost Index.





Sheet 5: Respondents

Number of Respondents

Respondents That Submit Reports Respondents That Do Not Submit Any Reports

(A) (B) (C) (D) (E)
Year Number of New Respondents a Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents (E=A+B+C-D)
1 1.2 33 0 0.2 34
2 1.2 34 0 0.2 35
3 1.2 35 0 0.2 36
Average 1.2 34 0 0 35
a New respondents include sources with constructed, reconstructed and modified affected facilities. In this standard existing respondents submit initial notifications.

Sheet 6: Responses

Total Annual Responses
(A) (B) (C) (D) (E)
Information Collection Activity Number of Respondents a Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses E=(BxC)+D
Subpart Ga
Notification of construction/reconstruction 1.2 1 0 1.2
Notification of actual startup 1.2 1 0 1.2
Notification of initial performance test 1.2 1 0 1.2
Notification of CERMS demonstration 1.2 1 0 1.2
Report of performance test 1.2 1 0 1.2
Report of noncompliance with NOx emission standard 1.1 1 0 1.1
Subpart G
Notification of physical/operational changes 0 1 0 0
Semiannual reports 24 2 0 48



Total 55





File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00