Notices of Enforcement Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion Plants (GDP), (NRC Enforcement Policy)

ICR 202310-3150-003

OMB: 3150-0136

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2023-10-27
Supporting Statement A
2023-10-26
ICR Details
3150-0136 202310-3150-003
Received in OIRA 202006-3150-001
NRC
Notices of Enforcement Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion Plants (GDP), (NRC Enforcement Policy)
Extension without change of a currently approved collection   No
Regular 10/27/2023
  Requested Previously Approved
36 Months From Approved 01/31/2024
8 8
680 680
9 9

The NRC’s Enforcement Policy includes the circumstances in which the NRC may grant a NOED. On occasion, circumstances arise when a power plant licensee’s compliance with a Technical Specification (TS) Limiting Condition for Operation or any other license condition would involve an unnecessary plant shutdown or transient. Similarly, for a gaseous diffusion plant, circumstances may arise where compliance with a Technical Safety Requirement (TSR) or other condition would unnecessarily call for a total plant shutdown, or, compliance would unnecessarily place the plant in a condition where safety, safeguards, or security features were degraded or inoperable. In these circumstances, a licensee or certificate holder may request that the NRC exercise enforcement discretion, and the NRC staff may choose to not enforce the applicable TS, TSR, or other license or certificate condition. This enforcement discretion is designated as a NOED. A licensee or certificate holder seeking the issuance of a NOED must justify, in accordance with NRC Enforcement Manual, the safety basis for the request, including an evaluation of the safety significance and potential consequences of the proposed request, a description of proposed compensatory measures, a justification for the duration of the request, the basis for the licensee's or certificate holder’s conclusion that the request does not have a potential adverse impact on the public health and safety, and does not involve adverse consequences to the environment, and any other information the NRC staff deems necessary before making a decision to exercise discretion.

PL: Pub.L. 83 - 703 1-311 Name of Law: Atomic Energy Act
  
None

Not associated with rulemaking

  88 FR 38106 06/12/2023
88 FR 73880 10/27/2023
No

1
IC Title Form No. Form Name
Notices of Enforcement Discretion (NOEDs) for Operating Reactors and Gaseous Diffusion Plants (GDP)

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 8 8 0 0 0 0
Annual Time Burden (Hours) 680 680 0 0 0 0
Annual Cost Burden (Dollars) 9 9 0 0 0 0
No
No

$46,400
No
    No
    No
No
No
No
No
G. Edward Miller 301 415-2481 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
10/27/2023


© 2024 OMB.report | Privacy Policy