Table 1: Annual Respondent Burden and Cost – NSPS subpart Kc (Proposed Rule) |
|
|
|
|
|
8.065 |
5.723 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
90.11 |
161.3 |
57.23 |
|
|
May 2022 - National Occupational Employment and Wage Estimates |
|
|
|
|
|
|
|
|
Burden item |
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
Chemical Manufacturing - May 2022 OEWS Industry-Specific Occupational Employment and Wage Estimates (bls.gov) |
|
|
|
|
|
|
|
|
Person hours per occurrence |
No. of occurrences per respondent per year |
Person hours per respondent per year |
Respondents per year a |
Technical person- hours per year |
Management person hours per year |
Clerical person hours per year |
Total Cost per year, ($) b |
|
Occupation Code |
Title |
Mean Hourly Rate |
110% OH and benefits |
Estimated Total Pay with Benefits |
|
|
|
|
|
|
(C=AxB) |
|
(E=CxD) |
(F=Ex0.05) |
(G=Ex0.1) |
|
|
11-0000 |
Mgmt Occup |
76.74 |
84.41 |
161.15 |
|
|
|
|
1. Applications |
N/A |
|
|
|
|
|
|
|
|
17-2081 |
Environmental Engineer |
59.21 |
65.13 |
124.34 |
|
|
|
|
2. Surveys and studies |
N/A |
|
|
|
|
|
|
|
|
49-0000 |
Maintenance/Inspections |
33.37 |
36.71 |
70.08 |
|
|
|
|
3. Reporting requirements |
|
|
|
|
|
|
|
|
|
43-0000 |
Office and Admin Support |
25.55 |
28.11 |
53.66 |
|
|
|
|
a. Familiarize with regulatory requirements |
1 |
1 |
1 |
294 |
294 |
14.7 |
29.4 |
$30,546 |
|
|
Technical |
38.538 |
42.3918 |
80.93 |
|
|
|
|
b. Required activities |
|
|
|
|
|
|
|
|
|
Petroleum and Coal Products Manufacturing - May 2022 OEWS Industry-Specific Occupational Employment and Wage Estimates (bls.gov) |
|
|
|
|
|
|
|
|
Notifications |
|
|
|
|
|
|
|
|
|
Occupation Code |
Title |
Mean Hourly Rate |
110% OH and benefits |
Estimated Total Pay with Benefits |
|
|
|
|
Notification of construction |
2 |
1 |
2 |
288 |
576 |
28.8 |
57.6 |
$59,845 |
|
11-0000 |
Mgmt Occup |
76.87 |
84.56 |
161.43 |
|
|
|
|
Notification of actual startup |
2 |
1 |
2 |
288 |
576 |
28.8 |
57.6 |
$59,845 |
|
17-2081 |
Environmental Engineer |
61.84 |
68.02 |
129.86 |
|
|
|
|
Notification of physical/ operational changes |
N/A |
|
|
|
|
|
|
|
|
49-0000 |
Maintenance/Inspections |
43.64 |
48.00 |
91.64 |
|
|
|
|
Notification of malfunction |
N/A |
|
|
|
|
|
|
|
|
43-0000 |
Office and Admin Support |
28.95 |
31.85 |
60.80 |
|
|
|
|
Notification of gap measurement inspection |
2 |
1 |
2 |
17.28 |
34.56 |
1.728 |
3.456 |
$3,591 |
|
|
Technical |
47.28 |
52.008 |
99.29 |
|
|
|
|
Notification of IFR delay of repair/emptying |
4 |
1 |
4 |
2.742 |
10.968 |
0.5484 |
1.0968 |
$1,140 |
|
|
|
|
|
|
|
|
|
|
Notification of EFR delay of repair/emptying |
4 |
1 |
4 |
0.0288 |
0.1152 |
0.00576 |
0.01152 |
$12 |
|
NSPS Kc Labor Rates (Average of Chemical Manufacturing and Petroleum and Coal Products Manufacturing) |
|
|
|
|
|
|
|
|
Notification of filling or refilling |
2 |
1 |
2 |
346.386 |
692.772 |
34.6386 |
69.2772 |
$71,978 |
|
Occupation Code |
Title |
Mean Hourly Rate |
110% OH and benefits |
Estimated Total Pay with Benefits |
|
|
|
|
Semiannual report |
|
|
|
|
|
|
|
|
|
11-0000 |
Mgmt Occup |
76.81 |
84.49 |
161.30 |
|
|
|
|
Compile semiannual report |
4 |
2 |
8 |
588.00 |
4704 |
235.2 |
470.4 |
$488,736 |
|
17-2081 |
Environmental Engineer |
60.53 |
66.58 |
127.11 |
|
|
|
|
Report of IFR failure |
2 |
1 |
2 |
27.42 |
54.84 |
2.742 |
5.484 |
$5,698 |
|
49-9000 |
Maintenance/Inspections |
38.51 |
42.36 |
80.87 |
|
|
|
|
Report of EFR failure |
2 |
1 |
2 |
0.29 |
0.576 |
0.0288 |
0.0576 |
$60 |
|
43-0000 |
Office and Admin Support |
27.25 |
29.98 |
57.23 |
|
|
|
|
EFR 1st seal gap measurement |
4 |
1 |
4 |
14.4 |
57.6 |
2.88 |
5.76 |
$5,985 |
|
|
Technical |
42.91 |
47.20 |
90.11 |
|
|
|
|
EFR 2nd seal gap measurement |
2 |
1 |
2 |
14.4 |
28.8 |
1.44 |
2.88 |
$2,992 |
|
|
|
|
|
|
|
|
|
|
CVS CPMS deviation |
2 |
10 |
20 |
10.80 |
216 |
10.8 |
21.6 |
$22,442 |
|
|
|
|
|
|
|
|
|
|
CVS flare deviation |
2 |
10 |
20 |
0.00 |
0 |
0 |
0 |
$0 |
|
Internal Floating Roof Tanks |
Total Number Tanks Across 5 Years |
Year 1 |
Year 2 |
Year 3 |
Year 4 |
Year 5 |
3 Year Average |
|
|
|
|
|
|
|
|
|
|
|
New IFR Tanks |
1368 |
273.6 |
273.6 |
273.6 |
273.6 |
273.6 |
273.6 |
|
Subtotal for Reporting Requirements |
|
|
|
|
7,246 |
362 |
725 |
$752,869 |
|
Modified IFR Tanks |
3 |
0.6 |
0.6 |
0.6 |
0.6 |
0.6 |
0.6 |
|
4. Recordkeeping requirements |
|
|
|
|
|
|
|
|
|
New Subject IFR Tanks |
1371 |
274.2 |
274.2 |
274.2 |
274.2 |
274.2 |
274.2 |
|
A. Read instructions |
1 |
1 |
1 |
294 |
294 |
14.7 |
29.4 |
$30,546 |
|
Previously Subject IFR Tanks |
0 |
0 |
274.2 |
548.4 |
822.6 |
1096.8 |
274.2 |
|
B. Gather and record information |
|
|
|
|
0 |
0 |
0 |
$0 |
|
Total Subject IFR Tanks |
1371 |
274.2 |
548.4 |
822.6 |
1096.8 |
1371 |
548.4 |
|
Vessel volumes, liquid vapor pressures, flares |
1 |
1 |
1 |
588.00 |
588.00 |
29.40 |
58.80 |
$61,092 |
|
Initial IFR Inspection |
1371 |
274.2 |
274.2 |
274.2 |
274.2 |
274.2 |
274.2 |
|
IFR internal inspection |
12 |
1 |
12 |
301.62 |
3619.44 |
180.97 |
361.94 |
$376,053 |
|
Yearly External IFR Inspection |
2467.8 |
0 |
246.78 |
493.56 |
740.34 |
987.12 |
246.78 |
|
IFR external inspection |
4 |
1 |
4 |
246.78 |
987.12 |
49.36 |
98.71 |
$102,560 |
|
Failed External IFR Inspection |
246.78 |
0 |
24.678 |
49.356 |
74.034 |
98.712 |
24.678 |
10% failure rate |
EFR gap measurement |
12 |
1 |
12 |
17.28 |
207.36 |
10.37 |
20.74 |
$21,544 |
|
Internal IFR Inspection (10 years) |
274.2 |
0 |
27.42 |
54.84 |
82.26 |
109.68 |
27.42 |
|
EFR internal inspection |
12 |
1 |
12 |
0.29 |
3.46 |
0.17 |
0.35 |
$359 |
|
Failed Internal IFR Inspection |
27.42 |
0 |
2.742 |
5.484 |
8.226 |
10.968 |
2.742 |
10% failure rate |
LEL monitoring |
0.75 |
1 |
0.75 |
548.40 |
411.30 |
20.57 |
41.13 |
$42,733 |
|
|
|
|
|
|
|
|
|
|
CVS operating plan |
4 |
1 |
4 |
5.40 |
21.60 |
1.08 |
2.16 |
$2,244 |
|
External Floating Roof Tanks |
Total Number Tanks Across 5 Years |
Year 1 |
Year 2 |
Year 3 |
Year 4 |
Year 5 |
3 Year Average |
|
Flare monitoring |
2 |
52 |
104 |
0.00 |
0.00 |
0.00 |
0.00 |
$0 |
|
New EFR Tanks |
72 |
14.4 |
14.4 |
14.4 |
14.4 |
14.4 |
14.4 |
|
Flare visible emissions events |
2 |
1 |
2 |
0.00 |
0.00 |
0.00 |
0.00 |
$0 |
|
New Subject EFR Tanks |
72 |
14.4 |
14.4 |
14.4 |
14.4 |
14.4 |
14.4 |
|
Flare operations |
2 |
1 |
2 |
0.00 |
0.00 |
0.00 |
0.00 |
$0 |
|
Previously Subject EFR Tanks |
0 |
0 |
14.4 |
28.8 |
43.2 |
57.6 |
14.4 |
|
Degassing events |
2 |
1 |
2 |
52.39 |
104.77 |
5.24 |
10.48 |
$10,886 |
|
Total Subject EFR Tanks |
72 |
14.4 |
28.8 |
43.2 |
57.6 |
72 |
28.8 |
|
C. Develop record system (5 year retention) |
10 |
1 |
10 |
5.40 |
54.00 |
2.70 |
5.40 |
$5,610 |
|
Initial EFR Gap Measurement |
72 |
14.4 |
14.4 |
14.4 |
14.4 |
14.4 |
14.4 |
|
D. Time to enter information |
|
|
|
|
0 |
0 |
0 |
$0 |
|
EFR Gap Measurement (5 years) |
28.8 |
0 |
2.88 |
5.76 |
8.64 |
11.52 |
2.88 |
|
CVS parameter records |
2 |
52 |
104 |
10.8 |
1123.2 |
56.16 |
112.32 |
$116,698 |
|
Failed EFR Gap Measurement |
2.88 |
0 |
0.288 |
0.576 |
0.864 |
1.152 |
0.288 |
10% failure rate |
E. Train personnel |
N/A |
|
|
|
0 |
0 |
0 |
$0 |
|
Internal EFR Inspection (when emptied/degassed) |
2.88 |
0 |
0.288 |
0.576 |
0.864 |
1.152 |
0.288 |
|
F. Audits |
N/A |
|
|
|
0 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
Subtotal for Recordkeeping Requirements |
|
|
|
|
7,414.2 |
370.7 |
741.4 |
$770,326 |
|
Fixed Roof Tanks |
Total Number Tanks Across 5 Years |
Year 1 |
Year 2 |
Year 3 |
Year 4 |
Year 5 |
3 Year Average |
|
TOTAL LABOR BURDEN AND COST |
|
|
|
|
16,860 |
|
|
$1,523,194 |
|
Modified Fixed Roof Tanks |
27 |
5.4 |
5.4 |
5.4 |
5.4 |
5.4 |
5.4 |
|
Capital O&M Cost |
|
|
|
|
|
|
|
$0 |
|
New Subject Fixed Roof Tanks |
27 |
5.4 |
5.4 |
5.4 |
5.4 |
5.4 |
5.4 |
|
GRAND TOTAL |
|
|
|
|
|
|
|
$1,523,194 |
|
Previously Subject Fixed Roof Tanks |
0 |
0 |
5.4 |
10.8 |
16.2 |
21.6 |
5.4 |
|
Assumptions: |
|
|
|
|
|
|
|
|
|
Total Subject Fixed Roof Tanks |
27 |
5.4 |
10.8 |
16.2 |
21.6 |
27 |
10.8 |
|
a The average number of respondents per year over the first three years of this ICR. |
|
|
|
|
|
|
|
|
|
New Subject CVS non-flare |
27 |
5.4 |
5.4 |
5.4 |
5.4 |
5.4 |
5.4 |
|
b This ICR uses the following labor rates from the United States Department of Labor, Bureau of Labor Statistics, May 2022, national mean labor rates for Management Occupations (11-0000), Environmental Engineers (17-2081), Maintenance/Inspections (49-0000), and Office and Administrative Support (43-0000) for the Chemical Manufacturing and Petroleum and Coal Products Manufacturing industries. The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry. Using an average of the two industries, fully burdened hourly rates are: $146.81 for management; $72.67 for technical (20% engineer and 80% maintenance/inspection); and $49.82 for clerical. |
|
|
|
|
|
|
|
|
|
Total Subject CVS non-flare |
27 |
5.4 |
10.8 |
16.2 |
21.6 |
27 |
10.8 |
|
|
|
|
|
|
|
|
|
|
|
Total Subject CVS flare |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Year |
Number of Respondents |
|
|
|
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
|
|
|
Respondents that Submit Reports |
Respondents That Do Not Submit Any Reports |
|
|
|
|
|
Monitoring Device |
Capital/Startup Cost for One Respondent |
Number of New Respondents |
Total Capital/Startup Cost, (B x C) |
Annual O&M Costs for One Respondent |
Number of Respondents with O&M |
Total O&M, (E x F) |
|
|
|
(A) Number of New Respondents |
(B) Number of Existing Respondents |
(C) Number of Existing Respondents that keep records but do not submit reports |
(D) Number of Existing Respondents That Are Also New Respondents |
(E) Number of Respondents (E=A+B+C-D) |
|
|
|
LEL monitor |
$750 |
0 |
$0 |
$100 |
0 |
$0 |
|
|
|
1 |
294 |
0 |
0 |
0 |
294 |
|
|
|
Total |
|
|
$0 |
|
|
$0 |
|
|
|
2 |
294 |
294 |
0 |
0 |
588 |
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
294 |
588 |
0 |
0 |
882 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Average |
294 |
294 |
0 |
0 |
588 |
|
|
|
Table 2: Average Annual EPA Burden and Cost – NSPS subpart Kc (Proposed Rule) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2022: |
$52.37 |
$70.56 |
$28.34 |
|
|
|
|
|
|
|
|
|
|
|
Activity |
(A) EPA person-hours per occurrence |
(B) No. of occurrences per plant per year |
(C) EPA person hours per plant per year (AxB) |
(D) Plants per year |
(E) Technical person-hours per year (CxD) |
(F) Management person-hours per year (Ex0.05) |
(G) Clerical person-hours per year (Ex0.1) |
(H) Cost, $ a |
|
Agency Worker Rates |
Labor Rates, $/hr a |
60% Overhead |
Total, $/hr |
|
|
|
|
|
Report review: New plant |
|
|
|
|
|
|
|
|
|
Managerial (GS-13, step 5) |
$44.10 |
$26.46 |
$70.56 |
|
|
|
|
|
Notification of construction |
2 |
1 |
2 |
288 |
576 |
29 |
58 |
$33,828 |
|
Technical (GS-12, step 1) |
$32.73 |
$19.64 |
$52.37 |
|
|
|
|
|
Notification of actual startup |
1 |
1 |
1 |
288 |
288 |
14 |
29 |
$16,914 |
|
Clerical (GS-6, step 3) |
$17.71 |
$10.63 |
$28.34 |
|
|
|
|
|
Notification of gap measurement inspection |
1 |
1 |
1 |
14.4 |
|
|
|
|
|
a https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2022/GS_h.pdf |
|
|
|
|
|
|
|
|
Notification of filling or refilling |
1 |
1 |
1 |
294 |
294 |
15 |
29 |
$17,267 |
|
Effective January 2022 |
|
|
|
|
|
|
|
|
Report review: Existing plant |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Notification of physical/ operational changes |
1 |
1 |
1 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
Notification of malfunction |
1 |
1 |
1 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
|
|
|
|
|
|
|
Notification of gap measurement inspection |
1 |
1 |
1 |
2.88 |
3 |
0 |
0 |
$169 |
|
|
|
|
|
|
|
|
|
|
Notification of IFR delay of repair/emptying |
1 |
1 |
1 |
2.742 |
3 |
0 |
0 |
$161 |
|
|
|
|
|
|
|
|
|
|
Notification of EFR delay of repair/emptying |
1 |
1 |
1 |
0.0288 |
0 |
0 |
0 |
$2 |
|
|
|
|
|
|
|
|
|
|
Notification of filling or refilling |
1 |
1 |
1 |
52.386 |
52 |
3 |
5 |
$3,077 |
|
|
|
|
|
|
|
|
|
|
Semiannual report |
2 |
2 |
4 |
588.00 |
2,352 |
118 |
235 |
$138,132 |
|
|
|
|
|
|
|
|
|
|
TOTAL BURDEN AND COST |
|
|
|
|
1,335 |
$209,549 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Assumptions: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a This cost is based on the following 2022 labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: $70.56 Managerial rate (GS-13, Step 5), $52.37 Technical rate (GS-12, Step 1), and $28.34 Clerical rate (GS-6, Step 3). These rates are calculated from the hourly rates included in the Office of Personnel Management (OPM) 2022 General Schedule which excludes locality rates of pay; the rates have been increased by 60 percent to account for benefit packages available to government employees. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Information Collection Activity |
Number of Respondents |
Number of Responses |
Number of Existing Respondents That Keep Records But Do Not Submit Reports |
Total Annual Responses |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E=(BxC)+D |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Notification of construction |
288 |
1 |
0 |
288 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Notification of actual startup |
288 |
1 |
0 |
288 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Notification of physical/ operational changes |
0 |
1 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Notification of malfunction |
0 |
1 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Notification of gap measurement inspection |
17.28 |
1 |
0 |
17.28 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Notification of IFR delay of repair/emptying |
2.742 |
1 |
0 |
2.742 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Notification of EFR delay of repair/emptying |
0.0288 |
1 |
0 |
0.0288 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Notification of filling or refilling |
346.386 |
1 |
0 |
346.386 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Semiannual report |
588.00 |
2 |
0 |
1176 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
2118 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Averge response burden |
7.96 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|