NRC Enforcement Manual, Parts I and II, Revision 11, Change 10, Dated February 24, 2022 (2)

Notices of Enforcement Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion Plants (GDP), (NRC Enforcement Policy)

NRC Enforcement Manual, Parts I and II, Revision 11, Change 10, Dated February 24, 2022 (2)

OMB: 3150-0136

Document [pdf]
Download: pdf | pdf
NUCLEAR REGULATORY COMMISSION
ENFORCEMENT MANUAL

U.S. Nuclear Regulatory Commission
Office of Enforcement
Washington, DC 20555-0001
Revision 11
Change 10
February 24, 2022

NRC Enforcement Manual

Overview
The sources of the NRC’s enforcement authority are the Atomic Energy Act of 1954, as
amended; the Energy Reorganization Act of 1974, as amended; and the Energy Policy Act of
2005. These statutes give the NRC broad authority. The Energy Policy Act of 2005 expanded
the definition of byproduct material, placing additional byproduct material under the NRC’s
jurisdiction, including both naturally occurring and accelerator produced radioactive materials
(NARM). The agency implements its enforcement authority through Title 10 of the Code of
Federal Regulations (10 CFR) Part 2, “Agency Rules of Practice and Procedure,” Subpart B,
“Procedures for Imposing Requirements by Order, or for Modification, Suspension, or
Revocation of a License, or for Imposing Civil Penalties.” The Administrative Dispute
Resolution Act of 1996 provides the statutory framework for the Federal Government to use
alternative dispute resolution (ADR).
The NRC Enforcement Policy establishes the general principles governing the NRC’s
Enforcement Program and specifies a process for implementing the agency’s enforcement
authority in response to violations of NRC requirements. This statement of policy is predicated
on the NRC’s view that compliance with NRC requirements serves a key role in ensuring safety,
maintaining security, and protecting the environment.
Enforcement authority includes the use of notices of violation; civil penalties; demands for
information; and orders to modify, suspend, or revoke a license. The NRC staff may exercise
discretion in determining the appropriate enforcement sanctions to be taken. Most violations
are identified through inspections and investigations and are normally assigned a severity level
(SL) ranging from SL IV, for those of more than minor concern, to SL I, for the most significant.
The Reactor Oversight Process (ROP) works in conjunction with the enforcement process for
operating nuclear reactors. Under the ROP, violations are not normally assigned a severity
level, but instead are assessed through the ROP and usually referred to as “findings.” Under
this program, the NRC determines the risk significance of inspection findings using the
significance determination process (SDP), which assigns the colors of green, white, yellow, or
red, with increasing risk significance. Findings under the ROP also may include licensee
failures to meet self-imposed standards. As such, an ROP finding may or may not involve a
violation of a regulatory requirement.
While the SDP can process most violations at operating power reactors, it cannot address
aspects of some violations; such violations require the NRC to follow the traditional enforcement
process. These include violations that resulted in actual safety or security consequences,
violations that may affect the ability of the NRC to perform its regulatory oversight function, and
violations that involve willfulness. In addition, while ROP findings are not normally subject to
civil penalties, the NRC does consider civil penalties for any violation that involves actual
consequences. SL IV violations and violations associated with green ROP findings are normally
dispositioned as noncited violations (NCVs). Inspection reports or inspection records document
NCVs and briefly describe the corrective action that the licensee has taken or plans to take, if
known at the time the NCV is documented.
The Office of Enforcement (OE) oversees NRC enforcement, giving programmatic and
implementation direction to regional and headquarters offices that conduct or are involved in
enforcement activities, and ensures that regional and program offices consistently implement
their enforcement programs. To this end, OE has developed and maintains the NRC

2

NRC Enforcement Manual

Enforcement Manual (Manual) which provides specific guidance to staff on implementation of
the NRC enforcement program.
The NRC Enforcement Manual:
•
•

is the primary source of staff guidance
contains procedures, requirements, and background information that are essential to
those who develop or review enforcement actions for the NRC

The guidance provided in this manual has been written to be consistent with the Enforcement
Policy. Because it is a policy statement, the Commission may deviate from the Enforcement
Policy and its implementing procedures, as appropriate, under the circumstances of a particular
case. In such cases, the Administrative Procedure Act (APA) requires that agency decisions
have a reasonable basis and prohibits a decision that is arbitrary or capricious. The
Enforcement Policy is revised (and the Manual is updated) periodically to reflect current
Commission direction. Before deciding on a specific enforcement action for enforcement issues
which were identified prior to the effective date of a policy revision, the staff will consider the
guidance from both the previous version of the Policy and the revised version, and typically will
apply the more lenient of the two policy versions.
The Manual applies to the enforcement activities of the Office of Enforcement (OE), the
Regional Offices, the Offices of Nuclear Reactor Regulation (NRR), Nuclear Material Safety and
Safeguards (NMSS), Nuclear Security and Incident Response (NSIR), International Programs
(OIP), and all other special teams or task forces involved in enforcement activities. It also
applies to the enforcement role of the Office of the General Counsel (OGC), with particular
emphasis placed on the Associate General Counsel for Hearings, and the Assistant General
Counsel for Security and Enforcement (SE).
Most enforcement actions are initiated from one of the Regional Offices; therefore, this Manual
has been structured to reflect that the Regional Offices, for the most part, initiate, recommend,
or issue enforcement actions. However, all offices that conduct inspections and determine
compliance should follow the guidance in this Manual. Program offices, such as NRR, NMSS,
NSIR, or OIP that take the lead for an enforcement action, assume the responsibilities of both
the Program Office and the Regional Office for that action. In such cases, the Program Office
should follow the guidance applicable to both the Program Office and the Regional Office.
The Manual is divided into three Parts. Part I discusses the enforcement program and provides
guidance related to identification and processing of enforcement actions. It also includes a
discussion on the roles, responsibilities, and authorities of each organization that implements
the NRC enforcement program. Part II provides detailed guidance on specific enforcement
areas of concern that have special processing requirements. For example, guidance for
processing individual enforcement actions and requirements specific for processing reactor,
materials, and fuel cycle licensee enforcement actions are contained in Part II. Part III contains
supplemental information that may be helpful in processing enforcement actions. A list of active
Enforcement Guidance Memoranda (EGMs), standard formats for enforcement packages,
examples of standard enforcement citations, minor violation examples and enforcement
processing aids and forms are contained in Part III.
The Manual is a living document and is maintained on the NRC Enforcement Web site. It can
also be found on the NRC’s public Web site, www.nrc.gov (Select ADAMS Public Documents,
then Basic References, under “Key Guidance Documents” select “Enforcement Manual”).
3

NRC Enforcement Manual

Changes to the Manual are contained in “Change Notices” posted in the Change Notice Index
on the Enforcement Web site. Enforcement Policy changes are also documented annually in
the NRC Enforcement Program Annual Report.
Questions or comments about this manual should be sent to David Jones, Senior Enforcement
Specialist, Office of Enforcement at [email protected].

4

NRC Enforcement Manual

TABLE OF CONTENTS
– ENFORCEMENT PROCESS ...................................................................................... 6
PART I - 1 NRC ENFORCEMENT PROGRAM ...................................................................12
PART I - 2 DISPOSITION OF VIOLATIONS .......................................................................92
PART I - 3 EXERCISE OF DISCRETION ..........................................................................180
PART I - 4 ADDITIONAL ENFORCEMENT-RELATED TOOLS.........................................195
PART I - 5 RESPONSIBILITIES AND AUTHORITIES .......................................................211
– TOPICAL CHAPTERS ............................................................................................248
PART II - 1 GENERAL TOPICS ........................................................................................251
PART II - 2 REACTOR TOPICS ........................................................................................338
PART II - 3 MATERIALS TOPICS .....................................................................................403
PART II - 4 REACTORS UNDER CONSTRUCTION .........................................................441
PART II - 5 IMPORT – EXPORT ENFORCEMENT TOPICS .............................................447

LIST OF FIGURES (PART I)
Figure 1: NRC Enforcement Process .......................................................................................13
Figure 2: Escalated Enforcement Case Processing .................................................................32
Figure 3: Consideration of an NOV, with Approved Corrective Action Program ........................96
Figure 4: Consideration of an NOV, All Other Licensees ........................................................102
Figure 5: Civil Penalty Assessment Process “Metro Map” ......................................................124

LIST OF FIGURES (PART II)
Figure 1: Length of a ban .......................................................................................................317

5

PART I: Enforcement Process

– ENFORCEMENT PROCESS
Part I provides an overview of the enforcement program and is separated into sections devoted
to guidance for each enforcement action discussed in the Enforcement Policy. Sections provide
guidance on: (1) identifying and processing minor violations, non-cited violations, non-escalated
and escalated violations, and violations associated with inspection findings identified through
the reactor oversight process (ROP); (2) assessing the significance of violations, the civil
penalty assessment process, and the use of enforcement orders; (3) the use of enforcement
discretion, Demands for Information (DFIs), Confirmatory Action Letters (CALs), Notices of
Deviation (NODs) and Notices of Nonconformance (NON); (4) tracking and documenting
enforcement actions, including closeout letters; (5) conducting predecisional enforcement
panels and significance determination process enforcement review panels (SERPs),
(6) handling predecisional enforcement information and conducting predecisional enforcement
conferences (PECs) and regulatory conferences; and (7) and the Commission notification
process. Part I also includes information regarding the roles, responsibilities, and signature
authorities of each NRC office involved with implementation of the enforcement program.

6

PART I: Enforcement Process

PART I – TABLE OF CONTENTS
PART I - 1 NRC ENFORCEMENT PROGRAM .........................................................................12
Introduction ..............................................................................................................14
The Enforcement Program ..............................................................................14
Overview of the Enforcement Process ............................................................14
The Enforcement Component of the Reactor Oversight Process ....................16
The Enforcement Component of the Construction Reactor Oversight Process17
Enforcement Actions Involving Individuals ......................................................17
Statute of Limitations.......................................................................................18
Dispositioning Noncompliances ...............................................................................19
Protecting Public Health and Safety and Providing for the Common Defense
and Security ....................................................................................................19
Identifying Noncompliances ............................................................................19
Gathering Facts ..............................................................................................20
Assessing Significance ...................................................................................21
Assigning Severity Levels ...............................................................................24
Using Enforcement Policy Violation Examples ................................................25
Using Other Enforcement Guidance Documents .............................................26
Using Information from the Significance Determination Process (SDP) ...........27
Using Risk Significance ...................................................................................29
Factors That Do Not Affect Significance ..........................................................31
General Overview of Escalated Enforcement Case Processing ......................32
Tracking Enforcement and SDP Issues ...........................................................33
Enforcement and Significance Determination Process Enforcement Review
Panel (SERP) Panels ......................................................................................39
Proper Handling of Predecisional Enforcement Information ............................51
Predecisional Enforcement Conferences and Regulatory Conferences...........51
Enforcement and SDP Caucuses ....................................................................68
Commission Notification and Consultation ......................................................73
Press Release.................................................................................................77
Licensee Response to Agency Action .............................................................78
Statute of Limitations.......................................................................................78
Reopening Closed Enforcement Actions .........................................................80
Settlement of Enforcement Proceedings and Actions ......................................80
General Documentation of Enforcement Issues .......................................................82
Documenting Noncompliances ........................................................................82
Documenting Potential Escalated Enforcement Actions ..................................83
Documenting Violations That Potentially Involve Willfulness ...........................83
Documenting Multiple Examples of a Violation ................................................84
Documenting Related Violations .....................................................................85
Documenting Examples of Violations Previously Cited....................................88

7

PART I: Enforcement Process

Documentation of Security-Related Information in Publicly Available Cover
Letters.............................................................................................................88
Protecting SUNSI and Predecisional Enforcement Information .......................91
PART I - 2 DISPOSITION OF VIOLATIONS .............................................................................92
Minor Violations .......................................................................................................93
Documenting Minor Violations .........................................................................93
Noncited Violations (NCVs) .....................................................................................94
NCVs for Power Reactor Licensees ................................................................95
Circumstances Resulting in Consideration of an NOV (vs. an NCV) for
Licensees and Non-Licensees with an Approved Corrective Action Program..96
Circumstances Resulting in Consideration of an NOV (vs. an NCV) for All Other
Licensees .....................................................................................................102
Issuing an NCV When Criteria in Section 2.3.2 of the Enforcement Policy are
met for issuing an NOV .................................................................................106
Documenting Noncited Violations (NCVs) .....................................................106
NCV Coordination, Review and Issuance......................................................108
Licensee Disputes of NCVs...........................................................................109
Non-Escalated Notice of Violation (NOV)...............................................................109
Preparing a Non-Escalated NOV Action ........................................................109
Issuing a Non-Escalated NOV Beyond the NCV Criteria of the Enforcement
Policy ............................................................................................................111
Documenting Non-Escalated Enforcement Actions .......................................112
Non-Escalated NOV Coordination, Review and Issuance .............................112
Licensee Notification, Mailing, and Distribution for Non-Escalated NOVs ......113
Licensee Response to a Non-Escalated NOV ...............................................113
Escalated Notices of Violation without a Civil Penalty ............................................114
Preparing an Escalated NOV Action .............................................................114
Escalated NOV Coordination, Review and Issuance .....................................117
Licensee Notification & Distribution of Escalated NOVs ................................118
Licensee Response to Escalated NOVs ........................................................119
NOV and NOV/CP Coordination and Review Output Measures ....................120
Press Releases for NOVs and NOV/CPs ......................................................121
Determining Whether a Civil Penalty Should Be Proposed ....................................122
Base Civil Penalty .........................................................................................123
Civil Penalty Assessment Process ................................................................124
Assigning Final Civil Penalty Amounts ..........................................................136
Civil Penalty Assessment Process Outcome .................................................136
Ability to Pay and Size of Operation ..............................................................137
Small Business Regulatory Enforcement Fairness Act (SBREFA) ................139
Notice of Violation and Proposed Imposition of Civil Penalty (NOV/CP).................140
Preparing an NOV/CP Action ........................................................................141
NOV/CP Coordination, Review and Issuance................................................144
Licensee Notification & Distribution of NOV/CPs ...........................................145

8

PART I: Enforcement Process

Licensee Response to NOV/CPs ..................................................................147
Civil Penalty Payment Plans .........................................................................150
NOV and NOV/CP Coordination and Review Output Measures ....................151
Press Releases for NOVs and NOV/CPs ......................................................151
Orders ...................................................................................................................153
Order Modifying, Suspending, or Revoking License ......................................155
Immediately Effective Orders ........................................................................157
Preparing an Order Action.............................................................................157
Order Coordination, Review and Issuance ....................................................158
Licensee Notification & Distribution of Orders ...............................................160
Press Releases for Orders ............................................................................161
Licensee Responses to Orders .....................................................................161
Relaxation, Withdrawal, or Rescission of Orders...........................................162
Orders Restricting NRC-Licensed Activities and Requiring Notice of New
Employment ..................................................................................................165
Order Imposing Civil Monetary Penalty (Imposition Order) ............................168
Disputed Violations ................................................................................................174
Disputed Violation Resolution Process ..........................................................174
Documenting Responses to Disputed Violations ...........................................177
Backfitting Concerns and Appeals.................................................................178
PART I - 3 EXERCISE OF DISCRETION................................................................................180
Use of Enforcement Discretion ..............................................................................181
Violations Identified During Extended Shutdowns or Work Stoppages ...................181
Violations Involving Old Design Issues ..................................................................182
Violations Identified Due to Previous Escalated Enforcement Actions....................183
Violations Involving Certain Discrimination Issues .................................................184
Violations Involving Special Circumstances ...........................................................185
Use of Discretion in Determining the Amount of a Civil Penalty .............................187
Escalation of Civil Penalties ..........................................................................188
Daily Civil Penalties.......................................................................................189
Mitigation of Civil Penalties ...........................................................................190
Exercise of Discretion to Issue Orders ...................................................................190
Exercise of Enforcement Discretion for FSAR Issues ............................................190
Exercise of Enforcement Discretion Involving Transportation Casks ......................192
Reactor Violations with No Performance Deficiencies ............................................192
Documenting Enforcement Discretion ....................................................................193
Notice of Enforcement Discretion (NOED) .............................................................194
PART I - 4 ADDITIONAL ENFORCEMENT-RELATED TOOLS ..............................................195
Demand for Information (DFI) ................................................................................196
Preparing a DFI Action ..................................................................................196
DFI Coordination, Review and Issuance .......................................................197
Licensee Notification & Distribution of DFI ....................................................198
9

PART I: Enforcement Process

Licensee Response to DFI ............................................................................198
Closeout Letters ....................................................................................................199
Confirmatory Action Letter (CAL) ...........................................................................200
Noncompliance with CALs ............................................................................202
CAL Responsibilities .....................................................................................203
CAL Tracking ................................................................................................203
Preparing a CAL ...........................................................................................203
CAL Coordination, Review and Issuance ......................................................204
CAL Signature Authority ................................................................................205
Licensee Notification, Mailing, and Distribution for CALs ...............................205
Closing Out CALs .........................................................................................206
Press Releases for CALs ..............................................................................206
Notice of Deviation (NOD) .....................................................................................207
Preparing an NOD Action ..............................................................................207
Licensee Notification, Mailing, and Distribution for NODs ..............................208
Notice of Nonconformance (NON) .........................................................................209
Preparing a NON Action ................................................................................209
Notification, Mailing, and Distribution of NONs ..............................................210
PART I - 5 RESPONSIBILITIES AND AUTHORITIES.............................................................211
Executive Director for Operations (EDO) ...............................................................212
Deputy Executive Directors for Operations (DEDOs) ....................................212
Office of Enforcement (OE)....................................................................................213
Regional Offices ....................................................................................................218
Headquarters Program Offices ..............................................................................226
Office of the General Counsel (OGC)............................................................226
Office of Nuclear Reactor Regulation (NRR) .................................................227
Office of Nuclear Material Safety and Safeguards (NMSS) ...........................231
Office of Nuclear Security and Incident Response (NSIR) .............................235
Office of International Programs (OIP) ..........................................................238
Office of the Chief Financial Officer (OCFO) .................................................240
Office of Public Affairs (OPA) ........................................................................240
Special Task Forces......................................................................................240
Summary of Program Office Delegation of Authority Memoranda .................241

10

PART I: Enforcement Process

PART I – LIST OF FIGURES
Figure 1: NRC Enforcement Process .......................................................................................13
Figure 2: Escalated Enforcement Case Processing .................................................................32
Figure 3: Consideration of an NOV, with Approved Corrective Action Program ........................96
Figure 4: Consideration of an NOV, All Other Licensees ........................................................102
Figure 5: Civil Penalty Assessment Process, “Metro Map” .....................................................124

11

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

PART I - 1 NRC ENFORCEMENT PROGRAM
This section provides information regarding:
•
•
•
•
•
•

the Enforcement Program (an introduction and overview)
the enforcement process outline, including diagram
identification of noncompliances
the assessment of violations
the processing of enforcement cases
the general documenting of enforcement cases

12

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

NRC Enforcement Process
The flowchart above represents the NRC’s graded approach to violations.

13

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

Introduction
The Enforcement Program
A. The NRC’s Enforcement Program uses a graded approach for violations, both in terms
of addressing their significance and developing sanctions.
B. The NRC assesses the significance of a violation by considering:
•
•
•
•

actual safety consequences;
potential safety consequences;
potential for impacting the NRC’s ability to perform its regulatory function; and,
any willful aspects of the violation.

C. Violations are assigned a severity level ranging from Severity Level I for the most
significant violations to Severity Level IV for those of more than minor concern.
D. Issues assessed through the Reactor Oversight Process’s (ROP) or Construction ROP
(cROP) Significance Determination Process (SDP) are assigned a color, i.e., red, yellow,
white or green, based on the risk significance, red being the most significant and green
being the least significant.
E. Minor violations must be corrected; however, given their limited risk significance, they
are not subject to enforcement action and are not normally described in inspection
reports.

Overview of the Enforcement Process
Generally, violations are identified through inspections and investigations. All violations are
subject to civil enforcement action and some may also be subject to criminal prosecution. When
an apparent violation is identified, it is assessed using the guidance in this Manual, in
accordance with the Enforcement Policy.
There are three primary enforcement sanctions available: notices of violation, civil penalties,
and orders.
•

A Notice of violation (NOV) is a written notice that concisely identifies an NRC
requirement and how it was allegedly violated. The NOV may require a written
explanation or statement in reply in accordance with the guidance provided in the Notice
(i.e., 10 CFR 2.201 specifies that the licensee or other person submit a written
explanation or statement in reply within 20 days of the date of notice or other time
specified in the Notice. The staff may allow additional time to respond upon a showing
of good cause).

•

A Civil Penalty is a monetary fine that is used to emphasize compliance in a manner
that deters future violations and to focus licensee’s attention on significant violations.
Accordingly, different levels of penalties are provided in Tables A and B, “Table of Base
Civil Penalties,” of the Enforcement Policy. Civil penalties are issued under the authority
of Section 234 of the Atomic Energy Act (AEA) or Section 206 of the Energy
Reorganization Act (ERA). Section 234 of the AEA provides for penalties up to
14

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

$100,000 per violation per day. This amount is adjusted annually for inflation in
accordance with the Federal Civil Penalties Inflation Adjustment Act Improvements Act
of 2015 (the 2015 Act). The current civil penalty amounts are published in the Policy.
•

Orders can be used to modify, suspend, or revoke licenses or require specific actions by
licensees or other persons. Orders can also be used to impose civil penalties. The
Commission's order issuing authority under Section 161 of the AEA is broad and
extends to any area of licensed activity that the Commission deems necessary to
promote the common defense and security or to protect health or to minimize danger to
life or property. In addition, as a result of a 1991 rulemaking, the Commission's
regulations now provide that orders may be issued to persons who are not themselves
licensed.

After an apparent violation is identified, the next step is to gather information about the apparent
violation and, thereafter, to assess its significance. Violations are assigned a severity level that
reflects their seriousness and safety significance which, in turn, determines how the violation
should be dispositioned. Severity Levels range from Severity Level I, for the most significant
violations, to Severity Level IV for those of more than minor concern. Minor violations are below
the significance of Severity Level IV violations and are typically not the subject of enforcement
action. Nevertheless, minor violations must be corrected.
In many cases, licensees who identify and promptly correct non-recurring Severity Level IV
violations, without NRC involvement, will not be subject to formal enforcement action. Such
violations may be characterized as "noncited" violations as provided in Section 2.3.2 of the
Enforcement Policy.
For materials licensees, if violations of more than a minor concern are identified by the NRC
during an inspection, such violations will be the subject of an NOV and a written response may
be required pursuant to 10 CFR 2.201, addressing the causes of the violations and corrective
actions taken or planned. In some cases, such violations can be documented on NRC Form
591 which constitutes an NOV that requires corrective action but does not require a written
response.
When escalated enforcement action appears to be warranted (i.e., Severity Level I, II, or III
violations, civil penalties or orders), a predecisional enforcement conference (PEC) may be
conducted with a licensee before the NRC makes an enforcement decision. A PEC may also
be held when the NRC concludes that it is necessary, or the licensee requests it. The purpose
of the PEC is to obtain information that will assist the NRC in determining the appropriate
enforcement action. The decision to hold a PEC does not mean that the agency has
determined that a violation has occurred or that enforcement action will be taken. If the NRC
concludes that a conference is not necessary, it may provide a licensee with an opportunity to
respond to the apparent violations in writing or by requesting a PEC before making an
enforcement decision.
Civil penalties are considered for Severity Level I, II and III violations and for NRC-identified
violations involving knowing and conscious violations of the reporting requirements of Section
206 of the Energy Reorganization Act.
If a civil penalty is to be proposed, a written NOV and proposed imposition of a civil penalty
must first be issued. The NOV must advise the person charged with the violation that the civil
penalty may be paid in the amount specified, or the proposed imposition of a civil penalty may
15

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

be contested in whole or in part, by a written response, either denying the violation or showing
extenuating circumstances. The NRC will evaluate the response and use that information to
determine if the civil penalty should be mitigated, remitted, or imposed by order. Thereafter, the
licensee may pay the civil penalty or request a hearing.
Orders may be used to modify, suspend, or revoke licenses. Orders may require additional
corrective actions, such as removing specified individuals from licensed activities or requiring
additional controls or outside audits. Persons adversely affected by orders that modify,
suspend, revoke a license, or that take other action, may request a hearing.
In addition to the orders used to modify, suspend, or revoke licenses, the agency may issue a
Demand for Information (DFI). A DFI is a significant enforcement action which can be used with
other enforcement actions such as an imposition of a civil penalty. As its name implies, a DFI is
a request for information from licensees and applicants for a license, vendors and contractors,
in order to determine, e.g., whether a license should be granted, suspended, or revoked, or
whether further enforcement action is warranted.
NOTE:
The NRC may issue a press release with a proposed civil penalty, Demand for
Information (DFI), or order. All orders and DFIs are published in the Federal
Register.

The Enforcement Component of the Reactor Oversight Process
The Reactor Oversight Process (ROP) utilizes the results of performance indicators (PIs) and
baseline inspection findings to determine the appropriate regulatory action to be taken in
response to a licensee’s performance. Because there are many aspects of facility operation
and maintenance, the NRC inspects utility programs and processes on a risk-informed sampling
basis to obtain representative information. The objective is to monitor performance in three
broad areas -- reactor safety (avoiding accidents and reducing the consequences of accidents if
they occur); radiation safety for both plant workers and the public during routine operations; and
protection of the plant against sabotage or other security threats. The ROP has been in effect
since April 2000.
Under the ROP, the staff assesses certain inspection findings at nuclear power plants through
the Significance Determination Process (SDP). The SDP is a risk-informed framework that was
developed to evaluate the actual and potential safety significance of these findings. Such
findings may contribute to potential safety concerns or programmatic weaknesses that do not
violate NRC regulations. The SDP provides a basis for discussing and communicating the
significance of such findings with the licensee. Some findings are associated with violations of
the regulations. The final disposition of the violations associated with findings that have been
evaluated through the SDP is contingent on the risk significance attributed to the findings
(assigned the colors of green, white, yellow, or red with increasing risk).
Regulatory Conferences are conducted in lieu of predecisional enforcement conferences if
violations are associated with risk significant findings evaluated through the SDP. Regulatory
Conferences are conducted to discuss the significance of findings evaluated through the SDP
with or without associated violations. The focus of these meetings is on the significance of the
16

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

issues and not necessarily on the corrective actions associated with the issue. Because the
significance assessment from the SDP determines whether or not escalated enforcement action
will be issued, a subsequent predecisional enforcement conference is not normally necessary.
Mitigation discretion addressed in Sections 3.1 - 3.5 of the Enforcement Policy (e.g., violations
identified during shutdowns, involving past enforcement actions, old design issues, or special
circumstances) does not normally apply to violations associated with issues evaluated by the
SDP.

The Enforcement Component of the Construction Reactor Oversight
Process
The Construction Reactor Oversight Process (cROP) uses the results of baseline inspection
findings to determine the appropriate regulatory action to be taken in response to a licensee’s
performance. The NRC inspects construction activities in two broad areas: construction and
operational programs; and construction activities associated with inspections, tests, analyses,
and acceptance criteria (ITAAC). The NRC inspects licensees’ construction programs at the
frequency dictated in associated inspection procedures. The NRC conducts one-time
inspections of licensees’ operational programs to ensure the respective program has been
adequately developed and implemented. The NRC inspects construction activities associated
with ITAACs on a risk-informed sampling basis (i.e., targeted ITAAC). The objective is to
monitor performance in three broad areas – construction reactor safety; safeguards programs,
and operational readiness. The cROP has been in effect since July 1, 2013.
Under the cROP, the staff assesses certain inspections findings at nuclear power plants under
construction through the construction SDP. The construction SDP is a risk-informed framework
that was developed to evaluate the actual and potential safety significance of these findings.
Such findings may contribute to potential safety concerns or programmatic weaknesses that do
not violate NRC regulations. The construction SDP provides a basis for discussing and
communicating the significance of such findings with the licensee. Some findings are
associated with violations of the regulations. The final disposition of the violations associated
with findings that have been evaluated through the construction SDP is contingent on the risk
significance attributed to the findings (assigned the colors of green, white, yellow, or red with
increasing risk).
Regulatory Conferences are conducted in lieu of predecisional enforcement conferences to
discuss the significance of potentially greater than green findings evaluated through the SDP
with or without associated violations. The focus of these meetings is on the significance of the
issues and not necessarily on the corrective actions associated with the issue. Because the
significance assessment from the construction SDP determines whether or not escalated
enforcement action will be issued, a subsequent predecisional enforcement conference is not
normally necessary. Mitigation discretion addressed in Sections 3.1 - 3.5 of the Enforcement
Policy (e.g., violations identified during shutdowns, involving past enforcement actions, old
design issues, or special circumstances) does not normally apply to violations associated with
issues evaluated by the construction SDP.

Enforcement Actions Involving Individuals
The NRC will normally take an enforcement action against an individual only if the staff is
satisfied that the individual fully understood, or should have understood, his or her responsibility;
knew or should have known, the required actions; and knowingly or with careless disregard (i.e.,

17

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

with more than mere negligence) failed to take required actions which have actual or potential
safety significance.
Actions can be taken directly against individuals either because they are individually licensed or
because they violated the rules on deliberate misconduct. Generally, when enforcement action
is taken against an individual, enforcement action is also taken against a licensee.

Statute of Limitations
The Statute of Limitations is applicable to NRC civil penalty cases (see 28 USC §2462) and
requires that the NRC initiate an action imposing a civil penalty, issuing an order to modify,
suspend, or revoke a license or an order prohibiting involvement in NRC licensed activity
(enforcement sanction) within the 5-year statutory period.
NOTE:
The Statute of Limitations is an affirmative defense which can be raised by a person
against whom such a sanction is proposed.
The Statute of Limitations does not prevent the staff from issuing an NOV (without a civil penalty
or other sanction) even if the underlying violation occurred more than five years earlier, or from
issuing an order requiring an action needed to ensure compliance with existing requirements
regarding protection of the public health and safety, promoting the common defense and
security, or protecting the environment.

18

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

Dispositioning Noncompliances
Protecting Public Health and Safety and Providing for the Common
Defense and Security
When an apparent safety or security issue is identified:
A. The region should initiate immediate action to correct the condition if the public is likely
to be endangered by continued operations or there is a concern involving the lack of
integrity of those involved in licensed activities. Immediate corrective action can include
issuing:
•
•

A Confirmatory Action Letter (CAL); or
An immediately effective order.
NOTE:
The first response when an apparent safety or common defense and security
issue is identified should be to ensure corrective actions are initiated.
Whether the issue may warrant enforcement action is a secondary
consideration.

B. Based on the circumstances of the case:
•
•

An expedited inspection report limited in scope to the issue may be prepared; or
The Office of Investigation (OI) may provide preliminary information.

Enforcement action may be taken before an inspection report is issued or a predecisional conference is held.

Identifying Noncompliances
Noncompliances include:
•

Violations: defined as a licensee's failure to comply with a legally binding requirement,
such as a regulation, rule, order, license condition, or technical specification.

•

Deviations: defined as a licensee's failure to:
o satisfy a written commitment; or
o conform to the provisions of a code, standard, guide, or accepted industry
practice when the commitment, code, standard, guide, or practice involved has
not been made a legally binding requirement by the Commission, but is expected
to be implemented.

•

Nonconformances: defined as a vendor's or certificate holder's failure to meet contract
requirements related to NRC activities (e.g., 10 CFR Part 50, Appendix B) where the
NRC has not placed requirements directly on the vendor or certificate holder.

19

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

NOTE:
Failure to comply with a Regulatory Guide or a Generic Letter is not a violation
(unless information in these documents has been incorporated into a license
condition) because Regulatory Guides and Generic Letters are not requirements. In
addition, a licensee's failure to comply with its procedures is not a violation unless
the licensee's procedures have been made a legally binding requirement, e.g., by
license condition.
Potential noncompliances may be identified through:
•
•
•
•
•
•

NRC inspections
NRC investigations
Allegations supported by an NRC inspection or investigation
Licensee internal audits
Licensee employee reports
Licensee self-disclosing events

Gathering Facts
A. It is necessary to gather specific information about an apparent noncompliance so that
the agency can make an informed decision on how to disposition it appropriately. When
an apparent noncompliance is identified, the agency must:
1. Determine whether a noncompliance has occurred (an event with safety
consequences does not necessarily constitute a noncompliance);
2. Assess the safety significance;
3. Categorize the severity level (if appropriate); and
4. Determine the appropriate enforcement action.
The information that is gathered is also used to document the enforcement process;
therefore, it must be complete and accurate.
B. The following questions serve as a guideline for gathering the information necessary to
inform the enforcement process. The list should not be considered prescriptive, or all
encompassing.
•
•
•
•
•
•
•

What requirement or commitment was violated?
How was the requirement or commitment violated?
Who caused the requirement or commitment to be violated?
When was the requirement or commitment violated?
How long did the noncompliance exist?
How, when, and by whom (licensee or NRC) was the violation discovered?
What is the apparent significance of the issue, e.g., actual or potential
consequences, potential for impacting regulatory process, was willfulness involved?

20

PART I: Enforcement Process

•
•
•
•
•
•

PART I – 1 NRC Enforcement Program

What information is necessary to complete the SDP (if applicable)?
What was the apparent cause?
What corrective actions have been taken or are planned to be taken (if known)?
Did the licensee place the issue in its corrective action program (if applicable)?
Was the licensee required to report the violation and, if so, what was the applicable
reporting requirement?
If a report was required, when was the report made to the NRC?

Assessing Significance
After the staff has determined that the noncompliance is a violation, the staff must assess the
significance of the violation before determining how the violation should be dispositioned.
Whenever possible, risk information is used in assessing the safety significance of violations
and assigning severity levels. A higher severity level may be warranted for violations that have
greater risk significance, while a lower severity level may be appropriate for issues that have
lower risk significance. Duration of the violation is also an appropriate consideration in
assessing the significance of the violation. The staff considers four specific factors when
assessing significance:
A. Actual Safety or Security Consequences: Actual safety or security consequences
include an actual:
•
•
•
•
•
•
•
•

Onsite or offsite releases of material exceeding regulatory or license limits
Exposures to workers or the public exceeding regulatory limits (e.g. 10 CFR 20.1201
and 10 CFR 20.1301)
Accidental criticality
Core damage
Loss of a significant safety barrier
Loss of control of radioactive material
Radiological emergency
Security system did not function as required and, as a result of the failure, a
significant event or an event that resulted in an action of radiological sabotage
occurred.

B. Potential Safety or Security Consequences:
•
•

Potential safety, security or exposure consequences include potential outcomes
based on realistic and credible scenarios, i.e., the staff consider the likelihood that
safety or security could have been negatively impacted under these scenarios.
For facilities under construction, the NRC considers the actual or potential impact on
the quality of construction and its resulting effect on the safety and security of the
facility.

C. Impacting the Regulatory Process: The NRC considers the safety and security
implications of noncompliances that may affect the NRC’s ability to carry out its statutory
mission. The agency is unable to use appropriate regulatory tools to address a
noncompliance because the agency is unaware that the noncompliance exists.

21

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

Examples of violations that impact the regulatory process include the failure to:
•
•
•
•
•
•
•
•
•
•

Receive prior NRC approval for changes in licensed activities
Notify NRC of changes in licensed activities
Perform 10 CFR 50.59 analyses
Perform 10 CFR 21 evaluations
Perform 10 CFR 50.55(e) evaluations
Provide the notice required by 10 CFR 150.20
Meet the requirement associated with the change process provisions in 10 CFR
50.54(a) (involving quality assurance programs), 10 CFR 50.54(p) (involving
safeguards plans), 10 CFR 50.54(q) (involving emergency plans)
Notify the NRC pursuant to the Commission’s requirements
Comply with reporting requirements
Provide complete and accurate information

In determining the significance of a violation that impacts the NRC’s regulatory process,
the NRC will consider:
1. The position and responsibilities of the person involved in the execution of licensed
activities relative to those activities or the use of licensed materials, regardless of the
individual’s job title or whether the individual is working directly for the licensee or
working for a contractor engaged in activities associated with licensed activities.
NOTE:
Reporting failures is important. Many of the surveillance, quality control,
and auditing systems on which both the NRC and its licensees rely in
order to monitor compliance with safety standards, are based primarily
on complete, accurate, and timely recordkeeping and reporting.
Therefore, the NRC may consider a licensee’s failure to make a required
report that impedes the NRC’s ability to take regulatory action, even if
that failure was inadvertent or did not result in an actual consequence, to
be significant. However, the severity level of an untimely report, in
contrast to no report, may be reduced depending on the circumstances.
2. The significance of the underlying violation, i.e., when an issue is being considered
for enforcement action because it impacts the NRC’s regulatory process, it should
first be reviewed on its own merits to ensure that its severity level is characterized
appropriately given the significance of the particular violation.
3. Whether the failure actually impeded or influenced regulatory action and/or
invalidated the licensing basis.
•

Unless otherwise categorized in the Violation Examples section in the
Enforcement Policy, the severity level of a violation involving the failure to make
a required report to the NRC will be based upon the significance and the
circumstances surrounding the matter that should have been reported.

22

PART I: Enforcement Process

•

PART I – 1 NRC Enforcement Program

The severity level of an untimely report, in contrast to no report, may or may not
be reduced depending on the circumstances surrounding the matter, e.g., if the
NRC had received the report in a timely manner, would the NRC actually have
taken an action based on the report.

D. Willfulness: Willful violations are of particular concern to the Commission because its
regulatory program is based on licensees and their contractors, employees, and agents
acting with integrity and communicating with candor.
1. Willful violations cannot be tolerated by either the Commission or a licensee.
Therefore, a violation involving willfulness may be considered more significant than
the underlying noncompliance.
NOTE:
All willful violations must be coordinated with OE.
2. Licensees are expected to take significant remedial action in responding to willful
violations commensurate with the circumstances of the violation in order to create a
deterrent effect within the licensee's organization and contract support. The relative
weight given to each of the following factors in arriving at the significance
assessment will be dependent on the circumstances of the violation:
a. The position and responsibilities of the person involved in the execution of
licensed activities relative to those activities or the use of licensed materials.
b. Notwithstanding an individual’s job title or whether the individual is working
directly for the licensee or working for a contractor engaged in activities
associated with licensed activities, several factors should be considered when
determining the severity level of a willful violation, including:
•
•
•

Whether the individual has the formal or informal authority to direct the
actions of others;
Whether the individual is, in fact, directing the actions of others; and
Whether the individual used his/her position to facilitate the violation, e.g.,
providing incomplete or inaccurate information or suppressing audit findings.

c. The significance of any underlying violation. Each issue being considered for
enforcement action that includes willfulness should first be reviewed on its own
merits to ensure that its severity level is characterized appropriately given the
significance of the particular violation.
d. The intent of the violator.
•

Willfulness embraces a spectrum of violations ranging from deliberate intent
to violate or falsify to and including careless disregard for requirements.

23

PART I: Enforcement Process

•

PART I – 1 NRC Enforcement Program

Willfulness does not include acts which do not rise to the level of careless
disregard, e.g., negligence or inadvertent clerical errors in a document
submitted to the NRC.

e. The economic or other advantage, if any, gained by the individual or for the
company, as a result of the violation. The avoidance of a negative consequence
can be considered a benefit.
NOTE:
The NRC will normally take enforcement action for violations of the Agency’s export
and import requirements in 10 CFR Part 110, “Export and Import of Nuclear
Equipment and Material,” for radioactive material and equipment within the scope of
the NRC’s export and import licensing authority (10 CFR 110.8, 110.9, and 110.9a)
for (1) completeness and accuracy of information, (2) reporting and recordkeeping
requirements (10 CFR 110.23, 110.26, 110.50, and 110.54), and (3) adherence to
general and specific licensing requirements (10 CFR 110.20-27 and 10 CFR110.50).

Assigning Severity Levels
Severity levels are used to:
•

Indicate the significance of a violation, except when the issue involved is assessed
through the Significance Determination Process (SDP); and

•

Determine the appropriate enforcement action to be taken.

The Enforcement Policy establishes four severity levels: Severity Level I, II, III and IV, with
Severity Level I being the most significant and Severity Level IV being the least significant.
A. Severity Level I and II violations:
•
•

Are considered to be “escalated enforcement actions.” This designation reflects the
level of regulatory concern associated with the violation. Severity Level I and II
violations warrant consideration of a civil penalty.
Usually involve actions with actual or high potential to have serious consequences
on public health and safety or the common defense and security.

B. Severity Level III violations are also considered to be “escalated enforcement actions.”
While not as significant as Severity Level I and II violations, Severity Level III violations
are significant enough to warrant consideration of a civil penalty.
C. Although Severity Level IV violations are not as significant based on risk, assigning this
severity level does not mean that a violation has no risk significance.
D. The Commission recognizes that there are other violations of minor safety or
environmental concern that are below the level of significance of Severity Level IV
violations.

24

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

•

Although certain violations may be designated as minor, licensees must correct
them.

•

Such violations:
o
o
o

Do not generally warrant documentation in inspection reports or records;
Do not warrant enforcement action; and
To the extent that they are described in inspection reports or inspection records,
will be noted as violations of minor significance that are not subject to
enforcement action.
NOTE:

Examples of minor violations can be found in this Enforcement Manual and in IMC
0612, “Power Reactor Inspection Reports” (Appendix E, “Examples of Minor
Issues”), IMC 0613, “Power Reactor Construction Inspection Reports” (Appendix E,
“Examples of Minor Construction Issues”), and in IMC 0617, “Vendor and Quality
Assurance Implementation Inspection Reports (Appendix E, “Examples of Minor
Issues”). Guidance for documenting minor violations can be found in this
Enforcement Manual, IMC 0610, “Nuclear Material Safety and Safeguards
Inspection Reports”; IMC 0612; IMC 0613; IMC 0616, “Fuel Cycle Safety and
Safeguards Inspection Reports”; and IMC 0617.

Using Enforcement Policy Violation Examples
The Enforcement Policy, Section 6.0, Violation Examples, provides examples of violations in
various activity areas subject to enforcement action.
A. The Violation Examples section of the Policy contains guidance for determining severity
levels. The examples are neither exhaustive nor controlling and are not intended to
address every possible circumstance. Generally, if a violation fits an example contained
in the Violation Examples, it is evaluated at that severity level. Application of this
guidance ensures programmatic consistency throughout the regions and program
offices. The Enforcement Policy contains violation examples in 15 activity areas:
•
•
•
•
•
•
•
•
•
•
•
•

Reactor Operations
Fuel Cycle Operations
Materials Operations
Licensed Reactor Operators
Facility Construction (10 CFR Part 50 and 52 Licensees and Fuel Cycle Facilities)
Emergency Preparedness
Health Physics
Transportation
Inaccurate and Incomplete Information or Failure to Make a Required Report
Discrimination
Reactor, Independent Spent Fuel Storage Installation, Fuel Facility, and Special
Nuclear Material Security
Materials Security

25

PART I: Enforcement Process

•
•
•

PART I – 1 NRC Enforcement Program

Information Security
Fitness-for-Duty
Export and Import Activities

B. If the region believes that a different severity level categorization is warranted and the
circumstances are not addressed by this Manual, the region should either:
1. Explain the rationale in the panel worksheet when it is sent to headquarters; or
2. Consult with OE prior to issuing the enforcement action in the region.
NOTE:
Consistent with the guiding principles for assessing significance, the
severity level for a violation may be increased if it includes willfulness.

C. If the staff chooses to categorize a violation at a severity level different from the
examples in the Violation Examples, the cover letter to the licensee should address the
staff's rationale for categorizing the severity level.
D. If a violation does not fit an example in the Violation Examples, it should be assigned a
severity level:
1. Commensurate with its safety significance; and
2. Informed by similar violations addressed in the Violation Examples.

Using Other Enforcement Guidance Documents
Enforcement Guidance Memoranda (EGMs) and Interim Enforcement Policies (IEPs) provide
guidance to inspection staff to aid in the disposition of noncompliance issues. They are used as
temporary guidance and are not intended to remain in effect for an extended period of time.

1.2.7.1

Interim Enforcement Policies

Due to the nature of the issues and policy considerations, IEPs are frequently in effect for longer
periods of time than an EGM. An IEP is necessary if the subject material is providing policy on
a specific topic. Because they set policy, IEPs are approved by the Commission. Significant or
broad issues, particularly sensitive issues, and issues not previously considered by the
Commission are likely to warrant an IEP. If severity level examples are being provided, an IEP
should be considered rather than an EGM. IEPs are located in their own section in the
Enforcement Policy.

1.2.7.2

Enforcement Guidance Memoranda

An EGM does not: change regulations; impose new requirements; change policy; and cannot be
used in place of rulemaking or exemption processes. EGM are intended to provide temporary
guidance until a change to this Manual can be made to incorporate the guidance provided in the
EGM or until a specific situation is resolved. A listing of active EGM is located as Appendix A of
this Manual on the NRC’s public web site.

26

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

Guidance provided by EGM may include:
•
•
•
•

criteria for allowing the use of enforcement discretion for specific circumstances;
standard language for cover letter descriptions and/or citations;
other guidance that should be considered in conjunction with an enforcement decision;
and,
severity levels for specific violations to ensure consistency.

1.2.7.3

EGM- and IEP-Related Enforcement Discretion Signature Authority

Non-escalated enforcement actions involving the exercise of enforcement discretion applied in
accordance with requirements of an EGM may be signed and issued by a responsible Branch
Chief in consultation with regional enforcement staff. Such actions by Branch Chiefs are
appropriate because: (1) EGMs generally contain more detailed guidance and are associated
with specific topics, and (2) EGMs have been reviewed and approved by OE, regional, and
program office management prior to their issuance. As a result, the application and issuance of
enforcement discretion in accordance with the limitations of the EGM does not need higher level
management signature. The same logic applies for issuing non-escalated enforcement actions
involving the exercise of enforcement discretion associated with Interim Enforcement Policies
(IEPs).

Using Information from the Significance Determination Process
(SDP)
A. For certain types of findings/violations at commercial nuclear power plants and
commercial nuclear power plants under construction, the enforcement process relies on
information from the reactor oversight process’s (ROP) Significance Determination
Process (SDP) or the construction oversight process’s (cROP) SDP.
NOTE:
The significance of findings/violations associated with the reactivation of
construction and licensing for Watts Bar Nuclear Plant, Unit 2 is determined
using a traditional enforcement approach, (i.e., the construction SDP is not
used to determine the significance of findings).
1. The SDP is used to evaluate the potential safety significance of inspection findings to
provide a risk-informed framework for discussing and communicating the significance
of such findings with licensees.
2. The final disposition of violations associated with findings that have been evaluated
through the SDP is contingent on the risk significance attributed to the findings.
3. Guidance on the SDP is described in NRC IMC 0609, “Significance Determination
Process,” and IMC 2519, “Construction Significance Determination Process.”
B. Depending on their significance, inspection findings are assigned the following colors:

27

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

1. Red (high safety or security significance)
2. Yellow (substantial safety or security significance)
3. White (low to moderate safety or security significance)
4. Green (very low safety or security significance)
C. The ROP uses an Agency Action Matrix to determine the appropriate agency response
to these findings. The cROP uses a Construction Action Matrix to determine the
appropriate agency response to these findings.
D. Findings are sometimes associated with one or more violations. If the violations are
more than minor (i.e., red, yellow, white, or green):
1. They will be documented in accordance with IMC 0611, “Power Reactor Inspection
Reports” or IMC 0613, “Power Reactor Construction Inspection Reports;” and this
Manual, dispositioning the non-compliance either as noncited violations (NCVs) or
NOVs. (Note: Violations associated with green SDP findings are normally
dispositioned as NCVs.)
2. Instead of using civil penalties as a deterrent, the staff will use other regulatory
responses based on the significance of the issue, e.g.:
a. Increased inspections
b. Demands for Information (DFIs)
c. Orders
E. Traditional enforcement will be used (i.e., assigning a severity level with or without a civil
penalty) for violations involving actual consequences, willfulness, or the potential for
impacting the regulatory process.
1. Examples of issues with actual consequences include, but are not limited to:
•
•
•
•

Exposures to the public or plant personnel above regulatory limits
Failures to make required notifications that impact the ability of Federal, State, or
local agencies to respond to actual emergencies
Transportation events
Substantial releases of radioactive material
NOTE:
Depending on the risk significance of the issue, civil penalties will also be
considered for issues involving potential safety consequences.

2. For violations that are willful or that have the potential for impacting the regulatory
process:
•

The use of civil penalties remains appropriate as a deterrent.
28

PART I: Enforcement Process

•
•

PART I – 1 NRC Enforcement Program

Risk insights can inform the significance determination of the underlying violation
or issue.
The staff should consider the SDP in conjunction with the Enforcement Policy
and the guidance included in the Enforcement Policy Violation Examples when
determining the appropriate severity level.

3. Traditional enforcement is also used for violations with no associated performance
deficiencies (e.g., a violation of TS which is not a performance deficiency). Such
violations are documented in accordance with appropriate Inspection Manual
Chapter.

Using Risk Significance
A. Risk is a relevant consideration in enforcement decisions concerning significance,
severity levels, appropriateness of sanctions, and the exercise of enforcement
discretion.
B. At each enforcement panel or Significance Determination Process/Enforcement Review
Panel (SERP), OE will ask whether the violation involves a risk significant issue.
C. The region is expected to have a position on risk significance or be able to describe what
steps should be taken to obtain a view on risk if the matter may be risk significant.
1. Regional input is normally the first step; however, this should not be considered only
a regional responsibility.
2. NRR should be prepared to provide its view on the risk associated with the
violation(s) at issue.
D. To the extent known, the licensee's position on risk for the violations at issue should be
discussed.
E. Following the decision at the SERP or enforcement panel to pursue escalated
enforcement on a particular issue where risk may be relevant to the enforcement
decision, an assignment will be made to the region or headquarters, as appropriate, to
obtain additional risk information as necessary. A repanel will be held as warranted.
F. Assuming the event is of sufficiently increased risk significance to warrant escalated
action, generally the issue of risk significance should be addressed in the
correspondence with the licensee that arranges a predecisional enforcement conference
or regulatory conference or in the “choice letter,” i.e., we should note that the apparent
violations appear to be risk significant and that if the licensee differs in that view, the
licensee should provide a brief explanation of its position.
G. Generally, conferences should be held for risk significant cases.
H. The staff recognizes the uncertainties associated with risk assessment.

29

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

NOTE:
The region should, to the extent practical, use the SRAs to assist them.
SRAs should be consulted for risk significance insights prior to each
respective regional enforcement panel, in order for the panel to have some
assessment of the risk significance of the events discussed. Assistance from
Research should also be sought, as needed. OE is available to assist the
region in obtaining headquarters assistance in this effort.
1. PRA models utilized by the staff and licensees vary in quality, creating the potential
for differing views on the risk significance of events. In addition, some PRA
limitations do exist, particularly in the area of human reliability analysis. In utilizing
the results of PRA, generally the staff should not base an enforcement decision
wholly on quantitative risk numbers; rather, risk significance should be one factor to
be considered in determining the final enforcement action to take.
2. In determining the appropriate enforcement action, the staff should continue to
balance risk information against the guidance currently provided in the Enforcement
Policy and the Enforcement Policy Violation Examples.
3. The staff should routinely consider the risk implication of each reactor case
considered for escalated action. Depending on the circumstances of the case, this
assessment may be:
a. Qualitative, relying primarily on engineering judgment based on qualitative risk
insights;
b. Quantitative risk analysis; or
c. A combination of the two.
4. If the staff uses specific, quantitative PRA results or qualitative risk insights to
support an enforcement decision, it should be reviewed by an NRC PRA specialist
prior to issuance of the action, generally the Senior Reactor Analysts (SRAs).
a. The Regional SRA is the preferred point for this review, due to the plant specific
design and operational information available to the regional staff.
b. Any quantitative PRA results provided as a basis for an enforcement action
should explicitly reference the source (e.g., IPE, specific analysis) so that all
assumptions, conditions, and methods are retrievable for subsequent review, if
needed. The basis for qualitative assessment should be briefly described.
I.

Judgment must be exercised in the use of risk significance as a factor in decisions
regarding the appropriateness of the sanction.
1. In order to convey the appropriate regulatory message, there may be cases where,
due to increased risk significance, it is appropriate to escalate the severity level and
the sanction.
2. Discretion may be warranted to reach the proper enforcement action. Based on risk
information it may be warranted to treat violations normally considered a Severity

30

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

Level IV violation at a higher severity level. It may also be appropriate to consider a
lower severity level or enforcement action for issues that have low risk significance.
a. Low risk does not excuse noncompliance.
b. If a licensee believes an issue is of low risk and not worthy of being a
requirement, the licensee may seek a change to the requirement. However, until
the requirement is changed, compliance is required.
NOTE:
Some reactor cases involve issues or events that do not lend themselves
to PRA insights. For example, construction, security, health physics, and
emergency preparedness issues are typically not amenable to current
methods of risk assessment. In these cases, risk insights from a PRA
perspective will not be needed.

Factors That Do Not Affect Significance
When determining significance, the following items are generally not considered unless they are
part of the violation itself:
•
•

Whether the licensee finds and reports a problem; and
Whether the licensee takes prompt and extensive corrective actions.

The significance of a violation should not be increased simply because the violation is repetitive.
•

•

Even when a trend in a specific program area that has safety significance exists, the
staff should not view the significance of a group of related programmatic violations as
being greater than the individual violations (i.e., do not aggregate the violations to
increase significance).
A trend in a specific program area may be considered in developing the appropriate
enforcement action and agency response (increased inspections, management
meetings, etc.); however, it should not be used to increase significance.

The following are examples of additional actions that should not be considered in determining
the significance of a violation:
•
•

The actions of a public utility commission or other State or local regulatory agency in
response to a proposed NRC enforcement action; and
The possible impact from the reaction of a public utility commission or other State or
local regulatory agency, or nature and context of an order, e.g., not allowing recovery of
the cost of a civil penalty or cost of the replacement power for an outage necessitated by
the violations at issue (NOTE: If a State regulatory agency has taken enforcement action
against a licensee for a transportation issue, the NRC should consider that action before
determining appropriate enforcement action).

31

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

General Overview of Escalated Enforcement Case Processing

Escalated Enforcement Case Processing
The figure above illustrates the general process used when handling potentially escalated
enforcement cases and those with discretion consideration. Additional process details are
provided, using the corresponding numerical subscripts with each process step (see below).
Escalated Enforcement Action Flowchart Steps –
1. Potential Escalated Enforcement or Discretion Approval. Cases that are usually subject
to this process would include, but not limited to: potential escalated enforcement (i.e. SL
I, II, or III violations or White, Yellow, or Red findings), potential willful, potential
discrimination cases or a potential need for enforcement discretion consideration.
Discretion consideration is for violations normally dispositioned at a particular severity
level; however, consideration is being given to reduce significance to a lower severity
level.
2. Prepare EAW. The Enforcement Action Worksheet (EAW) is prepared by the
responsible region/office (OE for discrimination cases) and provided to the appropriate
program offices, OE, and OGC (in cases involving OI or a potential Order and/or civil
penalty). Use guidance in Enforcement Manual Appendix D, “SERP Panel Worksheet for
SDP-Related Findings” and either the “Traditional Enforcement Panel Worksheet” or
NRC Form 1260 (located on the NRC SharePoint site in the NRC forms library) to aid in
preparing an EAW.
32

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

3. Panel. The enforcement panel will be scheduled by the responsible office that prepares
the EAW in coordination with the other parties involved. Reference Section 1.2.13 of the
Enforcement Manual for further details. The enforcement specialist will document the
panel decision on a Strategy Form using EATS and place the approved Strategy Form in
ADAMS.
4. Issue Conference/Choice Letter or Choice Call, or No Action. The panel outcome may
be to either issue a choice call, choice/conference letter, or no enforcement action.
Potential panel outcomes and their actions are discussed in the following Enforcement
Manual Sections:
a. Choice Call – Section 1.2.13.4 discusses choice calls.
b. Choice/Conference Letter – Boilerplates located in Appendix B, Forms 1-I through
1-V.
c. No Action – Section 1.2.13.4 discusses next steps when no enforcement action will
be taken. In some cases no action could be issuing a Close Out Letter
5. Licensee Action. The licensee has the opportunity to respond to the conference/choice
letter or choice call within the specified time discussed in the letter/call. The
enforcement action decided during the panel will direct how the licensee may be allowed
to respond. In the event the licensee does not respond, the NRC may choose to take
the action proposed during the panel, based on the information provided.
a. Caucus. Affords the NRC the opportunity to review any new information presented
by the licensee (after written response or conference) to assist in determining the
appropriate enforcement strategy. See Section 1.2.16 for further detail. Caucuses
associated with wrongdoing are discussed in Part II, Section 1.1.9 of Enforcement
Manual.
b. Predecisional Enforcement Conference (PEC)/Regulatory Conference. Section
1.2.15 discusses the details associated with PEC’s and Regulatory Conferences.
PEC’s associated with wrongdoing are discussed in Part II, Section 1.1.8.
c. Alternative Dispute Resolution (ADR). ADR is available for cases involving
discrimination and other wrongdoing as well as escalated nonwillful (traditional)
enforcement cases with the potential for civil penalties (excluding ROP cases). Part
II, Section 1.2 further discusses ADR. ADR typically results in an “agreement in
principle” where the NRC and licensee concur on a set of terms and conditions that
are then signed by each party and confirmed by an Order. In ADR sessions where
mediation is unsuccessful, the NRC may choose to continue with the originally
proposed traditional enforcement action.

Tracking Enforcement and SDP Issues
The staff tracks various enforcement and SDP issues through the use of OE’s Enforcement
Action Tracking System (EATS). Under this system, enforcement action (EA) numbers are
assigned to a variety of issues.
OE or the responsible regional/office enforcement staff will assign an EA number to each
enforcement case, regardless of the number of associated violations/findings.

33

PART I: Enforcement Process

•
•
•
•

PART I – 1 NRC Enforcement Program

If an enforcement case involves multiple findings/violations, assign a single EA number;
however, each finding/violation should have its own strategy form completed in EATS.
If additional related escalated violations or problems or SDP issues are identified
subsequent to an enforcement or SERP panel, additional EA numbers may be assigned.
If all the violations, problems, or issues are dropped subsequent to an enforcement or
SERP panel, the related EA numbers should be closed.
If a case involves individual actions, a separate EA number should be assigned to each
individual. Be sure to “relate” the different EA numbers to each other in EATS.

1.2.12.1 Enforcement Action (EA) Numbers
A. EA numbers are assigned to administratively track and file a variety of enforcement
issues, including SDP issues that are addressed in an enforcement panel or SERP.
B. EA numbers are assigned to program office orders imposing additional regulatory
requirements.
C. EA numbers are generally assigned when cases are discussed during enforcement or
SERP panels, whether or not the case ultimately results in enforcement action. During
or subsequent to a SERP or enforcement panel, an EA number will be assigned to:
1. Each case being considered for enforcement action; or
2. Each case involving an inspection finding being assessed by the SDP that does not
have enforcement implications.
D. A strategy form is created in EATS for each violation associated with a case and
normally provided to the region that initiated the action for review and comments.
E. EA numbers are assigned sequentially according to the year of issuance (e.g., EA-00011). Once an EA number has been assigned to a case, all subsequent documents
related to a case should include the complete five-digit EA number, EA-YY-NNN. This
EA number must be part of the ADAMS profile so that staff can search and retrieve all
documents associated with a specific enforcement case.
F. EA numbers are assigned to the following:
1. Any issue that is discussed during a SERP or enforcement panel, regardless of
whether the issue ultimately results in an enforcement action.
2. Any case in which a predecisional enforcement conference or Regulatory
Conference is scheduled.
3. Any case in which the region issues a letter giving a licensee the choice of
responding to apparent violations or requesting a predecisional enforcement
conference (i.e., "choice letter"), if not already issued.
4. All escalated enforcement issues. This includes those cases that require
headquarters’ review prior to issuance, as well as those that do not. Orders that

34

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

impose civil penalties retain the same EA number as the action that proposed the
civil penalty.
•

Multi-sanction cases receive individual EA numbers for each sanction, e.g., a
case that includes both a proposed civil penalty and a separate (stand-alone)
Demand for Information (DFI) would have one EA number for the proposed civil
penalty and a separate EA number for the DFI.

5. Any case involving willfulness whether or not escalated or non-escalated
enforcement action is to be issued, including willful cases where the staff proposes to
exercise discretion and refrain from issuing enforcement action (e.g., NCV).
6. For power reactors and power reactors under construction, Severity Level IV
violations and Green SDP findings associated with a violation where, although the
criteria for an NCV were met, discretion is used to issue an NOV.
7. Any issue where enforcement discretion is exercised (e.g., exercise of discretion per
EGMs or, as applicable, the Interim Policies).
8. Non-escalated enforcement actions requiring headquarters’ review, including:
a. Any non-escalated enforcement action involving an individual;
b. Any non-escalated enforcement action which, by the examples in the Violation
Examples section of the Policy, could be categorized at Severity Level III or
characterized as greater than green by the SDP;
c. Any non-escalated enforcement action related to a current proposed escalated
enforcement action, unless there has been prior approval for separate issuance
by the Director, OE.
9. Any enforcement action requiring Commission approval.
10. Any case involving the mitigation of enforcement sanctions as addressed in the
Enforcement Policy.
11. Any case in which the staff proposes to exercise discretion and refrain from issuing
an enforcement action for a transportation cask contamination violation that could be
categorized at Severity Level III or above.
12. Any Notice of Enforcement Discretion (NOED).
13. Any case involving an OI report where enforcement action appears warranted (i.e.,
whether the action is based on willfulness or not and whether the action is escalated,
non-escalated, or an NCV). OE will assign an EA number to the case when it
determines enforcement action is warranted or when it requests an OGC analysis of
whether enforcement action is supportable.
14. Any case in which the staff proposes to issue a DFI. The DFI should be given an
individual EA number even if issued together with another enforcement action. If

35

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

another enforcement action is issued after the response to the DFI which addresses
the subject matter of the original DFI, a new EA number is also to be obtained.
15. Any case (during review and approval) in which the region proposes to issue any
action to an individual (i.e., NOV, civil penalty, DFI, order, close out letter, or similar
letter).
16. Any case (during review and approval) in which the NRC proposes to issue an
enforcement action (regardless of severity level) to a licensed operator for failure to
comply with a facility licensee's fitness-for-duty (FFD) program.
17. Any Chilling Effect Letter (CEL) that is issued in the absence of a finding of
discrimination. The region should request an EA number when it is determined that
a CEL should be issued. The EA will be closed upon receipt of the licensee’s
response to the CEL. Any subsequent enforcement action proposed will be given a
new EA number. See the Allegation Manual for further guidance.
18. Any case in which the NRC issues a letter to the licensee and/or contractor
requesting information about a finding of discrimination for engaging in protected
activities made by DOL and its potential impact on the environment for raising
concerns.
NOTE:
Findings involving ERA Section 211 employee protection in other federal
jurisdictions (e.g., U.S. Circuit Court) may also warrant action by the
NRC. Consult with OE and OGC in such cases.
The region and/or OE should request an EA number when it is determined that such
a letter should be issued. The EA will be closed upon responsible staff acceptance
of the licensee’s response to the information request. Any subsequent enforcement
action proposed will be given a new EA number.
19. Any case referred to DOJ in which the NRC is considering escalated enforcement
action.
20. Any disputed minor violation, Severity Level IV violation, or violation associated with
a green SDP finding (regardless of whether it was dispositioned as an NCV or in an
NOV) that did not have an EA number when it was originally dispositioned. Actions
(including escalated) that were originally issued with an EA number should be
tracked using the existing EA number. Appropriate keywords should be used to
identify the violation as disputed in EATS.
21. An order (issued by the program office) imposing additional requirements beyond the
existing regulatory requirements (e.g., 2002 security orders). One EA number may
be used in the event the same order is issued to multiple licensees. The program
office should contact OE (normally through their office Enforcement Coordinator) as
soon as they believe an order should be issued.

36

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

22. Any actions involving the loss or failure to control or account for licensed material.
23. Any Confirmatory Action Letter (CAL) that is issued.
24. Any actions resulting from Augmented Inspection Team (AIT), Diagnostic Evaluation
Team (DET), or Incident Investigation Team (IIT) inspection.
25. Any issue that OE, the region, or the program office believes is warranted.

1.2.12.2 Preparing and Maintaining Strategy Forms
Strategy Forms are used to:
•
•
•
•

Summarize the agency’s strategy for dispositioning SDP and enforcement issues;
Serve as aids during case deliberations;
Record the conduct of enforcement or SDP meetings and discussions about the strategy
that was used; and
Document the basis for any change in enforcement or SDP approach.

To ensure that Strategy Forms fully serve their purposes, the following guidance should be
implemented:
A. Every case paneled in a SERP or enforcement panel will get an EA number whether or
not the case ultimately results in enforcement action, e.g., an inspection finding
characterized as white by the SDP will be assigned an EA number even if there are no
violations associated with it. If a violation is associated with the white issue, only one EA
number needs to be issued to address the case.
B. The OE Enforcement Specialist assigned to the case should prepare a Strategy Form
following each panel. In addition to the necessary information to support EATS, the form
should briefly state:
1. What was agreed to at the panel;
2. If there was not agreement at the panel, a brief description of the disagreement and
what actions are being taken to resolve the difference;
3. Whether actions need to be taken to obtain the views of others (briefing of the
managers in the normal decision chain need not be stated);
4. Whether additional investigation, interviews, or inspection activities are needed;
5. Whether there is a need to revisit the agreement after further reviews of the evidence
or research is conducted;
6. The date the violation occurred (required for tracking the Statute of Limitations); and
7. Any other actions needed to reach an enforcement decision.
C. For cases that have not been paneled but which require an EA number, the region will
submit to OE enough information such that the Enforcement Specialist can prepare a
Strategy Form.
D. The Strategy Form should list all panel attendees.

37

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

E. Subsequent to an enforcement or SERP panel, OE should provide the Strategy Form to
all program offices represented at the panel, for their review and comment.
F. The Strategy Form should, in general, be completed within five working days of the initial
panel, as well as any subsequent panel, enforcement caucus, or other substantive
communication where the enforcement strategy is revisited or modified.
G. Strategy Forms, in addition to other background documents, are entered in ADAMS and
are non-publicly available. Once strategy form is entered in ADAMS, the document
should be provided to all panel participants.
H. After a subsequent panel, caucus, or substantive discussion, a new Strategy Form
should be created using the original EA number in EATS, and noting the date of the
meeting or discussion, the panel number (i.e., “1", “2", “3") and the outcome of the
meeting, including a brief explanation of the reason for any change in strategy. The
background information need not be restated unless it has changed. The updated
Strategy Form is approved, distributed, and filed like the original Strategy Form.

1.2.12.3 Individual Action (IA) Numbers
Use of Individual Action (IA) numbers enables the NRC to maintain a list of individuals who have
been considered for individual enforcement action.
A. IA numbers are assigned to any case in which correspondence is addressed to an
individual concerning potential enforcement action; however, the region should use an
EA number for the review and approval stages and get an IA number from OE when the
correspondence is ready to be issued.
B. When an IA number is assigned, all external correspondence is included in a separate
system of records (NRC-3, "Enforcement Actions Against Individuals"). By the notice
establishing this system of records, individual actions and correspondence with
individuals may be maintained by personal identifier in NRC offices.
NOTE:
IA numbers are assigned by OE to administratively track and file all
correspondence issued to an individual, if that individual is being considered
for or has been issued an enforcement action. The EA number associated
with the action should not appear on the correspondence issued with an IA
number and should not appear in the ADAMS profile.

C. IA numbers should be used:
•
•

On all close-out letters and conference or choice letters to an individual; and
Throughout an individual’s case, including any subsequent actions, e.g., Noncited
Violation (NCV), NOV, civil penalty, DFI, order, or close-out letter. This includes
NOVs issued to licensed operators for FFD violations, (regardless of severity level).

38

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

D. Like the original correspondence, the region should use the EA number for the draft
action through the review and approval stages and include the IA number on the final
action when it is ready to be issued. The EA file should be closed upon issuing the final
IA action.
E. IA numbers are not assigned to cases in which a DFI or order involving an individual is
issued to the licensee, unless the correspondence is directed to an individual concerning
his or her performance, in which case, paragraph "A." applies.

Enforcement and Significance Determination Process Enforcement
Review Panel (SERP) Panels
A. Enforcement panels are meetings to discuss and reach agreement on an enforcement
approach for certain violations of NRC requirements. Enforcement panels assure
consistency in the process for characterizing violations and issuing enforcement actions.
B. SERPs are meetings to discuss and reach agreement on the significance of inspection
findings at power reactors and power reactors under construction that appear to be more
significant than green under the SDP.
1. For SDP findings that have an associated violation, the panel will discuss and reach
agreement on an enforcement approach for the related violation.
2. Although SERPs are similar to enforcement panels in many respects, specific
guidance for SERPs is included in NRC Inspection Manual Chapter 0609 and IMC
2519.
C. When a regional office does not believe a panel is necessary for one of the items listed
in bullet E. below:
1. The Regional Enforcement Coordinator should consult with OE.
2. The Director, OE, may make exceptions to the guidance in this Manual in cases
where the proposed resolution of the issue is noncontroversial and would be
consistent with recent precedent and current policy.
D. An Office Director or Regional Administrator may request a panel to discuss any issue
that is not specifically included in the items listed below. Otherwise, the following types
of violations and related issues should be brought to an enforcement panel unless
specifically exempted by current enforcement guidance in the Manual or an EGM, i.e.,
when enforcement guidance gives the regions the authority to classify a potentially
escalated violation at Severity Level IV based on specific criteria, and those criteria are
met, the issue does not need to be brought to a panel.
E. Unless otherwise specified, a panel should be held for the following items for all types of
NRC licensees:
1. Violations for which escalated enforcement action is recommended, i.e., any violation
for which an order, an NOV at Severity Level I, II or III, an NOV associated with a
red, yellow, or white SDP finding, or a civil penalty is being recommended.

39

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

2. Violations involving a finding of wrongdoing or discrimination by OI, a licensee or
DOL, including cases that OI has referred to DOJ. These violations should be
discussed regardless of the apparent severity level.
3. Violations normally classified at Severity Level I, II or III or associated with a red,
yellow, or white SDP finding for which enforcement discretion in accordance with the
Enforcement Policy is being recommended. OE should be consulted by telephone
for Severity Level IV issues that are being considered for enforcement discretion in
accordance with the Policy.
4. Violations normally classified at Severity Level I, II or III or associated with a red,
yellow, or white SDP finding for which non-escalated action is being recommended.
5. Cases in which enforcement action is being considered against an individual,
including a licensed reactor operator, regardless of the severity level of the violation.
6. Cases in which a DFI is being recommended prior to making a final enforcement
decision.
7. Cases where information obtained during a predecisional enforcement conference or
in response to a choice letter or DFI needs to be considered in determining
enforcement action.
8. Violations at power reactors and at power reactors under construction where a
departure from the NCV policy is proposed, i.e., to issue an NOV when the NCV
criteria are met and vice versa.
9. Licensee-disputed violations and violations of 10 CFR Part 55 that cannot be
resolved via coordination between the involved offices.

1.2.13.1 Participating in Panels
Participation in enforcement panels should be in accordance with the following guidelines:
A. Region: The region is generally responsible for chairing the panel and presenting the
pertinent facts of the case except when the program office is responsible for the
allegation or inspection activity, in which case the program office assumes the role of the
regional office.
1. The region should notify participants one week prior to the panel, unless otherwise
requested.
2. In addition to OE, the region should notify the NRR, NMSS or NSIR Enforcement
Coordinator, as appropriate. While the program offices should be invited to
participate in panels, their attendance is not mandatory. The region should also
notify the Assistant General Counsel for Security and Enforcement for cases
involving civil penalties, willfulness, or other legal issues, as well as the applicable OI
investigator and Regional Field Office Director for cases involving willfulness.

40

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

3. The regions may choose to conduct internal meetings prior to the scheduled
enforcement panel as appropriate. These internal meetings are often useful to
review the details of the incident to focus the subsequent panel discussion on the
major issues and for the region to develop its position for efficient presentation during
the panel call. The OE Enforcement Specialist will participate in these meetings as
an observer upon request by the region.
4. It is expected that the region will be represented on the panel by a person at the
Deputy Division Director level or higher. It is important to recognize that while the
regional participants provide a recommendation to the Regional Administrator, their
position does not represent the final region position.
B. OE: To achieve timely decision-making, the Director, Deputy Director, or Branch Chief,
EB, will normally participate in panels in addition to the OE Enforcement Specialist.
OE should help facilitate discussions and should focus on ensuring that violations are
accurate and that strategies are consistent with the Enforcement Policy, EGMs, other
applicable guidance, and past practice.
C. Program Office: When the program office is responsible for the allegation or inspection
activity, it is responsible for chairing the panel:
1. The NRR, NMSS, and NSIR Enforcement Coordinators are, thus, responsible for
arranging for participation by the necessary program office staff, OE, and OGC,
when appropriate. The Enforcement Coordinators are also responsible for ensuring
that those participating on the panel have briefing materials in advance of the
meeting.
2. NRC Inspection Manual Chapter 0609, Attachment 0609.01 describes which
organization should participate in a SERP. For power reactors under construction,
IMC 2519, Attachment 1 describes which organization should participate in a SERP.
3. In evaluating the appropriateness of the proposed enforcement strategy, program
office participants:
a. Should focus on whether the violations are factually and technically accurate and
the enforcement strategy is consistent with the program office’s policy, guidance,
position, or past practice;
b. Are responsible for elevating their concerns to program office management (the
Director, Division of Reactor Oversight, for NRR cases, and the applicable
Division Director for NMSS, and NSIR cases), if they disagree with the
enforcement strategy discussed during the panel.
D. OGC/OI: OGC provides the interpretation of laws, regulations and other sources of NRC
authority, including making the “deliberate call” for the NRC. As such, the OGC/SE
(Assistant General Counsel for Security and Enforcement) attorney should be invited to
panels involving civil penalties, willfulness (e.g., wrongdoing or discrimination) and other
cases with potential issues of legal significance. OI (applicable investigator and
Regional Field Office Director) should also be invited to panels involving willfulness.

41

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

1.2.13.2 Modified Enforcement Panel
A. The goal of the modified panel is to enhance efficiency by processing enforcement
cases when additional interactions, clarifications, and extended communications are not
necessary, and the panel representatives align on the proposed strategy decisions for
the case.
B. Modified panels are intended for cases that are not complex and include a
straightforward application of the enforcement policy, guidance, and precedent.
C. The modified enforcement panel process applies to traditional enforcement cases with a
proposed SL III or IV and may be used for the initial or subsequent panels and
caucuses, including Post-PEC caucus, if applicable.
D. Modified panels may be used for cases that are subject to the direct application of
normal civil penalty (CP) assessment process, including cases involving direct
application of the Lost Source Policy (LSP).
E. Modified panels cannot be used for:
•
•
•
•
•
•

Cases that might result in an Order (other than Orders imposing a CP)
Cases that are subject to the CP assessment process that require discretion for CP
proposal or amount
Cases that involve novel or precedent-setting enforcement action
Individual sanctions other than closeout letters or SL III cases involving
confirmed Fitness for Duty (FFD) violations
Cases in which the panel members disagree with the proposed action to use
enforcement discretion consistent with the Enforcement Policy Section 3.0, “Use of
Enforcement Discretion.”
Complicated enforcement or technical issues where the staff expects
considerable dialogue before reaching alignment

The decision to disposition a case via the modified panel process when the case fits
one or more of the aforementioned criteria requires OE management approval. The
responsible enforcement coordinator (regional, program office) should contact the
assigned OE enforcement specialist (ES) to facilitate this permission.
F. Guidelines for Conducting a Modified Enforcement Panel
1. Modified panels can be conducted via email, video teleconference (VTC),
teleconference, online video function, or face-to-face. All members must agree to
the proposed communication method for the modified panel. The responsible
enforcement coordinator should initiate the discussion on which method to use.
2. If the modified panel members decide to use a method other than email, the panel
should be held on the appropriate regional weekly panel day and time. The
responsible enforcement coordinator will coordinate with the other members and
schedule the appropriate panel day and time. Program offices should schedule their
panels by using the applicable regional affiliation (e.g., RII for fuel facilities; RI, RIII,
or RIV for materials licensees).

42

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

3. The responsible enforcement coordinator that initiates the modified panel process

should inform those staff members who are typically involved in the normal
enforcement panel process of the upcoming modified panel and should also include
the modified panel on the weekly enforcement agenda email. This can be done in
the same timeframe that notification of standard panels is made.

4. The responsible enforcement coordinator should prepare the enforcement action
worksheet (EAW) (NRC form 1260, EAW template, may be used) and also should
consider sending the next proposed action (e.g., choice letter, discretion letter, etc.)
along with the EAW for approval/concurrence to aid in timeliness. During the
modified panel, the members should confirm who will review and concur on the
proposed actions.
5. Sufficient time must be allowed for all panel members to read, confer, and fully
understand the facts and proposed disposition of the case prior to the modified
panel. Five working days is typically sufficient.
6. Any additional information supplied by the licensee or individual after the modified
panel should be shared with the modified panel members via email, VTC,
teleconference, online video function, or face-to-face. This information can be
documented as notes in a caucus/ Strategy Form.
7. The responsible enforcement coordinator is responsible for placing the EAW and/or
other applicable document in ADAMS.
8. The OE ES should prepare a strategy form, enter it into the Enforcement Actions
Tracking System and distribute it to the panel members for review within 10 days of
the panel.
G. Participants
1. Modified Panel Members
a. For non-OI related cases, the modified panel members will generally
consist of a regional representative (typically the assigned regional
enforcement staff), the assigned OE ES, and a representative of the
program office (typically the enforcement coordinator). For all cases that
result in a proposed CP, the assigned OGC attorney will be included as a
panel member.
b. For cases that involve an investigation, modified panels members will
generally consist of a regional representative (typically the assigned
regional enforcement staff), the assigned OE ES, a representative of the
program office (typically the enforcement coordinator), and the assigned
OGC attorney. It is expected that the panel members should have read
all the transcripts and have a full understanding of the facts of the case,
before the modified panel is convened.
c. A modified panel member may request the normal full panel process at
any time during the enforcement process.

43

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

d. Each modified panel member should brief his or her respective
management on the facts of the case and the planned use of this
process to disposition the case, and modified panel members should
obtain management’s agreement on the use the modified panel process
and the proposed enforcement disposition.
2. Observers
Observers (e.g., regional and program office management, inspection and technical
staff) may participate in a modified panel. Observers are not modified panel
members and should not engage in the deliberative process.

1.2.13.3 Preparing for Panels
A. In order for enforcement panels to be effective, the regions should ensure that
participants are appropriately prepared.
The regions should send SDP-related information to OE, and the NRR and NSIR
Enforcement Coordinators, as appropriate, at least 72 hours in advance of a SERP (see
Inspection Manual Chapter 0609 for specific details on SDP-related information or IMC
2519 for power reactors under construction).
B. It is recognized that these meetings are conducted during the preliminary stages of the
enforcement process; however:
1. Sufficient information should be gathered to support the meeting's purpose, i.e., to
discuss the apparent violations, severity levels, violation groupings, escalated
history, preliminary civil penalty assessment, etc.
2. If sufficient information is not available, the enforcement panel should be
rescheduled.
C. Briefing materials for proposed actions should include:
1. An Enforcement Action Worksheet (EAW) or a SERP Worksheet (Panel Worksheet)
(included in Appendix D). Paragraph G, below, provides additional guidance on
preparation of EAWs;
2. A draft inspection report (or draft report excerpt or other draft document that
addresses the circumstances of the case);
3. Other available information, e.g., an LER;
4. A draft NOV, and
5. Factors for the Sanction in Actions against Individuals (see list of factors in Appendix
D), if applicable.

44

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

NOTE:
The regions should send briefing materials to OE (e-mail “RidsOeMailCenter
Resource”), OGC, and the NRR, NMSS and NSIR Enforcement
Coordinators, as appropriate. The EDO Regional Coordinator should also
receive a copy of briefing materials. The materials should be provided at
least 72 hours in advance of the meeting.

D. Briefing information for an imposition should include the licensee’s response to the
proposed civil penalty action and the region’s assessment of it.
E. All briefing materials should be appropriately marked as predecisional information. The
regions and/or responsible program office should place the final version of the panel
worksheet in ADAMS following the panel.
F. Briefing materials sent to OE should either be faxed or sent by e-mail to
"RidsOeMailCenter Resource" as well as to the individual OE participants.
G. Enforcement Action Worksheet
1. An Enforcement Action Worksheet (EAW) is the primary enforcement panel briefing
package for everything other than SERPs. See Appendix D of this Manual for a
blank form. The EAW also provides case specific data to support tracking.
•

A brief, yet concise, case summary is provided, recognizing that attached or
referenced (in ADAMS) materials may be used for additional detail (e.g.,
inspection reports, licensee submittals, etc.). While the summary should be brief,
necessary facts to support an analysis pertinent to the enforcement process must
be included. Factors influencing the risk, both mitigating and escalating, should
be included and discussed, not simply the factors favorable to the proposed
position.

2. Detailed step-by-step directions are included on each form. The following is a list of
best practices that enhances the EAW’s quality and clarity. While not requirements,
they should be used unless clear guidance concludes otherwise.
•

Previous case examples should include both supporting and alternative views:
preferably including cases from other regions and focused on cases with EA
numbers. The emphasis of comparison with previous cases should be on the
case-specific facts highlighting similarities and differences as well as weighed
against the Policy examples and applicable Manual guidance.

•

Regional Counsel should review EAWs, normally as a matter of routine, but
certainly for proposed civil penalties and proposed orders.

•

Highlights of different views or opinions: enabling recognition of other views and
allows for capture in the case file.

45

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

•

Include all apparent non-escalated violations (e.g. SL IVs) associated with the
event/case: Enforcement panels are conducted, in part, to provide for agency
level consideration of escalated cases. The significance of escalated cases, as
well as the determination of appropriate agency action, can be influenced by
apparent violations that, on their own, appear to be of lower significance (i.e.
non-escalated). Disposition of all of the violations for an event at one time allows
more informed characterization of the overall issue, both from a significance
perspective and communication with stakeholders.

•

Draft apparent violations (i.e. NOV without the header and response
requirements): contributes to clarity of briefing and accuracy of the final product
by ensuring clear communications regarding the apparent violations.

•

In materials user cases, as relevant, include: whether there are facilities in
multiple states; the number of Authorized Users; and reference actual dose
calculations (ML number). Summary or generalized statements that the dose
was “minimal” or “acceptable” typically results in discussion regarding what is
considered “minimal” or “acceptable” and the confidence in the estimate.

•

If known, highlight what is still necessary from corrective actions: agreement on
appropriate next steps (e.g., no response, written response, PEC, etc.) can
depend on what, if anything is necessary to satisfy the identified root cause
(typically a materials user issue).

•

Incorporate the ADAMS ML number in the EATS record after placing the EAW in
ADAMS to enhance future retrieval.

3. Additional, specific guidance for each block is also provided on the form.

1.2.13.4 Panel Outcome
Depending on the discussions in the enforcement panel, the staff will determine one of several
outcomes.
A. If the staff concludes that no violation occurred:
1. OE will assign an EA number and document the disposition of the issue by
completing the Strategy Form (no violation or SDP finding without a violation).
2. OE will send the form to the region and make it available to the program offices, OI,
and OGC, as applicable.
B. If the staff concludes that non-escalated enforcement should be proposed:
1. OE or the regional enforcement staff will assign an EA number to the case and
document the disposition of the issue by completing the Strategy Form (including
why an NOV vs. an NCV was issued).
2. OE will send the form to the region and make it available to the program offices, OI,
and OGC, as applicable.
3. The regions may generally issue the enforcement action without prior coordination or
review with OE.

46

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

4. In special cases, OE may request that the action be coordinated or reviewed prior to
issuance.
C. If the staff concludes that a predecisional enforcement conference should be conducted,
the region should issue the inspection report two weeks prior to the conference.
Appendix B contains a template that should be used to develop the transmittal letter.
NOTE:
In cases which may involve a hearing or an ADR mediation session in the future
(cases with civil penalties, OI/OGC deliberateness, Confirmatory Orders – individual
bans/licensee, discrimination, etc.), the staff should request OGC review of ALL
discussions of apparent violations (AVs). This ensures that every document related
to the AV, and presented by the NRC, is consistent and defendable. For applicable
cases, the Regions must, send, for review, the choice letter, factual summary and in
certain cases, parts of the inspection report that discuss the AV. Headquarter staff
will review such cases and OE will coordinate the distribution of the document for
OGC’s review. For those cases that do not involve potential future hearings or an
ADR mediation session, Headquarters staff will normally NOT request review of the
choice letter. This is in recognition that OE expects that choice letters follow the
boilerplate. OGC reserves the right to decline review of any of these documents.
D. If the staff concludes that a predecisional enforcement conference need not be
conducted, but that additional information about the licensee’s corrective action is
necessary to decide on enforcement action or that a civil penalty is warranted, the
region:
1. Should proceed to issue the inspection report requesting a licensee response.
Appendix B contains a template that should be used to develop the choice letter.
2. Issue a choice letter, if appropriate:
•

•
•

Issuing a choice letter is appropriate where a licensee appears to understand the
significance of the violation and the need for corrective action at the inspection
exit but has not informed the NRC inspector of the corrective actions the licensee
has taken or plans to take subsequent to the inspection exit. This is more likely
to be the case for materials licensees’ inspections because inspectors are not
stationed at materials facilities.
Issuing a choice letter may provide an incentive to the licensee to develop and
implement comprehensive corrective actions in order to avoid the possibility of a
civil penalty.
If choice letters are to be issued to a licensee and individual actors, the letters
should be reviewed and signed at the same time to ensure that the messages
and information being conveyed are consistent, and that the licensee and/or
individual actor(s) are not informed of the possibility of escalated enforcement
ahead of the other parties.

3. Following receipt of the licensee’s response to the choice letter, the region should:

47

PART I: Enforcement Process

•
•

PART I – 1 NRC Enforcement Program

Discuss the licensee’s response with OE, and
Schedule another enforcement panel, if warranted.

4. The purpose of the additional consultation or panel is to provide a forum for
discussion of:
New information or perspectives that have been obtained that may warrant
reconsideration of the preliminary enforcement strategy for the case, including
whether a predecisional enforcement conference is necessary.
• The reasonableness of the licensee's corrective action.
5. If the staff concludes that a conference is necessary, the region should arrange for a
conference with the licensee as soon as possible.
•

6. If the staff concludes that a conference is not necessary, the meeting evolves into an
enforcement caucus meeting, whereby the staff determines the final enforcement
strategy for the case.
E. If the staff concludes that a predecisional enforcement conference need not be
conducted and that enough information exists to conclude that a civil penalty is not
warranted, the region may choose to:
1. Issue the inspection report requesting a licensee response (see Appendix B which
contains a template of the transmittal letter that should be used which includes an
additional paragraph informing the licensee that a civil penalty does not appear
warranted). This approach may reduce resource expenditures by the licensee if the
licensee understands in advance that the agency does not plan to issue a civil
penalty.
2. Following receipt of the licensee's response to the inspection report, the region
should:
•
•

Discuss the licensee’s response with OE, and
Schedule another enforcement panel, if warranted.

3. The purpose of the additional consultation or panel is to provide a forum for
discussion of:
•
•

New information or perspectives that have been obtained that may warrant
reconsideration of the preliminary enforcement strategy for the case, including
whether a predecisional enforcement conference is necessary.
The reasonableness of the licensee's corrective action.

4. An enforcement conference may be necessary and should be scheduled as soon as
possible, if staff concludes that the documented corrective action is not sufficiently
prompt and comprehensive such that a civil penalty may be warranted.
•
•

If the staff concludes that a conference is necessary or if the licensee requests a
conference, the region should arrange for a conference as soon as possible. or
If the staff concludes that a conference is not necessary, the meeting evolves
into an enforcement caucus meeting, whereby the staff determines the final

48

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

enforcement strategy for the case, i.e., whether the draft NOV should be modified
or withdrawn.
5. The region may choose to make a “choice call” to the licensee.
•
•

•

In such cases, the licensee will be contacted by telephone and informed that the
NRC does not see a need for a predecisional enforcement conference or a
written response prior to issuing the enforcement action.
During the telephone call, the licensee is provided the option of attending a
conference or submitting a written response to the apparent violations in the
inspection report (see letter template in Appendix B that should be used to
transmit the Notice of Violation (NOV) that documents the telephone
conversation).
If the licensee indicates during the choice call that it does desire to have a
conference or provide a written response before the NRC issues its enforcement
action, then the staff should follow the applicable guidance for issuing a choice
letter and then reviewing the licensee’s response afterwards.

F. If the staff concludes that an additional panel or discussion is necessary:
1. When the staff concludes that an additional panel or discussion is necessary, the
original principal panel participants should attend, if possible.
•
•

The other participants, to the extent that they might have information relevant to
the issues to be discussed, should also attend, if possible.
The original participants need not be present to conduct a subsequent panel or
discussion.
NOTE:
It is not always necessary to hold a new panel to change a past
agreement recorded on a Strategy Form. OE management can agree to
change an agreement through a consensus decision made during
discussions outside the panel process. The decision as to whether to
hold an additional panel is based on the complexity of the issue, level of
controversy associated with the change, and the estimated impact on
resources. For these cases, all affected parties must be included.

2. The region shall make available new information, guidance, or precedent, as
applicable that is influencing the discussion to change the enforcement strategy.
3. The region shall update the Enforcement Action Worksheet (EAW) to reflect changes
in the regional recommendation.
4. After a subsequent panel, the Strategy Form will be updated noting the outcome of
the meeting, including a brief explanation of the reason for any change in
enforcement strategy and distributed so that the region, program offices, OI, and
OGC are aware of the change and can comment, if desired.

49

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

5. Following receipt of the revised Strategy Form, it is the responsibility of the principal
participants to verify that the revised strategy is acceptable to the office or region.
•

•
•

The principal participants are responsible for discussing, as warranted, changes
to a previously agreed-upon strategy with the prior panel participants from their
office or region who may not have been involved in the subsequent panel or
discussion.
The regional principal participants should discuss, as warranted, the issues with
OI.
Disagreements with the revised strategy should be handled as discussed in the
following paragraph.

G. If, after being briefed on the enforcement panel outcome, the Regional Administrator, the
Director, Division of Reactor Oversight, for NRR cases, the Director, OI, the Associate
General Counsel for Hearings, Enforcement, and Administration, or the applicable
Division Director for NMSS or NSIR, disagree on enforcement strategy issues such as
severity level, SDP characterization, civil penalty assessment, or whether a
predecisional enforcement conference is necessary:
1. These parties should contact the Director, OE, as soon as possible, and no later than
24 hours after receiving OE's summary of the enforcement strategy documented on
the Strategy Form.
2. In the case of a disagreement with the enforcement panel outcome, the Regional
Administrator, program office director and Director, OE, should confer (“Office
Directors Call”) and either resolve their differences within 21 days or promptly
escalate the matter to the appropriate DEDO to arbitrate a decision. For cases
based on an OI investigation, a representative from OGC should be invited to
participate on the call.
a. Notes shall be taken during the OD call in order to subsequently document the
outcome of the meeting on a new Strategy Form. These notes should include
the decisions reached, any remaining unresolved issues, the basis for the use of
enforcement discretion as allowed by the Policy, and other relevant information.
The responsible Enforcement Specialist should serve as the note taker for the
OD Call, and could also help to ensure that any associated enforcement process
questions are discussed and resolved (e.g., civil penalty assessment, corrective
actions credit) during the conference.
b. For cases based on an OI investigation, a staff member knowledgeable of the
evidence and/or facts of the case should be included as a non-participant if an
OGC representative is not in attendance in order to ensure that the decisions
reached are not inconsistent with OGC’s analysis.
3. Based on the outcome of these discussions, OE will summarize the agreed-upon
enforcement strategy, including the basis for enforcement discretion on a new panel
Strategy Form to document the decisions reached.
H. If there is a disagreement involving willfulness, see Part II, Section 1.8, “Disagreement
Memoranda.”

50

PART I: Enforcement Process

I.

PART I – 1 NRC Enforcement Program

Re-exiting: If, as a result of the panel discussion, a substantive change is made to the
apparent violations or message given at the exit, a re-exit should be held. This may be
done by the branch chief by telephone.

Proper Handling of Predecisional Enforcement Information
A. The NRC staff should discuss the identification of apparent violations with licensees or
release inspection reports that document apparent violations to licensees to ensure that
corrective actions are initiated to protect the public health and safety and to obtain
compliance. However, the NRC staff may not discuss or release predecisional
enforcement information to licensees or the public. Predecisional enforcement
information includes, but is not limited to:
•
•
•

The potential severity level of a violation;
The proposed amount of a civil penalty; and
The nature or context of an order.
NOTE:
Release of information that may impact an open OI matter shall be
coordinated with OI in advance of its release.

B. The release of predecisional information may unnecessarily interfere with the
enforcement process and may inappropriately affect licensees or their employees.
1. The premature release of information, other than premature release by clearly
inadvertent actions, is a serious matter and may be considered for referral to the
Office of the Inspector General (OIG).
2. If predecisional information needs to be released to, e.g., achieve a settlement of an
enforcement action or to reach agreement on a confirmatory order, the Director, OE,
must be consulted prior to release of such information.
C. Predecisional documents associated with a proposed enforcement action should be
clearly marked, "Official Use Only - Predecisional Enforcement Information” until the final
enforcement action is issued. Additional information regarding the release of
predecisional information is included in Management Directive 3.4, “Release of
Information to the Public”.

Predecisional Enforcement Conferences and Regulatory
Conferences
A. Predecisional Enforcement Conferences (PECs) are normally open meetings between
the NRC and a licensee, applicant, licensed or nonlicensed individual, contractor,
vendor, or other person to obtain information from the party to assist the NRC in
determining whether an enforcement action is necessary and, if so, what the appropriate
enforcement action is. PECs address apparent violations assessed using traditional

51

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

enforcement. If held, a PEC is normally the final step in the NRC’s fact-finding process
before making an enforcement decision.
Although the NRC normally offers the licensee the opportunity to attend a PEC or
respond in writing, or both, there may be instances when it is appropriate to issue an
enforcement action before obtaining the licensee’s response (e.g. an immediate safety
or security issue).
B. Regulatory Conferences are normally open meetings between the NRC and reactor
licensees to discuss issues that the SDP assessment determines to be potentially risk
significant (i.e., red, yellow, or white), whether or not violations are involved.
1. Because the significance assessment from the SDP determines whether or not
escalated enforcement action will be issued (i.e., a Notice of Violation (NOV)
associated with a red, yellow, or white SDP finding), a subsequent predecisional
enforcement conference is not usually necessary.
2. Although regulatory conferences are similar to predecisional enforcement
conferences in many respects, specific guidance for regulatory conferences is
included in NRC Inspection Manual Chapter (IMC) 0609 and IMC 2519.
C. The decision to hold a PEC or a Regulatory Conference with enforcement implications
does not mean the agency has concluded that a violation has occurred or that
enforcement action will be taken.
NOTE:
The regions should send meeting notices for regulatory conferences with
enforcement implications to “RidsOeMailCenter Resource” and
“OEWeb.Resource.” The regions are responsible for ensuring that these
conferences are posted on the agency’s public meeting schedule website.
D. The purpose of the conference is to obtain information necessary for the NRC to
determine whether an enforcement action is necessary and, if so, what the appropriate
enforcement action is, e.g.:
•
•
•

A common understanding of the facts of the case, including whether a violation
occurred, and if so, its root causes, and any missed opportunities to identify the
violation sooner; and
A common understanding of corrective actions; and
A common understanding of the significance of the issues.

52

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

NOTE:
PECs and regulatory conferences are normally categorized as Category 1
meetings in accordance with the Commission’s Public Meeting Policy. The
policy statement as well as additional guidance on conducting public
meetings is included on the Communications and Public Meetings Web Site.
E. These conferences are not held to negotiate sanctions.

1.2.15.1 Applicability
A. PECs and Regulatory Conferences will normally be held:
1. When the NRC needs additional information prior to making an enforcement decision
involving a potential escalated action, e.g., Severity Level I, II, and III violations;
violations associated with a Red, Yellow or White finding, civil penalties, and orders;
2. Before issuing an order based on a violation of the Deliberate Misconduct rule;
3. Before issuing a civil penalty to an unlicensed individual;
4. To provide a licensee (or individual) an opportunity to discuss its perspective
regarding the issues, prior to the NRC making enforcement decisions; and
5. When the NRC needs additional information prior to making an enforcement decision
involving a significant vendor case, such as those involving recurring
nonconformances.
B. The NRC may take immediate enforcement action, and hold the conference
subsequently:
1. If necessary to protect the public health and safety or provide for the common
defense and security.
2. In special cases where a conference would not serve the agency’s interest, e.g.,
where NRC is taking its action before DOJ has completed its activities addressing
escalated criminal issues.
C. A licensee, vendor, or other person may seek to waive their opportunity to participate in
a conference.
1. The region should notify OE if a party seeks to waive a conference.
2. If a party waives its opportunity to participate in a conference, a DFI may be
warranted if the NRC needs additional information to make an enforcement decision.
D. If the NRC concludes during an enforcement panel that a PEC does not appear to be
necessary, the region may either:

53

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

1. Issue the inspection report including the apparent violation(s) and providing the
licensee a choice of requesting a conference or providing a written response to the
apparent violation(s) (“a choice letter”); or
2. Make a telephone call to the licensee informing them that the NRC does not see the
need for a conference and does not see the need for a civil penalty (“choice call”).
E. Notwithstanding the NRC’s conclusion that a PEC does not appear to be necessary, a
conference will normally be held if the licensee requests it.

1.2.15.2 Attendance at PECs and Regulatory Conferences
This section provides specific guidance concerning attendance at PECs and Regulatory
Conferences, including: NRC personnel, licensee personnel, media and members of the public,
and State government personnel.
A. NRC Attendance at PECs and Regulatory Conferences
1. NRC personnel should attend conferences according to the following guidelines:
a. The Regional Administrator should determine regional staff attendance at
conferences.
b. The region should be sensitive to the potential impact on a conference when the
number of NRC attendees is significantly greater than the number of licensee
attendees.
NOTE:
There should be a reason for each NRC person’s attendance at PECs
and Regulatory Conferences. If a NRC senior manager is requested to
attend a PEC by a licensee they should carefully consider the effect of
their attendance on the efficiency of the meeting as it may produce a
chilling effect on those present. Such a scenario would be considered
outside of the normal enforcement process.
2. OE attendance at conferences is at the discretion of the Director, OE. The cognizant
OE Enforcement Specialist should coordinate with OE management to determine
whether the issues to be discussed warrant OE attendance at the conference.
a. OE staff should attend all significant conferences, either in person or by video or
telephone. (OE should generally not participate by telephone if safeguards
information will be discussed.)

54

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

NOTE:
If OE plans to participate in a conference in person or by video or
telephone, the region shall send to OE, along with the inspection report,
any additional relevant information, at least 72 hours prior to the
conference.
b. If the Regional Administrator believes that telephone or video participation would
make a particular conference less effective, OE should be notified at least one
week in advance so that travel arrangements can be made.
3. The NRR, NMSS or NSIR Enforcement Coordinator should attend conferences as
deemed appropriate by the program office, or as requested by the region.
4. Additional program office designees (NRR/NMSS/NSIR technical or projects staff)
may attend conferences as deemed appropriate by the program office, or as
requested.
5. Regional Counsel should attend PECs, unless their schedule does not permit, and in
particular, should attend those conferences involving complex or novel issues or
those involving a complex or significant OI investigation.
6. OGC should be requested to attend conferences involving disputes over legal
issues.
7. OI should be invited to attend those conferences that involve a complex or significant
OI investigation, or those that could potentially result in an OI referral for
investigation.
B. Licensee Attendance at PECs and Regulatory Conferences
1. Licensee personnel should attend conferences according to the following guidelines:
a. The region should request that licensee attendance include:
•
•

Senior level managers and individuals prepared to address the
circumstances of the apparent violations and the corrective actions, e.g., the
Radiation Safety Officer; and
A licensee senior representative empowered to bind the licensee to commit to
corrective actions on its behalf.

b. When an individual's significant personal error contributed to the violation,
consideration should be given to that person's attendance at the licensee's
conference because it may be beneficial for NRC management to hear first-hand
the individual's explanation for the actions taken, to get a more complete
understanding of the violation circumstances.
c. When an enforcement action against an individual is contemplated, the
opportunity should normally be provided for a specific conference with the
individual.

55

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

C. Public Attendance at PECs and Regulatory Conferences
1. PECs and Regulatory Conferences are generally:
a. Classified as Category 1 meetings in accordance with the Commission Public
Meeting Policy;
b. Between the NRC and the licensee;
c. Normally held in the regional office; and
d. Open to public observation.
2. Conferences will not normally be open to the public if the enforcement action being
contemplated:
a. Would be taken against an individual, or if the action, though not taken against
an individual, turns on whether an individual has committed a wrongdoing;
b. Involves significant personnel failures where the NRC has requested that the
individual(s) involved be present at the conference;
c. Is based on the findings of an NRC Office of Investigations (OI) report that has
not been publicly disclosed; or
d. Involves Safeguards Information, Safeguards Information-Modified Handling
(SGI-M), Privacy Act information, or information which could be considered
sensitive or proprietary; and
e. Involves medical misadministrations or overexposures and the conference
cannot be conducted without disclosing personally identifying information about
the individual involved, e.g., their name, employee number, etc.
3. Conferences will not normally be open to the public if the conference will be
conducted at a relatively small licensee's facility.
4. Notwithstanding these criteria, a conference may still be open if:
a. The conference involves issues related to an ongoing adjudicatory proceeding
with one or more interveners; or
b. The evidentiary basis for the conference is a matter of a public record, such as
an adjudicatory decision by DOL.
NOTE:
Notwithstanding the criteria for opening or closing a conference to the
public, with the approval of the DEDO, conferences may either be open
or closed after balancing the benefit of the public observation against the
potential impact on the agency's decision-making process in a particular
case.
5. The Regional Administrator has the discretion to determine whether the public
should be allowed to observe a video conference on a case-by-case basis.

56

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

6. The public attending an open conference may observe but not participate in the
conference.
a. Members of the public may tape record (including videotape) an open conference
if that activity is not disruptive.
b. It is noted that the purpose of conducting conferences in the open is not to
maximize public attendance, but rather to provide the public with opportunities to
be informed of NRC activities while balancing the need for the NRC staff to
exercise its regulatory and safety responsibilities without an undue administrative
burden.
c. Following the conference, the staff is to be available for a brief period to entertain
questions and comments from members of the public concerning matters
discussed at the conference.
D. State Government Attendance at PECs and Regulatory Conferences
1. Since most PECs and Regulatory Conferences are open to the public, state
government personnel will be able to attend.
2. If the conference is closed,
a. the Commission's Policy on Cooperation with States at Commercial Nuclear
Power Plants and Other Nuclear Production or Utilization Facilities,” dated
February 15, 1989, and amended for adjacent states on February 25, 1992,
permits State representatives to attend conferences if information relevant to an
enforcement action is obtained by a State representative during an inspection
under a State/NRC inspection agreement.
b. The Regional Administrator may permit State personnel to attend a closed PEC
or Regulatory Conference, after consultation with OE.
•

Examples of situations where permission would be granted include where the
State representative could provide helpful information or insight (e.g., the
enforcement action involves a matter in which the State may also have a
related regulatory interest or where the enforcement action involves a general
license under 10 CFR Part 150 and an Agreement State has issued a specific
license.

•

If attendance by State personnel to a closed PEC has been deemed
appropriate, the following guidelines should be met for closed conferences:
o
o

o

State attendance should be from the appropriate State office (e.g., a
person from the State office of operational or radiation protection
safety and not from the State rate-setting office).
The State attendee should be informed that participation during the
conference is not allowed unless the State attendee was a participant
in the inspection under discussion and, in that case, the State
attendee may only make statements related to the areas inspected.
If actual safeguards information is to be discussed, State personnel
shall be excluded unless they have the necessary clearance.

57

PART I: Enforcement Process

o

o

•

PART I – 1 NRC Enforcement Program

The State attendee must agree not to disclose the conference details
with the media or the public documented in a non-disclosure
arrangement between the state and NRC. Such agreement should be
included in a Memorandum of Understanding (MOU) or, in its
absence, a protocol agreement.
This MOU or protocol agreement should be signed by the Regional
Administrator, or his designee, and the State attendee or State liaison
officer.

The following is a sample protocol agreement:
(State) understands, acknowledges and agrees that all enforcement
action will be undertaken by the NRC. (State) attendees will not disclose
any closed enforcement conference details or results with any person, the
media, or the public. (State) attendees may not participate during the
closed enforcement conference unless the attendee was a participant in
the inspection under discussion and, in which case, he or she may only
make statements related to the areas inspected.
__________________________________
NRC Regional Administrator (or designee)

_____________
Date

__________________________________
State Liaison Officer (or State Observer)

_____________
Date

3. Generally, only NRC personnel may attend enforcement caucus meetings following
the conference.
a. The Director, OE, may give prior approval for someone other than NRC
personnel to be present at an enforcement caucus meeting.
b. When the Director, OE, allows a person to attend a caucus, this person should
sign a non-disclosure agreement prior to attending the caucus.

1.2.15.3 Scheduling and Announcing PECs and Regulatory Conferences
A. Whether a PEC should be conducted is determined during an enforcement panel. The
process for determining whether to conduct a regulatory conference is governed by IMC
0609, Attachment 1 or IMC 2519, Attachment 1.
1. The region should issue the inspection report within four weeks of when the
enforcement panel or SERP was conducted.
2. OE will have already assigned an EA number to the case.
3. Conferences should generally be held within 6 weeks after completion of an
inspection. If a conference is scheduled subsequent to a licensee's response to a
choice letter, the conference should generally be held within four weeks of receipt of
the licensee's response.

58

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

NOTE:
See for additional guidance on cases involving individuals or cases that
have been referred to the Department of Justice (DOJ). These cases
require coordination with DOJ and approval of the Director, OE, prior to
scheduling a PEC.
B. The region should conduct a final exit briefing to inform the licensee:
1. That the NRC would like to conduct a conference prior to making an enforcement
decision;
2. Whether the conference will be open or closed to public observation;
3. For closed conferences, the conference will normally be transcribed;
4. The purpose of the conference and the information that the licensee is encouraged
to present at the conference.
a. This will help direct the licensee's focus and ensure that the licensee
understands what is expected at the conference.
b. This communication is especially important for material licensees because of
their infrequent contact with the NRC. If time permits, a written outline or agenda
of specific issues should be provided; and
c. That the licensee should begin it reviews based on the exit briefings, i.e., the
licensee should not wait until the inspection report has been issued.
C. The region should inform the licensee that any information provided during the
conference, including handouts or preliminary evaluations, will be made available to the
Public, unless it meets the provisions of 10 CFR 2.390(a)(4) or (a)(6).
D. The region should coordinate a date to hold the conference with the licensee, with the
goal of giving the licensee at least two weeks to review the inspection report.
1. Licensees should have adequate time to perform necessary reviews or
investigations, develop corrective action plans, and prepare presentations.
2. Licensees are expected to base their presentation on the inspection exit meeting.
a. The specific findings or issues of concern may not be fully understood until the
licensee has received the written report.
b. Unless prior approval is given by the Director, OE, or unless the licensee waives
receipt of the inspection report, the licensee should normally be given the
inspection report at least two weeks in advance.

59

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

NOTE:
Inspection reports should be sent to OE and the appropriate program
office at the same time the region sends it to the licensee.
E. In addition to the inspection report, the licensee should normally be sent a factual
summary for cases involving OI reports.
F. Additional time may be needed to prepare for conferences involving complex issues.
1. The timeliness of the process is dependent on effective exit meetings.
2. If, after the exit meeting, the agency concludes that different issues should be the
focus of the conference:
a. The licensee should be put on notice.
b. This should also be considered in scheduling the conference.
3. After the conference date and time have been set, the region should:
a. Promptly notify OE, the appropriate program office, OI (if applicable) and the
appropriate State liaison officers (unless the conference is closed); and
b. Highlight any novel or complex cases for the attention of the Director, OE.
G. The region should prepare a meeting notice in accordance with regional procedures and
include information (as applicable) in the Public Meeting Checklist Web Site. Meeting
notices should also include specific enforcement-related information. Appendix D
includes a checklist that consolidates the required information for conferences.
H. The meeting notice should:
1. Include the EA number.
2. Clearly identify the meeting as a "predecisional enforcement conference" or
“regulatory conference.”
3. In the purpose statement, provide sufficient detail to inform the public about the
general issues, including the activity area, or equipment involved.
The following examples demonstrate inadequate and adequate purpose statements
for meeting notices:
a. Adequate
• The purpose of the predecisional enforcement conference is to discuss the
apparent willful violation involving the transfer of licensed byproduct material
(EXIT signs containing tritium) without a specific license.
• The purpose of the predecisional enforcement conference is to discuss the
apparent procedural violation involving the motor driven emergency
feedwater pump.
60

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

b. Inadequate
• The purpose of the meeting is to discuss the procedural violation identified in
NRC Inspection Report No. 50-277/02-06.
• The purpose of the predecisional enforcement conference is to discuss the
deliberate transfer of licensed byproduct material without a specific license.
4. Refer to the issues as "apparent violations" or “potential noncompliances”, to reflect
the predecisional nature.
5. Indicate whether the conference is open or closed to public observation.
a. If the conference is open, include the following statement:
“This is a Category 1 Meeting: The public is invited to observe this meeting and
will have one or more opportunities to communicate with the NRC after the
business portion, but before the meeting is adjourned.”
NOTE:
If the case involves potential willfulness, the notice should refer to the
issues generally as “apparent willful violations,” instead of “apparent
deliberate violations.”
b. If the conference is closed, include one of the following statements:
“This conference is closed to public observation because it involves the findings
of an NRC Office of Investigations report that has not been publicly disclosed.”
or
“This conference is closed to public observation because it involves safeguards
information, Privacy Act information, or information which could be considered
sensitive or proprietary.”
or
“This conference is closed to public observation because it involves potential
wrongdoing by an individual.”
or
“This conference is closed to public observation because it involves significant
personnel failures where the NRC has requested that the individual(s) involved
be present at the conference.”
or

61

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

“This conference is closed to public observation because it involves medical
misadministrations or overexposures and the conference cannot be conducted
without disclosing personally identifying information about the individual(s)
involved.”
or
“This conference is closed to public observation because it will be conducted at a
relatively small licensee's facility (or will be conducted by telephone).”
c. Include the inspection report number and the ADAMS accession number, if it is
available.
NOTE:
Meeting notices for Regulatory Conferences with enforcement
implications should include a statement that the meeting will also address
whether enforcement action is warranted.
I.

The region should submit meeting notices for all conferences (open or closed) at least
10 calendar days in advance of the meeting to the Public Meeting Notice System
Coordinator (e-mail PMNS).

J. To support posting a conference to the Enforcement Web Site, the region should send a
copy of the meeting notice (including the EA number) at the same time it sends the
notice to the Public Meeting Notice System Coordinator, to:
•
•

RidsOeMailCenter Resource; and
The OE Web site Coordinator (OEWeb.Resource).
NOTE:
It is very important in meeting the intent of the Commission’s policy on public
meetings to provide the meeting notice and agenda in the background
information of the ADAMS package. Other related documents are normally not
necessary because the inspection report and transmittal letter typically provide
sufficient information. However, if a separate agenda is created, a copy of the
agenda should be sent to “RidsOeMailCenter Resource” and
“OEWeb.Resource.”

K. The region should notify OPA of all PECs and Regulatory Conferences.
1. OPA will determine whether to issue a press release announcing the conference.
2. All press releases should include language that conveys:

62

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

a. The decision to hold a conference does not mean that the agency has concluded
that a violation has occurred or that enforcement action will be taken.
b. Apparent violations discussed at conferences are subject to further review and
may be subject to change prior to any resulting enforcement action.
c. The conference is an opportunity for the licensee to present any additional
material information before the NRC arrives at a decision.
L. The only exception to issuing a meeting notice may be when security-related issues are
involved.

1.2.15.4 Conducting PECs and Regulatory Conferences
PECs and Regulatory Conferences should be conducted according to the following guidelines:
A. Conferences are normally conducted in the regional offices.
B. The region should consult with OE prior to scheduling the conference when:
1. There are special circumstances where the agency determines that it would be
beneficial to the enforcement process to conduct the conference at the licensee's
facility; or
2. It would be more practical for the agency to conduct the conference by telephone or
video.
3. It is up to the Regional Administrator’s discretion to allow a particular conference to
be conducted by telephone or video conference.
C. Members of the public will be allowed access to the NRC regional offices to attend open
conferences in accordance with the "Standard Operating Procedures For Providing
Security Support For NRC Hearings And Meetings" published November 1, 1991 (56 FR
56251) which provides that visitors may be subject to personnel screening, that signs,
banners, posters, etc., not larger than 18" will be permitted, and that disruptive persons
may be removed.
D. The Regional Administrator should determine the appropriate member of regional
management to serve as the presiding official at the conference.
1. The presiding official should not normally be below a Deputy Division Director;
however,
2. It may be appropriate for a Branch Chief to serve as the presiding official for certain
conferences involving materials licensees.
E. For those conferences in which safeguards information is to be discussed at the
conference, NRC staff should not participate by telephone, for security reasons.
1. If such participation is necessary, it should be done in accordance with Management
Directive 12.4, “NRC Telecommunications System Security Program,” and 12.6,
“NRC Sensitive and Unclassified Information Security Program.”

63

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

2. If security issues (not directly related to safeguards information) are the subject of
the conference, NRC staff should not participate by telephone unless a compelling
reason exists and safeguards information will clearly not be discussed.
NOTE:
Although some conferences may warrant transcription, conferences are
not conducted under oath. However, if warranted, the staff should be
clear that whether or not a statement is under oath, a false statement on
a material matter may be subject to civil and criminal prosecution.
F. The presiding NRC official or facilitator should:
1. Announce the meeting as an open or closed conference;
2. Discuss the purpose of the conference;
3. Inform the licensee and public attendees that the decision to hold the conference
does not mean that the agency has determined that violations have occurred or that
enforcement action will be taken;
4. Inform the public attendees (for open conferences) that the conference is a meeting
between the NRC and the licensee and that the meeting is open for public
observation but not participation; and
5. Briefly explain the enforcement process, focusing on the portions of the Enforcement
Policy that are applicable to the issues to be discussed.
a. When NRC staff is participating by video or telephone on a case involving
security, the presiding official should also announce that safeguards information
should not be discussed during the conference, for security reasons.
b. If the conference is open, the region should ensure that it has copies available of
the Enforcement Policy, inspection report, and slides to be discussed.
G. The region should briefly discuss the apparent violations and explain the agency's basis
for concern.
1. The level of detail to be discussed is related to the complexity and significance of the
issues.
2. Most of the detailed information will have been included in the inspection report.
3. The discussion should include the root causes of the apparent violations and the
corrective actions planned or taken.
a. Corrective actions considered by the NRC to be inadequate (or only marginally
acceptable) should be emphasized.
b. It is helpful to have a slide of the apparent violations, especially in complex
cases, to guide the discussion.

64

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

c. For regulatory conferences, it is helpful to have a slide of the most significant
factors that contributed to the preliminary risk determination.
H. The region should address the apparent safety significance of the issues.
1. The region should not specifically discuss severity level categorizations, civil penalty
amounts, or the nature or content of any orders.
2. If the region chooses to use slides or handouts for any part of its presentation, they
should contain the following note: "The apparent violations discussed in this
conference are subject to further review and are subject to change prior to any
resulting enforcement action."
I.

The licensee should be encouraged to:
1. Present its understanding of the facts and circumstances surrounding the apparent
violations;
2. Discuss whether it agrees with the NRC's understanding of the facts, the root
cause(s), the safety significance, and the immediate and long-term corrective actions
taken or planned to be taken; and
3. Present other information relevant to the agency's enforcement decision, e.g.:
a. The licensee's perspective on the severity and/or the risk significance of the
issue;
b. The factors that the NRC considers when it determines the amount of a civil
penalty that may be assessed (e.g., missed opportunities to identify the violation
sooner); and
c. Any other factors that may warrant enforcement discretion.

J. The licensee should understand that the conference is a means of providing to the NRC
information it believes the agency should consider in determining the appropriate
enforcement action and significance determination.
1. The conference is not a meeting to negotiate sanctions with the staff, nor should it be
used as a forum for protracted debate.
NOTE:
PECs and regulatory conferences should normally not last longer than
three hours.
2. Once the pertinent facts have been established, the presiding official must recognize
differences of opinion and keep the conference productive.
K. The region should normally take a short break prior to the conclusion of the conference
to meet with the staff to ensure that the staff has no outstanding questions.

65

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

L. The region should provide closing remarks. The presiding NRC official or facilitator
should include in those remarks, a reminder for the licensee and public attendees that:
1. The apparent violations discussed are subject to further review and are subject to
change prior to any resulting enforcement action; and
2. The statements of views or expressions of opinion made by NRC employees at the
predecisional enforcement conference, or the lack thereof, are not final conclusions.
M. After the business portion of an open meeting has been concluded, the presiding NRC
official or facilitator should announce that the staff is available to address comments or
questions from the public. Although licensees are not obligated, they may respond to
questions if they choose to do so.

1.2.15.5 Transcribing PECs and Regulatory Conferences
A. Under certain circumstances, the NRC may choose to transcribe a predecisional
enforcement conference (PEC). Normally, a transcription of a PEC or Regulatory
Conference is required for cases that may result in a request (by the licensee, individual
or NRC) for a hearing following issuance of the enforcement action. Enforcement
actions that offer an opportunity for a hearing include orders, CPs, actions involving
individuals, and other cases of public or regulatory interest. Additionally, if a PEC or
Regulatory Conference is closed to the public, it shall be transcribed. The purpose of
this requirement is to be transparent regarding the enforcement process.
B. Absent coordination with OE, conferences should be transcribed for cases involving:
1. A licensed operator
2. A licensee employee who may have committed a willful violation
3. A significant case in which a record is warranted
4. An OI report, or a case involving discrimination
5. Security-related violations. Distribution for review of the transcript involving Secret
information shall be limited to persons with a need-to-know and those who possess
the proper security clearance.
6. Any other case that the region believes should be transcribed, after consultation with
OE
C. Transcribed conferences should normally be closed meetings between the NRC and the
licensee. As such, licensees will not be allowed to transcribe or record a conference.
D. Transcripts should be placed in ADAMS and profiled as “non-public.” Although the
transcript is publicly releasable (with appropriate redaction) under FOIA, it is not to be
released without the approval of the Director, OE, and only after any associated
enforcement action has been issued.

66

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

1. If the licensee or any individual at the conference is subsequently provided a copy of
the transcript, whether by the staff's offer or the individual's request, the individual
should be informed that a copy will also be made available to the Public (subject to
removal of privacy information, proprietary information, etc.).
2. Transcripts for open conferences may be made available to the Public as soon as
they are available from the court reporter.
E. Transcription services may be obtained by contacting ASLB and submitting an NRC
Form 587. (The ASLB administers a contract for obtaining court reporting services.) In
certain circumstances, the NRC Headquarters Operations Center (HOC) may be able to
record the conference over a telephone bridge line set up by the HOO and the recording
sent to be transcribed; however, this method is not recommended and should only be
used in extreme circumstances.

1.2.15.6 PEC and Regulatory Conference Summaries
A. After the PEC or Regulatory Conference has been held, the region should prepare a
conference summary (see forms in Appendix D).
B. The conference summary documents the proceedings and serves as a vehicle for
making the licensee's handouts and the NRC's outline or agenda available to the Public.
C. In most cases, the licensee's presentation handouts (and the NRC's handouts, if used)
will provide sufficient information to summarize the conference proceedings.
D. The summary should include a brief description of the following information (if not
already addressed in the licensee's handouts), including:
1. The licensee's position (i.e., if the licensee agrees with the findings in the inspection
report, or if the licensee takes issue with the apparent violation(s)).
2. Any significant additions or corrections to the factual information in the inspection
report.
3. Any significant additional information that affects the significance of each violation.
4. The short-term and long-term corrective actions the licensee has implemented or has
committed to implement. (This description should be sufficient for the staff to judge
the corrective action as part of the civil penalty assessment process.)
NOTE:
The conference summary should not include predecisional, safeguards,
safeguards information - modified handling (SGI-M), Privacy Act information,
or information which could be considered sensitive or proprietary information.
E. The conference summary should be as brief as possible.

67

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

F. The region should include the conference summary as part of the background material
submitted with proposed escalated enforcement actions. The summary should be sent
to the licensee either before or when the enforcement action is issued.

Enforcement and SDP Caucuses
A. Enforcement caucuses are meetings that are held subsequent to a predecisional
enforcement conference or following receipt of a licensee’s response to a choice letter,
to discuss whether new information or perspectives were obtained warranting
reconsideration of the enforcement approach for the case and whether, for choice letter
responses, a conference should be conducted.
B. SDP/enforcement caucuses are meetings that are held subsequent to a regulatory
conference or following receipt of a licensee’s response to a choice letter, to discuss
whether new information or perspectives were obtained warranting reconsideration of
the significance determination for the case and whether, for choice letter responses, a
conference should be conducted.
1. Because the outcome of the SDP informs the enforcement process, a secondary
purpose for such meetings is to discuss and reach agreement on an enforcement
approach for any violations that might be associated with the inspection findings.
2. Although these caucuses are similar to enforcement caucuses in many respects,
specific guidance for SDP caucuses is included in IMC 0609, Attachment 1 or IMC
2519, Attachment 1.
C. Enforcement caucuses may be conducted via email, video teleconference (VTC),
teleconference, or face-to-face, and all members must agree to the proposed
communication method for the caucus. The responsible enforcement coordinator
(regional, program office) shall initiate the discussion on what method to be used. If a
caucus is conducted via email, there should be general agreement among all members
on the proposed enforcement strategy following the conference

1.2.16.1 Participating in Enforcement and SDP Caucuses
A. Participation in enforcement and SDP caucuses should be in accordance with the
following guidelines:
1. Region: The region should schedule a caucus as soon after a conference or receipt
of a licensee’s response to a choice letter as possible. When possible, the caucus
should occur immediately following the conference.
a. The region should notify OE, and the applicable program enforcement staff.
b. The region should invite the assigned OGC/SE attorney and the applicable OI
investigator and Regional Field Office Director for caucuses involving willfulness.
c. It is expected that the region will be represented by a person at the Division
Director level or higher.
d. It is important to recognize that the regional caucus participants provide a
recommendation to the Regional Administrator, i.e., their position does not
represent the final region position.

68

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

2. OE: Enforcement Specialists should attend all caucuses.
a. If OE management did not participate in the caucus, it will provide its position to
the region within one day of the meeting.
b. The decision will be documented on a Strategy Form.
c. A final decision on the enforcement action is not to be made until OE approves
the enforcement strategy as documented on the Strategy Form.
3. Program Office: The program office should be invited to participate in caucuses;
however, attendance is not mandatory except when the program office is responsible
for the allegation or inspection activity (in which case the program office assumes the
role of the regional office).
a. The NRR, NMSS and NSIR Enforcement Coordinators are responsible for
arranging for participation by the appropriate and necessary program office staff;
and
b. For ensuring that the staff has necessary materials in advance of the meeting
(e.g., conference handouts).
4. OGC: The assigned OGC/SE attorney shall participate in caucuses involving
willfulness (e.g., wrongdoing and discrimination), civil penalties, and other cases with
potential issues of legal significance.
5. OI: OI (applicable investigator and Field Office Director) should be invited if there
are questions as to OI findings.
B. In evaluating the appropriateness of the proposed enforcement strategy, program office
participants should focus on whether:
1. The violations are technically accurate and factual; and
2. The enforcement strategy is consistent with the program office’s policy, guidance,
position, and past practice.
C. If program office participants disagree with the enforcement strategy discussed during
the caucus, they are responsible for elevating their concerns to program office
management (i.e., the Director, Division of Reactor Oversight, for NRR cases; the
applicable Division Director for NMSS cases; or the Director, Division of Security
Operations, NSIR).

1.2.16.2 Enforcement and SDP Caucus Outcome
A. Subsequent to an enforcement or SDP caucus involving OE participation, OE will amend
(as warranted) its understanding of the enforcement strategy that was agreed upon
during the enforcement caucus by completing the lower portion of the Strategy Form.
1. OE will send the form to the region and provide it to the program office (through its
Enforcement Coordinator).
2. The form is used to:

69

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

a. Brief the Regional Administrator, the Director, OE (if he or she did not participate
in the caucus), the Director, Division of Reactor Oversight, NRR, the applicable
Division Director in NMSS, and the Director, Division of Nuclear Security, NSIR, if
warranted; and
b. Subsequently develop the enforcement action and the enforcement action
transmittal letter.
B. Depending on the information gathered during the conference or provided in the
licensee's response to the choice letter, and the discussions in the caucus, the staff will
determine:
1. The level of headquarters’ review that is necessary for the case; and
2. One of several outcomes:
a. The staff concludes that no violation occurred.
•
•
•
•

OE will document the conclusion of the enforcement caucus regarding the
disposition of the issue by completing the Strategy Form.
OE will send the form to the region and make it available to the program
office and OGC.
The region should inform the licensee in writing that the NRC does not intend
to issue enforcement action.
The region may use the information in the Conference Summary to clarify
why a citation was not issued.

b. The staff concludes that non-escalated enforcement action should be proposed.
•
•
•

OE will document the conclusion of the enforcement or SDP caucus
regarding the disposition of the issue by completing the Strategy Form.
OE will send the Strategy Form to the region, the program offices, and OGC.
The regions may generally issue the non-escalated enforcement action
based on region/OE/program office agreement on the Strategy Form.
However, issuance of non-escalated (SLIV) violations in advance of the final
enforcement action is not generally advisable before the final caucus stage
when escalated enforcement action is being issued.
NOTE:

In special cases, OE may request that the actual enforcement action be
submitted for review and approval prior to issuing a nonescalated NOV
that was the subject of a conference.
•
•

The region should include an explanation in the cover letter to the licensee of
why nonescalated action was appropriate in the particular case.
The final action should be signed by someone at least at the level of the
presiding official at the conference and should be sent to OE to close out the
EA number.

70

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

c. The staff concludes that escalated enforcement action should be proposed.
•
•
•

OE will document the conclusion of the enforcement or SDP caucus
regarding the disposition of the issue by completing the Strategy Form.
OE will send the form to the region and make it available to the program
office and OGC.
The region should prepare the appropriate escalated enforcement action.

d. Additional facts are disclosed or developed (at or after the conference) that could
lead to additional violations.
•
•

Special efforts should be taken to substantiate these violations before they
are included in the proposed enforcement action.
It may be appropriate to contact the cognizant licensee official, by at least a
telephone conference call, to:
o
o

•
•

Discuss the apparent violation before it is formalized; and
Provide any additional information that may be relevant.

New EA numbers may be assigned to any additional Severity Level I, II, III
violations or problems or greater-than-green findings that are proposed with
the action.
Strategy Forms should be prepared and updated, as appropriate.

e. The staff concludes that a conference should be conducted, or if the licensee
requests a conference.
•
•
•
f.

The region should arrange for a conference with the licensee as soon as
possible.
A conference may be necessary if the staff concludes that the documented
corrective action is not sufficiently prompt and comprehensive such that a
civil penalty may be warranted.
The Strategy Form should be updated to reflect the information.

The staff concludes that an additional caucus or discussion is necessary.
•
•
•
•

The same principal caucus participants should attend if practicable.
Other participants, to the extent that they might have information relevant to
the issues to be discussed, should attend if practicable.
All original participants need not be present to conduct a subsequent caucus
or discussion.
The Enforcement Specialist should make available any previous Strategy
Form(s) to support discussions regarding the case.

C. It is not always necessary to hold a new caucus to change a past agreement recorded
on a Strategy Form.
1. OE management can agree to change an agreement as a result of telephone calls or
meetings outside the caucus process.
71

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

2. After a subsequent caucus or substantive discussion, the Strategy Form will be:
a. Updated noting the outcome of the meeting, including a brief explanation of the
reason for any change in enforcement strategy; and
b. Distributed so that the region, program office, and OGC are aware of the change
and can comment, if desired.
3. Following receipt of the revised Strategy Form, it is the responsibility of the principal
participants to verify that the revised strategy is acceptable to the office or region.
a. The principal participants are responsible for discussing, as warranted, changes
to previously-agreed upon strategy with the prior caucus participants from their
office or region who may not have been involved in the subsequent caucus or
discussion.
b. The regional principal participants should discuss, as warranted, the issues with
OI.
D. Disagreements with the revised strategy should be handled as discussed below:
1. If the Regional Administrator, the Director, Division of Reactor Oversight, for NRR
cases, the applicable Division Director for NMSS, or the Director of the Division of
Security Operations for NSIR cases disagree on enforcement strategy issues such
as significance, SDP characterization, severity level, civil penalty assessment, or
enforcement discretion:
a. The Director, OE, must be informed as soon as possible, and normally no later
than 24 hours, after receiving OE's summary of the enforcement strategy
documented on the Strategy Form.
b. In the case of a regional disagreement, the Regional Administrator and Director,
OE, should confer and either resolve their differences or promptly escalate the
matter to the DEDO. (Depending on the nature of the regional disagreement, OE
may arrange for program office participation.)
c. In the case of a program office disagreement, the Director, Division of Reactor
Oversight, for NRR cases, the applicable Division Director for NMSS, or the
Director of the Division of Security Operations for NSIR cases, should:
•
•

Confer with the Director, OE, and the Regional Administrator to resolve their
differences; or
The Director, OE, will promptly escalate the matter to the DEDO.

E. Based on the outcome of these discussions, if warranted, OE will:
1. Revise the summary of the agreed upon enforcement strategy on the Strategy Form;
2. Send it to the region; and
3. Make the revised Strategy Form available to the program office and OGC.

72

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

NOTE:
If, as discussed in this section, the Director, OE, cannot resolve an
enforcement strategy issue with the Regional Administrator, the Director, OE,
may request that the complete case (including the transmittal letter to the
licensee) be submitted to headquarters for review and approval prior to
issuance.
F. Depending on the circumstances of the case, OE will decide whether:
1. Agreement on the Strategy Form is sufficient; or
2. The actual enforcement action package needs to be submitted to headquarters for
review and approval prior to issuance.

Commission Notification and Consultation
To ensure that the Commission has all information relating to the performance of its
enforcement duties:
A. The staff notifies the Commission of its intent to issue an escalated enforcement action
by issuing an Enforcement Notification (EN). ENs are issued for enforcement actions
such as those involving civil penalties, orders, and any case which the Commission was
previously consulted. See Appendix B for EN boilerplates.
1. A same-day EN is issued for:
a. All immediately effective orders, if a 3-day EN has not been issued;
b. Any case on which the Commission was previously consulted and a 3-day EN
has not been issued;
c. All notices of enforcement discretion involving natural events, such as severe
weather conditions. (See NOED guidance in Part I, Section 3.11.)
2. A 3-day EN is issued for:
a. All escalated NOVs associated with white, yellow, or red SDP findings;
b. The following enforcement actions when they are not subject to a same-day EN:
•
•

All civil penalties (Note: This does not include orders imposing a civil penalty);
All Severity Level I and II enforcement actions;

73

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

NOTE:
The region or program office with the lead for the enforcement action
should ALWAYS consult with OE prior to issuing the action when it
requires an EN or RN, to ensure that (any) comments from the
Commission are considered prior to issuance.
•
•

All Severity Level III enforcement actions associated with civil penalties;
Enforcement actions that have special interest and would not otherwise
receive an EN (e.g., discrimination issues, unique or significant issues,
escalated actions that have been withdrawn for which an EN was previously
issued, issues for which a press release was published);
NOTE:

There is a standard distribution list for the distribution of ENs; however, if
the subject of an EN involves an enforcement action taken by one region
against the subsidiary of a company that is located in another region, the
region in which the parent company resides should be advised of the
action.
•
•

All enforcement orders (except those associated with non-payment of fees)
that are not immediately effective; and
Enforcement DFIs.

3. General Information regarding ENs:
a. OE prepares or coordinates the preparation of ENs with the region or program
office that is the lead for the enforcement action (e.g., issues where OE
previously agreed to the enforcement strategy through a panel or caucus).
b. OE prepares and issues ENs for enforcement actions that are submitted to and
reviewed by OE.
c. ENs should clearly state when an order is issued to a licensed operator or a
nonlicensee.
d. Normally, the region or program office that is the lead for the enforcement action
is responsible for contacting the licensee or individual prior to the enforcement
action being taken.
e. If an EN will be publicly-available in ADAMS, placement in ADAMS should be
delayed seven days to ensure that the licensee has been notified of the action,
unless it is known that the licensee has received the action.
B. The staff notifies the Commission of its intent to issue a significant regulatory action,
such as a Final Significance Determination for a white, yellow, or red finding (that does
not include an NOV) or an order that requires additional safety measures beyond the
regulatory framework (versus an order based on compliance issues), by providing the
Commission with a Regulatory Notification (RN).

74

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

1. A same-day RN is issued for:
a. All immediately effective safety orders;
b. Any case on which the Commission was previously consulted, and a 3-day RN
was not already required;
c. All significant regulatory actions that are being modified, withdrawn or rescinded,
and the Commission was previously notified of their issuance.
2. A three-day RN is issued for:
a. All Final Significance Determination letters with a white, yellow, or red finding
(that does not include an NOV).
b. Issues of special interest that would not otherwise receive an RN.
3. General information regarding RNs:
a. OE prepares or coordinates the preparation of RNs with the region or program
office that is the lead for the enforcement action in a manner similar to the
issuance of ENs.
b. OE issues RNs for enforcement actions that are submitted to and reviewed by
OE.
c. OE uses the standard format in Appendix B and assigns the RN the next
sequential number from the EN system.
d. If an RN will be publicly available, public release of the RN in ADAMS should be
delayed seven days to ensure that the licensee has been notified of the action
unless it is known that the licensee has received the action.
C. The Commission should receive a more detailed and earlier explanation of an
enforcement action than an EN or RN provides if the action is likely to have implications
for broader sanctions or involves issues that are of substantial public interest (SECY-96222; SRM 11/26/96). Such explanations can be provided to the Commission in writing
(e.g., a SECY paper or memorandum) or verbally (e.g., a Commissioner’s Technical
Assistant brief). This communication should be completed prior to taking such action
(unless the urgency of the situation dictates immediate action). Such actions include, for
example:
1. Any change to the Enforcement Policy.
2. An action affecting a licensee's operation that requires balancing the public health
and safety or common defense and security implications of not operating with the
potential radiological or other hazards associated with continued operation.
3. Proposals to impose a civil penalty for a single violation or problem that is greater
than three times the Severity Level I value shown in Table A of the Enforcement
Policy for that class of licensee. This type of action normally warrants a briefing to
the Commission prior to issuance of action, instead of a SECY paper or
memorandum.
4. Proposals to impose daily civil penalties.
5. Any proposed enforcement action that involves a Severity Level I violation.
75

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

6. Any action the EDO believes warrants Commission involvement.
7. For enforcement cases involving OI reports where the NRC staff (other than the OI
staff) disagrees with the conclusions of the OI report concerning willfulness,
Commission consultation (via a SECY paper or memorandum) is needed unless the
Director, OI, agrees that it is not warranted. The Commission paper should include a
summary of the rationale upon which OI based its conclusions and a summary of the
non-OI staff’s basis for reaching different conclusions. If the Commission is not
consulted, OE should document the disagreement in its case file.
8. Any proposed enforcement action on which the Commission asks to be consulted.
NOTE:
When the Commission is consulted via a SECY paper or memorandum
prior to taking an enforcement action, the region or program office with
the lead for the enforcement action is responsible for drafting the
document. OE and the EDO should be included on concurrence.
9. Any enforcement action initiated more than 18 months after a violation is initially
identified (based on the completion date of the inspection), or more than 18 months
after referral of an apparent violation to OI where the enforcement action in the case
was affected or modified as a result of the age of the action and the EDO believes
that Commission consultation is warranted. The region should draft a Commission
paper for headquarters' review that explains:
a. The reasons for the delay (with input from OI, as necessary); and
b. The rationale for the staff's proposal with a specific focus on what effect the delay
has on the proposed action. This would include consideration of factors such as,
but not limited to:
•
•

•
•

Whether the effectiveness of the proposed enforcement action will be
affected by the delay;
Whether the focus of the action should be modified as a result of the delay
(e.g., if the staff has observed several years of good licensee performance in
the area in question, perhaps the enforcement action should focus on
sending a message to individual wrongdoers rather than to the licensee;
Whether the delay affects our ability to find or obtain credible evidence from
organizations or individuals; and
Whether the expected benefits to public health and safety or common
defense and security are justified by using limited NRC resources to pursue
this action.

76

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

NOTE:
In cases where a memorandum from the Director, OE, to the DEDO is
appropriate, a copy of this memorandum should also be provided to the
Commissioner's assistants at least five days before the action is to be
taken.
c. A Commission paper is not necessary if:
•
•

The enforcement action in the case was not affected or modified as a result
of the age of the action; or
The enforcement action was affected by the age of the action but the EDO
does not believe that Commission consultation is warranted. In such cases
OE should issue a memorandum (using the appropriate form in Appendix B)
from the Director, OE, to the DEDO that:
o Explains the reasons or problem that caused the delay (with input
from OI and the applicable regional office, as appropriate); and
o Explains the rationale for the staff's proposal with a specific focus on
what effect the delay has on the proposed action and brief
consideration of the factors included in paragraph c.8 above.

Press Release
A. Press releases are generally issued for civil penalties, orders, and in other enforcement
cases as appropriate; however, the decision as to whether a press release will be issued
rests with OPA.
The staff should notify the PAO at least 72 hours prior to issuance of an action with a
proposed civil penalty.
B. Press releases are normally issued to announce a PEC that is open to the public.
C. Although press releases are not normally issued for escalated NOVs proposed without a
civil penalty, there are two situations in which a press release will normally be issued:
1. Where, but for the five-year statute of limitations, a civil penalty would have been
proposed; and
2. Where, but for the limitation of proposing a civil penalty against a vendor (i.e., could
not establish that the violation was a knowing and conscious failure to notify the NRC
in accordance with 10 CFR Part 21), a civil penalty would have been proposed.
D. OPA may choose to issue a press release for escalated NOVs associated with an SDP
finding.
E. OPA may also choose to issue press releases for other enforcement actions that they
view as newsworthy.

77

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

Licensee Response to Agency Action
A. Civil Penalty: The provisions of 10 CFR 2.205 require that a licensee submit a written
response addressing the violations included within a civil penalty action within 20 days of
the date of the civil penalty action or other specified time frame; however, normally 30
days should be used.
1. Licensees may be granted response extensions where good cause is shown.
2. The staff shall review the licensee’s response and submit an acknowledgment letter
or order imposing the civil penalty, as appropriate.
B. Order Imposing: The provisions of 10 CFR 2.202 require that a licensee submit a written
response to an order under oath or affirmation within 20 days of the date of the order or
other specified time frame; however, normally 30 days should be used.
1. A licensee may either:
a. Pay the civil penalty; or
b. Request a hearing.
2. If a licensee does not respond to the order within the allotted time, the region should
contact OE and the case will be referred to the Attorney General for collection.
(Unless an individual receives an order, he/she is not entitled to a hearing)
3. If a licensee requests a hearing, OE will provide the request to OGC to forward to the
Office of the Secretary of the Commission.
4. Where good cause is shown, the staff may consider granting a licensee an extension
of time to request a hearing. The request must:
•
•

Be made in writing to the Director, OE; and
Include a statement of good cause for the extension.

Statute of Limitations
A. The Statute of Limitations (SOL), codified at 28 USC § 2462:
1. Establishes an affirmative defense that may be asserted by a person against whom a
sanction is proposed; and
2. Is intended to prevent the prosecution of stale claims.
B. The five-year SOL requires the NRC to initiate an action imposing a civil penalty, issuing
an order to modify, suspend, or revoke a license, or issuing an order to prohibit
involvement in NRC-licensed activities within the five-year statutory period.

78

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

NOTE:
The timeliness of initiating enforcement actions helps to ensure that the
enforcement program is effective in achieving its objectives.
1. Absent special circumstances, the NRC must issue the action imposing a sanction
no later than five years from the date of the violation.
2. The SOL does not prevent the staff from issuing an NOV (without a civil penalty or
other sanction) even if the underlying violation occurred more than five years earlier
or from issuing an order requiring an action needed to ensure compliance with
existing requirements regarding protection of the public health and safety, promoting
the common defense and security, or protecting the environment.
C. There are circumstances in which NRC’s action cannot be initiated promptly, e.g., when
a matter has been referred to DOJ for consideration of criminal prosecution.
1. If a matter has been referred to DOJ (see Part II, Section 1.1.17), then in accordance
with the MOU between the DOJ and the NRC, the staff should coordinate the NRC’s
actions with DOJ. Issuance of an enforcement action may be withheld to avoid
potential compromise of the DOJ case, pending DOJ’s determination. Consistent
with the MOU, the NRC may initiate a civil penalty proceeding after consultation with
DOJ when SOL expiration is imminent.
2. All enforcement actions for cases referred to DOJ should be coordinated through the
Director of OE, and the Assistant General Counsel for Security and Enforcement.
D. To protect the NRC’s authority to impose a sanction in cases where the five-year period
is nearing expiration, but staff review of the case is not complete:
1. The responsible office through the Director of OE, should seek a waiver from the
licensee or other entity that the SOL defense will not be asserted. This requires
Commission approval; or
2. Issue the enforcement action before the SOL date expires, after appropriate
consultation with DOJ.
E. There are cases for which the date of violation to start the SOL period may change
based on the date of discovery, e.g., where the licensee fraudulently concealed a
violation or where the licensee failed to provide the NRC with a required notification of
an underlying violation. In such cases, OGC must be consulted so that a legal
determination can be made as to whether the date of the violation can be changed to the
date of NRC identification.
F. In accordance with Commission direction (SRMs to COMSECY-13-0009 and
COMSECY-05-0033):

79

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

1. On an annual basis, OE will provide a report to the Commission for information,
preferably following OI’s communication with DOJ, regarding the status of any cases
that are under review for prosecution.
2. Once a case is within one year of the statute expiring, and no less than six months in
advance of reaching the SOL,
a. OE will develop a plan-of-action and inform the Commission.
b. OE should seek Commission approval prior to any agreement with DOJ that the
NRC will seek a waiver of the SOL from the party under investigation.
G. For cases with increased stakeholder interest, the staff should be particularly vigilant
about initiating actions as soon as possible and communicating relevant information to
the Commission.

Reopening Closed Enforcement Actions
A. Under special circumstances, i.e., where significant new information is received or
obtained by NRC which indicates that an enforcement sanction was incorrectly applied,
consideration may be given, on a case-by-case basis, to reopening a closed
enforcement action to increase or decrease the severity of a sanction or to correct the
record.
NOTE:
Reopening decisions will be made on a case-by-case basis, are expected to
occur rarely, and require the specific approval of the DEDO.
1. Special circumstances include, e.g., a situation in which individuals lied to the NRC
about information that would have been considered material to the NRC’s disposition
of the case.
2. Special circumstances do not include the discovery of additional information that was
reasonably available at the time the agency made its initial decision.
B. In cases where the severity of an original enforcement sanction was inappropriately low,
consideration may be given to issuing a separate sanction against a different applicable
requirement, categorized at the appropriate severity level to reflect the level of NRC
concern and convey the appropriate message to the licensee.
C. Even where special circumstances exist, the passage of time must be considered as
well for very old violations.

Settlement of Enforcement Proceedings and Actions
A. The procedures for settlement of a proceeding to modify, suspend, or revoke a license
or other action and compromise of a civil penalty are set forth in 10 CFR 2.203.
B. For those cases where a hearing has been requested:
80

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

1. Normally OGC has the lead;
2. The staff is responsible for preparing a settlement agreement;
3. The settlement agreement should retain the same EA number as the original
proposed enforcement action and should be signed by the signatory official for the
licensee and a hearings attorney for the NRC;
4. The stipulation or compromise is subject to approval by the designated presiding
officer, or if none has been designated, by the Chief Administrative Law Judge; and
5. If approved, the Atomic Safety and Licensing Board Panel (ASLBP) will issue a
decision or order settling and discontinuing the proceeding that will include the terms
of the settlement or compromise.
C. For those cases that do not involve a hearing, the staff (normally OE) is responsible for
preparing a settlement agreement (see the sample standard format in Appendix B).
1. The settlement agreement should retain the same EA number as the original
proposed enforcement action and should be signed by the signatory official for the
licensee and the Director, OE, for the NRC.
2. The settlement is subject to approval by the Director, OE after consultation, as
warranted, with the DEDO.
3. If approved, the staff (normally OE) will prepare an order settling, modifying, or
discontinuing the enforcement action that will include the terms of the settlement or
compromise using the standard format in Appendix B.

81

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

General Documentation of Enforcement Issues
Documenting Noncompliances
A. Noncompliances (other than minor violations) are normally documented in inspection
reports or, in certain cases involving material licensees, inspection records or by using
NRC Form 591, "Safety and Compliance Inspection."
NOTE:
If an issue is described in an inspection report in sufficient detail to conclude
that a noncompliance has occurred, then that observation must be
dispositioned as a violation, an apparent violation, or an NCV. To simply
document a noncompliance as a “weakness,” “licensee failure,” “observed
discrepancy,” or similar characterization without dispositioning it as a
violation, is inappropriate.

B. Detailed guidance on preparation of inspection reports and use of inspection records is
contained in program area specific IMCs, such as IMC 0610, “Nuclear Material Safety
and Safeguards Inspection Reports;” IMC 0611, “Power Reactor Inspection Reports;”,
IMC 0613, “Power Reactor Construction Inspection Reports;” IMC 0616, “Fuel Cycle
Safety and Safeguards Inspection Reports;” IMC 0617, “Vendor And Quality Assurance
Implementation Inspection Reports;” and IMC 2800, “Materials Inspection Program.”
C. The manner in which a noncompliance is documented in an inspection report or
inspection records depends on how the noncompliance will be dispositioned.
1. Inspection reports or inspection records must contain a sufficiently detailed
discussion of the inspection findings to substantiate the significance and support any
enforcement sanction the NRC may choose to issue.
2. The degree of detail necessary to support an enforcement action is a function of the
significance and complexity of the noncompliance.
D. With the exception of inspection reports associated with potential escalated enforcement
action, generally inspection reports are to be issued within the timeliness goals
established in IMCs 0610, 0612, 0613, 0616, and 0617 (i.e., 45 calendar days after the
completion of an inspection for regional or resident inspector reports or after the
completion of an inspection for integrated and major team inspection reports).
E. If a noncompliance has not occurred, to avoid any confusion, it may be appropriate in
certain situations to include a statement such as, "this issue does not constitute a
violation of NRC requirements."

82

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

Documenting Potential Escalated Enforcement Actions
A. Issues being considered for potential escalated enforcement action should be
documented in inspection reports (inspection records should not be used) and should
refer to the potential noncompliances as “apparent violations” throughout the report and
should not include any specific conclusions regarding the safety significance or severity
level of the apparent violations or SDP characterizations.
The discussion of an apparent violation in the inspection report: should address the
facts supporting the significance of the issue without making any specific conclusions
about the “safety significance,” e.g., in a particular case involving a procedure violation, it
would be appropriate to include the following sentence in the inspection report,
“Although the apparent violation of the failure to follow procedures did not result in an
actual safety consequence, it could have (under the circumstances) resulted in an
overexposure.” It would also be inappropriate to say, “The apparent violation of the
failure to follow procedures was not safety significant.”
1. The latter conclusion does not capture the full set of circumstances of the issue (i.e.,
that there was a potential safety consequence); and
2. Although this sentence does not specifically include a severity level categorization,
the conclusion could be construed as not meeting the threshold for escalated action.
B. The safety significance and severity level or SDP characterization of issues being
considered for escalated action is not normally made until after a SERP or enforcement
panel, a predecisional enforcement conference or regulatory conference, and SERP or
enforcement caucus.
1. A premature conclusion of the safety significance and severity level or SDP
characterization for an apparent violation in the inspection report has the potential for
confusion if views change based on a subsequent review of the facts.
2. Apparent violations should be addressed in the executive summary, report details,
observations and findings, and conclusion sections of the inspection report.

Documenting Violations That Potentially Involve Willfulness
A. The discussion in the inspection report should address the circumstances surrounding
the apparent violation without making a conclusion about the intent of the violator.
1. A premature conclusion as to whether an apparent violation is deliberate, willful, or
was due to careless disregard, has the potential for confusion if views change based
on a subsequent review of the facts.
NOTE:
Inspection reports that include apparent violations that may involve
willfulness are to be coordinated with OI. OE should be notified prior to
the issuance of the report.

83

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

2. Conclusions about the willfulness of an apparent violation represent agency
decisions that are normally not made until after OI has performed an investigation
and a predecisional enforcement conference has been held, therefore:
a. It is appropriate to include the following sentence in an inspection report
(presuming the facts are clear):
“Despite informing the inspector that he was aware of the need to use an
alarming dosimeter when performing radiography, the radiographer failed to
activate his alarming dosimeter.”
b. It is not appropriate to include the following sentence:
“The radiographer deliberately failed to activate his alarming dosimeter.”
c. If during an inspection, indications of willfulness are identified, regional
management and OI should be promptly notified.
B. Additional information related to cases involving willfulness can be found in Part II,
Section 1.1, “Wrongdoing.”

Documenting Multiple Examples of a Violation
A. Multiple examples of the same violation during the period covered by an inspection
should be included in one citation or NCV. However, inspector judgment must be used
to evaluate each example on its own merits to conclude the appropriate manner for
dispositioning the issue.
B. When determining whether multiple examples should be cited in a single violation, the
following should be considered:
1. Whether different root causes are involved;
2. Whether different corrective actions are necessary to prevent recurrence for the
different examples; and
3. Whether the facts of the case warrant separate treatment for factors such as
willfulness, actual consequences, or statute of limitations, etc.
C. If the corrective action is similar for multiple examples of violations of the same
requirement(s) they:
1. Should generally be cited in a single citation; and
2. An unresolved item from a previous inspection report period that is subsequently
resolved to be a violation may be included with examples in a current report period if,
in the judgment of the inspector and his/her management, the similarities of the
violations reasonably constitute “examples” of the same underlying violation.

84

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

D. Even though there may be multiple examples of a violation, each example must be able
to stand alone as a separate Severity Level IV violation. As discussed in the following
section of this chapter, multiple minor violations must not be aggregated to justify a
Severity Level IV violation.
1. Generally, the "contrary to" paragraph should state the violation and then state: "...as
evidenced by the following examples:" followed by the examples delineated as 1, 2,
3, etc.
2. When the examples of a particular violation are numerous, the NOV should cite
representative examples of the highest safety/regulatory significance in order to
convey the scope of the violation and provide a basis for assessing the effectiveness
of the licensee's corrective actions.
3. Normally three to five examples should be adequate.

Documenting Related Violations
A. The staff should not view the significance of a group of related programmatic violations
as being greater than the individual violations (i.e., aggregation). While these issues
may be considered in developing the appropriate enforcement action and agency
response (increased inspections, management meetings, etc.), they should not be used
to increase significance.
B. Related apparent violations that initially appear to be less significant frequently
contribute to the event or issue overall and should be considered, and issued, with any
apparent escalated violation. Additional information or views develop while the
escalated violation is processed (e.g. at a PEC or ADR) that can influence the apparent
non-escalated violation’s individual significance, the significance of the individual
apparent violation, or appropriately combined into a problem to demonstrate the totality
of the circumstances. Consequently, violations related to an apparent escalated
violation should not normally be issued prior to issuance of the final action.
C. Given that there may be cause to combine closely related apparent violations into a
problem, so as to address the totality of the circumstances, non-escalated apparent
violations related to an apparent escalated action should not normally be issued prior to
issuance of the final action.
D. Violations should not be aggregated for purposes of increasing the significance.
1. In some cases, it may be appropriate to group violations as examples of a problem.
a. The reason for grouping violations into a problem is to appropriately characterize
the significance of the event or incident.
b. Grouping the violations informs the licensee and the public that NRC is aware
that the violations are closely related and are not separate regulatory
breakdowns.
c. The staff will need to use judgment in determining whether grouping the
violations will convey the appropriate message.
85

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

d. When dispositioning violations as a problem, the staff should only group
violations that are closely related, such as having a cause and effect relationship
or directly related to the same event (e.g., failure to perform adequate testing that
results in a piece of inoperable equipment, loss of material and failure to report
the loss).
e. The staff can group violations that have the same or different severity levels.
When doing so, the problem should be assigned the severity level of the most
significant violation.
f.

The staff should not assign a severity level to the problem that is higher than the
most significant violation (i.e., should not aggregate lower severity level violations
into a problem assigned a higher severity level).
NOTE:
Although it may be appropriate to group violations as examples of a
problem, violations should not be “Aggregated” into a violation/problem of
a higher severity level, e.g., assessing several NCVs that are loosely
related as a Severity Level IV violation.

2. The cover letter should discuss the significance of each individual violation and the
NOV should include all Violation Example activity areas applicable to the violations
that are grouped as a problem.
3. When determining the civil penalty for the problem, the staff should follow the civil
penalty assessment process for each escalated violation and should not assess a
civil penalty higher than would be assessed for the most significant violation included
as an example of the problem.
E. The following guidance should be used to determine the significance of a problem and
whether a civil penalty is warranted:
1. For Severity Level II violations, identification credit is always considered; however,
identification credit is only considered for willful Severity Level III violations or
Severity Level III violations committed by a licensee who has had a violation
(regardless of the activity area) within the past two years or two inspections.
2. Regardless of other circumstances, (e.g., identification, past enforcement history),
the licensee’s corrective action should always be evaluated as part of the civil
penalty assessment process. When the licensee’s corrective action is not prompt
and comprehensive, at least a base civil penalty will always be assessed.
3. The following examples illustrate this guidance:
a. Example 1: This problem is composed of a two, non-willful violations, i.e., a
Severity Level II violation and a Severity Level III violation, involving a licenseeidentified issue where prompt and comprehensive corrective action was taken.
86

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

The licensee has no history of previous violations within the past two years or
two inspections.
The significance of this problem would result in a Notice of Violation involving a
Severity Level II problem; however, it would not be assessed a civil penalty
because:
•
•
•

The severity level of the most significant violation was a Severity Level II;
The Severity Level II violation was licensee-identified; and
The licensee took prompt and comprehensive corrective actions to address
the problem.

b. Example 2: This problem is composed of a two, non-willful violations, i.e., a
Severity Level II violation and a Severity Level III violation, involving an NRCidentified issue where prompt and comprehensive corrective action was taken.
The licensee has no history of previous violations within the past two years or
two inspections.
In this example, the significance of this problem would result in a Notice of
Violation involving a Severity Level II problem with a base civil penalty because:
•
•
•

The severity level of the most significant violation was a Severity Level II;
The Severity Level II violation was NRC-identified; and
The licensee took prompt and comprehensive corrective actions to address
the problem.

c. Example 3: This problem is composed of a two, non-willful violations, i.e., a
Severity Level II violation and a Severity Level III violation, involving an NRCidentified issue where prompt and comprehensive corrective action was NOT
taken. The licensee has no history of previous violations within the past two
years or two inspections.
In this example, the significance of this problem would result in a Notice of
Violation involving a Severity Level II problem with 2 x the base civil penalty
because:
•
•
•

The severity level of the most significant violation was a Severity Level II;
The Severity Level II violation was NRC-identified; and
The licensee had failed to take prompt and comprehensive corrective actions
to address the problem.

d. Example 4: This problem is composed of two, willful Severity Level III violations.
The first Severity Level III violation was NRC-identified and, in addition, the
licensee had not taken prompt and comprehensive corrective actions to address
the problem. The second Severity Level III violation was licensee-identified and,
in addition, the licensee had taken prompt comprehensive corrective actions to
address the problem. (Although irrelevant in this instance, the licensee has no
history or previous violations within the past two years or two inspections.)

87

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

In this example, the significance of this problem would result in a Notice of
Violation involving a Severity Level III problem with 2 x the base civil penalty
because:
•
•
•

The severity level of the most significant violation was a Severity Level III;
Although one of the violations was licensee-identified, the other violation was
NRC-identified; and
Although the licensee took prompt and comprehensive corrective actions for
the violation it identified, it did NOT take prompt and comprehensive
corrective actions for the violation that was NRC-identified.

Documenting Examples of Violations Previously Cited
A. Cases frequently arise in which examples of violations that have been previously cited
as NOVs or dispositioned as NCVs, are identified.
B. If corrective actions from the earlier issues have not been completed at the time that the
current examples of the same violation(s) become known to the inspection and no broad
additional corrective actions are warranted, the current examples do not need to be cited
when the current examples, had they been known at the time of the original inspection,
would not have been included in the initial citation to establish the scope and depth of
the needed corrective actions.
C. Any inspection report description of the additional examples should include text similar to
the following:
“This violation constitutes an additional example of violation XX-YYY/YY-ZZ-01 and is
not being cited individually. No additional response to violation XX-YYY/YY-ZZ-01 is
required. Further corrective actions for this additional example are expected to be taken
in conjunction with corrective actions for the previously cited violation.”

Documentation of Security-Related Information in Publicly Available
Cover Letters
This section provides guidance with respect to the generation of publicly available cover letters
related to enforcement documents that contain security-related (i.e., physical security,
information security, and material control and accounting) information for all NRC licensed
facilities (e.g., power reactors, fuel facilities, and material licensees). The purpose of a publicly
available cover letter is to transmit the overall inspection results or enforcement-related actions
in which the specific security related details are not available to the public. The guidance
balances the need to withhold certain information from public disclosure while at the same time
carrying out the NRC’s enforcement policy for security related non-compliances in an open and
transparent manner. The guidance discussed below has taken into consideration and is
consistent with the Commission policy in the area of security-related information.

1.3.7.1

Background

The issue of protecting security-related information below the safeguards and classified levels
has evolved since September 11, 2001. The staff had discussed this subject in several

88

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

documents, 1 and the Commission guidance on security-related information in very specific
areas can be found in any number of documents including, for example, SRM-SECY-14-0034,
“Request Public Release of Limited Inspection Information on Fuel Cycle Facilities,” (ADAMS
Accession No. ML14181B393 (non-public)), where the Commission directed the staff to release
limited information on Security and Material Control and Accounting (MC&A) inspections and
violations at Fuel Facilities through the issuance of publicly available cover letters related to
enforcement documents.
In implementing the Commission’s guidance in the area of security-related information, the
program offices have developed policies and procedures tailored specifically for their program
area. In order to ensure that all enforcement documents are reviewed to a consistent standard
for security-related information, the guidelines set forth below were developed. The intent is to
ensure that the guidance is interpreted consistently with specific regard to publicly available
cover letters and enforcement actions. It is likely, however, that even with this guidance and the
guidance generated by the other offices, there will be situations where judgment is required.
The current NRC Sensitive Unclassified Non-Safeguards Information (SUNSI) policy and
handling requirements are described in “NRC Policy and Procedures for Handling, Marking, and
Protecting SUNSI” (Announcement No. 077, October 26, 2005). The current NRC classified
and safeguards information policies and handling requirements are described in Management
Directive Volume 12, “Security.” All cover letters related to enforcement actions that staff
considers for public release should be reviewed and handled in accordance with the appropriate
handling, marking, and protection policy for the information.

1.3.7.2

Documentation Requirements

Consistent with the dual goals of (1) withholding security-related information and (2) regulating
in a transparent and open manner, the following specific guidelines regarding security-related
information should be followed when issuing publicly available cover letters related to
enforcement documents:
A. For actions issued under the Reactor Oversight Process (ROP), the Construction
Reactor Oversight Process (cROP), or traditional enforcement, the cover letter should
indicate that an inspection was completed. If there were apparent security violations, the
cover letter should indicate the number of security violations characterized as either
Green, or Severity Level IV. Where the staff finds apparent security violations above
those levels, the publicly available cover letters and enforcement actions should either
state that the apparent security violations are Greater than Green or are being
considered for escalated action. The cover letter should not discuss the number of
violations characterized above Green or Severity Level IV.
Examples of documents: SECY-04-0020, “Treatment of Physical Protection Under the Reactor
Oversight Process”; SECY 04-0155, “Request from the Department of Energy Office of Naval Reactors to
Designate Information Related to Nuclear Fuel Services, Inc. and BWX Technologies Inc. as Official Use
Only”; SECY-05-0082, “Revised Assessment of Process for the Security Cornerstone of the Reactor
Oversight Process”; SECY-05-0091,“Task Force Report on Public Disclosure of Security-Related
Information”; SECY-06-0036, “Public Disclosure Options within the Security Cornerstone of the Reactor
Oversight Process”; SECY-07-032 “Recommended Staff Actions Regarding Correspondence with
Allegers Involving Security-Related Concerns”; SECY-07-0129, “Revisions to Policy Governing Public
Availability of Information Associated with Category I Fuel Facilities”; and SECY-07-0189, “Staff
Consideration Regarding Increased Openness and Transparency in the Security Inspection Programs.”
1

89

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

In rare and exceptional instances, the NRC may choose not to release a cover letter or
enforcement document with security-related violations when the information could
potentially increase the security risk of a licensee or when another Federal agency
requests the NRC not to issue any public notifications regarding a specific event. On a
case-by-case basis, NRC senior management from the office issuing the cover letter of
an enforcement document, the Office of Nuclear Security and Incident Response
(NSIR), OE, OGC and OI (for cases involving OI reports) will determine when
withholding a cover letter of an enforcement document is appropriate after reviewing
specific circumstances of the case.
B. Where an inspection resulted in a combination of violations involving security-related
and health and safety violations, the health and safety violations should be made public.
To the extent that NOVs and inspection reports accompanying the cover letter provide
details of the security violations, they should be provided to the licensee in a non-public
attachment to the cover letter. In such cases, separate NOVs should be written for the
security-related violations and for the health and safety violations, in order to facilitate
public release of the health and safety violations and allow licensees to better control
access to security-related information.
C. Security-related enforcement actions issued to an individual should contain sufficient
detail to allow the individual to respond, without providing any specific security-related
details on the issue to the individual.
1. For enforcement actions taken in parallel with a licensee, the publicly available cover
letter sent to the licensee should be provided to the individual.
2. To the extent possible, orders as well as the cover letters issued to individuals
involving security-related information shall minimize details of security-related
information that is released to the public. In some cases (e.g., where there is a
continuing non-compliance) the public issuance of an order may indicate a significant
issue (even when the details are withheld) and may pose an increased risk of
exploitation of the vulnerability. In these cases, NRC senior management from the
office that is issuing the order, NSIR, OE, OGC and OI (for cases involving OI
reports) will determine whether temporarily withholding an order is appropriate after
reviewing the case specifics. In these cases, the order must still be made public but
only after the basic security consequences are mitigated.
3. For instances when the NRC decides not to issue an NOV to an individual, the NRC
will use discretion to ensure that security-related information is not made publicly
available. In these instances, the NRC will issue a close-out letter to the individual
stating that, although a violation was identified the NRC has decided not to issue an
NOV due to the security-related aspects of the case.
4. In rare and exceptional instances, the NRC may choose to issue a public NOV with
security-related violations to an individual. In these instances, NRC senior
management from the office that is taking the enforcement action, NSIR, OE, OGC
and OI (for cases involving OI reports) will determine when issuing an NOV is
appropriate after reviewing the case specifics.
D. Cover letters to orders should be publicly available and not contain security-related
information, including those issued as the result of Alternative Dispute Resolution. The
90

PART I: Enforcement Process

PART I – 1 NRC Enforcement Program

order itself should be made available to the public and published in the Federal Register,
by placing any specific security-related information in a non-public enclosure. Orders as
well as the cover letters issued to licensees involving security-related information will
conform to the above guidance. Although public release of orders is required, in some
cases (e.g., where there is a continuing non-compliance) the very issuance of an order
may indicate a significant issue even when the details are withheld, and public release of
the order may pose an increased risk of exploitation of that vulnerability. In these cases,
NRC senior management from the office that is issuing the order, NSIR, OE, OGC and
OI (for cases involving OI reports) will determine whether temporarily withholding an
order is appropriate after reviewing the case specifics. In these cases, the order must
still be made public but only after the basic security consequences are mitigated.
E. For the purposes of this guidance, violations of 10 CFR Parts 20.1801, 1802 and
30.34(i) will not be considered security-related violations and will be made available to
the public, in accordance with normal procedures.
F. Nothing in this guidance should be read to restrict providing additional information to
allegers who are appropriately cleared licensee personnel, in accordance with the
Allegation Manual. See the Allegation Manual for guidance related to release of
information to allegers.
G. Any reference to 10 CFR Part 19.11 as it relates to posting enforcement documents in
security-related enforcement actions should state “In accordance with 10 CFR Part
19.11, you may be required to post this Notice within two working days. However, you
are reminded to review your NRC security requirements that limit the release of
information.
H. In the rare case where the details of a security-related concern have been aired in public
forums (e.g., media coverage, public website, widely attended meetings), the above
guidance should be reconciled with the level of information already publicly available to
determine the appropriate level of public disclosure regarding resolution of the concern.
If a regional or program office concludes that circumstances warrant making additional
information available, NSIR, OE, OGC, OI (for cases involving OI reports), and the
applicable program office must be consulted. Should it be determined as a result of the
consultation that it is appropriate for the NRC to make more extensive information
available to the public, OE will notify the Commission of that decision, along with a short
summary of the basis for need.
I.

Appendix B of the Manual contains standard format boilerplates to be used in preparing
and processing enforcement packages.

Protecting SUNSI and Predecisional Enforcement Information
All sensitive unclassified non-Safeguards information (SUNSI), including predecisional
enforcement information, must be encrypted when the information is transmitted outside of NRC
facilities as stated in MD 12.5. This includes the requirement to encrypt the information during
transmission outside of the internal network. All encryption used by NRC must use FIPS 140
validated algorithms and cryptographic modules or encryption approved by the National Security
Agency for protection of classified information. Contact the Senior Level Advisor for Information
Security, Office of the Chief Information Officer (OCIO) with any questions regarding information
protection policy.
91

PART I: Enforcement Process

PART I – 2 Disposition of Violations

PART I - 2 DISPOSITION OF VIOLATIONS
This section provides information regarding:
•

the various enforcement tools used to disposition noncompliances and violations,
including nonescalated and escalated violations.

92

PART I: Enforcement Process

PART I – 2 Disposition of Violations

Minor Violations
A. Minor violations are violations below the significance of Severity Level IV violations and
may be (but not normally) associated with green inspection findings. Minor violations
are not the subject of formal enforcement action.
NOTE:
Inspectors should discuss minor violations with licensees (typically during the
exit meeting) so that licensees may take appropriate corrective actions. This
is especially important when a minor violation is related to an allegation
because the close-out letter to the alleger informs the alleger that the minor
violation has been corrected.
B. Issues that represent isolated (i.e., “isolated” in that based on a reasonable effort, the
staff determines that the issue is not recurring nor is it indicative of a programmatic issue
such as inadequate supervision, resources, etc.) failures to implement a requirement
and have insignificant safety or regulatory impact should normally be categorized as
minor violations.
C. Minor violations are, by their very nature, minor issues with little or no safety
consequences. While licensees must correct these minor violations, generally they do
not warrant documentation in inspection reports or inspections records and do not
warrant enforcement action.
D. Refer to Part III of the Enforcement Manual for examples of minor violations.

Documenting Minor Violations
A. Although, in general, minor violations should not be documented, there are a very few
exceptions when documentation is warranted.
NOTE:
Minor violations must be corrected and discussed with the licensee (normally
during the inspection exit), in general, minor violations should not be
documented in inspection reports.
B. Documenting a minor violation may be warranted as part of closing out a Licensee Event
Report (LER), an unresolved item (URI) or a construction deficiency report pursuant to
10 CFR 50.55(e), where it would be obvious to a member of the public that a violation is
involved (e.g., “failure to follow procedures,” in the body of the report or as part of the
title). Documentation, in this case, helps to provide public confidence that the agency
has dispositioned the violation.

93

PART I: Enforcement Process

PART I – 2 Disposition of Violations

C. In contrast, documenting a minor violation would not be warranted where a violation is
identified because of questions raised by an inspector or because of an inspector’s
training and expertise.
D. Documenting a minor violation may be warranted if the associated technical information
relates directly to an issue of agency-wide concern (e.g., to document the results of an
NRC temporary instruction (TI)).
E. To the extent that minor violations are described, they will be noted as violations of
minor significance that are not subject to enforcement action, e.g.:
“Although this issue should be corrected, it constitutes a violation of minor significance
that is not subject to enforcement action in accordance with Section 2 of the
Enforcement Policy.”
F. Minor violations are generally not discussed in inspection report cover letters; however,
documentation in the inspection report and inspection record should briefly describe the
circumstances surrounding the violation. A discussion of the corrective actions is not
necessary.
G. If a licensee disputes that a minor violation is a violation, the region should respond by
following appropriate steps of the process described in Section 2.3.7, “Dispute Process
for Non-escalated Enforcement Actions.”

Noncited Violations (NCVs)
A. Noncited Violation (NCV) is the term used to describe a method for dispositioning:
1. A Severity Level IV violation; and
2. A violation associated with an inspection finding that the Reactor Oversight
Process’s (ROP) or construction Reactor Oversight Process (cROP) Significance
Determination Process (SDP) evaluates as having very low safety significance (i.e.,
green).
B. NCVs:
1. Are normally public records of the violation;
2. Are normally issued by the region without prior OE approval;
3. Are documented as violations in inspection reports (or inspection records for some
materials licensees) as required by respective program guidance, such as IMC 0610,
“Nuclear Material Safety and Safeguards Inspection Reports;” IMC 0611, “Power
Reactor Inspection Reports;”, IMC 0613, “Power Reactor Construction Inspection
Reports;” IMC 0616, “Fuel Cycle Safety and Safeguards Inspection Reports;” IMC
0617, “Vendor And Quality Assurance Implementation Inspection Reports;” and IMC
2800, “Materials Inspection Program.”

94

PART I: Enforcement Process

PART I – 2 Disposition of Violations

4. Do not require a written response from licensees 2 ; and
5. May be sent to the licensee (or nonlicensee) as an attachment to an inspection
report or, in the case where inspection records are used to document the
noncompliance, as an attachment to the transmittal letter.

NCVs for Power Reactor Licensees
A. The NRC typically closes NCVs when they are entered into the licensee’s Corrective
Action Program (CAP) and Plant Issues Matrix (PIM).
NOTE:
Violations at a decommissioned facility that continues to have a 10 CFR Part
50 CAP as well as 10 CFR Part 72 violations that occur at a facility with a 10
CFR Part 50 CAP, should be evaluated under this NCV policy.

1. Licensee may not have completed their corrective actions, identified apparent
causes, or developed actions to prevent recurrence when the NRC closes the action.
2. The NRC does not require a written response from licensees describing the actions
taken to restore compliance and prevent recurrence of NCVs.
a. The NRC inspection program provides an assessment of the effectiveness of
licensees’ CAPs and PIMs.
b. This enforcement approach places greater NRC reliance on licensees’ CAPs.
B. Licensees are expected to take actions commensurate with the established priorities and
processes of their CAP.
C. Unlike other NCVs, for NCVs involving significant conditions adverse to quality (SCAQ),
licensees must:
1. Determine the cause of the condition (i.e., the root cause); and
2. Place the corrective actions that will be taken to preclude repetition in their CAP.
D. Unlike other NCVs, the NRC will only close NCVs that are material to the acceptance
criteria of an inspection, test, analyses, and acceptance criteria (ITAAC) after a review is
conducted by the NRC to ensure adequate corrective actions have been developed and
implemented such that the deficiency can no longer prevent the ITAAC from being
closed.

As discussed in Section 2.2, the term “licensee” also denotes “nonlicensees with an approved
Corrective Actions Program”.
2

95

PART I: Enforcement Process

PART I – 2 Disposition of Violations

Circumstances Resulting in Consideration of an NOV (vs. an NCV)
for Licensees and Non-Licensees with an Approved Corrective
Action Program
Licensees and Non-licensees with an
Approved Corrective Action Program
D

Severity Level IV
Violations &
Violations Related
to Green SDP
Findings

Failed to
Restore
Compliance?

Failed to
Place in
CAP?

NO

Repetitive &
NRC
Identified?*

NO

Willful?

Non-Cited
Violation

NO

D
YES

D

NO

YES

YES

YES
Notice of
Violation

Discretion

Consideration of an NOV, with Approved Corrective Action Program
The flow chart above is a graphical representation of the circumstances the staff should
consider when deciding whether a violation for a power reactor licensee should be dispositioned
as an NCV or in an NOV.
A. Any one of the following circumstances will result in consideration of an NOV which
requires a written formal response from a licensee, instead of an NCV:
1. The licensee failed to restore compliance within a reasonable time after a violation
was identified.
a. The purpose of this criterion, which applies only to violations that are continuing
at the time of discovery (see further discussion below), is to emphasize the need
to:
•
•

Take appropriate action to restore compliance in a reasonable period of time
once a licensee becomes aware of the violation; and
Take compensatory measures until compliance is restored when compliance
cannot be reasonably restored within a reasonable period of time.

b. For purposes of this criterion, restoring compliance:
•
•

Includes those actions taken to stop an ongoing violation from continuing;
and
Does not include those actions necessary to address root causes and
prevent recurrence.

c. Some violations require prompt action to restore compliance while others do not
based on whether the underlying requirement is continuous or conditional;
therefore, within a reasonable time in this criterion refers to the time needed to:

96

PART I: Enforcement Process

•
•
•

PART I – 2 Disposition of Violations

Stop an ongoing violation from continuing (which should be as soon as
possible);
Take compensatory actions for a continuing violation; or
Be in a state where the requirement no longer applies if relief is not provided
from the NRC and if compensatory action is not allowed by the requirement.
NOTE:

Absent an exemption, license amendment, or Notice of Enforcement
Discretion (NOED), action must be taken to restore compliance. Until
compliance can be restored, compensatory measures, as warranted,
must be taken. Restoring compliance is important to prevent an ongoing
violation.

2. The licensee did not place the violation into a CAP to address recurrence. (For
reactor facilities under construction in accordance with 10 CFR Part 52 and fuel cycle
facilities in accordance with 10 CFR Part 40 or Part 70, the corrective action program
must have been demonstrated to be adequate.)
a. The purposes of this criterion are to emphasize the need to:
•
•

Consider actions beyond those necessary to restore compliance, including
actions necessary to address root causes; and
Prevent recurrence.
NOTE:

While licensees should develop and place corrective actions to address
recurrence in their CAP for all NCVs, licensees are required to develop
and place corrective actions directed at preventing recurrence in their
CAP for NCVs involving SCAQ issues.
b. Placing a violation into a CAP to address recurrence allows the NRC to close out
a violation in an inspection report without detailed information regarding the
licensee’s corrective actions.
•
•

The licensee is expected to provide the NRC with a file reference indicating
that the violation has been placed in its CAP.
The file reference indicating that the violation has been placed in a CAP
would assist the NRC should it review the violation as part of an NRC
inspection of the effectiveness of the licensee’s CAP.

c. An NOV could be avoided for violations which do not require substantial efforts to
address recurrence, e.g., an isolated implementation error with more than minor
safety significance not reflecting inadequate training, procedures, resources, or
oversight, if the CAP includes:

97

PART I: Enforcement Process

•
•

PART I – 2 Disposition of Violations

Corrective actions to restore compliance;
An evaluation of the need for additional corrective actions to address
recurrence;
NOTE:

When it is determined that a repetitive violation occurred or corrective
actions to address recurrence were not effective, the NOV or NCV should
only use 10 CFR Part 50, Appendix B, Criterion XVI, for issues involving
SCAQ. This requires additional documentation explaining the basis,
usually citing requirements in the licensee’s QA plan or topical report.
•
•

Records that have been maintained for trending so that the licensee has
assurance that the matter is, in fact, isolated; and
Records so that the NRC can review the case as part of an inspection of the
licensee’s CAP.

d. While licensees should develop and place corrective actions to prevent
recurrence in their CAP for all NCVs, for NCVs involving SCAQ issues, licensees
are required to develop, and place corrective actions directed at preventing
recurrence in their CAP.
3. The violation is repetitive as a result of inadequate corrective action and was
identified by the NRC. Note: This exception does not apply to violations associated
with green SDP findings. (A violation is considered “repetitive” if it could reasonably
be expected to have been prevented by the licensee's corrective action for a
previous violation. In addition, a violation is considered “repetitive” if a previous
licensee finding occurred within the past 2 years of the inspection at issue, or the
period between the last two inspections, whichever is longer.)
a. The purposes of this criterion are to emphasize the importance of:
•
•

Effective corrective action to prevent recurrence; and
Licensees identifying recurring issues.

b. For NRC-identified violations, reasonable reviews must be performed to ensure
that the current violation is not a repetitive issue before concluding that an NCV
is appropriate.

98

PART I: Enforcement Process

PART I – 2 Disposition of Violations

NOTE:
For determining repetitiveness, the fact that the violation has occurred
before, is not the only criteria that should be considered. It does not
necessarily follow that past corrective action was not reasonable or
effective. The question that must be answered is: Did the licensee
develop and implement reasonable corrective actions for the previous
violation, commensurate with the safety significance, such that at the
time the corrective actions were implemented, there was a reasonable
expectation that the apparent root cause(s) of the violation would be
corrected?
c. To determine whether a violation is repetitive, the staff should:
•

Review the licensee’s PIM and Reactor Program System (RPS) or
Construction Inspection Program Information Management System (CIPIMS)
because they provide notice to the licensee. These include:
o

o

•

Perform a second review if the first review identifies a previous violation, to
determine if:
o
o

•

Docketed information which will have put the licensee on notice that it
must take corrective action for a noncompliance or that the licensee is on
record as having identified a noncompliance issue that requires corrective
action (e.g., a Licensee Event Report (LER)); and
Licensee CAP records, only to the extent that the inspector or regional
staff had previously described the issue in an inspection report or it was
described in other docketed information.

Corrective action for the previous violation had sufficient time to take
effect and was deemed inadequate; or
Adequate corrective action for the previous violation wasn’t taken in a
time frame commensurate with its safety significance.

Responses to previous NOVs, inspection reports, or the licensee’s CAP
should be reviewed. Note: It is acceptable to request background
information from the licensee to address this review.

d. The fact that a previous procedural violation occurred does not necessarily mean
that the current procedural violation is repetitive:
•

There must be a sufficient nexus between the current issue and the previous
corrective action, e.g., the failure to follow a maintenance procedure would
not be considered a repetitive procedural violation based on the existence of
a failure to follow a radiation protection procedure that occurred one year
ago, because it is not reasonable to expect that corrective action for the
radiation protection procedural violation (e.g., procedure revision, enhanced
training) would have prevented the maintenance procedural violation.

99

PART I: Enforcement Process

•
•

PART I – 2 Disposition of Violations

For implementation purposes, the determination of whether or not a violation
is repetitive need only be made for those violations identified by the NRC.
A licensee-identified, non-willful repetitive violation would be cited only if the
ineffectiveness of the licensee’s CAP is significant enough to raise it to a
violation associated with a greater than green ROP finding.
NOTE:
The purpose of this criterion is to encourage licensees to identify and
correct repetitive issues.

e. In determining whether a violation is repetitive, the fact that a violation recurs
does not necessarily mean that past corrective action was not reasonable or
effective, i.e., the standard for evaluating the past corrective actions is the
reasonableness of those actions as they pertain to the nature and significance of
the originally identified problem.
•
•

An NOV would not result if, despite the violation’s recurrence, the NRC finds
that the licensee’s corrective actions for the previous violation were
reasonable at the time.
When citing a violation under this criterion, the NRC is expected to be able to
address why the licensee’s actions were unreasonable and why reasonable
corrective action would have prevented the second violation.
NOTE:
As long as the corrective actions acceptably address the identified
causes and no other significant credible causes exist, and the
schedule for and actions necessary for implementation of the
corrective actions were appropriate, the licensee’s past actions
should be considered acceptable and the violation should not be
considered repetitive.

f.

It is not necessary for the original compliance issue to be documented or labeled
a violation by the NRC, e.g., an issue can be considered under this exception if a
licensee identifies a compliance issue that requires corrective action in a LER.

g. Unlike other NCVs, for repetitive NCVs involving SCAQ, whether the licensee’s
corrective actions for the previous violation appeared to be reasonable at the
time is not applicable.
•
•

For NCVs involving SCAQ, licensees are required to implement corrective
actions that prevent recurrence.
Recurring violations involving SCAQ should be cited as NOVs.

100

PART I: Enforcement Process

PART I – 2 Disposition of Violations

h. The NRC’s level of concern about a recurring violation is unrelated to whether it
can be cited. In the event a recurring violation is identified, and the previous
violation was not docketed:
•
•
•

The violation should be dispositioned as an NCV;
The documentation should note the NRC’s concern about its recurrence;
The documentation should note that an NOV will be issued if the violation
recurs.

4. The violation was willful. Notwithstanding willfulness, an NCV may still be
appropriate.
a. The purposes of this criterion are to emphasize the importance of:
•
•

Integrity and candor in carrying out licensed activities, as expressed in the
Enforcement Policy; and
Using this criterion only for those situations where the significance of the
willfulness does not justify an increase to Severity Level III.

b. Escalated enforcement action would not be considered when:
•

•
•
•

The licensee identified the violation and, although not required to be reported,
promptly provided the appropriate information concerning the violation to
appropriate NRC personnel, such as a resident inspector or regional branch
chief (who, in turn, is responsible to provide the information to the appropriate
regional staff);
The violation appears to be the isolated action of an employee without
management involvement;
The violation was not caused by lack of management oversight as evidenced
by either a history of isolated willful violations or a lack of adequate audits or
supervision of employees; and
Significant remedial action commensurate with the circumstances was taken
by the licensee that demonstrated the seriousness of the violation to other
employees and contractors, thereby creating a deterrent effect within the
licensee's organization. While removal of the employee from licensed
activities is not necessarily required, substantial disciplinary action is
expected.

5. The violation resulted in an ITAAC previously verified as closed by the NRC to be
reopened.
The purpose of this criterion, which applies only to violations that are committed at
power reactor facilities that are under construction and are material to an ITAAC
previously verified as closed by the NRC, is to require a licensee response on the
docket that includes the reason for the violation and the corrective actions that were
taken such that the deficiency no longer prevents the ITAAC from being closed.

101

PART I: Enforcement Process

PART I – 2 Disposition of Violations

NOTE:
OE will assure that periodic assessments of NRC tracking systems used to
document non-escalated enforcement are conducted to further assure the
quality of the data used to trend non-escalated violations (ROP and nonROP) issued to licensees, Certificate Holders, and other non-licensees.

Circumstances Resulting in Consideration of an NOV (vs. an NCV)
for All Other Licensees

Consideration of an NOV, All Other Licensees
The flow chart above is a graphical representation of the circumstances the staff should
consider when deciding whether a violation should be dispositioned as a NCV or in an NOV for
all non-power reactor licensees.
Any one of the following circumstances will result in consideration of an NOV requiring a formal
written response from a licensee.
A. The licensee failed to identify the violation.
NOTE:
Credit for identification is warranted for Severity Level IV violations
associated with events unless the staff can show credible actions that clearly
should have been, and were not, taken by the licensee in identifying event
causes.
1. An NOV is warranted when:
a. A licensee identifies a violation as a result of an event;
102

PART I: Enforcement Process

PART I – 2 Disposition of Violations

b. The root cause of the event is obvious; and
c. The licensee had prior opportunity to identify the problem but failed to take action
that would have prevented the event.
2. Disposition as an NCV may be warranted if the licensee demonstrated initiative in
identifying the violation's root cause.
NOTE:
In all non-escalated cases involving events where identification credit is
being denied, the Division Director must agree with the denial after
consultation with the Regional or program office Enforcement
Coordinator (as appropriate).
3. Typically, the identifiable event is the result of the underlying violation and not a
violation itself.
a. Identification credit should be considered when licensee follow-up of the event
demonstrates thoroughness in assessing contributing factors, as well as any
obvious, direct cause.
b. The standard for the thoroughness of the licensee’s actions is reasonableness
based on safety significance (see the additional discussion below).
4. Cases where identification credit is denied should be limited to investigations where
corrective actions or root causes default to “easy fixes” and the inspectors can
demonstrate that other significant, credible causes existed that were not identified by
the licensee.
a. Granting of identification credit should be considered for those cases where
licensee efforts are thorough enough to rule out the potential for more subtle
contributing factors.
b. There are cases where an event is caused simply by an isolated human error
with minimal opportunity for prevention or without contributing causes such as
inadequate procedures, labeling errors, lack of resources or supervision, and
prior opportunities, and the most obvious cause turns out to be the correct one.
B. The licensee did not correct or commit to correct the violation within a reasonable
time by specific corrective action committed to by the end of the inspection, including
immediate corrective action and comprehensive corrective action to prevent recurrence.
1. Unless the inspector, in consultation with his or her management, determines that
there were other significant, credible causes that were not reasonably addressed in
the corrective actions, the licensee’s actions should be considered adequate.

103

PART I: Enforcement Process

PART I – 2 Disposition of Violations

NOTE:
If there is a dispute with the licensee on the reasonableness of its
corrective actions, the Division Director must concur on any cited
violation.
2. If the licensee’s corrective actions are ongoing and the licensee, after input from the
inspector or other NRC staff, agrees that additional actions are necessary and states
that additional actions will be taken, the licensee should be given credit for corrective
action.
3. If the licensee has previously completed its corrective action and, after input from the
inspector or other NRC staff, agrees that additional corrective actions are necessary,
then credit for corrective action is not appropriate.
4. The criteria in the Enforcement Policy requires that “corrective action committed to
[by the licensee, must be committed to or completed] by the end of the inspection.”
a. If a licensee identifies an issue that prompts a reactive inspection, or if a licensee
identifies an issue while an inspection is open, the licensee’s corrective action
may not be fully formulated by the end of an inspection.
b. Cases where the licensee is implementing its corrective actions but, because of
legitimate circumstances, the corrective actions are not fully formulated by the
end of the inspection, can create an artificial constraint for assigning an NCV
instead of a cited Severity Level IV violation. Judgment is required in these
situations to reasonably accommodate the timing of events.
•

Denial of an NCV in favor of a cited Severity Level IV violation should not be
based solely on undeveloped corrective actions due to the close proximity to
the end of the inspection.

•

If necessary, follow-up discussions via phone with licensees should be made
prior to completing the inspection report (or inspection records for those
inspections that do not require the issuance of an inspection report) to gain
the information needed to make decisions regarding corrective action credit
for licensee-identified violations.

c. If the inspection report needs to be issued and there has not been a reasonable
time for the licensee to develop its corrective actions (but not longer than 30 days
from licensee discovery), an apparent violation that otherwise meets the criteria
for an NCV may be described in the inspection report as an apparent violation
and still be converted to NCV status once the corrective action becomes known.

104

PART I: Enforcement Process

PART I – 2 Disposition of Violations

NOTE:
NRC is interested in development of adequate corrective actions which
reasonably may require more time after the inspection has been
completed.
C. The violation is repetitive as a result of inadequate corrective action.
1. The violation could reasonably have been prevented by the licensee's corrective
action for a previous violation or a previous licensee finding that occurred:
a. Within the past two years of the current inspection; or
b. The period within the last two inspections, whichever is longer.
NOTE:
Reviews must be performed to ensure that the current violation is not a
repetitive issue before exercising this discretion. The expectation for
these reviews would include a review of NRC inspection findings, such
as inspection reports or inspection records for previous NCVs and NOVs.
2. Use only docketed information when considering previous NRC violations or licensee
findings. This information will have put the licensee on notice that it was required to
take corrective action for a violation.
3. For determining repetitiveness, the use of licensee records, such as program audit
records or inspection records, is appropriate only to the extent that the issue has
already been described in previous inspection reports, NRC Form 591s, or other
docketed information.
4. If a violation has not been previously identified in a docketed document, it should be
dispositioned as an NCV so that if the licensee’s corrective action fails again, an
NOV would be warranted at that point.
D. The violation was willful. Notwithstanding willfulness, an NCV may still be appropriate.
1. The purposes of this criterion are to emphasize the importance of:
a. Integrity and candor in carrying out licensed activities, as expressed in the
Enforcement Policy; and
b. Using this criterion only for those situations where the significance of the
willfulness does not justify an increase to Severity Level III.
2. Escalated enforcement action would not be considered when:
a. The licensee identified the violation and, although not required to be reported,
promptly provided the appropriate information concerning the violation to

105

PART I: Enforcement Process

PART I – 2 Disposition of Violations

appropriate NRC personnel, such as a resident inspector or regional branch chief
(who, in turn, is responsible to provide the information to the appropriate regional
staff);
b. The violation appears to be the isolated action of an employee without
management involvement;
c. The violation was not caused by lack of management oversight as evidenced by
either a history of isolated willful violations or a lack of adequate audits or
supervision of employees; and
d. Significant remedial action commensurate with the circumstances was taken by
the licensee that demonstrated the seriousness of the violation to other
employees and contractors, thereby creating a deterrent effect within the
licensee's organization. While removal of the employee from licensed activities is
not necessarily required, substantial disciplinary action is expected.
NOTE:
Severity Level IV violations that are dispositioned as NCVs will be
described in inspection reports (or inspection records for some materials
licensees) and will include a brief description of the corrective action the
licensee has either taken or plans to take.

Issuing an NCV When Criteria in Section 2.3.2 of the Enforcement
Policy are met for issuing an NOV
Notwithstanding that one of the exceptions in Section 2.3.2 of the Enforcement Policy is met,
there may be situations where a Severity Level IV violation or a violation associated with a
green SDP finding does not warrant citation in an NOV. These cases:
A. Should be discussed during the regular weekly SERP or enforcement panel conference
calls;
B. Require the approval of the Regional Administrator and the Director, OE, prior to
issuance; and
C. Should clearly state in the cover letter transmitting the NCV, the reason(s) for not citing
the issue notwithstanding the fact that it met one of the defined circumstances identified
in Section 2.3.2 of the Enforcement Policy.

Documenting Noncited Violations (NCVs)
A. In accordance with the Enforcement Policy, the NRC may disposition certain Severity
Level IV violations and violations associated with green SDP findings as noncited
violations (NCVs).
1. NCVs should be discussed in the report details and the summary of findings sections
of the report and noted in the inspection transmittal letter in accordance with the
following general guidance:

106

PART I: Enforcement Process

PART I – 2 Disposition of Violations

2. Inspection report details should briefly describe the requirement and how the
requirement was violated.
•

•

•

•

•

Even though the issue may warrant disposition as an NCV, the staff must still
provide sufficient detail to substantiate the existence of a Severity Level IV
violation or violation associated with a green SDP finding (see applicable
guidance in IMC 0612 and 0613).
Although the degree of detail necessary to support a violation is a function of the
significance and the complexity of the noncompliance, the supporting detail for a
given Severity Level IV violation or violation associated with a green SDP finding
should be the same, whether it is dispositioned as an NOV or NCV.
NCVs should be addressed in the inspection report transmittal letter (cover letter)
after any cited violations. The discussion should simply note how many NCVs
were identified, and include “appeal” process language. Cover letters should
include a Nuclear Materials Events Database (NMED) number, if applicable.
The details of specific NCVs should not normally be discussed in inspection
report cover letters. However, there may be instances where a brief discussion
of an NCV is warranted, such as cases where categorization at Severity Level III
or association with a white issue was seriously considered and where it is
important to emphasize the importance of corrective action.
Cover letters should not be used as a substitute for an NOV. In particular, cover
letters should not generally seek additional information about an NCV.

B. The following discussion provides specific guidance for documenting NCVs. (Note: For
the purpose of this subsection, the term “licensee” also includes “non-licensees”.)
1. Licensees and Nonlicensees with an Approved Corrective Actions Program:
a. The Enforcement Policy provides that most Severity Level IV violations and
violations associated with green SDP findings involving a power reactor be
dispositioned as NCVs unless they meet one of the exceptions that may warrant
citation in an NOV.
b. The inspection report should also include the licensee’s corrective action
program file reference.
•
•
•
•

In many cases, the licensee will not have yet developed the corrective actions
at the time of the inspection report’s issuance.
If the inspector is aware of the licensee’s corrective actions, he/she may
choose to document them in the inspection report.
Documentation in inspection reports and inspection records should also
briefly describe the corrective actions to provide a basis for a repetitive
violation if the corrective actions are inadequate or not implemented.
Documentation of the licensee’s corrective actions is not required for
enforcement purposes. An applicable conclusion should be included that the
issue will not be cited, as follows:
“This Severity Level IV violation is being treated as a Noncited Violation,
consistent with Section 2.3.2.a of the Enforcement Policy. This violation
is in the licensee’s corrective action program as [Include file reference].”

107

PART I: Enforcement Process

PART I – 2 Disposition of Violations

or
“This violation is associated with an inspection finding that is
characterized by the Significance Determination Process as having very
low risk significance (i.e., green) and is being treated as a Noncited
Violation, consistent with Section 2.3.2.a of the Enforcement Policy. This
violation is in the licensee’s corrective action program as [Include file
reference].”
or
“Although this violation is willful, it was brought to the NRC's attention by
the licensee, it involved isolated acts of a low-level individual, and it was
addressed by appropriate remedial action. Therefore, this violation is
being treated as a Noncited Violation, consistent with Section 2.3.2.a of
the Enforcement Policy. This violation is in the licensee’s corrective
action program as [Include file reference].”
2. All Other Licensees and Nonlicensees (Note: For the purpose of this subsection, the
term “licensee” also includes “nonlicensees”.):
a. Licensee-identified Severity Level IV violations that satisfy the criteria in the
Enforcement Policy may be dispositioned as NCVs.
b. NCVs documented in inspection reports should be cited in inspection reports as
NCVs, while NCVs documented in inspection records should be cited as NCVs
on NRC Form 591. In both cases, a conclusion should be included that the
violation will not be cited, as follows (depending on whether or not the violation
was willful):
“This non-repetitive, licensee-identified and corrected violation is being treated as
a Noncited Violation, consistent with Section 2.3.2.b of the Enforcement Policy.”
or
“Although this violation is willful, it was brought to the NRC's attention by the
licensee, it involved isolated acts of a low-level individual, and it was addressed
by appropriate remedial action. Therefore, this non-repetitive, licensee-identified
and corrected violation is being treated as a Noncited Violation, consistent with
Section 2.3.2.b of the Enforcement Policy.”

NCV Coordination, Review and Issuance
A. NCVs are normally issued by the region or program office in accordance with the
guidance established in Sections 5.3 and 5.4.
B. Enforcement Coordinators should be consulted on NCVs, as warranted.
C. The Regional Division Director should concur on an NCV prior to issuance if:

108

PART I: Enforcement Process

PART I – 2 Disposition of Violations

1. The Branch Chief and Enforcement Coordinator disagree on the disposition of the
issue;
2. The staff is informed by the licensee during the exit interview that it disagrees that
the issue is a violation or that the violation warrants Severity Level IV categorization
or that the inspection finding warrants green SDP characterization; or
3. The staff wants to exercise discretion and refrain from issuing an NOV beyond the
Enforcement Policy.
D. The region must schedule a SERP or enforcement panel if it proposes not to issue an
NOV when one or more criteria in Section 2.3.2 of the Enforcement Policy are met for
issuing an NOV.

Licensee Disputes of NCVs
A. Licensees are not required to provide written responses to NCVs; however, they may
respond in order to dispute such violations.
B. If a licensee disputes that a docketed NCV is a violation, the region should respond by
following the process described in Section 2.3.7, Dispute Process for Non-Escalated
Enforcement Actions.

Non-Escalated Notice of Violation (NOV)
A Notice of Violation (NOV) is a formal written citation setting forth one or more violations of a
legally binding requirement. Procedures for issuing an NOV are set forth in 10 CFR 2.201.
•

NRC Form 591 may also be used as an NOV for materials licensees under certain
circumstances.

•

The timeliness goal for issuing routine non-escalated NOVs is the same as for issuing
clear inspections (i.e. 45 calendar days after the inspection has been completed (see
IMCs 0610, 0611, 0613 or 0617, as applicable).

•

NOVs should be considered for Severity Level IV violations and violations associated
with green SDP findings when they meet the criteria discussed in the previous section.

Preparing a Non-Escalated NOV Action
A. The responsible office, i.e., the region, NRR, NMSS or NSIR, should prepare a nonescalated NOV package, including the following elements as discussed below:
1. Inspection reports should be prepared in accordance with the guidance in
appropriate Manual Chapter (IMC 0610, IMC 0611, IMC 2800, IMC 0613, etc.) and
the guidance in this Manual.
2. NOVs should be prepared by using the applicable standard formats in Appendix B
and the applicable standard citations in Appendix C.

109

PART I: Enforcement Process

PART I – 2 Disposition of Violations

3. NOVs should be dated the same date as the cover letter transmitting the
enforcement action to the licensee.
4. NOVs should include the following elements:
a. A concise, clear statement of the requirement or requirements that were violated,
appropriately referenced, paraphrased, or quoted (i.e., the legal citation for the
violation) (see the examples of standard citations in Appendix C).
b. A brief statement (usually no more than a few sentences) addressing the
circumstances of the violation, including the date(s) of the violation and the facts
necessary and sufficient to demonstrate that the requirement was not met
("contrary to" paragraph). To demonstrate noncompliance, the language of the
"contrary to" statement should parallel the applicable language of the
requirement.
c. Each violation, including a violation with multiple examples, should contain a
single "contrary to" statement.
•
•
•

As a general rule, multiple examples of the same violation during the period
covered by an inspection should be included in one citation.
The "contrary to" paragraph should generally state the violation, followed by
“...as evidenced by the following examples" and the examples delineated as
1, 2, 3, etc.
When the examples of a particular violation are numerous, sufficient
examples should be cited to convey the scope of the violation and to provide
a basis for assessing the effectiveness of the licensee's corrective actions.
Normally three to five examples is adequate.

d. The severity level proposed for the violation (i.e., Severity Level IV) and the
applicable Violation Examples section of the Enforcement Policy under which the
violation is categorized or, alternatively, the significance of the violation
associated with a SDP finding (i.e., green SDP finding).
e. If the staff concludes that a response is necessary, the letter should contain the
elements to be included in the licensee’s response, including:
•
•
•
•
f.

The reason for the violation, or if contested, the basis for disputing the
violation;
The corrective actions which have been taken by the licensee or other person
and the results achieved;
The corrective actions which will be taken ; and
The date when full compliance will be achieved.

The staff may conclude that a response is not necessary.
•

The staff may indicate that the licensee is not required to respond because
the information regarding the reason for the violation, the corrective actions
taken and planned to be taken to correct the violation and prevent recurrence
are already addressed on the docket.

110

PART I: Enforcement Process

•

PART I – 2 Disposition of Violations

This alternative requires the licensee to respond if the description does not
accurately describe the licensee's corrective actions.

B. Cover letters that transmit inspection reports and non-escalated NOVs to licensees
should be prepared by the region using the appropriate form in Appendix B.
1. If an inspection report is not issued, as may be the case for certain material
licensees, then all references to an inspection report should be deleted.
2. Cover letters should include a Nuclear Materials Events Database (NMED) number,
if applicable.
3. NMSS should use the appropriate form for vendor and approved Quality Assurance
cases, respectively.
C. Cover letters should:
1. Clearly state why a citation is being issued in terms of which criteria in Section 2.3.2
of the Enforcement Policy has been met. The explanation may be expanded, where
warranted, to convey the appropriate message to the licensee in terms of those
actions that require additional attention;
2. Provide an explanation of why a citation is being issued if, using the guidance in the
Enforcement Policy and this Manual, the violation could have been dispositioned as
an NCV;
3. Describe the response that is necessary from the licensee (if the region concludes
that a response is necessary), including any area that deserves special emphasis; or
4. Include a conclusion that a licensee response is not necessary (when the region
concludes that a response is not necessary), including a provision that the licensee
must respond if its understanding of the corrective action is different; and
5. Address, if applicable, any apparent violations being considered for escalated
enforcement action and the scheduling of a predecisional enforcement conference.

Issuing a Non-Escalated NOV Beyond the NCV Criteria of the
Enforcement Policy
Although it should rarely happen, this section provides guidance for situations when,
notwithstanding the outcome of the normal process for dispositioning Severity Level IV
violations and violations associated with green SDP findings, the staff chooses to issue an NOV.
A. The action requires an EA number; and
B. OE will coordinate the action with NRR or NSIR, as appropriate.
The cover letter transmitting the NOV must clearly state the reason for issuing the NOV,
notwithstanding that it was not one of the defined circumstances identified in Section 2.3.2 of
the Enforcement Policy.

111

PART I: Enforcement Process

PART I – 2 Disposition of Violations

Documenting Non-Escalated Enforcement Actions
A. Severity Level IV violations and violations associated with green SDP findings that are
cited in an NOV may be documented in an inspection report or inspection records and
should be addressed throughout the documentation as “violations” versus “apparent
violations,” (since an actual NOV is included).
1. The violations should be addressed in the report details and summary of findings,
and conclusion sections of the inspection report.
2. Inspection report details should briefly describe the requirement and how the
requirement was violated.
3. The staff must provide sufficient detail to substantiate the existence of a Severity
Level IV violation or violation associated with a green SDP finding (see applicable
guidance in IMCs 0610, 0611, 0613, 0616, and 0617). The degree of detail
necessary to support a violation is a function of the significance and the complexity
of the noncompliance.
4. The cover letter transmitting the non-escalated NOV should be prepared in
accordance with the guidance in this Manual and the appropriate cover letter
template in Appendix B. The cover letter MUST address why an NOV is being
issued in terms of the Enforcement Policy criteria they met.
NOTE:
For materials licensees, Severity Level IV violations may also be
dispositioned through the use of NRC Form 591.
B. Although they are considered administrative actions, notices of deviation and
nonconformance are generally issued as part of non-escalated enforcement actions and
may be documented in, or an attachment to, inspection reports or inspection records.
1. The deviations or nonconformances should be addressed in the executive summary,
report details, observations and findings, and conclusion sections of the inspection
report.
2. The cover letter transmitting a Notice of Deviation (NOD) should be prepared using
the appropriate cover letter template in Appendix B with appropriate modifications to
reflect the NOD as the enforcement action versus an NOV.
3. The cover letter transmitting a Notice of Nonconformance (NON) should also be
prepared using the appropriate template in Appendix B.

Non-Escalated NOV Coordination, Review and Issuance
A. Non-escalated NOVs should be coordinated and reviewed according to the following
guidelines:

112

PART I: Enforcement Process

PART I – 2 Disposition of Violations

1. Non-escalated NOVs are normally issued by the regions or appropriate program
office in accordance with the guidance established in Sections 5.3 and 5.4;
2. Regional enforcement staff should be available for consultation on non-escalated
NOVs for materials licensees and should concur on non-escalated NOVs involving
power reactors;
3. The Regional Division Director must concur on non-escalated NOVs involving power
reactors;
4. The Regional Division Director must concur on non-escalated NOVs involving
materials licensees if there is a dispute with the licensee on the reasonableness of its
corrective actions;
5. In all Severity Level IV NOVs for materials licensees involving events where
identification credit is being denied, the Division Director must agree with the denial
after consultation with the Regional or NMSS Enforcement Coordinator (as
appropriate);
B. The region should send OE a copy of all non-escalated NOV packages with EA numbers
after it has issued the action.

Licensee Notification, Mailing, and Distribution for Non-Escalated
NOVs
Licensees, States, and ADAMS (PARS) are normally sent a copy of the non-escalated NOV at
the time the inspection report is issued.
A. The mailing and distribution of the inspection report NOV is controlled by regional
procedures.
B. OE receives copies of all non-escalated enforcement actions through the Document
Control System.
C. Copies of non-escalated NOVs issued by the program offices should be sent to the
appropriate regional office. In addition, for non-escalated NOVs issued to Agreement
State licensees, a copy should be sent to the Agreement State and to the appropriate
Regional State Agreements Officer(s) of the appropriate region or regions.

Licensee Response to a Non-Escalated NOV
A. If the staff concludes that a licensee response is necessary, the provisions of 10 CFR
2.201 require that a licensee submit a written response to an NOV within 20 days of the
date of the NOV or other time specified in the NOV. Normally 30 days should be used.
B. If a licensee does not respond to an NOV within the allotted time and the region has
made several unsuccessful attempts to contact the licensee, the region should contact
OE (no later than 60 days from the date of the issuance of the NOV). Consideration will
be given to whether additional enforcement action is warranted.

113

PART I: Enforcement Process

PART I – 2 Disposition of Violations

C. Licensees may be granted response extensions where good cause is shown.
1. The region may grant extensions of up to 30 days without OE approval.
2. OE should be promptly notified of any extensions the region grants.
3. OE approval is required for extensions beyond 30 days.
4. Generally, verbal requests for extensions should be promptly followed up with written
confirmation of the length of the extension and the date a reply is due.
•
•

The confirmation may either be prepared by the NRC or the licensee.
A copy of this follow-up correspondence is to be sent to OE and the region.

D. If the licensee disputes a non-escalated enforcement action, see Section 2.8, “Disputed
Violations.”

Escalated Notices of Violation without a Civil Penalty
A Notice of Violation (NOV) is a formal written citation setting forth one or more violations of a
legally binding requirement. Procedures for issuing an NOV are set forth in 10 CFR 2.201 and
addressed in the Enforcement Policy.
•

An NOV including Severity Level I, II, or III violations is considered escalated
enforcement action. An NOV including violations associated with red, yellow, or white
SDP findings is also considered an escalated enforcement action.

•

Escalated NOVs are normally issued subsequent to conferences or after a licensee has
had an opportunity to respond to apparent violations in an inspection report. Escalated
NOVs are included in the Significant Enforcement Actions collection on the Enforcement
Web site.

Preparing an Escalated NOV Action
A. Escalated NOVs without civil penalties should be prepared by using the applicable
standard format in Appendix B and the applicable standard citations in Appendix C.
B. Escalated NOVs should be dated the same date as the cover letter transmitting the
enforcement action to the licensee.
C. The escalated NOV should include the following elements:
1. A concise, clear statement of the requirement or requirements that were violated,
appropriately referenced, paraphrased, or quoted (legal citation for the violation).
2. A brief statement (usually no more than a few sentences) of the circumstances of the
violation, including the date(s) of the violation and the facts necessary and sufficient
to demonstrate that the requirement was not met ("contrary to" paragraph).

114

PART I: Enforcement Process

PART I – 2 Disposition of Violations

a. To demonstrate noncompliance, the language of the "contrary to" statement
should parallel the applicable language of the requirement.
b. Each violation, including a violation with multiple examples, contains a single
"contrary to" statement.
3. As a general rule, multiple examples of the same violation during the period covered
by an inspection should be included in one citation.
a. The "contrary to" paragraph should generally state the violation and then state:
"...as evidenced by the following examples:" followed by the examples delineated
as 1, 2, 3, etc.
b. When the examples of a particular violation are numerous, sufficient examples
should be cited to convey the scope of the violation and to provide a basis for
assessing the effectiveness of the licensee's corrective actions. Normally three
to five examples should be adequate.
NOTE:
To avoid the release of predecisional information, the top and bottom of all
pages of documents included in escalated enforcement packages should be
marked as “Official Use Only - Predecisional Enforcement Information.” In
addition, enforcement packages including safeguards information should be
clearly marked: "Safeguards Information - Handle in Accordance With
10 CFR 73.21." Internal staff reviews and comments should not be made
available to the Public (i.e., should not be publicly available in ADAMS
(PARS)).
4. The severity level proposed for the violation or the severity level of the problem when
several violations have been grouped.
5. The applicable Violation Examples section of the Enforcement Policy under which
the violation is categorized or, alternatively, the associated significance of the
violation (i.e., red, yellow, or white SDP finding).
6. A request for the licensee to respond unless the region concludes that a response in
not necessary, including:
a. The reason for the violation, or if contested, the basis for disputing the violation;
b. The corrective steps which have been taken by the licensee or other person and
the results achieved;
c. The corrective steps which will be taken; and
d. The date when full compliance will be achieved.
7. A waiver, if the region concludes that a response is not necessary based on
information regarding the reason for the violation, the corrective actions taken and
planned to be taken to correct the violation and prevent recurrence is already
addressed on the docket. This alternative requires the licensee to respond if the
description does not accurately describe the licensee's corrective action position.

115

PART I: Enforcement Process

PART I – 2 Disposition of Violations

D. Cover letters that transmit escalated NOVs without civil penalties to licensees should be
prepared by the region (see forms in Appendix B).
1. The staff should refer to IMC 0612, IMC 0613, IMC 2519 and IMC 0609 for guidance
related to the overall structure of the cover letter and content of introductory
paragraphs for NOVs associated with SDP findings.
2. Transmittal letters with and without SDP findings should effectively and succinctly
communicate the NRC's perspectives on the violations and the need for corrective
action.
3. In addition to an EA number, cover letters should include a Nuclear Materials Events
Database (NMED) number, if applicable.
4. If possible, the letter should normally be no longer than two pages in length for each
violation and should include the following elements:
a. A summary of:
•
•
•

The purpose of the inspection;
If and how the issue was reported, e.g., 50.72, Licensee Event Report (LER),
50.55(e), Construction Deficiency Report, etc.; and
When the inspection report(s) related to this action were issued.

b. A discussion of whether a conference was conducted, a choice letter was issued,
or a choice call was made, as applicable.
c. A conclusion that a violation(s) occurred and a very brief summary of the event or
circumstances that resulted in the violation.
5. For NOVs without SDP findings, the discussion should be sufficiently detailed to
permit licensee management (and others who may review the action) to understand
the safety significance of the violations, including:
a. A concise discussion of the safety significance of the violation in terms of
whether it is based on the actual safety consequence, potential safety
consequence, potential for impacting the NRC’s ability to perform its regulatory
function, or it was willful and how it relates to severity level categorization;
b. A statement of the base civil penalty amount for the violation or problem and a
discussion addressing the applicable routine decisional points in the civil penalty
assessment process, i.e.;
•
•
•

Whether the licensee has had any escalated actions during the past two
years or two inspections (include specific reference to any prior escalated
action within two years or two previous inspections);
Whether credit was given for identification (address only if the answer to the
preceding question is “no”;
Whether credit was given for corrective action (include a brief description of
corrective actions); and

116

PART I: Enforcement Process

•

PART I – 2 Disposition of Violations

If discretion was exercised, an additional explanation of this decision
including a reference to the particular section of the Enforcement Policy
discussing the use of discretion;

c. A statement that the NOV is considered escalated action in accordance with the
Enforcement Policy because it is associated with a red, yellow, or white SDP
finding;
d. A statement associated with not proposing a civil penalty, i.e., to encourage
prompt (identification, if applicable) and comprehensive correction of violations,
(and to recognize the absence of previous escalated enforcement action, if
applicable). This section should also indicate who the action was coordinated
with, i.e., OE, DEDO, or the Commission;
6. Either:
a. A description of the response that is necessary from the licensee (if the region
concludes that a response is necessary), including any area that deserves
special emphasis; or
b. A conclusion that a licensee response is not necessary (if the region concludes
that a response is not necessary), including a provision that the licensee respond
if its understanding of the corrective action is different;
7. A statement that the NRC will determine, based on the licensee's NOV response,
corrective actions, and results of future inspections, whether further enforcement
action is necessary:
8. A statement that the letter and the licensee's response will be made available to the
Public; and
9. Any additional background information that supports the escalated enforcement
action that was not previously submitted to support the panel, e.g., LER, TS, FSAR.

Escalated NOV Coordination, Review and Issuance
A. All escalated NOVs must be coordinated with OE and the applicable headquarter
office(s) prior to issuance (refer to Section 5.4).
For the purposes of this Manual, “coordination” means either that:
•
•

The action needs to be submitted to headquarters for actual enforcement action
package review; or
The enforcement strategy for the action needs to be agreed upon (usually via a
panel or caucus). The Strategy Form will document the level of OE review.

B. If a proposed enforcement action is required to be submitted to headquarters for formal
review and approval prior to issuance, it should be electronically mailed to the assigned
OE Enforcement Specialist.

117

PART I: Enforcement Process

PART I – 2 Disposition of Violations

1. The OE Enforcement Specialist should review and make any changes prior to
submitting the proposed action to:
•
•

The Assistant General Counsel for Security and Enforcement (if applicable, see
Section 5.4.1), and
The applicable program office Enforcement Coordinator

2. The applicable program office should review the proposed action with a focus on
ensuring that the technical accuracy of the violations and the significance of the
violations with respect to safety and risk characterizations have been properly
evaluated from an overall agency perspective.
3. Comments should be provided (verbally, electronically, or in writing) to the OE
Enforcement Specialist within 10 working days.
a. Comments are normally provided through the program office Enforcement
Coordinators.
b. OE will consider timely program office comments and OGC comments, if
proposed, and revise the enforcement action, as appropriate.
c. The OE Enforcement Specialist, after consultation with OE management, will
notify the applicable program office Enforcement Coordinator when substantive
program office comments are not going to be incorporated into the final proposed
enforcement action.
4. OE will forward the revised enforcement package to the region indicating where the
action was revised (normally through the use of comparative text) and explaining any
significant changes.
5. The region should review the revised action and, if possible, provide concurrence on
headquarters' changes by the next day.
6. OE will either:
a. Approve and/or issue the action; or as appropriate,
b. Forward the OE-approved enforcement package to the DEDO for review and
approval and will advise the DEDO of any significant differences among the
region, the program office, and OGC.
C. Draft Commission papers (e.g., OI disagreements) should also be electronically mailed
to the addressees listed above, as required.
D. Notwithstanding the stated steps and timeliness goals for the coordination and review
process, it is recognized that additional steps and/or review time may be necessary for
unusually complex cases.

Licensee Notification & Distribution of Escalated NOVs
A. Licensee notification, mailing, and distribution should be made according to the following
guidelines:

118

PART I: Enforcement Process

PART I – 2 Disposition of Violations

B. In most cases, Escalated NOVs are mailed to licensees and States by regular mail.
NRC distribution should be made according to the distribution lists in Appendix D and
regional procedures.
C. Copies of escalated NOVs issued by the program offices should be sent to OE as well
as to the appropriate regional office.
NOTE:
Escalated NOVs should be e-mailed to OEWeb.Resource when they are put
in ADAMS to ensure that they are posted to the Enforcement Web site in a
timely manner. The e-mail should include a statement such as “The licensee
has received a copy of the enforcement action.”
D. For all escalated enforcement actions involving medical licensees, the distribution list
should include the Chairman, Board of Trustees.
1. The Board of Trustees frequently has oversight responsibility for the legal title,
management of funds, and direction of policy for the medical licensee.
2. This distribution effort will:
•
•
•

Ensure that escalated enforcement actions and their potential implications are
raised to the highest level of authority;
Deter future violations; and
Promote the health and safety of the public, including employees' health and
safety.

E. To provide members of the public referenced information as soon as possible, when a
press release is involved, the staff should release any escalated enforcement action to
the public via ADAMS and the Enforcement Web site as soon as possible after it has
notified the recipient of the enforcement action by e-mail or facsimile. In all cases, the
recipient(s) should receive the action before the press release is issued and before it is
publicly-available.

Licensee Response to Escalated NOVs
A. If the region concludes that a licensee response is necessary, the provisions of 10 CFR
2.201 require that a licensee submit a written response to an NOV within 20 days of the
date of the NOV or other specified time frame; however, normally 30 days should be
used.
B. If a licensee does not respond to an NOV within the allotted time and the region has
made several unsuccessful attempts to contact the licensee, the region should contact
OE (no later than 60 days from the date of the issuance of the NOV) and consideration
will be given to whether additional enforcement action is warranted.
C. Licensees may be granted response extensions where good cause is shown.

119

PART I: Enforcement Process

PART I – 2 Disposition of Violations

1. The region may grant extensions of up to 30 days without OE approval.
2. OE should be promptly notified of any extensions the region grants.
3. OE approval is required for extensions beyond 30 days.
a. Generally, verbal requests for extensions should be promptly followed up with
written confirmation of the length of the extension and the date a reply is due.
b. The confirmation may either be prepared by the NRC or the licensee, a copy of
which should be sent to OE and the region.
4. OE is responsible for notifying the Office of the Secretary when an enforcement
hearing extension extending beyond 30 days is approved.
D. A Licensee’s response to an escalated NOV may either:
1. Accept that the violation occurred as stated in the NOV. In this case, the region
should:
a. Review the licensee's response for the adequacy of the corrective action,
including whether the licensee has properly identified the root causes;
b. Send an acknowledgment letter usually within 30 days after receipt of the
licensee’s response to the same person and address as the escalated NOV.
NOTE:
Licensee denials include disputes involving NRC requirements, facts of
the case, application of the Enforcement Policy, and severity levels.
2. Contest the staff’s facts and/or conclusions regarding the escalated NOV. In this
case, the region should follow the guidance provided in Section 2.8, “Disputed
Violations.”
3. Disagree with the significance of the violation. In this case, the region should follow
the guidance provided in Section 2.8, “Disputed Violations.”

NOV and NOV/CP Coordination and Review Output Measures
Regional and OE (headquarters) timeliness on all escalated enforcement cases will be reported
on a periodic basis to the Regional Administrators and Program Office Directors.

120

PART I: Enforcement Process

PART I – 2 Disposition of Violations

NOTE:
Start Date: The measuring period starts on the latest of the following dates: (1)
inspection exit date, (2) the date the results of an agency investigation are forwarded
to the staff, (3) the date that the Department of Justice (DOJ) says NRC may
proceed, for cases referred to the DOJ, or (4) the date of the Department of Labor
decision that is the basis for the action. The inspection exit date will be defined by
the region or office performing the inspection and may be the date of the telephone
re-exit. For investigation cases, the start date will typically not be the re-exit date.
However, on rare occasions, when significant additional inspection effort is needed
after issuance of the investigation results are forwarded to the staff, the re-exit date
will be used as the start date.
The current timeliness output measures recognize that cases which include an OI investigation
require additional time to review the OI report prior to determining the appropriate enforcement
outcome. The following metrics are based upon the output measures reported annually to
Congress as part of the Congressional Budget Justification:
A. Cases that do not include an OI investigation: 100% completed within 160 calendar
days.
B. Cases that include an OI investigation: 100% completed within 330 days.

Press Releases for NOVs and NOV/CPs
A. Regional enforcement personnel will inform the regional Public Affairs Officer (RPAO) at
least 72 hours prior to the issuance of an action.
B. In the event that the RPAO decides to issue a press release, the RPAO will provide a
draft press release to the regional staff for concurrence.
1. OE may review press releases in the more significant cases.
2. After the enforcement action has been signed, the RPAO will receive verification that
the licensee has been notified of the action and has received a copy of the
enforcement action.
C. If the enforcement action has not been posted on the Enforcement Web site when the
press release is issued, the press release should state that the action will be posted on
the Enforcement Web page.
D. The regional enforcement staff should consider the following when reviewing press
releases:
•
•
•
•
•

The severity level categorization;
The significance determination (white, yellow or red);
Whether the violation reflects an actual or a potential consequence;
Whether the violation impacted the NRC’s ability to perform its regulatory function;
Whether the violation was willful; and
121

PART I: Enforcement Process

•

PART I – 2 Disposition of Violations

Whether the licensee reported the violation or identified it.

E. Press releases on the Web typically provide a link to the enforcement action on the
Enforcement Web site.

Determining Whether a Civil Penalty Should Be
Proposed
A. Civil penalties are considered for:
1. Knowing and conscious violations of the reporting requirements of Section 206 of the
Energy Reorganization Act;
2. Failure to make the required notifications that impact the ability of Federal, State and
local agencies to respond to an actual emergency preparedness event (site area or
general emergency);
3. Deliberate violations related to the release of Safeguards Information; and
4. Cases associated with the loss, abandonment, or improper transfer or disposal of
regulated source material.
B. Civil penalties are considered for Severity Level I, II, and III violations.
C. Civil penalties are considered for violations associated with red, yellow, or white SDP
inspection findings evaluated through the ROP’s SDP that involve actual consequences,
such as an overexposure to the public or plant personnel above regulatory limits, or
releases in excess of regulatory limits.
D. For violations that impact the regulatory process or that are willful and therefore
assessed under “traditional enforcement,” the SDP should be used to risk inform the
significance of the underlying violation or issue to the extent possible.
NOTE:
Civil penalties are not normally proposed for violations associated with low to
moderate or greater safety significant SDP findings absent actual
consequences.
E. The staff should consider the SDP output in conjunction with the guiding principles for
assessing significance and the guidance included in the Violation Examples (Section
6.0) of the Enforcement Policy to determine the appropriate severity level.
F. The following steps should be taken to determine whether a civil penalty should be
proposed for the violation.

122

PART I: Enforcement Process

PART I – 2 Disposition of Violations

•

Step 1:
Determine the base civil penalty appropriate for the significance of the
violation and the class of licensee.

•

Step 2:
o

o
o
o

Complete the civil penalty assessment process, which considers:

Severity Level of the violation, whether the violation was willful, and if the
licensee has had any previous escalated enforcement action (regardless of the
activity area) during the past two years or past two inspections, whichever is
longer;
Whether the licensee should be given credit for actions related to identification;
Whether the licensee's corrective actions are prompt and comprehensive; and
Whether, in view of all the circumstances, the matter in question requires the
exercise of discretion.
NOTE:
Credit for identification should always be considered except for cases
when the violation is the first willful SL III violation in past two years or two
inspections. (See Enforcement Policy, Section 2.3.4.b.)

•

Step 3:
Compare the amount of the civil penalty resulting from the civil penalty
process described above with the amount allowed by statute, to ensure that the
proposed civil penalty amount is within the statutory maximum.

•

Step 4:
Determine whether an escalated NOV should be issued with or without a
civil penalty based on the outcome of the civil penalty process.

Notwithstanding the outcome of the civil penalty assessment process, discretion, as discussed
in Section 3.6 of the Enforcement Policy, may be exercised by either escalating or mitigating the
amount of the civil penalty.

Base Civil Penalty
A. The NRC proposes different levels of penalties for different severity level violations and
different classes of licensees, vendors, and other persons.
B. Violations that involve loss, abandonment, or improper transfer or disposal of regulated
material are treated separately, regardless of the use or the type of licensee.
C. Civil penalties are also considered for deliberate and non-deliberate violations involving
individuals that release Safeguards Information. A detailed discussion can be found in
Part II, Section 1.4 of this Manual.
D. After determining that a civil penalty should be proposed with an NOV, the next step in
the civil penalty process is to determine the base civil penalty for the violation.
1. Tables A and B in Section 8 of the Enforcement Policy provide the base civil
penalties for various reactor, fuel cycle, and materials programs, and for the loss,
abandonment or improper transfer or disposal of regulated material.
123

PART I: Enforcement Process

PART I – 2 Disposition of Violations

2. The structure of these tables takes into account both the gravity of the violation and
the licensee's ability to pay, i.e., operations involving greater nuclear material
inventories and greater potential consequences to the public and licensee
employees receive higher civil penalties.
3. Civil penalties issued to individuals are rare and are determined on a case-by-case
basis.

Civil Penalty Assessment Process

Civil Penalty Assessment Process “Metro Map”
NOTE:
The “Metro Map” (Figure 5) is a graphical representation of the civil
penalty assessment process described in the Enforcement Policy. As
such, the staff should recognize that the “Metro Map” has limitations in its
ability to fully represent all aspects of the Policy. If there is a conflict
between the “Metro Map” depiction and the civil penalty assessment
process described in the Policy, the Policy narrative takes precedence
and is controlling. See Appendix D, “Enforcement Processing Aids and
Forms,” for additional guidance on interpreting the “Metro Map.”
A. The civil penalty assessment process is addressed in the Enforcement Policy.

124

PART I: Enforcement Process

PART I – 2 Disposition of Violations

B. In an effort to emphasize the importance of adherence to requirements and reinforce
prompt self-identification of problems and root causes and prompt and comprehensive
correction of violations, the NRC reviews each proposed civil penalty on its own merits.
C. The civil penalty assessment process considers four decision points:
1. Is this a non-willful Severity Level III enforcement action; and did the licensee have
any previous escalated enforcement action (regardless of the activity area) within the
past 2 years of the inspection at issue, or the period between the last two
inspections, whichever is longer?
2. Should the licensee be given credit for actions related to identification? (When the
NRC determines that a non-willful SL III violation or problem has occurred, and the
licensee has not had any previous escalated actions (regardless of the activity area)
during the past 2 years or two inspections, whichever period is longer, the NRC will
normally not consider the question of whether the licensee identified the present
violation or problem.)
3. Are the licensee's corrective actions prompt and comprehensive?
4. In view of all the circumstances, does the matter in question, or particularly poor
licensee performance, require the exercise of discretion, e.g., Severity Level I and II
violations should normally result in a civil penalty (see Enforcement Policy,
Section 3.6)?
D. Although each of these decisional points may have several associated considerations for
any given case, the outcome of the assessment process for each violation or problem,
absent the exercise of discretion, is limited to one of the following three results:
•
•
•

2.5.2.1

No civil penalty
A base civil penalty
Twice the base civil penalty.

Initial Escalated Action

A. The first decision point considers three criteria:
1. The SL of the apparent violation, or significance of the SDP finding with actual
consequences being considered for a civil penalty;
2. Whether or not the apparent violation was willful;
3. Recent escalated enforcement history.
B. If the SL of the apparent violation being considered for a civil penalty has been
evaluated at SL I or SL II, the staff will normally consider the question of whether the
licensee should receive credit for identifying the violation (the second decision point). If
the apparent violation has been evaluated at SL III, the staff will next consider whether
the violation was willful.

125

PART I: Enforcement Process

PART I – 2 Disposition of Violations

NOTE:
While apparent violations evaluated under the SDP with actual
consequences are anticipated to be rare, the significance of these
violations would likely be analogous to those evaluated at SL I and SL II
under traditional enforcement. Therefore, the staff would normally
consider the question of identification credit when determining the
amount of a proposed civil penalty for apparent violations associated with
Red and Yellow SDP Findings with actual consequences.
C. If the apparent violation being considered for a civil penalty has been determined to be
willful, the staff will normally consider the question of whether the licensee should
receive credit for identifying the violation. If a SL III apparent violation was non-willful,
the staff will next consider the licensee’s recent escalated enforcement history.
D. If the licensee has been issued an escalated enforcement action (regardless of the
activity area) for the facility during the past two years or two inspections, whichever is
longer, the staff will normally consider the question of whether the licensee should
receive credit for identifying the violation. Because the purpose of this criterion is to
encourage compliance with NRC requirements by considering a licensee’s past
performance, the staff will normally not consider who identified the new violation if a
licensee has not had previous escalated enforcement action at that facility within the
specified timeframe.
1. This criterion considers past NRC escalated actions with severity levels and orders,
i.e., traditional enforcement. It also includes previous escalated enforcement actions
issued under the SDP (i.e., NOVs associated with red, yellow, or white SDP
findings.) 3
2. It does not include previous escalated enforcement actions in an Agreement State.
a. Considering previous escalated actions in an Agreement State is not appropriate
because of variations in enforcement programs in the different Agreement
States.
b. If an Agreement State licensee violates a requirement while working in NRC
jurisdiction under reciprocity and the staff is aware of previous escalated action in
an Agreement State and the violation is directly repetitive or the enforcement
history is particularly poor, the staff may consider an adjustment to the civil
penalty by exercising enforcement discretion under the Enforcement Policy.
3. This criterion includes new licensees who have not been in existence during the past
two years or for two inspections (provided that they have not had previous escalated
actions). If a new licensee is involved, the staff should consider whether the
apparent significance of the violation requires the staff to:

See Staff Requirements Memorandum SRM-SECY-15-0163, dated September 21, 2016 (ADAMS
Accession Number ML16265A543).
3

126

PART I: Enforcement Process

•
•

PART I – 2 Disposition of Violations

Exercise discretion to impose a civil penalty; or
Take even more stringent action to address the apparent poor performance by a
new licensee.

4. This criterion should also be considered for license transfers and when a licensee
moves, including situations where the license is terminated, and a new license is
obtained.
•
•

This is appropriate if the facility personnel, procedures, and equipment stay the
same after a license transfer or move, thereby making past enforcement history a
valid issue.
If significant changes have been made in the above areas, consideration of
enforcement history may be inappropriate.

5. Using two years as the basis for assessment is expected to cover most situations.
Considering a slightly longer or shorter period might be warranted based on the
circumstances of a particular case.
6. The starting point of this period is when the licensee was put on notice of the need to
take corrective action.
a. For a licensee-identified violation or an event, this would be when the licensee is
aware that a problem or violation exists requiring corrective action.
b. For an NRC-identified violation, the starting point would be when the NRC puts
the licensee on notice, which is typically at the inspection exit meeting, or as part
of post-inspection communication.

2.5.2.2

Credit for Actions Related to Identification

A. Identification presumes that the identifier recognizes the existence of a problem and
understands that corrective action is needed.
B. The civil penalty assessment should normally consider the factor of identification in
addition to corrective action when:
1. A Severity Level I or II violation or a willful Severity Level III violation has occurred;
2. During the past two years or two inspections, whichever is longer, the licensee has
been issued at least one other escalated action; or
C. The NRC should consider whether the licensee should be given credit for actions related
to identification of the problem requiring corrective action, e.g., if a licensee discovers an
issue but fails to recognize that corrective actions are needed, then the licensee may not
be deserving of identification credit.
1. Identification and corrective action are separate decisions.
2. The decision on identification requires considering all the circumstances of
identification including:

127

PART I: Enforcement Process

PART I – 2 Disposition of Violations

a. Whether the problem requiring corrective action was:
•
•
•

NRC-identified
Licensee-identified
Revealed through an event
NOTE:

An event, as used in this section, means (1) a situation characterized by
an active adverse impact on equipment or personnel, readily obvious by
human observation or instrumentation, or (2) a radiological impact on
personnel or the environment in excess of regulatory limits, such as an
overexposure, a release of radioactive material above NRC limits, or a
loss of radioactive material, e.g., an equipment failure discovered through
a spill of liquid, a loud noise, the failure to have a system respond
properly, or an annunciator alarm would be considered an event.
Similarly, if a licensee discovered, through quarterly dosimetry readings,
that employees had been inadequately monitored for radiation, the issue
would normally be considered licensee-identified; however, if the same
dosimetry readings disclosed an overexposure, the issue would be
considered an event.
b. Whether prior opportunities existed to identify the problem requiring corrective
action, and if so, the age and number of those opportunities;
c. Whether the problem was revealed as the result of a licensee self-monitoring
effort, such as conducting an audit, a test, a surveillance, a design review, or
troubleshooting;
d. For NRC-identified issues, whether the licensee would likely have identified the
issue in the same time-period if the NRC had not been involved:
e. For cases in which the NRC identifies the issue or identifies the overall problem
(i.e., a programmatic issue requiring corrective action), consider:
•
•

Whether the licensee should have identified the issue (and taken action)
earlier; and
The degree of licensee initiative or lack of initiative in identifying the problem
or problems requiring corrective action.
NOTE:

In cases where the licensee identifies a noncompliance that has existed
for an extended length of time, the ease of identification of the
noncompliance should be taken into consideration.

128

PART I: Enforcement Process

f.

PART I – 2 Disposition of Violations

For a problem revealed through an event, the ease of discovery, and the degree
of licensee initiative in identifying the root cause of the problem and any
associated violations;

D. Although some cases may consider all of the above factors, the importance of each
factor will vary based on the type of case as discussed in the following general guidance:
1. Licensee-Identified: When a problem requiring corrective action is licensee-identified
(i.e., identified before the problem has resulted in an event), the NRC should
normally give the licensee credit for actions related to identification, regardless of
whether prior opportunities existed to identify the problem.
2. Identified Through an Event: When a problem requiring corrective action is identified
through an event, the decision on whether to give the licensee credit for actions
related to identification normally should consider:
a. The ease of discovery;
b. Whether the event occurred as the result of a licensee self-monitoring effort (i.e.,
whether the licensee was "looking for the problem");
c. The degree of licensee initiative in identifying the problem or problems requiring
corrective action; and
d. Whether prior opportunities existed to identify the problem.
•

Any of these considerations may be overriding if particularly noteworthy or
particularly egregious, e.g., if the event occurred as the result of conducting a
surveillance or similar self-monitoring effort (i.e., the licensee was looking for
the problem), the licensee should normally be given credit for identification.

•

As a second instance, even if the problem was easily discovered (e.g.,
revealed by a large spill of liquid), the NRC may choose to give credit
because noteworthy licensee effort was exerted in ferreting out the root
cause and associated violations, or simply because no prior opportunities
(e.g., procedural cautions, post-maintenance testing, quality control failures,
readily observable parameter trends, or repeated or locked-in annunciator
warnings) existed to identify the problem.

3. NRC-Identified: When a problem requiring corrective action is NRC-identified, the
decision on whether to give the licensee credit for actions related to identification
should normally be based on an additional question, i.e., should the licensee have
reasonably identified the problem (and taken action) earlier?
a. In most cases, this reasoning may be based simply on the ease of the NRC
inspector's discovery (e.g., conducting a walkdown, observing in the control
room, performing a confirmatory NRC radiation survey, hearing a cavitating
pump, or finding a valve obviously out of position). In some cases, the licensee's
missed opportunities to identify the problem might include a similar previous
violation, NRC or industry notices, internal audits, or readily observable trends.

129

PART I: Enforcement Process

PART I – 2 Disposition of Violations

b. If the NRC identifies the violation but concludes that, under the circumstances,
the licensee's actions prior to identification were reasonable and may have, in
fact, led to the identification, the matter can be treated as licensee-identified for
purposes of assessing the civil penalty. In such cases, the question of
identification credit shifts to whether the licensee should be given credit for
NRC's identification of the problem.
4. Mixed Identification: For "mixed" identification situations (i.e., where multiple
violations exist, some NRC-identified, some licensee-identified, or where the NRC
prompted the licensee to take action that resulted in the identification of the
violation), the NRC's evaluation should normally determine whether the licensee
could reasonably have been expected to identify the violation in the NRC's absence.
a. This determination should consider, among other things:
•
•
•
•
•
•

The timing of the NRC's discovery;
The information available to the licensee that caused the NRC concern;
The specificity of the NRC's concern;
The scope of the licensee's efforts;
The level of licensee resources given to the investigation; and
Whether the NRC's path of analysis had been dismissed or was being
pursued in parallel by the licensee.

b. In some cases, the licensee may have addressed the isolated symptoms of each
violation (and may have identified the violations), but failed to recognize the
common root cause and taken the necessary comprehensive action. Where this
is true, the decision on whether to give licensee credit for actions related to
identification should focus on identification of the problem requiring corrective
action (e.g., the programmatic breakdown).
c. Depending on the chronology of the various violations, the earliest of the
individual violations might be considered missed opportunities for the licensee to
have identified the larger problem.
5. Missed Opportunities to Identify: Missed opportunities include prior notifications or
missed opportunities to identify or prevent violations through, e.g.:
•
•
•

Normal surveillances, audits, or quality assurance (QA) activities;
Prior notice i.e., specific NRC or industry notification; or
Other reasonable indications of a potential problem or violation, such as
observations of employees and contractors, and failure to take effective
corrective steps.

a. In assessing this factor, consideration will be given to, among other things:
•
•
•
•

The opportunities available to discover the violation;
The ease of discovery;
The similarity between the violation and the notification;
The period of time between when the violation occurred and when the
notification was issued;
130

PART I: Enforcement Process

•
•

PART I – 2 Disposition of Violations

The action taken (or planned) by the licensee in response to the notification;
The level of management review that the notification received (or should have
received).

b. Missed opportunities may include findings of the NRC, the licensee, or industry
made at other facilities operated by the licensee where it is reasonable to expect
the licensee to take action to identify or prevent similar problems at the facility
subject to the enforcement action at issue.
c. The evaluation of missed opportunities should normally depend on whether the
information available to the licensee should reasonably have caused action that
would have prevented the violation.
d. Missed opportunities is normally not applied where the licensee appropriately
reviewed the opportunity for application to its activities and reasonable action
was either taken or planned to be taken within a reasonable time.
e. In some situations the missed opportunity is a violation in itself. In these cases,
unless the missed opportunity is a Severity Level III violation in itself, the missed
opportunity violation may be grouped with the other violations into a single
"problem."
f.

If the missed opportunity is the only violation, then it should not normally be
counted twice (i.e., both as the violation and as a missed opportunity--"double
counting") unless the number of opportunities missed was particularly significant.

g. The length of time during which the licensee failed to discover the violation
should also be considered. A two-year period should generally be used for
consistency in implementation.
E. If identification credit is given and the corrective action is judged to be prompt and
comprehensive, an NOV should normally be issued with no associated civil penalty. If
identification credit is given and the corrective action is judged to be less than prompt
and comprehensive, the NOV should normally be issued with a base civil penalty.
F. If identification credit is not given and the corrective action is judged to be prompt and
comprehensive, an NOV should normally be issued with the associated base civil
penalty. If identification credit is not given and the corrective action is judged to be less
than prompt and comprehensive, the NOV should normally be issued with two times the
base civil penalty.

2.5.2.3

Examples Where Identification Is Considered

A. Generally, if the licensee identifies a problem before an event occurs or before the NRC
identifies it, the licensee should get credit for the identification (even if missed
opportunities existed, including the failure of past corrective action for similar violations).
1. If the violation is identified as the result of an event associated with normal
operations, in contrast to an event associated with an assessment activity such as a
surveillance test, missed opportunities should be considered.

131

PART I: Enforcement Process

PART I – 2 Disposition of Violations

NOTE:
Identification presumes that the identifier recognizes the existence of a
problem and understands that corrective action is needed.
2. If the NRC identifies the violation, it is appropriate to consider whether the licensee
should have identified the violation.
a. The actual application of this factor will be a function of the circumstances of the
case, the issues associated with identification, and the regulatory message
warranted by the facts of the case.
b. Identification presumes recognition that corrective action is required.
B. Recognizing that application of the identification factor will require applying judgment to
the particular set of facts and circumstances in each case, the following guidance should
not be viewed as controlling or exhaustive:
1. Situations in Which the Licensee Should Be Given Credit:
a. Violations identified as a result of surveillances or tests, when a parameter check
is required by the procedure and limits or ranges do not meet regulatory
requirements.
b. Discovery of inoperable equipment during surveillance testing performed to
determine the operability of that equipment. If as a result of the surveillance
testing, an event occurs because of other equipment (i.e., equipment not being
tested) failing, missed opportunities should be considered when evaluating
identification for the failure of the "other" equipment.
c. Violations identified during a surveillance test where an evolution or process that
is being tested does not proceed as expected, e.g., a liquid spill due to a
mispositioned valve.
d. Disclosure of a fitness-for-duty violation during routine testing.
e. Identification of a violation as a result of the licensee follow-up of safety concerns
raised by an employee of the licensee.
f.

Violations identified in audit findings, deficiency reports, or contractor reviews, in
which the condition adverse to quality was not corrected in a timely manner, but
was later disclosed by a licensee review before an event occurred.

g. Violations identified as the result of procedurally required checks of a medical
treatment plan before treatment occurs, or as the result of daily checks of
radiography equipment before the equipment is used.
h. Cases in which, in response to an event, a licensee investigation identifies
violations that were not involved in or did not contribute to the event.

132

PART I: Enforcement Process

PART I – 2 Disposition of Violations

i.

Violations identified as the result of a licensee's review of, e.g., generic
communications, NRC Information Notices, reports generated by outside or
industry groups, etc.

j.

If the NRC finds a violation prior to the licensee's identification of it, but the
licensee was aggressively pursuing the same issue as the result of an NRC
Information Notice and likely would have found it within a reasonable time, the
licensee should get credit for its identification activities.

2. Situations in Which Missed Opportunities Should Be Considered Before Giving the
Licensee Credit for Identification:
a. Violations identified as the result of an event that was readily obvious by human
observation or mechanical instrumentation such as a reactor trip, or leak, spills,
or annunciator alarms.
b. As the result of a lost or damaged gauge, the licensee identifies a failure to
maintain constant control over a gauge containing byproduct material.
c. Discovery of an overexposure documented in a dosimetry report.
d. Licensee identifying the loss of control of material after being informed by a
member of the public that material has been found in the environment.
e. Receipt of records from the Federal Bureau of Investigations indicating that a
person who has been granted unescorted access had a criminal history of which
the licensee was not aware, although the information was available in the
licensee's records.
f.

As a result of an event or NRC questions, the licensee identifies violations that it
should have found earlier if it had been responsive to previous audits findings,
deficiency reports or contractor reviews, where conditions adverse to quality
were not corrected in a timely manner.

g. Violations that caused or contributed to an event, identified as part of a follow-up
to the event.
h. Violations identified as part of determining the root causes for a radiation injury to
a patient.
i.

Cases in which the inappropriate location of sources results in a
misadministration being disclosed when the source is removed.

j.

Cases in which an overexposure is identified after reading personal dosimetry or
data documented in dosimetry reports following an event where, due to the
event, the potential for an overexposure exists.

3. NRC-Identified Situations:
a. Cases in which a licensee does not appear to have been pursuing a matter on its
own but, due to concerns raised by the NRC, identifies:
133

PART I: Enforcement Process

•
•

PART I – 2 Disposition of Violations

Violations related to equipment failures when the NRC has questioned
operability of the equipment; or
Violations of reporting requirements found when the NRC requested
information on the event.

b. Violations related to an event would be considered NRC-identified if:
•

•

2.5.2.4

The violation is subsequently discovered by the NRC during event follow-up
where the licensee failed to initiate reviews or investigations that would have
reasonably identified the violation, e.g., a misadministration may have
occurred that the licensee attributes to a failure to follow procedure, and does
not pursue the matter further.
The NRC finds that an underlying root cause violation exists (e.g., a training
violation), but the licensee has not pursued it.

Credit for Prompt and Comprehensive Corrective Action

A. The purpose of corrective action is to encourage licensees to:
1. Take the actions necessary immediately upon discovery of a violation that will
restore safety and compliance with the license, regulation(s), or other requirement(s);
and
2. Develop and implement (in a timely manner) the corrective actions that will not only
prevent recurrence of the violation at issue, but will be appropriately comprehensive,
given the significance and complexity of the violation, to prevent occurrence of
violations with similar root causes.
B. Regardless of other circumstances (e.g., past enforcement history, identification, etc.),
the licensee's corrective actions should always be evaluated as part of the civil penalty
assessment process.
1. As a reflection of the importance given to this factor, an NRC judgment that the
licensee's corrective action has not been prompt and comprehensive will always
result in issuing at least a base civil penalty.
NOTE:
Even in cases when the NRC, at the time of the predecisional
enforcement conference, identifies additional peripheral or minor
corrective action still to be taken, the licensee may be given credit in this
area, as long as the licensee's actions addressed the underlying root
cause and are considered sufficient to prevent recurrence of the violation
and similar violations.
2. In assessing this factor, consideration will be given to:

134

PART I: Enforcement Process

PART I – 2 Disposition of Violations

a. The timeliness of the corrective action (including the promptness in developing
the schedule for long term corrective action);
b. The adequacy of the licensee's root cause analysis for the violation, and
c. The comprehensiveness of the corrective action (i.e., whether the action is
focused narrowly to the specific violation or broadly to the general area of
concern), given the significance and complexity of the issue.
C. Normally, the judgment of the adequacy of corrective actions will hinge on whether the
NRC had to take action to focus the licensee's evaluative and corrective process in order
to obtain comprehensive corrective action.
1. This will normally be judged at the time of the predecisional enforcement conference
(e.g., by outlining substantive additional areas where corrective action is needed).
2. Earlier informal discussions between the licensee and NRC inspectors or
management may result in improved corrective action, but should not normally be a
basis to deny credit for corrective action.
NOTE:
In response to violations of 10 CFR 50.59, corrective action should
normally be considered prompt and comprehensive only if the licensee
makes a prompt decision on operability, and either (1) makes a prompt
evaluation under 10 CFR 50.59 if the licensee intends to maintain the
facility or procedure in the as found condition; or (2) promptly initiates
corrective action consistent with Criterion XVI of 10 CFR 50, Appendix B,
if it intends to restore the facility or procedure to the FSAR description.
3. For cases in which the licensee does not get credit for actions related to identification
because the NRC identified the problem, the assessment of the licensee's corrective
action should begin from the time when the NRC put the licensee on notice of the
problem.
4. Notwithstanding eventual good comprehensive corrective action, if immediate
corrective action was not taken to restore safety and compliance once the violation
was identified, corrective action would not be considered prompt and
comprehensive.
D. Corrective action for violations involving discrimination should normally only be
considered comprehensive if the licensee takes prompt, comprehensive corrective
action that:
1. Addresses the broader environment for raising safety concerns in the workplace; and
2. Provides a personal remedy for the particular discrimination at issue.

135

PART I: Enforcement Process

PART I – 2 Disposition of Violations

Assigning Final Civil Penalty Amounts
A. The statutory maximum civil penalty amount, as established in the 1980 revision to the
AEA, is $100,000 per violation, per day; however, this amount is adjusted annually for
inflation in accordance with the Federal Civil penalties Inflation Adjustment Act
Improvements Act of 2015. The current civil penalty amounts are published in the
Policy.
B. To calculate the statutory maximum for a given Severity Level I, II, or III problem, each
associated violation should be assigned the value specified in the Enforcement Policy for
the particular class of licensee, multiplied by the number of days the violation existed,
and then added to the civil penalty amounts for the other violations. In other words, the
statutory maximum for a given Severity Level I, II, or III problem is the cumulative result
of the number of associated violations and the number of days that each violation
existed.
C. Civil penalties are normally assessed using the process described in the previous
section of this Manual.
D. The issuance of civil penalties is intended to be remedial, i.e., to encourage prompt and
effective corrective actions and to prevent recurrence.
NOTE:
The civil penalty assessment process described in this chapter is intended to
be a normative standard for most Severity Level III issues. Departures from
this process by the exercise of discretion (for either escalation or mitigation
of the enforcement action) requires the approval of the Director, OE, and
may require approval of the DEDO or EDO and/or notification or consultation
with the Commission, as specified in the Enforcement Policy. However, in
no instance will a civil penalty for any one violation exceed the maximum
value specified in 10 CFR 2.205, as published annually in the Federal
Register.
E. The NRC may exercise discretion and assess a separate violation and attendant civil
penalty up to the statutory limit for each day the violation continues (i.e., daily civil
penalties). The NRC may exercise this discretion when a licensee was aware of a
violation of at least moderate significance (i.e., at least a severity level III) and had a
clear opportunity to prevent, identify, and correct the violation but failed to do so.

Civil Penalty Assessment Process Outcome
Depending on the outcome of the civil penalty assessment process, the staff will conclude that
an escalated NOV should be issued without a civil penalty or that an escalated NOV should be
issued with a civil penalty.

136

PART I: Enforcement Process

PART I – 2 Disposition of Violations

Ability to Pay and Size of Operation
Although Tables A and B in the Enforcement Policy are structured to take into account as a
primary consideration, the gravity of a violation, and as a secondary matter, the licensee's ability
to pay, there may be circumstances that warrant an adjustment to the base civil penalty or
consideration of payment of a civil penalty over time.
A. It may be appropriate to increase the size of the base penalty on the basis of the amount
of nuclear materials inventoried, the potential hazards associated with them, and the
size and nature of the licensee operation and program.
1. Increasing the penalty requires OE approval and may require Commission
consultation.
2. Orders, rather than civil penalties, should be used when the intent is to suspend or
terminate licensed activities.
3. The deterrent effect of civil penalties is best served when the amounts take into
account the licensee’s ability to pay.
B. If a licensee can demonstrate financial hardship, the NRC will normally consider
payments over time which includes interest and administrative charges, rather than
reducing the amount of the civil penalty.
1. If, after consultation with OE, payments over time or reduction of the penalty appears
appropriate, the licensee will normally be required to address why it has sufficient
resources to safely conduct licensed activities and pay license and inspection fees,
e.g., a DFI can be used to require the licensee to respond to such an inquiry.
NOTE:
If payment of a civil penalty could impair the licensee's ability to safely
conduct licensed activity, the staff should consider whether the licensee
should be allowed to maintain its license, given its questionable financial
stability.
2. The licensee should be requested to provide the NRC with written evidence to
demonstrate that payment of the civil penalty would substantially affect its ability to
remain in business or would substantially affect its ability to safely conduct licensed
activities.
a. The licensee must support its position with documentation for the past three
years (such as profit and loss statements showing income and expenses
including such items as gross sales and salaries, balance statements showing
assets and liabilities, auditor's reports, and tax returns or other evidence) and
must also provide a statement from at least one financial institution that it could
not obtain a loan.

137

PART I: Enforcement Process

PART I – 2 Disposition of Violations

b. If the licensee's submittal does not support its claim, the responsible office should
impose the civil penalty and inform the licensee that NRC evaluation of the
submitted evidence does not support the licensee's claim.
c. If the licensee's submittal supports its claim, the civil penalty should be imposed
over a timeframe that is consistent with NRC’s evaluation of the licensee's
evidence and should provide the licensee with the basis for the NRC’s
conclusion.
•

•
•
•

The Division of the Comptroller in the Office of the Chief Financial Officer
(OCFO/DOC) will coordinate with the responsible office and OE, and will
normally prepare the terms to be included in a Promissory Note in Payment
of the Civil Penalty.
OCFO/DOC will prepare all promissory notes using the terms that the
responsible office provides, i.e., the length of time, the minimum monthly
payment, the payment schedule, etc.
OCFO/DOC will issue the note to the licensee.
After the licensee signs and returns the note to the NRC, the appropriate
OCFO/DOC manager will counter-sign the note and forward a copy to the
licensee, OE and the responsible office, as appropriate.

C. It may be appropriate to decrease the size of a base civil penalty on the basis of the size
and nature of the licensee’s operation and program and their ability to pay without further
requests from the licensee.
1. If an individual or a very small entity (e.g., a company with 10 or fewer employees) is
assessed a civil penalty associated with a severity level III violation, the staff may
propose up to a fifty percent reduction to the civil penalty amount.
NOTE:
For a civil penalty associated with a severity level I or II violation,
licensees may request reductions to the assessed civil penalty if they can
demonstrate financial hardship.
2. It is not the NRC’s intention that the economic impact of a civil penalty be so severe
that it adversely affects a licensee’s ability to safely conduct licensed activities or
puts a licensee out of business.
3. The deterrent effect of civil penalties is best served when the amounts take into
account the licensee’s ability to pay.
4. Decreasing the penalty requires OE approval.

138

PART I: Enforcement Process

PART I – 2 Disposition of Violations

NOTE:
If payment of a civil penalty could impair the licensee’s ability to safely
conduct licensed activities, the staff should consider whether the licensee
should be allowed to maintain its license, given its questionable financial
hardship.

NOTE:
Reductions in a civil penalty based on the severity and nature of the
violation is addressed in Section 3.5, “Violations Involving Special
Circumstances.”

Small Business Regulatory Enforcement Fairness Act (SBREFA)
The NRC is subject to the Small Business Regulatory Enforcement Fairness Act (SBREFA).
A. If a small entity claims hardship:
1. The Region may propose up to a 50% reduction to the civil penalty.
2. For proposed reductions of more than 50% and up to waiving the fine, the licensee
must also demonstrate that a hardship exists by meeting the criteria for financial
hardship.
3. The staff should note that payment over time is an option specifically tailored for
small businesses.
B. Among the requirements of the SBREFA, the NRC must consider the SBREFA in taking
civil penalty actions against small entities.
1. The NRC's Enforcement Policy civil penalty structure takes into account the size of
the licensee by virtue of the nature of the operation, the significance of the violations,
and consideration of factors such as identification, corrective action, licensee history,
and willfulness or other particularly poor performance.
2. SBREFA also addresses financial hardship.
a. In reaching decisions concerning enforcement actions, the staff should keep the
intent of SBREFA in mind.
b. There may be cases where, after considering the normal adjustment factors and
the size of a qualified small entity to whom a civil penalty may be issued, the staff
believes that the penalty should be reduced or eliminated. In those cases, it is
appropriate to propose such a modification based on the intent of SBREFA.

139

PART I: Enforcement Process

PART I – 2 Disposition of Violations

c. Any adjustments to the proposed civil penalty under SBREFA would be applied
as an exercise of discretion and the appropriate Enforcement Action Tracking
System (EATS) keyword should be entered.
NOTE:
Not all small entities are “equal.” For the purpose of reducing licensing
fees, small entities can include fairly large companies, corporations, etc.;
however, when considering whether to reduce the amount of a material
user’s civil penalty, the licensee must be, in fact, a small entity.

Notice of Violation and Proposed Imposition of Civil
Penalty (NOV/CP)
A. Civil penalties are enforcement sanctions that are normally proposed for Severity Level I
and II violations and are considered for Severity III violations. They are also considered
for violations associated with red, yellow, or white SDP findings that involve actual
consequences. The procedures for issuing civil penalties are set forth in 10 CFR 2.205
and are also addressed in the Enforcement Policy.
B. Civil penalties may be proposed for knowing and conscious violations of the reporting
requirement of section 206 of the Energy Reorganization Act.
C. Civil penalty actions are normally issued only after a licensee has had an opportunity to
respond (e.g., in a conference or in writing) to the apparent violations contained in an
inspection or OI report.
D. The purpose of a civil penalty is not retributive, but remedial, and should:
1. Encourage licensees to take effective and lasting corrective actions to avoid future
problems by being in compliance; and
2. Create a deterrent that will prevent future violations, both for the individual licensee
and for other, similar licensees.
E. When issuing a civil penalty, the following guidelines should be considered:
1. Separate civil penalties should normally be assessed for separate violations with
different root causes.
2. Separate non-compliances can be grouped as one violation in which case the cited
violations should include both “requirement” paragraphs followed by one “contrary to”
paragraph that addresses the common root cause and notes the resulting
consequence.

140

PART I: Enforcement Process

PART I – 2 Disposition of Violations

3. A single civil penalty should normally be assessed for violations that can be grouped
into one problem when they are closely related, such as cause and affect type
violations, e.g., it would be appropriate to view the failure to perform adequate testing
that results in a piece of inoperable equipment as one problem, warranting
consideration of one civil penalty.
4. Notwithstanding a common root cause, separate civil penalties may be assessed for
several violations that occurred over time, provided that each violation is addressed
in its own citation (i.e., “contrary to” paragraph).
5. Civil penalties may be issued to individual directors or responsible officers of a
nonlicensee vendor organization who knowingly and consciously fail to notify the
NRC in accordance with 10 CFR Part 21. Section 206 of the Energy Reorganization
Act (ERA) authorizes the NRC to impose civil penalties for knowing and conscious
failures to provide certain safety information to the NRC.
6. Section 234 of the AEA gives the NRC the authority to impose civil penalties on "any
person," including licensee employees. However, pursuant to the Enforcement
Policy, except as noted above, the NRC will not normally impose a civil penalty on an
individual.

Preparing an NOV/CP Action
A. The responsible office (region or program office issuing the action) should prepare
NOV/CP citations by using the applicable standard format in Appendix B and the
applicable standard citations in Appendix C.
B. The NOV enclosure should be dated the same date as the cover letter transmitting the
enforcement action.
C. The NOV should include the following elements:
1. A concise, clear statement of the requirement or requirements that were violated,
appropriately referenced, paraphrased, or quoted (legal citation for the violation).
2. A brief statement (usually no more than a few sentences) of the circumstances of the
violation, including the date(s) of the violation and the facts necessary and sufficient
to demonstrate that the requirement was not met ("contrary to" paragraph).
a. To demonstrate noncompliance, the language of the "contrary to" statement
should parallel the applicable language of the requirement.
b. Each violation, including a violation with multiple examples, contains a single
"contrary to" statement.
3. As a general rule, multiple examples of the same violation during the period covered
by an inspection should be included in one citation.
a. The "contrary to" paragraph should generally state the violation and then state:
"...as evidenced by the following examples:" followed by the examples delineated
as 1, 2, 3, etc.

141

PART I: Enforcement Process

PART I – 2 Disposition of Violations

b. When the examples of a particular violation are numerous, sufficient examples
should be cited to convey the scope of the violation and to provide a basis for
assessing the effectiveness of the licensee's corrective actions. Normally three
to five examples should be adequate.
NOTE:
To avoid the release of predecisional information, the top and bottom of
all pages of documents included in escalated enforcement packages
should be marked Official Use Only - Predecisional Enforcement
Information while under review. In addition, enforcement packages
including safeguards information should be clearly marked: "Safeguards
Information - Handle in Accordance With 10 CFR 73.21." Internal staff
reviews and comments should not be made available to the Public (i.e.,
should not be publicly available in ADAMS (PARS)).
4. The severity level proposed for the violation or the severity level of the problem when
several violations have been grouped.
5. The applicable violation examples section of the Enforcement Policy under which the
violation is categorized.
6. The amount of the civil penalty proposed.
7. A statement requesting the licensee’s response, to include:
a. Admission or denial of the alleged violation;
b. The reason for the violation if admitted, and if denied, the reasons why;
c. The corrective steps which have been taken by the licensee or other person and
the results achieved;
d. The corrective steps which will be taken; and
e. The date when full compliance will be achieved.
8. Instructions to the licensee for payment of the civil penalty or for protesting the civil
penalty.
D. Cover letters that transmit escalated NOVs with civil penalties to licensees should be
prepared by the responsible office using the appropriate form in Appendix B.
1. The letter should effectively and succinctly communicate the NRC's perspectives on
the violations and the need for corrective action.
2. In addition to an EA number, cover letters should include a Nuclear Materials Events
Database (NMED) number, if applicable.
3. If possible, the letter should normally be no longer than two pages in length for each
violation and should include the following elements:
a. A summary of the purpose of the inspection or investigation

142

PART I: Enforcement Process

PART I – 2 Disposition of Violations

b. If and how the issue was reported, e.g., 50.72, LER, 50.55(e), etc.
c. When the inspection report(s) related to this action were issued
4. A discussion of whether a conference was conducted, a choice letter was issued, or
a choice call was made, as applicable.
5. A conclusion that a violation(s) occurred and a very brief summary of the event or
circumstances that resulted in the violation. The summary:
a. Should not be as detailed as the discussion in the inspection report; however,
b. It should be sufficiently detailed to permit licensee management and others who
may review the action to understand the safety significance of the violations.
c. A concise discussion of the safety significance of the violation in terms of
whether it is based on the actual safety consequence, potential safety
consequence, potential for impacting the NRC’s ability to perform its regulatory
function, or it was willful and how it relates to severity level categorization.
d. A statement of the base civil penalty amount for the violation or problem and a
discussion addressing the applicable decisional points in the civil penalty
assessment process, i.e., (1) whether the licensee has had any escalated actions
for the site during the past two years or two inspections (include specific
reference to any prior escalated action), (2) whether credit was given for
identification (address only if the answer to (1) is no), and (3) whether credit was
given for corrective action (include a brief description of corrective actions). It
should also include an additional explanation if discretion was exercised,
including a reference to the particular section of the Enforcement Policy.
e. A conclusion of why a civil penalty is being proposed. The conclusion should:
•

•

•
•
•
•
f.

State the regulatory emphasis of the case, e.g., the importance of “design
control,” “system operability,” “procedural compliance,” “attention to detail,”
“accurate and complete information,” “control of licensed material,”
“compliance with technical specifications,” “compliance with dose limits,” etc.;
Address the licensee's shortcomings based on the civil penalty assessment
process that resulted in the civil penalty, i.e., emphasize the importance of
prompt identification and comprehensive correction of violations if the
licensee did not get credit for these factors;
Recognize previous escalated enforcement actions, if applicable;
Indicate who the action was coordinated with, i.e., OE, DEDO, or the
Commission;
Indicate, as appropriate, additional concerns the NRC may have. However,
care should be exercised to keep the correspondence focused on the overall
regulatory concern; and
Discuss any violations included in the enforcement action that were not
assessed a civil penalty.

A description of the response that is necessary from the licensee which should
be expanded if a particular response is desired.

143

PART I: Enforcement Process

PART I – 2 Disposition of Violations

g. A statement that the NRC will determine, based on the licensee's NOV/civil
penalty response, corrective actions, and results of future inspections, whether
further enforcement action is necessary.
h. A statement that the letter and the licensee's response will be made available to
the Public.
i.

Any additional background information that supports the escalated enforcement
action that was not previously submitted to support the panel, e.g., LER, TS,
FSAR.

NOV/CP Coordination, Review and Issuance
A. All NOV/CP actions must be coordinated with OE and headquarters prior to issuance
(refer to Section 5.4).
B. Prior to issuance, the responsible office will electronically mail the proposed enforcement
actions to the OE Enforcement Specialist for formal review and approval.
C. The OE Enforcement Specialist (ES) should review the documents and make any
changes prior to submitting the proposed action to the OGC Assistant General Counsel
for Security and Enforcement, and the applicable program office Enforcement
Coordinator(s)
1. OGC will review the proposed enforcement package and will generally provide
comments to OE within 10 working days of receipt of the package. Acceptance of
these comments does not constitute legal concurrence (or statement of no legal
objection). The attorney must specifically state that there is no legal objection.
2. The applicable program office should review the proposed action with a focus on
ensuring that the technical accuracy of the violations and the significance of the
violations with respect to safety and risk characterizations have been properly
evaluated from an overall agency perspective.
3. Comments should be provided (verbally, electronically, or in writing) to OE within 10
working days.
a. Comments are normally provided to OE through the program office Enforcement
Coordinators.
b. OE will consider timely OGC and program office comments and revise the
enforcement action, as appropriate.
c. The OE ES, after consultation with OE management, will notify the NRR, NMSS,
or NSIR Enforcement Coordinator when substantive program office comments
are not going to be incorporated into the final proposed enforcement action.
D. OE will forward the revised enforcement package to the responsible office indicating
where the action was revised (normally using comparative text) and explaining any
144

PART I: Enforcement Process

PART I – 2 Disposition of Violations

significant changes. The enforcement package will include the invoice document (in
PDF format) prepared by OCFO.
E. The responsible office should review the revised action and, if possible, provide
concurrence on headquarters' changes by the next day. The responsible office will
ensure that the appropriate documents are added to ADAMS.
F. If necessary, OE will forward the OE-approved enforcement package to the DEDO for
review and approval and will advise the DEDO of any significant differences among the
region, the program office, and OGC.
G. As soon as the Enforcement Notification (EN) is issued (Section 1.2.17 of the
Enforcement Manual), the OE ES will send an email to the Office of the Chief Financial
Officer (OCFO) via NonFeeInvoices.Resource to request that an invoice, with an
associated invoice number, be created. The email will include, at a minimum, the name
and address of the licensee, the amount of the proposed civil penalty, the day that the
Notice of Violation and Proposed Imposition of Civil Penalty is expected to be issued,
and the EA number associated with the action. The invoice (normally in PDF format) is
to be sent to the licensee as an enclosure to the final enforcement action to help OCFO
adequately track civil penalty payments to the NRC.
H. OCFO will create the invoice on or around the day the action is expected to be issued
and forward the document to the OE ES. The OE ES should remove any extraneous
pages from the invoice document, as appropriate.
I.

The responsible office should send OE the complete escalated enforcement package
after it has issued the action by including OEWeb.Resource, RidsOeMailCenter
Resource, the Chief, Enforcement Branch, and the ES on distribution.

J. Draft Commission papers (e.g., OI disagreements) should also be electronically mailed
to the addressees listed above, as required.
K. Notwithstanding the stated steps and timeliness goals for the coordination and review
process, it is recognized that additional steps and/or review time may be necessary for
unusually complex cases.

Licensee Notification & Distribution of NOV/CPs
A. Licensee notification, mailing, and distribution should be made according to the following
guidelines:
1. In most cases, the responsible office will notify the licensee by telephone of an
enforcement action involving a civil monetary penalty.
a. In certain cases (determined on a case-by-case basis), headquarters personnel
will provide this notification.
b. In all cases, the licensee will be notified of the proposed civil penalty before the
information is made public.
145

PART I: Enforcement Process

PART I – 2 Disposition of Violations

2. Licensees are to be provided a written copy of escalated enforcement actions as
expeditiously as possible.
a. Electronic transmission of escalated enforcement actions should be used to
provide a written copy to licensees having facsimile equipment.
b. Alternatively, licensees in close geographic proximity to regional offices may
choose to have a written copy picked up by courier from the regional office.
c. Escalated enforcement packages are to be mailed by either Certified Mail
(Return Receipt Requested) or Express Mail. If facsimile equipment is not
available, escalated enforcement packages are to be mailed by Express Mail.
NOTE:
Escalated NOVs should NOT be made publicly available in ADAMS until
confirmation that the licensee has received a copy of the enforcement
action (i.e., e-mail, facsimile, and courier). For individual actions,
contacting the individual is sometimes problematic. In such cases, every
reasonable attempt should be made to contact the individual before the
action is made publicly available in ADAMS.
3. The office in which the package is signed is responsible for its distribution.
a. Escalated NOVs should be emailed to “OEWEB” when they are put in ADAMS to
ensure that they are posted to the Enforcement Web site in a timely manner.
The email should include a statement such as; “the licensee has received a copy
of the enforcement action.”
b. Distribution lists for NRC addressees are in Appendix D.
c. A copy should be sent to the appropriate State. (The region’s State Liaison
Officer will normally handle this for program office cases upon request from OE
to the regional enforcement staff.)
4. For all escalated enforcement actions involving medical licensees, the distribution list
should include the Chairman and Board of Trustees.
B. In order to provide members of the public referenced information as soon as possible,
when a press release is involved, the staff should release any escalated enforcement
action to the public via ADAMS and the Enforcement Web site as soon as possible after
it has notified the recipient of the enforcement action by e-mail or facsimile.

146

PART I: Enforcement Process

PART I – 2 Disposition of Violations

NOTE:
In all cases, the recipient(s) should receive the action before the press
release is issued and before it is publicly available. For individual actions,
contacting the individual is sometimes problematic. In such cases, every
reasonable attempt should be made to contact the individual before the
press release is issued and the action becomes publicly available.

Licensee Response to NOV/CPs
A. The provisions of 10 CFR 2.201 require that a licensee submit a written response
addressing the violations included within a civil penalty action within 20 days of the date
of the civil penalty action or other specified time frame; however, normally 30 days
should be used.
B. If a licensee does not respond to a civil penalty action within the allotted time and the
region has made several unsuccessful attempts to contact the licensee, the region
should contact OE (no later than 60 days from the date of the issuance of the action)
and consideration will be given to whether additional enforcement action is warranted,
i.e., the case should be referred to the Attorney General, an order imposing the civil
penalty should be issued, or whether some other enforcement action is warranted.
C. The region may grant extensions of up to 30 days without OE approval.
1. OE should be promptly notified of any extensions the region grants.
2. OE approval is required for extensions beyond 30 days.
3. Generally, verbal requests for extensions should be promptly followed up with written
confirmation of the length of the extension and the date a reply is due. The
confirmation may either be prepared by the NRC or the licensee. A copy of this
follow-up correspondence is to be sent to OE and the region.
D. As discussed in Paragraphs E – H below, licensees may:
1. Admit the violation occurred, as documented, and pay the civil penalty; or
2. Admit the violation occurred, as documented, and submit a request through OCFO to
enter into an agreement with the NRC to pay the proposed CP by installments at
regularly specified intervals. See Section 2.6.5 for additional guidance on payment
plans.
3. Deny the violation, contest the staff's facts or conclusions, or request mitigation of
the civil penalty (in whole or in part) and pay the civil penalty; or
4. Deny the violation, contest the staff's facts or conclusions, or request mitigation of
the civil penalty (in whole or in part) and NOT pay the civil penalty; or
5. Not respond to the NOV/CP action as required.
147

PART I: Enforcement Process

PART I – 2 Disposition of Violations

E. If the licensee admits that the violation occurred as stated in the NOV and pays the civil
penalty,
1. The region should notify OE, usually within two weeks of receiving the licensee's
response, of the acceptability of the licensee's response. If the region requires
additional information from the licensee, the region should notify OE, and send a
letter directing the licensee to provide the required information.
2. OCFO will verify that the civil penalty payment was received and processed by the
NRC.
a. Monthly, OCFO will run a report out of FAIMIS Business Analytics to identify civil
penalty payments. This monthly report will be provided to OE, the regions and
program offices.
b. After the CP payment is verified, OCFO will send the licensee a letter
acknowledging receipt of CP payment with a copy to OE and the cognizant
region or program office.
c. The OE ES will update EATS accordingly.
F. If the licensee denies the violation, contests the staff's facts or conclusions, or requests
mitigation of the civil penalty, but pays the civil penalty (in whole or in part), see Section
2.8, “Disputed Violation.”
G. If the licensee denies the violation, contests the staff's facts or conclusions, or requests
mitigation of the civil penalty (in whole or in part), and does not pay the civil penalty:
1. The responsible office should follow the disputed violation resolution process
described in Section 2.8 of the Manual.
2. The responsible office should promptly notify the OE ES that the violation is being
contested and that the licensee is not paying the civil penalty.
3. The OE ES will contact OCFO to place the invoice “on hold” pending the outcome of
the regional or program office review of the license’s response.
4. The staff will review the independent review team’s recommendation at an
enforcement panel and determine whether the civil penalty should be imposed,
partially mitigated, or withdrawn.
5. If the panel recommends that the civil penalty should be imposed,
a. An Order Imposing Civil Monetary Penalty will be drafted for review with the
staff's evaluation included as an appendix to the order.
b. The OE ES will coordinate with OCFO (normally via email) to re-issue the original
invoice as an enclosure to the Order cover letter with a new payment due date.

148

PART I: Enforcement Process

PART I – 2 Disposition of Violations

c. The OE ES will forward the re-issued invoice (with the Order package) to the
responsible office once headquarters concurrence is obtained.
d. The responsible office will issue the Order and include the updated invoice
reflecting a new payment due date as an enclosure to the letter. The licensee is
then required to pay the civil penalty.
e. After the CP payment is verified, OCFO will send the licensee a letter
acknowledging receipt of the CP payment, with a copy to OE and the cognizant
region or program office.
f.

After payment confirmation is received from OCFO, the OE ES will update the
case file in EATS accordingly.

6. If the region recommends that the civil penalty should be partially mitigated,
a. An Order Imposing Civil Monetary Penalty will be drafted for review to reflect
partial civil penalty mitigation with the staff's evaluation included as an appendix
to the order.
b. The OE ES will coordinate with OCFO (normally via email) to modify the invoice
to the licensee to reflect the mitigated civil penalty amount and revised due date.
c. The OE ES will forward the re-issued invoice (with the Order package) to the
responsible office once headquarters concurrence is obtained.
d. The responsible office will issue the Order and include the updated invoice
reflecting the new amount and payment due date as an enclosure to the letter.
e. After the CP payment is verified, OCFO will send the licensee a letter
acknowledging receipt of the CP payment, with a copy to OE and the cognizant
region or program office.
f.

After payment confirmation is received from OCFO, the OE ES will update the
case file in EATS accordingly.

7. If the region or program office recommends that the civil penalty should be
withdrawn,
a. The region or program office will prepare a cover letter to the licensee, with the
staff's evaluation as an enclosure to the letter, stating that after further NRC
review a decision was made to withdraw the civil penalty.
b. After the region or program office sends the letter to the licensee, the OE ES will
update the case file in EATS and will request that OCFO cancel or void the
original invoice.
H. If the licensee does not provide a response to the NOV and proposed CP and/or does
not pay the civil penalty within the specified time:

149

PART I: Enforcement Process

PART I – 2 Disposition of Violations

1. The region or program office will draft an Order Imposing a Civil Monetary penalty for
review.
2. The OE ES will coordinate with OCFO to re-issue the original invoice with a new
payment due date.
3. The OE ES will forward the re-issued invoice (with the Order package) to the
responsible office once headquarters concurrence is obtained.
4. The responsible office will issue the Order and include the updated invoice reflecting
the new amount and payment due date as an enclosure to the letter.
5. After the Order Imposing the civil penalty is issued, OCFO will verify that payment by
the licensee was received. OCFO will send the licensee a letter acknowledging
receipt of CP payment with a copy to OE and the cognizant region or program office
6. If payment is not received within the specified timeframe, OCFO will issue a Dunning
Notice 4 to the licensee.
7. If the licensee does not pay within 120 days of the original invoice, OCFO may refer
the case to the U.S. Treasury for collection and notify OE and the region or program
office accordingly.

Civil Penalty Payment Plans
If a licensee can demonstrate financial hardship, the NRC will normally consider payments over
time, which includes interest and administrative charges, rather than reducing the amount of the
civil penalty (see Section 2.5.5). The cover letter and invoice instructions with the NOV/CP will
normally instruct the licensee to contact OCFO directly if they wish to enter into an agreement
with the NRC to pay the civil penalty over time.
A. If the licensee requests to enter into an arrangement for payment of the proposed CP by
installments at regularly specified intervals, OCFO will review the licensee’s justification
and consider whether it qualifies to pay the civil penalty over time through a payment
plan. OCFO may consult with the responsible office and/or OE regarding the licensee’s
justification.
B. Once the licensee has entered into an agreement to pay the CP by installments, OCFO
will include OE and the cognizant region or program office on distribution for the
correspondence formally issuing the promissory note to the licensee.
C. OCFO will verify that the first installment plan payment of the civil penalty was received
and processed by the NRC. OCFO will send the licensee a letter acknowledging receipt
of payment of the first installment plan payment of the civil penalty with a copy to OE and
the cognizant region or program office.
D. The OE ES will keep the case open in EATS until verification of final payment is
received. The ES will be responsible for updating EATS accordingly.
4

A Dunning Notice is a collection letter sent to defaulting debtor demanding payment by the creditor.

150

PART I: Enforcement Process

PART I – 2 Disposition of Violations

E. Once final CP payment is received, the OCFO fee billing contact will send a final
acknowledgment letter to the licensee confirming payment of the CP in its entirety, with
OE and the cognizant region or program office included in distribution.

NOV and NOV/CP Coordination and Review Output Measures
Regional and OE (headquarters) timeliness on all escalated enforcement cases will be reported
on a periodic basis to the Regional Administrators and Program Office Directors.
NOTE:
Start Date: The measuring period starts on the latest of the following dates:
(1) inspection exit date, (2) the date the results of an agency investigation
are forwarded to the staff, (3) the date that the Department of Justice (DOJ)
says NRC may proceed, for cases referred to the DOJ, or (4) the date of the
Department of Labor decision that is the basis for the action. The inspection
exit date will be defined by the region or office performing the inspection and
may be the date of the telephone re-exit. For investigation cases, the start
date will typically not be the re-exit date. However, on rare occasions, when
significant additional inspection effort is needed after issuance of the
investigation results are forwarded to the staff, the re-exit date will be used
as the start date.
The current timeliness output measures recognize that cases which include an OI investigation
require additional time to review the OI report prior to determining the appropriate enforcement
outcome. The following metrics are based upon the output measures reported annually to
Congress as part of the Congressional Budget Justification:
A. Cases that do not include an OI investigation: 100% completed within 160 calendar
days.
B. Cases that include an OI investigation: 100% completed within 330 days of NRC
processing time.

Press Releases for NOVs and NOV/CPs
A. Regional enforcement personnel will inform the regional Public Affairs Officer (RPAO) at
least 72 hours prior to the issuance of an action.
B. In the event that the RPAO decides to issue a press release, the RPAO will provide a
draft press release to the regional staff for concurrence.
1. OE may review press releases in the more significant cases.
2. After the enforcement action has been signed, the RPAO will receive verification that
the licensee has been notified of the action and has received a copy of the
enforcement action.

151

PART I: Enforcement Process

PART I – 2 Disposition of Violations

C. If the enforcement action has not been posted on the Enforcement Web site when the
press release issued, the press release should state that the action will be posted on the
Enforcement Web page.
D. The regional Enforcement Coordinator should consider the following when reviewing
press releases:
1. The severity level categorization;
2. Whether the violation reflects an actual or a potential consequence;
3. Whether the violation impacted the NRC’s ability to perform its regulatory function;
4. Whether the violation was willful; and
5. Whether the licensee reported the violation or identified it.
E. Press releases on the Web typically provide a link to the enforcement action on the
Enforcement Web site.

152

PART I: Enforcement Process

PART I – 2 Disposition of Violations

Orders
An order is a written NRC directive to modify, suspend, or revoke a license; to cease or desist
from a given practice or activity; to impose a civil penalty; or to take such other action as may be
proper. Section 161 of the Atomic Energy Act (AEA) grants the NRC authority to issue orders
that the Commission deems necessary to promote the common defense and security or to
protect health or minimize danger to life or property. This authority is implemented through
NRC regulations in 10 CFR 2.202 and 10 CFR 2.205, and is addressed in the Enforcement
Policy.
Adequate Protection
The AEA establishes “adequate protection” as the standard of safety on which NRC regulation
is based. In the context of NRC regulation, safety means avoiding undue risk or, stated another
way, providing reasonable assurance of adequate protection for the public in connection with
the use of source, byproduct and special nuclear materials. 5 A licensee, or other person, is not
obliged to meet an absolute standard but to provide “reasonable assurance” of adequate
protection of public health and, safety as determined “based on sound technical judgment of the
particulars of a case and on compliance with [the NRC’s] regulations.” 6 The ‘‘reasonable
assurance’’ standard “is not susceptible to formalistic quantification or mechanistic application
[r]ather, whether the reasonable assurance standard is satisfied is based on sound technical
judgment applied on a case-by-case basis.” 7
Safety and security are the fundamental regulatory objectives, and compliance with NRC
requirements plays a fundamental role in giving the NRC confidence that safety and security are
being maintained. NRC requirements, including technical specifications, other license
conditions, orders, and regulations, have been designed to ensure adequate protection -- which
corresponds to “no undue risk to public health and safety” -- through acceptable design,
construction, operation, maintenance, modification, and quality assurance measures. 8 It is the
NRC’s long-held position that compliance with the body of NRC regulations is presumptive of
reasonable assurance of adequate protection (see 1988 Backfit Rule, 53 FR 20603, 20606
(June 6, 1988)).
10 CFR 2.202, Orders
The NRC primarily exercises the authority to issue an order when it determines that doing so is
necessary to either ensure compliance with existing regulations following a violation or
noncompliance (generally referred to as “enforcement orders”); when necessary to protect
public health and safety, and the common defense and security; or to enhance safety or security
(referred to by various names such as “safety” or “security orders” “non-enforcement orders,”
Staff Requirements COMSAJ-97-008, Commission Discussion on Safety and Compliance (Aug. 25,
1997) (https://www.nrc.gov/reading-rm/doc-collections/commission/comm-secy/1997/1997008comsrm.pdf).
6 AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-09-7, 69 NRC 235, 263
(2009).
7 AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), LBP-07-17, 66 NRC 327, 340
(2007) (aff’d, Oyster Creek, CLI-09-7, 69 NRC 235).
8 Staff Requirements COMSAJ-97-008, Commission Discussion on Safety and Compliance (Aug. 25,
1997) (https://www.nrc.gov/reading-rm/doc-collections/commission/comm-secy/1997/1997008comsrm.pdf).
5

153

PART I: Enforcement Process

PART I – 2 Disposition of Violations

“licensing orders,” and “adequate protection orders”). While all NRC orders are issued pursuant
to 10 CFR 2.202, there are some common types of orders based on the underlying reason(s) for
which the staff issues them.
•

Enforcement Orders: These are typically orders that are issued to modify, suspend, or
revoke a license for the purpose of restoring compliance with existing regulations or
license provisions or to prohibit involvement in NRC licensed activities. Orders imposing
civil penalties are also considered enforcement orders (see Section 2.7.10 below). The
authority to issue such orders is delegated from the Commission through the Executive
Director of Operations (EDO), to the Director, Office of Enforcement (OE) in
Management Directive 9.19. The Director, OE may further re-delegate the authority to
issue certain orders to Regional Administrators or Program Office Directors as
appropriate. General guidance on the process of issuing Enforcement Orders is
provided in this section.
The Office of the Chief Financial Officer (CFO) issues fee orders, a form of an
enforcement order, which revokes licenses when licensees fail to pay fees required by
regulations. The authority to issue these orders is delegated from the Commission to
the CFO. The Office of the CFO uses an internal office procedure, “Accounts
Receivable Branch Process Description,” to process these orders.

•

Safety or Security Orders: These orders are typically issued to impose safety or
security related requirements on licensees based on the NRC’s determination that the
requirements of existing regulations or licenses are not sufficient to provide reasonable
assurance of adequate protection of the public health and safety or the common defense
and security. As such, they are commonly referred to as “adequate protection” orders.
In addition, the NRC may impose new requirements when there is a substantial increase
in the overall protection of the public health and safety or the common defense and
security to be derived from the backfit, and the costs of implementation are justified in
view of this increased protection (e.g., order issued pursuant to 10 CFR 50.109(a)(3)).
The authority to issue safety and security orders is delegated from the Commission
through the EDO to the Directors of the offices which report to the EDO and the director
of the Office of International Programs (OIP).
The various program offices utilize internal, office specific procedures that provide
guidance on issuing orders of this type, as follows:
•

•
•

NRR: LIC-106, “Issuance of Safety Orders” and IP 92702, “Follow-up on
Traditional Enforcement Actions Including Violations, Deviations, Confirmatory
Action Letters, Confirmatory Orders, and Alternative Dispute Resolution
Confirmatory Orders”
NMSS: LIC-155, “Procedures for Coordination of Regional Events and
Enforcement Activities”
OIP: LIC-103, “OIP Management of Orders”

Pursuant to 10 CFR 2.202(d), a licensee, contractor, or individual may consent to an order and
waive its hearing rights prior to issuance of the order. Such orders are commonly referred to as
Confirmatory Orders (COs) and create a legally binding agreement between the agency and
licensee or other person to whom the order was issued. Such orders can be issued either to
ensure restoration of compliance with regulations in an agreed upon timeframe or to ensure
adequate protection by codifying a licensee’s commitment to take certain actions, including
154

PART I: Enforcement Process

PART I – 2 Disposition of Violations

those that may have been documented in a Confirmatory Action Letter, or to formalize an
agreement reached with a licensee, contractor, or individual resulting from Alternative Dispute
Resolution. When a CO is issued, it is accompanied by a signed Waiver of Hearing Rights.
Although most orders are effective as of the date specified in the order (frequently the date of
issuance), a hearing request by the licensee, or other person to whom the order was issued,
typically stays the effectiveness of the order until after the hearing. However, under 10 CFR
2.202(a)(5), the NRC may make an order “immediately effective” if the NRC determines that the
public health, safety, or interest so requires, or if the order is in response to a violation involving
willfulness. If NRC makes an order immediately effective, then a challenge to the validity of the
order through a hearing request does not stay the effectiveness of the order during the hearing
process, although the recipient of an immediately effective order may also challenge the
immediate effectiveness.
The NRC will typically conduct follow-up inspections to verify proper implementation of the
specified licensee actions. The staff will determine on a case-by-case basis the extent to which
follow-up is necessary, depending on the requirements of the order. Verifying the
implementation of order requirements is an inspection function and is normally processed
similar to other required inspection follow-up items. In most instances, an order becomes an
integral part of the license and its requirements may remain active for the life of the license.
The NRC may also relax, withdraw, or rescind requirements in an order, either based on a
determination of good cause in accordance with directions contained in the order or upon the
NRC’s own initiative; the requirements may also be superseded if the requirements become
regulation (see Section 2.7.8 below).
Other Orders
Although not issued by the NRC staff, in addition to the orders described above, decisions
resulting from hearings adjudicated by the Atomic Safety and Licensing Board (ASLB) are
issued as orders (commonly called ASLB or Board Orders). If an ASLB decision is appealed to
the Commission, the Commission may issue its decision as a Commission Order. The NRC
may also issue an order to document an approved settlement agreement resulting from a
hearing.

Order Modifying, Suspending, or Revoking License
A. The procedures for issuing orders modifying, suspending, or revoking a license are set
forth in 10 CFR 2.202 and the Enforcement Policy.
B. An enforcement order is a written NRC directive to:
1. Modify, suspend, or revoke a license;
2. Cease and desist from a given practice or activity; or
3. Take such action as may be proper.
C. Orders may also be issued in lieu of, or in addition to civil penalties, as appropriate for
Severity Level I, II, or III violations in accordance with Section 3.7 of the Enforcement
Policy.

155

PART I: Enforcement Process

PART I – 2 Disposition of Violations

D. Unless a separate response is warranted, an NOV need not be issued where an order is
based on violations described in the order. The violations described in the order need
not be categorized by severity level.
E. The NRC may also issue orders to unlicensed persons, including vendors and
contractors (and employees), when the NRC has identified deliberate misconduct that
may cause a licensee to be in violation of an NRC requirement or where incomplete or
inaccurate information is deliberately submitted or where the NRC loses its reasonable
assurance that the licensee will meet NRC requirements with that person involved in
licensed activities.
F. License Modification Orders are issued when some change in licensee equipment,
procedures, personnel, or management controls is necessary.
G. Suspension Orders may apply to all or part of the licensed activity. Ordinarily, a licensed
activity is not suspended (nor is a suspension prolonged) for failure to comply with
requirements where such failure is not willful and adequate corrective action has been
taken. Suspension Orders may be used to:
1. Remove a threat to the public health and safety, common defense and security, or
the environment;
NOTE:
Orders should be prepared within time-frames that are consistent with
the safety and regulatory significance of the situations.
2. Stop facility construction; or
3. Revoke the license when:
a. The licensee has not responded adequately to other enforcement action;
b. The licensee interferes with the conduct of an inspection or investigation;
c. Any other reason for which license revocation is legally authorized.
H. Revocation Orders may be used:
1. When a licensee is unable or unwilling to comply with NRC requirements;
2. When a licensee refuses to correct a violation;
3. When a licensee does not respond to an NOV where a response was required;
4. When a licensee refuses to pay an applicable fee under the Commission's
regulations; or
5. Any other reason for which revocation is authorized under Section 186 of the Atomic
Energy Act (e.g., any condition which would warrant refusal of a license on an
original application).

156

PART I: Enforcement Process

I.

PART I – 2 Disposition of Violations

Cease and Desist Orders may be used to stop an unauthorized activity that has
continued after notification by NRC that the activity is unauthorized.

Immediately Effective Orders
A. Orders can be made immediately effective without prior opportunity for a hearing
whenever the NRC determines that the public health and safety or common defense and
security interests so require, or when the order is responding to a violation involving
willfulness.
These orders must specify the basis for their immediate effectiveness.
1. The discussion should support the finding that the Commission no longer has
reasonable assurance that activities will be conducted without undue risk to the
public's health and safety.
2. Immediately effective orders should be expedited.
3. Immediately effective orders should also be supported by a draft affidavit prepared
by a person who can testify as to why the public health, safety, or interest requires
an immediately effective order in this case.
B. Orders may be effective after a licensee or individual has had an opportunity to request
a hearing.
1. In such cases, the order becomes effective on the day following the deadline for
requesting a hearing, if the licensee does not request a hearing.
2. If the licensee requests a hearing, the order becomes effective as determined in the
hearing process.
C. All orders are published in the Federal Register. The issuing office is responsible for this
action.
D. If an immediately effective order is needed to eliminate an immediate hazard arising
from a violation that also warrants a civil penalty, the order should be expedited, and the
civil penalty issued promptly thereafter.

Preparing an Order Action
A. The responsible office should prepare the civil penalty package, including the following
elements as discussed below:
1. The order should be prepared using the applicable standard format in Appendix B.
Depending on the type of order, the order will include any of the following sections:
a. A section that identifies the licensee, the license, the type of facility and location,
and the date of issuance of the license.
b. A section that describes the relevant events, facts, violations, technical aspects
or legal reasons that substantiate issuing the order.

157

PART I: Enforcement Process

PART I – 2 Disposition of Violations

c. A section that provides the justification for issuing the order.
d. For a confirmatory order, a section that confirms, by the order, a licensee's
commitments to take certain actions.
e. A section that orders modification, suspension, or revocation of the license.
f. A section that states the licensee's obligation to respond to the order.
g. A section that states the opportunity for a licensee or any other person adversely
affected by the order to request a hearing.
2. A cover letter transmitting the order to the licensee should be prepared using the
applicable format in Appendix B, customized to reflect the specific order.
a. The letter should briefly state the basis for the order and describe any actions
required or prohibited based on the order.
b. The letter should also state that failure to comply with the provisions of the order
may result in civil and criminal sanctions and that the letter and its enclosures will
be made available to the Public.
c. A contact should be provided. This is normally the Director, OE.
3. For immediately effective orders, the originating office should provide, with the draft
package, a draft affidavit to support the order's immediate effectiveness.
4. Because 10 CFR 2.202(c)(2)(i) requires the staff to respond to a motion to set aside
immediate effectiveness within 5 days of receipt of the motion, the originating office
must be prepared to make the knowledgeable personnel available to put the affidavit
in final form (see applicable form in Appendix B).

Order Coordination, Review and Issuance
A. All orders are sent to headquarters for review and approval prior to issuance (refer to
Section 5.3 and 5.4).
NOTE:
Orders which are immediately effective should be expedited. Delaying
issuance undermines the basis for the necessity of an immediately effective
order.
B. The order package should be electronically mailed to:
•
•

OE (RidsOeMailCenter Resource)
The OE Enforcement Specialist

The OE enforcement specialist, after consultation with OE management, should review
and make any changes prior to submitting the proposed action to:
•
•

The Assistant General Counsel for Security and Enforcement
The applicable program office Enforcement Coordinator

158

PART I: Enforcement Process

PART I – 2 Disposition of Violations

C. Draft Commission papers (e.g., OI disagreements), order packages and supporting
background materials should be electronically mailed to the licensees listed above, as
required.
D. Notwithstanding the stated steps and timeliness goals for the coordination and review
process, it is recognized that additional steps and/or review time may be necessary for
unusually complex cases.
E. Orders should be given priority treatment by both the region and headquarters offices.
F. OGC review and statement of no legal objection is required on all orders. OGC will
review the proposed order and provide comments to OE within 10 working days of
receipt of the package.
G. The applicable program office should review the proposed action with a focus on
ensuring that the technical accuracy of the violations and the significance of the
violations with respect to safety and risk characterizations have been properly evaluated
from an overall agency perspective.
1. Comments should be provided (verbally, electronically, or in writing) to OE within 10
working days.
2. Comments are normally provided through the program office Enforcement
Coordinators.
3. OE will consider OGC and program office comments and revise the enforcement
action, as appropriate.
4. The OE Enforcement Specialist, after consultation with OE management, will notify
applicable program office Enforcement Coordinator when substantive program office
comments are not going to be incorporated into the final proposed enforcement
action.
H. OE will forward the revised order to the region indicating where the action was revised
(normally through the use of comparative text) and explaining any significant changes.
I.

The region should review the revised order and, if possible, provide concurrence on
headquarters' changes by the next day.

J. OE will obtain a statement of no legal objection or concurrence from OGC and issue the
order if delegated or, if warranted, will forward the OE-approved enforcement package to
the DEDO for review and approval and will advise the DEDO of any significant
differences among the region, the program office, and OGC.
K. For Confirmatory Orders (orders that confirm actions previously agreed upon as a result
of an ADR mediation session or other agreement), the consent of the recipient of the
order is required.
1. The applicable region or program office responsible for developing the order will
forward the draft order to the recipient with the text of the ordering portion of the
proposed order and a cover letter requesting that the appropriate person sign and
159

PART I: Enforcement Process

PART I – 2 Disposition of Violations

return the letter agreeing to the issuance of the order and the fact that the consent
waives the right to request a hearing on the order.
2. The text of the order itself will recite the consent to the order.

Licensee Notification & Distribution of Orders
Licensee notification, mailing, and distribution should be made for orders according to the
following guidelines:
A. In most cases, the region will notify the licensee by telephone of the issuance of an
order.
1. In certain cases (determined on a case-by-case basis), headquarters personnel will
provide this notification.
2. In all cases, the licensee will be notified of the order before the information is made
public.
B. Licensees are to be provided a written copy of the order as expeditiously as possible.
1. Electronic transmission (including electronic mail) should be used to provide a written
copy to licensees having supporting equipment.
NOTE:
A copy of the action should be e-mailed to OEWeb.Resource to ensure
that the action is posted to the Enforcement Web site in a timely manner.
The e-mail should include a statement such as, “The licensee has
received a copy of this action,” so that the Web staff will know that it can
be posted.
2. Orders should be mailed by Express Mail.
C. The issuing Office or Region is responsible for distribution of the order.
1. Distribution lists for NRC addressees are in Appendix D.
2. Orders involving individuals where they are restricted from licensed activities in
general should be sent to the Office of State Programs for distribution to all
Agreement States.
3. For all escalated enforcement actions involving medical licensees, the distribution list
should include the Chairman, Board of Trustees.
D. The staff should release any escalated enforcement action to the public via ADAMS and
the Enforcement Web site as soon as possible after it has notified the recipient of the
enforcement action by e-mail or facsimile. In all cases, the recipient(s) should receive
the action before any press release is issued and before it is publicly available.
160

PART I: Enforcement Process

PART I – 2 Disposition of Violations

E. All orders (including ADR confirmatory orders) are published in the Federal Register.
The issuing Office or Region is responsible for preparation of the Federal Register
Notice and submittal to the Office of Administration for publication.

Press Releases for Orders
A. Press releases are generally issued for all orders other than impositions.
B. Regional enforcement personnel will inform the Regional Public Affairs Officer (RPAO)
when these actions are about to be issued.
1. The RPAO will provide a press release to the regional staff for concurrence.
2. OE may also review press releases in some particularly significant cases.
3. After the enforcement action has been signed, the RPAO will verify that the licensee
has been notified of the action and has received a copy.
4. Press releases on the Web typically provide a link to the enforcement action on the
Enforcement Web site.
5. If the licensee issues its own press release during the intervening period, the RPAO
may proceed to issue an NRC press release.

Licensee Responses to Orders
A. The provisions of 10 CFR 2.202 require that a licensee submit a written response to an
order under oath or affirmation within 20 days of the date of the order or other specified
time frame.
B. The licensee may:
1. Consent to the order,
2. Admit or deny each allegation and provide a basis as to why the order should not
have been issued; and/or
3. Request a hearing.
C. If a licensee does not request a hearing by the deadline provided, the order becomes
effective at that time (for orders not immediately effective at the time of issuance).
D. Questions concerning the effectiveness and scope of a given order should be referred to
OE.
E. If the licensee has requested a hearing and subsequently calls the NRC to discuss the
case, the call should be referred to OE.

161

PART I: Enforcement Process

PART I – 2 Disposition of Violations

1. OE will ensure that the assigned OGC hearings attorney is present in any
discussions.
2. If a licensee requests a hearing, OE will provide a copy to OGC to forward to the
Office of the Secretary of the Commission.
F. Where good cause is shown, the staff may consider granting a licensee an extension of
time to request a hearing. The request for an extension must:
1. Be made in writing to the Director, OE; and
2. Include a statement of good cause for the extension.

Relaxation, Withdrawal, or Rescission of Orders
An order normally provides that the designated agency official may, when an order recipient
shows “good cause,” relax, withdraw, or rescind conditions of the order. The purpose of this
provision is to allow modification of the conditions contained within the order if the
circumstances warrant. The NRC may also relax, withdraw or rescind conditions of an order
upon its own initiative.
A. Generally, the terms relax, withdraw, and rescind, are defined as follows:
•

The NRC “relaxes” a requirement when it exercises its inherent discretionary
authority not to enforce a particular term of an order by extending a deadline,
decreasing a surveillance/reporting frequency, etc. 9 For example, if an order
provides that a licensee must install a required system by June of a specified year,
the NRC may agree to relax the requirement to allow, instead, installing the system
by December of the specified year.

•

The NRC “withdraws” a requirement when it exercises its inherent discretionary
authority not to enforce an order or a particular term of an order at all. For example,
if a licensee demonstrates good cause, or if the NRC determines on its own initiative,
that a system required by the initial order need not be installed at all, the NRC may
withdraw that requirement of the order.

•

The NRC “rescinds” a requirement when it formally decides not to enforce an order
or a particular term of an order due to a discovered mistake of fact or law that was
the basis for a requirement in the initial order. For example, if a licensee
demonstrates good cause for why it need not install a system required by the initial
order, on the basis that the NRC issued the order based on an incorrect
understanding of the licensee’s current protection/capabilities, the NRC may agree to
rescind that requirement of the order.

B. The process for an order recipient to request relaxation, withdrawal, or rescission of an
order is typically described in the order itself. The NRC official under whose authority
the order was issued is typically designated as the official who can approve relaxations,
withdrawals, or rescissions based on good cause, although the same offices that were
See Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-17-06, 85 NRC 96, 103
(2017) (slip op. at 8-9).
9

162

PART I: Enforcement Process

PART I – 2 Disposition of Violations

involved in the original issuance of the order (including OE), should be involved in any
such action. 10 When considering an order recipient’s request to relax, withdraw, or
rescind an order, the staff should evaluate the order recipient’s justification to determine
whether “good cause” exists and whether the action continues to provide reasonable
assurance of adequate protection. Each request is evaluated on a case-by-case basis.
For example, where an order is issued to ensure reasonable assurance of adequate
protection, a justification for relaxing, withdrawing, or rescinding conditions of the order
generally explains the necessary “good cause” in terms of maintaining adequate
protection. Typically, the “good cause” will explain why, based on factors similar to
those below, adequate protection continues to be achieved.
Similarly, in evaluating requests for extensions of time to complete a given requirement
for an adequate protection order, the NRC will consider why the extension is
appropriate. If an extension remains consistent with reasonable assurance of adequate
protection of safety and security, the NRC may agree that circumstances beyond an
order recipient’s control are acceptable reasons for justifying an extension of time, or a
modification in the exact requirement. Of course, if a demonstration of good cause to
relax, withdraw, or rescind an order condition is not present and if the order recipient
does not comply with the original requirement, the staff should consider enforcement
action consistent with the normal enforcement process.
C. The following criteria should be considered when determining whether to relax,
withdraw, or rescind conditions of an order. The list is neither exhaustive nor controlling.
Other factors unique to the specific order should be considered.
For all orders, the staff should consider:
1. Acceptable level of quality and safety. The staff should consider risk impacts.
Specifically, the staff should assess whether the applicable requirements, after
incorporating the proposed relaxation, withdrawal, or rescission, will continue to
provide an acceptable level of quality and safety based on sound technical judgment
applied on a case-by-case basis. 11
2. Temporary relief. If the licensee or applicant has made reasonable efforts to comply
with the requirement, the staff may consider extensions in time. Such extensions
may have no to minimal impact on safety, particularly in light of other actions taken to
reduce risk.
3. Subsequent rulemaking. When a rule associated with the issue is complete and
effective, the staff may relax particular conditions of an order, or withdraw an order
completely. The staff may take these actions on its own initiative—good cause
justification from individual licensees is not necessarily required in such cases.
4. Underlying purpose. Application of the order requirements (that are proposed to be
withdrawn or rescinded) in the particular circumstances would not serve the
underlying purpose of the order or is not necessary to achieve the underlying
This includes informal consultation with the Commission if the Commission specifically approved the
original order.
11 See Oyster Creek, CLI-09-7, 69 NRC at 263; Oyster Creek, LBP-07-07, 66 NRC at 340.
10

163

PART I: Enforcement Process

PART I – 2 Disposition of Violations

purpose of the order. The staff should consider alternative proposals provided in the
licensee’s good cause justification. For example, the licensee may have taken an
alternative approach to address the issue that resulted in the order and implemented
the change in accordance with 10 CFR 50.59. The staff should also consider how
the proposed justification impacts both the individual requirement in the order, as
well as the order’s overall strategy. In addition, if a licensee’s proposed justification
relies in part on its implementation of new compensatory measures, the staff should
be aware that some of those measures might not be legally binding as was the
original order. However, the staff would retain the authority to revoke the relaxation
or withdrawal of an order condition if compensatory measures relied on for “good
cause” are not implemented.
5. Material circumstance change. The staff may consider any other material
circumstance not considered when the order was issued. For example, the staff
should consider additional technical insights developed or significant changes in
operating plans provided in a licensee’s justification for relaxing, withdrawing, or
rescinding conditions of an order. The staff should also consider any new
understanding of the time needed to implement the requirements of the order (e.g., if
there are supply-chain challenges).
D. If a decision is made to relax, withdraw, or rescind any conditions of an order, the staff
should document any changes and the basis/rationale for the changes. In addition, the
staff should assess whether any compensatory measures (where applicable) or any new
or revised conditions need to be captured in a revised order to ensure that they are
legally binding, inspectable, and enforceable.

2.7.8.1

Coordination, Review and Issuance of Relaxation, Withdrawal or
Rescissions to Order Requirements

A. The same offices that were involved in issuing the original order are to be involved
before relaxing, withdrawing or rescinding a provision of the order.
B. If the NRC official under whose authority the order was issued finds it appropriate to
relax, withdraw or rescind an order requirement, OE should be contacted. OE will obtain
the views (as appropriate) of NRR, NMSS, NSIR, OGC, and the DEDO.
1. Typically, OGC should review any substantive changes to an order either based on a
request from the order recipient (for example, order relaxation) or based on staff
initiative. If the order was issued by the Regional Administrator, the Regional
Counsel may review substantive changes to an order.
2. OGC review is generally not necessary when staff is modifying minor, administrative
provisions of an order. For example, if an order recipient seeks relaxation for a brief
time extension to complete a requirement, OGC review is not necessary.
3. If the staff has any questions/concerns about whether OGC review of order
modification is advisable, the staff should consult with the Deputy or Assistant
General Counsel for OGC/SE.
C. In some orders, the Director, OE, is the designated official who can relax the order. In
these cases, OE will obtain the views of the appropriate offices.
164

PART I: Enforcement Process

PART I – 2 Disposition of Violations

Orders Restricting NRC-Licensed Activities and Requiring Notice of
New Employment
A. Orders to unlicensed individuals may include provisions that prohibit involvement in NRC
licensed activities:
1. For a specified period of time (normally the period of suspension would not exceed
five years); or
2. Until certain conditions are satisfied (e.g., completing specified training or meeting
certain qualifications).
B. Although not routinely used, under certain circumstances, orders to unlicensed
individuals may include provisions that:
1. Require notification to the NRC before resuming work in licensed activities, or
2. Require the person to tell a prospective employer or customer engaged in licensed
activities that the person has been subject to an NRC order.
C. Orders to NRC-licensed reactor operators may involve suspension for a specified period,
modification, or revocation of their individual licenses.
D. In order to have current information available to those who make licensing and other
decisions, OE includes orders to individuals on the Enforcement Web site within the
collection of significant enforcement actions to individuals.
E. OE includes any subsequent actions, such as modifications by the official authorized in
the order to relax its requirements and settlements.
F. A list of individuals who are currently subject to restrictions is included in the System of
Records, NRC-3 Enforcement Actions Against Individuals, and the list can be made
available to the public.
1. Distribution of the list is consistent with the Commission's direction when the
Deliberate Misconduct Rule took effect in 1991 that a list be made available. The list
is distributed to assist:
a. Those persons who are involved in licensing activities in making decisions as to
whether an individual may be engaged in licensed activities; and
b. NRC staff members in responding to inquiries concerning individual actions.
G. Employment Restrictions
1. Generally, before relying on information from the Enforcement Web site to deny a
licensing action or to initiate any contact with or to respond to an inquiry from an
employer concerning a prior wrongdoer, the staff should contact OE by telephone or
e-mail to verify the information.

165

PART I: Enforcement Process

PART I – 2 Disposition of Violations

2. For licensing actions, license reviewers should check the Enforcement Web site
before recommending issuance of a license that lists individuals by name, such as
RSO, authorized user, etc.
a. If any name on the proposed license or amendment matches a restricted
individual, the branch chief should be consulted immediately and then OE should
be advised.
b. Since several people may have the same name, staff should review the order to
see if the work history confirms or excludes a match of the individual.
NOTE:
If it appears that a restricted individual is seeking to be involved in
licensed activities, a compliance issue is raised, and OE should be
consulted.
H. Notice to NRC of New Employment
1. Many orders issued to individuals also require the individual to notify the NRC when
that individual accepts a new position that involves work in NRC-licensed activities.
a. This notification requirement may apply to the first employment in NRC-licensed
activities or may apply for a specified period of time. The purpose of the NRC
notification requirement is to:
•
•

Let wrongdoers know and appreciate that their future activities may be
subject to inspection; and
Provide the NRC with an opportunity to inspect the functional area in which a
former wrongdoer is working.

b. When such a notification is received in a regional office, OE should be consulted
to ensure that OE also is aware of the new employment; if OE becomes aware of
the information, OE will advise the appropriate region of receipt of that
information.
2. For materials licensees, the region (or program office) administering the license of
the new employer should insert a notation in the employer's license docket file that
notice has been received that a prior wrongdoer is now employed by that licensee.
a. This notation should not identify the individual by name.
b. The regional enforcement staff will maintain a record of notifications.
c. The note should remain in the file for as long as the order requires notice to the
NRC (Notice Period).
d. If the notice requirement applies only to the first employment, the note should
remain in the file until the next inspection and then be deleted.
e. If the docket file is made available for public review, the note should be withheld.
166

PART I: Enforcement Process

PART I – 2 Disposition of Violations

3. For reactor licensees:
a. OE will notify the NRR Enforcement Coordinator.
b. The NRR Enforcement Coordinator will notify the operator licensing staff in NRR
and the plant Project Manager and Senior Resident Inspector (SRI) of the
wrongdoer's employment.
c. The NRC should not volunteer or advise the licensee that the prior wrongdoer is
employed at its facility. (This is because the order allows the person to be reemployed, and if the NRC notifies the licensee, that information could have the
possible effect of suggesting to the licensee that the individual should not be
employed.)
4. For reactor and materials licensees, the region administering the license of the new
employer, or program office for those licenses administered by headquarters, should
acknowledge the notification in writing.
a. The letter to the individual will advise that the agency expects the individual to
fully understand the requirements of the license and pertinent regulations, that
the NRC expects full compliance with those requirements, and will routinely
inspect that facility in the future.
b. This letter would be prepared by the regional enforcement staff, with OE
concurring.
c. This letter would be made available to the public in the same fashion as the letter
issuing the initial action, e.g., under the IA number and without the new
employer's docket number.
I.

Materials licensees (without resident inspectors):
1. After learning that a prior wrongdoer has been employed by a licensee in its region:
a. The regional office should consider whether the circumstances warrant
increasing the inspection frequency or advancing the next scheduled inspection.
b. If the licensee is to be inspected during the notice period for that individual, the
region should plan to inspect the functional area in which the subject individual is
working.
•
•

•

After seeing the note in the docket file, the inspector should check with the
Enforcement Coordinator to learn the name of the prior wrongdoer.
To ascertain in what functional area the individual is working, the inspector
and the supervisor should discuss ways to identify unobtrusively the
functional area in which the subject individual is working, e.g., an inspector
could look at an organization chart, staff list, film badge list, or internal
telephone directory.
Inspection of the functional area in which the prior wrongdoer works, is a
goal, not a requirement.
167

PART I: Enforcement Process

•

•

PART I – 2 Disposition of Violations

The inspector should not do anything that is likely to alert the licensee that a
prior wrongdoer is working at the facility and the inspector should not go out
of the way to speak with the individual or treat him or her in an unusual
manner.
It is acceptable for the inspector to examine the functional area in which the
individual works, if that can be identified; however, the inspector should err on
the conservative side, and not jeopardize the individual's right to employment
if locating the individual is difficult.

c. The Inspection Report or field notes should not indicate that the inspection
focused on the performance of a prior wrongdoer.
•
•

Any violations or potential wrongdoing identified during the course of the
inspection should be handled in the normal manner, unless it appears that
the prior wrongdoer was involved in the violation.
If the prior wrongdoer was involved in the violation, contact OE.

J. Reactors and other licensees with resident inspectors:
1. A SRI who has been notified by NRR that a previous wrongdoer is now employed at
that facility can often identify unobtrusively the functional area in which the subject
individual is working, using sources such as the licensee's telephone directory.
2. During routine inspection activities, the resident should inspect the functional area in
which the subject wrongdoer is working. The functional area should be periodically
reviewed during the notice period.
3. The Inspection Report should not indicate that inspection activity focused on the
performance of a prior wrongdoer.
a. Any violations or potential wrongdoing identified during the course of the
inspection should be handled in the normal manner, unless it appears that the
prior wrongdoer was involved in the violation.
b. If the prior wrongdoer was involved in the violation, contact OE

Order Imposing Civil Monetary Penalty (Imposition Order)
The NRC issues an Order Imposing Civil Monetary Penalty when a licensee refuses to pay a
civil penalty unless a basis exists for withdrawal of the proposed penalty.
Draft Impositions, with the accompanying evaluation of the licensee's response and draft
transmittal letter to the licensee, are submitted to OE within approximately 45 days of receipt of
the licensee's response.

2.7.10.1 Preparing an Imposition Order Action
The responsible office should prepare the imposition package, including the following elements
as discussed below:

168

PART I: Enforcement Process

PART I – 2 Disposition of Violations

A. An Order Imposing Civil Monetary Penalty should be prepared by using the applicable
standard format in Appendix B. The Order Imposing Civil Monetary Penalty should be
sent to the same person and address as the original proposed enforcement action. The
order should include the following sections:
1. The first section identifies the licensee, the license, the type of facility and location,
and the date of issuance of the license.
2. The second section briefly describes the violation(s), when the Notice of Violation
and Proposed Imposition of Civil Penalty was issued, and when responses were
received from the licensee.
3. The third section is the statement of the decision to impose the civil penalty.
4. The fourth section is the statement that orders payment of the civil penalty.
5. The fifth section states the licensee's opportunity to request a hearing.
B. A cover letter transmitting the order to the licensee should be prepared using the
applicable form in Appendix B. The letter should:
1. Reference previous relevant correspondence between the licensee and the NRC,
very briefly take into account any licensee rebuttal or reasons for mitigation or
remission, impose the civil penalty.
2. State that the order and its enclosures will be made available to the Public.
3. Be more detailed if it is determined that an appendix will not be included (such as in
certain discrimination cases).
C. An appendix may or may not be included as part of the package.
1. OE will coordinate with OGC, the region, and the program office to determine
whether an appendix should be included.
•
•

Certain cases (such as discrimination) may not require an appendix.
If applicable, appendices should be prepared using the applicable form in
Appendix B.

2. The appendix should include:
•
•
•
•

A restatement of each disputed violation;
A summary of the licensee's response;
An NRC evaluation of the response; and
A conclusion.

3. The appendix should discuss only violations that have been assessed a civil penalty.
•
•
•

If the licensee has contested any violations that were not assessed a civil
penalty, those violations should be discussed in a separate document as an
additional enclosure to the cover letter.
In preparing the appendix it is important to understand that it puts the involved
licensee, as well as other licensees, on notice regarding the NRC position. This
permits other licensees to be aware of NRC concerns.
The appendix may improve the NRC's litigative position by demonstrating careful
consideration of the licensee's arguments.

169

PART I: Enforcement Process

PART I – 2 Disposition of Violations

D. The licensee's response to the proposed civil penalty action should be included in the
enforcement package as background material if it has not already been provided in a
panel.

2.7.10.2 Imposition Order Action Coordination, Review and Issuance
A. All Orders Imposing Civil Monetary Penalties are sent to OE and the applicable
headquarters office to issuance (refer to Section 5.3 and 5.4).
B. The imposition package should be electronically mailed to:
•
•

OE (RidsOeMailCenter Resource)
The OE Enforcement Specialist

The OE specialist should review and make any changes prior to submitting the proposed
action to:
•
•

The Assistant General Counsel for Security and Enforcement
The applicable program office Enforcement Coordinator

C. Draft Commission papers, imposition packages and supporting background materials,
including the licensee’s response to the proposed civil penalty, should also be
electronically mailed to the addressees listed above, as required. Impositions should be
given priority treatment by both the region and headquarters offices.
D. Notwithstanding the stated steps and timeliness goals for the coordination and review
process, it is recognized that additional steps and/or review time may be necessary for
unusually complex cases
E. OGC review and statement of no legal objection is required on all Orders Imposing Civil
Monetary Penalties. OGC will review the proposed order and provide comments to OE
within 10 working days of receipt of the package.
F. The applicable program office should review the proposed action with a focus on
ensuring that the technical accuracy of the violations and the significance of the
violations with respect to safety and risk characterizations have been properly evaluated
from an overall agency perspective.
1. Comments should be provided (verbally, electronically, or in writing) to OE within 10
working days.
2. Comments are normally provided through the program office Enforcement
Coordinators.
3. OE will consider OGC and program office comments and revise the enforcement
action, as appropriate.
4. The OE Enforcement Specialist, after consultation with OE management, will notify
the NRR, NMSS or NSIR Enforcement Coordinator when substantive program office

170

PART I: Enforcement Process

PART I – 2 Disposition of Violations

comments are not going to be incorporated into the final proposed enforcement
action.
5. OE will forward the revised order to the region indicating where the action was
revised (normally through the use of comparative text) and explaining any significant
changes.
G. The region should review the revised order and, if possible, provide concurrence on
headquarters’ changes by the next day.
H. OE will obtain a statement of no legal objection from OGC and issue the action, if
delegated to OE or, if warranted, will forward the OE-approved enforcement package to
the DEDO for review and approval and will advise the DEDO of any significant
differences among the region, the program office, and OGC.

2.7.10.3 Licensee Notification & Distribution of Imposition Orders
Licensee notification, mailing, and distribution of impositions should be made according to the
following guidelines:
A. In most cases, the region will notify the licensee by telephone of an Order Imposing Civil
Monetary Penalty.
1. In certain cases (determined on a case-by-case basis), headquarters personnel will
provide this notification.
2. In all cases, the licensee will be notified of the order before the information is made
public.
3. A copy of the action should be e-mailed to OEWeb.Resource to ensure that the
action is posted to the Enforcement Web site in a timely manner.
B. OE is to provide licensees with a copy of the order as expeditiously as possible.
Electronic transmission should be used to provide a copy to licensees having facsimile
equipment. Orders should be mailed by Express Mail.
C. OE is responsible for distribution of the order.
1. NRC distribution lists are in Appendix D.
2. A copy should also be sent to the appropriate State.
3. For all escalated enforcement actions involving medical licensees, the distribution list
should include the Chairman, Board of Trustees.
NOTE:
In all cases, the recipient(s) should receive the action before any press
release is issued and before it is publicly available.

171

PART I: Enforcement Process

PART I – 2 Disposition of Violations

D. The staff should release any escalated enforcement action to the public via ADAMS and
the Enforcement Web site as soon as possible after it has notified the recipient of the
enforcement action by e-mail or facsimile.
E. All Orders (including ADR confirmatory orders) Imposing Civil Monetary Penalties are
published in the Federal Register. The issuing office is responsible for this action.

2.7.10.4 Press Releases for Imposition Orders
A. Press releases are normally issued only for impositions where the amount of the civil
penalty has been changed from the original civil penalty action.
NOTE:
To avoid the release of predecisional information, the top and bottom of all
pages of documents included in escalated enforcement packages should be
marked Official Use Only - Predecisional Enforcement Information. In
addition, enforcement packages including safeguards information should be
clearly marked: "Safeguards Information - Handle in Accordance With 10
CFR 73.21." Internal staff reviews and comments should not be made
available to the Public (i.e., should not be publicly available in ADAMS
(PARS)).
B. Regional enforcement personnel will inform the Regional Public Affairs Officer (RPAO)
when an imposition is about to be issued.
1. For impositions involving a press release:
a. The RPAO will provide the draft press release to the regional staff for
concurrence.
b. Upon request, OE may also review press releases in particularly significant
cases.
2. After the enforcement action has been signed, the RPAO will verify that the licensee
has been notified of the action and has received a copy.
a. Press releases on the Web typically provide a link to the enforcement action on
the Enforcement Web site.
b. If the licensee issues its own press release during the intervening period, the
RPAO may proceed to issue an NRC press release.
C. Press releases for impositions should indicate whether the originally proposed civil
penalty is being imposed partially or in full.

172

PART I: Enforcement Process

PART I – 2 Disposition of Violations

2.7.10.5 Licensee Response to Imposition Order
A. The provisions of 10 CFR 2.202 require that a licensee submit a written response to an
order under oath or affirmation within 20 days of the date of the order or other specified
time frame; however, normally 30 days should be used.
A licensee may either:
• Pay the civil penalty; or
• Request a hearing.
B. If a licensee does not respond to the order within the allotted time, the region should
contact OE and the case will be referred to the Attorney General for collection.
C. If a licensee requests a hearing, OE will provide the request to OGC to forward to the
Office of the Secretary of the Commission.
D. Where good cause is shown, the staff may consider granting a licensee an extension of
time to request a hearing.
1. A licensee's request for an extension must be made in writing to the Director, OE;
and
2. Include a statement of good cause for the extension.

173

PART I: Enforcement Process

PART I – 2 Disposition of Violations

Disputed Violations
A. Licensees, or non-licensed entities (e.g., vendors or individuals) may deny or dispute
non-cited violations, cited violations, proposed civil penalties, or administrative actions
such as a Notice of Nonconformance or Notice of Deviation.
B. Licensees or non-licensed entities may provide a basis as to why an order (e.g., an
order imposing civil penalties) should not have been issued or request a hearing in
response to an order. See Section 2.7.7 for disputes involving orders.

Disputed Violation Resolution Process
A. If a licensee submits a contestation of the facts and/or conclusions regarding an NOV (or
NCV) or disagrees with the severity level or significance of the violation, the region or
headquarters program office will treat the response as a disputed violation.
B. The reviewers should follow the ROP or cROP (e.g., IMC 0609 or IMC 2519) and
applicable Manual guidance if a power (or construction) reactor licensee disagrees with
the significance of a colored finding (i.e., Green, White, Yellow, or Red).
C. Ensure the disputed violation has an EA number.
1. Disputed enforcement actions that were originally issued with an EA number should
be tracked under the same EA number.
2. The region or headquarters program office (collectively referred to as “the region”)
will obtain an EA number if the disputed enforcement action did not have an EA
number when issued.
D. The region receiving the disputed violation letter will forward a copy of the incoming
correspondence to the same persons who were on concurrence or distribution for the
original enforcement action. In addition, the regional enforcement coordinator will
ensure that copies of the letter are sent to the OE Deputy Director and OE/EB Branch
Chief.
E. The EB/BC will assign an ES for the disputed violation review. Typically, a new ES will
be assigned to a case that involved an escalated enforcement action. The previous ES
should be consulted to understand the specifics of the case.
F. Within 2 weeks of the date of the letter disputing the violation, the region will hold a
planning meeting with the assigned ES, the program office representative (i.e., branch
chief or higher) and OGC attorney, as appropriate, to discuss the schedule and other
aspects associated with reviewing the contentions raised by the licensee. The regional
enforcement coordinator should coordinate the planning meeting.
The planning meeting should focus on:
1. The licensee’s justification for disputing the violation, including whether the licensee
raised a formal backfitting appeal, or is raising backfit-related questions or concerns.
If backfitting is involved in any manner, see Section 2.8.3.

174

PART I: Enforcement Process

PART I – 2 Disposition of Violations

2. Determining the number and availability of staff members needed to review the
various points of contention raised in the letter. These persons should be
independent of the original enforcement action.
a. If the original enforcement action was non-escalated , the licensee’s denial
should be reviewed by independent reviewers from the impacted region or
program office (with an option to assign the review to another region or program
office).
b. If the original enforcement action was an escalated concern, the licensee’s denial
should be reviewed by a team of independent reviewers and led by a team lead
from another region and/or program office. An independent OE ES should also
be assigned to the team.
3. The expected time frame needed to (1) review the licensee’s basis for the denial, (2)
formulate a draft agency response, (3) approve the staff’s recommendation(s) which
may include conducting an enforcement panel, and (4) issuing a formal response to
the licensee.
4. The review schedule should reflect the goal of providing a final response to the
licensee as soon as practical, generally within 90 calendar days from the date of the
receipt of the dispute letter. The following should be considered:
•
•
•
•
•

Is the disputed violation technically complex such that program office support is
needed to resolve the dispute?
Does the disputed violation involve a generic issue, a licensing issue, or a policy
issue?
Does the disputed violation affect more than one region, but would not be
considered a generic issue?
Have differing opinions (formal or informal) been raised within the region on the
disputed violation, or between the region and headquarters on the disputed
violation?
Is there general alignment on the scope of the review needed?

G. The assigned OE ES will document the planning meeting as a “panel” in EATS, generate
a Strategy Form to record the agreed-upon path forward and coordinate and
disseminate correspondence when necessary.
H. After the planning meeting, the region will send a letter to the licensee acknowledging
receipt of their dispute letter and provide a general time frame when an NRC response
will be forthcoming (based on the schedule agreed to at the planning meeting). The
acknowledgment letter should be sent no later than 30 days from the date of receiving
the licensee’s dispute letter. An acknowledgement letter is not required if a licensee’s
dispute can be answered within 30 days.
I.

The following guidance should be followed by the assigned reviewers when evaluating
the dispute letter:
1. The staff will conduct its review based only on docketed and readily available
licensee information.
175

PART I: Enforcement Process

PART I – 2 Disposition of Violations

2. The staff should ensure that all major points of contention are addressed in the
NRC’s response. Any errors identified with the original enforcement action must be
addressed in the NRC’s response letter. See Section 2.8.2, “Documenting
Responses to Disputed Violations,” for additional guidance.
3. Licensee appeals to reduce the severity level or significance of a violation will be
considered as having sufficient merit for review if the licensee’s contention falls into
one of the following categories:
a. The severity level or significance determination was inconsistent with the Policy,
applicable SDP guidance, or lacked sufficient justification.
b. The licensee submits new information which was not available at the time of the
PEC or Regulatory Conference, or included in their written response. The new
information should be received within a reasonable period as agreed upon
between the licensee and the staff.
c. If the licensee disagrees with the severity level or significance of the violation but
does not provide sufficient justification for its position, the acknowledgment or
final response letter should state that the NRC reviewed the letter and concluded
that the licensee did not provide an adequate basis to reclassify the severity level
or significance; therefore, the NRC maintains that the violation occurred as
stated.
4. The licensee’s challenge to a proposed civil penalty, to include requesting a
reduction of the civil penalty amount, should be assessed in accordance with the
Policy and Section 2.5, “Determining Whether a Civil Penalty Should Be Proposed.”
In addition to the civil penalty assessment process, Section 2.5 addresses a
licensee’s ability to pay as well as considerations for small businesses.
J. The review team has the flexibility to document its findings as appropriate (e.g., in a
report or white paper); however, under the direction of the responsible supervisor the
team will document its review in a draft response letter.
K. The responsible supervisor will schedule an enforcement panel or SERP to review the
team’s recommended agency response to the disputed violation. The regional
enforcement coordinator will normally schedule and organize this panel meeting.
•

The team’s report and/or draft response letter should be forwarded to the OE Deputy
Director, EB Branch Chief, OE ES, and the appropriate regional and program office
staff at least 7 days before the scheduled panel. The OE ES will forward the
information to OGC, as appropriate.

•

The panel may be held virtually through the modified panel process if the draft
recommendation upholds the original enforcement action, with no changes.

•

The meeting will generally follow the normal enforcement panel process.

•

The assigned OE ES will document the review panel outcome in EATS and generate
a Strategy Form to record the agreed-upon resolution of the dispute.
176

PART I: Enforcement Process

PART I – 2 Disposition of Violations

•

Representatives from the region, program office and OE involved in the original
enforcement action should be invited to the enforcement panel or SERP to
understand the rationale for any recommended changes to the original violation and
the proposed NRC response.

•

In addition, the panel members should discuss whether any lessons learned from the
review team should be communicated to a larger audience.

Documenting Responses to Disputed Violations
A. OE concurrence is required when responding to a licensee’s dispute letter.
B. The NRC response letter should address all major points of contention described in the
licensee’s denial letter.
1. The region will prepare the response letter and submit it for review and concurrence
to OE by sending it to the RidsOeMailCenter Resource address and the responsible
OE ES for the case.
2. The response letter to the disputed violation should reference the appropriate EA
number.
3. OE’s review will consider both the application of the enforcement process (e.g.,
severity level and significance) and appropriateness of the violation outcome.
4. OE will coordinate the review of the proposed response with the panel members
associated with the original action.
C. The letter’s subject line should appropriately describe the agency’s response as follows:
1. If the NRC maintains that the original enforcement action remains valid, the subject
line of the letter should include the phrase, “DISPUTED NON-CITED (or CITED)
VIOLATION UPHELD.”
2. If the NRC concludes that a revised enforcement action should be issued, the
subject line should include the phrase, “DISPUTED NON-CITED (or CITED)
VIOLATION REVISED.”
3. If the NRC concludes that the original violation or action should be withdrawn, the
subject line should include the phrase, “DISPUTED NON-CITED (or CITED)
VIOLATION RESCINDED.”
D. The responsible OE ES will document the outcome of the staff’s review in EATS as
follows:
1. Add an “Issue NRC Response” activity under the “Disputed Violation” action and
enter the appropriate date of the letter and ADAMS Accession Number. The ES
should enter any keywords, if necessary.
2. If the NRC is withdrawing a previously issued NCV, NOV or NOV/CP:
177

PART I: Enforcement Process

PART I – 2 Disposition of Violations

a. The ES will add a “Letter Withdrawing Action” action and enter the appropriate
date of the letter and ADAMS Accession Number to the case record in EATS.
b. If a previously issued enforcement action being withdrawn was an escalated
action already documented in EATS, the ES will annotate the appropriate “Issue
NOV,” Issue NOV/CP” or “Problem Issued” activity by setting the “Withdrawn”
field to ‘Yes.’
E. The responsible OE ES will also document the disputed violation and the outcome of the
staff’s review in the (internal NRC only) “Disputed and Violations” list on OE’s
SharePoint site.
F. The letter containing the originally issued violation (or finding) should be revised to
include an opening paragraph that states the following (or similar).
The U.S. Nuclear Regulatory Commission has revised [or rescinded] a violation [or
finding] that was issued in this letter on [Date] (ADAMS Accession Number). The NRC’s
revision [or rescission] is a result of the agency’s review of your letter dated [Date]
(ADAMS Accession Number), in which you contested the Notice of Violation (NOV) [or
Non-Cited Violation] [or Finding] associated with [describe] that is located in Section [x]
of Enclosure [y] of this letter. As a result of NRC’s review of your letter, the NOV [or
NCV] has been revised [or rescinded]. The details associated with this revision [or
rescission] was provided to you in an NRC letter [dated] (ADAMS Accession Number).
Additionally, the revised report must receive a new and unique ADAMS accession
number and must be added into an ADAMS package which contains the original report.

Backfitting Concerns and Appeals
A. Informal Backfitting “Concerns”
1. A licensee might raise or refer to backfitting “concerns” when disputing a violation(s).
A backfitting “concern” will not be treated as a formal “backfit appeal” unless the
licensee explicitly identifies its concerns as such. A formal backfit appeal is
processed in accordance with MD 8.4, “Management of Backfitting, Forward Fitting,
Issue Finality, and Information Requests.”
2. Before the NRC assesses a licensee’s written backfitting concern, the NRC should
follow up with the licensee as soon as practical via telephone communication to
ensure NRC staff understands the licensee’s backfitting concern as well as the
licensee’s intent (e.g., whether the licensee intends the written correspondence to
constitute a formal backfit appeal). This communication serves to ensure the most
efficient and effective use of licensee and NRC staff resources.
3. The licensee’s decision not to pursue a formal backfit appeal should be documented
in the dispute response’s cover letter. The letter should state that the staff
considered the licensee’s stated backfit ‘concerns.’ However, it is not necessary for
the response to provide an in-depth, point-by-point assessment of every aspect of
the licensee’s backfitting ‘concern.’ Additionally, the letter should inform the licensee

178

PART I: Enforcement Process

PART I – 2 Disposition of Violations

that a ‘formal’ backfit appeal would be processed in accordance with the guidance in
MD 8.4.
B. Formal Backfit Appeals
1. If the licensee requests that the disputed violation be reviewed as a formal backfit
appeal, MD 8.4 will govern the NRC’s review process and timeframes.
2. Any response to a disputed violation will be held in abeyance until the MD 8.4 backfit
appeal process is completed. The region’s acknowledgment letter to the licensee
will note that the disputed violation is being reviewed under MD 8.4 and that the NRC
will not respond until the formal backfit appeal process is completed.
3. The results of the backfit appeal will inform the ultimate dispositioning of the disputed
violation and the NRC’s response.
4. The NRC’s response letter should appropriately describe the agency’s response
consistent with Section 2.8.2, Paragraph C.

179

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

PART I - 3 EXERCISE OF DISCRETION
This section provides information regarding:
•

The use of enforcement discretion in accordance with Section 3 of the NRC’s
Enforcement Policy

180

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

Use of Enforcement Discretion
According to the Enforcement Policy, the NRC may choose to exercise discretion and either
escalate or mitigate enforcement sanctions or otherwise refrain from taking enforcement action
within the Commission’s statutory authority. The use of enforcement discretion allows the NRC
to determine what actions should be taken in a particular case, notwithstanding the guidance
contained in the Policy. This section describes how discretion may be used in determining the
severity levels of violations and the appropriate enforcement sanctions to be taken.
NOTE:
The mitigation discretion described in the Enforcement Policy does not normally
apply to violations associated with issues evaluated by the SDP. The ROP uses the
Agency Action Matrix which has provisions to consider extenuating circumstances
that were previously addressed through enforcement mitigation to determine the
agency response to performance issues. (See SECY-00-0061.)

Violations Identified During Extended Shutdowns or
Work Stoppages
A. The NRC may refrain from issuing an NOV or a proposed civil penalty for a violation that
is identified after:
1. The NRC has taken significant enforcement action based upon a major safety event
contributing to an extended shutdown of an operating reactor or a material licensee
(or a work stoppage at a construction site); or
2. The licensee enters an extended shutdown or work stoppage related to generally
poor performance over a long period of time, provided that the violation:
a. Is documented in an inspection report (or inspection records for some material
cases); and
b. Meets all of the following criteria:
•

•
•
•
•

It was either licensee-identified as a result of a comprehensive program for
problem identification and correction that was developed in response to the
shutdown or identified as a result of an employee allegation to the licensee
(Note: Even if the NRC identifies the violation, discretion may be appropriate
if all other criteria are met);
The violation is based upon activities of the licensee prior to the events
leading to the shutdown;
The violation would not be categorized at Severity Level I;
The violation was not willful; and
The licensee's decision to restart the plant requires NRC concurrence.

181

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

3. Violations associated with findings identified and assessed under the ROP are not
normally considered for discretion under this section of the Policy.

Violations Involving Old Design Issues
A. For operating facilities, the NRC may refrain from proposing a civil penalty for a Severity
Level II or III violation involving a past problem, such as an engineering, design, or
installation deficiency, provided that the violation:
1. Is documented in an inspection report (or inspection records for some material
cases) that includes a description of the corrective action; and
2. Meets all of the following criteria:
a. It was licensee-identified as a result of the licensee’s voluntary initiative;
b. It was or will be corrected, including immediate corrective action and long term
comprehensive corrective action to prevent recurrence, within a reasonable time
following identification (this action should involve expanding the initiative, as
necessary, to identify other failures caused by similar root causes); and
c. It was unlikely to be identified (after the violation occurred) by efforts such as
normal surveillances or routinely scheduled quality assurance (QA) activities.
B. The NRC may refrain from issuing an NOV for cases that meet the above criteria
provided the violation was caused by conduct that is not reasonably linked to present
performance, e.g., violations that are at least 3 years old or violations that occurred
during plant construction.
1. This discretion may not apply if the licensee should have reasonably identified the
violation earlier.
2. Exercising this discretion encourages licensee efforts to identify and correct subtle
violations (that are not likely to be identified by routine efforts) before degraded
safety systems are called upon.
NOTE:
The intent of the ROP is to encourage licensees to pursue risk significant
issues. The current enforcement program gives credit to licensees for
old design issues that were licensee-identified, not likely to be identified
by routine licensee efforts, and where appropriate corrective actions have
been or will be taken by the licensee. This exercise of enforcement
discretion places a premium on licensees initiating efforts to identify and
correct subtle violations that are not likely to be identified by routine
efforts before degraded safety systems are called upon to work.
C. Discretion is not generally applied to departures from the FSAR when:

182

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

1. The NRC identifies the violation unless it was likely in the staff's view that the
licensee would have identified the violation in light of the defined scope,
thoroughness, and schedule of the licensee's initiative;
2. The licensee identifies the violation as a result of an event or surveillance or other
required testing where required corrective action identifies a FSAR issue;
3. The licensee identifies the violation but had prior opportunities to do so, e.g., the
licensee was aware of the departure from the FSAR and failed to correct it earlier;
4. There is willfulness associated with the violation;
5. The licensee fails to make a report required by the identification of the departure
from the FSAR; or
6. The licensee either fails to take comprehensive corrective action or fails to
appropriately expand the corrective action program with a defined scope and
schedule.

Violations Identified Due to Previous Escalated
Enforcement Actions
In accordance with the Enforcement Policy, the NRC may refrain from issuing an NOV or a
proposed civil penalty for a Severity Level II, III, or IV violation that is identified after the NRC
has taken escalated enforcement action, provided that the violation:
A. Is documented in an inspection report (or inspection records for some material cases)
that includes a description of the corrective action; and
B. Meets all of the following criteria:
1. It was licensee-identified as part of the corrective action for the previous escalated
enforcement action;
2. It has the same or similar root cause as the violation for which escalated
enforcement action was issued;
3. It does not substantially change the safety significance or the character of the
regulatory concern arising out of the initial violation;
4. It was or will be corrected, including immediate corrective action and long term
comprehensive corrective action to prevent recurrence, within a reasonable time
following identification; and
C. It would not be characterized at Severity Level I.

183

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

Violations Involving Certain Discrimination Issues
A. The NRC may refrain from taking enforcement action for cases involving discrimination
when a licensee who, without the need for government intervention:
1. Identifies an issue of discrimination; and
2. Takes prompt, comprehensive, and effective corrective action to address both the
particular situation and the overall work environment, i.e., to establish a safetyconscious workplace that includes aggressive licensee follow-up providing a
message that retaliation is not acceptable within the workplace.
B. The NRC may refrain from taking enforcement action for cases where:
1. A complaint is filed with the DOL, but the licensee settles the matter before the DOL
Area Office makes a finding of discrimination; or
2. A finding is made against the licensee; however, the licensee chooses to settle
before the evidentiary hearing begins.
a. The NRC policy of not normally citing violations in such cases might encourage
licensee settlements, thereby reducing the potential for a chilling effect.
b. Settlements normally provide a more timely remedy for the complainant and may
be used to demonstrate the licensee's commitment to a retaliation-free
environment.
C. The NRC may exercise its discretion not to take enforcement action:
1. When the licensee has publicized that:
a. A complaint of discrimination for engaging in protected activity was made to the
DOL; and
b. The matter was settled to the satisfaction of the employee (the terms of the
specific settlement agreement need not be posted); and
c. When the DOL Area Office finds discrimination, and the licensee has taken
action to positively reemphasize that discrimination will not be tolerated.
d. When a person comes to the NRC without going to the DOL and the matter is
promptly settled thereafter prior to the NRC conducting an investigation or, if an
investigation is initiated, prior to the NRC making a substantial effort on it.
NOTE:
The licensee might publicize information that discrimination will not be
tolerated by posting a notice, a newsletter, a handout, or by some other
means; however, the information should be conveyed in a manner
designed to minimize the chilling effect on others.
D. Even if no formal enforcement action is taken, the NRC would:

184

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

1. Issue a letter, as is normal practice in similar cases, to emphasize the need for
lasting remedial action;
2. Inform the licensee that future violations may result in enforcement action; and
3. In certain cases, as part of the settlement process, also consider entering into a
consent order with the licensee to address remedial action.
E. Whether the exercise of discretion is appropriate depends on the circumstances of the
case.
1. Enforcement discretion would not normally be appropriate for the following four types
of cases, however, depending on the circumstances, mitigation for corrective actions
may be appropriate:
a. Allegations of discrimination as a result of providing information directly to the
NRC;
b. Allegations of discrimination caused by a manager above first-line supervisor
(consistent with the current Enforcement Policy classification of Severity Level I
or II violations);
c. Allegations of discrimination where a history of findings of discrimination (by the
DOL or the NRC) or settlements suggest a programmatic rather than an isolated
discrimination problem;
d. Allegations of discrimination which appear particularly blatant or egregious.
2. Enforcement discretion would not normally be appropriate for cases where the
licensee does not appropriately address the overall work environment (e.g., by using
training, postings, revised policies or procedures, any necessary disciplinary action,
etc.) to communicate corporate policy against discrimination.

Violations Involving Special Circumstances
A. Notwithstanding the outcome of the normal civil penalty assessment process, the NRC
may reduce or refrain from issuing a civil penalty or an NOV for a Severity Level II, III, or
IV violation.
B. Exercise of this discretion will be based on the merits of the case after considering the
guidance in the Enforcement Policy and the NRC Enforcement Manual and such factors
as:
•
•
•
•
•
•
•

The age of the violation;
The technical and regulatory significance of the violation;
The clarity of the requirement;
The appropriateness of the requirement;
The overall performance of the licensee;
Whether the licensee reported significant information to the NRC that was not
otherwise required to be reported to the NRC; and
Other relevant circumstances, including any that may have changed since the
violation.

185

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

NOTE:
Discretion involving special circumstances is expected to be exercised only
where application of the normal guidance in the Enforcement Policy is
unwarranted. OE concurrence is required before exercising enforcement
discretion under Section 3.5 of the Policy.
C. The NRC may refrain from issuing enforcement action for violations resulting from
matters not within a licensee's control, such as equipment failures that were not
avoidable by reasonable licensee quality assurance measures or management controls.
In these cases, the staff should document the basis for its decision to exercise
discretion. For example:
“The staff has reviewed your root cause analysis of the event and has concluded that the
equipment failure could not have been avoided or detected by your quality assurance
program or other related control measures. Therefore, in accordance with Section 3.5 of
the Enforcement Policy, the NRC is exercising enforcement discretion and will not issue
a violation for this matter.”
NOTE:
If the staff determines that enforcement discretion should be granted for an
issue with no performance deficiency, it should be documented as meeting
Section 3.10 of the Enforcement Policy instead of Section 3.5. Any nonescalated enforcement action that does not receive this enforcement
discretion should be documented in accordance with Table 3 or Table 8 of
Inspection Manual Chapter 0611, “Power Reactor Inspection Reports.”
D. Generally, licensees are held responsible for the acts of their employees and
contractors.
1. Licensees will normally be cited at the same significance level that their employee or
contractor is cited.
2. Discretion reducing the significance level of the citation issued to the licensee may
be warranted in cases where, despite the thoroughness of the licensee’s oversight
and auditing programs, the licensee’s employee or contractor is still cited for a
violation.
E. The staff may consider exercising enforcement discretion for inaccurate or incomplete
performance indicator (PI) data submitted to the NRC as part of the ROP.
1. Exercising enforcement discretion on a case-by-case basis should take into account
whether the licensee has completed the initial stage of learning and recognizing
ongoing PI development activities.
2. The staff may consider exercising discretion if new PIs are developed.

186

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

3. OE will work with the regional offices and NRR in determining whether enforcement
discretion should be exercised for all future PI-related 10 CFR 50.9 violations.
F. In reaching decisions as to the appropriate sanction against licensees who qualify as
small entities, the staff should also consider the intent of the Small Business Regulatory
Enforcement Fairness Act (SBREFA).
1. There may be cases in which, after considering the normal adjustment factors and
the size of a qualified small entity to whom a civil penalty may be issued, the staff
believes that the penalty should be reduced or eliminated. In those cases, it is
appropriate to propose such a modification based on the intent of the SBREFA.
2. The modification of a civil penalty based on the intent of SBREFA should be treated
as an exercise of enforcement discretion.

Use of Discretion in Determining the Amount of a Civil
Penalty
A. When application of the normal guidance in the Enforcement Policy does not result in an
appropriate civil penalty sanction, the NRC may exercise discretion to apply its full
enforcement authority, where warranted to:
1. Propose a civil penalty where application of the civil penalty assessment factors in
Section 2.3.4, “Civil Penalty,” of the Policy would otherwise result in zero penalty;
2. Escalate the amount of the resulting civil penalty to ensure that the proposed civil
penalty appropriately reflects the significance of the issue, including assessing civil
penalties for continuing violations on a per day basis, up to the current statutory limit
specified in 10 CFR 2.205, as published annually in the Federal Register. This
amount is adjusted annually by the Federal Civil Penalties Inflation Adjustment Act
Improvements Act of 2015. The civil penalty amounts are published in the Policy;
3. Mitigate the amount based on merits of the case and the ability of the various
classes of licensees to pay.
NOTE:
Exercise of discretion under Section 3.6 of the Policy requires prior
approval by the Director, OE, and the DEDO and consultation with the
EDO or Commission, as warranted.
B. In Section 2.3.10, “Commission Notification and Consultation on Enforcement Actions,”
of the Policy, the Commission must be notified of all enforcement actions involving civil
penalties and must be consulted for any proposed civil penalty for a single violation or
problem that is greater than 3 times the value in Tables A and B in Section 8.0 of the
Policy for the severity level violation being considered.

187

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

Escalation of Civil Penalties
A. Notwithstanding the outcome of the normal civil penalty assessment process addressed
in Section 2.3.4 of the Enforcement Policy, the NRC may either:
1. Propose a civil penalty where application of the normal process would otherwise
result in a zero penalty; or
2. Propose a civil penalty greater than the amount resulting from application of the
normal process (i.e., greater than the base or twice the base civil penalty).
B. The purpose of exercising this discretion to escalate the amount of the civil penalty is to
ensure that the proposed civil penalty reflects the significance of the circumstances.
However, in no instance will a civil penalty exceed the current statutory maximum
specified in 10 CFR 2.205, as published annually in the Federal Register. This
discretion is expected to be exercised on an infrequent basis.
C. Examples when this discretion should be considered include, but are not limited to, the
following:
1. Violations or problems categorized at Severity Level I or II;
2. Over exposures or releases of radiological material in excess of NRC limits;
3. Cases involving particularly poor licensee performance;
4. Cases involving willfulness; particularly instances where the licensee made a
conscious decision to be in noncompliance with NRC requirements in order to obtain
an economic benefit.
5. Cases where a licensee's previous enforcement history has been particularly poor,
or where the current violation is directly repetitive of an earlier violation;
6. Cases where the violation results in a substantial increase in risk, including cases in
which the duration of the violation has contributed to the substantial increase;
7. Cases where a licensee had made a conscious decision to be in noncompliance in
order to obtain an economic benefit;
8. Cases involving the loss of control of material; and
9. Cases involving an individual or a licensee where a concern exists that the outcome
from the proposed civil penalty may be overly punitive rather than deterrent.
D. While Section 3.6 of the Policy lists the types of cases where a civil penalty should be
considered, the Policy does not necessarily require that a civil penalty must be proposed
nor does it imply a severity level. The Policy is indicating that the staff should have
sound justification for not issuing at least a base civil penalty in these cases after
following the civil penalty assessment process. For more egregious violations, case
specific facts may also serve as a basis for doubling a base civil penalty in the described
situations. As a result, the Regions should be prepared to address the justification for
188

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

not proposing a civil penalty under Section 3.6 during any enforcement panel
discussions, and a brief summary of these reasons should be documented in the
Strategy Form.

Daily Civil Penalties
A. In order to recognize the added safety significance for those cases where a very strong
message is warranted for significant violations that continue for more than one day, the
NRC may:
1. Exercise discretion and assess a separate violation and attendant civil penalty up to
the statutory limit for each day the violation continues; or
2. Exercise discretion if a licensee was aware or clearly should have been aware of a
violation, or if the licensee had an opportunity to identify and correct the violation but
failed to do so.
B. In evaluating whether daily civil penalties are appropriate, the NRC will consider factors
such as:
1. Whether the violation resulted in actual consequences to public health and safety or
to the common defense and security
2. The safety significance of the violation
3. Whether the violation was repetitive because of inadequate corrective actions
4. The degree of management culpability in allowing the violation to continue or in not
precluding it
5. The responsiveness of the licensee once the violation and its significance were
identified and understood
6. Whether the continuing violation was willful
7. The duration of the violation
These evaluation factors are not necessarily of equal significance; therefore, for each
case, the NRC will weigh the relative importance of each contributing factor, as well as
any extenuating circumstances, to determine whether it is appropriate to use daily civil
penalties.
C. When the NRC determines that the use of daily civil penalties is appropriate as part of
an enforcement action, the Agency will assess a base civil penalty for the first day of the
violation in accordance with the civil penalty assessment process discussed in Section
8.0, “Table of Base Civil Penalties,” of the Enforcement Policy.
D. To determine the total civil penalty for the continuing violation, the NRC will supplement
the base civil penalty determination with a daily civil penalty for some or all the days the
violation continues.

189

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

E. The NRC will determine the amount of the daily civil penalty on a case-by-case basis
after considering the factors noted in the preceding paragraph and any relevant past
precedent for similar violations.
F. The daily civil penalty may be less than the maximum statutory daily limit in effect at the
time of the violation.

Mitigation of Civil Penalties
A. Mitigation of NRC sanctions is addressed in the Enforcement Policy which provides that
when a violation of NRC requirements is identified, enforcement action should normally
be taken.
NOTE:
Exercise of mitigation discretion requires prior approval by the Director, OE,
and DEDO consultation, as warranted.
B. There are situations when it is appropriate for the agency to either limit or forgo the
normal use of its enforcement sanctions. These include, but are not limited to, the
following:
1. When the NRC wants to encourage and support licensee initiative for selfidentification and correction of problems. In such cases, the NRC may exercise
discretion and refrain from issuing a civil penalty and/or issuing an NOV.
2. For cases involving an individual or a licensee where a concern exists that the civil
penalty may be overly punitive rather than a deterrent in outcome. It is not the
NRC’s intention that the economic impact of a civil penalty be so severe that it
adversely affects a license’s ability to safely conduct licensed activities or puts a
licensee out of business.

Exercise of Discretion to Issue Orders
The NRC will, where necessary, issue orders in conjunction with civil penalties to achieve or
formalize corrective actions and to deter further recurrence of serious violations.

Exercise of Enforcement Discretion for FSAR Issues
To encourage licensees to promptly undertake voluntary initiatives to identify and correct FSAR
noncompliances, the staff may exercise enforcement discretion to either mitigate or escalate the
enforcement sanction.
A. Mitigation: Old Design Issues. The staff may refrain from issuing civil penalties and in
some instances, citations, for a two-year period where a licensee undertakes voluntary

190

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

initiative to identify and correct FSAR noncompliances that will be completed within that
two-year period.
B. This discretion would not normally be applied if:
1. The NRC identifies the violation unless it was likely in the staff's view that the
licensee would have identified the violation in light of the defined scope,
thoroughness, and schedule of the licensee's initiative;
2. The licensee identifies the violation as a result of an event or surveillance or other
required testing where required corrective action identifies the FSAR issue;
3. The licensee identifies the violation but had prior opportunities to do so (was aware
of the departure from the FSAR) and failed to correct it earlier;
4. There is willfulness associated with the violation;
5. The licensee fails to make a report required by the identification of the departure
from the FSAR; or
6. The licensee either fails to take comprehensive corrective action or fails to
appropriately expand the corrective action program. The corrective action should be
broad with a defined scope and schedule.
C. Escalation: The staff may escalate the amount of the civil penalties for FSAR/50.59
noncompliances identified by the NRC subsequent to the two year voluntary initiative
period.
1. The staff should use this discretion to consider assessing civil penalties for each
violation or problem at the statutory limit specified in 10 CFR 2.205, as published
annually in the Federal Register which may be further escalated after considering the
number and nature of the violations, the severity of the violations, whether the
violations were continuing, and who identified the violations (and if the licensee
identified the violation, whether to exercise discretion in accordance with the
Enforcement Policy), rather than the normal assessment factors.
2. This approach is intended to increase the incentive for licensees to take timely action
to ensure that their facilities match the FSAR, e.g.:
a. If a single Severity Level III violation is identified by the NRC and it lasted for 2
days, the civil penalty would be calculated by taking two times (no credit for
identification) the base CP for a SL III violation multiplied by the number of days
the violation occurred (2 x 0.5 x base CP listed in Table A of the Policy x 2 days).
b. If the licensee identified the same violation and application of enforcement
discretion under Section 3.2 was not warranted, the civil penalty would be
calculated by taking the base CP for a SL III violation multiplied by the number of
days the violation occurred (0.5 x base CP listed in Table A of the Policy x 2
days) for the example cited above, providing some recognition of the licensee's
efforts.

191

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

Exercise of Enforcement Discretion Involving
Transportation Casks
A. Enforcement may not be warranted for certain cask contamination issues.
The Enforcement Policy provides that "...licensees are not ordinarily cited for violations
from matters not within their control, such as equipment failures that were not avoidable
by reasonable licensee quality assurance measures or management controls."
B. Enforcement of the removable contamination limits in 10 CFR 71.87(i)(2) may not be
appropriate where the licensee had taken comprehensive steps to ensure compliance,
i.e., the licensee had decontaminated the cask several times before providing it for
transportation and the staff is not aware of any further reasonable actions that the
licensee could have taken to prevent the violation (see EA-93-306).
C. Exercise of this discretion:
•
•

Requires an EA number; and
Should be coordinated with OE.

Reactor Violations with No Performance Deficiencies
A. Enforcement Policy Section 2.2.4 states that violations with no associated performance
deficiency will be dispositioned using traditional enforcement. Therefore, operating
reactor violations with no associated performance deficiencies should be assigned a
severity level and are, thus, not described as findings or assigned a color (e.g., Green).
B. Although the Enforcement Policy allows the staff to exercise enforcement discretion
under Section 3.10, “Reactor Violations with No Performance Deficiencies,” the staff will
typically not exercise enforcement discretion permitted under the Policy for SL IV
violations as long as the violation meets the criteria described in Section 2.3.2 of the
Policy for disposition as a non-cited violation.
C. SL IV violations with no associated PD will normally be documented in inspection reports
with no required review by headquarters.
1. NRC-identified or self-revealed SL IV violations without an associated PD will be
documented in accordance with Table 3 in IMC 0611, “Power Reactor Inspection
Reports.”
2. Licensee-identified SL IV violations without an associated PD will be documented in
accordance with Table 8 in IMC 0611.
D. All SL I, II, and III violations without an associated PD that are being considered for
enforcement discretion under Section 3.10 of the Policy will be brought to an
enforcement panel and documented in accordance with IMC 0611.

192

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

Documenting Enforcement Discretion
A. For Severity Level I, II, III, or IV violations, the NRC may choose to exercise discretion
and refrain from issuing an NOV or civil penalty in accordance with the Enforcement
Policy.
B. When discretion is being considered for a violation and the agency has not yet reached
a formal enforcement decision, the inspection report narrative should refer to the
violation as an “apparent violation.”
C. When the agency concludes that discretion should be exercised for a violation that
meets the criteria of the Enforcement Policy, these issues should:
1. Be documented in inspection reports (inspection records should not be used) as
violations.
2. The cover letter to the licensee should include a reference to the applicable section
of the Policy, the severity level of the violations, and a clear basis for exercising this
discretion.
D. The EOD Cover Letter
1. The cover letter of an exercise of enforcement discretion (EOD) letter to the licensee
should include:
a. A reference to the Enforcement Policy;
b. The severity level or significance determination characterization of the violations;
and
c. A clear basis for exercising this discretion.
2. While it is not necessary to include a detailed analysis of this process in a transmittal
letter to a licensee, it is imperative that a sound rationale for exercising discretion is
included in the letter to the licensee, lest the agency appear arbitrary and capricious
in exercising its enforcement authority.
3. The subject line in the transmittal letter should either state or include, "EXERCISE
OF ENFORCEMENT DISCRETION."
E. EOD Coordination, Review and Issuance
1. EODs are coordinated with OE and the applicable headquarters program office prior
to issuance (see Section 5.3 and 5.4).
2. EOD cases require an EA number.
3. Where appropriate, based on the uniqueness or significance of the issue, e.g., the
first time that discretion (as discussed in this chapter) is exercised for a nuclear
power plant, the Commission should be provided prior notice through issuance of an
EN. If OE determines that an EN is necessary, it should contain the same
information that is included in the cover letter to the licensee.

193

PART I: Enforcement Process

PART I – 3 Exercise of Discretion

Notice of Enforcement Discretion (NOED)
A. Notices of Enforcement Discretion (NOEDs) are addressed in Section 3.8, “Notices of
Enforcement Discretion for Operating Power Reactors and Gaseous Diffusion Plants,” of
the Enforcement Policy.
B. Specific guidance and responsibilities for issuing NOEDs is provided in Appendix F to
the Enforcement Manual. (The initial issue of the Appendix replaced IMC 0410, “Notices
of Enforcement Discretion,” dated March 13, 2013.) Appendix F describes the process
whereby the staff may exercise enforcement discretion for unanticipated temporary
noncompliances with applicable technical specification (TS) limiting condition for
operations (LCO) or other license conditions.
C. Appendix F is applicable to all operating commercial nuclear power reactors except
those sites under Inspection Manual Chapter (IMC) 0350 or IMC 0351 and those sites
that have ceased operations and have certified that fuel has been permanently removed
from the reactor vessel.
NOTE:
The Enforcement Policy permits enforcement discretion at operating power reactors
and gaseous diffusion plants (GDPs); however, because there are no GDPs in
operation at this time, Appendix F was not developed with the intention of being
applied to GDPs.

194

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

PART I - 4 ADDITIONAL ENFORCEMENT-RELATED
TOOLS
This section provides information regarding:
•

Additional enforcement tools used to address noncompliances, such as demands for
information, closeout letters, confirmatory action letters, notices of deviation, and notices
of nonconformance

195

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

Demand for Information (DFI)
Demand for Information (DFI) is a formal request made to a licensee or applicant to obtain
information to determine whether the license should be granted, or if issued, whether it should
be modified, suspended, or revoked, or other enforcement action taken. The procedures for
issuing DFIs are set forth in 10 CFR 2.204 and the Enforcement Policy.
•
•
•

DFIs may be issued to unlicensed persons, including vendors and contractors (and
employees), for the purpose of enabling the NRC to determine whether an order or other
enforcement action should be issued.
A DFI may be included within another escalated action, such as an order or proposed
imposition of civil penalty.
A DFI is a significant action. It should be used only when it is likely that an inadequate
response will result in an order or other enforcement action.

Preparing a DFI Action
The responsible office should prepare the DFI package, including the following elements as
discussed below:
A. The DFI should be prepared using the applicable standard format in Appendix B. The
DFI should include the following sections:
1. A section that identifies the licensee, the license, the type of facility and location, and
the date of issuance of the license.
2. A section that describes the relevant events, facts, alleged violations, potentially
hazardous conditions, technical aspects or legal reasons that provide the substantive
basis for issuing the DFI.
3. A section that requires specific information from the licensee by a certain date
(determined on a case-by-case basis) to determine whether the license should be
modified, suspended, or revoked.
B. A cover letter transmitting the DFI to the licensee should be prepared using the
applicable form in Appendix B, customized to reflect the DFI as the applicable
enforcement action. The letter should:
1. Briefly state the basis for the DFI;
2. Describe the information requested;
3. State that the failure to comply with the DFI provisions may result in enforcement
action; and
4. Note whether the DFI will be made available to the Public.
C. As noted above, a DFI may also be incorporated into another action. In such cases, the
DFI is normally included, in an abbreviated format, as part of the transmittal letter for the
accompanying action, using language similar to the following:

196

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

“In addition, pursuant to Sections 161c, 161o, 182, and 186 of the Atomic
Energy Act of 1954, as amended, 10 CFR 2.204 and 50.54(f), in order for the
Commission to determine whether your license should be modified or other
actions taken, you are required to submit to the Director, Office of Enforcement,
U.S. Nuclear Regulatory Commission, Washington, DC 20555, within 30 days
of the date of this Demand for Information, in writing and under oath or
affirmation, an explanation as to why the NRC can have confidence that
[request information specific to the circumstances of the case]. . . ”
D. Copies of the response to the DFI should be sent to:
1. The Associate General Counsel for Hearings, Enforcement & Administration at the
same address; and
2. The Regional Administrator, specifying the region and regional address.

DFI Coordination, Review and Issuance
A. All DFIs are assigned EA numbers and are sent to headquarters for review and approval
prior to issuance (refer to Section 5.3 and 5.4).
B. The DFI package should be electronically mailed to:
•
•

OE (RidsOeMailCenter Resource)
The OE Enforcement Specialist

The OE enforcement specialist, after consultation with OE management, should review
and make any changes prior to submitting the proposed action to:
•
•

The Assistant General Counsel for Security and Enforcement
The applicable program office Enforcement Coordinator

C. Draft Commission papers, order packages and supporting background materials should
be electronically mailed to the addressees listed above, as required.
D. Notwithstanding the stated steps and timeliness goals for the coordination and review
process, it is recognized that additional steps and/or review time may be necessary for
unusually complex cases. Orders should be given priority treatment by both the region
and headquarters offices.
E. If requested, OGC will review the proposed DFI and provide comments to OE within 10
working days of receipt of the package.
F. The applicable program office should review the proposed action with a focus on
ensuring that the technical accuracy of the violations and the significance of the
violations with respect to safety and risk characterizations have been properly evaluated
from an overall agency perspective.
1. Comments should be provided (verbally, electronically, or in writing) to OE within 10
working days.

197

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

2. Comments are normally provided through the program office Enforcement
Coordinators.
3. OE will consider timely OGC and program office comments and revise the DFI, as
appropriate.
4. The OE Enforcement Specialist, after consultation with OE management, will notify
the applicable program office Enforcement Coordinator when substantive program
office comments are not going to be incorporated into the final proposed
enforcement action.
5. The OE Enforcement Specialist, after consultation with OE management, will notify
the program office Project Manager when substantive program office comments are
not going to be incorporated into the final proposed enforcement action.
G. OE will forward the revised DFI to the region indicating where the action was revised
(normally through the use of comparative text) and explaining any significant changes.
H. The region should review the revised DFI and, if possible, provide concurrence on
headquarters' changes by the next day.
I.

OE will attempt to resolve any differences among the region, the program office, and
OGC.

Licensee Notification & Distribution of DFI
Licensee notification, mailing, and distribution for DFIs should be made according to the
following guidelines:
A. In most cases, the region will notify the licensee by telephone of the issuance of a DFI.
However, in certain cases (determined on a case-by-case basis), headquarters
personnel will provide this notification.
B. Licensees are to be provided a written copy of the DFI as expeditiously as possible.
Electronic transmission should be used to provide a written copy to licensees having
facsimile equipment. DFIs should be mailed by Express Mail.
C. OE is responsible for distribution of the DFI (see the distribution lists for NRC
addressees are in Appendix D).

Licensee Response to DFI
A. The provisions of 10 CFR 2.204 require that a licensee submit a written response to a
DFI under oath or affirmation within 20 days of the date of the DFI or other specified time
frame (determined on a case-by-case basis).
B. If a licensee does not respond to a DFI within the required time, the NRC will consider
issuing an order to modify, suspend, or revoke the license or consider taking such other
action as necessary to compel a response.

198

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

C. After reviewing the licensee's response to the DFI, the NRC determines whether further
action is necessary to ensure compliance with regulatory requirements.

Closeout Letters
A. Closeout letters primarily serve to document closure of an investigation, both to
individuals involved in the investigation and in the NRC’s enforcement records.
B. Closeout letters are prepared and sent to individuals for whom an individual enforcement
sanction had been considered but the NRC determined that an individual enforcement
action was not appropriate. Individuals have been considered for individual enforcement
if they are discussed at an enforcement panel. Closeout letters should be issued:
1. When the individual engaged in deliberate misconduct, but the NRC determined that
enforcement action was not warranted in accordance with the Enforcement Policy;
2. When the individual engaged in careless disregard or when there is insufficient
evidence to prove deliberate misconduct, and the NRC determined that enforcement
action was not warranted in accordance with the Enforcement Policy; or
3. On a case-by-case basis, when the individual is not employed by the licensee or
company that was the subject of the investigation and:
a. The individual(s) were named in an OI report conclusion; or
b. The individual(s) were part of the investigation focus, but were not named in the
report conclusion.
C. Two forms of closeout letters are contained in Appendix B. The use of one or the other
depends on whether the NRC concluded the individual engaged in deliberate
misconduct or not, i.e., Form 45-I should be used for individuals when the NRC
concludes the individual engaged in deliberate misconduct but enforcement action is not
warranted. Form 45-II should be used when the NRC concludes the individual did not
engage in deliberate misconduct.
D. Closeout letters are normally placed into ADAMS as sensitive, non-public documents.
1. ADAMS Document Processing Template OE-001 specifies that sensitive and nonpublic documents restrict viewer rights to the ADAMS group OE-RPOES and other
groups determined by the originating office.
2. For closeout letters, the “other groups” are individuals who are on distribution or
concur on a specific closeout letter and therefore may be included as a viewer. This
ensures limited distribution and control of documents consistent with the Privacy Act.
3. A copy of the closeout letter should also be maintained in the Individual Action
Tracking System files and are placed on the license docket.
4. See Part II, Section 1.4.11.A of the Enforcement Manual for additional details related
to issuance of individual actions and associated documents.

199

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

Confirmatory Action Letter (CAL)
A. Confirmatory Action Letters (CALs) are administrative actions and are letters issued to
licensees or, if appropriate, to non-licensees subject to the Nuclear Regulatory
Commission’s (NRC) jurisdiction 12 to emphasize and confirm a licensee's or nonlicensee's agreement to take certain actions in response to specific issues.
NOTE:
Although this section refers to recipients as licensees, it is implied to mean
either a licensed recipient or non-licensed recipient subject to the NRC’s
jurisdiction.

B. The NRC expects licensees and non-licensees to adhere to any obligations and
commitments addressed in a CAL.
C. CALs should only be issued when there is a sound technical and/or regulatory basis for
the desired actions discussed in the CAL.
1. CALs must meet the threshold defined in the Enforcement Policy, i.e., "to remove
significant concerns about health and safety, safeguards, or the environment."
NOTE:
The level of significance of the issues addressed in a CAL should be
such that if a licensee did not agree to meet the commitments in the CAL,
the staff would likely proceed to issue an order.
2. CALs may be used to confirm that a licensee will adhere to existing provisions.
3. Generally, CALs are not issued to individuals.
4. CALs shall not be used to remove an individual from, or restrict his or her ability to
perform, licensed activities. Such action requires an order, not only to ensure
enforceability, but because individuals rights are affected and the opportunity for a
hearing, which is afforded by an order but not a CAL, must be given to the affected
individual and any other person adversely affected by the action.
D. Even though a CAL, by definition, confirms an agreement by the licensee to take some
described action, it may, at times, require some negotiation prior to issuance.
1. The licensee must agree to take the action.
Non-licensees subject to the NRC’s jurisdiction may include, for example, vendors; contractors or
subcontractors of licensees; or unlicensed individuals who are employees of licensees, contractors, or
subcontractors.
12

200

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

2. Once a CAL is agreed upon, the licensee is expected to take the documented
actions and meet the conditions of the CAL.
E. A CAL may be issued when a materials licensee is violating a particular license
condition, but the license condition prescribes neither the action nor the timeliness for
restoring compliance as would be prescribed by a reactor licensee's technical
specification action statement.
1. A CAL would be useful in this type of situation to confirm compensatory actions
which, if implemented, would ensure safety such that an immediate suspension of
licensed activities might not be necessary.
2. The use of a CAL in this situation is generally reserved for materials licensees.
3. A NOED would be the appropriate tool for reactor licensees and gaseous diffusion
plants if the issue is addressed by a license or certificate condition.
F. CALs may be issued to confirm the following types of actions (note that this is not an
exhaustive list):
•
•
•
•
•
•
•
•
•

In-house or independent comprehensive program audit of licensed activities
Correction of training deficiencies, e.g., radiological safety, etc.
Procedural improvements
Equipment maintenance
Equipment operation and safety verification
Voluntary, temporary suspension of licensed activities
Licensee’s agreement to NRC approval prior to resumption of licensed activities
Root cause failure analyses
Improved control and security of licensed material

G. On occasion, licensees elect to submit letters to the NRC addressing actions that they
intend to take in reaction to safety issues.
1. Depending on the significance of the issues involved, the staff may elect to issue a
brief CAL accepting the licensee’s letter and commitments; however, this practice
should not be routine.
2. CALs should be limited to those cases where the issues involved clearly meet the
threshold for issuing a CAL discussed above.
H. Orders should be issued instead of CALs in the following situations:
1. When it is apparent that the licensee will not agree to take certain actions that the
staff believes are necessary to protect public health and safety and the common
defense and security;
2. When there is an integrity issue;
3. When there is some likelihood that a licensee may not comply with a CAL
commitment; or

201

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

4. When the staff has concluded that the CAL will not achieve the desired outcome.
NOTE:
The issuance of an order, in lieu of a CAL, should be considered
whenever there is a need to ensure that a legally binding requirement is
in place. Orders must be coordinated between the regional office, the
appropriate program office, OGC, and OE.

Noncompliance with CALs
A. CALS do not establish legally binding commitments with the exception of the reporting
provisions contained in Section 182 of the Atomic Energy Act, as amended (AEA) and its
implementing regulations which require a licensee to notify the NRC when:
1. The licensee’s understanding of its commitments differs from what is stated in a
CAL;
2. The licensee cannot meet the corrective actions schedule; and
3. The licensee’s corrective actions are completed.
B. Failure to provide the reports required by Section 182 of the AEA may be treated like
any other violation of a legally binding requirement.
C. Failure to meet a commitment in a CAL can be addressed through;
1. A Notice of Deviation;
2. An order where the commitments in a CAL would be made NRC requirements; and
3. A Demand for Information (DFI) where the licensee's performance, as demonstrated
by the failure to meet CAL commitments, does not provide reasonable assurance
that the NRC can rely on the licensee to meet the NRC's requirements and protect
public health and safety or the common defense and security.
D. Issuance of a CAL does not preclude the NRC from taking enforcement action for
violations of regulatory requirements that may have prompted the issuance of the CAL.
Such enforcement action is intended to:
1. Emphasize safe operation in compliance with regulatory requirements; and
2. Clarify that the CAL process is not a routine substitute for compliance.
E. The NRC would not normally take additional enforcement action for those violations that
continue after a CAL has been issued where compensatory actions have been accepted
by the NRC and taken by the licensee in accordance with its commitments.

202

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

CAL Responsibilities
A. The Office of Enforcement is the agency’s centralized control point for oversight and
implementation of an effective CAL process. As such, OE is responsible for:
1. Developing agency-wide CAL related guidance;
2. Maintaining a system for tracking the issuance and status of CALs; and
3. Ensuring CAL audits are conducted periodically to verify compliance with CAL
policies and procedures.
B. The Enforcement Coordinators from the Region or Program Office that is issuing the
CAL will be responsible for:
1. Ensuring that CALs generally meet this guidance;
2. Assigning an EA number to the CAL. If the Regional or Program Office Enforcement
Coordinators are unavailable, contact OE for an EA number. This should be
completed just prior to CAL issuance to prevent multiple numbers assigned to one
CAL; and
3. Updating EATS with the status of the CAL, i.e. issued date and ADAMS ML number,
closure letter date and ADAMS ML number, and closure of the case in EATS.

CAL Tracking
A. EATS will be utilized as the agency-wide CAL tracking system.
B. The EA number will serve as the CAL tracking number.

Preparing a CAL
CALs should be prepared using the appropriate form in Appendix B and should include the
following elements:
A. A brief discussion of the specific issues with which the NRC has concern, including how
and when they were identified.
B. A brief statement summarizing NRC/licensee communication on the agreed-upon
actions.
1. The statement should include when the communication took place, the names and
positions of the principal individuals involved in the communication, and whether the
communication took place in a telephone conversation or a face-to-face meeting.
2. Face-to-face meetings should also include the location of the meeting (i.e., regional
office, licensee's facility).

203

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

C. A clear description of the agreed-upon actions and where warranted and appropriate,
the date(s) when actions will be completed.
D. A statement that requires the licensee to provide written notification to the NRC if its
understanding of the relevant issues and commitments differ from what is stated in the
CAL.
E. A statement that requires the licensee to provide written notification to the NRC if for any
reason it cannot complete the actions within the specified schedule. It should also
require that the licensee inform the NRC of the modified schedule.
F. A statement that requires the licensee to provide written notification to the NRC if it
intends to change, deviate from, or not complete any of the documented commitments,
prior to the change or deviation.
G. A statement that requires the licensee to provide the NRC with written confirmation of
completed actions.
H. A statement that issuance of the CAL does not preclude issuance of an order formalizing
the commitments in the CAL or requiring other actions nor does it preclude the NRC
from taking enforcement action for violations of NRC requirements that may have
prompted the issuance of the CAL.
I.

A statement that failure to meet the commitments in a CAL may result in an order if the
licensee’s performance, as demonstrated by the failure to meet CAL commitments, does
not provide reasonable assurance that the NRC can rely on the licensee to meet the
NRC’s requirements and protect public health and safety or the common defense and
security.

J. A statement that the letter and any licensee response will be made available to the
Public.
K. Citation of the regulation implementing Section 182 of the AEA and authorizing the
required responses to the CAL by the licensee.

CAL Coordination, Review and Issuance
CALs should be coordinated and reviewed according to the following guidelines:
A. CALs issued by the region must be coordinated with the appropriate program office prior
to issuance.
1. Unless NMSS requests, CALs issued to fuel cycle or materials licensees do not
require NMSS concurrence.
2. CALs issued to operating reactor licensees must be concurred on by the Director,
NRR or their designee.
3. Because NSIR is responsible for coordinating security assessment activities across
the spectrum of NRC licensees, CALs issued to NRC licensees which include
security-related provisions, must be concurred on by the Director, NSIR.
204

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

4. CALs issued to 10 CFR Parts 50 and 52 reactor construction sites must be
concurred on by the Director, NRR or their designee.
B. Regional enforcement staff shall be consulted before the region issues a CAL.
C. Applicable Program Office Enforcement Coordinators shall be consulted before the
program office issues a CAL.
D. CALs issued by NRR, NMSS or NSIR, must be coordinated with the appropriate region.
This coordination will help to provide consistency between the regions and program
offices in response to similar issues and provide program oversight and assistance.
E. Regional counsel and/or OGC should be consulted as needed.
F. Coordinate and consult with OE prior to issuing a CAL, as OE is the centralized control
point to oversee and implement the CAL process. OE concurrence is not required to
issue a CAL.

CAL Signature Authority
CALs should be signed and issued according to the following guidelines:
A. The Regional Administrator should sign all CALs issued by the region.
B. The Director, NRR, the Director, NMSS, or the Director, NSIR, should sign all CALs
issued by NRR, NMSS or NSIR, respectively.
C. All CALs should include OE on the distribution list.

Licensee Notification, Mailing, and Distribution for CALs
A. CAL distribution:
1. CALs should be sent to the licensee by either Certified Mail (Return Receipt
Requested) or Express Mail.
2. Upon issuance, CALs should be distributed to:
a.
b.
c.
d.
e.
f.
g.
h.

OE at RidsOeMailCenter Resource
The appropriate Deputy EDO
The appropriate program office (i.e., NRR, NMSS or NSIR)
The appropriate region
The appropriate Regional Public Affairs Officer
The Regional State Liaison Officer
The State
For material licensees, a copy should be sent to the Regional State Agreements
Officer

3. CALs should, where possible, be made available to the Public.

205

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

B. The staff should be sensitive to describing agreed upon licensee corrective actions that
involve safeguards matters to prevent inadvertent release of safeguards information.

Closing Out CALs
A. A CAL may or may not require follow-up inspection to verify completion of the specified
licensee actions. Whether the staff believes that an inspection is necessary to close a
CAL will be determined on a case-by-case basis and will depend on the circumstances
of the case.
B. CALs or actions required to close a CAL, are not license amendments and should not be
treated as such. Any action that constitutes a license amendment shall be handled
separately under the license amendment request process.
C. Ensure that all offices involved in the development of the CAL have reviewed the
submitted information and agree that the CAL can be closed. For some complex
technical issues, it may be appropriate for the staff to document its review in the form of
a Technical Evaluation Report or other equivalent document. This report should be
included as part of the Inspection Report.
D. The issuing office (i.e., region, NRR, NMSS or NSIR) will issue documentation formally
closing out the CAL. OE concurrence on the document closing a CAL is not required;
however, OE should be on distribution.
E. Correspondence closing out a CAL should be sent to the same person/address as the
CAL; however, verbal notification, in advance of written correspondence, may be
sufficient to permit plant restart or resumption of affected licensee activities.

Press Releases for CALs
Press releases are not routinely issued to address the issuance of a CAL. If a region believes
that a press release is appropriate, it should be coordinated with Public Affairs which will make
that determination.

206

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

Notice of Deviation (NOD)
A. A Notice of Deviation (NOD) is an administrative action and is a written notice to a
licensee describing its failure to satisfy a commitment that is not a legally binding
requirement.
1. Although an NOD is considered an administrative mechanism, it is processed as a
non-escalated enforcement action.
2. A NOD is normally sent to the licensee as an attachment to an inspection report.
B. The timeliness goal for issuing a routine NOD is the same as for issuing clear
inspections (see IMCs 0610, 0612, 2800, 0613, etc.).

Preparing an NOD Action
A. The regions should prepare an NOD action package, using the applicable standard
format provided in Appendix B. NODs should be dated the same date as the transmittal
letter to the licensee.
1. The NOD should include the following elements:
a. Inspection reports which should be prepared in accordance with the guidance in
IMCs 0610, 0612, 2800, 0613, etc. and the guidance provided in this Manual;
NOTE:
NODs are considered administrative actions, processed as nonescalated enforcement actions, therefore, they normally do not need to
be coordinated with OE prior to issuance; however, NODs involving the
FSAR require the approval of the Director, OE.
b. A concise, clear statement of the applicable commitment;
c. A brief statement (usually no more than a few sentences) addressing the
circumstances of the deviation, including the date(s) of the deviation and the
facts necessary and sufficient to demonstrate that the commitment was not met
("contrary to" paragraph).
•
•

To demonstrate noncompliance, the language of the "contrary to" statement
should parallel the applicable language of the commitment.
Each deviation, including a deviation with multiple examples, should contain a
single "contrary to" statement;

2. As a general rule, multiple examples of the same deviation during the period covered
by an inspection should be included in one citation.

207

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

a. The "contrary to" paragraph should generally state the deviation, followed by
"...as evidenced by the following examples" and the examples delineated as 1, 2,
3, etc.
b. When the examples of a particular deviation are numerous, sufficient examples
should be cited to convey the scope of the deviation and to provide a basis for
assessing the effectiveness of the licensee's corrective actions. Normally three
to five examples is adequate.
3. The NOD should also include:
a. A request for the licensee to provide a response which includes the reasons for
the deviation;
b. The corrective actions which will be taken to avoid further deviations; and
c. The date when the corrective actions will be completed.
B. Cover letters that transmit inspection reports and NODs should be prepared by the
region using the appropriate form in Appendix B modified to distinguish an NOD from an
NOV.

Licensee Notification, Mailing, and Distribution for NODs
A. Licensees are normally sent NODs at the time an inspection report is issued. NODs are
made available to the Public in accordance with agency procedures. The mailing and
distribution of the inspection report and NOD are controlled by regional procedures.
B. NOVs should be used for certificate holders who fail to meet requirements directly
imposed on them by the NRC and for vendors who violate 10 CFR Part 21 requirements
or other requirements directly imposed on them by the NRC.

208

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

Notice of Nonconformance (NON)
A. A Notice of Nonconformance (NON) is a written notice to a vendor or certificate holder
describing its failure to meet commitments related to NRC activities. These
commitments are normally contained in contract requirements and are not directly
imposed on the vendor or certificate holder by the NRC.
B. A NON is considered an administrative action and is processed as a non-escalated
enforcement action. A NON is normally sent to the vendor or certificate holder as an
attachment to an inspection report.
C. The timeliness goal for issuing a routine NON is the same as for issuing clear
inspections (see IMC 0610 and IMC 0617).

Preparing a NON Action
A. NON actions should be prepared by:
1. The NRR staff responsible for vendor cases; or
2. The NMSS staff responsible for shipping package transportation cases.
NOTE:
Because an NON is considered an administrative action processed as a
non-escalated enforcement action, it does not need to be coordinated
with OE prior to issuance.
B. NONs are dated the same date as the cover letter transmitting the action to the vendor
or certificate holder.
C. The NON should include the following elements:
1. Inspection reports which should be prepared in accordance with the guidance in IMC
0610, IMC 0617 and IMC 2800 and the guidance provided in this Manual;
2. A concise, clear statement of the applicable requirement or requirements,
appropriately referenced, paraphrased, or quoted;
3. A brief statement (usually no more than a few sentences) addressing the
circumstances of the nonconformance, including the dates of the nonconformance (if
possible to determine) and the facts necessary to demonstrate that one or more of
the requirements were not met ("contrary to" paragraph).
a. To demonstrate noncompliance, the language of the "contrary to" statement
should parallel the applicable language of the requirement.
b. Each nonconformance, including a nonconformance with multiple examples,
contains a single "contrary to" statement;

209

PART I: Enforcement Process

PART I – 4 Additional Enforcement Tools

4. As a general rule, multiple examples of the same nonconformance during the period
covered by an inspection should be included in one citation.
a. The "contrary to" paragraph should generally be followed by "...as evidenced by
the following examples:" and examples delineated as 1, 2, 3, etc.
b. When the examples of a particular nonconformance are numerous, sufficient
examples should be cited to convey the scope of the nonconformance and to
provide a basis for assessing the effectiveness of the corrective actions.
Normally three to five examples is adequate.
5. A request for the vendor or certificate holder to provide a response which includes a
description of the actions taken or planned to correct the nonconformances, the
actions taken or planned to prevent recurrence, and the date when the corrective
actions were or will be completed.
D. Cover letters that transmit inspection reports and NONs should be prepared using the
appropriate form in Appendix B.

Notification, Mailing, and Distribution of NONs
Vendors or certificate holders are normally sent NONs at the time an inspection report is issued.
NONs are made available to the Public in accordance with agency procedures.

210

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

PART I - 5 RESPONSIBILITIES AND AUTHORITIES
This section provides information regarding:
•

the delegation and re-delegation of responsibilities and authorities for enforcement
activities as implemented in the Enforcement Policy and in Volume 9 of the NRC
Management Directives (MDs)

211

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

Executive Director for Operations (EDO)
A. The Executive Director for Operations (EDO) is the chief operating and administrative
officer of the Commission. Except as otherwise provided by law, regulation,
Commission action, or action by the Chairman, the EDO reports to and is supervised by
the Chairman as provided in MD 9.17, "Organization and Functions, Office of the
Executive Director for Operations."
B. The EDO, through the Chairman, ensures that the Commission is fully and currently
informed about matters within its function.
C. The EDO is responsible for the following activities which may involve the agency’s
enforcement program:
1. Supervising, directing, coordinating, and approving the activities of the offices
reporting to the EDO and Deputy Executive Directors (DEDOs);
2. Developing and promulgating rules (as defined in the Administrative Procedures Act
and subject to the limitation set out in paragraphs 038, 039, and 0310 of MD 9.17);
3. Developing and approving delegations of authority for offices reporting to the EDO
and DEDOs;
4. Exercising the Commission’s authority to take enforcement or other action under 10
CFR Part 2, Subpart B; and
5. Issuing subpoenas under Section 161c of the Atomic Energy Act of 1954, as
amended, where necessary or appropriate for the conduct of inspections or
investigations.
D. Limitations placed on the authority of the EDO require that the EDO present all
significant questions of policy to the Commission for resolution, and with respect to these
questions, present all major views of the affected offices to the Commission (see the
discussion below regarding Commission notification).

Deputy Executive Directors for Operations (DEDOs)
A. Deputy Executive Director for Materials, Waste, Research, State, Tribal, Compliance,
Administration and Human Capital Programs (DEDM)
1. The DEDM carries out day-to-day supervision, guidance, and direction of the Offices
of Nuclear Materials, Safety, and Safeguards (NMSS), Research (RES), OE, and the
Office of Investigations (OI).
NOTE:
The title “Deputy Executive Director” and acronym “DEDO” refer to either
the DEDR or DEDM, as appropriate.

212

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

2. The DEDM provides oversight across agency lines of authority for all NRC policies
and activities related to materials and waste safety.
3. The DEDM is responsible to the EDO for the NRC enforcement program and is
authorized to approve or issue:
a. All escalated enforcement actions including orders and civil penalties pursuant to
10 CFR Part 2, Subpart B; and
b. Actions involving individuals, including licensed operators.
4. The DEDM is authorized to act, when delegated, in the stead of the EDO or DEDR
during the EDO’s or DEDR’s absence and take action as necessary to perform the
EDO’s or DEDR’s duties.
B. Deputy Executive Directors for Reactor and Preparedness Programs (DEDR)
1. The DEDR is responsible for carrying out day-to-day supervision, guidance, and
direction of the Offices of NRR, NSIR and the agency’s regional offices.
2. The DEDR provides oversight across agency lines of authority for all NRC policies
and activities related to reactor safety and homeland protection and preparedness
and has responsibility for matters dealing with the homeland security aspects of
physical and personnel security, information security, information technology
security, safeguards, emergency response, and threat and vulnerability assessment.
3. The DEDR is authorized to act, when delegated, in the stead of the EDO or the
DEDM during the EDO’s or DEDM’s absence and take action as necessary to
perform the EDO’s or DEDM’s duties.

Office of Enforcement (OE)
In accordance with Management Directive (MD) 9.19, “Organization and Functions, Office of
Enforcement,” OE has delegated authority to:
•

Exercise oversight of NRC enforcement programs, including the Enforcement ADR
program as described in Part II, Section 1.2 of the Enforcement Manual;

•

Provide programmatic and implementation direction to the offices in the regions and in
OE Headquarters (headquarters) that are conducting or involved in enforcement
activities; and

•

Ensure that regional enforcement programs are adequately carried out.

A. Delegation of Authority to the Director, OE
1. In accordance with MD 9.19, the Director of OE is authorized to:
a. Prepare and issue enforcement actions including notices of violation (NOVs),
proposed impositions of civil penalties, orders, settlement agreements and
demand for information in the DEDO’s absence or under the DEDO’s direction;
213

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

b. Prepare and issue notices of deviations;
c. Manage major enforcement actions (civil penalties, orders, and significant
NOVs);
d. Approve or direct enforcement action to be taken by offices in the regions or
headquarters in the DEDO's absence or under the DEDO's direction;
e. Prepare letters requesting investigations, confirming actions, or obtaining
information under sections 161(c) or 182 of the Atomic Energy Act;
f. Prepare subpoenas for alleged violations of regulatory requirements, and issue
those actions in the DEDO's absence or under the DEDO's direction;
g. Take necessary or appropriate action in accordance with the decision of an
Administrative Law Judge, an Atomic Safety and Licensing Board, or the
Commission after enforcement hearings pursuant to 10 CFR Part 2;
h. Approve, after consultation with the DEDO as warranted, the decision to
disposition a willful violation as a noncited violation (NCV);
i. Recommend to the EDO, through the DEDO, changes to rules and policies for
Commission consideration concerning enforcement matters; and
j. Provide guidance and training on implementation of the Commission's
Enforcement Program.
2. In accordance with the December 13, 2015, Delegation of Authority for Enforcement
Actions (ML15211A322) issued by the DEDO, the Director, Office of Enforcement
(OE), is delegated the authority to approve, sign, and issue all enforcement actions.
This delegation supersedes all previous delegations of authority to the Director, OE,
regarding enforcement actions.
a. This authority includes, but is not limited to:
•
•
•
•
•
•

notices of violation (including those associated with inspection findings
characterized as Green, White, Yellow or Red pursuant to the Significance
Determination Process),
civil penalties,
orders (including confirmatory orders and immediately effective orders),
demands for information,
settlement and compromise agreements, and
enforcement actions involving individuals.

b. The Director, OE, is also authorized to take the following actions:
•
•
•
•
•
•

Exercise oversight of NRC enforcement programs.
Provide programmatic and implementation direction to the offices in the
regions and in headquarters conducting enforcement activities.
Ensure that regional enforcement programs are adequately carried out.
Prepare letters requesting investigations, confirming actions, or obtaining
information under sections 161(c) or 182 of the Atomic Energy Act of 1954,
as amended (AEA).
Prepare subpoenas to licensees, companies, individuals, or other persons to
obtain information to assist the Commission in the administration and
enforcement of the AEA.
Take necessary or appropriate action in accordance with the decision of an
Administrative Law Judge, the Atomic Safety and Licensing Board, or the
214

PART I: Enforcement Process

•
•
•

PART I – 5 Responsibilities and Authorities

Commission after enforcement hearings pursuant to Title 10 of the Code of
Federal Regulations Part 2.
Recommend to the Executive Director for Operations, through the DEDO,
changes to rules and policies for Commission consideration concerning
enforcement matters.
Provide guidance and training on implementation of the Commission’s
Enforcement Program.
Review proposals to mitigate penalties.

3. The authority delegated to the Director, OE is subject to the following limitations:
a. The authority delegated to the Director, OE, does not apply to cases where the
Director, OE, is in disagreement on a proposed course of action with the Director
of the Offices of Nuclear Reactor Regulation, Nuclear Material Safety and
Safeguards, Nuclear Security and Incident Response, or a Regional
Administrator.
b. The Director, OE, shall consult with the Deputy Executive Director for Materials,
Waste, Research, State, Tribal, Compliance, Administration, and Human Capital
in any case involving novel issues, or substantial legal, programmatic, or policy
issues raised during the review process.
c. The authority of the Director, OE, does not extend to cases in which the decision
to take a specific action reset with an administrative law judge, the Atomic safety
Licensing Board, or the Commission after a hearing pursuant to 10 CFR Part 2,
“Agency Rules of Practice and Procedure.”
4. While Severity level I violations and violations associated with Red findings are
delegated to the Director, OE, the EDO may elect to issue these actions directly.
5. The Director, OE, shall notify or consult with the Commission in a manner consistent
with the guidance in the Enforcement Policy. Notification will typically be provided by
the Enforcement Notification (EN) process. Consultation will involve additional
communication prior to the EN on a case-by-case basis.
6. The authority of the Director, OE, to issue a subpoena requires the concurrence from
OGC and consultation with OI.
B. Re-delegation of Authority by the Director, OE
The authority delegated to the Director, OE, may be re-delegated subject to the written
approval of the DEDO. Such re-delegations must be made in writing and a copy filed with
the EDO, the Secretary of the Commission, the General Counsel, and the Director, Office of
Chief Human Capital Officer. This authority is subject to the following limitations:
•
•
•
•

The Director, OE, may not delegate the authority to approve, sign, or issue immediately
effective orders, with the exception of immediately effective confirmatory orders.
The Director, OE, may not re-delegate the authority to approve, sign, or issue civil
penalties to individuals licensed pursuant to 10 CFR Part 55.
The Director, OE, may not delegate the authority to sign or issue a subpoena.
The Director, OE, must stipulate any limitations on further delegations of authority.

215

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

C. Deputy Director, OE
The Deputy Director, OE:
•
•
•

Assists the Director in overseeing, managing, and directing the development of
enforcement policies and programs, and in issuing enforcement actions;
Notifies the Office of the Secretary (SECY) when an enforcement hearing extension
request is granted; and
During the absence of the During the absence of the Director, OE, the Deputy Director,
OE, is authorized and directed to act in the stead of the Director.

D. Chiefs, Enforcement Branch (EB) and Concerns Resolution Branch (CRB)
As directed by the Director of OE, the EB and CRB Branch Chiefs:
•
•
•
•

Assists the Director, OE, in developing and implementing enforcement policies and
programs, and in issuing enforcement actions;
Acts for the Director, OE, in the Director and Deputy Director’s absence. Acts for the
Deputy Director, OE, in the Deputy Director’s absence, in accordance with the redelegation of authority specified in Section B above;
Supervises the OE enforcement staff in the execution of its responsibilities;
Is authorized by the Director, OE, to review and concur on the following enforcement
actions, after consultation with the Director or Deputy Director, OE, as appropriate:
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o

•
•

Rulemakings initiated by other Program Offices
Commission papers with enforcement considerations from other offices
Licensee correspondence with enforcement considerations generated by other
offices
Generic communications
Technical Interface Agreements (TIAs) and Technical Assistance Requests (TARs)
with enforcement considerations
Actions utilizing enforcement discretion involving Severity Level III violations/white
SDP findings and below
Actions utilizing enforcement discretion involving NFPA 805
NOVs involving Severity Level III violations and below
NOVs involving Severity Level III violations with a civil penalty that is no greater than
1 times the base penalty
Safety Orders
Enforcement Notifications (ENs)
Office Input to the Congressional Report on the Enforcement Program
OE Web Summaries
Acknowledgment letters for civil penalties
Close-out letters to individuals

Assigns and reviews quarterly audits of the enforcement program; and
Reviews and approves SDP/EA Request & Strategy Forms (Strategy Forms).

E. OE Staff
As directed by the Chiefs, EB and CRB, the OE staff:
216

PART I: Enforcement Process

•
•
•

•

PART I – 5 Responsibilities and Authorities

Assists the Chiefs, EB and CRB, in developing and implementing the enforcement
program and Enforcement Policy;
Participates in enforcement panels, Significance Determination Process/Enforcement
Review Panels (SERPs), and ADR strategy sessions to provide enforcement
perspectives;
Assigns enforcement action (EA) and individual action (IA) numbers to proposed
enforcement actions as appropriate and prepares and maintains Strategy Forms.
Strategy forms are submitted to the Chief, EB or CRB, OE, within five working days of
the panel;
Provides periodic reports to the Commission regarding cases that may challenge the
Statute of Limitations;
NOTE:
The Statute of Limitations applicable to NRC civil penalty cases and orders
imposing sanctions requires that the NRC initiate these actions within five
years of the date of the violation.

•
•
•
•
•
•

•

•

Assigns EA numbers to all findings addressed in a SERP/enforcement panel,
irrespective of whether an apparent violation is involved (in order to allow the agency to
keep track of SDP issues);
Reviews the enforcement strategy for proposed escalated enforcement actions to
ensure technical adequacy and conformance to established policy, guidance, and
precedent;
Participates in predecisional enforcement conferences and regulatory conferences
whenever practical and as directed by the Chiefs, EB or CRB, OE, to provide
enforcement perspectives;
Participates enforcement and SERP caucuses whenever practical and as directed by the
Chiefs, EB or CRB, OE, to provide enforcement perspectives;
Notifies the Offices of Public Affairs (OPA), NMSS, NRR, NSIR OIP, and Congressional
Affairs (OCA), of enforcement actions that may impact their offices’ interests;
Prepares Enforcement Notifications (ENs) for Severity Level I and II cases, NOVs
associated with white, yellow and red findings, and other enforcement activities of
particular interest, e.g., specific civil penalty actions, orders, and other enforcement
actions.
Prepares Regulatory Notifications (RNs) for significant regulatory actions, such as a
Final Significance Determination for a white, yellow, or red finding (that does not include
an NOV) or an order that requires additional safety or security measures beyond the
regulatory framework (versus an order based on compliance issues, e.g., 2002 security
orders);
Reviews press releases when OPA determines that one is needed;
o

Press releases that are issued to announce predecisional enforcement or regulatory
conferences that are open for public observation, should:
 be carefully worded so as not to prejudge the outcome; and

217

PART I: Enforcement Process



•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•

PART I – 5 Responsibilities and Authorities

include an explicit description of the nature of the conference as a predecisional
opportunity for the licensee to present any additional material information before
the NRC arrives at a decision.

Coordinates the development of and reviews press releases for significant enforcement
issues;
Reviews substantiated OI reports and coordinates with the region, OGC, and the
applicable program office to determine whether enforcement action is appropriate;
Responds to “3-week email” regarding unsubstantiated OI reports;
Assists in preparing letters requesting investigations, confirming actions, or obtaining
information under sections 161(c) or 182 of the Atomic Energy Act, and in preparing
subpoenas with respect to alleged violations of regulatory requirements;
Evaluates the enforcement program as carried out by the regional offices;
Participates in regularly scheduled conference calls with the Regional Enforcement staff
and the Program Office Enforcement Coordinators to discuss enforcement issues and
cases;
Maintains and revises the Enforcement Policy and the NRC Enforcement Manual, as
directed by the Chiefs, EB or CRB, OE;
Maintains the Enforcement Action Tracking System (EATS) and Individual Action
Tracking System (IATS);
Maintains enforcement-related information on the NRC’s internal and external Web sites;
Prepares an annual report for the enforcement program;
Develops and provides training on the enforcement program;
Serves as petition manager for 10 CFR 2.206 petitions assigned to OE;
Coordinates with the Occupational Safety and Health Administration (OSHA) on the
resolution of enforcement issues involving both the NRC and OSHA at NRC facilities;
Reviews documents generated by other Program Offices such as rulemakings, generic
communications, TIAs related to enforcement, and 2.206 Director Decisions;
Prepares Enforcement Guidance Memoranda (EGMs) addressing emergent
enforcement issues;
Prepares input to the Congressional Report addressing enforcement activities
associated with the regulation of nuclear power plants, as required; and
Assures periodic assessments of the NRC tracking systems used to document
non-escalated enforcement data are conducted to assess the quality of the data
collected and for trending non-escalated violations.

Regional Offices
The regional offices are responsible for implementing the enforcement program subject to the
overall policy, program, and implementation guidance of OE.
A. Responsibilities of Regional Offices
In general, the regional offices:
•
•

Prepare and issue non-escalated enforcement actions;
Schedule and conduct enforcement and SERP panels, predecisional enforcement and
regulatory conferences, and enforcement and SERP caucuses;

218

PART I: Enforcement Process

•

PART I – 5 Responsibilities and Authorities

Prepare and issue escalated enforcement actions when authorized to do so, or after
concurrence by the Director, OE, and approval by the DEDO, as required;
NOTE:
The regional offices are normally responsible for enforcement activities
associated with on-site contractors.

•
•
•
•
•
•

Implement the ADR program as described in Part II, Section 1.2 of the Enforcement
Manual;
Evaluate licensees' responses to enforcement actions and prepare appropriate
responses;
Track the status of enforcement actions;
Conduct regional staff training;
Issue regional enforcement procedures, and
Audit regional enforcement actions.

B. Delegation of Authority to the Regional Administrators
In accordance with the revised delegation from the Director, OE, issued in March 2017
(ML17038A336), the Regional Administrators are delegated the authority to approve, sign,
and issue certain enforcement actions. These delegations apply to enforcement actions in
all areas in which the specific regional office evaluates, directly manages, or conducts
inspections. If there is an overlap between the regional and headquarters program office
inspection or oversight authority, and a dispute arises within the agency, or regarding which
office should issue the enforcement action, OE should be consulted prior to taking the
enforcement actions.
Regional offices are authorized to take certain enforcement actions as authorized by the
Director, OE. Refer to table 5.3.1 below.

NOTE:
The following table is for information only. For Regional delegations, refer to
the latest delegation of authority memorandum. Signature authority for the
various enforcement actions are subject to the limitations specified in the
delegation of authority memorandums and depicted herein. Re-delegation
below the Regional Administer requires that all conditions for the specified
position, including those of the Regional Administer, be satisfied.

219

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

Table 5.3.1, Delegation of Authority to Regional Administrators

RA

Deputy
RA

Division
Director

Notice of Violation - SL I

1, a, c

5

Notice of Violation - SL II

1, c

5

Notice of Violation - SL III

1, c

3

5

Notice of Violation - SL III FFD

1, c

3

3

Escalated Violations to Individuals

1, a, c

5

Violation associated with a Red SDP

1, a, c

5

Violation associated with a Yellow SDP

1, c

3

5

Violation associated with a White SDP

1, c

3

5

1, a, c

5

Deputy
Division
Director

Branch
Chief i

Insp.

Escalated Enforcement Actions

NOV with Civil Penalty
NOV with Civil Penalty to Licensed
Individuals (10 CFR 55)

5

N/A

Non-escalated Enforcement Actions
Notice of Violation - SL IV

√

3

3

3

3

N/A

Notice of Violation - SL IV issued beyond
NCV Criteria

2

3

3

3

3

N/A

Willful Violations dispositioned as SL IV

1, c

3

3

3

3

N/A

Noncited Willful Violations

1, c

3

3

3

3

N/A

Noncited Violations

√

3

3

3

3

N/A

Minor Violations

√

3

3

3

3

N/A

Violations associated with a Green SDP

√

3

3

3

3

N/A

Notice of Deviation

√

3

3

3

3

N/A

Notice of Nonconformance

√

3

3

3

3

N/A

NRC Form 591

√

3

3

3

3

3, g

1, c

3

3

3

5

N/A

1, c

3, b

5

1, c

3, b

5

1, a, b,
c

5

Non-escalated Enforcement Actions to
Individuals
Orders
ADR Confirmatory Order
ADR Confirmatory Order to Individual
Cease and Desist Order
Cease and Desist Order to Individual
Confirmatory Order
Confirmatory Order to Individual

N/A
1, a, c
N/A

220

3, b

5

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

Table 5.3.1, Delegation of Authority to Regional Administrators

RA

Order Imposing Civil Monetary Penalty
Order Imposing Civil Monetary Penalty to
Individual
Order Modifying License (not Safety
Orders)

1, a, b,
c

Deputy
RA

Division
Director

Deputy
Division
Director

Branch
Chief i

5

N/A
1, a, b,
c

Prohibition Order

N/A

Revocation Order

1, a, b,
c

5

Suspension Order

1, a, b,
c

5

Demand for Information (DFI) associated w/
enforcement actions

1, c

5

Demand for Information to Individual

N/A

Conduct ADR Mediation Session

2

3

5

ADR Agreement in Principle

2

3

5

Conduct Enforcement Panel, SERP, PEC,
Regulatory Conference and Caucuses

2

3

3

3

5

√

3

3

3

3

1, c

3

3

3

5

Final Case Disposition Letters
Close-out Letter
Exercise of Discretion Letter (See Note 6)
Exercise of Discretion Letter (see Note 7)

2

3

3

3

3

Letter to Withdraw, Modify or Rescind
Action (See Note 8)

1, c

3

3

3

5

Letter to Withdraw, Modify or Rescind
Action (See Note 9)

2

3

3

3

3

Chilling Effect Letter

√

3

3

3

3

Letter of Reprimand

√

3

3

3

3

√d

3

3

3

3

Letter Responding to Disputed Violation
(See Note 8)

1, c, f

3

3

3

5

Letter Responding to Disputed Violation
(See Note 9)

2

3

3

3

3

Administrative Action Letters

Case Processing Letters
Choice or Conference Letter

221

Insp.

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

Table 5.3.1, Delegation of Authority to Regional Administrators

RA

Deputy
RA

Division
Director

Deputy
Division
Director

Branch
Chief i

Letter to Individuals (Escalated Enforcement
Actions)

1, c

3

3

3

5

Letter to Individuals (Nonescalated
Enforcement Actions)

1, c

3

3

3

5

Insp.

Any other delegation of enforcement authority not explicitly granted in accordance with the
Delegation of Authority for Enforcement Actions memorandum (ML17038A336) must be
approved by the Director, OE.
The Deputy Regional Administrator is authorized to act in the stead of the RA during his/her
absence.
Notes:
1.
2.
3.
4.
5.

8.
9.

Subject to Panel approval, may approve, sign and issue
Subject to Panel approval (including Modified Panel), may approve, sign and issue
RA delegation required
Office Director delegation required
Any other delegation of the enforcement authority not explicitly granted herein must be
approved by the Director, OE.
Application of Enforcement Policy would normally result in an escalated enforcement action
Application of Enforcement Policy would normally result in a nonescalated enforcement
action
For those cases where the previous action was an escalated enforcement action
For those cases where the previous action was a nonescalated enforcement action

√
a.
b.
c.
d.
e.
f.
g.
h.
i.

Authority to approve, sign and issue
The Director OE or the EDO my elect to issue these enforcement actions directly
Non-immediately effective only
OE concurrence required
OE concurrence required for cases associated with an OI Report
OE on distribution list
Actions without hearing rights
After consultation with Branch Chief in accordance with manual Chapter 2800.
Not used.
Includes Acting Branch Chiefs w/ advance written approval by the Regional Administrator

6.
7.

C. Re-delegation of Authority by the Regional Administrator must be made in writing, and a
copy must be filed with the Director, OE.
D. Regional Administrators
In accordance with the responsibility for supervising and directing the enforcement functions
of the region, subject to the overall policy, program, and implementation guidance of OE,
Regional Administrators are authorized to:

222

PART I: Enforcement Process

•
•
•
•
•

•
•
•
•
•
•
•
•
•

•
•
•

PART I – 5 Responsibilities and Authorities

Approve, sign, and issue certain enforcement actions as specified in the most recent
delegation of authority memorandum (ML17038A336).
Recommend all escalated enforcement actions to headquarters either: (1) through
consultation (usually via an enforcement or SERP panel) or (2) by submitting the actual
enforcement action package for review and approval.
Review licensees' responses to proposed escalated enforcement actions and
recommend appropriate action to the Director, OE.
Conduct enforcement and SERP panels, predecisional enforcement conferences,
regulatory conferences, and enforcement and SERP caucuses.
Contact the Director, OE, as soon as possible, and generally no later than 24 hours after
receiving the Strategy Form, if the Regional Administrator disagrees with an
enforcement strategy (or SDP conclusion) arrived at during a SERP or enforcement
panel or caucus.
Notify OE when an enforcement action involves significant disagreement within the
region, including disagreement by the Regional Counsel.
Ensure that Regional Counsel, as appropriate, reviews and provides legal advice on all
regional escalated enforcement action recommendations submitted to headquarters for
review and approval.
Review OI reports promptly and notify OE whenever an OI Field Director concludes,
during or after an investigation, that willfulness is involved (even if a report has not yet
been issued).
Make recommendations to OE for enforcement action, including immediate action, when
warranted.
Review all OI reports to determine if OI documents violations (willful or nonwillful) that
are not identified as such.
Ensure that appropriate training and instructions are provided to regional staff to
implement the enforcement program, including the use of NRC Form 591s.
Ensure that region-based enforcement actions, including NRC Form 591s, are
periodically audited.
Provide copies of regional instructions and procedures to OE.
Ensure, for cases in which the regional licensing staff receives notice of a licensee
bankruptcy action, that the regional enforcement staff determines whether any
outstanding civil penalties exist and if so, promptly notifies the Director, OE, so that an
appropriate claim can be filed to preserve the NRC's interest.
Ensure that copies of TIAs and TARs that involve apparent violations are sent to the
Director, OE, and transmitted electronically via email to “RidsOeMailCenter Resource.”
Review escalated enforcement actions prior to submitting them for headquarters’ review.
Recommend to the Director, OE, as appropriate, changes to the Enforcement Policy or
guidance within this Manual.

E. Re-delegation of Authority by the Regional Administrator
The Deputy Regional Administrator is authorized to act in the stead of the RA during his/her
absence.
The Regional Administrator may re-delegate his/her authority to resident inspectors and
above in accordance with the most recent delegation of authority memorandum
(ML17038A336). Re-delegation of authority by the RA must be made in writing and a copy
filed with the Director, OE.
F. Regional Counsel
223

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

As directed by the Regional Administrator, the Regional Counsel
•
•

Reviews and provides legal advice on all regional escalated enforcement action
recommendations, prior to being submitted to headquarters for review and approval, as
appropriate and
Reviews other enforcement actions, as requested.

G. Regional Enforcement Staff
As directed by the Regional Administrator, the regional enforcement staff
•
•

•
•
•
•
•
•

Prepare or review all escalated enforcement actions prepared by the regional staff to
ensure technical adequacy and conformance to established policy, guidance, and
precedents.
Prepare an enforcement or SERP or Panel Worksheet (Panel Worksheet) (forms are
included in Appendix D) for all proposed enforcement issues and for all operating and
new construction reactor findings (including those without associated violations) that will
be discussed during an enforcement or SERP panel.
Provide the Panel Worksheet electronically via email to “RidsOeMailCenter Resource” at
least 72 hours prior to the scheduled panel.
Compile supporting documents for issues to be addressed in enforcement and SERP
panels.
Serve as point of contact for regional reviews, comments, and concurrence for
subsequent changes or revisions made to enforcement actions and final SDP letters
submitted to headquarters for review and approval.
Ensure that all enforcement actions issued by the region that were the subject of an
enforcement or SERP panel are subsequently transmitted electronically via email to
“RidsOeMailCenter Resource”.
Review all OI reports and coordinate with regional and headquarters staff to determine
whether enforcement action is appropriate.
Prepare a “3-week email” within 60 days week of receiving an unsubstantiated OI report.
o

Indicating that either;



o
o

Addressed to the Director, OE, the Assistant General Counsel for Security and
Enforcement, and the appropriate Office Director or Regional Administrator.
Inviting a response to the proposal that barring a different view;



•

No enforcement action is being considered, or
That although a violation appears to be present, willfulness is not involved.

There does not appear to be a violation of NRC requirements, therefore, no
enforcement action is proposed, or
The non-willful violation will be treated in accordance with normal enforcement
processes.

Prepare draft Commission papers for escalated enforcement actions requiring
Commission consultation, or review those prepared by the regional staff.

224

PART I: Enforcement Process

•
•
•
•
•
•
•
•
•
•
•
•

PART I – 5 Responsibilities and Authorities

Track the progress of all escalated enforcement actions and final SDP letters being
prepared in preparation in the region.
Provide a monthly report (by the 5th of every month to provide timely input for
Congressional Report) to OE on the number of escalated and non-escalated reactor
enforcement actions.
Strive to achieve timely actions.
Maintain necessary records and statistics on enforcement actions taken by the region.
Monitor, audit, and assist in processing non-escalated enforcement actions to ensure
that they are consistent with the Enforcement Policy, other guidance, and precedents.
Ensure that disputed minor violations, Severity Level IV violations, or violations
associated with green SDP findings (irrespective of whether they were dispositioned as
NCVs or in NOVs) are coordinated with OE.
Attend enforcement and SERP panels, predecisional enforcement conferences,
regulatory conferences, and SERP and enforcement caucuses, as appropriate.
Participate in regularly scheduled conference calls with OE to discuss enforcement
issues and cases.
Train regional personnel in enforcement matters.
Revise regional enforcement procedures, as appropriate.
Inform Regional Public Affairs Officer (RPAO) at least 72 hours prior to issuance of an
enforcement action involving a proposed civil penalty or an escalated NOV associated
with a red, yellow, or white SDP finding.
Review press releases for enforcement actions and activities to ensure that they
conform to the guidance in this Manual.

H. Regional Division Directors
Regional Division Directors are responsible to the Regional Administrator for recommending
escalated enforcement actions. Recommendations should include;
•
•
•

An evaluation of the significance of the violation,
Whether a civil penalty or order should be proposed, and
Whether mitigation or escalation of the civil penalty is appropriate.

I.

Resident and Region-Based Inspectors

As directed by regional management, resident and region-based inspectors;
•
•
•
•
•
•

Identify violations of regulatory requirements and recommend enforcement action,
Appropriately document findings and enforcement action,
Recommend to appropriate regional management the severity level of an apparent
violation and provide information that bears on the mitigation or escalation of a civil
penalty, if proposed,
Review responses to NOVs submitted by licensees to determine whether corrective
actions are adequate,
Prepare or provide input to evaluations of licensees' responses to proposed civil
penalties and orders, as appropriate, for submission to regional management, and
Attend enforcement and SERP panels, predecisional enforcement conferences,
regulatory conferences, and enforcement and SERP caucuses, as appropriate.

225

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

J. Senior Reactor Analysts
As directed by regional management, senior reactor analysts support NRC objectives
related to improving the utilization of risk insights in the reactor inspection and enforcement
programs.

Headquarters Program Offices
In accordance with the delegation of authority memoranda issued by the Director, OE, the
Offices of NMSS, NRR, NSIR and OIP have the authority to approve, sign and issue certain
enforcement actions. These delegations apply to enforcement actions in all areas in which the
specific program office evaluates, directly manages, or conducts inspections. If there is an
overlap between the regional and the applicable headquarters program office inspection or
oversight authority, and a dispute arises within the agency, or regarding which office should
issue the enforcement action, OE should be consulted prior to taking the enforcement actions.

Office of the General Counsel (OGC)
A. NRC MD 9.7, "Organization and Functions, Office of the General Counsel," states, in
relevant part for purposes of this section of the Enforcement Manual, that the Assistant
General Counsel for Security and Enforcement (OGC/SE):
1. Provides legal advice concerning NRC inspection, investigations and enforcement
activities, including notices of violation, civil penalties, and orders.
2. Acts as counsel for the NRC staff in public administrative proceedings before the
Commission, Atomic Safety and Licensing Boards, and presiding officers, relating to
enforcement actions involving facility or materials licenses, including the imposition
of civil penalties and the modification, suspension, or revocation of licenses and
other appropriate actions.
B. OGC/SE serves as the principal OGC contact for all enforcement matters. As such,
OGC/SE provides review and statements of “no legal objection” (NLO) for the following:
•
•
•

Enforcement actions that would result in hearing rights (e.g., orders and civil
penalties),
Enforcement-related OI matters (including all willful violations), and
Enforcement actions included in Commission papers (e.g., actions including SL I
violations).

When requested by OE and in coordination with the case attorney or OGC/SE
management, OGC/SE may provide legal advice (and NLO, if also requested) on:
•
•
•

Choice/conference letters
Factual Summaries
Closeout letters to individuals

1. When an NLO is required, an OGC/SE attorney will provide one in writing (email may
suffice). OE will resolve OGC/SE comments that constitute legal objections. On a
226

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

case-by-case basis, OGC/SE may also determine that review for an NLO is not
necessary for a specific document.
2. OGC/SE will generally review a document and provide its NLO determination within
10 working days of receipt; if delays occur during the review, OGC/SE will notify OE
accordingly.

Office of Nuclear Reactor Regulation (NRR)
NRR is responsible for supporting the enforcement program in all areas where NRR evaluates,
directly manages, or conducts inspections, including power reactors, and non-power reactors.
NRR is responsible for implementing the enforcement program and Enforcement Policy subject
to the overall policy, program, and implementation guidance from OE. For cases where NRR is
responsible for the allegation or inspection activity, NRR shall assume the role of the regional
office, as well, in implementing the enforcement program and Enforcement Policy.
NOTE:
NRR reviews the enforcement strategy for escalated enforcement actions for
10 CFR Part 50, 52 and 55 licensees to ensure that the violations have been
adequately established and that the significance of the violations has been properly
evaluated from an overall agency perspective.
When NRR assumes the role of the regional office (i.e., issuing non-SDP enforcement actions),
NRR generally:
•
•
•
•
•
•
•
•

Prepares and issues non-escalated enforcement actions;
Schedules and conducts enforcement panels, predecisional enforcement conferences, and
enforcement caucuses;
Prepares and issues escalated enforcement actions when authorized to do so, or after
concurrence by the Director, OE, and approval by the DEDO, as required;
Implement the ADR program as described in Part II, Section 1.2 of the Enforcement Manual;
Evaluates licensees' responses to enforcement actions and prepares appropriate
responses;
Tracks the status of enforcement actions;
Conducts NRR staff training; and
Audits NRR enforcement actions.

For all cases where the region evaluates, directly manages, or conducts inspections, NRR
generally reviews the enforcement strategy for escalated enforcement actions recommended by
the regional offices to ensure that:
•
•

Violations have been adequately established; and
The significance of the violations has been properly evaluated from an overall agency
perspective.

For the ROP and cROP, NRR generally develops and directs the implementation of policies,
programs, and procedures for regional application of the SDP in the evaluation of findings and

227

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

issues associated with the ROP or cROP. The output of the SDP provides a direct input into the
enforcement program in terms of how a violation will be dispositioned.
A. Delegation of Authority to the Director, NRR
The Director, NRR is authorized to act according to the following guidelines:
•

•

In accordance with MD 9.27, "Organizations and Function, Office of Nuclear Reactor
Regulation," the Director, NRR has been authorized to issue orders (i.e., safety
orders) and DFIs. However, use of this authority is expected to be confined to
actions not associated with violations.
In accordance with the delegation from the Director, OE, (ML16265A350) the
Director of the Office of Nuclear Reactor Regulation (NRR) is delegated authority to
approve, sign, and issue certain enforcement actions. This delegation applies to
enforcement actions in all areas in which NRR evaluates, directly manages, or
conducts inspections. If there is overlap between regional and NRR inspection
authority, and a dispute arises regarding which office should issue the enforcement
action, the Office of Enforcement (OE) should be consulted.

The Director NRR shall follow all agency regulations, the NRC Enforcement Policy, the
NRC Enforcement Manual, and other guidance from the OE in conducting enforcement
activities under this delegation of authority.
The Director, NRR, is authorized to take certain enforcement actions as authorized by
the Director, OE. Refer to Table 5.4.10.1 below.
B. Re-delegation of Authority by the Director, NRR (effective October 13, 2019)
The Deputy Office Director for Reactor Programs, NRR, is authorized to act in the stead
of the Director during his/her absence.
The Director, NRR, may re-delegate his/her authority to inspectors and above in
accordance with the delegation of authority memorandum (ML16265A350). Redelegation of authority by the Director, NRR, must be made in writing and a copy filed
with the Director, OE
C. Director, Division of Reactor Oversight, NRR (effective October 13, 2019)
As directed by the Director, NRR, and the Deputy Office Director for Reactor Programs,
the Director, Division of Reactor Oversight:
•
•

Serves as the principal NRR manager responsible for enforcement matters involving
10 CFR Part 50, 52 and 55 licensees;
Ensures that the enforcement strategy for escalated enforcement actions and cases
involving Commission papers for 10 CFR Part 50, 52 and 55 licensees are reviewed
to ensure that:
o
o

Violations have been adequately established, and
The significance of the violations has been properly evaluated from an overall
agency perspective;
228

PART I: Enforcement Process

•

•

•
•
•
•
•
•

PART I – 5 Responsibilities and Authorities

Ensures that comments are provided (verbally, electronically via email to
“RidsOeMailCenter Resource”, or in writing) based on the review in paragraph (b) of
this section to the Director, OE, generally within 10 working days of receipt of the
enforcement package in headquarters;
Ensures that the NRR Enforcement Coordinator and project, technical, and
management personnel attend enforcement and SERP panels, predecisional
enforcement conferences, regulatory conferences, and enforcement and SERP
caucuses, as appropriate;
Contacts the Director, OE, as soon as possible, and generally, no later than 24 hours
after receiving the Strategy Form, if he/she disagrees with an enforcement strategy
arrived at during an enforcement or SERP panel or caucus;
Reviews applicable OI reports to identify immediate safety issues and provide NRR
perspective in determining appropriate enforcement action;
Recommends to the Director, OE, initiation of proposed enforcement action, as
appropriate;
Ensures that responses to TIAs are coordinated with OE, as appropriate;
Reviews escalated enforcement actions prior to submitting them for headquarters’
review; and
Recommends to the Director, OE, changes to the Enforcement Policy or guidance
within this Manual, as appropriate.

D. NRR Enforcement Coordinator
As directed by the Deputy Office Director for Reactor Programs and the Director,
Division of Reactor Oversight, the NRR Enforcement Coordinator:
•
•
•

•

•
•
•

Serves as the principal NRR contact for enforcement matters involving 10 CFR Part
50, 52 and 55 licensees;
Participates in the weekly regional enforcement and SERP panels considering all
10 CFR Part 50, 52 and 55 licensee cases;
Leads the NRR review of the enforcement strategy for enforcement actions
discussed during panels and caucuses and notifies the Director, Division of Reactor
Oversight, and the Deputy Office Director for Reactor Programs (as appropriate) of
the enforcement strategy, especially in cases where the Enforcement Coordinator
disagrees with the strategy;
Obtains necessary technical support from other NRR divisions to ensure that the
enforcement strategy for actions proposed by the regions are technically adequate
and that reactor safety aspects of the violation have been properly evaluated from an
overall agency perspective and are consistent with previous actions or staff
positions;
Participates in predecisional enforcement conferences and regulatory conferences
with enforcement implications, when the issues warrant;
Consolidates NRR views on the enforcement strategy for proposed escalated actions
and forwards NRR comments (verbally, electronically, or in writing) to the Director or
Deputy Director, OE, for enforcement actions submitted to headquarters;
Ensures that disputed non-escalated enforcement actions (NCVs and NOVs)
involving non-power reactors are coordinated with OE;

229

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

•

Reviews all applicable OI reports to identify immediate safety issues, coordinates
with appropriate NRR staff, and provides NRR’s perspective in determining
appropriate enforcement action; and

•

Prepares a “3-week email” within 60 days of receiving an OI report:
o
o
o

•

Indicating that either:
 No enforcement action is being considered; or
 That although a violation appears to be present, willfulness is not involved.
Addressed to the Director, OE, the Assistant General Counsel for Security and
Enforcement, and the appropriate Office Director or Regional Administrator; and
Inviting a response to the proposal that barring a different view:
 There does not appear to be a violation of NRC requirements, therefore, no
enforcement action is proposed; or
 The non-willful violation will be treated in accordance with normal
enforcement processes.

Participates in regularly scheduled conference calls with OE, the regions, and the
other Program Office Enforcement Coordinators to discuss enforcement issues and
cases.

E. NRR Staff
In accordance with the delegations of authority for areas in which NRR evaluates,
directly manages, or conducts inspections (e.g., non-power reactors) the NRR staff:
•
•
•
•
•
•
•
•
•
•

Ensures that the enforcement activities conducted under current delegation(s) are
consistent with established policy, guidance, and precedent;
Identifies violations of regulatory requirements and recommends enforcement action;
Appropriately documents enforcement actions;
Issues notices of nonconformance and non-escalated enforcement actions, including
NOVs, and NCVs;
Recommends the severity level of an apparent violation and provides information
that bears on the mitigation or escalation of a civil penalty, if proposed;
Conducts enforcement panels, predecisional enforcement conferences, and
enforcement caucuses;
Prepares a Panel Worksheet and compiles supporting information for enforcement
and SERP panels;
Requests EA numbers for all contemplated escalated enforcement actions;
Submits all escalated enforcement actions to headquarters, for review and approval;
and
Reviews OI reports and makes recommendations to OE for enforcement actions
including immediate action, when warranted.

As directed by the Director, NRR, NRR staff and management personnel support
enforcement activities initiated by the regions, as follows:
•

The Division of Reactor Oversight (DRO) provides oversight and representatives as
necessary to support enforcement and SERP panels;
230

PART I: Enforcement Process

•

•

The Division of Risk Assessment (DRA) supports assessment of the safety
significance of the event(s) on which the proposed enforcement action is based.
This support will include probabilistic risk assessment (PRA) and Accident Sequence
Precursor calculations, where appropriate, as part of the integrated process
considering all facets surrounding the violation in support of enforcement decisions;
Appropriate project, technical, and management personnel should:
o
o
o

•

PART I – 5 Responsibilities and Authorities

Participate in enforcement and SERP caucuses to provide additional agency
perspectives associated with the enforcement strategy for potential escalated
enforcement actions;
Participate in enforcement and SERP panels to provide additional agency
perspectives associated with the enforcement strategy for potential escalated
enforcement actions; and
Attend predecisional enforcement conferences and regulatory conferences.

Project, technical, and management personnel will:
o
o

Review applicable OI reports to identify immediate safety issues and provide
NRR’s perspective in determining appropriate enforcement action; and
Coordinate with OE on TIAs that have the potential for enforcement implications.

Office of Nuclear Material Safety and Safeguards (NMSS)
NMSS is responsible for implementing the enforcement program and Enforcement Policy
subject to the overall policy, program, and implementation guidance from OE, for all areas
NMSS evaluates, directly manages, or for which it conducts inspections, or issues violations
involving: (1) industrial, commercial, and medical uses of radioactive materials; (2) material
control and accounting (MC&A), chemical, fire protection, and criticality safety activities at fuel
facilities; (3) gaseous diffusion plants; (4) transportation shipping packages; (5) independent
spent fuel storage installations; (6) dry storage systems for spent fuel; (7) uranium recovery
activities (8) the decommissioning of previously operating nuclear facilities and power plants
decommissioning activities; (9) low-level waste licensees; and (10) high-level waste repository
safety. For cases where NMSS is responsible for the allegation or inspection activity, NMSS
shall assume the role of the regional office, as well, in implementing the enforcement program
and Enforcement Policy. In addition, NMSS, including the Regional State Liaison Officer, work
in conjunction with the regional and program offices as well as the Agreement State within
which the NRC plans to take enforcement action, to ensure proper transmittal of the NRC’s
actions to individuals licensed by the State and enforcement actions issued to Agreement State
Licensees.
When NMSS assumes the role of the regional office, NMSS generally:
•
•
•
•
•

Prepares and issues non-escalated enforcement actions;
Schedules and conducts enforcement panels, predecisional enforcement conferences, and
enforcement caucuses;
Implement the ADR program as described in Part II, Section 1.2 of the Enforcement Manual;
Prepares and issues escalated enforcement actions when authorized to do so, or after
concurrence by the Director, OE, and approval by the DEDO, as required;
Evaluates licensees' responses to enforcement actions and prepares appropriate
responses;
231

PART I: Enforcement Process

•
•
•
•

PART I – 5 Responsibilities and Authorities

Tracks the status of enforcement actions;
Provides information about certain enforcement actions for Health and Human Services
(HHS) database;
Conducts NMSS staff training; and
Conducts audits of NMSS enforcement actions.

When NMSS is providing technical support to the regions, NMSS generally reviews
enforcement strategies for escalated enforcement actions recommended by the regional offices
to ensure that:
•
•

Violations have been adequately established; and
The significance of the violations has been properly evaluated from an overall agency
perspective.
A. Delegation of Authority to the Director, NMSS
In accordance with MD 9.26, "Organization and Functions, Office of Nuclear Materials
Safety and Safeguards", the Director, NMSS, is authorized to issue orders (i.e., safety
orders) and DFIs; however, use of this authority is expected to be confined to actions not
associated with violations.
In accordance with a delegation of authority issued by the Director, OE, (ML16265A348)
the Director of the Office of Nuclear Material Safety and Safeguards (NMSS) is
delegated authority to approve, sign, and issue certain enforcement actions. This
delegation applies to enforcement actions in all areas in which NMSS evaluates, directly
manages, or conducts inspections. If there is overlap between regional and NMSS
inspection authority, and a dispute arises regarding which office should issue the
enforcement action, the Office of Enforcement (OE) should be consulted.
The Director NMSS shall follow all agency regulations, the NRC Enforcement Policy, the
NRC Enforcement Manual, and other guidance from the OE in conducting enforcement
activities under this delegation of authority.
The Director, NMSS, is authorized to take certain enforcement actions as authorized by
the Director, OE. Refer to Table 5.4.10.1 below.
B. Re-delegation of Authority by the Director, NMSS
The Deputy Director, NMSS, is authorized to act in the stead of the Director during
his/her absence.
The Director, NMSS, may re-delegate his/her authority to inspectors and above in
accordance with the delegation of authority memorandum (ML16265A348).
C. NMSS Enforcement Coordinators
As directed by NMSS management, the NMSS Enforcement Coordinators:
•

Serve as point of contact for NMSS reviews, comments, and concurrence for
subsequent changes, or revisions made to enforcement actions;
232

PART I: Enforcement Process

•
•
•
•
•

•
•

•

•

•
•
•

•
•
•

PART I – 5 Responsibilities and Authorities

Provide training on enforcement matters within NMSS;
Serve as the principal NMSS contact for enforcement matters involving all material
cases;
Participate in regularly scheduled conference calls with OE, the regions, and the
other Program Office Enforcement Coordinators to discuss enforcement issues and
cases;
Participate in NMSS and regional predecisional enforcement conferences, when the
issues warrant;
Provide comments and/or concurrence, as appropriate, to OE generally within five
working days of receipt of the enforcement package; Participate in enforcement
panels and caucuses conducted by Regions (or OE or other Offices, as appropriate)
to provide additional agency perspectives associated with the enforcement strategy
for potential escalated enforcement actions;
Review and coordinate comments within NMSS on escalated enforcement actions
for all material cases submitted by the regions or other offices;
Lead the NMSS review of the enforcement strategy for enforcement actions
proposed by regions or others offices, and discussed during panels and caucuses
and notify the Director, NMSS, especially in cases where the Enforcement
Coordinator disagrees with the strategy.
Obtain necessary technical support from other NMSS divisions to ensure that the
enforcement strategy for actions proposed by the regions or other offices are
technically adequate and that safety aspects of the violation have been properly
evaluated from an overall agency perspective and are consistent with previous
actions or staff positions.
Review the enforcement strategy for escalated enforcement actions proposed by the
regions or other offices to ensure that the violations have been adequately
established and that the safety significance of the violations has been properly
evaluated from an overall agency perspective;
Coordinate with appropriate NMSS Division concerning possible enforcement action
based on OI reports.
Ensure that all applicable OI reports are reviewed and that recommendations are
made to OE for enforcement action, including immediate action, when warranted;
As appropriate, prepare a “3-week email” within 60 days of receiving an OI report:
o Indicating that either:
 No enforcement action is being considered; or
 That although a violation appears to be present, willfulness is not involved;
o Addressed to the Director, OE, the Assistant General Counsel for Security and
Enforcement, and the appropriate Office Director or Regional Administrator; and
o Inviting a response to the proposal that barring a different view:
 There does not appear to be a violation of NRC requirements, therefore, no
enforcement action is proposed; or
 The non-willful violation will be treated in accordance with normal
enforcement processes.
Provide assistance to the lead division, on request, in reviewing inspection and
investigation findings to identify apparent violations that may warrant escalated
enforcement action;
Provide assistance to the lead division, on request, in developing enforcement action
worksheets, agendas for enforcement panels with OE, and issuing background
information to all participants at least 72 hours in advance;
Schedule matters to be considered during OE enforcement panels;
233

PART I: Enforcement Process

•
•

•
•
•
•

PART I – 5 Responsibilities and Authorities

Provide assistance to the lead division, upon request, to determine whether a
licensee has been the subject of previous escalated enforcement action for purposes
of the civil penalty assessment process;
Provide assistance to the lead division, upon request, in drafting escalated
enforcement actions, including cover letters, orders, DFIs, proposed civil penalties,
orders imposing civil penalties, and Commission papers to ensure technical
adequacy and conformance to established policy guidance and precedents,
including coordination with OE during this process, as appropriate;
Provide assistance to the lead division, upon request, in arranging and conducting
predecisional enforcement conferences, including developing opening remarks on
the Enforcement Policy and process;
Provide assistance to the lead division, upon request, regarding policy advice
concerning enforcement matters, including information on enforcement actions in
similar cases;
Track progress of all escalated enforcement actions while in preparation in NMSS
and strive to achieve timely actions; and
Provide assistance to the lead division, on request, to ensure that responses to
disputed non-escalated enforcement actions (NCVs and NOVs) are coordinated with
OE.

D. Other NMSS Staff and Management
In accordance with the delegations of authority for areas where NMSS evaluates,
directly manages, or conducts inspections, the NMSS staff:
•
•
•
•
•
•
•
•
•
•
•
•
•
•

Informs, and coordinates with, the NMSS Enforcement Coordinator for all
enforcement actions.
Serves as the lead for enforcement activities within their technical area, and ensures
that the enforcement activities conducted under current delegation(s) are consistent
with established policy, guidance, and precedent.
Identifies violations of regulatory requirements and recommends enforcement action;
Appropriately documents enforcement actions;
Issues notices of nonconformance and non-escalated enforcement actions, including
NOVs and NCVs;
Signs and issues NRC Form 591s for Severity Level IV violations and Noncited
Violations (NCVs), if qualified and authorized to do so and subject to the review and
approval requirements specified in the appropriate inspection manual chapter;
Recommends the severity level of an apparent violation and provides information
that bears on the mitigation or escalation of a civil penalty, if proposed;
Prepares a Panel Worksheet and compiles supporting information for SERP and
enforcement panels;
Conducts enforcement panels, predecisional enforcement conferences, and
enforcement caucuses;
Requests EA numbers for all contemplated escalated enforcement actions;
Submits all escalated enforcement actions to OE for review and approval;
Reviews responses to enforcement actions to determine whether corrective actions
are adequate;
Reviews OI reports and makes recommendations to OE for enforcement action,
including immediate action, when warranted; and
Upon request, supports enforcement activities initiated by the regions, as follows;
234

PART I: Enforcement Process

o
o

o

PART I – 5 Responsibilities and Authorities

provide representatives as necessary to support enforcement panels,
Appropriate project, technical, and management personnel should:
 Participate in enforcement panels to provide additional agency perspectives
associated with the enforcement strategy for potential escalated enforcement
actions;
 Participate in enforcement caucuses to provide additional agency
perspectives associated with the enforcement strategy for potential escalated
enforcement actions; and
 Attend pre-decisional enforcement conferences.
Project, technical, and management personnel will:
 Review applicable OI reports to identify immediate safety issues and provide
NMSS’s perspective in determining appropriate enforcement action; and
 Coordinate with OE on TIAs that have the potential for enforcement
implications.

Office of Nuclear Security and Incident Response (NSIR)
NSIR is responsible for supporting the enforcement program where NSIR has program
ownership or where NSIR evaluates, directly manages, or conducts inspections involving
security at nuclear facilities or security of nuclear materials and nuclear activities. This
inspection responsibility typically includes force-on-force (FOF) inspections and inspection
activities associated with security during reactor operations and construction, security-related
information or security-related violations involving nonlicensees and vendors. NSIR is
responsible for implementing the enforcement program and Enforcement Policy subject to the
overall policy, program, and implementation guidance from OE. NSIR is also responsible for
reviewing the enforcement strategy for escalated enforcement actions prepared by the regions
to ensure that the significance of the violations has been properly evaluated from an overall
agency perspective. For cases where NSIR is responsible for the allegation or inspection
activity, NSIR shall assume the role of the regional office, as well, in implementing the
enforcement program and Enforcement Policy.
When NSIR assumes the role of the regional office, NSIR generally:
•
•
•
•
•
•
•
•

Prepares and issues non-escalated enforcement actions;
Participates in enforcement panels, predecisional enforcement conferences, and
enforcement caucuses;
Implement the ADR program as described in Part II, Section 1.2 of the Enforcement Manual;
Prepares and issues escalated enforcement actions when authorized to do so, or after
concurrence by the Director, OE, and approval by the DEDO, as required;
Evaluates licensees' responses to enforcement actions and prepares appropriate
responses;
Tracks the status of enforcement actions;
Conducts NSIR staff training, and
Audits NSIR enforcement actions.

When NSIR is providing technical support to the regions, NSIR generally reviews enforcement
strategies for escalated enforcement actions recommended by the regional offices to ensure
that:
•

Violation have been adequately established; and
235

PART I: Enforcement Process

•

PART I – 5 Responsibilities and Authorities

The significance of the violations has been properly evaluated from an overall agency
perspective.
A. Delegation of Authority to the Director, NSIR
In accordance with the delegation of authority issued by the Director, OE,
(ML17066A351) for all areas where NSIR evaluates, directly manages, or in which it
conducts inspections. If there is overlap between regional and NSIR inspection
authority, and a dispute arises regarding which office should issue the enforcement
action, the Office of Enforcement (OE) should be consulted.
The Director NSIR shall follow all agency regulations, the NRC Enforcement Policy, the
NRC Enforcement Manual, and other guidance from the OE in conducting enforcement
activities under this delegation of authority.
The Director, NSIR, is authorized to take certain enforcement actions as authorized by
the Director, OE. Refer to Table 5.4.10.1 below.
In accordance with the responsibility for supervising and directing all enforcementsupporting functions of NSIR, the Director, NSIR:
•
•
•
•
•
•
•
•

Contacts the Director, OE, as soon as possible, and generally no later than 24 hours
after receiving the Strategy Form, if they disagree with an enforcement strategy
arrived at during an enforcement panel or enforcement caucus;
Ensures that OI reports are reviewed and that recommendations are made to OE for
enforcement action, including immediate action, when warranted;
Ensures that NSIR staff receives appropriate training and instructions to implement
the enforcement program and that NSIR-based enforcement actions are periodically
audited;
Ensures that disputed non-escalated actions (NCVs and NOVs) are coordinated with
OE;
Ensures that copies of TIAs that involve apparent violations are sent to the Director,
OE;
Ensures that the enforcement activities conducted under this function are consistent
with established policy, guidance, and precedents;
Reviews escalated enforcement actions prior to submitting them for headquarters’
review; and
Recommends to the Director, OE, as appropriate, changes to the Enforcement
Policy or guidance within this Manual.

B. Re-delegation of Authority by the Director, NSIR
The Deputy Director, NSIR, is authorized to act in the stead of the Director during his/her
absence.
The Director, NSIR, may re-delegate his/her authority to section chiefs and above in
accordance with the delegation of authority memorandum (ML17066A351). Redelegation of authority by the Director, NSIR, must be made in writing and a copy filed
with the Director, OE.

236

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

C. NSIR Enforcement Coordinator
As directed by NSIR management, the NSIR Enforcement Coordinator:
•
•
•

•

•
•

•
•
•

Serves as the principal NSIR contact for enforcement matters involving security at
nuclear facilities and security of nuclear materials and nuclear activities;
Participates in the weekly regional SERP and enforcement panels for all cases
involving security at nuclear facilities and security of nuclear materials and nuclear
activities;
Leads the NSIR review of the enforcement strategy for enforcement actions
discussed during panels and caucuses and notifies appropriate NSIR management
of the enforcement strategy, especially in cases where the Enforcement Coordinator
disagrees with the strategy;
Obtains necessary technical support from other NSIR divisions/directorates to
ensure that the enforcement strategy for actions proposed by the regions are
technically adequate and that reactor safety aspects of the violation have been
properly evaluated from an overall agency perspective and are consistent with
previous actions or staff positions;
Participates in predecisional enforcement conferences and regulatory conferences
with enforcement implications, when the issues warrant;
Consolidates NSIR views on the enforcement strategy for proposed escalated
actions and forwards NSIR’s comments, i.e., verbally, electronically via
“RidsOeMailCenter Resource”, or in writing, to the Director or Deputy Director, OE,
for enforcement actions submitted to headquarters;
Participates in regularly scheduled conference calls with OE, the regions, and the
other Program Office Enforcement Coordinators to discuss enforcement issues and
cases;
Reviews all applicable OI reports to identify immediate safety issues, coordinates
with appropriate NSIR staff, and provides NSIR perspective in determining
appropriate enforcement action; and
Prepares a “3-week email” within 60 days of receiving an OI report.
o
o
o
o
o

Indicating that either:
No enforcement action is being considered; or
That although a violation appears to be present, willfulness is not involved;
Addressed to the Director, OE, the Assistant General Counsel for Security and
Enforcement, and the appropriate Office Director or Regional Administrator; and
Inviting a response to the proposal that barring a different view:
 There does not appear to be a violation of NRC requirements, therefore, no
enforcement action is proposed; or
 The non-willful violation will be treated in accordance with normal
enforcement processes.

D. NSIR Staff
In accordance with the delegations of authority for areas where NSIR evaluates, directly
manages, or conducts inspections, the NSIR staff:
•
•

Identifies violations of regulatory requirements and recommends enforcement action;
Appropriately documents enforcement actions;
237

PART I: Enforcement Process

•
•
•
•
•
•
•
•
•
•

PART I – 5 Responsibilities and Authorities

Issues notices of conformance and non-escalated enforcement actions, including
NOVs and NCVs;
Sign and issue NRC Form 591s for Severity Level IV violations and Noncited
Violations (NCVs), if qualified and authorized to do so and subject to the review and
approval requirements specified in the appropriate inspection manual chapter;
Recommends the severity level of an apparent violation and provides information
that bears on the mitigation or escalation of a civil penalty, if proposed;
Prepares a Panel Worksheet and compiles supporting information for SERP and
enforcement panels;
Conducts enforcement panels, predecisional enforcement conferences, and
enforcement caucuses;
Requests EA numbers for all contemplated escalated enforcement actions;
Submits all escalated enforcement actions to OE for review and approval;
Reviews responses to enforcement actions to determine whether corrective actions
are adequate;
Reviews OI reports and makes recommendations to OE for enforcement action,
including immediate action, when warranted; and,
Ensures that the enforcement activities conducted under current delegation(s) are
consistent with established policy, guidance, and precedent.

In accordance with guidance from the Director, NSIR, to support the enforcement
program, appropriate project, technical, and management personnel from NSIR:
•
•
•

Participate in enforcement panels to provide additional agency perspectives
associated with the enforcement strategy for potential escalated enforcement
actions;
Attend predecisional enforcement conferences;
Participate in enforcement caucuses to provide additional agency perspectives
associated with the enforcement strategy for potential escalated enforcement
actions.

In accordance with guidance from the Director, NSIR, to support the enforcement
program, the NSIR staff:
•

•

•

Reviews the enforcement strategy for regional escalated enforcement actions for
material licensees to ensure that the violations have been adequately established
and that the safety significance of the violations has been properly evaluated from an
overall agency perspective;
Provides comments (verbally, electronically via email to “RidsOeMailCenter
Resource” or in writing) based on the review conducted under the preceding
paragraph of this to OE generally within five working days of receipt of the
enforcement package; and
Reviews applicable OI reports and makes recommendations to OE for enforcement
action, including immediate action, when warranted.

Office of International Programs (OIP)
OIP is responsible for supporting the enforcement program in all areas where OIP evaluates,
directly manages, or conducts inspections. OIP is responsible for implementing the
enforcement program and Enforcement Policy subject to the overall policy, program, and
238

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

implementation guidance from OE. For cases where OIP is responsible for the allegation or
inspection activity, OIP shall assume the role of the regional office, as well, in implementing the
enforcement program and Enforcement Policy.
When OIP assumes the role of the regional office, OIP generally:
•
•
•
•
•
•
•
•

Prepares and issues non-escalated enforcement actions;
Schedules and conducts enforcement panels, predecisional enforcement conferences, and
enforcement caucuses;
Implement the ADR program as described in Part II, Section 1.2 of the Enforcement Manual;
Prepares and issues escalated enforcement actions when authorized to do so, or after
concurrence by the Director, OE, and approval by the DEDO, as required;
Evaluates licensees' responses to enforcement actions and prepares appropriate
responses;
Tracks the status of enforcement actions;
Conducts OIP staff training; and
Audits OIP enforcement actions.

For all cases where the region evaluates, directly manages, or conducts inspections, OIP
generally reviews the enforcement strategy for escalated enforcement actions recommended by
the regional offices to ensure that:
•
•

Violations have been adequately established; and
The significance of the violations has been properly evaluated from an overall agency
perspective.
NOTE:
Early engagement and coordination with OIP is required for any enforcement actions
associated with foreign nationals and/or foreign entities/licensees to ensure the
Agency’s international responsibilities are addressed prior to issuance of any
enforcement actions. Regional enforcement staff and OE enforcement specialists
will consult with the appropriate OIP staff/management in the early stages of the
enforcement case process.
A. Delegation of Authority to the Director, OIP
In accordance with the responsibility for supervising and directing the enforcement
functions for the Office of International Programs, subject to the overall policy, program,
and implementation guidance of OE, OIP is authorized to take certain enforcement
actions as authorized by the Director, OE as specified in delegation of authority
memorandum (ML16116A349). This delegation applies to enforcement actions in all
areas in which OIP evaluates, directly manages, or conducts inspections. If there is
overlap between regional and OIP inspection authority, and a dispute arises regarding
which office should issue the enforcement action, OE must be consulted.
The Director, OIP, shall follow all agency regulations, the NRC Enforcement Policy, the
NRC Enforcement Manual, and other guidance from the OE in conducting enforcement
activities under this delegation of authority.
239

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

The Director, OIP, is authorized to take certain enforcement actions as authorized by the
Director, OE. Refer to Table 5.4.10.2 below.
B. Re-delegation of Authority by the Director, OIP
1. The Deputy Director, OIP, is authorized to act in the stead of the Director during
his/her absence.
2. The Director, OIP, may re-delegate his/her authority to branch chiefs and above in
accordance with the delegation of authority memorandum (ML16116A349). Redelegation of authority by the Director, NSIR, must be made in writing and a copy
filed with the Director, OE.

Office of the Chief Financial Officer (OCFO)
OCFO has delegated authority to issue orders to licensees who violate Commission regulations
by nonpayment of license and inspection fees.

Office of Public Affairs (OPA)
OPA, including the Regional Public Affairs Officer (RPAO):
•
•

May issue press releases for various enforcement-related actions or activities that the
agency views as significant or newsworthy; and
Coordinates the issuance of press releases involving enforcement actions or activities with
the regional enforcement staff, and OE, as appropriate.
NOTE:
Press releases announcing predecisional enforcement conferences and regulatory
conferences that are open for public observation should be brief and carefully worded
so as not to prejudge the outcome; and include an explicit description of the nature of
the conference as a predecisional opportunity for the licensee to present any
additional material information before the NRC arrives at a decision.

Special Task Forces
•
•
•

NRC management may establish a special task force to investigate or otherwise review
circumstances surrounding activities which may result in an enforcement action.
Special task forces can serve a valuable purpose by bringing special expertise and insight
into the investigative and enforcement processes.
Special task forces formed to investigate or otherwise review circumstances surrounding
activities which may result in an enforcement action should have a charter or tasking
memorandum that:

240

PART I: Enforcement Process

o
o
o
o

PART I – 5 Responsibilities and Authorities

Delineates their role within the agency’s existing investigative and enforcement
processes;
Clearly defines the responsibilities of the special task force and establishes a work plan
at the outset that describes how the special task force will document task force findings;
Addresses whether the special task force’s activities and work products should be
independent or integrated within the existing investigative and enforcement processes;
Includes a clear strategy addressing how the special task force’s work will ultimately be
used by the agency, e.g.;



Whether the special task force should prepare an independent report or should
prepare input for an OI, NRR, NMSS, NSIR or region-based report.
Whether the special task force should participate in enforcement decision-making
activities, such as enforcement panels, conferences, and caucuses.

Summary of Program Office Delegation of Authority Memoranda
The following tables are for information only. For office-specific delegations, please refer to the
applicable delegation of authority memoranda.
In accordance with the delegation from the Director, OE, the Headquarters Program Offices are
delegated authority to approve, sign, and issue certain enforcement actions. These delegations
apply to enforcement actions in all areas in which the specific program office evaluates, directly
manages, or conducts inspections. If there is overlap between regional and the headquarters
program office inspection or oversight authority, and a dispute arises within the agency, or
regarding which office should issue the enforcement action, OE should be consulted prior to
taking enforcement action.
Program offices are authorized to take certain actions as authorized by the Director, OE. Refer
to tables 5.4.10.1 through 5.4.10.2 below.
NOTE:
The following tables are for information only. For program office delegations, refer to
the latest delegation of authority memorandum. Signature authority for the various
enforcement actions are subject to the limitations specified in the delegation of
authority memorandums and depicted herein. Re-delegation below the Office Director
requires that all conditions for the specified position, including those of the Office
Director, be satisfied.

Table 5.4.10.1, Delegation of Authority to NRR, NMSS and NSIR
Office
Director

Escalated Enforcement Actions
Notice of Violation - SL I

5

Notice of Violation - SL II

5

Notice of Violation - SL III

5

241

Deputy
Office
Director

Division
Director

Deputy
Division
Director

Branch
Chief k

Insp.

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

Table 5.4.10.1, Delegation of Authority to NRR, NMSS and NSIR
Office
Director

Notice of Violation - SL III FFD

5

Escalated Violations to Individuals

5

Violation associated with a Red SDP

5

Violation associated with a Yellow SDP

5

Violation associated with a White SDP

5

NOV with Civil Penalty

5

NOV with Civil Penalty to Licensed
Individuals (10 CFR 55)

Deputy
Office
Director

Division
Director

Deputy
Division
Director

Branch
Chief k

Insp.

N/A

Non-escalated enforcement actions
Notice of Violation - SL IV

√

4

4

4

4

N/A

Notice of Violation - SL IV issued beyond
NCV Criteria

2

4

4

4

4

N/A

Willful Violations dispositioned as SL IV

1, c

4

4

4

5

N/A

Noncited Willful Violations

1, c

4

4

4

5

N/A

Noncited Violations

√

4

4

4

4

N/A

Minor Violations

√

4

4

4

4

N/A

Violations associated with a Green SDP

√

4

4

4

4

N/A

Notice of Deviation

√

4

4

4

4

N/A

Notice of Nonconformance

√

4

4

4

4

N/A

NRC Form 591

√

4

4

4

4

4, g

1, c

4

4

4

5

Non-escalated Enforcement Actions to
Individuals
Orders
ADR Confirmatory Order

5

ADR Confirmatory Order to Individual

5

Cease and Desist Order

5

Cease and Desist Order to Individual
Confirmatory Order
Confirmatory Order to Individual
Order Imposing Civil Monetary Penalty
Order Imposing Civil Monetary Penalty to
Individual
Order Modifying License (not Safety
Orders)

N/A
5
N/A
5
N/A
5

Prohibition Order

N/A

Revocation Order

5

242

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

Table 5.4.10.1, Delegation of Authority to NRR, NMSS and NSIR
Deputy
Office
Director

Office
Director

Suspension Order

Division
Director

Deputy
Division
Director

Branch
Chief k

Insp.

5

Demand for Information (DFI) associated w/
enforcement actions
Demand for Information to Individual

5
N/A

Conduct ADR Mediation Session

2

5

ADR Agreement in Principle

2

5

Conduct Enforcement Panel, SERP, PEC,
Regulatory Conference and Caucuses

2

4

4

4

5

√

4

4

4

4

N/A

1, c

4

4

4

5

N/A

Final Case Disposition Letters
Close-out Letter
Exercise of Discretion Letter (See Note 6)
Exercise of Discretion Letter (See Note 7)

2

4

4

4

4

N/A

Letter to Withdraw, Modify or Rescind
Action (See Note 8)

1, c

4

4

4

5

N/A

Letter to Withdraw, Modify or Rescind
Action (See Note 9)

2

4

4

4

4

N/A

Chilling Effect Letter

√

4

4

4

4

N/A

Letter of Reprimand

√

4

4

4

4

N/A

√, d

4

4

4

4

N/A

Letter Responding to Disputed Violation
(See Note 8)

1, c, f, h

4

4

4

5

N/A

Letter Responding to Disputed Violation
(See Note 9)

2

4

4

4

4

N/A

Letter to Individuals (Escalated Enforcement
Actions)

1, c

4

4

4

5

N/A

Letter to Individuals (Nonescalated
Enforcement Actions)

1, c

4

4

4

5

N/A

Division
Director

Deputy
Division
Director

Branch
Chief i

Administrative Action Letters

Case Processing Letters
Choice or Conference Letter

Table 5.4.10.2, Delegation of Authority to OIP
Office
Director

Escalated Enforcement Actions
Notice of Violation - SL I

5

243

Deputy
Office
Director

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

Table 5.4.10.2, Delegation of Authority to OIP
Office
Director

Notice of Violation - SL II

5

Notice of Violation - SL III

5

Notice of Violation - SL III FFD

5

Escalated Violations to Individuals

5

Violation associated with a Red SDP

5

Violation associated with a Yellow SDP

5

Violation associated with a White SDP

5

NOV with Civil Penalty

5

NOV with Civil Penalty to Licensed Individuals
(10 CFR 55)

Deputy
Office
Director

Division
Director

Deputy
Division
Director

Branch
Chief i

N/A

Non-escalated Enforcement Actions
Notice of Violation - SL IV

√, c

4

4

4

4

Notice of Violation - SL IV Issued Beyond NCV
Criteria

√, c

4

4

4

4

Willful Violations Dispositioned as SL IV

√, c

4

4

4

4

Noncited Willful Violations

√, c

4

4

4

4

Noncited Violations

√, c

4

4

4

4

Minor violations

√, c

4

4

4

4

Violations associated with a Green SDP

N/A

Notice of Deviation

√, c

4

4

4

4

Notice of Nonconformance

√, c

4

4

4

4

NRC Form 591

N/A

Non-escalated Enforcement Actions to
Individuals

√, c

4

4

4

4

Orders
ADR Confirmatory Order

5

ADR Confirmatory Order to Individual

5

Cease and Desist Order

5

Cease and Desist Order to Individual

N/A

Confirmatory Order

5

Confirmatory Order to Individual

N/A

Order Imposing Civil Monetary Penalty

5

Order Imposing Civil Monetary Penalty to
Individual

N/A

244

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

Table 5.4.10.2, Delegation of Authority to OIP
Office
Director

Order Modifying License (not Safety Orders)

Deputy
Office
Director

5

Prohibition Order

N/A

Revocation Order

5

Suspension Order

5

Demand for Information (DFI) associated w/
enforcement actions

5

Demand for Information to Individual

N/A

Conduct ADR Mediation Session

5

ADR Agreement in Principle

5

Conduct Enforcement Panel, SERP, PEC,
Regulatory Conference and Caucuses

5

Final Case Disposition Letters
Close-out Letter

√, c

5

Exercise of Discretion Letter (See Note 6)

5

Exercise of Discretion Letter (See Note 7)

√, c

5

Letter to Withdraw, Modify or Rescind Action
(See Note 8)

1, c

5

Letter to Withdraw, Modify or Rescind Action
(See Note 9)

1, c

5

Chilling Effect Letter

√, c

5

Letter of Reprimand

√, c

5

√, c

5

Administrative Action Letters

Case Processing Letters
Choice or Conference Letter
Letter Responding to Disputed Violation (See
Note 8)

5

Letter Responding to Disputed Violation (See
Note 9)

1, c, h

Letter to Individuals (Escalated Enforcement
Actions)

5

5

Letter to Individuals (Nonescalated Enforcement
Actions)

√, c

245

5

Division
Director

Deputy
Division
Director

Branch
Chief i

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

Any other delegation of enforcement authority not explicitly granted in accordance with the
Delegation of Authority for Enforcement Actions memorandums must be approved by the
Director, OE.
Deputy Directors are authorized to act in the stead of the Director during his/her absence. Redelegation of Authority by the Director must be made in writing, and a copy must be filed with
the Director, OE.
Notes:
1.
2.
3.
4.
5.

8.
9.

Subject to Panel approval, may approve, sign and issue
After consultation with OE, may approve, sign and issue
RA delegation required
Office Director delegation required
Any other delegation of the enforcement authority not explicitly granted herein must be
approved by the Director, OE.
Application of Enforcement Policy would normally result in an escalated enforcement action
Application of Enforcement Policy would normally result in a nonescalated enforcement
action
For those cases where the previous action was an escalated enforcement action
For those cases where the previous action was a nonescalated enforcement action

√

Authority to approve, sign and issue

a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.

The Director OE or the EDO my elect to issue these enforcement actions directly
Non-immediately effective only
OE concurrence required
OE concurrence required for cases associated with an OI Report
OE on distribution list
Actions without hearing rights
After consultation with Branch Chief in accordance with manual Chapter 2800.
Those actions that are upheld by the RA do not require panel approval or OE concurrence
Includes Acting Branch Chiefs w/ advance written approval by the Office Director
After coordination with OE
Acting Branch Chiefs may not exercise this authority without first consulting with OE.

6.
7.

246

PART I: Enforcement Process

PART I – 5 Responsibilities and Authorities

THIS PAGE LEFT INTENTIONALLY BLANK

247

PART II: Topical Chapters

– TOPICAL CHAPTERS
Part II provides guidance on processing enforcement actions in specific areas of interest.
Guidance is provided for enforcement cases involving the Alternative Dispute Resolution (ADR)
process, discrimination and wrongdoing violations, material false statements violations and
incomplete and inaccurate information violations. Guidance is also provided for enforcement
cases involving specific areas of concern with reactor, materials, and fuel cycle licensees. Some
of the specific areas of concern include (1) fire protection, safeguards, Fitness-for-Duty (FFD),
and emergency preparedness; (2) loss, abandonment, or improper transfer or disposal of
licensed material, transportation, medical events, and Master Material Licensees (MMLs); and
(3) the decommissioning funding assurance rule.

248

PART II: Topical Chapters

PART II – TABLE OF CONTENTS
PART II - 1 GENERAL TOPICS ........................................................................................251
1.1
Wrongdoing ..................................................................................................252
1.2
Alternative Dispute Resolution (ADR) ...........................................................275
1.3
Discrimination ...............................................................................................284
1.4
Enforcement Actions related to Contractors and Individuals..........................306
1.5
Material False Statements and Completeness and Accuracy of Information .326
1.6
Deliberate Misuse of Licensed Material .........................................................331
1.7
Factual Summaries .......................................................................................333
1.8
Disagreement Memoranda ............................................................................336
PART II - 2 REACTOR TOPICS ........................................................................................338
2.1
Reactor Operations Related Issues...............................................................339
2.1.1
Actions Involving Inoperable Equipment........................................................339
2.1.2
Actions Involving Degraded Equipment .........................................................346
2.1.3
Enforcement of 10 CFR 50.59 and Related FSAR Violations ........................347
2.1.4
Citations Against 10 CFR Part 50, Appendix A, General Design Criteria .......351
2.1.5
Citations Against 10 CFR Part 50, Appendix B..............................................351
2.1.6
Enforcement Actions in Conjunction with Plant Shutdowns ...........................353
2.1.7
Actions Involving Loss of Decay Heat Removal (DHR) .................................354
2.1.8
Actions Involving Service Water Systems .....................................................357
2.1.9
Actions Involving Emergency Core Cooling Systems ....................................358
2.1.10 Actions Involving the Maintenance Rule ........................................................361
2.1.11 Issues That Are Violations of 10 CFR 50.65 and Issues That Are Not Violations
of 10 CFR 50.65 ...........................................................................................362
2.1.12 10 CFR 50.54 Deficiency Grace Period.........................................................379
2.2
Actions Involving Fire Protection ...................................................................380
2.3
Security .........................................................................................................382
2.4
Enforcement Actions Involving Fitness-For-Duty (FFD).................................390
2.5
Emergency Preparedness .............................................................................402
PART II - 3 MATERIALS TOPICS .....................................................................................403
3.1
Loss, Abandonment, or Improper Transfer or Disposal of Regulated Material
.....................................................................................................................404
3.2
Transportation ...............................................................................................410
3.3
Medical .........................................................................................................413
3.4
Master Materials Licenses.............................................................................420
3.5
Miscellaneous Materials Operations..............................................................423
3.6
Clarification of Decommissioning Funding Assurance Rule ...........................432
3.7
Timeliness in Decommissioning of Materials Facilities Rule ..........................435
3.8
Severity Levels of Violations at Fuel Facilities ...............................................438
3.9
Dispositioning Violations of Naturally Occurring and Accelerator-Produced
Radioactive Materials (NARM) Requirements ...............................................438
PART II - 4 REACTORS UNDER CONSTRUCTION .........................................................441
PART II - 5 IMPORT – EXPORT ENFORCEMENT TOPICS .............................................447
249

PART II: Topical Chapters

PART II – LIST OF FIGURES
Figure 1: Length of a ban............................................................................................317

250

PART II: Topical Chapters

PART II-1: General Topics

PART II - 1 GENERAL TOPICS
This section provides information regarding:
•

Enforcement cases that apply across the various programs (i.e. reactors, materials, fuel
facilities, etc.)

•

Guidance related to wrongdoing - general, discrimination, alternative dispute resolution
(ADR), and enforcement actions related to contractors and individuals and other general
topics. For guidance that specifically relates to a particular type of program, refer to the
appropriate topical chapter.

251

PART II: Topical Chapters

PART II-1: General Topics

Wrongdoing
Office of Investigation (OI) Investigations and Reports
OI may conduct an investigation for alleged wrongdoing by NRC licensees, individuals or
organizations who are licensed by the NRC, have applied for NRC licenses, or who are vendors
or contractors of NRC licensees.
A. Wrongdoing involves a violation of NRC requirements resulting from discrimination,
deliberate misconduct, or careless disregard.
B. The NRC staff is required to notify OI when a reasonable basis exists for believing that
wrongdoing may have occurred.
C. Upon receipt of an OI report involving wrongdoing, OE, OGC, the region, and the
appropriate program office perform an initial screening to determine appropriate
enforcement action.
NOTE:
In addition to the guidance provided in this section, refer to the Enforcement
Manual, Part II, Section 1.3 for guidance uniquely related to discrimination
cases.

Willful Violations
A. A willful violation is one in which an NRC requirement has been breached through a
voluntary and intentional action or lack of action other than a mistake or error.
1. Notwithstanding the actual safety consequence of a willful violation, the Commission
has taken the position that all willful violations are of particular concern because its
regulatory programs are based on licensees and their employees and contractors
acting with integrity and communicating with candor.
2. OI refers cases to DOJ when willful violations are substantiated by OI.
B. Willful violations may result either from conduct which:
1. Is intentional or deliberate; or
2. Constitutes reckless or careless disregard or indifference as to whether a
requirement will be violated.
C. The basic elements of a deliberate violation are typically:
1. A requirement exists (a regulation, license condition or technical specification, order
or statute);

252

PART II: Topical Chapters

PART II-1: General Topics

2. A violation of the requirement has occurred;
3. The person's actions were voluntary, as opposed to inadvertent;
4. The person committing the violation knew a requirement existed, understood the
requirement, and knew the requirement was applicable at the time; and
5. The person knew that his or her actions were contrary to the requirement.
NOTE:
It is important to recognize that careless disregard is not a subset or
lesser version of deliberate conduct. Both deliberate conduct and
careless disregard conduct are subsets of willful conduct, but they are
non-intersecting subsets with different elements that must be proven by a
preponderance of the evidence from the OI report.
D. The elements of conduct which demonstrate careless (or reckless) disregard are
typically:
1. A requirement exists (a regulation, license condition or technical specification, order
or statute);
2. A violation of the requirement has occurred;
3. The person's actions were voluntary, as opposed to inadvertent, constituting or
resulting in the violation;
4. The person acted with reckless disregard or indifference to:
a. The existence of the requirement;
b. The meaning of the requirement; or
c. Whether the intended conduct conformed to the requirement.

Enforcement Process
A. In accordance with the Discrimination Task Force recommendation, the Commission
approved centralization of the enforcement process for discrimination cases; therefore,
OE has the lead for all discrimination cases.
B. For other wrongdoing cases (i.e., wrongdoing cases that do not involve discrimination),
the region in which the wrongdoing occurred has the lead.

Roles and Responsibilities
For wrongdoing cases:
A. The applicable region or program office is responsible for:
253

PART II: Topical Chapters

PART II-1: General Topics

1. Scheduling and preparing for the initial kickoff meeting (see Section 1.1.5.2 below),
enforcement panel, ADR strategy session, ADR mediation sessions, PEC, and
enforcement caucuses;
2. Preparing enforcement actions;
3. Reviewing responses to NOVs;
4. Drafting and issuing any necessary press releases;
5. Communicating with licensee management and the complainant;
6. Providing notification to external stakeholders including the state liaison officer;
7. Issuing the closeout letter for any unsubstantiated cases; and
8. Reviewing the case for the identification and evaluation of any underlying technical
issues and to give clarification on site specific issues.
B. OE is responsible for:
1. Participating in enforcement panels, ADR strategy sessions and enforcement
caucuses, and to provide perspectives and concur on any actions taken. OE may
also participate in ADR mediation sessions and PECs, as needed;
2. Ensuring an EA number is assigned;
3. Completing the strategy form in EATS to document the proposed enforcement
strategy.
4. Ensuring that an OGC attorney is assigned to review all substantiated OI reports,
and coordinating the review of the OI report with OGC.
C. OGC is responsible for:
1. Assigning an attorney to review substantiated OI reports (currently communicated
through the OI reports tracking system in SharePoint);
2. Determining the sufficiency of the evidence to support a violation of the NRC’s
deliberate misconduct regulations;
3. Reviewing and providing legal advice on escalated enforcement actions, orders,
actions involving OI findings; and
4. Representing the staff in any NRC adjudicatory hearings on enforcement action.
D. For cases involving DOL interface, OE takes the lead once the DOL Administrative Law
Judge finds for the complainant.

Processing OI Reports
A. At the conclusion of an investigation where OI substantiates wrongdoing, but before the
OI report is issued, OI may conduct an “out-brief” with the responsible office and OE (as
appropriate) to discuss:
1. A brief overview of the allegation(s) that formed the basis of the investigation;
2. The investigation’s findings;
3. Whether or not there are any safety concerns that might require immediate
enforcement action.

254

PART II: Topical Chapters

PART II-1: General Topics

NOTE:
Coordination with OE is required for all substantiated OI reports or if the
responsible office concludes that a violation in an unsubstantiated report may
be willful. The “responsible office” refers to the region or the program office
responsible for the allegation(s) that are the subject of the OI investigation.
B. When OI issues a report where allegations of wrongdoing are substantiated, the
following general steps (discussed in greater detail below) are taken to process the OI
report:
1. OE will coordinate with OGC to ensure that an OGC attorney is assigned to the case.
Attorney assignments are currently communicated through the OI reports tracking
system in SharePoint.
2. The responsible office(s), OE and OGC will perform an initial screening and review of
the OI report and exhibits.
3. The responsible office will hold a kickoff meeting to ensure that the responsible
office(s), OE and OGC have all the appropriate documents to review the case.
Additionally, the kickoff meeting will ensure that there is alignment with the process
milestones necessary to bring the wrongdoing case to an enforcement panel in a
timely manner. For cases involving licensee fitness-for-duty (FFD) drug and alcohol
violations by individuals, the kick off meeting will also include the following:
a. Upon completion of the initial screening and review of the OI report and exhibits,
the responsible offices will determine if any FFD drug and alcohol violations
occurred that revealed the licensee failed to take the required sanctions against
the individual(s) as required by 10 CFR 26.75, “Sanctions,” or other apparent
deficiencies in the licensee’s implementation of its FFD program. If any
deficiency is identified, the responsible offices will process the OI case following
the normal process outlined in this section.
b. If no deficiencies are identified and all responsible offices agree, the OE
enforcement specialist will open an enforcement action number in the
enforcement action tracking system, document the case facts, and disposition
the case under the modified panel process citing Section 4.1, “Considerations in
determining enforcement actions involving individual,” of the Enforcement Policy
as the basis for terminating the review and closing the OI case.

255

PART II: Topical Chapters

PART II-1: General Topics

NOTE:
When reviewing an OI report for FFD violations, the staff should be aware
that additional violations of regulatory requirements, i.e., incomplete and
inaccurate information listed on a Personal History Questioner (10 CFR
73.56) could have occurred. If the staff believes that there are additional
violations that need to be dispositioned, the normal process to disposition
OI reports should be followed.

4. OGC will review the OI report, and complete an analysis of the report and its exhibits
to determine whether or not sufficient evidence exists to support:
•
•
•

A violation of NRC requirements,
Willful conduct – careless disregard
Willful conduct – deliberate misconduct

5. The responsible office will coordinate with OE to schedule and hold an enforcement
panel with the region, the program office, and OGC to discuss the findings of the OI
report and the development of possible enforcement action. The panel should be
held within 45 days from the receipt date of the OI report. The responsible office
should invite OI to participate.
6. The responsible office will prepare and process the resulting enforcement action.
C. If OI issues a report that does not substantiate allegations of wrongdoing, the following
general steps are taken to process an unsubstantiated OI report:
1. The responsible office will prepare a “three-week email” within 60 days of receiving
the unsubstantiated OI report. The email will indicated that either:
•
•

No violation appears to be present, therefore, no enforcement action is being
considered, or
Although a violation appears to be present, willfulness is not involved.

2. The email will also invite a response to the proposal that, barring a different view,
that:
•
•

There does not appear to be a violation of NRC requirements, therefore, no
enforcement action is proposed, or
The non-willful violation will be treated in accordance with normal enforcement
processes.

3. Addressees have 3 weeks from the date of the email to respond and provide a
differing view; otherwise, the responsible office may assume that it can proceed with
the proposed actions that are identified in the email.

256

PART II: Topical Chapters

PART II-1: General Topics

D. Regardless of the age of issues addressed by OI reports, processing OI reports is
considered an enforcement priority; therefore, timeliness goals stated within the steps of
these procedures should be followed, if possible.

1.1.5.1

Receipt and Initial Screening

A. Upon receipt of the OI report, the region, OE, and the appropriate program office will:
1. Determine from the OI report and exhibits whether or not any safety concerns are
identified (if not previously discussed at an OI “out-brief”), and if immediate
regulatory action is warranted.
2. If immediate action to address the safety concern appears to be warranted:
a. The responsible office will immediately notify OE.
b. The region, program office, and OE will promptly evaluate the need for regulatory
action, such as the issuance of an immediately effective order.
•

•
•

If immediate enforcement action is warranted, OE will coordinate the action
with the other offices, including OGC, and expedite the process. This should
be a rare occurrence, in light of the coordination that should have occurred
when the matter was first identified.
If any other office or region believes that immediate action is warranted, OE
should be immediately contacted.
For cases which have been referred to DOJ, refer to the Memorandum of
Understanding for guidance.
NOTE:

Notwithstanding the stated timeliness goals, it is recognized that
additional review time may be necessary for unusually complex cases or
those with an unusually large number of exhibits.
B. Within one week of receiving an OI report, the responsible office(s), OE and OGC will
also perform an initial screening and review of the OI report to determine:
1. The scope and level of effort that will be required to fully review the substantiated OI
report and its accompanying exhibits, and
2. Whether or not enforcement action appears to be warranted.

1.1.5.2

Kickoff Meetings

If the OI report findings indicate that enforcement action appears warranted, the responsible
office will schedule a kickoff meeting within two weeks of receiving the OI report and based on
the following guidance:
A. Purpose of the Kickoff Meeting
257

PART II: Topical Chapters

PART II-1: General Topics

1. Ensure that the responsible office(s), OE and OGC have all the appropriate
documents to review the case.
2. Ensure that there is logistical alignment and coordination to ensure timely processing
of OI cases in accordance with the following milestone targets:
•
•

45 days from issuance of the ROI (OI Report of Investigation) to Panel
30 days from Panel to Choice Letter

3. Non-exclusive list of topics:
•
•
•
•
•
•

Setting a tentative panel date and interim step target dates (e.g. case review,
EAW development, circulation, etc.) in order to support a panel date which is
within the overall 45 day target goal;
Anticipating any issues that may cause delays in the review process;
Determining priority of the case;
Identifying any on-going or related inspections or OI investigations;
Ensuring all licensee procedures cited in the draft NOV are included in the OI
Report, and if not, obtaining them; and
Any other topic the attendees deem appropriate discussing

B. Kickoff Meeting Attendees and Responsibilities
1. Required attendees
a. Responsible Office (Region) Enforcement Specialist or enforcement staff
•
•
•

Schedule the kickoff meeting/teleconference and notify the required
attendees and optional attendees.
Inform the attendees of any other related ongoing OI investigations or related
inspections as well as past investigations or inspections that may be related
or otherwise helpful in understanding the case
Summarize the path forward in an email to the attendees and other
stakeholders if a non-discrimination case

b. OE Enforcement Specialist
•
•

Coordinate the meeting/teleconference with the responsible office.
Summarize the path forward in an email to the attendees and other
stakeholders if a discrimination case

c. OGC Attorney
•

Highlight any preliminary potential legal issues with the basis for, or
categorization of, the apparent violation

•

Address other issues, as requested by one of the above

2. Optional attendees
258

PART II: Topical Chapters

PART II-1: General Topics

a. Program Office Enforcement Coordinator
b. Regional Division representative(s)
c. OI case agent, or the applicable Field Office Director
C. Kickoff Meeting Timing and Duration
1. The kickoff meeting or teleconference should be held within 2 weeks following the
issuance of the OI report. The meeting or teleconference may be held during the
applicable region’s regularly scheduled weekly panel or at another mutually agreed
upon time.
2. The meeting or teleconference is anticipated to be no more than 15-30 minutes.

1.1.5.3

OGC Analysis of OI Report

A. Typically, within 30 days following issuance of an OI report which substantiates willful
violations, OGC should:
1. Complete its review of the OI report and exhibits;
2. Inform the responsible office enforcement coordinator; and OE Enforcement
Specialist whether there is sufficient evidence to support enforcement action.
3. Discuss the apparent willful violations and the evidence which supports those
violations with the assigned OE Enforcement Specialist and/or the responsible office
enforcement staff to assist in preparing for the enforcement panel.
B. If OGC determines that there are significant legal concerns with the OI conclusions or
that there is insufficient evidence to support them, OGC should promptly inform OE. OE
will coordinate with OI and the other offices to determine the appropriate course of action
during the enforcement panel.
C. If OE, the region, or the program office identifies weaknesses in the evidence, they
should promptly inform the assigned OGC attorney so that their views can be
considered.

1.1.5.4

“Three-Week Emails”

D. If the responsible office determines that there does not appear to be a violation of NRC
requirements and, therefore, no enforcement action appears warranted, the responsible
office enforcement coordinator will:
1. Issue an electronic mail (e-mail) message within 60 days after receiving the OI report
indicating that no enforcement action is being considered. This message is
commonly referred to as a “three-week e-mail” based on the allowed response time
specified in the message. The e-mail message should be addressed to:
•
•

The Director, OE
The Assistant General Counsel for Security and Enforcement
259

PART II: Topical Chapters

•
•

PART II-1: General Topics

The appropriate Office Director or Regional Administrator (or designee)
Copies should be sent to RidsOeMailCenter Resource, the Regional
Enforcement Coordinator, and the Program Office Enforcement Coordinator

2. The three-week email shall invite a response to the proposal of no enforcement
action.
3. The responsible office may consider the matter closed if after three weeks from the
date of the e-mail message, the responsible office has not received differing views;
and, thereafter:
a. Send a letter to the licensee or vendor (if individuals other than the alleger were
interviewed during the investigation) to notify them that the investigation is
complete, and that no enforcement action is being proposed. The letter should
provide the results of the investigation which can be in the form of a short
summary of the OI report or a copy of the OI synopsis; and
b. Send a closure letter to the alleger in accordance with Management Directive
8.8, “Management of Allegations.”
4. Documentation generated as a result of the actions outlined above shall be retained
in the related allegation file.
NOTE:
Release of the synopsis should be coordinated with the OI Field Office
Director, unless authorization for release was previously granted. (The
region, in coordination with OI, will ensure that the identity of any alleger
or confidential source will not be compromised through the release of the
synopsis.)
E. If the OI report does not indicate willfulness but there are still violations present, the
responsible office will send a three-week email message (generally described above)
and indicate that, barring a differing view, the non-willful violations will be treated in
accordance with normal enforcement processes.

Enforcement Panel
A. For wrongdoing cases, the responsible region or program office should prepare for an
enforcement panel by preparing an enforcement panel worksheet including the
responsible office’s enforcement recommendation.
B. Within approximately four weeks of receiving an OI report, or within two weeks following
OGCs determination, OE, the region, OGC, and the applicable program office will
participate in an enforcement panel to determine the general direction of any
enforcement action that may be appropriate. The responsible office should invite OI to
participate.

260

PART II: Topical Chapters

PART II-1: General Topics

NOTE:
All actions to individuals should be discussed at an enforcement panel,
regardless of the severity level of the violation.
C. Panel Conduct: During the panel, the participants, among other things, may or may not:
1. Agree with the OI findings;
2. Agree on the issue of willfulness (i.e., careless disregard or deliberate intent);
3. Conclude that additional information is required; and
4. Agree on the appropriate enforcement action approach.
a. For the first two scenarios, it may be appropriate for the OI Field Office Director
or the investigator to provide a briefing to the rest of the staff on the details of the
case.
b. For the third scenario, potential weaknesses may be identified in the evidence.
Any concern(s) should be discussed at the panel.
•
•

OI may be asked as to the likelihood of obtaining further information through
investigation.
Alternatively, after consulting with OI, it may be appropriate to issue a DFI to
request additional information from the licensee.

D. Enforcement Panel Outcome
At the enforcement panel the staff may conclude that:
•
•
•
•

No violation occurred;
Non-escalated enforcement should be proposed;
Escalated enforcement action should be considered; or
A PEC does not need to be conducted.

If the staff concludes that escalated action should be considered:
1. The NRC may provide an opportunity for a PEC or ADR with the licensee, contractor,
or other person before taking enforcement action; or
2. If the case has not been accepted by DOJ, the region or OE should, if applicable,
schedule a PEC, or issue a choice letter to the licensee offering ADR or a PEC.
a. The conference letter or choice letter (see forms in Appendix B) will normally
include a factual summary which provides notice to the conference participants of
the factual basis for the staff’s preliminary conclusion that NRC regulatory
violations occurred.

261

PART II: Topical Chapters

PART II-1: General Topics

b. The conference letter or choice letter should be provided to the licensee at least
two weeks in advance of the conference.
E. Disagreements With OI Conclusions: If any member of the NRC staff (other than OI)
disagrees with an OI report conclusion regarding willfulness, the responsible office
should:
1. Promptly inform the assigned OGC attorney;
2. Schedule an enforcement panel to discuss OI’s conclusion
3. Document the decision on a Strategy Form.
a. OE will check the applicable boxes depicting the nature of the disagreement with
OI’s conclusion; i.e., the case does not meet:
•
•

The legal threshold for taking an enforcement action if OGC determines the
case does not meet the threshold for prevailing at a hearing.
The policy threshold for taking an enforcement action regarding deliberate
misconduct, careless disregard, or non-willful violations, if the staff
determines that enforcement action should not be taken; e.g., for a minor
violation of low safety consequence.

b. In the Remarks section of the Strategy Form, provide a brief (one or two
sentence) statement of the reason for not taking an enforcement action.
4. OE will provide the Strategy Form to the panel participants.
a. If any of the parties disagree with the strategy, they should contact the assigned
Enforcement Specialist as soon as possible, and normally not later than 24 hours
after receiving the Strategy Form. The Enforcement Specialist shall inform OE
management of the disagreement as soon as practical.
b. In rare circumstances, the issues may be significant enough to warrant direct
discussion between the Directors of OI and OE.
•

If the issues cannot be resolved between the Office Directors, Commission
consultation may be necessary.

•

If the Directors determine Commission consultation is not needed, OE should
document the nature of the disagreement on the Strategy Form as described
above.

c. If a Commission (SECY) paper is required because of disagreements
surrounding willfulness, the Commission paper should include a summary of the
rationale upon which OI based its conclusions and a summary of the non-OI
staff's basis for reaching different conclusions.

262

PART II: Topical Chapters

PART II-1: General Topics

Enforcement Action (EA) Number and Strategy Form
A. Enforcement Action (EA) numbers are used to administratively track a variety of
enforcement issues including all findings addressed in an enforcement panel, regardless
of whether an apparent violation is involved.
1. A single EA number should be used for each enforcement case; however, a separate
strategy form should be generated for each apparent violation when multiple
apparent violations are identified against a licensee or contractor.
2. A single EA number should be used when apparent violations are identified against
an individual, regardless if there is one or more apparent violation identified.
3. All cases involving willful violations (including those dispositioned as NCVs or
involving discretion) require an EA number. OE concurrence and an OGC no legal
objection is also required on the final package for such cases.
B. An Enforcement Specialist fills out the Strategy Form to document the enforcement
strategy agreed upon by the panel.
1. The Strategy Form should normally be completed within five working days of the
panel, subsequent panel, or enforcement caucus.
2. The parties involved should contact the Enforcement Specialist as soon as possible,
and normally not later than 24 hours after receiving the Strategy Form, if they
disagree with the characterization of the enforcement action as stated in the Strategy
Form. The Enforcement Specialist shall notify OE management of any such
disagreement as soon as practical.
C. In rare cases where the parties involved cannot reach consensus on an enforcement
strategy, the Director, OE, and the Directors of the other involved offices will meet to
determine the appropriate path forward.
1. If the issues cannot be resolved between the Directors, Commission consultation is
necessary.
2. If the Directors determine Commission consultation is not needed, OE should
document the nature of the disagreement on the Strategy Form as described above.

Predecisional Enforcement Conference (PEC)
PECs are conducted to gain a common understanding of the facts of the case, including
whether a violation occurred, and if so, its root causes, and any missed opportunities to identify
the violation sooner, corrective actions taken or planned, and significance of the issues. The
process for conducting a PEC is described in the Enforcement Policy and in this manual.
A. The PEC is normally closed for cases that involve:
1. Potential wrongdoing by an individual; and

263

PART II: Topical Chapters

PART II-1: General Topics

2. Those that involve findings of an OI report that has not been publicly disclosed,
(except if based on DOL finding).
3. Refer to NRC Form 578, “Request for court reporting services” to request
transcription services.
B. Absent coordination with the Director, OE, conferences should be transcribed for cases
involving a licensed operator, a licensee employee who may have committed a willful
violation, a significant case in which a record is warranted, any other case involving an
OI report, or a case involving discrimination.
1. Licensees will not be allowed to transcribe or record a conference.
2. Transcripts should not normally be released until after any associated enforcement
action has been taken.
a. If a transcript release is being considered prior to an enforcement action being
taken, the approval of the Director, OE is required.
b. If the licensee or any individual at the conference is subsequently provided a
copy of the transcript, whether by the staff's offer or the individual's request, the
individual should be informed that a copy will also be made available to the public
(subject to removal of privacy information, proprietary information, etc.).
c. Transcripts from open conferences may be made available to the public sooner.
3. Although transcribed conferences are not conducted under oath, the staff should
make it clear to the person making a statement that when a false statement is made
on a material matter, the person making the statement may be subject to civil and
criminal prosecution.
C. Attendees
1. NRC Attendance: There should be a reason for each NRC person’s attendance.
a. OE and the applicable region should attend all significant conferences.
b. The applicable program office enforcement coordinator should attend
conferences as deemed appropriate by the program office, or as requested by
the region or OE.
c. OGC or Regional Counsel should typically attend wrongdoing conferences.
2. Licensee Attendance:
a. Licensee attendance should include senior level managers and individuals
prepared to address the circumstances of the apparent violations and the
corrective actions.
b. When an individual’s significant personal action contributed to the violation,
consideration should be given to that person’s attendance at the licensee’s
conference.
D. Conduct of PEC
PECs generally conform to the following agenda:
264

PART II: Topical Chapters

PART II-1: General Topics

1. NRC will make an opening presentation.
2. Licensee will be provided an opportunity to make a presentation.
3. Frequently, the NRC will caucus briefly after the licensee’s presentation to determine
if additional questions remain.
4. The senior NRC official present will offer closing remarks and concludes the PEC.
E. PEC Summary
1. After the PEC has been held, the staff should prepare a PEC Summary (see sample
summary in Appendix D).
2. The PEC transcript should be entered into the PDR; however, transcripts should not
be released until after any associated enforcement action has been issued without
the approval of the Director, OE.

Enforcement Caucus
A. After the conclusion of the PEC, the PEC transcript is distributed to appropriate staff and
an enforcement caucus is scheduled.
B. Depending on the information gathered during the PEC and the discussions in the
caucus, the staff will determine one of several outcomes. OE will document its
understanding of the enforcement strategy that has been agreed upon during the
enforcement caucus by completing a Strategy Form and will follow the normal review
process.

Enforcement Action and Severity Level Categorization
A. Enforcement actions for wrongdoing and discrimination should follow the guidance
specified in the Enforcement Policy and this manual. Examples of sanctions that may be
appropriate include NCVs, NOVs, civil penalties, orders, or DFIs.
B. Civil penalties are normally assessed for Severity Level I and II violations and are
considered for Severity Level III violations.
C. With the exception of violations against the deliberate misconduct rule, NOV “contrary
to” paragraphs should not include the word “willful” or “deliberate misconduct.”
1. The discussion of willfulness should be included in the cover letter as part of the
significance discussion.
2. Including “deliberate misconduct” in “contrary to” paragraphs is required when
violations are based on the deliberate misconduct requirements.
D. The statute of limitations applicable to NRC civil penalty cases requires that the NRC
initiate an action imposing a civil penalty, issuing an order to modify, suspend, or revoke
265

PART II: Topical Chapters

PART II-1: General Topics

a license or an order to prohibit involvement in NRC licensed activity (enforcement
sanction) within the five-year statutory period.

1.1.10.1 Discretion
A. Notwithstanding the outcome of the normal civil penalty assessment process addressed
in the Enforcement Policy, the NRC may either:
1. Propose a civil penalty where application of the normal process would otherwise
result in zero penalty; or
2. Propose a civil penalty greater than the amount resulting from application of the
normal process (i.e., greater than the base or twice the base civil penalty).
B. Exercise of this discretion:
1. Ensures that the proposed civil penalty reflects the significance of the circumstances.
2. Requires prior approval by the Director, OE, and the DEDO and consultation with the
EDO, as warranted.

Program Fraud Involving Civil Penalties
OI investigations have occasionally uncovered that licensees have engaged in program fraud,
e.g., an OI investigation of a radiography licensee regarding its willful misuse of licensed
materials reveals that the licensee is not, as it has claimed (and paid the license fees for), a
small entity.
A. OGC has the lead for the program fraud aspect of such cases.
B. Information about the program fraud aspect of the case should be coordinated with OE
because as OE pursues the violation regarding the alleged misuse of licensed materials,
the fact that the licensee has deliberately mislead the agency may provide a context in
which the seriousness of the violation is assessed.

Processing Enforcement Actions
A. Concurrence
1. OE has the lead for all discrimination cases; as such all correspondence regarding
discrimination cases are processed in OE and provided to the region for information
only.
2. For other wrongdoing cases, the applicable region has the lead and responsibility for
issuance of any actions.
3. OGC reviews and provides its no legal objection on all enforcement actions that
would result in hearing rights, enforcement-related OI matters (including all willful
violations), and enforcement actions included in Commission papers.

266

PART II: Topical Chapters

PART II-1: General Topics

B. Signature Authority
The DEDO, Regional Administrator, or the Director, OE, has signature authority of the
various actions depending on the severity and/or the license type.

Enforcement Sanctions for Willful Violations
A. Because a willful violation is normally a significant regulatory issue, enforcement
sanctions:
1. Should demonstrate the unacceptability of such actions; and
2. Could include, in the event the agency loses reasonable assurance that licensed
activities can be conducted safely, orders amending, suspending or revoking a
license or preventing an individual from conducting activities involving regulated
materials.
B. A violation may be considered more significant than the underlying noncompliance if it
includes indications of willfulness.
In determining the significance of a violation involving willfulness, the relative weight of
each of the following factors will be assessed based on the circumstances of the
violation, including:
1. The position of the person involved in the violation (e.g., a supervisory or nonsupervisory employee whether working for the licensee or for a contractor);
2. The regulatory responsibilities imposed on the person involved in the violation (e.g.,
a licensed operator or an unlicensed operator fulfilling a position of regulatory
significance related to the public health and safety or the common defense and
security;
3. The significance of any underlying violation;
4. The intent of the violator (i.e., deliberateness or careless disregard); and
5. The economic or other advantage, if any, gained as a result of the violation.
C. If a licensee refuses to correct a minor violation within a reasonable time such that it
willfully continues, the violation should be considered at least more than minor.
D. Licensees must take remedial action in responding to willful violations commensurate
with the circumstances that demonstrate the seriousness of the violation, thereby
creating a deterrent effect within the licensee's organization.
E. Every case involving a willful violation will normally be considered for escalated action.
However, in an effort to encourage licensees to act responsibly in the identification and
correction of such violations, the NRC may choose, in accordance with the Enforcement
Policy, to disposition certain violations by issuing an NCV if the licensee identified and
corrected the violation.

267

PART II: Topical Chapters

PART II-1: General Topics

NOTE:
If the agency cannot make a conclusion as to whether an issue involves
willfulness, it may issue a Demand for Information (DFI) to the licensee,
requesting information on whether the NRC can have reasonable assurance
that the licensee will conduct its activities in accordance with NRC
requirements.

Delaying Enforcement Action Pending Investigation
In cases where an OI investigation is being conducted, enforcement action should generally not
be taken for matters that are within the scope of the OI investigation until the investigation has
been completed and the report issued.

Cases Requiring Immediate Action
A. If immediate action is required to protect the public health and safety or provide for the
common defense and security, the staff will not wait for completion of the OI
investigation and report. The staff may initiate and issue enforcement action when the
OI investigation discloses a significant safety issue that includes a preponderance of
evidence that a person in a position of responsibility has engaged in wrongdoing, i.e.,
has committed a willful act that causes the NRC to lose reasonable assurance that
licensed activities:
1. Will be performed in accordance with the Commission's requirements, or
2. Will not create an undue risk to the public health and safety or the common defense
and security.
B. If during an OI investigation, the OI Field Office Director concludes that sufficient
evidence of wrongdoing exists:
1. The OI Field Office Director will promptly notify the appropriate Regional
Administrator (This preliminary conclusion is subject to change based on additional
investigation and review);
2. The Regional Administrator will promptly consult with the Director, OE; and
3. The Director, OE, will coordinate, as appropriate, with OGC and the appropriate
program office to determine whether immediate action is necessary.
C. If it appears that immediate action is appropriate, the Regional Administrator will request
OI to promptly furnish the region, OE, OGC, and the program office with the evidence
gathered (e.g., transcripts or document exhibits) and also provide briefings, as
necessary, in order to develop an appropriate case.
D. If it is determined that enforcement action should be taken, OE will:

268

PART II: Topical Chapters

PART II-1: General Topics

1. Advise the Director, OI, of the reasons why enforcement action should proceed
during the pending investigation; and
2. Coordinate with DOJ (in accordance with the NRC/DOJ Memorandum of
Understanding discussed below) if the Director, OI, determines that the case will
likely be referred to DOJ for prosecution.
E. If the Regional Administrator and the Director, OE, determine that immediate action is
not necessary:
1. The region should prepare a brief note to the regional case file, with a copy to OE
and the program office, explaining the basis for the initial decision.
a. This note should: Include the caveat that the initial decision is "based on
evidence to date."
b. Be labeled, “Official Use Only - Predecisional Enforcement Information.”
2. If disagreement exists between the Regional Administrator, the Director, OE, and/or
the program office, the matter will be promptly elevated for the DEDO's
consideration.
3. After the complete OI investigation report is issued:
a. The region should reconsider whether regulatory action is necessary; and
b. If enforcement action is warranted but has not already been taken, such action
should be taken after DOJ completes or declines the case that was referred to
them.

Cases Not Requiring Immediate Action
A. If there is no immediate public health and safety or common defense and security
concerns:
1. Technical issues should be addressed apart from the OI issues if this can be
accomplished without compromising the pending OI investigation.
2. If addressing technical issues might involve the release of information that could
compromise the OI investigation, OI must be consulted before such information is
released.
B. If there are associated violations arising from an inspection that can be separated from
the issues OI is investigating:
1. The region may proceed with an enforcement action for those violations before
issuance of the OI report, but only after consultation with the Director, OE.
2. Review the OI report when it is issued to determine if the separated action should be
reopened.

269

PART II: Topical Chapters

PART II-1: General Topics

Department of Justice Referrals
A. Alleged or suspected criminal violations of the AEA and other relevant Federal laws are
referred to DOJ, in accordance with the Memorandum of Understanding (see Section
1.1.17.3).
B. All enforcement cases involving referrals to DOJ shall be coordinated with OE to ensure
the statute of limitations is being tracked, as required by SRM COMSECY-05-0033,
dated September 9, 2005.
C. OI refers cases to DOJ during or upon completion of an OI investigation involving willful
violations for potential criminal prosecution.
D. OE and OGC coordinate the enforcement actions for cases that are referred to DOJ
involving an apparent willful violation where circumstances warrant such action.
NOTE:
OE has increased its focus on statute of limitations (see section 6.3)
deadlines which will help ensure that any contemplated enforcement actions
can be completed before the SOL runs out.

1.1.17.1 Policy of Withholding NRC Action
A. As a general policy, if a matter has been referred to the DOJ, unless immediate action is
necessary for public health and safety or common defense and security reasons,
issuance of an enforcement action should be withheld to avoid potential compromise of
the DOJ case, pending DOJ determination that the enforcement action may be issued.
B. For those cases for which DOJ is likely to convene a Grand Jury, OE should coordinate
its efforts with OI to ensure that OI can provide investigators who are not constrained in
communicating to the NRC staff by the Federal Rules of Criminal Procedure regarding
Grand Jury proceedings, and can, therefore, separately support any possible NRC
enforcement action.

1.1.17.2 NRC Enforcement Action
A. Notwithstanding the policy on withholding NRC enforcement action for those cases
accepted by DOJ, the staff should take certain actions, e.g. enforcement panel with a
preliminary decision, to ensure timely processing of enforcement actions upon DOJ
release or decline of the case.
B. Within six weeks of receiving an OI report, or two weeks after the enforcement panel, the
Director, OE, will normally contact DOJ to advise them of the NRC's intended direction in
terms of any potential enforcement action. This will enable DOJ to advise OE if an NRC
enforcement action will interfere with planned DOJ action.
1. If DOJ does not object to the NRC conducting alternative dispute resolution (ADR) or
a PEC, then the NRC should proceed with the enforcement process.
270

PART II: Topical Chapters

PART II-1: General Topics

2. If DOJ does object, the NRC should not proceed with an enforcement process;
instead, the region/program office and OE may reach an agreement as to whether a
preliminary recommended action should be drafted pending DOJ review. In
situations where the SOL is reaching expiration, the NRC should be prepared to, at a
minimum, complete the disposition of the enforcement case so as to be ready to
issue any civil action, after consultation with DOJ in accordance with the MOU.
3. If DOJ determines that a referred case lacks prosecutorial merit, it will normally notify
the NRC (Director, OI) by a letter of declination. OI should promptly call OE upon
receipt of the letter and should send copies of the letter to OE and the applicable
region as soon as possible so that the enforcement process can proceed in a timely
manner.
4. Following DOJ declination, the region/program office should resume the enforcement
process consistent with the enforcement panel decision.

1.1.17.3 Memorandum of Understanding (MOU) Between the NRC and DOJ
A. The MOU between the NRC and DOJ (published in the Federal Register on December
14, 1988) is included on the Enforcement Web site.
B. The MOU addresses:
1. Coordination of matters that could lead to enforcement action by the NRC as well as
criminal prosecution by DOJ;
2. The exchange of information between the agencies;
3. The responsibilities of each agency, including the NRC's responsibilities to notify
DOJ of suspected criminal violations;
4. Coordination with DOJ on NRC regulatory activities that run parallel to or may affect
DOJ activities. Under this section, potential NRC actions are divided into three
categories:
a. Actions the NRC needs to take when it concludes that the NRC lacks reasonable
assurance that activities authorized by a licensee are being conducted without
endangering the health and safety of the public or the common defense and
security;
b. Immediate action the NRC must take to protect the public health, safety, or the
common defense and security; and
c. Actions the NRC must take to fix an immediate problem. This category applies
when time does not allow for reasonable consultation. The NRC is to notify DOJ
in advance if time permits and, if not, as soon as possible after the action is
taken.
5. NRC’s responsibility to consider the views and concerns of DOJ to the fullest extent
possible consistent with the regulatory action that the NRC believes is required;
6. Civil penalty actions.
271

PART II: Topical Chapters

PART II-1: General Topics

a. Before issuing a civil penalty based on a referred case or one involving "special
circumstances," the NRC will notify DOJ of the contemplated action.
b. NRC should defer initiation of the action until DOJ either concludes its criminal
investigation or prosecution, or consents to the NRC action. One exception is
provided, pertaining to matters involving the statute of limitations.
NOTE:
If the NRC proceeds with a case that DOJ is still processing, NRC has
agreed to seek a stay in any resulting hearing, provided DOJ is prepared
to support the staff with appropriate affidavits and testimony. The
Director, OE, is the staff official responsible for coordinating regulatory
activities with DOJ; however, the Director, OE, normally interfaces with
OI and OGC also has certain coordination responsibilities.
7. Exchanges of information between the NRC and DOJ; and
8. The time frames for consultation, i.e.:
a. NRC’s commitment to notify the DOJ of contemplated civil enforcement action,
normally within 45 days of a referral to DOJ; and
b. DOJ’s commitment to notify NRC of its preliminary position on criminal
prosecution or investigation, normally within 60 days of the referral.

Release of OI Reports and Transcripts of Interviews
A. Release of OI reports and exhibits:
1. Will not normally be provided if OI concludes that disclosure could interfere with
ongoing investigation activities. If this situation arises, the Regional Administrator
and Director, OE, will consult on how to proceed.
NOTE:
The Director, OE should be consulted before release of any OI report
(and/or exhibits) associated with an enforcement action. In addition, in
every case, exhibits will normally be provided only if requested through
the FOIA process. Additional information is included in Management
Directive 3.4, “Release of Information to the Public.”
2. Are not generally available to the licensee or public until after the enforcement action
has been issued, except in cases involving DOL hearings (discrimination cases).

272

PART II: Topical Chapters

PART II-1: General Topics

3. A conference letter or choice letter (see forms in Appendix B) will normally include a
factual summary which provides notice to the conference participants of the factual
basis for the staff’s preliminary conclusion that NRC regulatory violations occurred.
B. Transcripts of interviews conducted to support enforcement action:
1. Should NOT be released to licensees without prior approval by the Director, OE, and
the Director, OI, until after the action has been issued.
2. May be provided to individuals for review, if an individual (or individual's attorney)
requests a copy of the transcript of their OI interview to prepare for a PEC (of which
they are the subject), provided that the related OI investigation is complete and
closed. The Director, OI, and Director, OE, should be consulted in these cases.
3. Will NOT be made available to the public until after the enforcement action is issued.

Processing Administratively Closed OI Cases
OI may choose to administratively close a case for several reasons including a lack of resources
or because of an ongoing activity by another agency associated with the case.
A. Lack of Resources: Whenever OI closes a case for lack of resources, the region or
applicable program office will review the case and make an initial determination of the
action, if any, that appears warranted. This includes, where appropriate, discussing with
OE the assignment of a higher priority.
1. The region or applicable program office will first review the OI priority criteria and
make a determination of whether the OI priority should be changed or whether the
case should be reopened.
2. If the case should be reopened, the region or applicable program office will either:
a. Issue a memorandum to the Regional Administrator/Office Director; or
b. Schedule a multi-office meeting involving the region, OE, OGC, and the
applicable program office to discuss the merits of changing the priority or
reopening the investigation.
3. The region or applicable program office will also review the final field notes or
inspection report (not a draft) for the case to determine whether there is sufficient
information to conclude that a violation exists and that enforcement action appears
warranted.
4. If the region or applicable program office concludes that a non-willful violation exists,
the case will be handled using the normal NOV process.
5. If the region or applicable program office concludes that a willful violation exists, the
region or applicable program office will schedule a multi-office meeting with the
region, OE, OGC, and the applicable program office to discuss the appropriate
course of action to take.
273

PART II: Topical Chapters

PART II-1: General Topics

6. If the region or applicable program office concludes that neither a violation nor
wrongdoing exists, it will:
a. Issue a memorandum to the Regional Administrator, the Associate General
Counsel for Hearings, Enforcement & Administration, and the appropriate Office
Director, stating this conclusion and inviting the recipients of the memorandum to
respond to the memorandum’s proposal to take no enforcement action.
b. Close the matter if, after three weeks, no differing views have been received.
c. Subsequently, the responsible office should send a letter to the licensee or
vendor (if individuals other than the alleger were interviewed during the
investigation) to notify them that the matter has been resolved or closed.
•
•
•
•

The letter should provide the results of the investigation which can be in the
form of a short summary of the OI report or a copy of the OI synopsis.
Release of the synopsis should be coordinated with the OI Field Office
Director, unless authorization for release was previously granted.
The region or program office sending the close-out letter should also
coordinate with OE to verify that the matter is in fact closed and that no other
office has an open issue.
Additional information is included in Management Directive 3.4, “Release of
Information to the Public.”

B. Activity by Another Agency: OI may administratively close a case because another
agency, such as DOL or DOJ, may be considering action associated with the case. In
these cases, OE will assign an EA number to the case in an effort to:
1. Ensure that the staff revisits the case after the other agency has completed its
activity; and
2. Track the issue so that the staff can determine whether to take action before the
other agency has completed its activity should the statute of limitations become an
issue.

274

PART II: Topical Chapters

PART II-1: General Topics

Alternative Dispute Resolution (ADR)
Alternative Dispute Resolution (ADR) is used to resolve both discrimination and other
wrongdoing cases after the NRC Office of Investigations has completed an investigation
(previously referred-to as post-investigation ADR), and the NRC concludes that pursuit of an
enforcement action appears warranted. ADR is also used for escalated nonwillful enforcement
cases with a potential for a civil penalty (excluding ROP cases).
A. Enforcement ADR (previously “post-investigation ADR”) may be used for discrimination
violations based solely on a finding by the U.S. Department of Labor (DOL); however,
the NRC will not negotiate the finding by DOL.
B. Non-willful violations identified during a wrongdoing investigation maybe dispositioned
within the scope of ADR.
C. Use of ADR is voluntary by all parties, including the NRC, and may be ended by any
party at any time.
1. Individuals within the Commission’s jurisdiction may be offered ADR.
2. There may be circumstances where it may be inappropriate for the NRC to engage in
enforcement ADR and therefore retains the option to decline ADR as a party. Some
examples include:
a. If the U.S. Department of Justice has substantial involvement in the case;
b. If the subject matter of the case is such that a Confirmatory Order detailing the
terms of the settlement agreement cannot be made public;
c. If the case is a particularly egregious case in which the public interest is not
served by engaging in ADR.
d. If ADR is not offered, the reason should be included on the strategy form.
e. Approval from the Director, OE, is required for the NRC to decline participation in
ADR.
D. Complements and works in conjunction with the traditional NRC enforcement process.
1. ADR is offered for any case within the scope of the program at three points in the
process: (1) with a choice or conference letter; (2) in the cover letter forwarding the
initial enforcement sanction (e.g. NOV or order); and (3) if an order imposing a CP is
issued, in the cover letter providing that order.
2. If an agreement is not reached, the normal enforcement process is resumed.
E. Licensees can engage in ADR to resolve discrimination complaints prior to an OI
investigation, i.e. early-ADR, utilizing the NRC’s program (refer to MD 8.8) or a licensee
sponsored program.

Enforcement Alternative Dispute Resolution
A. Alternative dispute resolution (ADR) sessions are addressed in the Enforcement Policy
and this manual.
275

PART II: Topical Chapters

PART II-1: General Topics

NOTE:
Licensees can utilize ADR to resolve discrimination complaints prior to the
initiation of an investigation by OI (i.e., Early ADR). The Early ADR process
is discussed in NUREG/BR-0313, Rev. 1, August 2010 “Pre-Investigation
Alternative Dispute Resolution Program.”
B. The Administration Dispute Resolution Act of 1996 (ADRA) authorizes and encourages
the use of ADR by Federal agencies.
C. Enforcement ADR may be used to resolve discrimination and other wrongdoing cases
and escalated non-willful (traditional) enforcement cases with the potential for civil
penalties.
Non-willful violations identified during a wrongdoing investigation maybe dispositioned
within the scope of ADR.
D. Mediation is the form of ADR the NRC typically uses.
Mediation is an informal process in which a trained neutral (the “mediator”) works with
the parties to help them reach an agreement.
E. Terms of the ADR settlement agreement will be confirmed by confirmatory order.
NOTE:
One of the advantages of offering ADR is that corrective actions proposed by
the licensee or individual, and accepted by the NRC, become legally-binding
requirements upon issuance of the confirmatory order.
F. The use of ADR is voluntary, and any participant may end the mediation at any time.
G. For guidance related to ADR agreements, refer to EGM-11-005.

ADR Roles and Responsibilities
A. OE:
1. Director, OE, has overall ADR program responsibility.
2. Director, OE may serve as the lead NRC negotiator for any ADR mediation session
and in particular serves as the lead NRC negotiator for discrimination cases. This
responsibility may be delegated to the Deputy Director, OE.

276

PART II: Topical Chapters

PART II-1: General Topics

3. Director, OE has the authority to sign settlement agreements and issue ADR
confirmatory orders. This responsibility may be delegated to the Deputy Director,
OE.
4. Typically take the lead to perform follow-up reviews for discrimination cases.
5. For wrongdoing cases and escalated non-willful (traditional) enforcement cases with
the potential for civil penalties, the OE enforcement specialist should participate in
the ADR strategy session and may participate in the ADR mediation session, at the
discretion of OE management.
6. Prior to ADR strategy session for a pending discrimination enforcement ADR
session, and after consultation with OE management, the OE enforcement specialist
assigned to the case will attempt to contact the concerned individual (CI) whose
discrimination allegation forms the basis of the NRC's action to inform the CI of the
pending mediation session and to solicit input regarding potential corrective actions
for consideration during the NRC mediation. The OE enforcement specialist should
respectfully inform the CI that the NRC may or may not be able to gain such
proposed corrective actions during the mediation session but nevertheless the NRC
is appreciative of the input to ensure the best outcome for the benefit of the public.
7. On or about the date that a discrimination enforcement ADR confirmatory order (CO)
is issued, the OE enforcement specialist assigned to an enforcement ADR case,
after consultation with OE management, will either (1) attempt to contact the
concerned individual whose allegation of discrimination forms the basis of the CO to
inform him/her of the CO's issuance or (2) notify the regional or program office
allegation coordinator of the issuance of the CO so that the allegation coordinator
may attempt to contact the concerned individual on or about the date the
confirmatory order is issued.
B. Region:
1. Regional Administrators may serve as the lead NRC negotiator for ADR sessions
involving wrongdoing (other than discrimination) and escalated non-willful
(traditional) enforcement cases with the potential for civil penalties for their region.
During the absence of the Regional Administrator, the Deputy Regional Administrator
is authorized to act in the stead of the Director.
The Deputy Regional Administrator may serve as the lead NRC negotiator for ADR
sessions if re-delegated by the Regional Administrator. Any further delegation below
the Deputy Regional Administrator must be approved by the Director, OE. Redelegation of this authority must be made in writing, and a copy must be filed with the
Director, OE.
a. In order to support a more consistent, effective and transparent delegation
process, the following are a set of factors to consider for selecting an individual to
act as lead negotiator in an enforcement ADR mediation. While recognizing that
there is no quantitative threshold that must be met, the overall approach to
designating a person to act as lead negotiator in enforcement ADR mediation is
to provide the RA with the flexibility to select the person who is best able to act in
his or her place as the lead negotiator, on a case-by-case basis.
277

PART II: Topical Chapters

•
•
•
•
•
•
•
•
•
•

PART II-1: General Topics

Complexity of the issue(s) in dispute;
Level of precedent setting impact of any outcome;
Level of senior management interest in the outcome of the mediation;
Level of public interest in the outcome of the mediation;
Designee’s knowledge/expertise with the type of issue presented in the
pending enforcement action;
Designee’s familiarity and experience with the particular facts and legal
issues of the pending enforcement action;
Designee’s previous experience as lead negotiator and past ADR and
negotiation training and experience generally;
Designee’s schedule and workload flexibility to support a timely mediation
process;
Designee’s knowledge/familiarity with Enforcement ADR Program process;
Designee’s level of seniority

2. Regional Administrators or Deputy Regional Administrators, if re-delegated, have the
authority to sign and issue ADR confirmatory orders involving wrongdoing cases
(other than discrimination) for their region after obtaining concurrence from the
Director, OE.
3. For wrongdoing cases, other than discrimination, and nonwillful (traditional)
enforcement cases with the potential for civil penalties, the regional enforcement
staff should develop the ADR strategy worksheet and attend the ADR mediation
session.
4. Responsibility for tracking, inspection, and follow-up of actions contained in all ADR
confirmatory orders. Typically, OE will take the lead to perform follow-up reviews for
discrimination cases.
C. Program Offices (NRR, NMSS and NSIR):
1. Responsible for developing and maintaining procedures for follow-up and closure of
ADR confirmatory orders falling within their area of responsibility. Typically, OE will
take the lead to perform follow-up reviews for discrimination cases.
2. The Office Directors, after consultation with OE, may serve as the lead NRC
negotiator for ADR sessions involving wrongdoing, other than discrimination, and
escalated nonwillful (traditional) enforcement cases with the potential for civil
penalties in areas in which their program office evaluates, manages or inspects.
During the absence of the Director, the Deputy Director is authorized to act in the
stead of the Director.
3. For wrongdoing cases, other than discrimination, and escalated nonwillful (traditional)
enforcement cases with the potential for civil penalties, the program office
enforcement coordinator should develop the ADR strategy worksheet and attend the
ADR mediation session.
D. Office of General Counsel:

278

PART II: Topical Chapters

PART II-1: General Topics

Provide legal advice to the NRC ADR lead negotiator during conduct of the ADR
mediation session. Regional Counsel may provide legal advice for their region.
E. Office of Investigations:
Available to attend ADR strategy sessions and mediation sessions, if requested.
F. Office of Public Affairs:
Responsible for determining whether to issue a press release (as appropriate) to
announce significant agency actions, such as ADR confirmatory orders.

Confidentiality
A. All mediation activities under the ADR program are subject to the confidentiality
provisions of the Administrative Dispute Resolution Act, 5 U.S.C. 574; the Federal ADR
Council’s guidance document entitled “Confidentiality in Federal ADR Programs;” and
the explicit confidentiality terms set forth in the Agreement to Begin Voluntary Mediation
signed by the parties.
These protections apply to communications between the neutral, who is an individual
who functions to aid the parties in resolving a controversy, and the parties involved in the
enforcement process.
B. A party to a dispute resolution proceeding shall not voluntarily disclose or through
discovery or compulsory process be required to disclose any dispute resolution
communication, with exceptions provided in the ADRA. Of particular interest to the
enforcement program are the following exceptions:
1. The communication was prepared by the party seeking disclosure. In other words, if
a statement is made by a party or if a document is prepared by a party, that same
party is allowed to use or disclose the statement or document in any subsequent
proceeding.
2. Except for dispute resolution communications generated by the neutral, dispute
resolution communications provided to or available to all parties to the dispute
resolution proceeding. In other words, for purposes of the enforcement program,
unless the parties agree to other rules, the comments and documents shared with
each other are not confidential. This is different than standard practice in nonFederal ADR. Typically, conversations held between the parties in ADR are
confidential; however, the ADRA does not include this provision. A separate contract
addressing confidentiality can be agreed to by the parties. However, that contract
does not bind non-signatories, nor will it protect against disclose of documents
through the Freedom of Information Act. Note that discussions and documents
shared with the neutral in private discussions are confidential.
C. Nothing in the ADRA prevents the discovery or admissibility of any evidence that is
otherwise discoverable, merely because the evidence was presented in the course of a
dispute resolution proceeding. In other words, pre-existing documents do not become
confidential solely because they were used in a dispute resolution proceeding (e.g., ADR
279

PART II: Topical Chapters

PART II-1: General Topics

confidentiality will not prevent OI from collecting evidence that existed prior to an attempt
to negotiate a settlement).

Attendees
A. Attendees shall include an ADR mediator, the NRC, and the party the NRC is
considering taking escalated enforcement action against (either a licensee, contractor, or
an individual)
B. NRC Attendance: NRC attendance should normally be limited to the following
individuals:
1. Lead NRC negotiator (Director, OE, Regional Administrator, Director, Program Office
or their approved designee),
2. OGC or Regional Counsel
3. Enforcement Specialist/Coordinator assigned to the case
4. Other personnel requested by the lead NRC negotiator.
C. Licensee/Contractor Attendance: Licensee/contractor attendance should include senior
level managers and/or individuals who have decision making authority such that an
agreement in principle can be reached.

Conduct of ADR
A. Although nonwillful escalated cases with a potential for a civil penalty are within the
scope of the ADR program, ADR is generally conducted to resolve issues resulting from
an OI investigation. The goal is to provide a process that is less adversarial and would
promote greater communication and, in turn, greater cooperation among the parties.
B. ADR can be offered at three distinct places in the enforcement process after OI has
completed an investigation:
1. After an enforcement panel has initially determined that escalated enforcement
action is being considered based on an OI case and prior to the conduct of a PEC;
2. After the initial enforcement action is taken (e.g. an NOV, order or proposed civil
penalty); and
3. With imposition of a civil penalty and prior to a hearing request.
Each case will be afforded a maximum of two attempts to reach a settlement on the
same underlying issue through the use of ADR.
NOTE:
The purpose of ADR is not to dispute the facts of the case, but to identify
ways to resolve the issue. It is designed to bring about more effective,
efficient, and timely resolution of enforcement actions than normally
achieved by the traditional enforcement process.
C. ADR generally conforms to the following agenda:
280

PART II: Topical Chapters

PART II-1: General Topics

1.
2.
3.
4.

NRC will make an opening presentation.
Licensee will be provided an opportunity to make a presentation.
The ADR mediator will make some opening remarks.
Frequently, the parties will caucus briefly to allow the mediator to discuss the case
privately with each party.
5. An agreement in principal is reached and signed by the parties at the conclusion of
the session.

ADR Process
A. Strategy session is used to aid the NRC negotiating team in identifying the interests of
the NRC staff (staff) and agreeing upon a strategy prior to conducting the ADR
mediation session.
NOTE:
The enforcement staff can obtain specific ADR program implementation
guidance by contacting the ADR Project Manager directly.
1. The strategy session should include a discussion of the staff’s perception of the other
party’s interests and identify general considerations for reaching an agreement.
Discussions should include the types of actions that could be taken by the other
party that would meet NRC’s interests and therefore could warrant modification of
the initial enforcement position as well as the attendees to the mediation session and
each attendee’s role. A strategy session is typically held approximately 10 days to 2
weeks prior to the expected mediation session.
2. The staff’s negotiation strategy should be identified on a strategy sheet (see form in
appendix D) and should include the agency’s minimum settlement position. A
general characterization of the strategy is appropriate (e.g., the staff would consider
a, b, and c if the licensee agrees to x, y, z). If during the negotiation, the NRC lead
negotiator believes that this minimum position is not attainable and believes a
different settlement option should be pursued and is acceptable based on
information obtained at the ADR mediation session, he/she should contact the
Director OE to obtain headquarters’ agreement.
3. Except for discrimination cases, the applicable regional office or program office
should work with OE via the assigned enforcement specialist to develop the strategy
worksheet and coordinate the strategy session. Typically, the strategy sessions
include the enforcement specialist, Regional Counsel, regional or program office
enforcement coordinator, lead negotiator, ADR Program Manager and the Director
OE. Additional parties with knowledge of the investigation and/or site performance
should be considered for participation in the strategy session (i.e. branch chief, lead
inspector, OI investigator, program office, and Agency Allegation Advisor). OE is
responsible for coordinating strategy sessions for discrimination cases and should
follow the same guidance.

281

PART II: Topical Chapters

PART II-1: General Topics

B. Prior to conducting an ADR Mediation session, the responsible office should ensure
proper internal notifications are issued:
1. Pursuant to OEDO Procedure-0350, One-Week Look Ahead Notices of Enforcement
ADR Mediation should be issued (and marked as OUO-Sensitive Internal
Information) to read substantially as follows:
On [insert date], region [#] staff [or OE staff in case of discrimination cases -- also
reference any other office participating in the mediation e.g. OGC] is/are scheduled
to meet with [insert “representatives of [insert name of company]” or “an individual”]
in a mediation session in [insert location e.g. city, state] as part of the agency’s
enforcement alternative dispute resolution program. The scope of the mediation is
based on the letter [insert (ML#)] issued by the NRC, dated, [insert date] relating to
apparent violation(s) identified during an OI investigation [insert “and inspection” if
applicable].
C. ADR mediation sessions may resolve: whether a violation occurred, the appropriate
enforcement action, and the appropriate corrective actions for the violation(s).
1. At the ADR mediation session, typically an agreement in principle is reached and
signed by the involved parties.
2. The terms and conditions of the agreement in principle are then incorporated into a
confirmatory order.
3. For guidance in drafting terms for agreements in principal and confirmatory orders,
use the following:
•
•

•
•

•
•
•
•
•

Always draft AIPs/COs with inspectability and enforceability in mind!
o Don’t assume all parties have the same intentions
o Watch for vagueness and loopholes
Be clear about who is performing each action and who is subject to each action:
o Clarify facility and management level to which each action applies.
 Fleet-wide or facility specific?
 All employees or just management to receive training?
o Avoid the passive voice.
Set clear deadlines for completion of each action.
o Watch subparagraph indentation—it can affect meaning!
If we are looking for a particular outcome, be specific about what we want to see.
o The language should lead to a specific outcome rather than allowing the
individual or company to conduct additional evaluations before committing to
the action we want to see.
Include in the order any corrective actions already taken by the licensee that we
want to see as enforceable requirements.
Set a clear standard of performance, e.g., “licensee will create a … in compliance
with…”
Keep compliance within the individual or company’s control as much as possible
rather than leaving actions subject to third-party approval.
Avoid “should” and “approximately.”
Explain ambiguous terms such as “periodic,” “adequate,” and “effective.”
282

PART II: Topical Chapters

•
•

PART II-1: General Topics

Avoid subjective criteria, e.g., who decides if something is done “effectively”—if
NRC should decide, include NRC review as a provision.
In general:
o Ensure accuracy of factual statements, including the apparent violation.
o Ensure that “standard” or boilerplate language in Confirmatory Order is the
most current.
o Label sections, paragraphs (I. A., B., a., 1., etc.), and subparagraphs, and
number pages to make it easy to cross-reference.

D. Follow-up and Verification of ADR Confirmatory Orders
The applicable regional or program office will track and perform follow-up inspection on
all ADR confirmatory order open actions, except for those based on discrimination
cases, in accordance with the guidance contained in the appropriate inspection manual
chapters.
Follow-up inspection activity of ADR confirmatory orders should be documented in the
appropriate licensee inspection report.
E. Document Control
1. ADR strategy session documents, the ADR strategy sheet, or any document the
NRC generates to inform the mediator of NRC’s interests, and other draft documents
associated with the issuance of the confirmatory order including any Agreement in
Principle reached at the ADR mediation session typically are sensitive, non-public
documents with limited distribution lists and should be filed in ADAMS.
2. The choice letter, agreement to mediate, signed hearing waiver and consent form,
any notice of violation, and the final confirmatory order will be placed in ADAMS as
public documents unless precluded due to document classification. Distribution of
these documents should include the OE ADR Program Administrator.

283

PART II: Topical Chapters

PART II-1: General Topics

Discrimination
A. For discrimination cases, OI investigates only those cases that:
1. Meet the prima facie threshold discussed in (a) below.
a. To constitute a prima facie case, the complainant must establish that:
•

•
•
•

He/she was engaged in a protected activity (an employee participates in a
protected activity when he/she raises safety-related issues or any issue within
the NRC’s regulatory jurisdiction, even if the context in which he or she does
so is the resolution (rather than raising) of another safety issue);
Management had knowledge of the protected activity;
An adverse action was taken (or threatened); and
A nexus exists between the adverse action and the protected activity, i.e., the
action was taken in part (contributing factor), or in close temporal proximity to,
the protected activity.

2. Are potentially more significant cases from an enforcement perspective.
B. Those cases that do not constitute a prima facie case are not normally investigated by
the NRC.
C. Complaints that do not constitute a prima facie case but do indicate a pattern developing
at a licensee site or other circumstances which indicate a potentially degrading safety
conscious work environment (SCWE) at a licensee site may warrant follow-up
investigation.
A SCWE is an environment that encourages individuals to raise regulatory concerns to
the licensee and/or directly to the NRC without fear of retaliation.

Enforcement Process
For detailed guidance related to wrongdoing cases, refer to Part II, Section 1.1 of this Manual.
Section 1.1, “Wrongdoing,” discusses various topics that relate to discrimination cases,
including processing OI reports, kickoff meetings, enforcement panels and outcome, the use of
EA numbers, strategy forms, PECs, severity level categorization, discretion, concurrence, etc.

Roles and Responsibilities
For discrimination cases:
A. OE has the responsibility for:
1. Scheduling and preparing for the enforcement panel, ADR mediation session, PEC,
and enforcement caucuses;
2. Preparing enforcement actions;
3. Reviewing responses to NOVs;
4. Drafting and issuing any necessary press release.
284

PART II: Topical Chapters

PART II-1: General Topics

5. Communicating with licensee management and complainant, and for keeping the
region informed of any actions to be taken;
6. Assigning the EA number for the case;
7. Filling out the Strategy Form to document the proposed enforcement strategy.
8. Coordinate and initiate the kickoff meeting per Section 1.1.5.2 above.
B. The region is responsible for:
1. Participating in enforcement panels, etc., to provide specific licensee enforcement
perspectives and maintain awareness of pending enforcement action;
2. Providing notification to external stakeholders including the state liaison officer;
3. Issuing the closeout letter for any unsubstantiated cases; and
4. Reviewing the case for the identification and evaluation of any underlying technical
issues and to provide clarification on site specific issues.
C. See Section 5.4.1 for OGC’s responsibility.

Enforcement Panel
A. For discrimination cases, OE will prepare the enforcement panel worksheet and a written
analysis of the evidence for purposes of the enforcement panel discussion (see next
Section). It is important that participants be authorized to speak for their office.
B. In discrimination cases where DOL determined discrimination occurred and OI did not
substantiate:
1. It may be appropriate, depending upon the basis of the DOL decision, to schedule an
enforcement panel to review the DOL documentation (e.g., Final Investigative
Report, ALJ hearing transcripts, etc.).
2. If consensus cannot be reached during this panel regarding the enforcement action
approach, OE will promptly arrange a meeting with the respective Office Managers.
C. If two investigative findings of discrimination by the same licensee and/or contractor are
made within 18 months (either by OI or OSHA):
1. The region and/or OE should request an EA number; and
2. Schedule a multi-office enforcement panel to discuss the agency's strategy for
requesting the licensee and/or contractor to ascertain whether a cultural problem
exists and to identify any particular areas within the workplace in which supervisors
do not appreciate the importance of raising concerns.
a. The NRC can require the licensee and/or contractor's senior management to
meet with the Regional Administrator to explain the employment actions in
question, and to address what actions the licensee and/or contractor is taking to
ensure that employees are not "chilled."
b. The licensee and/or contractor should be expected to address:
•

Whether it has confidence that remedial actions have been effective; and
285

PART II: Topical Chapters

•

PART II-1: General Topics

The basis for this view.

c. The letter establishing this meeting can also request the licensee and/or
contractor to document actions taken or planned to assess and mitigate the
potential impact on the environment for raising concerns. If responsible staff
concludes that positive results have been achieved through actions already taken
by the licensee and/or contractor, credit for these results should be noted in the
letter.
D. If more than two OI investigative findings of discrimination occur within an 18-month
period, the NRC should take the actions specified above and consider stronger actions.
1. OE will consider whether a DFI might be issued as to why the licensee should not be
ordered to obtain an outside independent contractor to:
a. Review the licensee's programs for maintaining a safety-conscious work
environment or safety culture;
b. Survey employees to determine whether they feel free to raise concerns without
fear of retaliation; and
c. Develop recommendations, if warranted, to improve the workplace environment.
2. If it is determined that a DFI will be issued, OE should request an EA number; and
3. If an adequate response is not received to this DFI, then the NRC should consider
issuing an order.

Written Summary of Case
A. In every discrimination matter the staff considers for enforcement action, OE will
prepare, prior to and for purposes of the enforcement panel discussion, a written
summary of the evidence that may support each element of a discrimination case.
Those elements are:
1. Did the employee engage in “protected activity” as that term is defined in Section 211
of the Energy Reorganization Act of 1974 (ERA), and the Commission’s
discrimination requirements, e.g., 10 CFR 50.7(a)(1), and interpreted by the
Department of Labor and the courts?
2. Was the employer (an NRC licensee, applicant for an NRC license, contractor or
subcontractor of a licensee or applicant) aware of the protected activity at the time of
the adverse action?
3. Was an adverse action taken by the employer against the employee, which affected
the employee’s terms, conditions or privileges of employment?
4. Was the adverse action taken, at least in part, because of the protected activity?
B. The purpose of the written analysis is to reach a determination in each discrimination
matter as to whether, based on all the available evidence, there is information sufficient
to provide a reasonable expectation that a violation of the Commission’s discrimination
requirements, e.g., 10 CFR 50.7, can be shown by a preponderance of the evidence.
286

PART II: Topical Chapters

PART II-1: General Topics

1. The analysis should include a statement of OGC’s position, if available, as to
whether the evidentiary standard is satisfied.
2. The staff and OGC’s conclusion may be added after the panel.
3. The length of the analysis should normally be limited to one or two pages.
C. The analysis may be revised during the deliberative process, as the matter is further
considered by all NRC components involved in the enforcement process.
D. Revised analyses should be distributed to the principal participants in the deliberative
process.
E. The analysis should be placed in the enforcement file.
F. Appendix D includes a sample written analysis of a discrimination matter that the staff
may use as a guide in preparing summaries.

Enforcement Panel Outcome
A. At the enforcement panel the staff may conclude that:
1.
2.
3.
4.

No violation occurred;
Non-escalated enforcement should be proposed;
Escalated enforcement action should be considered; or
A PEC does not need to be conducted.

B. If the staff concludes that escalated action should be considered:
1. The NRC may provide an opportunity for a PEC or ADR with the licensee, contractor,
or other person before taking enforcement action; or
2. If the case has not been accepted by DOJ, the region or OE should, if applicable,
schedule a PEC, or issue a choice letter to the licensee offering ADR or a PEC.
a. The conference letter or choice letter (see forms in Appendix B) will normally
include a redacted OI report in accordance with Section 1.3.10.B.
b. The conference letter or choice letter should be provided to the licensee at least
two weeks in advance of the conference.
3. OE should normally schedule the PEC within 60 days from the date of issuance of
the OI report.
a. A PEC may not need to be held in such cases where there is a full adjudicatory
record before DOL. If a conference is held in such cases, generally the
conference will focus on the licensee’s corrective action and not the facts of the
case.
b. When scheduling the PEC, the NRC should establish two dates which are
mutually agreeable to the NRC and the licensee. The complainant should be
given the option of either of these two dates for the conference.
287

PART II: Topical Chapters

PART II-1: General Topics

c. A separate letter should be sent to the individual subject to the alleged
discrimination providing the individual an opportunity to attend the licensee’s
conference.
d. The individual should be provided with a copy of the letter to the licensee.
e. In certain cases, typically when the proposed enforcement action is based upon
a decision by an Administrative Law Judge of the Department of Labor, no
factual summary should be necessary, since the participants will be fully
conversant with the facts to be discussed at the PEC.
f.

In addition, there may be other matters in which the parties have investigated or
adjudicated the issues.
•
•

The staff need not automatically prepare a summary when it proposes an
enforcement conference.
The recommendation to forgo preparation of a factual summary should
normally be agreed to at the enforcement panel.

Predecisional Enforcement Conference (PEC)
Discrimination PECs are typically closed to public observation since they involve personnel
issues and frequently personal performance issues; however, if the evidentiary basis is a matter
of public record, the licensee’s PEC could be open to public observation.
NOTE:
For discrimination cases where the whistleblower was not in attendance, the
whistleblower is given the option of reviewing the PEC transcript and providing
written comments.

1.3.6.1

Attendees

A. NRC Attendance: There should be a reason for each NRC person’s attendance.
1. OE and the applicable region should attend all significant conferences.
2. The applicable program office enforcement coordinator should attend conferences as
deemed appropriate by the program office, or as requested by the region or OE.
3. OGC or Regional Counsel should typically attend wrongdoing conferences.
B. Licensee Attendance:
1. Licensee attendance should include senior level managers and individuals prepared
to address the circumstances of the apparent violations and the corrective actions.
2. When an individual’s significant personal action contributed to the violation,
consideration should be given to that person’s attendance at the licensee’s
conference.

288

PART II: Topical Chapters

PART II-1: General Topics

C. Complainant: The Enforcement Policy permits the individuals who were the subject of
the alleged employment discrimination to participate in the conference.
1. The complainant is included in establishing the conference date.
2. The complainant is allowed no more than two personal representatives to attend the
PEC.
3. The complainant may participate by observing the conference and, following the
presentation by the licensee:
a. The complainant may, if desired, comment on the licensee’s presentation and
present his/her views on why he/she believes discrimination occurred;
b. The licensee is afforded an opportunity to respond; and
c. The NRC may ask clarifying questions.

1.3.6.2

Conduct of PEC

A. Complainant (for discrimination cases) will be given an opportunity to make a statement
and comment on the licensee’s presentation.
1. The complainant’s personal representative does not normally participate in the
conference unless they are providing comments for the complainant, such as an
attorney responding to legal arguments put forward by the licensee.
2. The NRC may question the complainant regarding the complainant’s statement.
3. After the complainant’s presentation is complete, the licensee will have an
opportunity to respond to the complainant’s presentation.
4. The senior NRC official present will offer closing remarks and conclude the PEC.
NOTE:
At no time will the complainant and the licensee be allowed to question
each other directly.
B. Post Submittals
1. Submittals from the licensee and complainant will not generally be accepted when
the licensee and complainant have received redacted OI report prior to the
conference.
2. The NRC will accept the licensee’s response to a proposed NOV.

1.3.6.3

Reimbursement of Complainant’s Travel Expenses

A. Management Directive 14.1 “Official Temporary Duty Travel allows for reimbursement of
a complainant’s travel expenses when the individual is performing a direct service to the
government, generally referred to as invitational travel.
1. Because the NRC is requesting the complainant’s presence at the PEC to assist the
staff in determining the facts of a case, invitational travel is appropriate.
289

PART II: Topical Chapters

PART II-1: General Topics

2. Because the complainant’s personal representative does not provide a direct service
to the government, the Federal Travel Regulation does not allow reimbursement of
their expenses.
NOTE:
In the SRM for SECY-03-0172, “Reimbursement of the Travel Expenses
of Individuals Requested to Attend a Predecisional Enforcement
Conference,” the Commission approved the reimbursement of only the
complainant’s travel expenses related to attending a PEC.
B. To facilitate the expense reimbursement process, OE should send the complainant a
PEC confirmation letter (see forms in Appendix B) confirming the time, date, and location
of the PEC.
1. When the NRC will reimburse the claimant’s PEC travel expenses, the confirmation
letter should also include an optional paragraph and enclosure regarding
reimbursement of travel expenses. (Note: The claimant may choose to pay his or
her own travel expenses or the expenses may be paid by a third party, i.e., the
licensee. Under those circumstances, the optional information regarding
reimbursement of travel expenses should not be used).
2. When the NRC will reimburse the claimants’ travel expenses, OE should also
prepare and process NRC Form 279, “Official Travel Authorization” and provide
assistance to the complainant in making travel reservations and in completing travel
vouchers upon completion of the travel.

Enforcement Caucus
A. For discrimination cases, OGC makes the determination, with staff input, whether:
1. By a preponderance of the evidence, the protected activity was a “contributing factor”
in the unfavorable personnel action; or
2. The licensee provided “clear and convincing evidence” that a legitimate
nondiscriminatory consideration was the only motive for the adverse action.
NOTE:
Engagement in protected activities does not immunize employees from
discharge or discipline for legitimate reasons or from adverse actions
dictated by non-prohibited considerations.

Enforcement Sanction
A. The particular sanction to be issued for a discrimination violation should be determined
on a case-by-case basis.
290

PART II: Topical Chapters

PART II-1: General Topics

B. The Enforcement Policy, Section 6.10, provides examples of Severity Level I, II, III, and
IV violations based on discriminatory acts by senior corporate management, plant
management or mid-level management, and first-line supervision or other low-level
management, respectively.
1. Notwithstanding an individual's specific job title or relationship to the person subject
to discrimination, severity level categorization should consider several factors,
including:
a. The position of the individual relative to the licensee's organization;
b. The individual's responsibilities relative to licensed activities; and
c. The potential chilling effect that the action could have on the licensee's
organization based on the individual's position.
2. Where the level of a supervisor is concerned, e.g., first-line supervisor versus plant
management, the supervisor's sphere of influence is a guide to determining the
appropriate severity level. While a vice president is the direct supervisor for only a
few employees, the vice president's sphere of influence is great and the impact of his
or her decision could affect the atmosphere throughout the site.
a. The examples in Section 6.10 of the Policy are provided as a guide;
b. The final severity level categorization for discrimination actions should reflect the
regulatory concern the cases represent, e.g., a second-line supervisor may not
necessarily be appropriately categorized at Severity Level II when there are
multiple levels of management.
C. If a Commission paper is required for the enforcement action and the action is based on
a decision and finding of discrimination by the DOL, the Commission paper must
contain:
1.
2.
3.
4.

A brief but reasonably precise description of the acts of discrimination;
A brief summary of the DOL's (ALJ or Secretary of Labor) reasoning;
Copies of the DOL decisions; and
In cases where the staff differs with the DOL decision, the staff's reasons for
differing.

D. As additional findings of discrimination are reached, the NRC's response (in addition to
any enforcement action) should escalate on the premise that a pattern may be
developing.

Discretion
A. It is recognized that there are some cases of discrimination where enforcement action
may not be warranted, e.g.:
1. When a licensee who, without the need for government intervention, identifies an
issue of discrimination and takes prompt, comprehensive, and effective corrective
action to address both the particular situation and the overall work environment is
helping to establish a safety-conscious workplace; or
291

PART II: Topical Chapters

PART II-1: General Topics

2. When a complaint is filed with the DOL, but the licensee settles the matter before the
DOL Area Office makes a finding of discrimination.
B. Normally enforcement discretion would not be appropriate for cases that involve:
1. Allegations of discrimination as a result of providing information directly to the NRC;
2. Allegations of discrimination caused by a manager above first-line supervisor
(consistent with the current Enforcement Policy classification of Severity Level I or II
violations);
3. Allegations of discrimination where a history of findings of discrimination (by the DOL
or the NRC) or settlements suggest a programmatic rather than an isolated
discrimination problem;
4. Allegations of discrimination which appear particularly blatant or egregious; and
5. Cases where the licensee does not appropriately address the overall work
environment (e.g., not using training, postings, revised policies or procedures, any
necessary disciplinary action, etc., to communicate corporate policy against
discrimination).

Release of OI Reports and Transcripts of Interviews
A. Release of OI reports and exhibits are not generally available to the licensee or public
until after the enforcement action has been issued, except in cases involving DOL
hearings (discrimination cases).
NOTE:
The Director, OE should be consulted before release of any OI report (and/or
exhibits) associated with an enforcement action. In addition, in every case,
exhibits will normally be provided only if requested through the FOIA
process. Additional information is included in Management Directive 3.4,
“Release of Information to the Public.”
B. For discrimination cases, the SRM for SECY 02-0166, “Policy Options and
Recommendations for Revising the NRC’s Process for Handling Discrimination Issues,”
directed that the OI report, with appropriate redactions and without the supporting
documentation (exhibits or other referenced information) and after OGC review of the
sufficiency of the evidence, should be provided to the PEC participants prior to the
conference.

292

PART II: Topical Chapters

PART II-1: General Topics

NOTE:
“PEC participants” is a term that generally encompasses the licensee (the
licensee’s management and legal counsel), the complainant, and any
individual who may have been offered an individual PEC.
1. To implement this direction, after an enforcement panel determines that a PEC is
warranted, the OE enforcement specialist should request a bracketed version of the
OI report from the appropriate OI Field Office Director or OI headquarters.
2. OI will bracket, in preparation for redaction, the report using OI’s second party
requestor standard, including privacy and attorney-client privilege information.
3. The bracketed OI report will be forwarded from OI to the staff noting that release of
the redacted report to PEC participants is acceptable. The OI report will continue to
indicate that it is not for public disclosure without the approval of the originating field
office director.
a. After OI brackets the report, typically the assigned enforcement specialist, the
headquarters allegation specialist, and the OGC enforcement attorney should
review the report to ensure appropriate redaction has been completed.
b. OGC may complete the review as part of concurrence in the PEC letter.
c. Since the release is discretionary and not in response to a FOIA request, the
staff is not bound by FOIA law when redacting the report. Additional redaction
may be appropriate on a case-by-case basis, such as to protect other on-going
enforcement actions.
4. The memorandum forwarding the report from OI to the staff provides approval for
release to the PEC participants.
5. The redacted OI report will also be provided if a choice letter is used.
a. If a licensee provides a written response to the choice letter, determination of
whether to provide the complainant a copy of the OI report will be made on a
case-by-case basis.
b. Typically, if the staff is persuaded by the licensee’s written presentation, the
licensee’s presentation and the OI report would be provided to the complainant
for comment.
c. If the staff is not persuaded by the licensee’s presentation, providing the OI
report to the complainant will be considered on a case-by-case basis.
d. For cases involving DOL hearings, OE is to prepare a transmittal letter to send
the OI report to the parties involved in the DOL action. Use the appropriate Form
letter from Appendix B.
6. Consistent with all allegation material, the redacted OI report will not be placed in
ADAMS because the standard for redacting documents may not adequately redact
the document for public release.

293

PART II: Topical Chapters

PART II-1: General Topics

Continuing Violations (Hostile Work Environment) Involving
Discrimination
A. Most violations of prohibitions on discrimination, such as a discriminatory termination or
a failure to grant a promotion as the result of engaging in protected activities, are not
considered "continuing."
1. An exception may apply to cases involving a hostile work environment (sometimes
referred to as H&I).
a. Harassment and Intimidation (H&I) is a course of conduct directed at a specific
person that causes substantial emotional distress in such person and serves no
legitimate purpose or words, gestures, and actions which tend to annoy, alarm
and abuse (verbally) another person.
b. Intimidation involves behavior(s) towards another person (words or actions)
which causes them to be timid or fearful.
B. A hostile work environment (refer to DOL Case Number 1999ERA00025; Overall v. TVA)
exists when it is permeated with discriminatory intimidation, ridicule, and insult that is
sufficiently severe or pervasive to alter the conditions of employment and create an
abusive working environment. The mere utterance of an epithet which engenders
offensive feelings in an employee does not sufficiently affect the conditions of
employment.
1. Factors used to consider when determining whether conduct is sufficiently severe or
pervasive include:
a. Frequency of the discriminatory conduct
b. Severity of the discriminatory conduct
c. Whether the discriminatory conduct is physically threatening or humiliating, or a
mere offensive utterance
d. Whether the discriminatory conduct unreasonably interferes with an employee’s
work performance
2. Usually acts of discrimination or a pattern of activities or events would need to be
identified as having produced a hostile work environment.
a. If, following the initiating event, the hostile environment persisted, a continuing
violation may exist such that daily civil penalties may be appropriate for each day
that the hostile work environment continued. This is an area in which the law is
evolving.
b. OE will consult with OGC on cases involving a hostile work environment or the
potential for "continuing" discrimination.

294

PART II: Topical Chapters

PART II-1: General Topics

Application of Corrective Action Civil Penalty Assessment Factor for
Discrimination Violations
A. Application of the Corrective Action factor is discussed in the Enforcement Policy and
this manual. The Enforcement Policy also provides an explanation of the Corrective
Action factor as applied to discrimination cases.
B. The NRC can require broad remedial action to improve the workplace environment.
1. NRC cannot require a licensee to provide the individual with a personal remedy.
2. DOL has the authority to require a licensee to provide the individual with a personal
remedy.
C. The Commission does not believe that a proposed penalty should be mitigated if a
personal remedy is not provided (59 FR 60697, November 28, 1994).
1. A violation involving discrimination is not completely corrected without the personal
remedy.
2. The chilling effect may continue if a personal remedy is not provided.
D. Credit for Corrective Action should normally only be considered if the licensee takes
prompt, comprehensive corrective action that:
1. Addresses the broader environment for raising concerns in the workplace; and
2. Provides a remedy for the particular discrimination at issue.
E. In the determination of whether or not a remedy has been provided, the NRC considers
whether a settlement has been reached or if a remedy ordered by DOL has been
implemented.
1. Where a remedy has been accepted by DOL, NRC intends to defer to DOL on the
adequacy of the remedy.
2. Cases where a licensee offers an employee a reasonable remedy, but the employee
declines, will be handled on a case by case basis.
F. The promptness and scope of corrective action should also be considered in applying
the Corrective Action factor.
1. If settlement occurs early in the administrative process, credit may be warranted
based on corrective actions as the chilling effect may have been minimized by the
promptness of the remedy and remedial action.
2. If settlement occurs after the evidentiary record closes before the Administrative Law
Judge, credit normally would not be warranted because any existing chilling effect
may have existed for a substantial time, and the complainant may have had to spend
substantial resources to present his or her case.
3. If the licensee does not take broad corrective action until after a Secretary of Labor's
decision, and the Secretary's decision upholds an Administrative Law Judge's finding
of discrimination, corrective action may be untimely making credit unwarranted.
295

PART II: Topical Chapters

PART II-1: General Topics

4. If the licensee chooses to litigate and eventually prevails on the merits of the case,
then enforcement action will not be taken and, if already initiated, will be withdrawn.
5. Assuming that evidence of discrimination exists, enforcement action that emphasizes
the value of promptly counteracting the potential chilling effect is warranted.

Discrimination for Engaging in Protected Activities (DOL Process)
A. The NRC places a high value on nuclear industry employees being free to raise potential
safety concerns, regardless of the merits of the concern, to both licensee management
and the NRC.
Although licensees are responsible for the actions of their contractors, they are not
required to specifically report to the NRC allegations that their contractors may have.
B. One of the goals of the NRC's Enforcement Policy is to ensure, through appropriate
enforcement action against a licensee or licensee contractor (and when warranted,
against the individual personally responsible for the act of discrimination), that
employment actions taken against licensee or contractor employees for raising safety
concerns do not have a chilling effect on the individual or others on the reporting of
safety concerns.
C. Section 211 (formerly section 210) of the ERA provides that no employer may discharge
or otherwise discriminate against any employee with respect to compensation, terms,
conditions, or privileges of employment because the employee engaged in certain
protected activities.
1. These protected activities include notifying an employer of an alleged violation of the
AEA or ERA, refusing to engage in any practice made unlawful by those acts,
testifying before Congress or in a Federal or State proceeding regarding any
provision of these acts, or commencing, testifying, assisting, or participating in a
proceeding under these acts.
2. The NRC regulations that are related to the protection of whistle blowers include: 10
CFR 19.20, 30.7, 40.7, 50.7, 52.5, 60.9, 63.9, 61.9, 70.7, 71.9, 72.10, and 76.7.
3. In addition, 10 CFR Part 50, Appendix B, Criterion I, provides that persons and
organizations performing quality assurance functions shall have sufficient authority
and freedom to identify problems and provide solutions.
NOTE:
For purposes of this guidance, discrimination should be broadly defined
and should include intimidation or harassment that could lead a person to
reasonably expect that, if he or she makes allegations about what he or
she believes are unsafe conditions, the compensation, terms, conditions,
and privileges of employment could be affected.

296

PART II: Topical Chapters

PART II-1: General Topics

D. Allegations of discrimination can be made directly to the NRC, DOL, or both.

Memorandum of Understanding (MOU) Between NRC and DOL
A. The MOU (published in the Federal Register on December 3, 1982, revised on
September 9, 1998) describes the responsibilities of the NRC and DOL in protecting the
rights of employees as specified in Section 211 of the ERA. The MOU between the
NRC and DOL is included on the Enforcement Web site.
1. Section 3 of the MOU provides that the two agencies will "...cooperate with each
other to the fullest extent possible in every case of alleged discrimination involving
employees of Commission licensees, license applicants, or contractors or
subcontractors of Commission licensees or applicants."
2. If DOL receives a complaint concerning a possible violation of Section 211, it will
promptly notify the NRC. DOL will promptly provide NRC a copy of all complaints,
decisions made prior to a hearing, investigation reports and orders associated with
any hearing or administrative appeal on the complaint.
3. The NRC will facilitate DOL's investigations by taking all reasonable steps to assist
DOL in obtaining access to licensed facilities and any necessary security clearances.
B. The procedures for implementing the MOU to ensure prompt notification, investigation,
and follow-up of complaints involving alleged discrimination against employees who
have contacted or attempted to contact the NRC, are included in the MOU.

Processing Discrimination Complaints Filed with NRC
A. If an employee raises a concern directly to an NRC employee (rather than filing an
allegation of discrimination with DOL), the NRC employee should be sensitive to his/her
NRC responsibilities in this area.
B. The NRC employee should make sure that the alleger understands that the NRC is
concerned about the complaint(s), following the guidance in MD 8.8, “Management of
Allegations.”

Processing Discrimination Complaints Filed with DOL
The division of responsibilities between the two agencies for processing discrimination
complaints that have been filed with the DOL is detailed in the following Sections.

1.3.16.1 Department of Labor Process
A. The Department of Labor is authorized by the Energy Reorganization Act to order
personal remedies for an individual found to have been discriminated against by an NRC
licensee.
B. The NRC is not authorized to order personal remedies, but is responsible for regulating
the nuclear industry and can take enforcement action against a licensee for
discriminating against an employee for engaging in protected activities.
297

PART II: Topical Chapters

PART II-1: General Topics

In accordance with these different responsibilities, whereas the NRC may receive an
anonymous allegation which it may decide to investigate and could later act on the
findings, the DOL process starts when an individual files a complaint with the DOL
seeking personal remedies.
C. In accordance with the MOU between DOL and NRC, the DOL will send copies of official
correspondence and decisions to the NRC to assist the NRC in tracking complaints of
discrimination at licensed facilities.
The information provided by DOL to the NRC, especially the compliance officers'
narrative reports, should not be publicly released without the permission of DOL other
than documents NRC knows to be public.
D. The following guidance describes the steps in the DOL process.
1. OSHA: In accordance with Section 211 of the ERA, a complaint filed with DOL is first
reviewed by OSHA to determine whether the complainant has established a prima
facie case.
a. If a prima facie case has been established:
•
•
•

OSHA will acknowledge the complaint by letter and assign a compliance
officer to investigate the allegation. If additional information is needed from
the DOL, it can be requested using Form 29.
The compliance officer will interview individuals associated with the allegation
of discrimination and compile a "narrative report" of these interviews; and
The compliance officer will make a recommendation as to whether
discrimination occurred.

2. OSHA will issue a decision and will send copies of this decision to the complainant
and his or her employer. Note that sometimes the employer of record is a licensee
contractor and, in some cases, the licensee may not know at this point that a
complaint was even filed against its contractor.
3. Appeal: An appeal of OSHA’s decision can be filed within thirty (30) days of the
decision with the Office of Administrative Law Judges (ALJ). If no appeal is filed
within that time, OSHA's decision is considered a final decision of the Secretary of
Labor.
4. Administrative Law Judge: If there is an appeal, an "ERA" number will be assigned
by DOL and the ALJ assigned to the case will schedule and conduct a hearing on the
issues involved in the complaint. The ALJ will then issue a Recommended Decision
and Order which can be appealed to the Secretary of Labor. If no appeal is sought
by either party, the ALJ’s decision becomes the final DOL decision.
5. Secretary of Labor: The Secretary of Labor will review the ALJ's Recommended
Decision and Order, if one of the parties requests review. Where the Recommended
Decision and Order finds discrimination and recommends relief, the Secretary is
required to issue a preliminary order providing that relief, not including compensatory
damages, pending the Secretary's decision on the matter. The Secretary, on May 3,
298

PART II: Topical Chapters

PART II-1: General Topics

1996, delegated this authority to the Administrative Review Board of the Department
of Labor.
6. Additional Appeals beyond the Secretary of Labor: The party against whom the
Secretary rules may appeal the decision to U.S. Court of Appeals.
7. Settlements: The individual and the employer may settle the matter after a complaint
is filed with the Department of Labor but before a final decision is reached by the
DOL.

1.3.16.2 NRC Process
The following guidance describes the steps of the NRC enforcement process in terms of the
steps of the DOL process identified in the section above.
NOTE:
After OSHA issues a determination that discrimination occurred, the NRC should
issue a letter requesting information from the licensee (as described in Section
1.3.17.A.1 below). The issuance of this letter is not dependent on whether the
OSHA determination is appealed and should be issued upon the NRC’s knowledge
of the OSHA determination. If OI investigated the matter, it may not be necessary to
wait until DOL completes its process.

A. OSHA
1. If the complaint is withdrawn or settled before OSHA issues a finding, or if OSHA
concludes that the complaint was not timely filed, the NRC should review the
complaint and any associated documents. If the alleger has not yet been in contact
with NRC regarding his/her interest in participating in an investigation, an Allegation
Review Board will be convened to determine whether an OI investigation is
necessary.
2. If OSHA concludes that discrimination occurred, and the licensee and/or contractor
appeals the decision, the region should:
a. Request a copy of the DOL/OSHA compliance officer's narrative report or solicit
support from OGC and/or Regional Counsel to obtain information related to the
decision by the other legal authority;
b. Contact the licensee and/or contractor to obtain feedback regarding their
knowledge of the finding and any actions planned or taken to assess and
mitigate the potential impact on the environment for raising concerns. During this
contact, the licensee and/or contractor will be informed that they will be receiving
a letter requesting written feedback related to the discrimination finding;
c. Request an EA number; and
299

PART II: Topical Chapters

PART II-1: General Topics

d. Prepare a letter informing the licensee and/or contractor of NRC’s awareness of
the discrimination finding, that NRC will be evaluating the licensee’s follow up
actions, and requesting documentation of actions taken or planned to assess and
mitigate the potential impact on the environment for raising concerns. If
responsible staff concludes that positive results have been achieved through
actions already taken by the licensee and/or contractor, credit for these results
should be noted in the letter. For planned actions, the licensee should be
requested to provide estimated dates of completion.
NOTE:
After OSHA issues a determination that discrimination occurred, the NRC should
issue a letter requesting information from the licensee (as described in Section
1.3.17.A.1 below). The issuance of this letter is not dependent on whether the
OSHA determination is appealed and should be issued upon the NRC’s knowledge
of the OSHA determination.
3. If OSHA concludes that discrimination occurred, and the licensee or contractor does
not appeal the decision:
a. The OSHA decision is considered a final order of the Secretary of Labor and
b. Enforcement action may be appropriate.
If enforcement action is considered, OE should request a copy of the DOL/OSHA
compliance officer's narrative report and should coordinate the matter with the
region. If the discrimination finding was made by another legal authority, support
should be solicited from OGC and/or Regional Counsel to obtain information related
to the legal decision. OE will consult with OGC to determine whether to issue a letter
requesting information from the licensee as described in Section 1.3.16.2.A.2 above,
or an enforcement action.
4. If OSHA concludes that no discrimination occurred, and the individual does not
appeal the decision, the region should:
a. Request a copy of the DOL/OSHA compliance officer's narrative report or solicit
support from OGC and/or Regional Counsel to obtain information related to the
legal decision.
b. Review the information obtained to ensure that the NRC can close the matter
with no further action.
5. If OSHA concludes that no discrimination occurred, and the individual appeals the
decision, the staff should await the ALJ's Recommended Decision and Order.
B. Administrative Law Judge
1. After conducting a hearing, the ALJ will issue a Recommended Decision and Order.
The Energy Policy Act of 1992 revised Section 211 of the ERA to, among other
things, require the Secretary of Labor to issue a preliminary order providing certain
relief specified by the ALJ while awaiting the final order of the Secretary.
300

PART II: Topical Chapters

PART II-1: General Topics

2. If the ALJ finds that discrimination occurred and does not establish that the
respondent would have taken the same action regardless of an employee’s protected
activities (respondent unable to show by clear and convincing evidence):
NOTE:
If no appeal is filed (the 30-day appeal period should commence 10
business days after the ALJ’s decision is rendered) the DOL decision
becomes final.
a. OE should obtain an EA number and initiate the enforcement process.
b. The appropriate enforcement action should be issued following the issuance of
the ALJ's Recommended Decision and Order.
c. OE should also consider whether it would be appropriate to take some action
against the contractors or individual(s) found by the ALJ to be responsible for the
discrimination
3. If the ALJ finds that discrimination occurred, and it is appealed to the DOL ARB, and
there exists a completed and similarly factual OI investigation which does not
substantiate discrimination:
a. The NRC may await a decision by the DOL ARB before initiating the enforcement
process; however, after contacting the licensee and/or contractor regarding their
knowledge of the discrimination finding and any actions taken in response, a
letter should be processed informing the licensee and/or contractor that NRC is
aware of the finding and requesting documentation of actions taken or planned to
assess and mitigate the potential impact on the environment for raising concerns.
If responsible staff concludes that positive results have been achieved through
actions already taken by the licensee and/or contractor, credit for these results
should be noted in the letter. For planned actions, the licensee and/or contractor
should be requested to supply requested dates of completion. OE should
request an EA number for this action. If enforcement action is ultimately taken, a
separate EA number will be obtained.
b. If a civil penalty is proposed, the enforcement action will require a response in
accordance with the provisions of 10 CFR 2.201.
c. The licensee’s response to the provisions of 10 CFR 2.205 (i.e., payment of any
civil penalty) should be delayed until 30 days after the DOL decision becomes
final.
4. If the ALJ finds no discrimination, the NRC should await issuance of the Secretary of
Labor’s decision, if an appeal is filed.
5. If the ALJ dismisses the complaint for procedural reasons (withdrawal, settlement, or
untimely), the region should:
301

PART II: Topical Chapters

PART II-1: General Topics

a. Review the record, including the earlier OSHA decision; and
b. Determine whether it is appropriate to initiate the enforcement process, to
request additional OI investigation, or wait for the ARB’s ruling, if an appeal is
filed.
C. Administrative Review Board (ARB)
1. If, on a timely appeal, the ARB affirms the ALJ’s finding of discrimination:
a. The licensee and/or contractor is expected to respond to any civil penalty already
issued by the NRC.
b. Although no specific action is required by the NRC at this point, OE should
ensure that the licensee and/or contractor has received notice of the ARB Order,
especially in cases in which the Respondent is a licensee contractor, to avoid a
delay in the licensee and/or contractor’s response.
c. OE should initiate the enforcement process if not already done so.
NOTE:
The Secretary of Labor has delegated responsibility for reviewing ALJ
determinations to the ARB.
2. If the ARB affirms the ALJ’s finding of no discrimination, the region would normally
close the case without further action.
3. If the ARB reverses the ALJ’s finding that discrimination occurred and dismisses the
case, the NRC normally would withdraw the enforcement action if it was based solely
on the DOL process (i.e., without independent findings from an OI investigation that
discrimination had occurred).
4. If the ARB reverses the ALJ’s finding that no discrimination occurred, concluding
instead that discrimination did occur, OE should obtain an EA number and initiate the
enforcement process.
5. If the ARB dismisses the case for procedural reasons, (withdrawal, settlement, or
untimely), OE should review the record, including the earlier ALJ’s decision, and
determine whether earlier enforcement was appropriate, whether to impose the civil
penalty, or withdraw the proposed civil penalty.
D. Additional Appeals beyond the Secretary of Labor: The party against whom the
Secretary rules may appeal the decision to U.S. Court of Appeals. Absent a stay issued
by the Court, the NRC enforcement action is not stayed. Therefore, the region should
consult with OE in such cases.
E. Settlements: The individual and the employer may settle the matter after a complaint is
filed with the Department of Labor but before some final decision is reached by the DOL.
In such cases, the NRC will normally need to develop the evidence to support an
enforcement action if it is to prevail.
302

PART II: Topical Chapters

PART II-1: General Topics

Chilling Effect of Actual or Potential Discrimination
In addition to concerns about the appropriate enforcement action in cases of actual
discrimination, the NRC must also consider the impact of such discrimination in the workplace,
i.e., whether the awareness of the discriminatory act will discourage other licensee and
contractor employees from raising safety concerns.
A. Letter Requesting Information from the Licensee in Responding to a Finding of
Discrimination
1. In each case of a finding of discrimination by DOL, the NRC should, regardless of
whether or not the NRC is aware of a party appealing the DOL determination, bring
the matter to the attention of the licensee. After contacting the licensee and/or
contractor to discuss their knowledge of the finding and any corrective actions
planned or taken to assess and mitigate the potential chilling effect, follow up
correspondence is normally provided. This correspondence serves three purposes:
a. To notify the licensee and/or contractor of the NRC's concern,
b. To understand the basis for the licensee and/or contractor's position on whether
or not discrimination occurred, and
c. To obtain a description of any remedial action the licensee and/or contractor
plans to take to address the potential chilling effect. Remedial action may be
warranted, even if the licensee and/or contractor disagree with the finding of
discrimination, because of the potential for a chilling effect.
d. If responsible staff has concluded that positive results have been achieved
through actions already taken by the licensee and/or contractor, credit for these
results should be noted in the letter.
2. The NRC normally issues the information request letter noted in Section 1.13.7.A.1
after the OSHA investigation has been completed and a finding has been made of
discrimination, and after contacting the licensee and/or contractor to discuss their
knowledge of the finding and corrective actions planned or taken.
a. If the licensee settles a case soon after the OSHA finding and does not challenge
the finding in adjudication, the chilling effect may be minimized and it may not be
necessary to send an information request letter. A conversation should be held
with the licensee and/or contractor in order to obtain feedback regarding their
knowledge of the finding and confirm that it is not apparent that the environment
for raising concerns has been adversely impacted;
b. If OSHA finds that discrimination did not occur and subsequently the ALJ
reverses the OSHA finding, concluding instead that discrimination did occur, the
NRC may:
•
•

Await the ARB final decision before taking enforcement action; and
While awaiting the ARB decision, issuance of an information request letter is
usually after contacting the licensee and/or contractor to discuss their
knowledge of the finding and corrective actions planned or taken.

303

PART II: Topical Chapters

PART II-1: General Topics

3. Once a finding of discrimination is made by either the ALJ or the ARB, and neither
the respondent nor the claimant appeals to the next higher level, the NRC will:
a. Evaluate whether to take enforcement action; and
b. If enforcement action is initiated based solely on a DOL finding, the NRC will
normally issue a choice letter since the choice letter, like the information request
noted in Section 1.3.17.A.1, requires the licensee to address the discrimination
finding and corrective actions, including any necessary to protect the
environment for raising concerns.
4. The information request noted in Section 1.3.17.A.1 requires that the licensee
describe:
a. Its position regarding whether the actions affecting the individual violated 10 CFR
50.7 (or other requirement) and the basis for its position, including the results of
any investigations it may have conducted to determine whether a violation
occurred; and
b. The actions taken or planned to ensure that the matter is not having a chilling
effect on the willingness of other employees to raise safety and compliance
concerns within its organization, and as discussed in NRC Form 3, to the NRC.
5. The licensee's response to the discrimination finding noted in the information request
letter is mandatory under the provisions of the AEA, 10 CFR 2.204, “Demand for
information,” and the applicable provisions of Title 10 implementing Section 182 of
the AEA. The request for information regarding the licensee/contractor’s actions to
assess and mitigate the potential chilling effect of the discrimination finding on the
environment for raising concerns is not considered part of the DFI.
6. When an information request noted in Section 1.3.17.A.1 is to be issued:
a. The staff should request an EA number for tracking purposes.
b. Any subsequent enforcement action proposed will be given a separate EA
number.
c. The EA number should be closed upon responsible staff acceptance of the
licensee’s response to the information request letter; therefore, the region must
send a copy of the letter to OE.
d. OE should be included on concurrence of the information request letter.
7. The licensee information requests discussed in Enforcement Manual Sections
1.2.12.1.F.8.l, 1.3.16.2.A.2, 1.3.16.2.B.3, and 1.3.17 relate to the potential for a
licensee’s work environment to be chilled as a result of a publicly noticed finding of
discrimination. There are other cases in which no finding of discrimination has been
made, but NRC has concluded based on allegation information, and/or inspection
findings, and/or other inputs, that the work environment is chilled. In these cases,
the NRC typically issues correspondence to the licensee requesting the licensee to
take corrective actions to resolve the work environment problem. Such
correspondence is referred to as a Chilling Effect Letter (CEL) and guidance related
to its content, issuance, evaluation, and closure is located in the Allegation Manual.
An EA number is to be requested for the issuance a CEL. Form 28 of Enforcement
Manual Appendix B should NOT be used in the drafting of a CEL.
304

PART II: Topical Chapters

PART II-1: General Topics

B. Numerous DOL Settlements Without Findings of Discrimination
1. If a licensee has numerous cases which end in settlement agreements before DOL
reaches a finding of discrimination at any level, the region should consider whether
this is:
a. Indicative of true, though uninvestigated, discrimination; or
b. A chilling effect.
2. The NRC must be careful when reaching such conclusions that the agency is not
perceived as discouraging settlements.

305

PART II: Topical Chapters

PART II-1: General Topics

Enforcement Actions related to Contractors and
Individuals
Enforcement and Administrative Actions Involving Individuals
NOTE:
Early engagement and coordination with OIP is required for any
enforcement actions associated with foreign nationals and/or foreign
entities/licensees to ensure the Agency’s international responsibilities are
addressed prior to issuance of any enforcement actions. Regional
enforcement staff and OE enforcement specialists will consult with the
appropriate OIP staff/management in the early stages of the enforcement
case process. Normally, whenever action is taken against an individual,
action is also taken against a licensee.

A. Enforcement actions involving individuals, including licensed operators, are significant
actions that will be closely controlled and judiciously applied.
B. An enforcement action involving a licensed individual will normally be taken only when
the NRC is satisfied that the individual:
1. Fully understood, or should have understood, his or her responsibility;
2. Knew, or should have known, the required actions; and
3. Knowingly, or with careless disregard (i.e., with more than mere negligence) failed to
take required actions which have actual or potential safety significance.
NOTE:
Normally, whenever action is taken against an individual, action is also
taken against a licensee.
C. Action may be taken directly against individuals (licensed or un-licensed) who engage in
deliberate misconduct that causes or would have caused, if not detected, a licensee to
be in violation of any rule, regulation, or order related to NRC-licensed activities (e.g., 10
CFR 50.5).
D. Actions against non-licensed individuals will normally be taken only in cases involving
deliberate misconduct by the non-licensed individual, in cases involving a lack of
reasonable assurance, and in cases in which an individual violates any requirement
directly imposed on him or her (e.g., a violation of any rule adopted under Section 147,
“Safeguards Information,” of the AEA).
306

PART II: Topical Chapters

PART II-1: General Topics

E. Action against NRC-licensed reactor operators may be taken even if the violation does
not involve deliberate misconduct, since operators licensed by the NRC are subject to all
applicable Commission requirements.
F. The NRC may take enforcement action against a licensee that may impact an individual,
where the conduct of the individual places in question the NRC's reasonable assurance
that licensed activities will be properly conducted.
1. The NRC may take enforcement action for reasons that would warrant refusal to
issue a license on an original application. Accordingly, appropriate enforcement
actions may be taken regarding matters that raise issues of integrity, competence,
fitness-for-duty, or other matters that may not necessarily be a violation of specific
Commission requirements.
2. Enforcement actions against licensed operators for failure to meet fitness-for-duty
requirements are addressed in this manual.
G. Because potential enforcement actions and administrative actions involving individuals
are significant actions, the Director, OE, is to be notified as soon as the staff identifies
any violation or issue that could lead to an enforcement or administrative action against
an individual.
H. The staff should consider in each case application of the deliberate misconduct rule
against an individual or contractor found to have committed the act of wrongdoing.
I.

A demand for information, ADR, or a PEC should normally be used for each case in
which wrongdoing is found, to put the burden on the licensee and the individual
supervisor to explain why they believe that an individual enforcement action should not
be taken.

J. Predecisional enforcement conferences, ADR, or a demand for information should
normally be used with contractors and their personnel where wrongdoing is caused by
contractor personnel.
K. In those cases where the staff believes enforcement action against an individual may be
warranted, the NRC will normally provide the individual with an opportunity to address
the apparent violations by:
1. Responding to a choice letter; or
2. Participating in a PEC, unless the circumstances of the case warrant immediate NRC
action.
3. An individual should normally be provided an opportunity to address the apparent
violation(s) before the agency takes escalated enforcement action (e.g., a PEC,
response in writing or if deliberate then ADR).
L. There may also be cases in which the staff proposes to issue a demand for information
(DFI) in lieu of, or in addition to, conducting ADR or a PEC.
M. When issuing an action against an individual:
307

PART II: Topical Chapters

PART II-1: General Topics

1. If the individual is employed by the licensee, a copy of the action should be sent to
the licensee.
2. If the individual is no longer employed by the licensee, a copy of the action is not
sent to the licensee.
3. A copy of the action is placed on the Enforcement Web page.
•
•

NOVs should remain on the Enforcement Web page for one year from the date
they are issued.
Orders should remain on the Enforcement Web page until all conditions of the
order has been met, including, as stipulated in the order, the length of time the
order is to remain in effect.

4. Enforcement Specialists should enter actions against individuals in the Action Items
Tracking System (AITS) with, e.g., in the case of NOVs, a year deadline, to ensure
that actions that have been placed on the Enforcement Web pages will be removed
in a timely manner.

Enforcement Actions against Licensees for Actions of Contractors
A. The Commission's long-standing policy has been and continues to be to hold its
licensees responsible for compliance with NRC requirements.
1. This is the case even if licensees use contractors for products or services related to
licensed activities; therefore,
2. Licensees are responsible for having their contractors maintain an environment in
which contractor employees are free to raise concerns without fear of retaliation.
B. Nevertheless, certain NRC requirements apply directly to contractors of licensees.
1. See, for example, the rules on deliberate misconduct, such as 10 CFR 30.10 and
50.5 and the rules on reporting of defects and noncompliances in 10 CFR Part 21.
2. The Commission's prohibition on discriminating against employees for raising safety
concerns applies to the contractors of its licensees, as well as to licensees (see, for
example, 10 CFR 30.7 and 50.7).
a. If a licensee contractor discriminates against one of its employees in violation of
applicable Commission rules, the Commission intends to consider enforcement
action against both the licensee, who remains responsible for the environment
maintained by its contractors, and the employer who actually discriminated
against the employee.
b. In considering whether enforcement actions should be taken against licensees
for contractor actions, and the nature of such actions, the NRC intends to
consider, among other things:

308

PART II: Topical Chapters

•
•

•
•

PART II-1: General Topics

The relationship of the contractor to the particular licensee and its licensed
activities;
The reasonableness of the licensee's oversight of the contractor environment
for raising concerns by methods such as licensee's reviews of contractor
policies for raising and resolving concerns and audits of the effectiveness of
contractor efforts in carrying out these policies, including procedures and
training of employees and supervisors;
The licensee's involvement in or opportunity to prevent the discrimination;
and
The licensee's efforts in responding to the particular allegation of
discrimination, including whether the licensee reviewed the contractor's
investigation, conducted its own investigation, or took reasonable action to
achieve a remedy for any discriminatory action and to reduce potential
chilling effects.

Individual Action (IA) Numbers
A. Individual Action (IA) numbers are assigned by OE to administratively track and file all
correspondence issued to an individual, if that individual is being considered for or has
been issued an enforcement action.
B. All correspondence issued to an individual should include an IA number.
C. IA numbers should be used on all close-out letters and on conference or choice letters,
but never on correspondence containing the corresponding EA numbers.
D. The region should use an EA number for the review and approval stages and get an IA
number from OE when the correspondence is ready to be issued.
1. The EA number should never appear on the correspondence/enforcement action
issued with an IA number; nor, should it appear in the ADAMS profile. This is to
maintain an individual’s privacy, consistent with the Privacy Act.
2. The EA file should be closed upon issuing the final IA action.

Predecisional Enforcement Conferences Involving Individuals
A. Once the staff determines that an individual PEC should be conducted,
1. An EA number will be assigned if one has not previously been issued.
2. The staff should contact OE to obtain an IA number to include on a conference or
choice letter or DFI when the correspondence is ready to be issued.
3. Although the original EA number should be used for any subsequent action or closeout letter during the review and approval stages, the IA number should be used on
the final correspondence to the individual.
B. For cases where the focus of regulatory concern is the licensee but a specific individual
or individuals are involved, when the staff contacts the licensee to schedule the
309

PART II: Topical Chapters

PART II-1: General Topics

conference, the staff should make clear to the licensee the agency’s desire to have the
individual or individuals attend.
C. Letters to the licensee that describe apparent violations involving the individual should
avoid publicizing the individual's identity. If necessary, the apparent violation may be
described in an attachment to the letter, and the letter made available to the public
without the attachment.
D. Written correspondence concerning the PEC should normally not be made public
(ADAMS (PARS)) in a manner that identifies the individual. The identification of the
individual should be withheld from the public pending the issuance of any enforcement
action, including a DFI.
E. For ADR or a PECs involving only the individual, the letter requesting the conference
should have an IA number and include:
1. A clear statement of the purpose of the conference, the time and date agreed upon,
and any apparent violations to be discussed.
2. A copy of the inspection report or the OI report factual summary should be enclosed
if available.
3. A copy of the transcript of the individual's OI interview may be included, if the
individual (or individual's attorney) requests it to prepare for the conference and the
OI investigation has been completed and is closed.
a. The Director, OI, and Director, OE, should be consulted in these cases.
b. The transcript of the individual's OI interview will not be made available thru a
FOIA request until after the enforcement action is issued.
4. A description of the information that the individual is expected to address.
5. A description, in general terms, of the range of possible enforcement actions that the
NRC is considering.
6. A statement that the individual is not required to attend the conference and that,
should the individual choose not to attend, and the NRC intends to proceed based
on the facts already at hand.
7. A statement that the individual may choose to bring a personal representative;
however, if the individual desires to bring more than one representative, the
individual should contact the NRC in advance of the conference.
8. A point of contact who can answer any questions about the conference.
F. As with other PECs, a meeting notice should be issued when an individual is involved;
however, care should again be taken for privacy considerations.
1. The meeting notice should avoid using names or titles in a manner to implicate a
particular individual as being the focus of the conference.
310

PART II: Topical Chapters

PART II-1: General Topics

2. For a conference in which only the individual and his/her representative(s) will be
attending (i.e., no licensee representatives), the meeting notice should use a general
designation (e.g., "Diablo Canyon employee") rather than the individual's name or
specific title.
G. Predecisional enforcement conferences involving individuals normally will be closed and
should be transcribed.
1. Consideration should be given to having NRC counsel (regional or OGC) present.
2. An OE staff member should also attend the more significant conferences and for all
cases involving discrimination.
3. For a conference involving only the individual, the NRC may allow limited licensee
attendance only if the individual who is the subject of the conference so desires.
NRC attendance at these conferences should also be limited.
H. Appendix D includes opening remarks for a PEC with licensed operators. While use of
the remarks is not mandated, they cover important issues that should be addressed. The
presiding official should consider these remarks and adjust them as appropriate for
conferences with unlicensed individuals.
I.

If the individual chooses to bring a personal representative (usually an attorney, spouse,
or relative), the NRC should make it clear at the outset of the conference that the
purpose of the meeting is to receive information from the individual and understand the
individual's perspective. As such, the NRC's questions should primarily be addressed to
and answered by the individual.

J. Subsequent to the PEC, the region and/or OE should determine, whether enforcement
action should be issued against the facility licensee, against the individual, or both (See
guidance below).

Action against the Licensee or Against the Licensee and the
Individual
A. When a potential enforcement issue involves an individual, the decision must be made
whether to cite solely against the licensee or cite against the individual and the facility
licensee.
1. Action against an individual will not be taken if the individual's improper action was
caused by management failures.
2. Most transgressions of individuals involving Severity Level III or IV violations will be
handled by citing only the facility licensee.
B. Cite solely against the facility licensee.
The following examples of situations illustrate when the NRC will cite only the facility
licensee:

311

PART II: Topical Chapters

PART II-1: General Topics

NOTE:
NOVs are issued to facility licensees to recognize their responsibility for the
conduct of their employees.
1. Inadvertent individual mistakes resulting from inadequate training or guidance
provided by the facility licensee.
2. Inadvertently missing an insignificant procedural requirement when the action is
routine and fairly uncomplicated, and where no unusual circumstance exists
indicating that the procedures should be referred to and followed step-by-step.
3. A case in which compliance with an express direction of management, such as the
Shift Supervisor or Plant Manager, resulted in a violation.
4. Individual error directly resulting from following the technical advice of an expert
unless the advice was clearly unreasonable, and the licensed individual should have
recognized it as such.
5. Violations resulting from inadequate procedures unless the individual used a faulty
procedure knowing it was faulty and did not attempt to have the procedure corrected.
C. Cite individual (licensed or unlicensed) & the facility licensee: Serious violations,
including those involving the integrity of an individual (e.g., lying to the NRC) concerning
matters within the scope of the individual's responsibilities, will be considered for
enforcement action against the individual as well as against the facility licensee.
1. Listed below are examples of situations which could result in enforcement actions
involving individuals, licensed or unlicensed. If the actions described in these
examples are taken by a licensed operator or taken deliberately by an unlicensed
individual, enforcement action may be taken directly against the individual.
2. Violations involving willful conduct not amounting to deliberate action by an
unlicensed individual in these situations may result in enforcement action against a
licensee that could impact an individual.
3. The situations include, but are not limited to, violations that involve:
•
•
•
•
•
•
•

Willfully causing a licensee to be in violation of NRC requirements
Willfully taking action that would have caused a licensee to be in violation of NRC
requirements but did not because it was detected, and corrective action was
taken
Recognizing a violation of procedural requirements and willfully not taking
corrective action
Willfully defeating alarms which have safety significance
Unauthorized abandoning of reactor controls
Dereliction of duty
Falsifying records required by NRC regulations or by the facility license
312

PART II: Topical Chapters

•
•
•
•
•
•
•
•

PART II-1: General Topics

Willfully providing, or causing a licensee to provide, an NRC inspector or
investigator with inaccurate or incomplete information on a matter material to the
NRC
Willfully withholding safety significant information rather than making such
information known to appropriate supervisory or technical personnel in the
licensee's organization
Submitting false information designed to allow a person to gain access to a
licensee facility or, as a result, allowed a person to gain unescorted access to a
licensee facility
As a contractor or other person who provides testing or other services, willfully
providing false data to a licensee, when the data affects the licensee's
compliance with 10 CFR Part 50, Appendix B, or other regulatory requirement
Willfully providing false certification that components meet the requirements of
their intended use, such as an ASME Code
As vendors of equipment for transportation of radioactive material, willfully
supplying casks that do not comply with their certificates of compliance
Willfully performing unauthorized bypassing of required reactor or other facility
safety systems
Willfully taking actions that violate TS LCOs (enforcement action for a willful
violation will not be taken if the operator meets the requirements of 10 CFR
50.54(x), i.e., if the operator acted reasonably considering all the relevant
circumstances surrounding the emergency)

D. Cite the individual (unlicensed) and the facility licensee: In deciding whether to issue an
enforcement action to an unlicensed person in addition to the facility licensee, the
following factors should be considered:
1. The level of the individual within the organization;
2. Whether the violation was willful;
3. The individual's training, experience, and knowledge of the potential consequences
of the wrongdoing;
4. The potential safety or common defense and security consequences of the
misconduct;
5. The actual safety or common defense and security consequences of the misconduct;
6. The benefit to the wrongdoer (e.g., personal or corporate gain);
7. The degree of supervision of the individual (i.e., how closely the individual is
monitored or audited, and the likelihood of detection...such as a radiographer
working independently in the field as contrasted with a team activity at a power
plant);
8. The employer's response, including long term and short term disciplinary action and
site specific and industry-wide actions taken;

313

PART II: Topical Chapters

PART II-1: General Topics

9. The attitude of the wrongdoer (e.g., admission of wrongdoing, acceptance of
responsibility);
10. The degree of management responsibility or culpability; and
11. Who identified the misconduct.
12. The severity of the action taken by the employer; for example, if the individual has
been placed into PADS such that there is minimal likelihood that they would work in
the nuclear field in the future.

Action against the Individual
A. If the NRC determines that action will not be taken against an individual, the staff should
prepare a close-out letter using the appropriate form in Appendix B of this manual.
1. Individual close-out letters state that the individual did or did not engage in deliberate
misconduct and no further actions are warranted.
2. Generally, close-out letters would be given to an individual who was or was not found
to have engaged in deliberate misconduct, who holds a low-level position within the
organization (e.g. non-supervisory employee) involved in a violation of very low
potential for safety or security consequences to occur and there was no actual safety
or security consequence.
NOTE:
Very low potential for safety or security consequences to occur is, for
example, 1) a violation that, absent consideration (potential escalation)
for willfulness, would be evaluated as a minor or Severity Level IV
violation using the traditional enforcement process or 2) a minor or Green
finding if the SDP process is used to classify the significance.
B. NOVs may be issued to licensed or unlicensed individuals.
1. Generally, a Severity Level IV violation should not be issued to an individual. An
exception to this may be if the individual is a licensed operator and the circumstance
of the violation warrants it.
2. Generally, a Severity Level III violation should be issued to:
a. An individual who engaged in deliberate misconduct that resulted in no actual
safety or security consequences but had potential for substantial safety or
security consequences to occur;
b. A licensee official who engaged in deliberate misconduct (regardless of the
significance of the underlying violation);

314

PART II: Topical Chapters

PART II-1: General Topics

c. An individual who repeatedly engaged in deliberate misconduct, regardless of the
safety or security significance or whether or not the individual was a licensee
official; or
d. An NRC-licensed individual whose violation involved (i) willfulness (i.e., either
deliberate misconduct or careless disregard), (ii) fitness-for-duty (e.g., individual
performing licensed duties while under the influence of alcohol), or (iii) significant
personal license performance issues (e.g., unauthorized abandoning of reactor
controls, dereliction of duty).
NOTE:
Low to moderate potential for safety or security consequences to occur
is, for example, 1) a violation that, absent consideration (potential
escalation) for willfulness, would be evaluated as a Severity Level III
violation using the traditional enforcement process or 2) a white finding if
the SDP process is used to classify the significance.
3. An NOV need not require a response from the individual if the action is being issued
at Severity Level IV to an individual who holds a low-level position within the
organization who has been terminated from employment involving licensed activities.
In such cases, there is normally not much corrective action that an individual could
take; however, an opportunity for the individual to respond should be provided.
4. With the exception of violations against a deliberate misconduct rule (e.g., 10 CFR
50.5), NOV “contrary to” paragraphs should not include the word “willful” or
“deliberate misconduct.”
a. Discussion of willfulness should be included in the cover letter as part of the
significance discussion.
b. Including “deliberate misconduct” in “contrary to” paragraphs is required when
violations are based on the deliberate misconduct requirements.
C. Orders
1. Generally, an Order to ban an individual should be issued to:
a. An individual who engaged in deliberate misconduct after being put on notice
regarding such acts, either by the NRC through an individual Notice of Violation
or Order, or through the individual’s employer, typically evidenced by disciplinary
action related to prior wrongdoing constituting a violation of NRC requirements by
the individual;
b. An individual who engaged in deliberate misconduct that resulted in actual safety
or security consequences or a significant potential for safety or security
consequences to occur;

315

PART II: Topical Chapters

PART II-1: General Topics

NOTE:
A significant potential for safety consequences to occur is, for example,
1) a violation that, absent consideration (potential escalation) for
willfulness, would be evaluated as a Severity Level I or II violation using
the traditional enforcement process or 2) either a red or yellow finding if
the SDP process is used to classify the significance.
c. An individual who engaged in deliberate misconduct and the evidence indicates
that the individual deliberately intended to harm others or cause a safety or
security problem, whether or not such harm or safety problem occurred;
d. An individual who engaged in deliberate misconduct and the evidence indicates
that the individual succeeded in persuading, or attempted to persuade others to
participate in wrongdoing; or
e. A NRC licensed individual whose actions were deliberate and resulted in the
NRC no longer having reasonable assurance that licensed activities will be
conducted in a manner that provides adequate protection to the public health and
safety.
2. Determining the length of a ban
a. Typically, bans are fixed at one, three, or five years (unless the ban is in place
until certain conditions are satisfied).
b. Factors which should be considered when determining the length of a ban
include, but are not limited to:
•
•
•

The position of the individual in the organization;
The significance (or potential significance) of the underlying violation; and
Other circumstances such as violations of 10 CFR Part 26, which specifies
the length of time a licensee or other entity would restrict an individual from
authorization to the facility, should be taken into account when deciding the
length of the ban, for an individual, from NRC licensed activities.

316

PART II: Topical Chapters

PART II-1: General Topics

Position in the
Organization

Years Banned

3

5

5

1

3

5

1

1

3

Safety Significance
Figure 1: Length of a ban
The figure above illustrates the higher the position in the organization and the
higher the safety significance, the longer the ban, and vice versa.
NOTE:
For unlicensed individuals, such orders may include provisions that prohibit
involvement in NRC licensed activities for a specified period of time or until certain
conditions are satisfied (e.g., completing specified training or meeting certain
qualifications). For NRC-licensed reactor operators, such orders may involve
suspension for a specified period, modification, or revocation of their individual
licenses.
3. Orders generally require:
a. Notification to the NRC before the person resumes working in licensed activities;
and/or
b. The person to tell a prospective employer or customer engaged in licensed
activities that the person has been subject to an NRC order.
D. Civil penalties
1. Except for individuals subject to civil penalties under Section 206 of the ERA, as
amended, the NRC will not normally impose a civil penalty against an individual.
However, Section 234 of the AEA gives the Commission authority to impose civil
penalties on “any person.” Furthermore, any person, whether or not a licensee of the
Commission, who violates any regulations adopted under Section 147, “Safeguards
Information,” of the AEA will be subject to the full range of enforcement sanctions,
including civil penalties. Section 11s of the AEA broadly defines “person” to include
individuals, a variety of organizations, and their representatives or agents.
2. The intent of civil penalties to individuals is to serve as a deterrent; these penalties
generally do not require a base civil penalty as high as that issued to a licensee or
317

PART II: Topical Chapters

PART II-1: General Topics

contractor. However, willful violations may support a civil penalty outside of the
range listed in Section 8 of the Enforcement Policy.
3. Civil penalties associated with violations of NRC requirements
a. Section 234 of the Atomic Energy Act (AEA) gives the Commission authority to
impose civil penalties on "any person." Furthermore, any person, whether or not
a licensee of the Commission, who violates any regulations adopted under
Section 147, “Safeguards Information,” of the AEA will be subject to the full range
of enforcement sanctions, including civil penalties. Section 11s of the AEA
broadly defines “person” to include individuals, a variety of organizations, and
their representatives or agents. Such cases are rare and require Commission
approval.
b. Except for individuals subject to civil penalties under Section 206 of the Energy
Reorganization Act of 1974, the NRC will not normally impose a civil penalty
against an individual.
4. Civil penalties associated with the release of Safeguards Information (SGI)
a. The NRC typically reserves civil penalties for cases involving egregious violations
and for individuals who refuse to correct or mitigate the release of information.
b. The NRC will typically issue a civil penalty to any individual who deliberately
releases SGI, regardless of whether that individual is employed by the licensee,
certificate holder, applicant for a license or a certificate of compliance, or their
contractors. If an individual deliberately released or failed to properly control SGI
after employment ends with a licensee, certificate holder, applicant for a license
or a certificate of compliance, or their contractor, the NRC will typically consider
individual enforcement actions, including civil penalties.
c. Civil penalty considerations for violations by individuals who release SGI and
who are not employed by an NRC licensee differ from those individuals who
release SGI, including SGI-M, and are employed by a licensee. As used in this
civil penalty discussion, “licensee” includes licensee, certificate holder, applicant
for a license or a certificate of compliance, and their contractors).
•

Individuals employed by a licensee
A civil penalty is typically not issued for non-deliberate violations of SGI
requirements for individuals if their employer (a licensee, certificate holder,
applicant for a license or a certificate of compliance, or contractor): (1) placed
the violation in its corrective action program, and (2) has taken, or plans to
take, corrective actions to restore compliance.
The NRC will consider, on a case-by-case basis, the appropriateness of a
civil penalty for non-deliberate releases of SGI by an individual in which the
employer failed to take or plan to take corrective actions.

318

PART II: Topical Chapters

•

PART II-1: General Topics

Individuals not employed by a licensee
The NRC will consider, on a case-by-case basis, the appropriateness of a
civil penalty for cases involving deliberate or non-deliberate releases of SGI
by individuals no longer (or never) employed by a licensee. This
consideration is also given to those cases involving releases of SGI by an
individual after employment has been ended with a licensee.

d. When determining the appropriate severity level for the release of SGI, consider
the following:
•
•
•
•
•

Type of SGI information disclosed
Availability of the disclosed information to the public
Damage or vulnerability that the information caused or may cause to the
licensee that possessed ownership of the SGI
Damage that the information caused or could cause to public health and
safety
SGI-related significance determination process information, when available

e. When determining if a civil penalty is to be issued and the final civil penalty
amount, consider the following:
• Individual’s reasons and potential motives
• Lack of understanding/knowledge of the significance of the information
• Economic gain
• Desire to express personal view
• Willingness to correct or mitigate the release of information
f.

Table A, “Table of Base Civil Penalties”, in Section 8 of the Enforcement Policy
lists the base civil penalty to individuals who release SGI. Section 6.13,
“Information Security,” of the Enforcement Policy provides examples of violations
to help determine the severity levels for cases related to the release of SGI.

E. Demands for Information (DFIs)
1. A DFI is a formal request for information that can be made to an individual for the
purpose of enabling the NRC to determine whether an order or other enforcement
action should be issued.
2. An individual to whom the NRC has issued a DFI may, in his or her discretion,
respond to a DFI by filing a written response under oath or affirmation.
3. All DFIs should provide an opportunity for the individual to challenge the underlying
facts, including any (apparent) violations.

Action Against the Facility Licensee
The particular sanction to be issued to a facility licensee should be determined on a case-bycase basis.

319

PART II: Topical Chapters

PART II-1: General Topics

A. Most transgressions of individuals involving Severity Level III or IV violations will be
handled by citing only the facility licensee.
B. In accordance with the Enforcement Policy, the NRC may disposition a licenseeidentified Severity Level IV willful violation involving a low-level individual as an NCV.
C. NRC-identified willful violations involving individuals (regardless of the severity level)
should always be cited in an NOV.
D. Notwithstanding the outcome of the normal civil penalty assessment process, the
Enforcement Policy provides that discretion will be considered (i.e., proposing or
increasing the amount of a civil penalty) for willful violations.

Sanctions Issued to Facilities
A. NOVs, with the exception of violations against the deliberate misconduct rule, should not
include the word “willful” or “deliberate misconduct” in the NOV “contrary to” paragraphs.
In such cases, the discussion of willfulness should be included in the cover letter as part
of the significance discussion.
B. DFIs may be issued to a licensee or applicant to obtain information regarding the
competence or integrity of a particular licensee employee to determine whether the
license should be granted, or if issued, whether it should be modified, suspended, or
revoked, or other enforcement action taken.
1. Cover letters and DFIs should include individuals’ titles, but should not include
individuals’ names.
NOTE:
Including “deliberate misconduct” in “contrary to” paragraphs is required
when violations are based on the deliberate misconduct requirements.
2. Licensees should not get copies of DFIs that may be issued to the subject
individuals, because the NRC has not made final, public conclusions about the
individuals.
3. Individuals who are the subject of DFIs should receive a copy of the action sent to
the licensee.
C. Orders modifying the facility license may be issued in the case of an unlicensed person,
whether the unlicensed person is a firm or an individual, to require:
1. The removal of the person from all licensed activities for a specified period of time or
indefinitely;

320

PART II: Topical Chapters

PART II-1: General Topics

NOTE:
Individuals who are the subject of orders should receive a copy of the
action sent to the licensee.
2. Prior notice to the NRC before utilizing the person in licensed activities;
3. Notice of the issuance of such an order to other persons involved in licensed
activities making reference inquiries; or
4. Conditions to employers which require, e.g., retraining, additional oversight, or
independent verification of activities performed by the person, if the person is to be
involved in licensed activities.
D. CALs may be used instead of orders if the licensee is told that an individual may not use
licensed material because the individual:
1. Is not named on the license;
2. Does not meet the Commission requirements; or
3. Where the licensee has already, on its own, removed an individual and the NRC only
seeks to be informed of any decision to reinstate that individual and the basis for that
decision.
a. Such a CAL should state clearly that the agreement does not require NRC
approval for reinstatement.
b. In such cases the person, under existing license conditions or regulations, lacks
authorization to be involved in the licensed activity, and the CAL is merely being
used to confirm that the licensee will adhere to existing provisions (i.e., in such a
situation the CAL would not affect the individual's rights).
E. When the NRC takes an enforcement action against a licensee because of an individual
employee's action, and that enforcement action may affect the employment of the
individual, the individual may have rights to a hearing.
1. NRC employees may be individually liable for infringing on a person's constitutional
rights.
2. If the NRC concludes that an individual should be removed from licensed activities,
an order is to be used rather than an informal action, such as a CAL, to clearly
establish the opportunity for a hearing.

Actions Concerning Individuals Licensed by Other Authorities
A. Some enforcement actions are taken against individuals who are licensed by other
authorities.

321

PART II: Topical Chapters

PART II-1: General Topics

1. The most common cases are enforcement actions taken against physicians who are
licensed by individual State licensing boards.
2. Others who may be subject to NRC action and are licensed by a State board include,
e.g., nurses, medical technologists, professional engineers, and attorneys.
B. If an order is issued against an individual who is licensed (or registered) by a State, the
issuing office should send a copy of the order to the licensing authority for the State.
1. The transmittal letter to the individual should show the State on the "cc" list.
2. In addition, a copy of the enforcement action against a physician should be sent to:
Federation of State Medical Boards of the United States, Inc.
400 Wiser Road, Suite 300
Euless, Texas 76039
a. The Federation is a central repository that maintains the Physician Disciplinary
Data Bank.
b. The transmittal letter to the physician should show the Federation on the "cc" list.
C. If the region intends to forward an order issued against an individual to a State licensing
authority and/or the Federation, it should highlight this intent in the Enforcement Action
Worksheet included with the region's recommended proposed enforcement action to OE.
D. It is imperative that if after issuance of the action, NRC changes its position on the
matter, a copy of the NRC revised position be forwarded to the same licensing authority
and the Federation, as applicable.

Coordination and Review for Actions Involving Individuals
A. Any proposed order (other than a confirmatory order) or civil penalty to be issued to an
individual requires the concurrence of the Director, OE, and the DEDO.
B. A confirmatory order, NOV without a civil penalty, NCV, or any proposed administrative
action (CAL, DFI, or similar letter) directed to an individual requires appropriate
coordination with OE prior to issuance.

Notification, Mailing, & Distribution of Actions Involving Individuals
A. Action Against the Individual:
1. In order to afford individuals, the opportunity to address apparent violations before
issues are made public, enforcement actions against individuals may be subject to a
45-day hold period, as discussed further below.
2. When NOVs are issued to individuals, they may be made available to the public (and
posted to the Enforcement Web site (for escalated NOVs)) ONLY if the individual has

322

PART II: Topical Chapters

PART II-1: General Topics

previously had an opportunity to present his or her views on the facts of the case to
the NRC.
3. When NOVs are issued to individuals the actions should NOT be made available to
the public or the licensee, when it is sent to the individual, if the individual has not
been given an opportunity to present his or her views on the facts of the case to the
NRC, such as during a PEC, in response to a choice letter or a previously issued
DFI, or during an OI investigation in which the individual was specifically provided an
opportunity to challenge the alleged wrongdoing.
a. In these cases, the action should provide the individual with an opportunity to
respond within 30 days.
b. The action should state that after 45 days the action will be sent to the licensee
and made available to the public, unless the individual provides a sufficient basis
to withdraw the action
4. A copy of the action should be distributed only to OE and those offices with a need
for the document.
5. In cases where an enforcement action is being proposed for a licensee based on the
actions of the individual, the enforcement action against the licensee should be
withheld for at least 45 days while the individual is given the opportunity to respond.
6. If an individual provides a sufficient basis to withdraw an action, the staff should
issue a close-out letter to the individual stating that the action will be withdrawn.
7. When the staff issues a close-out letter to the individual stating that an action will be
withdrawn, the staff should also review the proposed action for the licensee to
consider whether it remains appropriate based on the individual's response.
8. If an individual does not respond to the action or fails to provide a sufficient basis to
withdraw the action, the responsible office (the region or OE) should ensure that the
action (and the individual's response, if one was provided) are distributed to the
licensee and made available to the public 45 days after the action was issued.
9. For an action subject to the 45-day hold, the region will forward a hard copy only to
OE; and when the final enforcement decision is made, forward the electronic version
to OE for posting on the Enforcement Web site (i.e., the region is responsible for
tracking the 45-day hold period).
10. PEC letters, choice letters, and DFIs should only be made public if the agency
concludes that enforcement action should be issued to the individual. These
documents should be made public at the time the action is made public.
11. Close-out letters that are issued to individuals are not made available to the public
(although they remain subject to release under FOIA). Close out letters to licensed
individuals are placed on the license docket.
12. The region is responsible for mailing and distributing NOVs, civil penalties, and
close-out letters to individuals for willful violations other than those cases involving
discrimination.
323

PART II: Topical Chapters

PART II-1: General Topics

13. OE is responsible for mailing and distributing DFIs and orders against individuals.
Actions should be mailed by either Certified Mail (Return Receipt Requested) or
Express Mail.
14. OE should be on distribution for all actions issued to individuals, including close-out
letters. In addition, the facility licensee should be shown on the "cc" for all actions
issued to individuals.
15. The issuing office should attempt to notify the individual by telephone when it is
issuing an individual action. This is especially important when an order is being
issued or an enforcement action is being taken against a foreign national living
outside the United States. In these cases, individuals must be notified prior to the
normal five-day ADAMS hold release date to ensure they are made aware of the final
action before it is publicly available.
16. The region must ensure that the copies of actions against individuals and related
documents that are made available to the public do not include individuals' home
addresses.
17. Press releases that address individual actions and enforcement actions may be
issued sooner than the normal five-day ADAMS hold after the staff has confirmed
that the individual has received the action.
18. If the NRC discovers (through inspections or investigation-related material)
potentially damaging or disqualifying information regarding an individual’s
trustworthiness and reliability, and the individual currently possesses Unescorted
Access (UA) or is in the process of obtaining Unescorted Access Authorization
(UAA), the NRC will consider, on a case-by-case basis, notifying the licensee that
has granted, or is processing the UA/UAA of the information. This notification may
occur in the preliminary or final determination stage of the enforcement process, as
appropriate, with approval of the Director, OE. If the NRC makes such a notification,
it nevertheless remains the licensee’s responsibility to evaluate the information
provided in accordance with its access authorization program to determine the
appropriate actions regarding individual access authorizations. A licensee may
reasonably reach a conclusion that the information provided by the NRC is not
disqualifying under the circumstances (e.g. based on additional facts, based on a
different assessment of the facts, or based upon the final resolution of the
enforcement process).
19. Exceptions to the above process will be considered on a case-by-case basis by the
Director, OE.
B. Action Against the Facility Licensee:
1. Actions issued to licensees should be mailed in accordance with the normal
guidance included within the applicable sections of this manual.
2. If an enforcement action is being proposed for a licensee in conjunction with an
individual action, then the enforcement action against the licensee should be
withheld for at least 45 days while the individual is given the opportunity to respond.
324

PART II: Topical Chapters

PART II-1: General Topics

If an individual subsequently provides a sufficient basis to withdraw the action, the
staff should review the proposed action for the licensee to consider whether it
remains appropriate based on the individual's response.
3. Individuals who are the subject of DFIs or orders that are issued against the facility
licensee should receive a copy of the action that is sent to the licensee.
a. The transmittal letter to the licensee should include language such as, "A copy of
this letter and its enclosure(s) is being sent to (name or title of individual). The
individual is not required to provide a response to the Demand, (order) but may
do so if he or she desires within days under oath or affirmation."
b. The transmittal letter to the licensee should also include the individual's name on
the "cc" list.
4. Exceptions to the above process will be made on a case-by-case basis by the
Director, OE.

325

PART II: Topical Chapters

PART II-1: General Topics

Material False Statements and Completeness and
Accuracy of Information
Section 2.3.11 of the Enforcement Policy provides the policy, and to a great extent, the process,
for evaluating incomplete and inaccurate information submitted by licensees to the NRC for
enforcement action. Section 6.9 provides examples of violations of varying severity levels
involving inaccurate or incomplete information or the failure to provide significant information.
These sections of the Policy should be reviewed in conjunction with this section of the Manual.

Materiality Guidance:
A. 10 CFR 50.9 (and other applicable regulations, e.g., 10 CFR 30.9, 40.9, 50.9, 55.9,
60.10, 61.9a, 70.9, 71.7, 72.11, and 110.7a) requires information provided to the NRC to
be complete and accurate in all material respects. An example of an inaccuracy or
omission that is clearly material is failing to disclose that the site upon which a nuclear
plant is to be built lies over a fault or is seismically active (or stating that it is not when it
actually is). An example of inaccurate information that may not be material is the color a
guard rail is to be painted, assuming there is no specific importance to the color (e.g., to
identify protected equipment, etc.).
B. The Commission has squarely addressed this question in two decisions: Virginia
Electric and Power Co. (North Anna Power Station, Units 1 and 2), CLI-76-22, 4 NRC
480 (1976) (VEPCO); and Randall C. Orem, D.O., CLI-93-14, 37 NRC 423, 428
(1993). In VEPCO, the Commission explained that materiality depends on whether
information is capable of influencing the NRC reviewer to whom it is submitted or from
whom it is withheld. CLI-76-22, 4 NRC at 487. Information is material if it “has a natural
tendency or capability to influence a reasonable agency expert.” Id., CLI-76-22, 4 NRC
at 486, 491. Information that has no potential bearing on the regulatory process, on the
other hand, is not material. Id.
In Orem, the Commission emphasized that materiality does not depend on whether the
NRC actually relied on a particular statement. See Orem, CLI-93-14, 37 NRC at 428
(explaining that “[w]hether a statement would have, in fact, induced the agency to grant
an application has no bearing on materiality”). If a reasonable NRC reviewer would
consider the information in reaching his or her decision, the information is material.
Id., CLI-93-14, 37 NRC at 428. See also Sequoyah Fuels Corp. and General Atomics
(Gore, Oklahoma Site Decontamination and Decommissioning Funding), LBP-95-12, 41
NRC 478, 485) (1995) (referring to VEPCO and Orem as establishing an “objective
reliance” approach to materiality, under which information is material if a reasonable
agency decisionmaker would take it into account when doing his or her job).
The Commission has made two other key points concerning materiality. First, a
statement need not be intentionally false in order to violate § 186 of the AEA or the
NRC’s regulations. VEPCO, CLI-76-22, 4 NRC at 486. If an applicant or licensee
intentionally submits a false statement to the NRC, however, it may be subject to
additional sanctions under NRC regulations prohibiting deliberate misconduct (e.g.,
10 C.F.R. § 30.10(a)(2)). Second, the test for materiality is whether a reasonable NRC
staff reviewer would consider the information when reaching a decision, not whether a
reasonable member of the public would do so. Id., CLI-76-22, 4 NRC at 487. In certain
326

PART II: Topical Chapters

PART II-1: General Topics

cases, a staff reviewer may be interested in information that a member of the public
would not find significant, while in other cases the converse may be true. Id.
Examples of information that the Commission or the Board has found to be material
include statements regarding the location of a geologic fault line (VEPCO), a
consultant’s report indicating that the fault may be reactivated (VEPCO), statements
regarding the location at which byproduct material will be used (Orem), and facts relating
to a company’s control over day-to-day operations at an NRC-licensed site (Sequoyah
Fuels). As the Commission has emphasized, however, “Whether a particular bit of
information is material in a given context must . . . ‘be judged by the facts and
circumstances in the particular case.’” VEPCO, CLI-76-22, 4 NRC at 487 (citation
omitted). “There is no obvious boundary between material information and trivia, but
clear cases of both exist, and a careful attention to context along with a healthy dose of
common sense will resolve most problems.” Id.
C. Timing of information: The Commission has stated that materiality can be, at least
somewhat, dependent on when it was submitted. The Commission stated in VEPCO
that “[m]ateriality is dependent in part on the stage of the proceeding involved. At the
very beginning of the licensing process, when initial investigations are being made, the
applicant has greater latitude to inquire into areas that may prove, when that inquiry is
concluded, to be without significance in terms of licensing decision. At the hearing
stage, in contrast, where agency decision-making is imminent, arguably relevant data
must be promptly furnished if the agency is to perform its function.” VEPCO, CLI-76-22,
4 NRC at 488. This suggests that, whereas an inaccuracy or omission may not be
material if it relates to information an applicant provides with its initial licensing submittal
or early in the licensing process, a similar inaccuracy or omission may in fact be material
if it relates to information the applicant submits when the NRC is closer to making a
licensing decision.

Application
A. While the preceding section indicates that the legal threshold for a materiality violation is
relatively low, it is important to realize that not every instance of a material false
statement or submission of incomplete/inaccurate information warrants enforcement
action. For example, information that may otherwise be considered incomplete or
inaccurate submitted in a large licensing package may be more appropriately addressed
by requests for additional information. The excessive use of enforcement in this area
may tend to create a “chilling effect” on licensees when providing information, which is
contrary to the principles of good regulation.
The enforcement staff should consider several factors when determining whether or not
to cite a licensee for providing incomplete/inaccurate information or for a material false
statement. These are:
1. Precedent cases - An important aspect of being a stable and predictable regulator is
consistency. While many cases involving incomplete/inaccurate information are
different, and all cases are considered on a case-by-case basis, it is important to
recognize cases that are similar and reach consistent outcomes.
2. Enforcement Policy guidance and examples – Although case specifics may differ
from the exact examples in the Policy (the examples are neither exhaustive nor
327

PART II: Topical Chapters

PART II-1: General Topics

controlling), effort should be made to ensure enforcement decisions are consistent
with the examples (e.g., if failure to make a required report is listed specifically as a
SL IV example, failure to make an analogous report should not be cited as a SL III
without some type of escalating circumstances making the case more significant).
3. Safety/regulatory significance – Violations of 10 CFR 50.9 and other regulations
dealing with incomplete/inaccurate information are dispositioned using traditional
enforcement, which is focused on regulatory significance. However, in the event that
there is an underlying technical violation, the safety significance of that violation can
also be used to distinguish cases that are otherwise similar.

Incomplete/Inaccurate Information in the Licensing Process
A. Licensees submit large amounts of information to the NRC as part of the licensing
process. At times, NRC reviewers have questions about the information submitted, may
need additional information, or question the accuracy or completeness of the submittal.
Submitting requests for additional information (RAIs) to the licensee is a common part of
the licensing process and is often the most efficient way for reviewers to get the
information needed for an informed regulatory decision. While typically the staff
requests additional information when questions arise about information in a licensing
submittal, it is possible that such submittals could warrant enforcement action if they
contain incomplete or inaccurate information.
B. It is important to maintain flexibility in the Enforcement program due to the individual
nature of each case. While generally, no enforcement action is taken for inaccurate or
incomplete information submitted in the licensing process, the NRC has the authority to
do so on a case by case basis if a particular submission warrants such action. If
inaccurate or incomplete information is submitted within the licensing process, and the
licensee does not promptly identify and correct the information, then the NRC reviewer
determines whether enforcement is appropriate (See Enforcement Policy §2.3.11).
Enforcement (up to SLIV) may be considered when the NRC has previously raised some
question as to the accuracy or clarity of the information, or if the information was not
timely identified and corrected by the licensee. If the licensee identifies the issue and
corrects it, or if the NRC has not raised questions about the information at the time the
reviewer discovers it, a minor violation may result. Escalated enforcement typically
would only be considered if the incomplete/inaccurate information was submitted
deliberately.

Enforcement Process for Incomplete/Inaccurate Information
A. If enforcement action appears warranted for incomplete or inaccurate information, the
region, or responsible program office in licensing cases, should prepare the appropriate
enforcement action cited against the applicable regulation (e.g., 10 CFR 30.9, 40.9,
50.9, 55.9, 60.10, 61.9a, 70.9, 71.7, 72.11, and 110.7a).
B. The provisions of the applicable regulation address two elements:
1. A general provision that requires that all information provided to the Commission by
an applicant or licensee or required by the Commission to be maintained by the

328

PART II: Topical Chapters

PART II-1: General Topics

applicant or licensee be complete and accurate in all material respects (violations are
most commonly cited against this element); and
2. A reporting requirement that requires applicants and licensees to report to the NRC
information identified by the applicant or licensee as having a significant implication
for the public health and safety or common defense and security.
NOTE:
The provisions in 10 CFR Part 55 contain the first element only, i.e., that
all information provided to the Commission by an applicant or licensee or
required by the Commission to be maintained by the applicant or
licensee shall be complete and accurate in all material respects.
C. If the inaccurate or incomplete information was provided to the NRC, after citing the
requirement paragraph, the "contrary to" paragraph should establish:
1. When the information was provided to the NRC;
2. How the information was provided and to whom in the NRC it was provided (e.g.,
oral presentation to the NRC staff in the NRC Region IV office; letter to the Director,
NRR, licensing correspondence);
3. What specific information the licensee or applicant provided (use direct quotes if
possible);
4. How the information was either inaccurate or incomplete; and
5. How the inaccuracy or incompleteness was material (i.e., a statement explaining why
a reasonable Staff reviewer would consider the information containing the inaccuracy
or omission when performing his or her job duties). If the NRC took any action based
on the inaccuracy or omission (e.g., granted a license amendment or requested
additional information from the applicant/licensee), that should be stated as well.
Keep in mind, however, that under Commission precedent the NRC need not be
induced into action for the inaccuracy or omission to be material.).
D. If the inaccurate or incomplete information was required by the Commission to be
maintained, the requirement section should include the requirement for maintaining the
information and the “contrary to” paragraph should establish:
1. When the inaccurate or incomplete information was identified;
2. That the information was required to be maintained by the Commission;
3. How the information was either inaccurate or incomplete; and
4. How the inaccuracy or incompleteness was material.

329

PART II: Topical Chapters

PART II-1: General Topics

NOTE:
It is important to note that information provided to the NRC relating to a
licensee’s commitment to perform or complete an activity in the future is
normally not a violation of 10 CFR 50.9 if it turns out that the licensee
subsequently did not perform or complete the activity. This is because at
the time the commitment was made, the licensee intended to perform or
complete the activity; therefore, the information was accurate at the time.

Violations of Reporting Requirements
A. A licensee may violate the reporting requirements if the licensee:
1. Did not file a required report; (Note: Unawareness of a reporting requirement is not
an excuse)
2. Filed an incomplete or incorrect report; or
3. Filed a report late.
B. A licensee normally will not be cited for failing to report an issue if the licensee was not
aware of the information that was reportable; however, a licensee should be cited for
failure to report an issue if the licensee knew of the information to be reported but did not
recognize that a report was required.
C. The severity level assigned to the licensee's failure to submit a required, acceptable, and
timely report on a violation that occurred at the licensee's facility is normally the same as
would be assigned to the event constituting the violation that should have been reported;
however, the severity level for submitting a late report may be reduced, including
considering the violation minor, depending on the individual circumstances.

Violations of Record-Keeping Requirements
A. When a licensee is required to perform a task and to keep a record of having performed
it, but cannot produce that record:
1. A violation may be issued for failing to keep the record.
2. The existence of a citation for failure to report a required task may indicate that a
licensee did not perform that task. However, without additional evidence that the
task was, indeed, not performed, the absence of the record is normally insufficient to
support a violation for "failure to perform" the task.
NOTE:
Corroborating information, such as interviews or other evidence, should
be used to determine whether the licensee failed to perform the task or
merely failed to record that the task was performed.

330

PART II: Topical Chapters

PART II-1: General Topics

Deliberate Misuse of Licensed Material
A. This section provides guidance on the extent to which an NRC licensee should be held
liable for deliberate, frivolous or malicious misuse of NRC-licensed material at its facility.
B. NRC licensees are required to control and limit their use of byproduct material to that
authorized by the license or by regulation.
1. In general, licensees are accountable for the use of their licensed material by their
employees and should normally receive at least a citation for violations involving
deliberate misuse of their licensed material by their employees or agents.
2. Since the underlying issue of misuse normally would be categorized at Severity
Level IV or higher, and since the Enforcement Policy states that the severity level of
a willful violation may be increased, these violations normally would be categorized
at Severity Level III or above and an NOV should be issued at Severity Level III or
above.
C. Although there may be cases where the ownership of the material and/or the identity of
the perpetrator cannot be established definitively, in the absence of reasonable evidence
to the contrary, normally the NRC will presume that:
1. The NRC-licensed material used in the incident belonged to the licensee, assuming
that the licensee has possessed the type, quantity and form of the material involved;
2. The individual who perpetrated the act was an employee or agent of the licensee;
and
3. The individual obtained the material while acting in the capacity of employee or
agent.
D. Enforcement discretion should be considered for each case involving deliberate misuse
of licensed material by licensee employees; however, it is not necessarily appropriate to
seek a civil penalty against the licensee in every case.
1. NRC should encourage licensees to prevent, investigate, report, and correct
violations involving deliberate misuse of licensed material.
a. If civil penalties were automatic imposed for deliberate misuse, licensees would
have a disincentive to conclude that the misuse was a result of a deliberate
action.
b. Where there is a need to convey a specific message about some particular facet
of the case, a civil penalty may be assessed based on enforcement discretion,
notwithstanding the normal application of the civil penalty factors.
2. The following are examples where it may be appropriate to use discretion to highlight
a concern such as:
a. Inadequate actions to prevent deliberate misuse
b. The effort put forth by the licensee in investigating the deliberate misuse
331

PART II: Topical Chapters

PART II-1: General Topics

c. Whether deliberate misuse has occurred previously
d. Whether the licensee had some basis to suspect that deliberate misuse might
occur
e. The corrective actions taken by the licensee
f. The past performance of the licensee in controlling the use of licensed material,
including training, labeling, posting, surveys, and security
g. The actual and potential consequences of the deliberate misuse
E. In accordance with the Enforcement Policy, if the individual responsible for the deliberate
misuse of licensed material is identified, enforcement action also may be taken directly
against that individual.

332

PART II: Topical Chapters

PART II-1: General Topics

Factual Summaries
Office of Investigation (OI) reports and exhibits for non-discrimination wrongdoing cases may
not be made available to licensees or to the public until after the NRC takes enforcement action
except as approved by the OI and OE Directors or as may be required by law. Responses to
Congressional requests are handled through Commission procedures. Licensees and members
of the public may request and obtain a copy of a full OI report under the Freedom of Information
Act after the NRC takes its initial enforcement action (e.g., issuance of an NOV). 13 In order for
the licensee or individual to make an informed response to the NRC, whether through a
predecisional enforcement conference (PEC), alternative dispute resolution, or written response
letter, a case factual summary (factual summary) of the OI investigation will be provided.
A. A factual summary is a summary of the investigation that is provided to the
licensee/individual(s) in lieu of the OI report. It is not intended to provide a full
discussion of the evidence gathered in the course of the NRC’s investigation.
B. The factual summaries allow the licensee/individual to understand the basis for the
potential enforcement action, and provide enough information to permit a licensee or
individual to independently verify the facts of the case while also protecting the sources
of the investigation.
C. The identity of an alleger or a confidential source must not be compromised through the
release of the factual summary.
D. While the length of the summary in each case depends on the facts, it should not
ordinarily exceed two single-spaced pages.
E. Normally, the regions draft the factual summary and include it as an attachment to the
Choice letter or PEC letter issued to the licensees or individuals.
NOTE:
For Severity Level IV NOVs, a brief summary of the basis for the violation
should be discussed in the transmittal cover letter.
F. The factual summary should:
1. Be a stand-alone document that contains enough information to allow the licensee or
individual to conduct an independent investigation;
2. Indicate the OI Investigation Report Number, and the start date and completion date
of the investigation;

According to Part II, Section 1.4.4.E of the Enforcement Manual, an individual or individual's attorney
may request a copy of the individual’s OI interview transcripts prior to a predecisional enforcement
conference (PEC), if the OI investigation is complete/closed and after consulting OI/OE directors.
13

333

PART II: Topical Chapters

PART II-1: General Topics

3. Include sufficient background facts such as when and where the apparent
violation(s) occurred, details of what happened and a general description of who was
involved in the violation that does not specifically identify the person;
4. Provide the facts supporting the identification of an apparent violation, including the
facts supporting a finding of willfulness
G. The factual summary may identify the requirement(s)/regulation(s) that were apparently
violated, but must not contain conclusive statements that a violation has occurred. In
addition, the factual summary must not include:
•
•

Names or other identifying information of the individuals involved in the potential
enforcement matter
Personally identifiable information (PII) or proprietary information
NOTE:
A Factual Summary is an Agency Summary and therefore may be different
than an OI report synopsis, including the conclusion regarding willfulness.

Coordination and Review
The factual summaries should be coordinated and reviewed according to the following
guidelines:
A. OGC (and/or Regional Counsel) may review the factual summary on a case-by-case
basis, at their request (typically at the enforcement panel). OE will review all factual
summaries and coordinate the review and concurrence process with OGC and other HQ
program offices, as appropriate.
B. Unless specifically requested during the enforcement panel, program office review and
concurrence of the factual summary is not required. If a review is requested, comments
are normally provided to OE through program office Enforcement Coordinators.
C. Comments from HQ offices should be provided verbally, electronically or in writing, to
OE within 10 working days. OE will resolve the comments in coordination with regions
(and/or with program office, if appropriate) and will forward the revised document to
OGC, if requested.
D. OGC’s statement of no legal objection (NLO) and program office concurrence, if
appropriate, will be forwarded to the regions by OE.
E. Regions will follow the regular process for licensee notification, mailing and distribution
of Choice letter or PEC letter.
F. All Choice/PEC letters and the attached OI factual summary issued to the Licensee will
be made publicly available in ADAMS, except for OUO-SRI, SGI and other sensitive
related cases.
334

PART II: Topical Chapters

PART II-1: General Topics

G. All Choice/PEC letters and the attached OI factual summary issued to individuals,
including licensed operators, will NOT be made publicly available in ADAMS, in order to
protect the privacy of the individuals.

335

PART II: Topical Chapters

PART II-1: General Topics

Disagreement Memoranda
This section provides additional information on Disagreement Memoranda and the Commission
(SECY) Paper process when disagreements arise.

Background
A disagreement memorandum (or memo) is a document written to formally describe a
disagreement between two or more offices on an enforcement matter, but where the parties
agree that Commission consultation is not warranted to resolve the disagreement. In the case
of a disagreement memo, the parties essentially agree to disagree, with the agency taking the
action recommended by one of the parties.
The need for a disagreement memo typically arises out of cases involving OI investigations into
whether a licensee acted willfully in committing a violation. Either the NRC staff, OGC, or both
disagree with the OI investigation outcome. This occurs when OI provides evidence that either
substantiates or fails to substantiate an allegation of deliberateness. When the staff or OGC (or
both) disagree with OI’s determination regarding the sufficiency of the evidence and the
disagreement cannot be resolved at panel, OE should consider use of a disagreement memo.

History
In the past, all cases where disagreement occurred went to the Commission via a SECY paper.
The staff later developed a process where disagreements could be documented in a
“disagreement memo,” where parties essentially agree to disagree. This means the parties still
do not agree, but reach a compromise. Disagreement memos were typically pursued if the
Director, OI, agreed that Commission consultation was not necessary. At some point in mid2000s, this process was largely supplanted by documenting the disagreement in the
enforcement strategy in EATS.
Disagreement memos are still a valid option when parties can agree to disagree (i.e., when one
side does not agree with the proposed action, but also agrees that it is not necessary to involve
the Commission in an attempt to change or prevent the action). If parties cannot “agree to
disagree” and the Director, OI, believes Commission consultation is necessary, she/he can still
elevate the disagreement to the Commission in a SECY paper.

Timing
One of the pitfalls of attempting to resolve a dispute without consulting the Commission is that
too much time can be spent trying to reach a consensus decision. This can lead to timeliness
issues as well as questions from the Commission if the case ultimately does result in a
Commission SECY paper requesting consultation. While OE does not dictate the outcome of
this process, the enforcement specialist should ensure that key stakeholders are kept informed
of timeliness, the statute of limitations for the violation, or other issues that affect the decision to
continue negotiating a disagreement memo.

OE Role
If agreement cannot be reached at an enforcement panel, Part II, Section 1.1.6, of the Manual
directs participants to elevate the disagreement to the Director, OE. The Enforcement
336

PART II: Topical Chapters

PART II-1: General Topics

Specialist should ensure that the Director, OE, is briefed on the specific circumstances and
reasons for the disagreement. The Director, OE, may elect to elevate the disagreement to
OEDO. However, if the disagreement is between OI and OGC, OE should facilitate the
discussion between OI and OGC and attempt to assist in resolving the disagreement. It is
important to ensure that if progress is not being made toward resolving the issue, the parties
should begin considering a disagreement memo and possible Commission consultation via a
SECY paper.
If the Director, OI, in coordination with the OEDO, determines that Commission consultation is
necessary, then OE will:
•
•
•
•
•

draft the SECY paper
brief the EDO and Commissioner’s Technical Assistants
assemble the exhibits and attachments as appropriate
seek concurrence on SECY paper from affected stakeholders
work with SECY to distribute copies of the Commission SECY paper, as necessary

Commission SECY Papers
Commission SECY papers can be one of several types, information, negative consent, or
notation vote. Typically, SECY papers resulting from disagreements over enforcement issues
will be either:
•

Negative Consent – Negative consent means that the NRC staff will take the
recommended approach absent direction from the Commission to do otherwise, or

•

Notation Vote – Notation vote means that each Commissioner must vote on whether to
accept the staff’s recommended action. In this case, the Commission vote papers are
used to draft the staff requirements memorandum (SRM) directing the staff to take a
certain action. Once the SRM is issued, OE may have additional responsibilities to carry
out the required actions, such as issuing the enforcement action as directed by the
Commission.

337

PART II: Topical Chapters

PART II-2: Reactor Topics

PART II - 2 REACTOR TOPICS
This section provides information regarding:
•

Enforcement topics specifically related to reactor cases.

338

PART II: Topical Chapters

PART II-2: Reactor Topics

Reactor Operations Related Issues
Actions Involving Inoperable Equipment
A. Whether to take enforcement action for equipment inoperability:
1. Equipment operability is an important factor in establishing the safety significance of
a violation.
a. Judgment should be exercised in expending resources to determine operability.
b. Analyses may be required to frame the safety significance of the deficiency and
discover all relevant aspects of the discrepant condition.
NOTE:
The significance of findings associated with operating power reactors is
normally determined by the Significance Determination Process (SDP) of
the Reactor Oversight Process (ROP). To the extent that the SDP does
not apply or that the ROP is not applicable, violations should be
assessed in accordance with the guiding principles for assessing
significance in the Enforcement Policy and the guidance in this section of
this manual.
2. For cases where it is obvious that the system, subsystem, train, or component is
inoperable, e.g., where the valves are closed, or circuit breakers are open such that
no flow or power is available, and the complete function is lost:
a. It is appropriate to cite directly against the Technical Specification (TS)
requirement for operability.
b. In accordance with example b.1, Section 6.1, of the Enforcement Policy:
•
•

Consideration should be given to issuing a Severity Level II violation when a
system designed to prevent or mitigate a serious safety event could not
perform its intended function.
Consideration should be given to issuing a Severity Level III violation, when a
redundant safety train or subsystem (or for BWRs, a diverse system), is
available.
NOTE:

From an enforcement perspective, the NRC has the burden of proof to
demonstrate inoperability in an enforcement hearing.
3. For cases where it is not obvious that a degraded system is inoperable, extensive
resources may be needed to determine operability:

339

PART II: Topical Chapters

PART II-2: Reactor Topics

a. If the region believes that there is a significant operability issue, but does not
believe that they can justify an operability citation, OE should be consulted:
•
•

Before escalated action is ruled out; and,
If, in order to make an operability judgment, excessive resources must be
expended.

b. In some cases, the message inherent in a Severity Level II enforcement action
may be worth the resources to develop and prove an operability issue.
c. The escalated enforcement package should not be delayed beyond established
timeliness goals pending the results of operability evaluations without prior
consultation with OE.
4. If the region believes that there is a significant operability issue but does not believe
that they can justify an operability citation without expending significant resources, a
more appropriate and timely enforcement action (and more effective in achieving
lasting corrective action) may be available by citing against the root cause of the
violation (e.g., inadequate corrective action, procedures, reviews, design, or tests)
rather than against the operability requirement for the system.
B. How to cite for equipment inoperability:
1. Technical Specifications include a section specifying Limiting Conditions for
Operation (LCOs). LCOs are the lowest functional capability or performance levels
of equipment required for safe operation of the facility. Each individual LCO includes
both an applicability and action statement.
a. The applicability statement specifies when the LCO is applicable (e.g., Modes 1,
2, and 3).
b. The action statement prescribes remedial measures required under designated
conditions in a narrative paragraph format.
•

Many action statements first identify the time necessary to restore the piece
of inoperable equipment (commonly referred to as the allowed outage time
(AOT)), and then identify the time necessary to take other action, such as
compensatory measures or shutdown, in the event that compliance with the
LCO is not restored.
o
o

•

A violation does not necessarily exist based solely on the failure to
restore equipment to operable status within the AOT.
A violation would exist when an LCO is not met and all necessary actions
have not been completed within all applicable completion times.

An action statement remains in effect until the condition no longer exists or
the unit is not in a MODE within the LCO APPLICABILITY. While the term
"AOT" is not used in improved Standard Technical Specifications (STS), the
term and concept of "AOT" is being used for the purposes of this guidance.

340

PART II: Topical Chapters

•

PART II-2: Reactor Topics

For improved STS (i.e., NUREG-1430 through NUREG-1434), action
statements are written in a matrix format and are separated into three
discreet parts, i.e., Conditions, Required Action(s), and Completion Time(s).

2. AOT Examples: The following examples illustrate the use of completion times with
different types of conditions and changing conditions.
a. Example 1:
When a pump is declared inoperable, Condition A is entered. If the pump is not
restored to operable status within seven days (the AOT), a violation does not
exist. Instead, Condition B is entered, and the Completion Time clocks for
Required Actions B.1 and B.2 start. A total of 12 hours is allowed for reaching
Mode 3 and a total of 36 (not 48 hours) is allowed for reaching Mode 4 from the
time that Condition B was entered. If Mode 3 is reached within six hours, the
time allowed for reaching Mode 4 is the next 30 hours because the total time
allowed for reaching Mode 4 is 36 hours. A violation exists if the pump cannot be
restored to operable status after seven days and the unit is not placed in Mode 3
within the next 12 hours or a violation exists if the pump cannot be restored to
operable status after seven days and the unit is not placed in Mode 4 within the
next 36 hours.
b. Example 2:
A pump in a two train system is declared inoperable and Condition A is entered.
Before Condition A expires, a second pump is declared inoperable. In this case,
Condition A is not re-entered for the second pump. Instead, LCO 3.0.3 is
entered, since the actions do not include a Condition for more than one
inoperable pump. The Completion Time clock for Condition A does not stop after
LCO 3.0.3 is entered but continues to be tracked from the time Condition A was
initially entered. While in LCO 3.0.3, if either of the inoperable pumps is restored
to OPERABLE status and the Completion Time for Condition A has not expired,
LCO 3.0.3 may be exited, and operation continued in accordance with Condition
A with the original completion time applicable.
3. Potential enforcement should be considered based on the total duration that a
condition may have existed. i.e., when the time of occurrence and the extent to which
the licensee should have identified the condition earlier, is readily determined.
a. In order to address the issue of potential enforcement for a pre-existing condition,
it is necessary to clearly distinguish between:
•
•

Compliance with the TS ACTION statements; and
Compliance with the TS LCOs.

341

PART II: Topical Chapters

PART II-2: Reactor Topics

NOTE:
This guidance emphasizes the importance of licensees taking
appropriate actions upon discovery of inoperable equipment, rather than
focusing resources to attempt to determine when the condition occurred,
e.g., choosing to shut down the plant in a less than orderly fashion solely
to comply with the TS.
b. The distinction between the TS ACTION statement and the TS LCOs is evident
in the general TS usage rules in the improved STS, i.e.:
•
•

LCO 3.0.1 - LCOs shall be met during the modes or other specified
conditions in the applicability, except as provided in LCO 3.0.2.
LCO 3.0.2 - Upon discovery of a failure to meet an LCO, the Required
Actions of the associated conditions shall be met, except as provided in LCO
3.0.5 and LCO 3.0.6. If the LCO is met or is no longer applicable prior to
expiration of the specified completion time(s), completion of the Required
Action(s) is not required unless otherwise stated.

c. The determination of whether an action statement (LCO 3.0.2) is met is based on
when the condition is discovered.
•
•

Once discovered, the question is whether the actions to be completed are
completed on time.
While a licensee may be in compliance with the action statement of a TS
based upon the discovery of the violation, a licensee may not be in
compliance with the TS LCO (3.0.1) based on when the violation occurred.

d. The following guidelines should be used for cases where the time of occurrence
can be established, and the licensee should have discovered the condition
sooner:
•

•

•

If the time between the occurrence of the condition and the discovery of the
condition is greater than the AOT for that condition, then the licensee should
be cited for a failure to satisfy the TS LCO. If the licensee otherwise satisfied
the TS Required Action(s) from the time of discovery of the condition, the
citation and enforcement correspondence should acknowledge this.
If the time between the occurrence of the condition and the discovery of the
condition is less than the AOT for that condition, and upon discovery the
Required Actions are completed within the AOT or the shutdown track is
satisfied, there is not an LCO violation. This would be true even if the time
between the occurrence of the condition and the completion of Required
Actions is greater than the AOT. However, there may be a root cause issue
outside of the TS issue warranting appropriate enforcement action.
If the time between the occurrence of the condition and the completion of
Required Actions is less than the AOT, then there is no violation.

e. In determining whether to cite a violation against the LCO, consideration should
also be given to other violations, such as root causes that may focus the
342

PART II: Topical Chapters

PART II-2: Reactor Topics

corrective action. If there is a clear root cause violation, the LCO violation and
the root cause violation should normally be combined into one escalated issue or
problem.
f.

Depending on the regulatory and technical significance (i.e., actual and potential
consequences, including risk considerations), there may also be cases where the
significance dictates more than one escalated action, one for the LCO violation
and one (or more) for the root causes, e.g.:
•

Depending on the total time the equipment was inoperable and other factors
determined by the root cause evaluation, enforcement discretion may be
warranted to increase the amount of the civil penalty based on a substantial
increase in risk due to the excessive duration of the inoperability and/or
increase the severity level above Severity Level III.

•

LCO Examples: The following examples illustrate these guidelines. (Use
TABLE 1 for TS examples.)
TABLE 1
CONDITION

REQUIRED ACTION

A. One pump inoperable.

A.1 Restore pump to
OPERABLE status.

B. Required Action and
associated Completion
Time not met.

B.1 Be in MODE 3.
AND
B.2 Be in MODE4.

COMPLETION
7 days
12 hours
36 hours

Example 1:
Upon discovery of an inoperable pump, Condition A is entered. The licensee is
able to restore the pump in seven days and three hours. Therefore, the licensee
was able to comply with the TS action statement. During the root cause analysis,
the licensee was able to determine that the violation occurred seven days and
nine hours prior to discovery because of not following a procedure required by
10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and
Drawings." It is further determined that the licensee should have identified this
condition at that time. In this case, the time between the occurrence of the
violation and the time of discovery of the violation was seven days and nine
hours... a time greater than the AOT of seven days. Therefore, a violation of the
TS LCO would be warranted. Citations against
10 CFR Part 50, Appendix B, Criterion V and Criterion XVI, "Corrective Action"
should also be considered.
Example 2:
Upon discovery of an inoperable pump, Condition A is entered. The licensee is
able to restore the pump in seven days and three hours. Therefore, the licensee
was able to comply with the TS ACTION statement. During the root cause
analysis, the licensee was able to determine that the violation occurred six days
343

PART II: Topical Chapters

PART II-2: Reactor Topics

prior to discovery because a procedure was not properly followed. It is further
determined that the licensee should have identified this condition. In this case,
the time between the occurrence of the violation and the time of discovery of the
violation was six days, a time less than the AOT of seven days. Therefore, a
violation of the TS LCO for the pre-existing condition would not be warranted.
However, enforcement action for the root cause (i.e., Criterion V) and the failure
to identify (i.e., Criterion XVI) should be considered.
g. When an inoperable condition is discovered, the TSs should be reviewed to
determine if a violation of the TS action statement has occurred based on the
time of discovery.
•
•

The next step would be to determine if the time of occurrence can be
established and to determine if the licensee should have discovered the
condition sooner.
The time between discovery and occurrence should be compared to the AOT
to determine if a violation of the TS LCO has occurred.

4. Proper citations against equipment operability should include a paragraph describing
the requirement and a paragraph describing how the requirement was not met.
a. The requirement paragraph should identify and establish:
•
•
•
•

What the applicable TS is;
When the LCO is applicable;
What the LCO requires; and
What the action statement requires.

b. The citation should establish how the requirement was not met. The "contrary to"
paragraph should establish:
•
•
•
•

When the equipment was inoperable;
That the LCO was applicable;
How the specified equipment was rendered inoperable, and
That action was not taken within the specified time to restore operability.

c. Refer to the following example:
Technical Specification (TS) 3.6.6.1 requires that while the plant is in Modes 1, 2,
3, or 4, two independent Supplemental Leak Collection Release Systems shall
be operable. The TS ACTION statement requires that, "with one Supplemental
Leak Collection and Release System inoperable, restore the inoperable system
to operable status within seven days or be in at least hot standby within the next
six hours and in cold shutdown within the following 36 hours."
Contrary to the above, between June 9, 2006 and June 27, 2006, while the plant
was in Mode 1, the "A" train of the SLCRS was inoperable, in that the fire damper
in the train was closed, thereby stopping the flow of air in the system, and action
was not taken to either restore the system to operable status within seven days
or place the unit in cold shutdown within the following 36 hours.
344

PART II: Topical Chapters

PART II-2: Reactor Topics

5. When a situation exists that exceeds the designated conditions of a specific TS
ACTION statement, then it may be necessary to include the generic LCO,
traditionally TS 3.0.3, as part of the citation. The following example illustrates this
point, i.e., the TS ACTION statement prescribes remedial measures to be taken
when one of the subsystems is inoperable, but does not address when both
subsystems are inoperable:
Technical Specification (TS) 3.5.2 requires, in part, that in MODES 1, 2, and 3,
two independent Emergency Core Cooling System (ECCS) subsystems shall be
operable with each subsystem comprised of, in part, an operable flow path
capable of taking suction from the refueling water storage tank on a Safety
Injection signal and automatically transferring suction to the containment sump
during the recirculation phase of operation.
TS 3.0.3 requires, in part, that when a Limiting Condition for Operation is not met,
except as provided in the associated ACTION requirements, within one hour
action shall be initiated to place the unit in a MODE in which the specification
does not apply by placing it, as applicable, in at least HOT STANDBY within the
next six hours, at least in HOT SHUTDOWN within the following six hours, and at
least COLD SHUTDOWN within the subsequent 24 hours.
Contrary to the above, between July 15, 2006 and August 13, 2006, while in
MODE 1, both independent ECCS subsystems were inoperable in that both flow
paths were incapable of supplying water from the refueling storage tank to the
reactor core on a Safety Injection signal because normally open valves in each
flow path were closed. With both flow paths inoperable, the licensee failed to
take action within one hour to place the unit in a MODE in which TS 3.5.2 does
not apply.
6. There may be cases when it is not clear exactly when a piece of equipment became
inoperable. In such cases, the burden is on the agency to establish realistic timeframes for when it is most likely that the piece of equipment was rendered
inoperable.
NOTE:
When it is not clear exactly when a piece of equipment became
inoperable, the burden is on the agency to establish realistic time-frames
for when the piece of equipment likely became inoperable.
a. In establishing realistic time-frames, consideration should be given to issues
such as:
•
•
•
•

When the equipment was last tested as operable;
Whether other activities were conducted that could have impacted equipment
operability;
Whether prior indication of inoperability existed; and
When the inoperable piece of equipment was discovered.
345

PART II: Topical Chapters

PART II-2: Reactor Topics

b. As long as time-frames can be established to substantiate a TS violation, the
cited time-frames should be as conservative as possible. The following example
illustrates this scenario.
TS 3.5.2 requires that two independent emergency core cooling system (ECCS)
subsystems be operable in Modes 1, 2, and 3 with each subsystem comprised, in
part, of one operable safety injection (SI) pump.
TS 3.0.3 requires that when a Limiting Condition for Operation is not met, that
action be initiated within one hour to place the unit in at least HOT STANDBY
within six hours, at least HOT SHUTDOWN within the following six hours, and at
least COLD SHUTDOWN within the subsequent 24 hours.
Contrary to the above, on December 23, 2005 between at least 12:07 a.m. and
12:30 p.m., the reactor was operated in Mode 1 with both SI pumps inoperable,
in that they could not have performed their intended function for a limited range
of loss of coolant accidents, due to a freeze protection system failure that caused
ice to block the common recirculation line between the SI pumps and the
refueling water storage tank. With both SI pumps inoperable during this period,
the licensee failed to place the unit in at least hot standby within six hours.
•

In this example, 12:07 a.m. represents the time at which there was an
indication that the equipment was inoperable. Specifically, at this time, the
licensee attempted to add water to the Refueling Water Storage Tank
(RWST) unsuccessfully via the recirculation line. Therefore, from at least this
time, one can conclude that the recirculation line was frozen, rendering the SI
pumps inoperable. 12:30 p.m. represents the time at which the licensee
declared both SI pumps inoperable.

•

Although it is highly likely that the recirculation line was frozen before 12:07
a.m., proving that this was the case is not necessary to support the TS
violation.

Actions Involving Degraded Equipment
A. Additional guidance on inoperable and degraded equipment is included in Generic Letter
91-18, “Degraded Conditions and Operability.”
B. It may be better to focus the enforcement action on the root cause of the problem rather
than on the issue of operability for those cases where:
1. Inoperability is difficult to establish, such as cases that involve significant differences
in system performance capabilities as compared to Final Safety Analysis Report
(FSAR) assumptions (e.g., where margins explicitly stated or implied in the FSAR
are under dispute, or the original design basis is no longer available); or
2. Complicated or complex analyses are required to determine the safety significance.

346

PART II: Topical Chapters

PART II-2: Reactor Topics

NOTE:
In many cases, resources would be better spent in focusing on identifying
and correcting root cause issues that, corrected, will prevent future
failures, than in determining whether or not a piece of equipment or a
system was, in hindsight, operable.
C. In cases involving degraded (but not clearly inoperable) equipment:
1. The enforcement action should not cite the TS for the piece of equipment (since
being degraded is not of itself a violation).
2. The enforcement action should cite the requirement that addresses the root cause of
the problem that ultimately caused the piece of equipment to be significantly
degraded, e.g.:
•
•
•
•
•

The licensee's failure to take corrective action (i.e., 10 CFR Part 50 Appendix B,
Criterion XVI)
The failure to follow procedures (administrative TS requirement Appendix B,
Criterion V)
The failure to control design (Appendix B, Criterion III)
The failure to control tests (Appendix B, Criterion XI)
The failure to perform a safety analysis (10 CFR 50.59)

D. The cover letter for enforcement actions involving degraded equipment should focus on
the licensee's root cause failure as the basis for the action, emphasizing that it
represents a regulatory concern (rather than focusing on whether the equipment was or
was not inoperable).

Enforcement of 10 CFR 50.59 and Related FSAR Violations
A. One of the requirements of 10 CFR 50.34 and 50.71(e) is that each operating reactor
facility shall develop and maintain a FSAR.
The FSAR contains design bases, operational limits and analyses of facility structures,
systems and components. In essence, it is a statement by the applicant of how it
intends to comply with many of the NRC's requirements.
B. A licensee who fails to meet an FSAR commitment that describes how it intends to meet
a regulatory requirement may have, depending on the circumstances, violated one or
more requirements.
1. Enforcement action may be taken directly against the underlying requirement (e.g.,
the TS or the regulation).
2. Cite the specific NRC regulation when the departure from the FSAR directly involved
a specific legally binding NRC requirement.

347

PART II: Topical Chapters

PART II-2: Reactor Topics

3. When the departure from the FSAR does not directly involve a specific requirement
other than Appendix B, it may be appropriate for the staff to cite the particular
criterion of 10 CFR Part 50, Appendix B (e.g., Criterion III, Design Control).
C. The failure to update the FSAR that does not have a material impact on safety or
licensed activities is considered a minor violation of 10 CFR 50.71(e).
D. Under 10 CFR 50.59, licensees may make changes to the facility and procedures
described in the FSAR (as updated), and conduct tests or experiments not described in
the FSAR without obtaining a license amendment if specific criteria are met. A
significant revision to 10 CFR 50.59 was made on October 4, 1999 (64 FR 53582), and
the regulation was further amended on December 21, 2001 (66 FR 64738) and
August 28, 2007 (72 FR 49500). The regulation is applicable to Parts 50 and 52
licenses.
NOTE:
The fundamental difference in the “new” (post-October 1999) rule is the
criteria under which prior NRC review and approval is required. The “old”
(pre-October 1999) rule used the concept of whether an “unreviewed safety
question” existed. The “new” rule deletes the concept of the unreviewed
safety question and allows for minimal increases or decreases in certain
specified parameters.
1. Under either the “old” or “new” 10 CFR 50.59 regulation, the Commission can take
enforcement action if a licensee:
a. Incorrectly concluded that a change did not affect the technical specifications;
b. Incorrectly determined that a change did not require prior NRC review and
approval before implementing the change;
c. Failed to conduct a safety evaluation for a change;
d. Failed to report the change to the NRC; or
e. Failed to keep a record of the change(s) as required.
2. Citations against 10 CFR 50.59 are generally not appropriate when the facility never
matched its description in the FSAR (e.g., the licensee never implemented a licensed
design requirement).
a. This type of citation has often been referred to as a “defacto 50.59 violation.”
b. These design deficiencies should be assessed in accordance with Inspection
Manual Chapter 0326, “Operability Determinations.”
c. Deficiencies should be dispositioned as Appendix B violations (normally Criterion
III or Criterion V) or Technical Specifications, as applicable.
3. A citation against 10 CFR 50.59 should:
a. Identify the license and design bases requirement (the citation should also
reference the FSAR section, if applicable);
b. Establish that an evaluation was inadequate or was not performed; and/or
348

PART II: Topical Chapters

PART II-2: Reactor Topics

c. Establish that the change constituted an unreviewed safety question (if the
change was made under the “old” rule);
d. Establish that prior NRC review and approval was required;
e. Establish that a change to a TS was required.
4. There may be issues concerning compliance with 10 CFR 50.59 that will be
complicated by whether the “new” rule or “old” rule was applicable. A deficiency
under the “old” requirement should not be cited if the deficiency would not be a
violation under the “new” rule:
•

The staff should exercise discretion pursuant to Section 3.5 of the
Enforcement Policy and not issue citations or document noncited violations
against the “old” rule.

•

The staff will document in inspection reports that the issue was identified, but
that no enforcement action is being taken because the “new” (i.e., current)
rule requirements were met. OE concurrence is required for use of discretion
under Section 3.5.

5. Because 10 CFR 50.59 violations could potentially impede or impact the regulatory
process, they are not processed through the ROP and are, instead, processed under
traditional enforcement using the examples in Section 6.1 of the Enforcement Policy.
To ensure a consistent approach for determining significance, the 10 CFR 50.59
violation severity level examples in Section 6.1 of the Policy have been informed by
the consequence of the resulting physical, procedural, or analytical change to the
facility as evaluated by the SDP.
a. Violations of 10 CFR 50.59 will be categorized at Severity Level IV if:

14

•

the activity or change (1) required prior Commission review and approval,
and the licensee failed to obtain Commission approval; and (2) the
consequence of the activity or change evaluated by the SDP is of very low
safety significance (i.e., Green);

•

the licensee fails to implement 10 CFR 50.59 administrative procedures that
results in non-isolated (i.e., repetitive) failures to prepare adequate written
evaluations that provide the bases for the determination that the change, test,
or experiment does not require a license amendment; 14

•

the licensee fails to maintain records or submit the reports required by
10 CFR 50.59(d)(2) and (d)(3).

Consistent with NEI 96-07, Revision 1 (endorsed by the NRC), written evaluation explanations should be
complete in the sense that another knowledgeable reviewer could draw the same conclusion. Restatement of the
criteria in a negative sense or making simple statements of conclusion is not a sufficient explanation. It is
recognized, however, that for certain very simple activities, a statement of the conclusion with identification of
references consulted to support the conclusion would be adequate and the 10 CFR 50.59 evaluation could be very
brief. The importance of the documentation is emphasized by the fact that experience and engineering knowledge
(other than models and experimental data) are often relied upon in determining whether evaluation criteria are
met. Thus, the basis for the engineering judgment and the logic used in the determination should be documented
to the extent practicable and to a degree commensurate with the safety significance and complexity of the activity.

349

PART II: Topical Chapters

PART II-2: Reactor Topics

b. Violations will normally be categorized at Severity Level III if:
•

the licensee fails to obtain prior Commission approval for an activity or
change that has a consequence evaluated by the SDP as having low-tomoderate or greater safety significance (i.e., White, Yellow, or Red).

•

the Region should convene an enforcement panel per Part I, Section 1.2.13.

c. For those 10 CFR 50.59 issues where the severity level of the violation cannot be
informed by the ROP SDP, the Region should convene an enforcement panel to
determine the appropriate significance of the violation.
6. In addition to the guidance provided regarding citations against 10 CFR 50.59, in
cases where a licensee has never implemented a commitment made under oath in
the FSAR or amended FSAR, a material failure to have the facility conform to the
FSAR may also constitute a violation of 10 CFR 50.9 if it occurred after 10 CFR 50.9
became effective (February 1, 1988), or may constitute a material false statement.
E. In determining which enforcement action to recommend for a failure to implement an
FSAR commitment (i.e., NOV against a specific requirement, Appendix B, 10 CFR
50.59, 10 CFR 50.9; or Notice of Deviation against the FSAR), the region should
consider which enforcement action will convey the appropriate message to the licensee
and which enforcement action will constitute the most defendable citation.

2.1.3.1

Application of the Corrective Action Civil Penalty Assessment Factor for
10 CFR 50.59 Violations

A. In the event a violation of 10 CFR 50.59 results in an SDP finding of red, yellow or white,
it may be necessary to assess corrective actions under the traditional enforcement
approach.
B. Corrective actions should normally be considered prompt and comprehensive only if the
licensee makes a prompt decision on operability, and either:
1. Makes a prompt evaluation under 10 CFR 50.59 if the licensee intends to maintain
the facility or procedure in the “as found” condition; or
2. Promptly initiates corrective action consistent with criterion XVI of 10 CFR 50,
Appendix B if it intends to restore the facility or procedure to the FSAR description.
NOTE:
It is important for licensees to recognize the need for prompt and
comprehensive corrective actions because until such actions are taken
the violation continues unabated.

350

PART II: Topical Chapters

2.1.3.2

PART II-2: Reactor Topics

Exercise of Enforcement Discretion for FSAR Issues

For detailed guidance related to exercising discretion for FSAR issues, please refer to Part I of
the Enforcement Manual.

Citations Against 10 CFR Part 50, Appendix A, General Design
Criteria
A. When the Commission developed and adopted Appendix A, the General Design Criteria
(GDC) were intended to provide a basis for judging the adequacy of:
1. The preliminary design of the facility at the construction permit stage; and
2. The detailed design and construction at the operating license stage.
B. The GDC function as criteria for assessing the design criteria for the plant; therefore:
1. The GDC carry over into the requirements for the FSAR (50.34(b)) for analyses of
safety-significant structures, systems, and components (SSCs) with emphasis upon
performance requirements, the bases upon which such performance requirements
have been established; and
2. Technical specifications (TSs) are required to be derived from the analyses in the
FSAR (50.36(b)).
NOTE:
Citations against the GDC are expected to be rare and require OE
approval prior to issuance.
C. The GDC are not directly applicable to operating requirements.
1. The GDC were not intended, in and of themselves, to constitute the controlling
parameters for operation of nuclear power plants.
2. TSs provide the controlling parameters on operation of a nuclear power plant, as is
contemplated by Section 182.a of the AEA.

Citations Against 10 CFR Part 50, Appendix B
A. Citations for Quality Assurance (QA) issues that are violations of 10 CFR Part 50,
Appendix B, should be constructed with a clear statement of the applicable Appendix B
criterion, followed by a statement of how that requirement was not met.
B. Normally, for citations for QA issues, it is not necessary to:
1. Include a reference to 10 CFR 50.54(a) or 50.55(f) as the underlying regulation when
citing Appendix B; or
351

PART II: Topical Chapters

PART II-2: Reactor Topics

NOTE:
10 CFR Part 50, Appendix B, only applies to safety-related structures,
systems, and components (SSCs).
2. Reference that portion of the licensee's approved QA program which implements
Appendix B, unless the licensee's approved QA program significantly differs from
that of Appendix B.
a. In most circumstances, the licensee's QA program is consistent with and
amplifies the provisions of Appendix B; therefore, a reference to the licensee's
QA program is not normally necessary.
b. If there is a conflict between an approved QA plan and Appendix B, the matter
should be discussed with OE and NRR before issuing a violation.
C. In the case of operating reactors where the TS administrative requirements may
encompass certain Appendix B requirements such as procedures, the TS, if more
specific, should be cited.
1. It may be appropriate in a particular case to utilize Appendix B for the citation if
broader corrective action is appropriate.
2. It is essential for Appendix B, Criterion XVI citations, that the “contrary to” paragraph
indicates that the licensee failed to take corrective action for a condition adverse to
quality.
3. The following is an example of a citation against 10 CFR Part 50 Appendix B for
failure to take corrective action.
10 CFR Part 50 Appendix B, Criterion XVI, "Corrective Action," requires, in part,
that measures shall be established to assure that conditions adverse to quality,
such as failures, deficiencies, and deviations, are promptly identified and
corrected.
Contrary to the above, from June 10, 2006 to August 3, 2008, the licensee failed
to take prompt corrective action for a condition adverse to quality. Specifically,
on June 10, 2006, a quality assurance auditor identified that a longitudinal pipe
weld on the low head safety injection system was not included in the licensee's
In-Service Inspection program and as of August 3, 2008, the licensee had not
revised its In-Service Inspection program to include the identified weld.
D. Corrective Action Program (CAP) Procedure Violations
1. Corrective action program (CAP) procedures are not specifically required by 10 CFR
50, Appendix B. Inspection occasionally identifies that a Condition Report (CR) was
not prepared for a condition adverse to quality (CAQ). The failure to write a CR may
be included in apparent causes of a violation, but should not typically be cited as the

352

PART II: Topical Chapters

PART II-2: Reactor Topics

violation itself. When concerns exist regarding a licensee’s failure to follow their CAP
procedure, the following should be considered:
•

Consider the CAQ of interest. Frequently, concerns about adherence to a CAP
procedure exist because the CAQ was either not promptly identified or corrected,
or perhaps both. Consequently, if a licensee failed to write a CR, typically an
action required by Appendix B was not completed, and a violation of Appendix B,
Criterion XVI (in this example) should be documented for failure to promptly
identify or correct the CAQ. See paragraph “C” of this part for a discussion of
Appendix B citations.

•

If a CAQ was both promptly identified and corrected, but no CR was written as
required by a licensee’s CAP procedure, consider other functions of the CR.
Ensure that the stated functions were complete as required by Appendix B. For
example, a licensee may use a CR to initiate the nonconforming materials, parts,
or components process required by Criterion XV. Failure to write a CR could
prevent completion of the nonconforming item process, even though the CAQ
was identified and corrective actions taken to restore compliance. Consequently,
a violation of Criterion XV may exist.

•

If all of a licensee’s quality assurance requirements are implemented with the
sole remaining issue being a failure to follow the CAP procedure (e.g. write a
CR), consideration should be given to evaluating an apparent violation as minor.
Contact OE if the circumstances warrant documenting a violation of a CAP
procedure.

E. The provisions of Appendix B do not generally apply to the radiation protection and
safeguards areas.
1. Appendix B only applies to safety-related SSCs.
2. There may be cases where procedures relating to security and radiation protection
might be subject to Appendix B quality assurance criteria under certain
circumstances, e.g., where "quality assurance" as defined in Appendix B comprises
all those planned and systematic actions necessary to provide adequate confidence
that an SSC will perform satisfactorily in service.

Enforcement Actions in Conjunction with Plant Shutdowns
A. Enforcement actions based on findings at plants with major shutdowns:
1. Should be processed substantially before restart is contemplated; and
2. Should normally be submitted to OE at least two months before scheduled startup, if
possible, to permit:
a. The case to be issued; and
b. The licensee's corrective action to be assessed prior to startup in order to avoid
issuing sanctions at the same time or after startup is authorized.

353

PART II: Topical Chapters

PART II-2: Reactor Topics

B. The logic in the preceding paragraph should be followed for plants that are to be
licensed.

Actions Involving Loss of Decay Heat Removal (DHR)
A. The significance of decay heat removal violations is normally determined by the SDP.
B. To the extent that the SDP does not apply or that the ROP is not applicable, violations
should be assessed in accordance with the guiding principles for assessing significance
in the Enforcement Policy and in this section.
C. Because of the NRC staff's reassessment of the potential consequences of DHR events,
actions in this area must be critically assessed to apply the appropriate severity level.
1. In some scenarios, the precursors to core damage (such as boiling in the core) may
occur much sooner after a loss of DHR than previously thought, and the implications
of such a loss may be more serious.
2. To ensure that these cases are handled uniformly and to better determine whether
escalated action is appropriate, all actions (cited or noncited) that result in a loss of
DHR or shutdown cooling, require prior OE notification.
D. A citation against a TS Limiting Condition for Operation may not always be available
since TSs may not be specific about the amount of time allowed to restore DHR after an
interruption.
1. An exception is where the licensee took little or no action to immediately correct the
problem. Such rare cases would clearly warrant consideration of escalated
enforcement no matter what caused the DHR loss.
2. The majority of DHR problems do not involve prolonged losses or losses for which
the licensee does not take at least some corrective action.
E. Under current NRC requirements, enforcement actions related to DHR events will
generally consist of 10 CFR Part 50 Appendix B violations for lack of adequate
procedures or not following procedures.
1. The NRC has reassessed the significance of this issue and has provided extensive
prior notice to the industry on this subject (particularly events occurring during
reduced reactor coolant system inventory operations) in the form of Generic Letters
(GL 87-12 and GL 88-17), Information Notices, meetings with various industry
groups, and letters to licensed operators.
a. Much of the NRC guidance focuses on losses of DHR during reduced reactor
coolant system (RCS) inventory operation; however,
b. Other types of losses of DHR, such as one caused by an improper design
change, can also be evaluated using some or all of the guidelines as appropriate.
2. Given the potential for core damage and the guidance provided by the NRC, failure
of licensees to take aggressive action to assure appropriate procedures, procedure
implementation, and training may be appropriately categorized at Severity Level III.
354

PART II: Topical Chapters

PART II-2: Reactor Topics

F. The following guidelines, which have been coordinated with NRR, should be used to
evaluate whether a particular loss of DHR should be considered a Severity Level III
matter. The factors to consider are:
1. How similar was the root cause of the loss of DHR to the deficiencies addressed in
NRC generic guidance such as GL 87-12 and GL 88-17?
2. Given that a deficiency similar to that in NRC guidance occurred, how sensitive were
the operators to the problem?
3. How quickly did the operators respond? (Core decay heat level may not call for
instantaneous response; however, the failure to correct such a situation quickly
simply because the operator does not view it as particularly pressing may indicate a
lack of sensitivity to this type of problem.)
4. Did they respond using detailed procedural guidance, and if they did not, was their
training sufficient in and of itself?
5. Given that the operators procedurally treated the "symptoms," did they recognize the
problem as a loss of DHR?
6. Did the operators have other available indications not specified in the procedures
that could have been consulted, and did they use them?
7. Does the plant have a history of interruptions of DHR? (This may indicate a
continuing lack of sensitivity to this issue.)
8. Were procedures in place to provide operator guidance for alternative DHR options
not normally employed? (In a number of instances licensees have made after-thefact arguments about alternative sources of circulation and cooling. Because such
sources were not defined by procedures, it was unclear if the operator in such cases
could have aligned such sources quickly enough and whether the availability of such
sources was only fortuitous.)
NOTE:
There is no exact formula for arriving at a severity level and the factors
discussed below may be weighted differently or may not be applicable in
any given case.
G. The scenarios provided in the two examples that follow illustrate certain key actions or
inactions that, when considered under the guidance provided earlier, would result in the
recommended severity level classifications. It should be noted that in neither instance
was DHR flow lost for an extended period, if it was ever fully lost.
Example 1: For maintenance work on a reactor coolant pump seal, reactor vessel water
level needs to be lowered to mid-loop. In preparation for the draindown, an auxiliary
operator performs a full inspection of the tygon tube level-indication system and then
355

PART II: Topical Chapters

PART II-2: Reactor Topics

reports to the control room that he is standing by to monitor level during the draindown.
Shortly before level reaches the mid-loop area, the control room secures the draindown
to allow the level indicators to stabilize before draining the last few inches of water.
Simultaneously, maintenance personnel arrive in the containment in preparation for the
seal work and inadvertently place a large box on the tygon hose. Upon resuming the
draindown, the control room operator notes a growing discrepancy between the level
being reported from the containment and the control room indication. Just as the control
room operator terminates the draindown to investigate the discrepancy, the operating
DHR pump begins to cavitate. The operator quickly secures the pump, restores RCS
inventory, and starts the standby pump. The auxiliary operator again performs a walk-on
of the tygon hose, discovers the blockage, and removes it before resuming draindown.
Recommendation: The licensee should be assessed either an NCV or NOV for a
Severity Level IV violation for inadequate work control. Although pump cavitation
occurred after a loss of adequate level, due to erroneous level indication, proper
preparation for the draindown was accomplished and the operators responded quickly
and correctly to the event.
Example 2: Before the draindown to mid-loop, an auxiliary operator is stationed to
monitor level without first having anyone walk down the tygon hose. Earlier,
maintenance personnel had entered the containment and inadvertently placed a large
box on the tygon hose. After the draindown begins, the control room operator notes a
growing difference between control room level indication and that being reported from
the containment. He secures the draindown and then asks the auxiliary operator about
the condition of his indicating hose. The auxiliary operator replies that the level seems
to be decreasing more slowly than he anticipated but the decrease has been smooth
and he doesn't see any air bubbles. With that information, the control room operator
decides to continue the draindown relying solely on the tygon hose rather than on the
relatively new control room indicator with which there have been problems. The control
room operator makes this decision despite the fact that, at the time, the control room
indicator is providing a level reading significantly lower than that of the tygon hose. After
recommencing the draindown, the operating DHR pump begins to cavitate. The control
room operator gets a report from the containment that the level is still indicated to be
well above mid-loop and, therefore, he starts the standby pump and secures the
cavitating pump. Almost immediately, the standby pump also begins to cavitate. The
operator, realizing that level must be too low, finally takes action to restore level and
directs the auxiliary operator to walk down the tygon hose.
NOTE:
The more a case appears similar to the circumstances of the generic
guidance and the less responsive the operators are, the more likely the case
should be considered at Severity Level III.
Recommendation: The licensee should be assessed a Severity Level III violation.
Proper preparations were not made, the operator made a nonconservative judgment in
choosing which level indicator to use, and when given an opportunity to recognize the
mistake, chose to start a second pump rather than to learn why the first pump was
cavitating.
356

PART II: Topical Chapters

PART II-2: Reactor Topics

Actions Involving Service Water Systems
A. The significance of service water system violations is normally determined by the SDP.
B. To the extent that the SDP does not apply or that the ROP is not applicable, violations
should be assessed in accordance with the guiding principles for assessing significance
in the Enforcement Policy and the guidance in this section.
C. Although the specific title of the system(s) may vary, as used in the context of this
guidance, the term "service water system" (SWS) refers to the cooling water system that
provides the ultimate heat sink for the plant's safety-related systems.
D. Determining the appropriate enforcement action for cases involving the SWS may be
challenging because of the potential difficulty in determining whether or not the SWS can
adequately perform its design function. Deficiencies that can affect the operability of the
SWS include problems such as:
•
•
•
•
•

Inadequate heat removal capability as a result of bio-fouling
Silting
Erosion and corrosion
Single failure concerns
Inadequate original design margin

E. The first decision in SWS cases is whether the agency should cite against SWS
operability.
1. Licensee expenditures of time and resources to perform after-the-fact analyses
supporting SWS operability do not obligate similar NRC expenditures to review the
analysis to support enforcement action.
2. It may be preferable to cite against the root cause of the deficiency rather than to
expend resources to perform complex operability analyses.
F. In some cases, it may not be prudent to cite against the SWS being unable to perform its
intended function (e.g., one train of the SWS is not available).
1. In such cases, an enforcement action citing the requirement that best reflects the
root cause failure may be used to establish a Severity Level III violation, e.g., the
licensee has a degraded system.
2. The following example illustrates this point:
10 CFR Part 50, Appendix B, Criterion XVI (Corrective Action), requires, in part, that
measures shall be established to assure that conditions adverse to quality, such as
failures, deficiencies and deviations, are promptly identified and corrected.
Contrary to the above, between June 15, 2006 and August 31, 2006, a condition
adverse to quality at the ABC Nuclear Station was not promptly identified or
corrected. Specifically, mussel clusters of enough volume to cause significant
reductions in service water flow to vital components had accumulated along an 80
357

PART II: Topical Chapters

PART II-2: Reactor Topics

foot section of service water system piping. On at least nine occasions during that
time period, actions taken by licensee personnel in reaction to indications of
degraded service water flow were ineffective in identifying and correcting the full
extent of the problem. These ineffective corrective actions resulted in significantly
reduced service water flow to the "B" Diesel Generator heat exchanger which in turn
resulted in a reduction in the diesel generator's electrical load carrying capability.
G. Additional examples of requirements that could be cited for the root cause failure
include:
•
•
•
•

Failure to perform a design change safety analysis (10 CFR 50.59)
Failure to follow procedures (administrative TS requirement)
Failure to control design (Appendix B, Criterion III)
Failure to control tests (Appendix B, Criterion XI)

H. For those enforcement actions that do not cite against operability, the cover letter should
focus on the licensee's root cause failure as the basis for the action, rather than focusing
on whether the SWS was or was not operable.
I.

Additional information on SWSs is addressed in Generic Letter (GL) 89-13, “Service
Water System Problems Affecting Safety Related Equipment.”
1. Failure to comply with a Generic Letter is not a violation unless the commitment is
addressed by a legal requirement or has been incorporated into the licensee's
license.
2. GL 89-13 may be cited to establish prior notice in assessing a civil penalty for a
particular action.

Actions Involving Emergency Core Cooling Systems
A. The significance of emergency core cooling violations is normally determined by the
SDP.
B. To the extent that the SDP does not apply or that the ROP is not applicable, violations
should be assessed in accordance with the guiding principles for assessing significance
in the Enforcement Policy and the following guidance.
C. 10 CFR 50.46 enumerates specific steps that must be implemented by a licensee
following the discovery of an error in an approved LOCA code.
1. The effect of the error on predicted peak clad temperature (PCT) must be estimated.
2. The error must be reported to the NRC on a schedule determined by the magnitude
of the change in PCT.
3. If the impact of correcting the error causes the predicted PCT to exceed the
acceptance criterion of 2200 °F, the licensee is required to take immediate action to
return to compliance with the regulation.

358

PART II: Topical Chapters

PART II-2: Reactor Topics

D. Enforcement action could be taken against a licensee, related to non-compliance with 10
CFR 50.46 acceptance criteria, in, e.g., the following circumstances:
1. A licensee discovers an error in an approved ECCS model and does not follow the
requirements for assessing and reporting the error.
2. A licensee discovers an error and assesses its impact, but does not report it or take
other action mandated by the regulation as a result of the assessment (e.g., limiting
power to stay under 2200 °F; replacing Dougall-Rohsenow correlation per Appendix
K requirements).
3. An error is discovered in an ECCS model by the NRC staff that a licensee (or
vendor) could reasonably have been expected to discover had the code been
validated properly, in which case enforcement action could be taken against the
licensee per the requirements of 10 CFR Part 50, Appendix B, for failure to provide
adequate QA.
E. Although enforcement action might be warranted for violations of 10 CFR Part 50,
Appendix B, the staff does not believe that it is normally appropriate to take enforcement
action for 10 CFR 50.46 against a licensee who:
1. Discovers an error in an approved LOCA code; and
2. Follows the requirements of 10 CFR 50.46 for assessing, reporting, correcting the
error, including whatever steps are needed to stay in compliance with the PCT
acceptance criterion.
F. Enforcement action is generally not taken when errors in the code are not preventable
by reasonable QA measures as analogous to failure of a plant component (hardware)
resulting from a latent (hidden) flaw that the licensee could not reasonably have been
expected to discover prior to the component failure.
1. The NRC would generally require that the failure be evaluated, once identified, to
determine if the latent flaw could be generic and, therefore, requires reporting
under10 CFR Part 21.
2. The equipment would also require repair and testing to demonstrate it could meet its
functional requirements.
3. Evaluation (including a Part 21 evaluation), repair and testing, are types of actions
that are consistent with licensee requirements under 10 CFR 50.46. Accordingly, the
staff does not believe that there is a fundamental inconsistency in the way in which
enforcement action is taken for software and hardware faults.
G. Enforcement policy with respect to LOCA codes and 10 CFR 50.46 requirements must
be considered in the context of the fundamental differences between “hardware,” i.e.,
plant equipment, and “software,” i.e., computer codes and analytical results.
1. Determination of whether hardware can accomplish a specific function is, in many
cases, a relatively straightforward process.
359

PART II: Topical Chapters

PART II-2: Reactor Topics

a. The equipment is operated, its output (e.g., flow from a pump) is measured, and
the measured value is compared to a required value, such as that in Technical
Specifications, to determine if the equipment meets its functional requirements.
(Due consideration must be given to concerns such as instrument uncertainty.)
b. Functionality can be assessed retrospectively, to some extent; if equipment is
shown to be out of compliance with its functional requirements, and that it met
those requirements during a previous surveillance test. In that case, the
assumption is often made that it would not have met its functional requirements
for some period prior to the most recent assessment.
2. Computer code assessments are different from hardware assessments. Errors can
be extremely subtle and may not become apparent until a specific part of the
analysis package is exercised in a certain way.
a. 10 CFR 50.46 recognizes this aspect of code development and usage and
anticipates that circumstances might arise in which a mathematical model
considered to be adequate could be shown, in the light of new information, to be
deficient.
b. 10 CFR 50.46 is essentially unique among the NRC’s Part 50 requirements, in
that it provides specific steps to be taken by a licensee if a LOCA analysis is
found not to meet the peak clad temperature (PCT) acceptance criterion by virtue
of correction of a newly-discovered error.
•
•

In such cases, enforcement action against 10 CFR 50.46 or Appendix B
would not be taken.
However, as noted above, if the errors were preventable by reasonable QA
measures, a violation of Appendix B might be warranted.

H. It must be recognized that there is not a unique, “correct” result for any given plant’s
LOCA analysis.
If a licensee’s analytical model conforms to the requirements of Appendix K of 10 CFR
Part 50:
1. The predicted PCT is understood to be substantially higher than that which would be
occur in an actual event that followed the licensing basis accident scenario.
a. Appendix K-mandated phenomenological models are known to intentionally overor under predict specific parameters to bias the PCT result in a conservative
direction.
b. A “best-estimate” (or “realistic”) calculation of plant response, using identical
initial and boundary conditions, would give a much lower PCT.
2. There is no “standard” ECCS analytical model. Beyond Appendix K requirements,
each vendor’s codes contain different, sometimes proprietary, phenomenological
models and modeling approaches (e.g., nodalization, time step), and consequently
each would give a somewhat different answer for PCT.
360

PART II: Topical Chapters

PART II-2: Reactor Topics

Actions Involving the Maintenance Rule
A. Because of the non-prescriptive nature of the rule language, enforcement of the
maintenance rule represents a continuing challenge to inspectors.
1. Since implementation of the maintenance rule in July 1996, enforcement of the rule
has evolved as lessons were learned.
2. This guidance addresses issues typical of those which are more frequently raised by
inspectors; however, it cannot possibly address every conceivable maintenance rule
compliance issue.
NOTE:
When a question regarding the application of the Maintenance Rule
comes up, the regions can request that such question is paneled. OE
will ensure that appropriate NRR staff attends the panel. Others,
including the regional inspector, resident inspector, project manager, etc.,
may be asked to attend the meeting or provide input to the discussions.
B. General Enforcement Guidance for Apparent Violations of the Maintenance Rule
1. A maintenance rule violation can only be cited against the specific language of 10
CFR 50.65. The most straightforward method to determine whether a violation of the
maintenance rule (or any other requirement) exists is to construct a “contrary to”
statement that uses parallel language of the rule or requirement in a description of
what the licensee did or did not do.
2. Regulatory Guide (RG) 1.160, “Monitoring the Effectiveness of Maintenance at
Nuclear Power Plants” (ML003761662), endorses NUMARC 93-01, Industry
Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants.
a. NUMARC 93-01 guidance is non-binding and thus, does not represent
requirements and can neither be used as the basis for, nor cited in, a
maintenance rule violation. NUMARC 93-01 provides methods that are
acceptable to the NRC for complying with the provisions of 10 CFR 50.65.
b. RG 1.160 and NUMARC 93-01 can be useful to inspectors in understanding how
licensees typically implement their maintenance rule programs and in defining
terms as they are commonly used with respect to the implementing guidance.
C. The Maintenance Rule does not require licensees to establish program procedures.
1. There cannot be a procedure violation of 10 CFR Part 50, Appendix B, Criterion V,
Instructions, Procedures, and Drawings, for failing to establish, implement or to
maintain Maintenance Rule process implementing procedures.
2. There cannot be a violation of the administrative section of technical specifications
which invokes RG 1.33, “Quality Assurance Program Requirements.”
361

PART II: Topical Chapters

PART II-2: Reactor Topics

a. RG 1.33 does not cover the maintenance rule process.
b. The failure to follow a licensee’s maintenance rule implementing procedure(s)
cannot be cited as part of a maintenance rule violation, although the
implementing procedure may be useful in providing insights when evaluating
whether a direct violation of 10 CFR 50.65 may have occurred.
D. There cannot be a violation of Appendix B, Criterion XVI for failure to identify or correct
conditions adverse to quality, for failure to identify or correct deficiencies with a
licensee’s maintenance rule implementation because the maintenance rule process is
not safety-related.
1. This reasoning also applies to violations of Criterion V.
2. As in the past, a maintenance procedure used for the performance of a maintenance
activity on an SSC can be referenced in a technical specification (TS)/RG 1.33 or
Appendix B, Criterion V violation, when that maintenance procedure is not adequate,
is not maintained, or is not followed and, for use of Appendix B, Criterion V, when the
activity was on a safety-related SSC.
E. Except in 10 CFR 50.65 (a)(4), there is no distinction in the Maintenance Rule for
varying degrees of SSC risk significance.
1. The scope of Paragraph (a)(4) assessments may be limited to SSCs that a riskinformed evaluation process has shown to be significant to public health and safety.
2. The scope reduction does not apply to any other section of the Maintenance Rule.
F. Acronyms and terms have been used which are consistent with those used by licensees
to describe maintenance rule-related activities. Acronyms and terms associated with the
maintenance rule are described in RG 1.160 and NUMARC 93-01.
G. The SDP will be used to determine the significance of a violation or maintenance rule
finding.

Issues That Are Violations of 10 CFR 50.65 and Issues That Are Not
Violations of 10 CFR 50.65
A. Paragraph (a)(1)
1. Issues that are violations of 10 CFR 50.65 (a)(1):
a. Failure to establish goals for SSCs in (a)(1). Goals must be:
•
•

Justifiable and defensible.
Supported by either an adequate Expert Panel determination, adequate use
of PRA), or some other reasonable basis and be commensurate with safety.

b. Failure to monitor performance or condition against established goals.
362

PART II: Topical Chapters

•
•

PART II-2: Reactor Topics

The monitoring program must be sufficient in scope and frequency to
adequately support a determination as to whether SSCs are meeting their
assigned goals.
Performance monitoring must include tracking of both availability and
reliability, where goals of this nature are appropriate, since that provides the
maximum assurance that SSCs are capable of fulfilling their intended
functions.

c. Failure to take appropriate corrective action when performance or condition goals
are not met.
•

•

Corrective actions should sufficiently address actions to achieve goals, be
commensurate with the goals being monitored, and be timely and
reasonable. The corrective actions of concern are those necessary to meet
goals - not necessarily corrective actions to correct individual SSC failures.
The standard for adequacy of corrective actions is reasonableness. Unless
there are significant, credible, differing causes that are not reasonably
addressed in the corrective actions, the licensee’s actions should be
considered adequate.

d. Failure to consider industry operating experience, where practical, which should
include, e.g.:
•
•
•

Specific vendor recommendations
Generic communications issued by the NRC or vendors
Information communicated via industry working groups or owners groups

2. Issues that are not violations of 10 CFR 50.65 (a)(1):
a. Failure to meet a goal. If a goal is not met, appropriate corrective action shall be
taken.
b. Failure to establish goals based on industry-wide operating experience.
•

•

The words of the rule, “where practical, take into account industry-wide
operating experience,” were not intended to force compliance with industry
goals, but rather were intended to require licensees to consider industry
experience as an information source for setting reasonable goals.
A decision not to take into account industry experience, on the basis that it is
not practical to do so, should be justifiable.

c. Failure to subdivide SSCs into high safety significant (HSS) SSCs, low safety
significant (LSS) SSCs, and low safety significant (LSS) standby SSCs. (The
rule does not require this).
d. Failure to link goals to the licensee’s PRA. (The rule does not require this.)

363

PART II: Topical Chapters

PART II-2: Reactor Topics

e. Failure to take corrective action as a result of condition monitoring which
indicates that an SSC is degrading, but is still capable of performing its intended
function. When established goals are not met, either:
•
•
f.

Appropriate corrective action shall be taken to achieve the goals; or
The goals must be changed with adequate justification.

Failure to perform a cause determination when a performance criterion or goal is
exceeded.
•

•

Unlike Criterion XVI of Appendix B for significant conditions adverse to
quality, (a)(1) does not require determination of causes, only that corrective
actions be taken when goals are not met; however, if a licensee takes
ineffective corrective actions due to fixing the incorrect cause, a corrective
action violation could be considered.
For corrective action issues involving safety-related SSCs, Appendix B,
Criterion XVI, may be more easily used for enforcement purposes.

B. Paragraph (a)(2)
1. Issues that are violations of 10 CFR 50.65 (a)(2):
a. Failure to move an SSC to (a)(1) when performance indicates that the SSC is not
being effectively controlled through appropriate preventive maintenance.
NOTE:
The focus of (a)(2) is on the results achieved through maintenance. For
a violation to exist there must first exist an equipment performance
problem which could indicate that preventive maintenance is not being
effective. If a performance problem is determined to exist, then the
following two questions are relevant to a determination of whether there
is a violation: (1) Does that performance problem invalidate the
demonstration that the performance of the SSC is being effectively
controlled through appropriate preventive maintenance; and (2) If the
performance demonstration is invalid, did the licensee move the SSC to
(a)(1)?
•

The performance demonstration must be technically justifiable and
reasonable.

364

PART II: Topical Chapters

PART II-2: Reactor Topics

NOTE:
For enforcement purposes, the (a)(2) “demonstration” is not a one time or
periodic evaluation of past SSC performance, but is a continuing
requirement. Hence, if the performance or condition of an SSC
decreases due to, e.g., failures or increased unavailability, the
demonstration of effective preventive maintenance can be questioned.
•

When the performance demonstration is no longer technically justifiable, the
demonstration ceases to be valid and the SSC is required to be moved to
(a)(1) where the performance of the SSC is monitored against established
goals, e.g.:
A repetitive preventive maintenance preventable functional failure would
indicate that the licensee has failed to demonstrate the effectiveness of
preventive maintenance and consequently that SSC must be moved to
(a)(1). For such failures, the time between occurrences and the type of
failure should be taken into consideration, e.g., human errors of omission
or commission need not be considered repetitive after a reasonable time
period. Other component specific preventable failures may be considered
repeat despite lengthy periods between failures.

b. Failure to consider both reliability and availability when evaluating whether an
SSC’s performance or condition has been demonstrated to be effectively
controlled.
•
•

In order for an SSC to remain capable of performing its intended function, it
must be both reliable and available.
If the degree of reliability and availability are not technically justifiable and
reasonable, a violation may exist.

2. Issues that are not violations of 10 CFR 50.65 (a)(2):
a. Failure to establish performance criteria, establish appropriate performance
criteria, link performance criteria to the licensee’s PRA, or to meet established
performance criteria.
NOTE:
10 CFR 50.65 does not dictate by what method the performance is to be
demonstrated. However, the licensee must be able to demonstrate,
through some reasonable means, that performance is being effectively
controlled through appropriate preventive maintenance. RG 1.160
endorses an acceptable method for demonstrating performance.
Whatever method the licensee uses to demonstrate performance must
be reasonable, technically justifiable, and take into account availability
and reliability.
365

PART II: Topical Chapters

PART II-2: Reactor Topics

b. Failure to move an (a)(2) SSC to (a)(1) solely because its performance criteria
are not met. (Conversely, just because performance criteria are met does not
necessarily mean that an (a)(2) demonstration is valid.)
c. Failure to correctly characterize a failure as a functional failure (FF) or
maintenance preventable functional failure (MPFF).
d. Failure to correctly consider a failure or unavailability period as potentially
impacting the (a)(2) demonstration, but when considered, the demonstration
remains valid.
e. Failure to document the demonstration. The rule has no explicit requirements to
document the demonstration.
f.

Failure to consider SSC failures caused by activities other than preventive
maintenance.
•
•

Paragraph (a)(2) specifically applies to preventive maintenance.
Random failures or failures due to errors of design, manufacturing,
modifications, or corrective maintenance do not apply in determining whether
preventive maintenance is being effective.

C. Paragraph (a)(3)
1. Issues that are violations of 10 CFR 50.65 (a)(3):
a. Failure to perform the required periodic evaluation at least every refueling cycle,
and in any case, not to exceed 24 months.
b. Failure to evaluate (a)(1) activities (performance and condition monitoring
activities and associated goals) and (a)(2) activities (preventive maintenance
activities).
c. Failure to make adjustments, where necessary, to goals and monitoring to
ensure that unavailability and reliability are balanced.
•
•

The licensee’s evaluation process must be reasonable and technically
justifiable and should include a reasonable basis for making or not making
adjustments.
The intent of the evaluation is to provide an opportunity to feedback lessons
learned into the process.

366

PART II: Topical Chapters

PART II-2: Reactor Topics

NOTE:
As stated previously, the focus of the rule is on the results achieved
through maintenance. Consequently, there must first exist an SSC
performance problem before the validity of the SSC performance
demonstration comes into question. If there is a performance problem
which invalidates the licensee’s demonstration that the performance of
the SSC is being effectively controlled through appropriate preventive
maintenance, the SSC must be moved to (a)(1).
2. Issues that are not violations of 10 CFR 50.65 (a)(3):
a. Failure to document the evaluation.
•
•

The rule has no explicit requirements to document the evaluation.
Licensees should use documentation to the extent necessary to assure
themselves that the requirement for an evaluation has been acknowledged
and performed adequately.

b. Failure to complete the evaluation in accordance with the licensee’s
administrative procedure. The licensee’s administrative procedure for
implementation of 10 CFR 50.65 or for performing evaluations cannot be cited as
part of a maintenance rule violation.
c. Failure to apply industry-wide operating experience.
•

•

The words of the rule, “where practical, take into account industry-wide
operating experience,” were not intended to force compliance with industry
practices, but rather were intended to require licensees to consider industry
experience as an information source for conducting evaluations.
A decision not to take into account industry experience, on the basis that it is
not practical to do so, should be justifiable.

D. Paragraph (a)(4)
1. Issues that are violations of 10 CFR 50.65 (a)(4):
a. Failure to perform a risk assessment prior to performing maintenance activities.
Required assessments:
•
•

May be limited to those SSCs which, singularly or in combination, can be
shown (by a risk-informed evaluation process) to have a significant effect on
the performance of key plant safety functions.
Are significant to public health and safety.

b. Failure to perform an adequate assessment.

367

PART II: Topical Chapters

•
•
•
•

PART II-2: Reactor Topics

To support a violation, there should be a technically justifiable reason as to
why the assessment is determined to be inadequate.
The sophistication of the assessment should be commensurate with the
complexity of the configuration and should meet the test of reasonableness.
If the assessment is sufficient in complexity, technically justifiable, and
reasonable, it would be difficult to conclude that the assessment was
inadequate.
The information considered should be complete and accurate (e.g.,
congruence of the assessed configuration to the existing plant configuration
and activities) and the assessment tool or process should be used
appropriately (e.g., within its capabilities and limitations).
NOTE:
The Maintenance Rule does not give guidance on what constitutes an
adequate assessment.

c. Failure to update a prior assessment due to emergent work or changing plant
conditions that could have an impact on the existing assessment.
•
•

Included in this violation would be the identification of external factors
including changed environmental conditions.
Reasonableness applies when evaluating whether emergent work or
changing external factors become impacting. A licensee should not be
expected to react at too low a threshold, e.g.:
A typical summer weather forecast for afternoon thunder storms may be
too low a threshold for deferring work on an emergency diesel generator,
whereas the issuance of a tornado watch due to severe storms in the
area may be an appropriate level for a more rigorous reassessment and
additional risk management actions.

d. Failure to manage the increase in risk that may result from the proposed
maintenance activity.
•
•
•

The process for managing risk involves using the result of the assessment in
plant decision making to control the overall risk impact.
The licensee is not bound to keeping risk below some threshold or for taking
particular actions when risk exceeds some threshold.
The licensee is responsible for making conscious decisions as to how the
increase in risk will be handled, then by following their own action plan for
handling the increased risk.

2. Issues that are not violations of 10 CFR 50.65 (a)(4):
a. Failure to document the assessment.
•

The rule has no explicit requirements that the assessment be documented.
368

PART II: Topical Chapters

•

PART II-2: Reactor Topics

Licensees should use documentation to the extent necessary to assure
themselves that the requirement for an assessment has been acknowledged
and performed adequately.

b. Failure to use probabilistic analyses to perform a risk assessment.
•
•

See the Statements of Consideration (SOC) in Section 2.1.11.2 below.
Depending on the complexity of the SSCs out of service, a probabilistic
assessment may be the most defensible, but is not explicitly required. A
violation may exist, however, if a probabilistic assessment of a deterministic
risk assessment reaches a significantly different conclusion and indicates that
a probabilistic assessment reasonably should have been performed in place
of the deterministic assessment.

c. Failing to perform an adequate assessment that is questioned and corrected
prior to commencement of maintenance activities.
•
•

This includes occasions when an NRC inspector questions an assessment
prior to the maintenance activity commencing.
“Commencement” of maintenance activities is considered the point when the
SSCs of concern are disabled or prevented from performing their safety
function.

E. Paragraph (b)(1)
1. Issues that are violations of 10 CFR 60.65 (b)(1):
•

Failure to include a safety-related SSC in scope.

2. Issues that are not violations of 10 CFR 60.65 (b)(1):
•

Failure to properly classify an SSC as either HSS or LSS. The failure to place
within the scope those safety related and non-safety related SSCs as described
in (b)(1) and (b)(2) is the violation, not improper classification as HSS or LSS.

F. Paragraph (b)(2)
1. Issues that are violations of 10 CFR 50.65 (b)(2):
•

Failure to include in the scope those types of non-safety related SSCs described
in (b)(2).

2. Issues that are not violations of 10 CFR 50.65 (b)(2):
•

No specific guidance is provided.

2.1.11.1 Examples of Violations
A. Paragraph (a)(1)

369

PART II: Topical Chapters

PART II-2: Reactor Topics

1. Failure to set goals and monitor:
10 CFR 50.65 (a)(1), requires, in part, that the holders of an operating license shall
monitor the performance or condition of structures, systems, or components (SSCs)
within the scope of the rule as defined by 10 CFR 50.65 (b), against licenseeestablished goals, in a manner sufficient to provide reasonable assurance that such
SSCs are capable of fulfilling their intended functions. Such goals shall be
established commensurate with safety.
Contrary to the above, between (dates), the licensee failed to perform monitoring and
failed to established goals for the residual heat removal system although the system
was classified as being within the scope of the monitoring program on (dates) after
the preventive maintenance program was shown to be ineffective due to repeat
preventive maintenance preventable functional failures.
2. Failure to take corrective actions:
10 CFR 50.65 (a)(1), requires, in part, that the holders of an operating license shall
monitor the performance or condition of structures, systems, or components (SSCs)
within the scope of the rule as defined by 10 CFR 50.65 (b), against licenseeestablished goals, in a manner sufficient to provide reasonable assurance that such
structures, systems, and components (SSCs) are capable of fulfilling their intended
functions. Such goals shall be established commensurate with safety. When the
performance or condition of a SSC does not meet established goals, appropriate
corrective action shall be taken.
Contrary to the above, from (date), the time that the Leakage Detection System
(LDS) was placed into the scope of the monitoring program, the licensee did not take
corrective actions when the performance of LDS did not meet licensee established
goals in that the LDS functions were determined not to have met the established goal
for reliability on (date) and no changes were made to the preventive maintenance on
the LDS system.
B. Paragraph (a)(2)
Failure to demonstrate effective preventive maintenance nor set goals and monitor:
Example 1:
10 CFR 50.65 (a)(1), requires, in part, that the holders of an operating license shall
monitor the performance or condition of structures, systems, or components (SSCs)
within the scope of the rule as defined by 10 CFR 50.65 (b), against licenseeestablished goals, in a manner sufficient to provide reasonable assurance that such
SSCs are capable of fulfilling their intended functions.
10 CFR 50.65 (a)(2) states, in part, that monitoring as specified in 10 CFR 50.65
(a)(1) is not required where it has been demonstrated that the performance or
condition of an SSC is being effectively controlled through the performance of
appropriate preventive maintenance, such that the SSC remains capable of
performing its intended function.
370

PART II: Topical Chapters

PART II-2: Reactor Topics

Contrary to the above, as of (date), the licensee failed to demonstrate that the
performance or condition of five primary containment isolation valves and the
containment hydrogen analyzers had been effectively controlled through the
performance of appropriate preventive maintenance and did not monitor against
licensee-established goals. Specifically, the licensee failed to identify, and properly
account for five preventive maintenance preventable functional failures of primary
containment isolation valves and nine preventive maintenance preventable functional
failures of the containment hydrogen analyzers occurring from (date) to (date) which
demonstrate that the performance or condition of these SSCs was not being
effectively controlled through the performance of appropriate preventive maintenance
and, as a result, that goal setting and monitoring was required.
Example 2:
10 CFR 50.65(a)(1) requires, in part, that holders of an operating license shall
monitor the performance or condition of structures, systems, and components
(SSCs) within the scope of the monitoring program as defined in 10 CFR 50.65(b)
against licensee-established goals, in a manner sufficient to provide reasonable
assurance that such SSCs are capable of fulfilling their intended functions.
10 CFR 50.65 (a)(2) states, in part, that monitoring as specified in 10 CFR 50.65
(a)(1) is not required where it has been demonstrated that the performance or
condition of an SSC is being effectively controlled through the performance of
appropriate preventive maintenance, such that the SSC remains capable of
performing its intended function.
Contrary to the above, the licensee failed to demonstrate that performance of the
480-volt ac electrical distribution system was being effectively controlled through the
performance of appropriate preventive maintenance in that a repetitive preventive
maintenance preventable failure of a 480-volt ac electrical breaker occurred on
(date). Following the failure, the licensee failed to consider placing the 480-volt ac
electrical distribution system under 10 CFR 50.65(a)(1) for establishing goals and
monitoring against the goals.
C. Paragraph (a)(3)
Example 1:
10 CFR 50.65 (a)(3) requires, in part, that performance and condition monitoring
activities and associated goals and preventive maintenance activities shall be evaluated
at least every refueling cycle. Adjustments shall be made where necessary to ensure
that the objective of preventing failures of structures, systems, and components (SSCs)
through maintenance (reliability) is appropriately balanced against the objective of
minimizing unavailability of SSCs due to monitoring or preventive maintenance.
Contrary to the above, the periodic evaluation conducted for the period (dates) did not
adequately evaluate the maintenance activities to ensure that reliability was
appropriately balanced against unavailability for two emergency diesel generators
(EDGs). Specifically, unavailability monitoring of the EDGs during the refueling cycle
completed (date) did not consider individual EDG maintenance periods for emergent
work on (date) for EDG 1-1 and on (date) for EDG 2-1. As a result, total unavailability
371

PART II: Topical Chapters

PART II-2: Reactor Topics

was not properly considered and assessed for the EDGs. Without considering this
unevaluated unavailability, the balancing of unavailability and reliability was not
adequate.
Example 2:
10 CFR 50.65(a)(3) states, in part, that performance and condition monitoring activities
and associated goals and preventive maintenance activities shall be evaluated at least
every refueling cycle provided the interval between evaluations does not exceed 24
months.
Contrary to the above, as of (date), the licensee had failed to complete the periodic
evaluation for the refueling cycle which ended (date).
Example 3:
10 CFR 50.65 (a)(3) requires, in part, that preventive maintenance activities shall be
evaluated at least every refueling cycle and these evaluations shall take into account,
where practical, industry-wide operating experience.
Contrary to the above, industry-wide operating experience was not taken into account
during the evaluation conducted between (dates) for the 22 CVC pump. Specifically,
industry-wide operating experience documented previous failures of the CVC pump
speed increaser due to wear induced failures of the lubricating oil pump drive pins that
could be prevented through performance of vendor recommended preventive
maintenance. The PM developed for this activity had never been performed and was
indefinitely deferred resulting in failure of the 22 CVC pump on (date).
D. Paragraph (a)(4)
Example 1:
10 CFR 50.65 (a)(4) requires, in part, that before performing maintenance activities
(including but not limited to surveillance, post-maintenance testing, and corrective and
preventive maintenance), the licensee shall assess and manage the increase in risk that
may result from the proposed maintenance activities.
Contrary to the above, the licensee failed to perform an assessment prior to conducting
maintenance activities between (dates) on the control rod drive (CRD) pump train B and
the reactor core isolation cooling (RCIC) system. The failure to perform an assessment
occurred during a Division 1 outage in which the residual heat removal (RHR) train A,
the low pressure core spray system (LPCS), emergency closed cooling (ECC) train A,
emergency service water (ESW) train A, and Division 1 emergency diesel generator
(EDG) had already been assessed for risk and removed from service.
Example 2:
10 CFR 50.65(a)(4) requires, in part, that before performing maintenance activities
(including but not limited to surveillance, post-maintenance testing, and corrective and
preventive maintenance), the licensee shall assess and manage the increase in risk that
may result from the proposed maintenance activities.
372

PART II: Topical Chapters

PART II-2: Reactor Topics

Contrary to the above, the licensee failed to perform an adequate risk assessment in
that the overall maintenance risk assessment performed by the licensee for all plant
maintenance to be performed during the week of (date(s)) was inadequate because it
failed to account for certain high safety significant structures, systems, and components
(HSS SSCs) or others within the licensee-established risk assessment scope) that
was/were concurrently out of service.
Example 3:
10 CFR 50.65 (a)(4) requires, in part, that before performing maintenance activities
(including but not limited to surveillance, post-maintenance testing, and corrective and
preventive maintenance), the licensee shall assess and manage the increase in risk that
may result from the proposed maintenance activities.
Contrary to the above, the licensee failed to manage the risk associated with the repair
of the pipe leak on A train of the essential service water system (ESW), in that, although
a risk assessment had been performed for the A train emergent work leak repair,
including a provision that isolation and draining of the affected pipe segment not
commence until all repair materials and procedures were staged to immediately
commence work, isolation was accomplished prior to the correct welding procedure
being completed. This resulted in an unnecessary unavailability of A train ESW for 23
hours while the weld procedure was being approved.
E. Paragraph (b)(1)
10 CFR 50.65 (b)(1) requires, in part, that the holders of an operating license shall
include within the scope of the monitoring program specified in 10 CFR 50.65 (a)(1)
safety-related structures, systems, or components (SSCs)that are relied upon to remain
functional during and following design basis events to ensure the integrity of the reactor
coolant pressure boundary, the capability to shut down the reactor and maintain it in a
safe shutdown condition, and the capability to prevent or mitigate the consequences of
accident that could result in potential offsite exposure comparable to the 10 CFR, Part
100 guidelines.
Contrary to the above, as of (date), the licensee failed to include within the scope of the
monitoring program specified in 10 CFR 50.65 (a)(1), the safety-related SSCs that
provide the pressurizer level, reactor pressure vessel level, and residual heat removal
suction relief valve over-pressure protection functions as applicable for non-Mode 1
conditions. These SSCs are relied upon during and after design basis events to
maintain the reactor in a safe shutdown condition.
F. Paragraph (b)(2)
Example 1:
10 CFR 50.65 (b)(2) requires, in part, that the scope of the monitoring program specified
in paragraph (a)(1) include non-safety related structures, systems, and components
(SSCs) whose failure can prevent safety-related SSCs from fulfilling their safety-related
function.

373

PART II: Topical Chapters

PART II-2: Reactor Topics

Contrary to the above, from (date) to (date), the Unit 2 turbine building sump system was
not included in the scope of the monitoring program specified in 10 CFR 50.65 (a)(1).
The inclusion of the turbine building sump in the scope of the monitoring program was
necessary because the failure of that system could prevent the emergency feedwater
system, a safety-related system, from fulfilling its safety-related function.
Example 2:
10 CFR 50.65 (b)(2) requires, in part, that the scope of the monitoring program specified
in paragraph (a)(1) include non-safety related structures, systems, and components
(SSCs) that are relied upon to mitigate accidents or transients or are used in plant
emergency operating procedures (EOPs).
Contrary to the above, as of (date), the licensee failed to include the area radiation
monitoring system within the scope of the monitoring program specified in10 CFR 50.65
(a)(1). The area radiation monitoring system is a non-safety related system used in the
plant EOPs. As a result, the preventive maintenance on the system was not assessed
following three maintenance preventable functional failures occurring between (dates).

2.1.11.2 Requirements for Monitoring the Effectiveness of Maintenance at
Nuclear Power Plants
A. Paragraph 50.65(a)(1)
1. Requires each holder of an operating license under 50.21(b) or 50.22 to monitor the
performance or condition of SSCs against licensee-established goals in a manner
sufficient to provide reasonable assurance that such SSCs, as defined in paragraph
(b), are capable of fulfilling their intended functions.
a. Such goals shall be established commensurate with safety and, where practical,
take into account industry-wide operating experience.
b. When the performance or condition of an SSC does not meet established goals,
appropriate corrective action shall be taken.
c. For a nuclear power plant for which the licensee has submitted the certifications
specified in 50.82(a)(1), this paragraph only shall apply to the extent that the
licensee shall monitor the performance or condition of all SSCs associated with
the storage, control, and maintenance of spent fuel in a safe condition, in a
manner sufficient to provide reasonable assurance that such structures, systems,
and components are capable of fulfilling their intended functions.
2. The SOC for paragraph (a)(1) indicates that the licensee establish a monitoring
regime which is sufficient in scope to provide reasonable assurance that (1) intended
safety, accident mitigation and transient mitigation functions of the structures,
systems, and components (SSCs) described in paragraph (b)(1) and (b)(2)(i) can be
performed; and (2) for the SSCs described in subparagraphs (b)(2)(ii) and (b)(2)(iii),
failures will not occur which prevent the fulfillment of safety-related functions, and
failures resulting in scrams and unnecessary actuations of safety-related systems
are minimized.
a. Where failures are likely to cause loss of an intended function, monitoring should
be predictive in nature, providing early warning of degradation.
374

PART II: Topical Chapters

PART II-2: Reactor Topics

b. Monitoring activities for specific SSCs can be performance oriented (such as the
monitoring of reliability and availability), condition-oriented (parameter trending),
or both.
c. The results of monitoring are required to be evaluated against the licenseeestablished goals. Goals should be established commensurate with an SSC’s
safety significance.
d. Where available, the assumptions in and results of probabilistic risk assessments
(PRAs) or individual plant examinations (IPEs) should be considered when
establishing goals.
3. SSCs which are treated under paragraph (a)(1) may have formally established
reliability and availability goals against which they are explicitly monitored, where
goals of this nature are appropriate. In addition, and regardless of the nature of the
monitoring and goals established to satisfy paragraph (a)(1), reliability and
availability over the longer term must be assessed periodically pursuant to the
requirements of paragraph (a)(3), as part of the evaluation of goals, monitoring
requirements, and preventive maintenance requirements.
B. Paragraph (a)(2)
1. States that monitoring as specified in paragraph (a)(1) of this paragraph is not
required where it has been demonstrated that the performance or condition of a
structure, system, or component is being effectively controlled through the
performance of appropriate preventive maintenance, such that the structure, system,
or component remains capable of performing its intended function.
2. The SOC for this paragraph indicates that the purpose of paragraph (a)(2) is to
provide an alternate approach (a preventive maintenance program) for those SSCs
where it is not necessary to establish the monitoring regime required by (a)(1).
a. Under the terms of paragraph (a)(2), preventive maintenance must be
demonstrated to be effective in controlling the performance or condition of an
SSC such that the SSC remains capable of performing its intended function.
b. It is expected that, where one or more maintenance-preventable failures occur on
SSCs treated under this paragraph, the effectiveness of preventive maintenance
is no longer demonstrated. As a result, the SSCs would be required to be
treated under the requirements of paragraph (a)(1) until such time as a
performance history is established to demonstrate that reliability and availability
are once again effectively controlled by an established preventive maintenance
regimen.
c. Once such a demonstration has been made, it would be acceptable to return to
treating the SSCs under paragraph (a)(2).
C. Paragraph (a)(3)
1. Requires that performance and condition monitoring activities and associated goals
and preventive maintenance activities shall be evaluated at least every refueling
cycle provided the interval between evaluations does not exceed 24 months. The
evaluations shall be conducted taking into account, where practical, industry-wide
375

PART II: Topical Chapters

PART II-2: Reactor Topics

operating experience. Adjustments shall be made where necessary to ensure that
the objective of preventing failures of structures, systems, and components through
maintenance is appropriately balanced against the objective of minimizing
unavailability of structures, systems, and components due to monitoring or
preventive maintenance.
2. The SOC for this paragraph indicates that this provision requires that SSCs
performance or condition goals, performance or condition monitoring, and preventive
maintenance activities implemented pursuant to paragraphs (a)(1) and (a)(2) be
evaluated in light of SSCs’ reliabilities and availabilities.
a. In the case of SSCs treated under paragraph (a)(1), adjustments are to be made
to goals, monitoring, or preventive maintenance requirements where equipment
performance or condition have not met established goals.
b. Conversely, at any time the licensee may eliminate monitoring activities initiated
in response to problematic equipment performance or industry experience once
the root cause of the problem has been corrected or the adequacy of equipment
performance has been confirmed.
c. In the case of SSCs treated under paragraph (a)(2), adjustment of preventive
maintenance requirements may be warranted where SSCs availability is judged
to be unacceptable.
d. SSCs which are treated under paragraph (a)(1) may have formally established
reliability and availability goals against which they are explicitly monitored, where
goals of this nature are appropriate. In addition, and regardless of the nature of
the monitoring and goals established to satisfy paragraph (a)(1), reliability and
availability over the longer term must be assessed periodically pursuant to the
requirements of paragraph (a)(3), as part of the evaluation of goals, monitoring
requirements, and preventive maintenance requirements.
D. Paragraph (a)(4)
1. Requires that before performing maintenance activities (including but not limited to
surveillance, post-maintenance testing, and corrective and preventive maintenance),
the licensee shall assess and manage the increase in risk that may result from the
proposed maintenance activities. The scope of the assessment may be limited to
structures, systems, and components that a risk-informed evaluation process has
shown to be significant to public health and safety.
2. The SOC for this paragraph indicates that the intent of this requirement is to have
licensees appropriately assess the risks related to proposed maintenance activities
that will directly, or may inadvertently, result in equipment being taken out of service
and then, using insights from the assessment, suitably minimize the out-of-service
time resulting from the proposed maintenance activities while also controlling the
configuration of the total plant to maintain and support the key plant safety functions.
a. In general, a risk assessment is necessary before all planned maintenance
activities. Assessments should also be performed when an unexpected SSC’s
failure initiates required maintenance activities or when changes to plant
376

PART II: Topical Chapters

PART II-2: Reactor Topics

conditions affect a previously performed assessment. However, the reevaluation
of a previous assessment should not interfere with, or delay, the plant staff’s
taking timely actions to restore the appropriate SSCs to service or taking
compensatory actions necessary to ensure that plant safety is maintained. If the
SSC is restored to service before performing the assessment, the assessment
need not be conducted.
b. Assessments may vary from simple and straightforward to highly complex.
However, the degree of sophistication required for the assessment
notwithstanding, the NRC intends that the assessment process will examine the
plant condition existing before the commencement of the maintenance activity,
examine the changes expected by the proposed maintenance activity, and
identify the increase in risk that may result from the maintenance activity. The
assessments are expected to provide insights for identifying and limiting risksignificant maintenance activities and their durations.
c. The level of complexity necessary in the assessment would be expected to differ
from plant to plant, as well as from configuration to configuration, within a given
plant. When a licensee proposes to remove a single SSC from service for
maintenance while no other SSC is out of service, a simple deterministic
assessment may suffice. If the SSC is covered by TS, then the assessment
could be as simple as an expert judgment, along with confirming the relevant
requirements of TS. When one SSC is out of service and the licensee proposes
to remove a second SSC from service for maintenance, the assessment could be
simplified through the use of a table of results for pre-analyzed combinations,
typically high-safety-significant SSCs paired against each other. However, more
detailed assessments are required if a licensee proposes to remove multiple
SSCs from service during power operations or to remove from service systems
necessary to maintain safe shutdown during shutdown or startup operations.
These more detailed assessments are expected to involve probabilistic analyses
where possible, and to also include considerations of key plant safety functions
to be maintained and defense in depth.
d. In general, the NRC expectation regarding managing the risk is a scrutable
process for controlling or limiting the risk increase of the proposed maintenance
activities. This process should include an understanding of the nature (i.e.,
affecting the core damage, or large early release frequency) and significance of
the risk implications of a maintenance configuration on the overall plant baseline
risk level. For example, risk-significant plant configurations should generally be
avoided, as should conditions where a key plant safety function would be
significantly degraded while conducting maintenance activities. The effective
control of potentially significant risk increase due to an unexpected failure of
another risk-important SSC can be reasonably assured by planning for
contingencies, or coordinating, scheduling, monitoring, and modifying the
duration of planned maintenance activities.
e. The second sentence in the new (a)(4) paragraph states: “The scope of the
assessments may be limited to structures, systems, and components that a riskinformed evaluation process has shown to be significant to public health and
safety.” In response to public comments on the proposed rule, this second
sentence has been added so that licensees may reduce the scope of SSCs
377

PART II: Topical Chapters

PART II-2: Reactor Topics

subject to the pre-maintenance assessment to those SSCs which, singularly or in
combination, can be shown to have a significant effect on the performance of key
plant safety functions. The focus of the assessments should be on the SSCs
modeled in the licensee’s PRA, in addition to all SSCs evaluated as risk
significant (high safety-significant) by the licensee’s maintenance rule expert
panel. Typically, these SSCs have been analyzed as causing potential initiating
events, if failed, and as accident mitigators, or as high safety-significant SSCs
with their support systems. Such SSCs may be identified by operating
experience or by deterministic or probabilistic analyses.
f.

The rule has no explicit documentation requirements. Instead, the rule
emphasizes performance. A licensee’s assessment process is expected to
identify the impact on safety that is caused by the performance of maintenance.
Licensees should use documentation to the extent necessary to assure
themselves that the requirement for an assessment has been acknowledged and
performed adequately.

E. Paragraph (b)(1)
1. Requires SSCs that are relied upon, to remain functional during and following design
basis events to ensure the integrity of the reactor coolant pressure boundary, the
capability to shut down the reactor and maintain it in a safe shutdown condition, and
the capability to prevent or mitigate the consequences of accidents that could result
in potential offsite exposure comparable to the guidelines in 50.34(a)(1) or 100.11 of
this chapter, as applicable.
2. The SOC indicates that the scope of SSCs subject to the final maintenance rule
includes safety-related SSCs, and certain "non-safety" SSCs in the balance of plant
(BOP) which meet one or more of four specific criteria, that include one general
safety-related criterion described in (b)(1), and three non-safety related criteria
described in (b)(2).
F. Paragraph (b)(2)
3. Requires the inclusion of non-safety related SSCs: (i) That are relied upon to
mitigate accidents or transients or are used in plant emergency operating procedures
(EOPs); or (ii) Whose failure could prevent safety-related structures, systems, and
components from fulfilling their safety-related function; or (iii) Whose failure could
cause a reactor scram or actuation of a safety- related system.
4. The SOC indicates that the scope of SSCs subject to the final maintenance rule
includes safety-related SSCs, and certain "non-safety" SSCs in the BOP which meet
one or more of four specific criteria, that include one general safety-related criterion
described in (b)(1), and three non-safety related criteria described in (b)(2).
G. Paragraph (c)
Requires that the requirements of this section be implemented by each licensee no later
than July 10, 1996.

378

PART II: Topical Chapters

PART II-2: Reactor Topics

10 CFR 50.54 Deficiency Grace Period
A. The significant provision of the regulations in this area is 10 CFR 50.54(s)(2)(ii) which
provides a four-month grace period for correction of deficiencies that rise to such a level
that the Commission may make a finding that the state of emergency preparedness no
longer provides reasonable assurance that adequate protective measures can and will
be taken in the event of a radiological emergency.
1. The grace period represents a recognition by the Commission that many elements of
emergency planning involve complex arrangements and interactions with local,
State, and Federal entities, much of which is beyond a licensee's direct control.
2. The grace period reflects an acknowledgment that the licensee's degree of control in
the emergency planning area is significantly less than that in the areas of reactor
health and safety.
3. Even where there are significant deficiencies in emergency plans and a formal
finding to that effect is made, a grace period should be allowed for corrective action.
See County of Rockland v. U.S. Nuclear Regulatory Commission, 709 F.2d 766,
770-771 (2nd Cir. 1983).
B. The policy underlying the grace period strongly suggests that it was intended to apply to
emergency planning deficiencies which can be remedied only in cooperation with State
and local officials.
1. If plans are adequate, in place, and capable of implementation, but the licensee
failed to implement the plans either during a drill or an actual emergency, no grace
period should be necessary to remedy the deficiency.
2. In the Statements of Consideration (SOC) supporting the initial rule (45 FR 55402,
August 19, 1980), the Commission discussed how it would apply the grace period,
and, in considering plan deficiencies, indicated that it would consider local, State,
and licensee plans to see if the features in one plan could compensate for
deficiencies in another plan.
a. If an emergency planning deficiency can be remedied only in cooperation with
State and local officials, enforcement action should await the expiration of the
grace period.
b. The EDO is to be notified before establishing the grace period and should concur
on the enforcement action.
c. If the deficiency is of such a nature that cooperation with State and local officials
is not necessary to remedy the deficiency, then the grace period does not apply
and the matter may be pursued.

379

PART II: Topical Chapters

PART II-2: Reactor Topics

Actions Involving Fire Protection
A. Fire protection requirements are established by:
•
•
•
•
•
•
•

10 CFR Part 50, Appendix A
GDC 3
10 CFR 50.48
10 CFR Part 50, Appendix R
Facility license conditions
Facility TSs
Other legally binding requirements, as applicable

B. Fire protection violations may involve:
•
•
•
•
•

Inoperable or inadequate fire barriers
Separation, suppression, or detection systems
Repair parts
Procedures
Other conditions or items required to prevent fires, protect shutdown equipment
during a fire, or restore safe shutdown equipment to service following an actual fire

C. Failures to meet regulatory requirements for protecting trains of equipment required for
achieving and maintaining safe shutdown constitute serious violations.
D. The significance of fire protection violations is normally determined by the SDP.
E. To the extent that the SDP does not apply or that the ROP is not applicable, violations
should be:
1. Assessed in accordance with the guiding principles for assessing significance in
Section 2.0 of the Enforcement Policy; and
2. Assigned a severity level commensurate with the significance.
F. The following guidance provides examples of violations at various severity levels and
should be used as a guide to determine the appropriate enforcement action. (For
purposes of this guidance, required SSCs are those that are necessary to achieve and
maintain safe shutdown and that require the application of fire protection features as
described in the licensee's fire hazards analysis report and NRC's safety evaluation
report.)
1. Severity Level I: Violations of fire protection requirements established to protect or
enable operation of safe-shutdown equipment, for cases in which an actual fire
damages that equipment to such a degree that safe shutdown could not be achieved
or maintained.
2. Severity Level II: Violations of fire protection requirements established to protect or
enable operation of safe-shutdown equipment, for cases in which a postulated fire in
the area would so damage that equipment that safe shutdown would not be achieved
and maintained.
380

PART II: Topical Chapters

PART II-2: Reactor Topics

3. Severity Level III: Violations of fire protection requirements established to protect or
enable operation of safe-shutdown equipment, for cases in which a postulated fire in
the area, in the absence of additional evaluation, could so damage that equipment
that shutdown could not be achieved and maintained using the applicable equipment
identified in the fire hazards analysis in accordance with applicable requirements.
a. Failure to have an adequate written evaluation available for an area in which
Appendix R compliance is not apparent will be taken as an indication that the
area does not comply with NRC requirements, and may result in enforcement
action at this severity level.
b. Licensees may exercise engineering judgment as to the threshold for
documenting detailed analysis for spurious equipment actuations following a fire.
Thus, potential spurious actuations judged by the licensee to not involve
substantial risk to safe shutdown capability may not be covered by documented
evaluations.
c. The NRC may judge differently the potential impact on safe shutdown capability,
and may request the licensee to provide additional analysis. A Severity Level III
violation is probably not warranted unless this additional analysis confirms a
significant problem.
4. Severity Level IV: Failures to meet one or more fire protection requirements that do
not result in a Severity Level I, II, or III violation and which have more than minor
safety or environmental significance.

381

PART II: Topical Chapters

PART II-2: Reactor Topics

Security
This section provides specific guidance concerning enforcement practices for security issues.
Sections 6.11, 6.12, 6.13 of the Enforcement Policy provide examples of violations in each of
the four severity levels as guidance in this activity area.

Compliance with the Security Plan versus 10 CFR Part 73
A. Licensees subject to the requirements of 10 CFR Part 73.25, 73.26, 73.40, 73.45, 73.46,
and 73.55 must submit security plans to the NRC for approval.
1. Once these plans are approved, they are incorporated into the license by
amendment and the licensee is required to meet the approved plans.
2. While citations for violations of these plan requirements must be made against the
applicable section of the NRC-approved Security Plan and not against Part 73,
citations may indicate the connection between the Security Plan and Part 73.
a. This limitation does not apply to orders while they remain in effect.
b. If changes to the Security Plan result in additional issues, these can be assessed
and assigned a color using the SDP process.
c. Violations of the requirements in an order may always be cited against the
specific requirements contained in the respective order.
3. Changes to the Security Plan that reduce the effectiveness of the plan (that are
made without NRC’s permission), should be assigned a severity level.
B. If there is a conflict between the requirement(s) in a plan, a regulation, or an order,
NSIR, NRR or NMSS (as appropriate) should be consulted.
C. Citations against the general performance criteria of 10 CFR 73.55(a) may be viable.
Any such violations should be coordinated with OE and NRR prior to issuance.
D. Other general sections of Part 73 (e.g., those governing the reporting of safeguards
events and the protection of safeguards information) remain in force even when
licensees insert references to these requirements in their security plans.

Access Control
A. Access control is not only limited to protected and vital area barriers, but also includes all
security measures employed to ensure that unauthorized persons, vehicles, and
materials are excluded from entry into the protected and vital areas.
B. The severity level of an access control violation may be determined by considering the
following factors:
1. The ease of exploitation of the vulnerability created by the violation, compounded by
its predictability.

382

PART II: Topical Chapters

PART II-2: Reactor Topics

a. In determining the vulnerability of a protected or vital area barrier, one must
consider whether it could be seen by a potential adversary as being vulnerable
based on, e.g., the height of fencing, delay barriers, security force separation
from the objective, ease and opportunity to achieve a hostile objective, time
and/or opportunity available to execute an assault, etc.
b. Predictability refers to the ease with which an adversary can anticipate an
opportunity, e.g.: Since the operational status of an alarm system is not usually
apparent to a potential adversary, the fact that a particular alarm zone would not
have detected an unauthorized intrusion for a short period of time will probably
not be obvious, and therefore, the vulnerability is less significant. The absence
of a search of particular types of containers by security staff would create
predictability that could be exploited by an adversary, and therefore, the
vulnerability is more significant.
c. Ease of passage of a vulnerability refers to the type of opening and the
environment in or surrounding a pathway, e.g.: If the pathway is an underground
tunnel that has many twists and turns, or one that has sudden vertical drops or
climbs, a simple 96-square-inch standard may not be appropriate, since the
diameter of such a tunnel would be inadequate to allow an adversary to
maneuver along the inside of it. Ease of passage may also refer to whether the
opening is under water.
C. When considering ease of exploitation, the following elements of barrier, monitoring, and
response should be weighed:
1. Barrier Integrity:
a. The integrity of the barrier may be compromised by breaches in that barrier, but it
may also be compromised by procedural errors or improper design or installation.
b. Lost keys and/or lost keycards have the potential to allow unauthorized and
undetected access to controlled areas of a plant. The significance of such
violations is a function of:
•
•
•
•

Whether the keys/keycards were truly lost;
Whether the keys/keycards were marked to indicate the areas to which they
allowed access;
Whether and when the keys/keycards were recovered; and
Whether there is any evidence that the keys/keycards have been used before
they were recovered.

c. The significance of underground pathways allowing access to controlled areas is
discussed in Information Notice 86-83 (September 19, 1986).
2. Compensatory Measures for Unlocked/Unalarmed Portals:
a. The significance of security personnel being inattentive while posted as
compensatory measures is determined by what functions such personnel are
intended to provide.

383

PART II: Topical Chapters

•

•

PART II-2: Reactor Topics

If a security force member is posted at a door that is normally alarmed and
locked as compensation for the alarm annunciation function, if the security
force member is inattentive, only one element of access control is
inadequate.
If a security force member is posted at a door for the controlled access
logging function as well as compensation for the alarm annunciation function,
if the security force member is inattentive, two elements of access control are
inadequate.

Enforcement Actions Involving Failure to Report Arrests
The NRC requires high assurance that the individuals who are granted access to Nuclear Power
Plants, licensed under 10 CFR Part 50 are trustworthy and reliable, such that they do not
constitute an unreasonable risk to public health and safety or the common defense and security,
including the potential to commit radiological sabotage. This section describes how to
appropriately evaluate enforcement actions involving failures to report arrest, under 10 CFR
73.56 (effective March 31, 2010). The facts of the case impact the results, thus it is possible that
not all cases involving failure to report arrest will be dispositioned in the manner described
below.
A. Failure to Report an Arrest While Maintaining Unescorted Access
Authorization/Unescorted Access (UAA/UA)
1. Licensee’s or Contractor’s employee does not report an arrest or legal action to their
employer promptly, where the employee is maintaining UAA/UA
2. 10 CFR 73.56(g) by its terms, puts direct onus on the individual, not the licensee, to
report legal actions
3. 10 CFR 73.56(o) Records outlines the record keeping requirements. While it is
possible the licensee may have an internal procedure requiring a record to be kept of
arrests, § 73.56(o) does not require a licensee to maintain records of arrest (reported
or not reported)
4. Typically, a violation to the individual will be issued and no violation to the licensee
for these particular events (§ 73.56(g) is one of the few regulations that, by its terms,
directs the individual conduct, rather than the licensee). On a case by case basis,
individuals that are not company officials (supervisors, managers) are typically given
closeout letters while licensee officials typically receive a SL III depending on their
position in the organization.
5. When there is no violation to the licensee, the individual cannot be cited for 10 CFR
50.5, Deliberate Misconduct, even if the individual acted deliberately in failing to
report their legal actions
B. Failure to Report Arrest While UAA/UA Pending
1. 10 CFR 73.56(g) by its terms, puts direct onus on the individual, not the licensee, to
report legal actions

384

PART II: Topical Chapters

PART II-2: Reactor Topics

2. All licensees are required to maintain a Physical Security Plan (PSP) which requires
them to implement an access authorization program in accordance with Nuclear
Energy Institute (NEI) 03-01
3. NEI 03-01 requires individuals filling out a Personal History Questionnaire (PHQ) to
report all legal actions that occurred in the timeframe between signing the PHQ and
the certifying of UAA or granting UA
4. Typically, a violation to the individual will be issued and no violation to the licensee
for these particular events (§ 73.56(g) is one of the few regulations that, by its terms,
directs the individual conduct, rather than the licensee). On a case by case basis,
individuals that are not company officials (supervisors, managers) are typically given
closeout letters while licensee officials typically received a SL III depending on their
position in the organization.
5. When there is no violation to the licensee, the individual cannot be cited for 10 CFR
50.5, Deliberate Misconduct, even if the individual acted deliberately in failing to
report their legal actions
C. Failure to Report Arrest in Personal History Questionnaire (PHQ): This section
addresses the situations in which an individual provides false information about a legal
issue as part of a licensee’s or contractor’s access authorization program. Failures to
report a legal action while maintaining UAA/UA are different from those who fail to report
a legal action in the PHQ process.
1. Employees Applying for UAA/UA:
a. Are required by the licensee’s or applicant’s access authorization program to
disclose all personal history information regarding legal actions including any
information necessary for a reviewing official to make a determination of the
individual’s trustworthiness and reliability
b. Failure to disclose this information would result in a violation of §73.56(d)(2)
against the individual, through NEI 03-01, which in most cases is part of the
licensee’s program under the PSP. On a case by case basis, individuals that are
not company officials (supervisors, managers) are typically given closeout letters
while licensee officials typically received a SL III depending on their position in
the organization.
c. Further, if a employee deliberately provides false information in the PHQ, a
violation of §50.5(a)(2) may occur because the individual deliberately provided
information that they knew was incomplete or inaccurate in some respect
material to the NRC
d. §73.56(o) Records requires licensees to maintain some of the information
gathered for the granting of UAA/UA
e. Therefore, if a licensee grants UAA/UA and the information collected which
resulted in the grant contains inaccurate information, the licensee may be in
violation of § 50.9 Completeness and accuracy of information
2. Non-Employees Applying for UAA/UA
a. Are required by the licensee’s or applicant’s access authorization program to
disclose all personal history information regarding legal actions including any
385

PART II: Topical Chapters

b.

c.

d.
e.

PART II-2: Reactor Topics

information necessary for a reviewing official to make a determination of the
individual’s trustworthiness and reliability
Failure to disclose this information would result in a violation of §73.56(d)(2)
against the individual, through NEI 03-01, which in most cases is part of the
licensee’s program under the PSP. On a case by case basis, typically individuals
that are not employees would be given closeout letters.
The difference from non-employees and employees is that §50.5(a) only applies
to employees of licensees, applicants, contractors and subcontractors.
Therefore, a §50.5(a) violation does not apply to a non-employee who provides
false information in their PHQ
§73.56(o) Records requires licensees to maintain some of the information
gathered for the granting of UAA/UA
Therefore, if a licensee grants UAA/UA and the information collected which
resulted in the grant contains inaccurate information, the licensee would be in
violation of § 50.9 Completeness and accuracy of information

Access Authorization Program
A. A licensee’s ability to implement its safeguards security program is based, in significant
part, on its access authorization program.
1. The successful completion of the elements of the access authorization program is
critical to ensuring that the safeguards security program can be implemented as
required.
2. Violations or licensee requirements implementing 10 CFR 73.56, “Personnel access
authorization requirements for nuclear power plants,” should be assessed using the
Physical Protection Significance Determination Process (PPSDP), unless these
violations are willful or deliberate, in which case they should be assessed as
discussed in Part II, Section 1.1 of the Enforcement Manual.
B. Authorization versus Clearance for Access:
Individuals are considered cleared for access as soon as all required background
investigations, evaluations, and fitness-for-duty actions have been successfully
completed. At that point, however:
•
•

Individuals do not have authorized unescorted access and do not have such access
until they are added to the licensee's authorized access list and are issued a proper
badge; and
Actual entry of a cleared but as-yet unauthorized individual is a violation. Note,
however, that this violation is not as significant as actual entry of an uncleared,
unauthorized individual.

C. Improper Access by Authorized or Other Persons:
Employees who have been properly cleared and authorized for access to the site must
still enter the protected area and vital/material access areas properly.

386

PART II: Topical Chapters

•
•
•

PART II-2: Reactor Topics

Failing to properly log in to a vital aria by tailgating, i.e., following another employee
into the area without properly logging in, is a violation although it is usually assessed
as a Severity Level IV violation.
It is more significant if a person is improperly allowed access to an area where the
need for access to that area has not been determined.
It is very significant if a person uses another person’s identification to gain access to
an unauthorized area, or if a person has been terminated for cause and still gains
access to a protected or vital area following that termination.

D. Vital Areas Within Vital Areas:
1. Two barriers are required at power reactors, while three barriers are required at
Category I fuel facilities, i.e., a parameter barrier and one or two vital area barriers.
2. As a general rule, when vital areas are contained within other vital areas, the barrier
and access control requirements are not required at the inner-most barrier.
a. The licensee is only required to have one vital area barrier to protect all vital
areas.
b. The inner barrier and access control functions must be fully operative at only the
necessary vital area barrier.
NOTE:
If an inner vital area barrier remains intact while the outer vital area
barrier is discovered to have vulnerabilities, there is no violation unless
the failed outer barrier allows access to vital equipment.

Searches
A. Searches of individuals, vehicles, and packages are considered inadequate if they are
not able to detect the items for which they are conducted, e.g.: a vehicle search must
include an examination of the inside of the glove compartment and the undercarriage,
motor area, storage areas and the area under the seats.
NOTE:
It is not sufficient to conclude that an item is not contraband or is not
otherwise prohibited merely because it cannot be identified through the
normal electronic or video search process.
B. Searches of hand carried items or shipping packages are considered inadequate if they
are not able to identify items to the extent that such items can be excluded as
contraband or as items that are otherwise prohibited.

387

PART II: Topical Chapters

PART II-2: Reactor Topics

C. When a vehicle that has entered the site is later found to have contained contraband
(i.e., weapons, drugs, or explosives of any kind) in an accessible area, the presumption
is that the search was inadequate.

Protection of Safeguards Information
A. When safeguards information is not properly protected from compromise, the severity
level of the violation is a function of:
1. The location of the material during the time it was not controlled;
2. The significance of the material;
3. The amount of time left uncontrolled; and
4. The opportunity for compromise of the material while it was uncontrolled.
B. The following examples illustrate the significance of a violation involving safeguards
information that is not properly controlled:
1. If safeguards information had been left in an unlocked container within the locked
and continuously-staffed primary access control point, this violation is less significant
than if the safeguards information had been left in an uncontrolled area inside the
protected area.
2. If safeguards information had been left uncontrolled and outside of a protected area,
this violation is more significant than if the safeguards information had been left
uncontrolled and inside a protected area.
3. A violation involving safeguards information that has been left uncontrolled is more
significant when it is sufficiently extensive; or descriptive of the security system as to
significantly assist an adversary in an act of radiological sabotage or theft of strategic
special nuclear material (SSNM), this violation is more significant that if the
safeguards information would not have significantly assisted the adversary.

Protection Against Vehicle Bomb Threats
The NRC has issued orders modifying license conditions addressing land vehicle assaults as
well as waterborne assaults. These orders should be consulted prior to issuing any
enforcement action involving these license conditions.
A. 10 CFR 73.55(c)(7) requires licensees to establish vehicle control measures, including
vehicle barrier systems, to protect against land vehicle intrusion.
B. 10 CFR 73.55(c)(8)(I) requires licensees to confirm to the Commission that vehicle
control measures established to protect against land vehicle intrusion meet the design
goals and criteria specified for protection against a land vehicle bomb.
C. Under 10 CFR 73.55(c)(8)(ii), licensees may propose alternative measures for protection
against a vehicle bomb that would then be subject to review and approval by the NRC.
388

PART II: Topical Chapters

PART II-2: Reactor Topics

1. This is common in the area of physical security and 10 CFR 73.55 already provides
for such alternative measures.
2. By allowing licensees to propose alternative measures for protection against a
vehicle bomb, the Commission is allowing them to change the focus of compliance
from the rule to the approved plans submitted by licensees.
D. 10 CFR 73.55(c)(9) requires that licensees submit a summary description of the
proposed vehicle control measures within 180 days of the effective date of the rule and
fully implement the measures by within 18 months of the effective date.
E. Violations of 10 CFR 73.55(c)(8)(I) and (9)(I) should be treated in the same manner as
any other incomplete and/or inaccurate statement, i.e., under 10 CFR 50.9 and Section
6.9 of the Policy.
F. Violations of 10 CFR 73.55(c)(8)(ii) should also be treated as incomplete and/or
inaccurate statements, to the extent that they do not accurately "describe the level of
protection that these measures would provide."

Citations Against 10 CFR Part 50, Appendix B
A. Appendix B of 10 CFR Part 50 addresses quality assurance criteria for nuclear power
plants and fuel reprocessing plants.
1. Any citations against 10 CFR Part 50, Appendix B in the safeguards area should be
coordinated with OE prior to issuance.
2. Appendix B applies to SSCs that prevent or mitigate the consequences of postulated
accidents that could cause undue risk to the health and safety of the public.
3. The provisions of Appendix B do not generally apply to the safeguards area.
B. If the region desires to use the Appendix B criteria as the basis for a citation in the
safeguards area, it will have to include in the citation sufficient facts and discussion to
support the position that the procedure in question is necessary to assure, in the event
of an accident, "adequate confidence that a structure, system, or component will perform
satisfactorily in service."

389

PART II: Topical Chapters

PART II-2: Reactor Topics

Enforcement Actions Involving Fitness-For-Duty (FFD)
A. The NRC prescribes the requirements and standards for the establishment,
implementation, and maintenance of FFD programs in 10 CFR Part 26.
B. Part 26 requirements apply to licensees authorized to:
1. Operate a nuclear power reactor;
2. Possess or use formula quantities of SSNM; or
3. Transport formula quantities of SSNM.
C. Each FFD issue must be evaluated to determine whether enforcement action should be
issued against:
1. The facility licensee for failure to adequately implement the FFD program and
2. The individual licensed operator for failure to meet requirements in 10 CFR Part 55.
D. The NRC will not typically pursue enforcement action against non-licensed individuals
that violate drug and alcohol provisions of licensees’ FFD programs unless the licensee
fails to take the required sanctions against the individual(s) as required by 10 CFR
26.75, “Sanctions,” or the NRC identifies apparent deficiencies in the licensee’s
implementation of its FFD program. See Part II, Section 1.1.5, “Wrongdoing,” for
specific steps in dispositioning these types of cases.
E. For all FFD issues, individuals cannot be directly cited under Part 26.

Action Against the Facility Licensee for FFD Violations
A. Licensees subject to 10 CFR Part 26 must establish implement and maintain an FFD
program. In accordance with Section 26.23, “Performance Objectives,” the FFD
program must provide reasonable assurance:
1. That individuals are trustworthy and reliable as demonstrated by the avoidance of
substance abuse;
2. That individuals are not under the influence of any substance, legal or illegal, or
mentally or physically impaired from any cause, which in any way adversely affects
their ability to safely and competently perform their duties;
3. For the early detection of individuals who are not fit to perform the duties that require
them to be subject to the FFD program;
4. That workplaces subject to 10 CFR Part 26 are free from the presence and effects of
illegal drugs and alcohol; and

390

PART II: Topical Chapters

PART II-2: Reactor Topics

5. That the effects of fatigue and degraded alertness on individuals’ abilities to safely
and competently perform their duties are managed commensurate with maintaining
public health and safety.
B. The NRC may cite the facility licensee if drugs and/or alcohol are found in the
workplace 15 if:
1. The issue is recurring (i.e., the corrective actions from a previous issue were not
sufficient to prevent this occurrence) such that the licensee is not meeting the
performance objectives under Part 26; or
2. The licensee’s Part 26 policy, procedure or training was found to be inadequate
(discussion between the regional and headquarter staff may be warranted).
C. Generally, the NRC will not take enforcement action against a facility licensee if an
individual fails a drug or alcohol test.
1. “Not take enforcement action” (to the facility licensee) indicates that the NRC has not
identified a violation and consequently, will not issue a violation (i.e., the NRC will not
use enforcement discretion or any other enforcement tool).
2. The NRC is not issuing enforcement action because the incidents are not indicative
of a programmatic failure, in that, the licensee has effectively implemented its FFD
program to provide reasonable assurance: that persons are trustworthy and reliable
as demonstrated by the avoidance of substance abuse; that individuals are not under
the influence of any substance, legal or illegal, or mentally or physically impaired
from any cause, which in any way adversely affects their ability to safely and
competently perform assigned duties; and, for the early detection of individuals who
are not fit to perform the duties that require them to be subject to the FFD program.
Additionally, the licensee has taken the actions required by 10 CFR Part 26 in
response to the event.
D. The Enforcement Policy provides examples of violations in which the facility licensee
failed to meet the requirements of 10 CFR Part 26.
E. If an enforcement action against a facility licensee is warranted, the enforcement action
should be prepared and processed in accordance with the standard guidance for
escalated and non-escalated actions.
1. The significance of an FFD finding at an operating power reactor should normally be
assessed by the ROP’s SDP.
2. The significance of an FFD violation for all other licensees should be assessed in
accordance with the Enforcement Policy.

Workplace is any location in which categories of persons listed in Section 26.4 perform or direct the
activities or have access to the types of material or information described in Section 26.4.
15

391

PART II: Topical Chapters

PART II-2: Reactor Topics

Action Against the Licensed Operator for FFD Violations
There may be instances in which an operator fails the FFD test, but is not in violation of their
Part 55 license because he/she was not performing licensed duties at the time of the test (see
2.4.2.A.3). The guidance for processing these FFD cases is located in section 2.4.4.
A. The requirements in 10 CFR Part 55 require, in part, that licensed operators:
1. Observe all applicable rules, regulations, and orders of the Commission;
2. Shall not use, possess, or sell illegal drugs; and
3. Shall not perform activities authorized by a license issued under 10 CFR Part 55
while under the influence of alcohol or any prescription, over-the-counter, or illegal
substance that could adversely affect his or her ability to safely and competently
perform his or her licensed duties.
a. Activities authorized by an operator’s license include, but are not limited to:
1) Standing watch as a licensed operator;
2) Standing watch in a licensed operator position and peer checking other
licensed operators performing licensed activities;
3) Performing certain work control activities (which the facility licensee requires
an individual to hold a 10 CFR 55 license) such as authorizing tag-outs or
acting as work control supervisor; and
4) Supervising or performing fuel movements in the reactor core or moving
spent fuel assemblies in the spent fuel pool.
b. Activities such as requalification training, licensed operator turnover (individual
has not yet taken the watch) or processing into the protected area through
security are not considered activities authorized by the license.
B. The NRC should ensure that the facility licensee takes the required action in accordance
with 10 CFR Part 26 as applicable.
C. Generally, there will be no enforcement action taken against the facility licensee
because the incident is not indicative of a programmatic failure.
D. Section 55.53(j) prohibits a licensed operator (regardless if the operator license is active
or inactive (i.e., not terminated) from the use, sale, or possession of illegal drugs, and
from performing activities authorized by his or her license while under the influence of
alcohol or any prescription, over-the-counter, or illegal substance that could adversely
affect their ability to safely and competently perform their licensed duties.
10 CFR 55.53(j) includes a definition of the term “under the influence” as it applies to
alcohol and drugs, including prescription and over-the-counter drugs.

392

PART II: Topical Chapters

PART II-2: Reactor Topics

E. 10 CFR 55.53(d) requires that licensed operators, regardless if an operator license is
active or inactive (i.e., not terminated), observe all applicable rules, regulations, and
orders of the Commission.
F. 10 CFR 55.53(k) requires licensed individuals to participate in facility licensee drug and
alcohol testing programs established pursuant to 10 CFR Part 26.
An order would normally be issued revoking the Part 55 license whenever a licensed
operator refuses to participate in the facility licensee’s FFD program or substitutes,
subverts or adulterates a sample.
G. The Enforcement Policy addresses appropriate enforcement actions against individual
licensed operators who fail to meet FFD requirements and are in violation of their Part
55 license.
1. There may be cases where the NRC chooses to exercise discretion and issue a
Severity Level IV violation, e.g., where a licensed operator self-reports his or her
regulatory noncompliance. However, discretion would generally not be considered if
the licensed operator self-reports during or after the conduct of a Part 26 drug or
alcohol test.
2. A prohibition order is normally appropriate when a licensed individual has a second
confirmed positive drug or alcohol test result, and twice violates their Part 55
regulations, including during an assessment or treatment period. This would
generally be a 5-year ban from all NRC-licensed activities.

Preparing Licensed Operator FFD Enforcement Actions
A. Upon notification that a licensed operator tested positive during FFD testing, the
Region’s DRS Operator Licensing Branch typically sends the licensee a standard letter
with a request for additional information, seeking details in writing from the licensee
regarding the positive test and the operator's FFD testing history. The NRC letter shall
request that the facility licensee provide a copy of the NRC letter, as well as the facility’s
response to the NRC letter, to the affected licensed operator. The NRC letter should
inform the facility that if it is unwilling to provide this information to the operator, then the
NRC will provide the information to the licensed operator, as part of the operator's
docket file.
B. FFD actions should be coordinated and reviewed according to the following guidelines:
1. The operator licensing staff in NRR and NSIR FFD staff should be consulted/notified
when the region has determined that a licensed operator may have violated the drug
and alcohol provisions of the facility licensee’s FFD policy, attempted to subvert or
refused to participate, or violated other conditions of his or her license with regard to
FFD concerns.
2. If the facility licensee decides not to terminate the individual and maintain the license,
NRR shall be contacted. Discussions should be held between the region and
appropriate headquarter offices to:

393

PART II: Topical Chapters

PART II-2: Reactor Topics

a. determine the status of the individual’s license, the resolution should be
communicated to both the facility licensee and licensed individual; and
b. discuss possible appropriate corrective actions (e.g., Substance Abuse Expert
evaluation and recommendations concerning education, treatment, return to
duty, follow-up drug and alcohol testing and aftercare, and the NRC’s review of
appropriate medical records, etc.).
C. Fitness for duty actions against licensed operators are not processed like other
escalated actions.
1. Section 26.719 requires the facility licensee to report licensed operators FFD policy
violations to the NRC Operations Center within 24 hours of discovery.
2. The NRC will normally take enforcement action based on this notification without
conducting an inspection. However, depending on the circumstances, OI might
perform an investigation.
D. Use the appropriate Appendix B cover letter.
E. In drafting the citation, it is important to note that the licensed operator may be in
violation of Part 55 license conditions, including, the operator’s:
1. Failure to observe an applicable rule, regulation or order of the Commission (10 CFR
55.53(d));
2. Use, sale, or possession of illegal drugs or use of alcohol (10 CFR 55.53(j)); or
3. Refusal to participate in the facility licensee’s FFD program (10 CFR 55.53(k)).
F. For violations of 10 CFR 55.53(j), i.e., use, sale, or possession of illegal drugs or use of
alcohol, two separate situations are possible:
1. The licensed operator uses, possesses, or sells illegal drugs, or consumes alcohol
within the protected area; or
2. The licensed operator performs licensed duties while under the influence of any
substance that could adversely affect an operator’s ability to safely and competently
perform licensed duties.

394

PART II: Topical Chapters

PART II-2: Reactor Topics

NOTES:
An “illegal drug” is defined in Section 26.5.
10 CFR 55.53(j) states that “under the influence” includes a licensed
operator exceeding, “as evidenced by a confirmed positive test, the lower
of the cutoff levels for drugs or alcohol contained in 10 CFR Part 26,
Appendix A . . . or as established by the facility licensee;” therefore,
performing duties immediately before or after submitting a urine sample
that later tests positive would be considered performing duties “under the
influence.”
G. To have submitted a urine sample that will test positive and performing licensed
activities are two separate actions; however, given the close relationship between action
and result, it is sufficient to cite both requirements and include both violations in the
“Contrary to” paragraph as examples of the same Severity Level III violation, e.g.:
10 CFR 55.53(j) prohibits the use of (illegal drug used in this case) and prohibits the
licensee from performing activities authorized by a license issued under 10 CFR Part 55
while under the influence of (illegal drug used in this case). “Under the influence” is
defined in 10 CFR 55.53(j) to mean that the “licensee exceeded, as evidenced by a
confirmed positive test, the lower of the cutoff levels for drugs or alcohol contained in 10
CFR Part 26, Appendix A, of this chapter, or as established by the facility licensee.”
Contrary to the above, the licensee violated 10 CFR 55.53(j), as evidenced by the
following examples:
a. The licensee used (substance) as evidenced by a confirmed positive test for that
drug resulting from a urine sample submitted on (date); and
b. The licensee performed licensed duties on (date) immediately before (after) the
submission of a urine sample which indicated that the licensee was under the
influence of alcohol (name of drug).
This is a Severity Level III violation. (Supplement 6.4.c)
H. For violations of 10 CFR 55.53(k)), i.e., refusing to participate in the facility licensee’s
FFD program, the citation should use the following format:
10 CFR 55.53(k) requires that licensed operators participate in the drug and alcohol
testing programs established by the Part 50 licensee pursuant to 10 CFR Part 26.
Contrary to the above, on (date), [insert operator name] did not participate in (cooperate
with) the [insert facility name] (alcohol) program on (date) in that [describe what
happened].
This is a Severity Level III violation. (Supplement 6.4.c)

395

PART II: Topical Chapters

PART II-2: Reactor Topics

Processing Procedure for Licensed Operators
A. Generally, enforcement actions issued to licensed operators for failures to comply with
facility licensees’ FFD programs (regardless of severity level) are required to be paneled
via a full or modified panel (see section 2.4.4.C).
There is no violation if the licensed operator was not performing licensed activities at the
time of the FFD test (see section 2.4.2.A.3 for more information). For these particular
cases, a panel is not necessary. The regions shall issue a close-out letter. HQ
concurrence is not necessary; however, the OE assigned specialist shall be placed on
distribution. For tracking and trending purposes, the Region shall assign the case an EA
number and request an IATS number from OE.
B. The Region shall open a case in EATS and track the case using the EA number.
1. For enforcement timeliness metrics purposes, the start time should be upon receipt
of written confirmation of the positive FFD determination from the reactor licensee
(i.e., the receipt of the licensee letter in response to the NRC’s standard questions).
2. For cases in which OI opens an investigation, the start date will be the date of
issuance of the OI report.
C. A modified panel (no EAW required) can be held if: 1) the case meets the modified
panel criteria, 2) the individual has no prior FFD violation and 3) either: the facility
licensee terminates the individual, or keeps the individual and terminates their license
then;
1. The Region may provide the licensee’s letter with details of the positive FFD test
result and the individual's FFD history to the modified panel participants.
a. the licensee's letter explaining the circumstances and additional information must
be redacted of all personally identifiable information and placed in ADAMS as
non-publicly available so that it can be referenced in EATS.
b. The Region should also provide its proposed/draft NOV.
1) It is recognized that the Region’s draft enforcement action may be
incomplete, as it is provided prior to the outcome of the choice call for cases
where escalated action is warranted.
2) If there are disagreements on the overall enforcement strategy, a full panel
shall be convened, and an enforcement action worksheet supplied to the
appropriate offices.
D. The OE Enforcement Specialist shall open an IA number in IATS and provide this
number to the Region’s Enforcement Coordinator.
E. If the panel determines that a violation did not occur and there is no past history of FFD
failures, the Region may proceed with issuance of the close-out letter. No HQ
concurrence is required; place the assigned OE specialist on distribution.
396

PART II: Topical Chapters

PART II-2: Reactor Topics

F. If this is the first FFD violation and the facility licensee is keeping both the individual and
license, then the Regions are encouraged to send the individual a conference letter and
hold a PEC.
G. If an escalated action is warranted and the Region is not requesting a conference, the
Region should conduct a choice call with the individual to convey the following:
1. The NRC was notified via a letter from the facility licensee of a confirmed positive
FFD determination, and based on this information as well as the additional
information reviewed as a result of this occurrence; the NRC has identified an
apparent violation (AV) of NRC requirements. The individual should be advised that
he/she may obtain a copy of the notification letter that was sent to the NRC by his
employer and the licensee's response to the additional information requested by the
NRC, either from his employer or from the NRC. The specific details of the AV and
the general NRC enforcement process should be discussed with the individual at this
time.
2. Explain the enforcement action to the individual (e.g., escalated enforcement, no civil
penalty, etc.). If the individual has more questions, you can direct them to the
“Issued Significant Enforcement Actions” webpage (http://www.nrc.gov/aboutnrc/regulatory/enforcement/current.html).
3. Discuss the PEC option and ask if they are interested in pursuing it.
a. If the licensee terminates the individual or his/her license, inform the individual
that the NRC has enough information to proceed with issuance of its final
enforcement action and believes that a PEC is not necessary.
4. An ADR offer would only be applicable if OI performed an investigation. However,
generally ADR would not be offered unless there were extenuating circumstances
discovered during the investigation which would warrant the ADR offer.
5. If the licensed operator requests that the apparent violation be documented in
writing, then the Region should prepare a choice letter and send it to the individual.
HQ’s review is not required for this choice letter.
6. If the licensed operator requests a PEC, then the PEC should be held in accordance
with the following guidelines:
a. The PEC would be closed to public observation due to the likely discussion of
personal privacy/medical information;
b. The PEC shall be transcribed;
c. Limit the number of attendees at the PEC (e.g., a Regional Division Director, an
Operator Licensing Branch Chief, a Regional Attorney, Regional Enforcement
Officer and a HQ representative);
d. The Region should issue a Meeting Announcement in accordance with
Management Directive 3.5, “Attendance at NRC Staff Sponsored Meetings,” and
applicable Regional Office Instructions;
397

PART II: Topical Chapters

PART II-2: Reactor Topics

e. The licensed operator may choose to bring a personal representative to the PEC;
and
f.

Because the licensed operator may present information of a medical related
basis for the apparent violation (or lack thereof), the Region should consider the
need for subsequent review of this information by an NRC medical consultant.

7. The following are some suggested PEC questions, these may or may not apply to all
cases:
•

Do you agree with the characterization of the information presented with respect
to the apparent violation?

•

Do you understand the basis for the potential violation of NRC regulations with
respect to the conditions of your license?

•

Do you dispute, disagree, or require clarification of the information presented?

•

Do you understand the significance and the potential consequences associated
with your actions that led to the positive FFD test results?

•

Why did this occur?

•

Why did you not report your condition to your supervisor, security, or medical
staff prior to accessing the site?

•

We know what subsequent actions were taken by the facility with respect to the
FFD program and that a medical review by the Medical Review Officer (MRO)
and Substance Abuse Expert (SAE) was conducted; however, what personal
actions have you resolved to take or plan to take to address this issue?

•

What assurance do we have that this event would not happen again?

•

Why should we allow you to return to licensed duties?

•

What could you do to restore the trust and confidence the public and the NRC
has in you as a licensed operator, that you will follow all the rules and regulations
and conditions of your license to safely and effectively perform you licensed
duties?

H. Once the licensed operator responds in writing or attends a PEC, a short caucus may be
held, or a summary of the response drafted and emailed to panel participants to affirm
the action agreed upon during the initial panel. This action should be documented in
EATS.
1. If a modified panel was originally held, a re-panel is not necessary. The Region
should proceed with issuance of the final action that was agreed upon by the
modified panel process, without any further HQ review.

398

PART II: Topical Chapters

PART II-2: Reactor Topics

2. If a regular panel was held, the final action should be sent to HQ for appropriate
concurrence and/or signature (if an order).
I.

If the individual declines the opportunity to attend a PEC or respond in writing, the
Region should proceed with the issuance of the final action. HQ’s review or concurrence
of the final enforcement action is not required for cases that used the modified panel
format. Concurrence is required for cases in which the regular panel process was used.

J. OGC will not normally provide comments for Severity Level III NOVs without a civil
penalty or willfulness.
1. OGC review and statement of no legal objection is required on all orders.
2. OGC will review the proposed order and provide comments to OE within 10 working
days of receipt of the package.
K. The NRR Enforcement Coordinator should ensure that the operator licensing staff in
NRR reviews the proposed action with a focus on ensuring that the technical accuracy of
the violations and the significance of the violations with respect to safety have been
properly evaluated from an overall agency perspective.
1. Comments should be provided (verbally, electronically, or in writing) to assigned
enforcement specialist within 5 working days. The NRR Enforcement Coordinators
normally provide comments for FFD cases.
2. Comments on immediately effective orders should be expedited.
L. The NSIR Enforcement Coordinator should ensure that the staff in NSIR reviews the
proposed action with a focus on ensuring that the technical accuracy of the violations
and the significance of the violations with respect to safety have been properly evaluated
from an overall agency perspective.
1. Comments should be provided (verbally, electronically, or in writing) to the assigned
enforcement specialist within 5 working days. The NSIR Enforcement Coordinator
normally provides comments for FFD cases.
2. Comments on immediately effective orders should be expedited.
M. OE will consider timely OGC and program office comments and revise the enforcement
action, as appropriate.
1. If necessary, OE will forward the revised action to the region indicating where and
why the action was revised.
2. The Director, OE, or designee shall be briefed on any comments from other offices
not incorporated into the final enforcement action.
N. The region should review the revised action and, if possible, provide concurrence on
headquarter changes or provide concurrence as soon as possible.

399

PART II: Topical Chapters

PART II-2: Reactor Topics

Licensee Notification, Mailing, and Distribution of FFD Actions
Licensee notification, mailing, and distribution should be made according to the following
guidelines:
A. Enforcement actions against licensed operators should be mailed to individuals by either
Certified Mail (Return Receipt Requested) or Express Mail.
B. Enforcement actions against licensed operators (including any enclosures) can be made
available to the Public (ADAMS, PII redacted as appropriate), including the Part 50
licensee, upon issuance so long as the individual was given an opportunity to attend a
PEC, given a choice call or provide a written response prior to issuance of the final
action.

Licensed Operator Response to FFD Action
A. Licensed operators are generally required to respond to NOVs within 30 days.
B. Licensed operators are typically not required to respond to NOVs where the operator’s
license has expired or when the facility terminates the individual and/or the license,
unless the licensed operator contests the action.
C. A licensed operator’s response to a NOV can either (a) accept the violation or (b)
contest the staff’s facts and conclusions regarding the NOV.
1. If the licensed operator does not dispute that the violation occurred as stated in the
NOV:
a. The regional office is to review the licensed operator’s response for the adequacy
of the corrective action and should request additional information from the
licensed operator if necessary.
b. Licensed operator’s responses should normally be acknowledged by the region
within 30 days after their receipt.
1) The acknowledgment letter should be sent to the licensed operator.
2) A copy of the NOV, the operator’s response, and the acknowledgment letter
should be made available to the Public with the home address deleted.
2. If the licensed operator denies the violation:
a. The region should coordinate the agency’s response to the licensed operator
with OE.
b. The licensed operator’s response should be carefully reviewed to ensure that the
staff’s initial action was appropriate.

400

PART II: Topical Chapters

PART II-2: Reactor Topics

c. The region should prepare a response to the licensed operator addressing the
licensed operator’s points of contention and the acceptability of the corrective
action.
1) The licensed operator’s home address should be deleted from all documents
made available to the Public.
2) If the licensed operator’s response does not present additional information,
then the region will prepare a brief response addressing the licensed
operator’s points of contention.
3) Even if the licensed operator’s response does not present new information, if
an error in the enforcement action is identified, it must be corrected.
4) If the licensed operator provides a sufficient basis to withdraw the violation,
then the violation should be withdrawn and not made available to the Public.
5) The region should normally respond to the licensed operator’s responses
within 30 days.

401

PART II: Topical Chapters

PART II-2: Reactor Topics

Emergency Preparedness
This section provides specific guidance concerning enforcement practices for emergency
preparedness issues.
A. Normally emergency preparedness findings are evaluated through the SDP and
enforcement actions are taken based on the SDP outcome.
B. If findings are not addressed through the SDP, Section 6.6 of the Enforcement Policy
provides examples of violations in each of the four severity levels as guidance in this
activity area.

402

PART II: Topical Chapters

PART II-3: Materials Topics

PART II - 3 MATERIALS TOPICS
This section provides information regarding:
•

enforcement topics specifically related to materials and fuel cycle operations

403

PART II: Topical Chapters

PART II-3: Materials Topics

Loss, Abandonment, or Improper Transfer or Disposal
of Regulated Material
A. The guidance in this section applies to violations that involve loss, abandonment, or
improper transfer or disposal of regulated material. It does not apply to violations that
involve security and control of regulated material unless the failure to secure or control
results in loss, abandonment, improper transfer or disposal, or other unauthorized
release of regulated material.
NOTE:
Normally, the lost source policy does not apply to generally licensed devices
that are not required to be registered in accordance with 10 CFR
31.5(c)(13)(i). Moreover, the loss of generally licensed devices that are not
required to be registered will normally be dispositioned at severity level IV.
When a civil penalty is warranted based on the merits of the case, the
guidance in Section 3.1.2 (below) should be followed.
B. Violations of NRC requirements involving loss, abandonment, or improper transfer or
disposal of regulated material containing NRC-licensed material will be considered for
escalated enforcement action as follows:
1. Such violations, in accordance with the Enforcement Policy, “are treated separately,
regardless of the use or the type of licensee.”
2. The staff should assign a severity level to the violation that appropriately reflects the
normal factors for considering significance, including:
a. A consideration of the chemical and physical characteristics of the radioactive
material;
b. Safety and environmental significance;
c. Whether the circumstances surrounding the violation, represents an isolated,
rather than programmatic, weakness; and
d. Whether the staff should increase the significance when a violation is willful.
NOTE:
If the licensee exercises adequate security and control but the
source/device is still lost (e.g., stolen), there is no violation and,
therefore, no enforcement issues.
C. Consultation with OE is required for all cases involving loss, abandonment, or improper
transfer or disposal of regulated material.
D. All cases being considered for disposition at Severity Level IV should be coordinated
with OE (normally by phone or e-mail) and should receive an EA number.
404

PART II: Topical Chapters

PART II-3: Materials Topics

Violation Examples
A. The following are examples of Severity Level III violations involving the loss,
abandonment, or improper transfer or disposal of regulated material:
Example 1:
A licensee failed to maintain control of a portable moisture density gauge containing 8
mCi of Cs-137 and 40 mCi of Am-241 resulting in the loss of the gauge. The gauge was
recovered eight hours later at the same time that the licensee was reporting the loss to
the NRC. The NRC issued a Severity Level III violation and proposed imposition of a
civil penalty.
Example 2:
A licensee failed to maintain control of a portable moisture density gauge containing 8
mCi of Cs-137 resulting in the gauge being stolen. The amount of the radioactive
material was less than 1000 times the 10 CFR Part 20, Appendix C value and the
licensee had a functional program to detect and deter security violations that included
training, staff awareness, detection, and corrective action; however, the violation was
significant since the gauge contained more than a nominal amount of material. The
NRC issued a Severity Level III violation and proposed imposition of a civil penalty.
Example 3:
A licensee failed to maintain control of brachy-therapy sources containing 7.7 mCi of Ir192 resulting in the loss of the material. The NRC issued a Severity Level III violation
and proposed imposition of a civil penalty.
B. The following are examples of Severity Level IV Violations involving the loss,
abandonment, or improper transfer or disposal of SSDs:
Example 1:
A licensee lost a static eliminator containing 10 mCi of Po-210. Due to the low actual
safety significance associated with the isotope and small amount of material and the
difficulty in gaining access to material, the NRC issued a Severity Level IV violation.
Example 2:
A licensee lost a sealed source containing 0.7 mCi of I-125. Due to the low actual safety
significance associated with the small amount of material, the fact that the quantity was
less than 1000 times the 10 CFR Part 20, Appendix C value, and the licensee had a
functional program, the NRC issued a Severity Level IV violation.

405

PART II: Topical Chapters

PART II-3: Materials Topics

NOTE:
The December 18, 2000, (65 FR 79139) change to the base civil penalty
structure considers both the cost of proper disposal and the relative risk to
the public from sources that are lost, abandoned, or improperly transferred or
disposed of. The Commission believes that a base civil penalty equivalent to
three times the cost of proper disposal will provide for sufficient deterrence
and an economic incentive for licensees to expend the necessary resources
to ensure compliance.

Civil Penalties for Violations Involving Loss, Abandonment,
Improper Transfer or Disposal of Regulated Material
A. Civil penalties for violations that involve loss, abandonment, or improper transfer or
disposal of regulated material are assessed:
1. Using the normal civil penalty assessment process:
2. Under Section 8.0, Table A, Item “f,” of the Enforcement Policy; or
3. By considering the actual cost of proper disposal, regardless of the type of licensee
or the use of the regulated material.
B. For those instances where a licensee has lost NRC regulated material, but took
immediate action to recover it, in a timely matter, with little or no risk to the public while
the material was not in the licensee’s control (loss of control vs. loss of material), the
normal civil penalty assessment process will typically be used. Notwithstanding the
normal civil penalty assessment process, in cases where a licensee has lost required
control of its material, the NRC may exercise discretion and impose a civil penalty.
C. In cases where there is an actual loss of material (e.g. loss, abandonment, improper
transfer or disposal), Table A.f (Section 8 of Enforcement Policy) is typically used to
assess at least a base civil penalty. The three levels of civil penalties listed in Table A.f
are intended to correlate the civil penalty amount to the costs of properly disposing of the
regulated.
1. Regulated material containing small amounts of radioactive material, such as gas
chromatographs, and devices containing hydrogen-3 (tritium) have a base civil
penalty in the amount of $7,000 for a severity level I violation, $5,600 for a severity
level II violation, and $3,500 for a severity level III violation.
2. Regulated material containing at least 370 MBq (10 mCi) of cesium-137, 3.7 MBq
(0.1 mCi) of strontium-90, 37 MBq (1 mCi) of cobalt-60, and 37 MBq (1mCi) of
americium-241 or any other transuranic (i.e., element with atomic number greater
than uranium (92)) are considered to present a higher risk for potential exposure to
the public and for loss of property (due to contamination) if the material is lost,
abandoned, or improperly transferred or disposed of. Based on the higher risk,
violations involving loss, abandonment, or improper transfer or disposal of regulated
material in this category have been assigned a base civil penalty amount of $17,000
406

PART II: Topical Chapters

PART II-3: Materials Topics

for a Severity Level I violation, $13,600 for a Severity Level II violation, and $8,500
for a Severity Level III violation.
3. With the exception of regulated material containing hydrogen-3 (tritium), the highest
activity regulated material (i.e., those with activities greater than 3.7×104 MBq (1
Curie)) have been assigned a base civil penalty amount of $54,000 for a Severity
Level I violation, $43,200 for a Severity Level II violation, and $27,000 for a Severity
Level III violation.
D. Adjustment of Civil Penalty Amounts Based on Disposal Costs:
1. In assessing the amount of a civil penalty, the NRC may consider information
concerning the estimated or actual cost of authorized disposal for the particular
material in question instead of using the civil penalty amounts in Tables A.f and B of
the Enforcement Policy.
a. The estimated or actual cost of authorized disposal would be the estimated or
actual cost for an individual or organization that found and took possession of the
regulated material.
b. Normally, the burden of determining the estimated or actual cost of authorized
disposal rests with the licensee.
•

If a licensee requests that the civil penalty amount be reduced based on the
estimated or actual cost of disposal, the licensee should provide a copy of a
written estimate from a waste disposal site, waste broker, or the regulated
material manufacturer.
NOTE:

NRC will typically adjust the civil penalty amount to correlate to one of the
base civil penalty amounts for violations involving loss, abandonment, or
improper transfer or disposal. For example, if the base civil penalty
amount is $27,000, based on the violation being at Severity Level III and
involving material described in Table Af.1., and a licensee provides
adequate information demonstrating that three times the cost of
authorized disposal is $6,000, the NRC would likely assess a $8,500 civil
penalty (the amount a Severity Level III violation for material described in
Table A.f.2.). In cases that the NRC decides to mitigate a civil penalty,
the NRC will only mitigate the civil penalty down to the lowest base civil
penalty in Tables A.f and B, currently $3500.
2. The licensee may provide the information in (1) above, in its response to a choice
letter, a proposed action, or at a pre-decisional enforcement conference (PEC).
3. NRC may increase or decrease the value of the civil penalty if it has reliable specific
information on the expected cost of disposal (e.g., assessment of a civil penalty
amount for a similar case).

407

PART II: Topical Chapters

PART II-3: Materials Topics

4. Based on current information and recent cases, the NRC has determined that the
expected authorized costs of disposal of portable moisture density gauges containing
approximately 10 mCi of Cs-137 and 40 mCi of Am-241 is less than $1,000.
Therefore, rather than have licensees provide disposal information for such cases,
the NRC will typically propose imposition of civil penalties in the amount $3,500 for
Severity Level III violations involving the loss, abandonment, or improper transfer or
disposal of these types of material.
5. The NRC will evaluate the merits of each specific case and may reduce or increase
the amount of a civil penalty based on other information, such as the actual
consequences of the loss, abandonment, or improper transfer or disposal.
NRC would typically only consider reducing the amount of a civil penalty for
identification or corrective action if such actions were extraordinary.
E. Choice Letters: In some cases, NRC may have sufficient information to make an
enforcement decision and does not need to hold a PEC. In such cases, NRC may send
a choice letter to the licensee.
1. If the staff is considering a civil penalty, the choice letter should explicitly state that
NRC is considering the use of discretion in accordance with the Enforcement Policy
to issue a civil penalty.
2. The standard choice letter may include an optional paragraph that informs the
licensee that the licensee may submit information regarding the expected costs of
authorized disposal.
F. Conference Letters: If the staff chooses to invite the licensee for a conference, the
licensee should be informed that the NRC:
1. Should normally proposes imposition of a civil penalty of at least the base amount for
violations involving the loss, abandonment, or improper transfer or disposal of
regulated material (loss of material); and
2. May consider adjusting the civil penalty amount to a more appropriate base amount if
a licensee can demonstrate that three times the actual cost of disposal would be
significantly less than the base amount.
NOTE:
The license may provide information regarding the actual expected costs
of authorized disposal in its response to a choice letter, a proposed
action, or as part of a PEC.
G. Cover letters for NOVs with civil penalties typically discuss the complete civil penalty
assessment process, including:
1. How NRC considered credit for identification and corrective action; and
408

PART II: Topical Chapters

PART II-3: Materials Topics

2. If applicable, the use of discretion in consideration of the actual costs of disposal in
determining the civil penalty.

409

PART II: Topical Chapters

PART II-3: Materials Topics

Transportation
A. 10 CFR Part 71 establishes the requirements for:
•
•
•
•

Packaging;
Preparation for shipment;
Transportation of licensed material; and
The standards for NRC approval of packaging and shipping procedures for fissile
material and for quantities of other licensed material in excess of Type A quantity.
NOTE:
Section 6.8 of the Enforcement Policy provides examples of violations in
each of the four severity levels as guidance in this activity area.

B. The packaging and transport of licensed material is also subject to:
•
•
•

Other parts of Title 10 (e.g., Parts 20, 21, 30, 39, 40, 70, and 73);
The regulations of other agencies (e.g., U.S. Department of Transportation (DOT)
and the U.S. Postal Service (USPS)) or Agreement States having jurisdiction over
means of transport; and
The jurisdiction of individual states which may take enforcement action for
transportation incidents that also involve violations of NRC, Agreement State, or
DOT requirements.

C. Reactor transportation cases are normally addressed under the Significance
Determination Process (SDP).

Memorandum of Understanding (MOU) Between NRC and DOT
A. The MOU between the NRC and DOT is included on the Enforcement Web site.
B. In accordance with the MOU:
1. DOT is required to regulate safety in the transportation of hazardous materials,
including radioactive materials;
2. NRC is authorized to license and regulate the receipt, possession, use, and transfer
of "byproduct material," "source material," and "special nuclear material."
3. Each agency has its own inspection and enforcement programs within its jurisdiction
to assure compliance with its requirements.
a. The NRC will assist DOT, as appropriate, in inspecting shippers of fissile
materials and other radioactive materials exceeding Type A limits.
b. The DOT and the NRC will consult with each other on the results of their
respective inspections in the areas where the results are related to the other
agency's requirements.
410

PART II: Topical Chapters

PART II-3: Materials Topics

c. Each agency will take enforcement action, within the limits of its authority, as it
believes appropriate.
4. In accordance with Section IV of the MOU regarding formalized working
arrangements:
a. The NRC normally carries out enforcement actions for violations of the
requirements of 10 CFR 71 and 49 CFR (except 49 CFR Parts 390 through 397)
by NRC licensees.
b. DOT normally carries out enforcement actions for violations of 49 CFR (including
Parts 390 through 397) by carriers of radioactive materials and shippers of
radioactive materials from Agreement States, or any other shippers otherwise not
subject to NRC requirements (shippers of radium, for example).

NRC Action in Conjunction with State Action
A. When a State takes an enforcement action (e.g., the imposition of a civil penalty or
suspension or revocation of the licensee's burial permit or both) against a licensee for
activities that also represent violations of NRC requirements, the following guidance
should be used:
1. Individual States may take enforcement action against shippers for transportation
incidents that also involve violations of NRC, Agreement State, or DOT
requirements.
2. Notwithstanding the severity level of a violation, the NRC will not normally propose a
civil penalty in cases where a State issues a civil penalty.
a. Even if a State has taken enforcement action for the violation, the NRC may
consider enforcement action beyond an NOV, such as the issuance of a civil
penalty or order, if the violation is repetitive.
b. If the region believes that a civil penalty should be assessed in a particular case,
the region should submit a recommendation to the Director, OE.
3. The region should submit NOVs with Severity Level I, II, or III violations to OE for
review and approval prior to issuance.
4. The region may issue NOVs with Severity Level IV violations without prior review and
approval by the Director, OE, or the DEDOs.
5. Regardless of the severity level, all NOVs and accompanying documents should
require the licensee to submit to the office issuing the NOV a description of the
corrective action taken or planned to prevent similar future violations.
a. This corrective action will be reviewed by the region.
b. If the region determines that the corrective action is unsatisfactory, the region
should consider further enforcement action to ensure compliance with NRC
regulations.
c. A PEC does not need to be held if:
•

The licensee understands the significance of the violation; and
411

PART II: Topical Chapters

•

PART II-3: Materials Topics

The region is satisfied with the corrective action.

d. NOVs including Severity Level III violations should:
•
•
•
•

Be coordinated with OE;
Have an EA number;
Be signed by the Regional Administrator; and
Be sent subsequently to OE for information.

B. Violations that are discovered by the NRC at the licensee's facility, or in other cases
where the State has not taken action will continue to be processed in accordance with
normal NRC policy and practice.

Inaccessible Areas with Excessive Radiation Levels
When the area of a transport vehicle with excessive radiation levels is not easily accessible,
consideration may be given to categorizing the violation at a lower severity level.

Exercise of Enforcement Discretion Involving Transportation Casks
For detailed guidance related to exercising discretion for cases involving transportation casks,
please refer to Part I of the Enforcement Manual.

412

PART II: Topical Chapters

PART II-3: Materials Topics

Medical
This section provides specific guidance concerning enforcement practices related to medical
cases.

Actions Involving Written Directive Requirements
A. Section 6.3 of the Enforcement Policy lists examples of severity levels for violations
associated with the requirements to use written directives for certain medical uses of
byproduct material.
1. For any administration that requires a written directive to be prepared in accordance
with 10 CFR 35.40, licensees must develop, implement, and maintain written
procedures in accordance with 10 CFR 35.41.
2. The written procedures must provide high confidence that each administration of
byproduct material, or radiation from byproduct material, is in accordance with the
written directive.
B. The Enforcement Policy places greater emphasis, and attaches greater importance, to
violations that are indicative of, or flow from, deficiencies of a programmatic nature.
NOTE:
Substantial programmatic weaknesses apply in cases where the licensee
fails to establish or effectively implement one or more of the requirements in
10 CFR 35.40 or 35.41. Programmatic weakness indicates that the failure is
more widespread than simple occasional human error, e.g., a situation where
licensee employees are trained to check the calculation of radiation dose to
be administered for a certain treatment and normally do so; however, there
have been failures to meet this requirement on a number of occasions
because of staffing shortages, and one of those occasions resulted in a
medical event.
1. Programmatic deficiencies have, as their root cause, an underlying weakness in
some part of the licensee's program for preventing medical events that is more
widespread than simple occasional human error. Examples include, but are not
limited to:
a. Failure to develop and implement adequate written procedures for
administrations that require a written directive
b. Failure to train personnel on the procedures
c. Failure to follow procedures
2. Programmatic deficiencies are correctable, and pose the risk of additional
occurrence if effective corrective action is not taken.

413

PART II: Topical Chapters

PART II-3: Materials Topics

3. A decision on whether to categorize a violation resulting in a medical event at
Severity Level I, II, III or IV must consider both the consequences and the isolated or
programmatic nature of the violation.
a. If the medical event was caused by an isolated failure and there were only limited
medical consequences based on a medical consultant's report, then the violation
would be categorized at Severity Level IV, e.g., the administration of a dosage of
greater than 30 microcuries of sodium iodine I-131, that was not within 20% of
the dosage prescribed by the authorized user, would meet the criteria for a
medical event.
b. If the medical event was caused by a one-time failure to determine the activity of
the dosage prior to the administration, and the medical consultant expected
limited consequences, the violation would be categorized at severity level IV.
c. If the medical consultant found that the consequences were not limited, or if the
violation appeared to result from a substantial programmatic failure or a
programmatic weakness, then the violation would be categorized at Severity
Level III or greater.

Severity Level for Failure to Report A Medical Event
A. 10 CFR 35.3045 requires that medical events be reported to the NRC. When there is a
failure to report a medical event to the NRC, the following considerations apply:
1. Failure to report a medical event is normally categorized at Severity Level III.
2. If no report has been made to NRC at the time that NRC becomes aware of the
medical event, the violation normally should be categorized at Severity Level III.
3. If the report to NRC is late or incomplete but is nonetheless the vehicle by which
NRC becomes aware of the medical event, the violation may be categorized at
Severity Level IV provided that the late or incomplete nature of the report did not
substantially diminish the NRC's ability to determine the significant facts of the
medical event once the NRC became aware of it.
B. 10 CFR 35.3045 requires that medical events be reported to:
1. The referring physician; and
2. Either the patient, or the patient's responsible relative or guardian.
C. An exception in 10 CFR 35.3045(e) provides that the patient need not be notified if the
referring physician informs the licensee that, based on medical judgment, telling the
patient would be harmful.
D. When there is a failure to report a medical event to the referring physician or the patient
or the patient's responsible relative or guardian, the following considerations apply:
1. If no report has been made to the referring physician, the violation normally should
be categorized at Severity Level III. (The regulation does not specify that the report
414

PART II: Topical Chapters

PART II-3: Materials Topics

to the referring physician needs to be in writing; therefore, an oral report to the
referring physician is sufficient.)
2. If neither an oral nor a written report has been made to the patient or the patient's
responsible relative or guardian, and the referring physician did not invoke the
exception in 10 CFR 35.3045(e) as it applies to the patient, the violation normally
should be categorized at Severity Level III.
3. If the licensee made an oral report to the patient or the patient's responsible relative
or guardian, but failed to make a written report as required by 10 CFR 35.3045(d),
the violation may be categorized at Severity Level IV provided that the licensee
promptly provides the written report once the matter is brought to the licensee's
attention.

Reporting Final Adverse Actions Against Healthcare Practitioners,
Providers, or Suppliers to the Healthcare Integrity and Protection
Data Bank
A. “Healthcare Integrity and Protection Data Bank for Final Adverse Information on Health
Care Providers, Suppliers and Practitioners (HIPDB),” found in 45 CFR Part 61, requires
federal agencies to report certain final adverse actions taken against healthcare
providers, practitioners, and suppliers to the HIPDB.
The regulations in 45 CFR 61 define the types of final adverse actions that are
reportable to the HIPDB.
The reportable actions must be formal or official actions such as the revocation or
suspension of a license, reprimands, censure, probation, other negative actions or
findings that limit the scope of practice, and other adjudicated actions or decisions.
B. The following final adverse actions taken by the NRC must be reported to the HIPDB:
NOTE:
The scope of actions that must be reported to the HIPDB, is defined in very
broad terms.
1. Orders suspending or revoking a license, excluding Orders suspending a license due
to non-payment of fees
2. Orders modifying a license that limit the scope of practice of the licensee
3. NOVs with associated civil monetary penalties
4. CALs that limit the scope of practice of the licensee
5. Orders to individuals prohibiting involvement in NRC-licensed activities

415

PART II: Topical Chapters

PART II-3: Materials Topics

6. Termination of a license by a licensee for the purpose of avoiding enforcement
actions
C. The following actions do not need to be reported to the HIPDB:
1. NOVs with no associated civil penalty
1. Licensee corrective action plans
2. Non-publicly available final adverse actions
D. For those actions where the reportability of the action is questionable, the action and the
associated background information should be provided to OGC for the final
determination of reportability.

3.3.3.1

Entities that are Considered Healthcare Practitioners, Providers, or
Suppliers

A. The reportability of the actions described in the previous section is limited to those
actions taken against NRC licensees, and individuals employed or contracted by
licensees, that satisfy the definition of a healthcare practitioner, provider, or supplier as
prescribed in 45 CFR 61.
B. NRC licensees and individuals that satisfy the definitions prescribed in 45 CFR Part 6
are categorized as follows:
1. Healthcare practitioners:
a.
b.
c.
d.
e.
f.

Physicians
Technologists/technicians
Pharmacists
Nurses
Medical Physicists
Health Physicists

2. Healthcare providers:
a. Hospitals
b. Clinics
c. Mobile Medical Units
3. Healthcare suppliers:
a.
b.
c.
d.

3.3.3.2

Radiopharmaceutical Manufacturers
Radiopharmacies
Medical Source Replacement Contractors
Source Providers (e.g. Seeds)

Information to be Reported

A. 45 CFR 61 specifies the information that must be reported.
416

PART II: Topical Chapters

PART II-3: Materials Topics

1. This information is dependent on the entity involved and the type of action reported.
2. Optional information will be reported only if readily available.
B. HIPDB requires the NRC to provide certain information, such as birth date, gender,
Social Security Number, school attendance with dates, State license numbers, and
medical specialties that the NRC may not normally collect.
1. For final adverse actions resulting from enforcement actions, OE will collect the
additional information that is required as part of the final enforcement action.
2. The proposed action, e.g., NOV/CP or Order, will contain a paragraph requesting the
information to be provided as part of the response to the action.
a. The action will not be closed until the required information is received.
b. NMSS and/or the Regional Office will be responsible for collecting the data for
other reportable final adverse actions that did not result from an enforcement
action, and providing it to OE for entry into the database.
c. The required information must be forwarded to the OE Office Director within 10
calendar days of those actions being final.
C. Mandatory information that must be reported for an Individual includes:
•
•
•
•
•
•
•
•
•

Name, sex, date of birth
Social Security Number
Home address or address of record
Organization name and type
Occupation and specialty, if applicable
National Provider Identifier (NPI), when issued by the Health Care Financing
Administration (HCFA)
Name of each professional school attended and years of graduation
NRC license number, including field of licensure
With respect to the State professional license (including professional certification and
registration) on which the reported action was taken, the license number, the field of
licensure, and the name of the State or territory in which the license is held

D. Mandatory information that must be reported for an organization includes:
•
•
•
•
•

Name and business address of the organization
Federal Employer Identification Number (FEIN), or Social Security Number when it is
used by the subject as a Taxpayer Identification Number (TIN)
The NPI, when issued by HCFA
Type of organization
With respect to the State professional license (including professional certification and
registration) on which the reported action was taken, the license number, the field of
licensure, and the name of the State or territory in which the license is held

E. Mandatory information that must be reported for both an individual and an organization
includes:
417

PART II: Topical Chapters

•
•
•
•
•
•

3.3.3.3

PART II-3: Materials Topics

A narrative description of the acts or omissions and injuries upon which the reported
action is based
Classification of the acts or omissions in accordance with reporting codes provided in
the database
Classification of the action taken in accordance with the reporting code in the
database, and the amount of any monetary penalty resulting from the reported action
The date the action was taken, its effective date and duration
If the action is on appeal
Name, title, address, and telephone number of the responsible official submitting the
report

Information Collection

A. To request the information that the HIPDB requires but that the NRC does not normally
collect, one of the following paragraphs should be inserted in the proposed final adverse
action document after the paragraph that requires the licensee to submit a response:
1. For an individual, include:
In addition, 45 CFR Part 61, “Healthcare Integrity and Protection Data Bank for
Final Adverse Information on Health Care Providers, Suppliers and
Practitioners,” requires Federal Agencies to report certain final adverse actions
taken against healthcare providers, practitioners, and suppliers to the U.S.
Department of Health and Human Services’ Healthcare Integrity and Protection
Data Bank. Since the HHS Databank requires information that the NRC does not
normally collect, you are required to submit the following information with your
response: your date of birth; Social Security Number; sex; employment
organization name and type; Occupation and/or specialty; National Provider
Identifier (NPI), when the NPI is issued by the Health Care Financing
Administration (HCFA); name of each professional school attended and years of
graduation; professional certification and/or registration; your State license
number; your field of licensure; and the name of the State or territory in which
your license is held. This information should be provided on a separate sheet of
paper since it will not be publicly released. This enforcement action will not be
closed until this information is received.”
2. For an organization, i.e., a licensee, include:
“In addition, 45 CFR Part 61, “Healthcare Integrity and Protection Data Bank for
Final Adverse Information on Health Care Providers, Suppliers and
Practitioners,” requires Federal Agencies to report certain final adverse actions
taken against healthcare providers, practitioners, and suppliers to the U.S.
Department of Health and Human Services’ Healthcare Integrity and Protection
Data Bank. Since the HHS Databank requires information that the NRC does not
normally collect, you are required to submit the following information with your
response: Federal Employer Identification Number (FEIN), or Social Security
Number (when it is used as a Taxpayer Identification Number (TIN)); the National
Provider Identifier (NPI), when the NPI is issued by the Health Care Financing
Administration (HCFA); the type of organization; and the State professional
418

PART II: Topical Chapters

PART II-3: Materials Topics

license (including professional certification and registration) on which the
reported action was taken, the license number, the field of licensure, and the
name of the State or territory in which the license is held. This information
should be provided on a separate sheet of paper since it will not be publicly
released. This enforcement action will not be closed until this information is
received.”
B. When the NRC receives the response containing the information that the HIPDB
requires but that the NRC does not normally collect, the information should be scanned
into ADAMS; however, this information must be profiled as not publicly available.
C. A copy of the response containing the information that the HIPDB requires but that the
NRC does not normally collect, must be provided to the Office Director, OE, for entry into
the databank.

419

PART II: Topical Chapters

PART II-3: Materials Topics

Master Materials Licenses
A. A Master Materials License (MML) is a materials license (byproduct, source, and/or
special nuclear material), issued to a Federal organization, authorizing use of radioactive
material at multiple sites.
1. The MML remains an NRC licensee, and is required to meet NRC regulatory
requirements.
2. The MML authorizes the licensee to issue permits to multiple user sites (permittees)
for the possession and use of licensed material under the master license.
3. The MML obligates the licensee to have a centralized program that provides
oversight and internal licensee inspection of the MML permittees.
B. Where responsibilities are divided between the MML management and NRC, the division
of responsibilities and requirements for coordination are clearly defined and documented
in a Letter of Understanding (LOU) between NRC and the MML.
1. Responsibility for allegations and enforcement are activities that are divided between
the NRC and the MML.
2. Inspection activities, including reactive inspections and/or inspection frequencies are
not within the purview of the Office of Enforcement (OE), and will not be addressed
here.
C. The MML must have an enforcement program that commits to following NRC’s
Enforcement Policy to ensure that enforcement actions are consistent with the Policy
and regulations and are uniformly applied between the MML and its permittees.

Process for Dispositioning Violations
A. The MML
1. Based on the Enforcement Policy, when the MML identifies permittee violations of
NRC or license requirements that could result in escalated enforcement (SL III, SLII,
or SL I), the facts related to the case are provided to the appropriate NRC Regional
MML Project Manager (PM).
2. An MML is an NRC licensee. Reports and notifications, as described in the
regulations, must be made to NRC within the time frames specified in the regulation
(e.g., 20.2201 Reports of theft or loss of material). Reports and notifications from
permittees to the MML do not fulfill the responsibility of reporting to NRC.
3. The outcome of any NRC enforcement action against the MML depends, among
other things, on appropriate corrective actions implemented at the permittee level;
therefore, the MML is expected to ensure that permittees provide corrective actions
appropriate to their violations. Additionally, if the MML licensee’s performance
history (i.e., history is considered against MML actions only, not the actions of each
separate permittee) has indicated a failure to take steps to prevent recurrence of
420

PART II: Topical Chapters

PART II-3: Materials Topics

violations at other permittees, consideration may be given to the need for NRC to
request this additional information from the licensee for further consideration of any
corrective action credit and/or discretion not to cite the MML.
4. The MML may take whatever enforcement action it deems appropriate against its
permittee for violations of NRC regulations, license conditions, or conditions of the
permit. However, the MML may not issue a civil penalty to its permittee.
B. The NRC Project Manager (PM)
1. The PM coordinates any needed Regional Office follow-up of events or incidents
using the appropriate inspection guidance for MML licenses (at whatever frequency
the region and Program Office believes is appropriate).
a. Once the information has been gathered and reviewed, and apparent violations
that may result in escalated action are identified, the region should disposition
potential escalated violations through the normal enforcement process.
b. An Enforcement Action Worksheet is prepared, and an enforcement panel is
scheduled. The worksheet should include the MML and/or the permittees shortand long-term corrective actions appropriate to the violation(s).
2. Enforcement actions taken by NRC against the MML do not preclude the MML from
taking any action it deems necessary against its permittee for those violations. NRC
may issue a CP to the MML but will normally not take action against a MML
permittee.
C. NRC Enforcement Discretion
1. Exercise of Discretion to either escalate or mitigate enforcement sanctions is
addressed in Chapter 3 of the Enforcement Policy.
2. Discretion to mitigate an escalated enforcement action regarding an MML may be
considered when:
a. The violation was not willful
b. The MML has done a thorough investigation, and has reported their findings to
the MML PM
c. A source is not lost
3. Although these cases normally should result in a civil penalty of at least the base
amount, for MMLs, discretion to mitigate the enforcement sanction may be
considered when:
a. Based on the source activity/dose rate the violation would normally be
dispositioned as Severity Level III or Severity Level IV.
b. During the period of time that the location of the source was not known, workers
or members of the public were not likely to exceed the radiation dose described
in 10 CFR 20.1201 or 20.1301
421

PART II: Topical Chapters

PART II-3: Materials Topics

c. The final location of the source is believed to be in an area where it would be
unlikely for workers or members of the public to exceed the radiation dose
described in 10 CFR 20.1201 or 20.1301
4. NRC discretion to either mitigate or escalate an enforcement sanction would be
considered on a case-by-case basis when:
a. A source is lost, and the underlying violation was willful
b. There was an over-exposure of a worker or a member of the public; or
c. Based on the source activity/dose rate, the violation would normally be
dispositioned as SL I or SL II

422

PART II: Topical Chapters

PART II-3: Materials Topics

Miscellaneous Materials Operations
This section provides specific guidance concerning enforcement practices for miscellaneous
materials operations.

Activities of Unqualified Persons
A. When taking escalated enforcement action for violations involving unauthorized and
potentially unqualified persons using material or performing licensed activities,
consideration should be given as to whether the individual in question is, in fact,
unqualified to use the materials or perform the activities.
B. An inspector may ask the materials licensee to explain whether or not the current
unauthorized user is technically qualified.
NOTE:
An individual may be technically qualified through completion of a formal
training program (not including on-the-job-training) to perform the activities in
question but does not have the appropriate certification to perform these
activities. In that case, the violation may be categorized as an SL IV. This
stands in marked contrast to the individual who lacks the appropriate training
and certification required to perform the activities in question. In that case,
the violation will normally be categorized as an SL III.
1. If the user is not qualified, a Severity Level III violation should be cited and the user
should be precluded from further licensed activity without appropriate supervision.
2. If the user is qualified, the violation may be categorized at a Severity Level IV.
a. OE concurrence is not required.
b. The licensee should take corrective action to preclude further unsupervised
activity by the unauthorized user of licensed material until the license has been
amended.
3. If the only user of licensed material is not qualified:
a. In cases involving more hazardous materials, e.g., materials used in medical
programs, an order suspending the license until an authorized, qualified user is
obtained may be appropriate.
b. If radiation hazards are minimal, e.g., materials used in stationary liquid-levelmeasuring gauges or stationary thickness-measuring gauges, a Confirmatory
Action Letter (CAL) suspending the user or preventing the user from using
licensed material until becoming qualified may be appropriate.

423

PART II: Topical Chapters

•
•

PART II-3: Materials Topics

The CAL could also state, at the licensee's option, that the licensee will
suspend further activities until it finds another qualified user and amends its
license to reflect this change.
If the CAL is ineffective, an order suspending the license should be
considered.

NRC Action Against Agreement State Licensee
A. An Agreement State is defined as any State with which the Commission or the Atomic
Energy Commission has entered into an effective agreement under subsection 274b of
the Atomic Energy Act of 1954, as amended (AEA), by which those States have
assumed regulatory responsibility over byproduct and source materials and small
quantities of special nuclear material.
Regulations addressing the activities of Agreement State licensees in areas of NRC
jurisdiction are located in 10 CFR Part 150.
NOTE:
In accordance with 10 CFR 150.20, a licensee must submit an NRC
Form-241 at least 3 days before engaging in the activities permitted
under the general license. The NRC considers failure to submit this form
to be significant because without this information, the NRC is not aware
of the licensed activities being conducted in NRC jurisdiction and,
therefore, cannot inspect these activities. This impedes the agency’s
ability carry out its mission to protect the public health and safety and
ensure the common defense and security.
B. A non-Agreement State is defined as any other State. The materials programs in such
states are subject to NRC jurisdiction.
C. Under reciprocity, the provisions of CFR 150.20 establish a general license authorizing
any person who holds a specific license from an Agreement State to conduct the same
activity in areas under NRC jurisdiction provided that the specific license does not limit
the activity authorized by the general license to specified installations or locations.
D. Areas under NRC jurisdiction are:
1. Areas within non-Agreement States
2. Areas under exclusive Federal jurisdiction within Agreement States
3. Offshore waters
E. The NRC can take enforcement action against an Agreement State licensee if:
1. It is improperly conducting activities in areas under NRC jurisdiction in conjunction
with the general license in 10 CFR 150.20;
424

PART II: Topical Chapters

PART II-3: Materials Topics

2. It is improperly conducting activities in areas under NRC jurisdiction in conjunction
with an NRC specific license; or
3. It failed to submit an NRC Form-241 in accordance with 10 CFR 150.20.
F. For those cases where the NRC identifies issues involving or concerning the Agreement
State licensee that may have an immediate impact on the public health and safety or the
common defense and security, the office that identified the issue should provide
immediate notification of the concern to the Agreement State that issued the license.
For proposed escalated enforcement actions, the office issuing the enforcement action
should discuss the enforcement action with the Agreement State before the enforcement
action is issued.
G. For those cases where the NRC proposes enforcement action against an Agreement
State licensee:
1. For proposed escalated enforcement actions, the office issuing the enforcement
action should discuss the enforcement action with the Agreement State before the
enforcement action is issued to ensure that the Agreement State understands the
NRC’s rationale for issuing the action.
2. The office proposing enforcement action should ensure that the Agreement State
that issued the specific license receives copies of any enforcement correspondence.
3. If the staff proposes to conduct a PEC, the office proposing the conference should
notify the Agreement State and forward a copy of the meeting notice for the
conference.

Use of Byproduct Material in Areas Under Exclusive Federal
Jurisdiction Within Agreement State
A. The AEA and NRC regulations require that, in order to use byproduct material, a person
must obtain a license either from:
1. The NRC, for those areas under NRC jurisdiction; or
2. An Agreement State, for those areas under Agreement State jurisdiction.
B. In order for an Agreement State licensee to use material in areas of exclusive Federal
jurisdiction within the Agreement State, the Agreement State licensee must either:
1. Obtain a license from the NRC as required by 10 CFR 30.3; or
2. File an NRC Form-241 pursuant to 10 CFR 150.20 at least 3 days before engaging
in the activities permitted under the general license, as long as the Agreement State
license does not limit the activity it authorizes to specified installations or locations.

425

PART II: Topical Chapters

PART II-3: Materials Topics

NOTE:
Information indicating that the Agreement State licensee was given
erroneous information concerning the status of the Federal property may
be contained in a written statement from the Federal agency or a written
statement signed and dated by the licensee documenting the name and
title of the person at the Federal agency who provided the determination
that the work site was not in an area of "Exclusive Federal Jurisdiction"
and the date the determination was provided.
C. Notwithstanding its location within an Agreement State, there are areas that are under
exclusive federal jurisdiction, including:
1. Areas under NRC jurisdiction, e.g., Federal facilities; and
2. Areas not under the jurisdiction of the Agreement State, e.g., Tribal lands.
D. Each case involving the failure to file an NRC Form-241 or obtain an NRC license prior
to using materials in areas of exclusive Federal jurisdiction will need to be reviewed on a
case-by-case basis to determine the appropriate enforcement action.
NOTE:
In February 27, 1997, an amendment to 10 CFR 150.20 (62 FR 1662) was
implemented which requires licensees to file NRC Form-241 prior to using
byproduct material in areas under exclusive Federal jurisdiction within
Agreement States. Special consideration should be given for violations that
occurred prior to this date.
E. Enforcement discretion in accordance with the Enforcement Policy may be appropriate:
1. If the Agreement State licensee was not aware that it was operating within NRC
jurisdiction; or
2. If the Agreement State licensee was given erroneous information concerning the
status of the Federal property.
•

When enforcement discretion is exercised in this case, an enforcement panel
with OE is not required, however:
o
o

The region needs to obtain an EA number for tracking purposes; and
Coordination with OE staff is warranted given the exercise of discretion.

3. If other violations of NRC requirements exist, the region should issue an NOV for
these failures and the "contrary to" paragraph and cover letter should indicate that
the location was an area under exclusive Federal jurisdiction.
426

PART II: Topical Chapters

PART II-3: Materials Topics

•

Enforcement action for other violations should only be taken in accordance with
the provisions in 10 CFR 150.20.

•

The subject line in the letter to the licensee should either read or include,
"EXERCISE OF ENFORCEMENT DISCRETION." The cover letter to the
licensee should include the following:
“If, in the future, you operate at a temporary job site that is a Federally controlled
site in an Agreement State and which may be subject to exclusive Federal
jurisdiction (e.g., a military facility, or VA hospital) you should obtain a written
jurisdictional determination from the Federal agency which controls the facility or
land in question. If possible, obtain this determination in writing. If that is not
available, you should keep a written record, signed and dated, that reflects the
name and title of the person at the Federal agency who provided the information
that the work site was not in an area of exclusive Federal jurisdiction and the
date that the determination was provided. Absent this documentation, the NRC
would expect to take enforcement action for future violations of this nature.”

F. Any proposed enforcement action should be prepared using the standard citation in
Appendix C for failure to comply with 10 CFR 30.3, "Activities requiring license." The
violation should normally be categorized at Severity Level III.
1. The cover letter transmitting the enforcement action should specifically state that the
licensee conducted NRC-licensed activities in an area under exclusive Federal
jurisdiction.
2. If additional violations of NRC requirements exist, the "contrary to" paragraph should
also indicate that the location was an area under exclusive Federal jurisdiction.
3. In addition to the action against the Agreement State licensee, the head of the
Federal facility should be informed in writing (see forms in Appendix B).

Information Copies to Outside Organizations
The following office is to be sent a copy of every inspection report, CAL, NOV, or order that is
issued concerning an individual radiographer:
ATTN: Technical Services Manager
American Society for Nondestructive Testing, Inc.
1711 Arlingate Lane
P.O. Box 28518
Columbus, OH 43228-0518

Actions Involving Radiation Safety Officers (RSOs)
A. The following examples provide additional clarification on when it may be appropriate to
consider the lack of an RSO or replacement of an RSO with an unqualified individual as
a Severity Level III violation.

427

PART II: Topical Chapters

PART II-3: Materials Topics

1. If the RSO leaves the facility and no RSO is appointed, a Severity Level III violation
is appropriate.
2. If the RSO leaves the facility and the individual assigned as a replacement RSO is
not qualified under applicable NRC criteria, a Severity Level III violation is
appropriate.
B. If, on the other hand, the RSO leaves the facility and the individual assigned as a
replacement RSO is qualified under the applicable NRC criteria, but the license has not
been amended to name the new RSO, a Severity Level IV violation is appropriate.
C. For some small materials licensees, there are no special qualification requirements or
duties for the RSO position because of the limited types and quantities of material
authorized on the license. For this type of licensee, a violation involving a change of
RSO without receiving required NRC approval, or an absent RSO, is more appropriately
categorized at Severity Level IV, unless other concurrent violations indicate the
existence of a programmatic breakdown.

Liability of Former and Successor Licensees
A. The termination of an NRC license does not invalidate the former licensee's liability for
actions taken under the license.
1. Depending on the circumstances of a particular case (i.e., former licensees not in
bankruptcy or out of business), escalated action may be taken against a former
licensee for actions occurring during the time it held its license.
a. The NRC's philosophy is that civil penalties should deter future violations not only
for the involved licensee but also for other licensees conducting similar activities.
b. For a particularly significant violation, it may be appropriate to issue a civil
penalty to a licensee who is terminating licensed activities, to deter future
violations by other licensees.
B. OE should be notified before a license is terminated for cases where:
1. An OI investigation or inspection is ongoing, since, in such cases, enforcement
action could still be taken based on the results of that investigation or inspection; and
2. Enforcement action is pending and the licensee has not been responsive.
C. The transfer of control of a license to a new individual or business is a matter requiring
NRC consent.
1. Enforcement action should be taken if a person is found to have obtained a business
or commenced operations under these conditions without obtaining NRC approval.
2. The NRC considers the successor licensee to have assumed responsibility for
violations occurring under the previous license, if these violations are not resolved
when transfer of control occurs.
428

PART II: Topical Chapters

PART II-3: Materials Topics

Enforcement Action against Nonlicensees
A. The Enforcement Policy is also applicable to nonlicensees, including:
1. Contractors and subcontractors;
2. Holders of NRC approvals, e.g., certificates of compliance (CoCs), early site permits,
standard design certificates, quality assurance program approvals, or applicants for
any of them; and
3. Employees of any of the foregoing, who knowingly provide components, equipment,
or other goods or services that relate to a licensee's activities subject to NRC
regulation.
B. Prohibitions and sanctions for any of the persons included in the preceding paragraph,
who engage in deliberate misconduct or knowing submission of incomplete or inaccurate
information are provided in the rule on deliberate misconduct, e.g., 10 CFR 30.10 and
50.5.
C. Entities who supply products or services provided for use in nuclear activities are subject
to certain requirements designed to ensure that the products or services that could affect
safety are of high quality.
1. Contractors supplying basic components or services to licensees or their contractors
are subject to the requirements of 10 CFR Part 21 for reporting defects and failures
to comply associated with a substantial safety hazard.
a. NOVs will be issued for entities who violate 10 CFR Part 21.
b. Civil penalties may be imposed against individual directors or responsible officers
of an organization who knowingly and consciously fail to provide the notice
required by 10 CFR 21.21(d)(1).
2. Through procurement contracts with licensees or their contractors, suppliers may be
required to have quality assurance programs that meet applicable quality assurance
requirements (e.g., 10 CFR Part 50, Appendix B, or 10 CFR Part 71, Subpart H).
3. Contractors constructing or modifying 10 CFR Part 50 construction permit holder or
Part 52 licensee facilities, up to the 10 CFR 52.103(g) finding, are subject to the
additional requirements of 10 CFR 50.55(e) for reporting of defects and failures to
comply associated with a substantial safety hazard, and any significant breakdown in
the quality assurance program that could cause a defect in basic components when
contractually imposed.
D. When inspections determine that violations of NRC requirements have occurred, or that
contractors have failed to fulfill contractual commitments that could adversely affect the
quality of a safety significant product or service (e.g., 10 CFR Part 50, Appendix B), the
NRC will typically take enforcement action.
1. NOVs and civil penalties will be used, as appropriate, for licensee failures to ensure
that their contractors have programs that meet applicable requirements.
429

PART II: Topical Chapters

PART II-3: Materials Topics

2. NOVs may be issued to contractors and vendors who violate 10 CFR 21 and may
also be used for other violations such as those resulting from deliberate misconduct.
Civil penalties may be imposed against individual directors or responsible officers of
a contractor organization who deliberately fail to provide the notice required by 10
CFR 21.21(d)(1).
3. NOVs and order may be issued to nonlicensees who are subject to the specific
requirements of 10 CFR Part 71 and 10 CFR Part 72.
4. Notices of nonconformance or orders will be used against nonlicensees who are
subject to the specific requirements of 10 CFR Part 72 (see additional discussion in
the FRN for the Policy revision in 1999).
E. Notices of Nonconformance will be used for contractors who fail to meet commitments
related to NRC activities but are not in violation of specific requirements.

Enforcement Actions Involving Irradiated Gemstones
A. The process of enhancing gemstone color through bombardment with either neutrons or
electrons can make the gems slightly radioactive. After irradiation, the gemstones are
typically set aside to allow any radioactivity to decay. The initial distributors of these
gemstones normally conduct radiological surveys to ensure that any residual
radioactivity is below regulatory limits prior to being made available to the general public.
On September 25, 1990, the NRC issued Information Notice No. 90-62, “Requirements
for Import and Distribution of Neutron-Irradiated Gems,” to remind gemstone importers
and distributors of long-standing NRC requirements in 10 CFR 30 and 110 that govern
the import and distribution of irradiated gems, and to provide information on NRC's
planned actions on unauthorized importation or distribution. This generic communication
was prompted by numerous inquiries to NRC indicating that large quantities of reactor
neutron-irradiated gems, particularly blue topaz, were being distributed in the United
States without NRC authorization. Since neutron-irradiated gems contain small
quantities of radioactive byproduct material, a specific NRC license is required for initial
distribution of such gems to unlicensed persons (such as gem dealers, wholesalers, and
consumers).
B. The Energy Policy Act of 2005 gave NRC jurisdiction over radioactive materials
produced in accelerators. Most of these materials are medical isotopes used in
diagnosis and therapy, but the regulations also apply to irradiated gemstones. In 2007,
NRC completed extensive surveys and evaluations of health and safety matters
involving irradiated gemstones, after learning that many of the gemstones on the market
at the time had been imported and distributed by unlicensed entities. In February 2008,
the NRC met with representatives of the jewelry industry, and a copy of the NRC
presentation and NRC-issued Fact Sheet, “Irradiated Gemstones” (ML21078A086)
provides additional information and continues to be made available for reference by the
jewelry industry on industry websites.
C. Regardless of whether irradiated gemstones are imported or produced in the United
States, the initial distribution of irradiated gemstones in the United States requires (1) a
specific license from the NRC (10 CFR Part 30) or an Agreement State that allows for
430

PART II: Topical Chapters

PART II-3: Materials Topics

possession of the radioactive material prior to distribution, and (2) an NRC exempt
distribution license pursuant to 10 CFR Part 32. Accordingly, the NRC will generally
take enforcement action against unauthorized importers or distributors of neutronirradiated gems.
D. Any apparent violations involving domestic production or imports of irradiated gemstones
or radioactive enamels must be addressed through the normal enforcement process
consistent with the Policy. As such, any potential escalated enforcement action would
also be dispositioned through an enforcement panel.
E. Consideration of enforcement discretion for cases involving irradiated gemstones or
radioactive enamels is governed by the applicable criteria identified in Section 3.0, “Use
of Enforcement Discretion,” of the Policy. Section 3.0 of Part I in this manual provides
guidance regarding the documentation needed, and process to be followed when
exercising enforcement discretion.

431

PART II: Topical Chapters

PART II-3: Materials Topics

Clarification of Decommissioning Funding Assurance
Rule
A. On July 26, 1995, the NRC issued a rulemaking on "Clarification of Decommissioning
Funding Requirements" for materials licenses, (Clarification Rule) (60 FR 38235).
1. The Clarification Rule requires licensees to have:
a. Adequate financial assurance for decommissioning during licensed operations;
and
b. Updated financial assurance for decommissioning when the licensee decides to
cease operations and begin decommissioning.
NOTE:
Licensees were required to provide adequate financial assurance for
decommissioning by November 24, 1995, the effective date of the
Clarification Rule.
2. The Clarification Rule was intended to address those licensees who have been in
timely renewal since the promulgation of an earlier Decommissioning Rule, or who
have ceased operations without having adequate decommissioning funding
arrangements in place.
3. Licensees were required to provide adequate financial assurance for
decommissioning by November 24, 1995, when the Clarification Rule became
effective.
B. Violations of the Clarification Rule are normally identified during records reviews
conducted to determine compliance with the rule, and enforcement action should be
taken if the licensee is currently not in compliance with the requirements of the rule.
1. The staff will provide the licensee with a letter indicating that an apparent violation
has been identified as a result of a records review (see forms in Appendix B).
2. The licensee can request a PEC within 7 days or can provide a written response
within 30 days.
3. Since an inspection report is not issued for a violation identified during a records
review, the letter needs to clearly identify and document the specific apparent
violation.
a. The language used in the letter to identify and document the apparent violation
may be adapted from the standard citations for 10 CFR 30.35 and 30.36.
b. Although the text of these standard citations focuses on violations of 10 CFR Part
30, the text can be adapted for violations of the identical regulation in 10 CFR
Parts 40, 70, or 72.
432

PART II: Topical Chapters

PART II-3: Materials Topics

4. In addition to sending the letter, the region should contact the licensee's
management by telephone to assure that the licensee has an opportunity to ask
questions in order to fully understand the apparent violation.
C. The Enforcement Policy provides that violations involving significant failure to meet
decommissioning requirements should be categorized at Severity Level III.
D. Violations involving significant failure to meet decommissioning requirements may be
treated by issuing a Severity Level IV violation if the licensee:
1. Responds to the apparent violation within 30 days;
2. Provides an acceptable plan for meeting the decommissioning financial assurance
requirements; and
3. Fully implements the plan according to an agreed-upon schedule.
E. Where the NOV is not issued until the corrective action is completed, a response to the
NOV normally would not be required.
F. Escalated enforcement action in the form of an NOV, civil penalty and/or Order is
appropriate, if the licensee:
1. Is not responsive;
2. Does not provide an acceptable plan for meeting the decommissioning financial
requirements; or
3. Is not implementing the plan according to an agreed-upon schedule.
NOTE:
Corrective action is not considered in determining the severity level of a
violation; however, the significance of a violation is increased if the
licensee has notice of the violation but is either unwilling or unable to
achieve compliance.
G. Enforcement decisions will be made on a case-by-case basis.
H. In processing cases involving significant failure to meet decommissioning requirements:
1. An enforcement action (EA) number is required to track the action.
2. Following the licensee's response, the determination of the severity level and
sanction, if appropriate, is to be discussed during the weekly OE panel for the
respective region.

433

PART II: Topical Chapters

PART II-3: Materials Topics

3. Appropriate regional and Division of Waste Management and Environmental
Protection staff will participate in weekly OE panels involving escalated enforcement
action in response to Clarification Rule violations.
I.

In the event an application for renewal of a license is outstanding under these
circumstances, the staff may deny the license renewal application and require the
licensee to begin decontamination and decommissioning activities.

J. As the staff considers escalated enforcement action, it should also consider matters, on
a case-by-case basis, such as:
1. The licensee's financial status
2. The types and levels of contamination at the site
3. The steps needed to ensure protection of the public health and safety if the licensee
should declare bankruptcy, abandon the site, or both

434

PART II: Topical Chapters

PART II-3: Materials Topics

Timeliness in Decommissioning of Materials Facilities
Rule
A. On July 15, 1994, the NRC issued a rulemaking entitled "Timeliness in Decommissioning
of Material Facilities" for materials licensees (Timeliness Rule, 59 FR 36026-36040).
B. The Timeliness Rule amended 10 CFR Parts 30, 40, 70, and 72, and established
definitive criteria for timely decommissioning upon termination of operations.
1. The rule establishes requirements for notifying the NRC of pending decommissioning
actions and cessation in licensee operations, establishes requirements for when
decommissioning plans need to be submitted, and establishes requirements for
completing decommissioning activities.
2. The rule allows licensees to request relief from the timing of requirements where
justified.
C. Violations of the Timeliness Rule may be identified either during routine onsite
inspections or through records reviews conducted to determine compliance with the
regulation.

Processing Violations for Failure to Notify NRC pursuant to 10 CFR
30.36(d), 40.42(d), and 70.38(d)
A. If the notification failure is not willful and there are no other decommissioning timeliness
violations for which escalated enforcement action may be taken, the violation is normally
dispositioned as a Severity Level IV violation.
1. In determining whether other decommissioning timeliness violations occurred, the
staff should determine whether the licensee should have completed
decommissioning activities (i.e., whether more than 24 months have passed since
the notification was required). If so, this additional violation should also be evaluated
for significance as described in the following section, and both violations may be
cited together as a single problem.
2. In evaluating acceptable corrective actions for notification failures, the staff should
evaluate whether accepting a late notification will also entail accepting an alternate
decommissioning schedule (i.e., for the initiation and/or completion of
decommissioning). If the staff determines that an alternate schedule is acceptable,
the evaluation should be documented in accordance with guidance in NUREG 1757,
Vol. 3, “Consolidated Decommissioning Guidance: Financial Assurance,
Recordkeeping, and Timeliness.”
B. If the failure to notify may be willful or if there are additional decommissioning timeliness
violations for which escalated enforcement action may be taken, the issue should be
discussed at an enforcement panel.

435

PART II: Topical Chapters

PART II-3: Materials Topics

NOTE:
Licensees are not required to notify NRC when a decision is made to
permanently cease principal activities in any separate building or outdoor
area (or when no principal activities have been conducted in any separate
building or outdoor area) unless the separate building or outdoor area
contains residual radioactivity such that the building or outdoor area is
unsuitable for release in accordance with NRC requirements.

Processing Violations for Failure to Complete Decommissioning
within 24-Months of Initiation Pursuant to 10 CFR 30.36(h), 40.42(h),
and 70.38(h)
A. In accordance with Section 6.3 of the Enforcement Policy, failure to meet required
decommissioning schedules is normally dispositioned as a SL III violation and
should, therefore, be discussed at an enforcement panel.
B. Notwithstanding the Enforcement Policy guidance, the staff may recommend at an
Enforcement Panel that such a violation be categorized at Severity Level IV if the
following conditions exist:
1. The violation is not willful;
2. The licensee only possessed sealed sources with no external contamination;
3. Upon identification of the violation (by either the licensee or the NRC), the
licensee disposed of its licensed material and requested termination of its NRC
license (or committed to do so within a reasonable amount of time).
C. In evaluating acceptable corrective actions for failures to complete decommissioning,
the staff should evaluate whether a licensee’s commitment to conduct
decommissioning will also entail accepting an alternate decommissioning schedule
(i.e., for the initiation and/or completion of decommissioning). If the staff determines
that an alternate schedule is acceptable, the evaluation should be documented in
accordance with guidance in NUREG 1757, Vol. 3, “Consolidated Decommissioning
Guidance: Financial Assurance, Recordkeeping, and Timeliness.”

Storage Only Licenses
A. There are two types of licenses that authorize “storage only.” The Timeliness Rule
applies differently depending on the type of “storage only” license, as follows:
1. For the first type of license, storage historically was not a principal activity authorized
by the license; however, the license has been amended to authorize “storage only”
because as a result of some difficulty regarding the transfer or disposal of the
material, the material remains on the licensee’s site.

436

PART II: Topical Chapters

PART II-3: Materials Topics

a. Storage under these circumstances is not a "principal activity" as defined in CFR
30.4.
b. The requirements to notify NRC and undertake decommissioning in CFR
30.36(d)(2)-(4) are not triggered, because there is no principal activity to cease.
c. For these licensees, decommissioning issues should be addressed when the
license comes up for renewal.
d. Concerns about such licensees also may be addressed through Demands for
Information, CALs, Orders, etc.
e. Concerns, which may involve insolvency, lack of security and control, etc., should
be discussed on the weekly OE panel for the respective region which should be
attended by the NMSS Division of Waste Management and Environmental
Protection staff.
2. For the second type of license, storage of material historically has been the principal
activity conducted by the licensee, who did not engage in an activity that produced or
used the material in storage.
a. In such cases, storage should be treated as the principal activity under the
license, and the notification and decommissioning requirements in CFR
30.36(d)(2)-(4) are applicable.
b. The requirements to notify NRC and undertake decommissioning in 10 CFR
30.36(d)(2)-(4) are triggered when the licensee ceases to store the material (i.e.,
the material is transferred).
B. Questions concerning an NRC position on the Timeliness Rule should be referred to the
NMSS Division of Waste Management and Environmental Protection staff.

437

PART II: Topical Chapters

PART II-3: Materials Topics

Severity Levels of Violations at Fuel Facilities
The severity levels in the examples in Section 6.2, Fuel Cycle Operations, of the Policy that are
applicable to fuel facilities are based on the relationship of the loss of criticality safety control(s)
to the availability (or likely availability) of a sufficient amount of fissile material for a nuclear
criticality accident.
Also, the examples in Section 6.3, Materials Operations, address events that involve chemical
processes integral to licensed activities, whether or not radioactive material is released. The
following examples from Section 6.3 are illustrative:
A. Example 6.3.a.1, concerning significant injury or loss of life to site personnel, addresses
a very significant regulatory concern because, in addition to the radiation, contamination
and releases, the NRC is concerned about the actual impact of any occurrence from a
portion of a licensed activity, including chemical processes, that has been reviewed and
approved as part of the NRC licensing process.
B. Example 6.3.b.1 indicates that the loss of control over licensed or certified activities is a
very significant safety concern when there is the substantial potential for a significant
injury or loss of life, whether or not radioactive material is released.
C. Example 6.3.c.5, qualified person to conduct licensed activities” highlights the
importance that the NRC places on having qualified persons to conduct licensed
activities.

Dispositioning Violations of Naturally Occurring and
Accelerator-Produced Radioactive Materials (NARM)
Requirements
Background
Prior to the enactment of the Energy Policy Act of 2005 (EPAct), on August 8, 2005, naturally
occurring and accelerator-produced radioactive materials (NARM) were not covered under the
Atomic Energy Act of 1954, and therefore, were not regulated by the NRC. Most of these
materials were regulated by State regulatory authorities.
Although the legislation made NRC’s authority over these new materials effective immediately
when the bill was enacted in August 2005, the NRC did not have regulations in place that would
specifically apply to this newly covered byproduct material. The NRC issued a time-limited
waiver on August 31, 2005 (70 FR 51581), for continued use and possession of NARM, allowing
time for the NRC to develop regulations to implement the new requirements.
The NRC published notification of its plan for the transition of regulatory authority resulting from
the expanded definition of byproduct material in the Federal Register on October 1, 2007
(72 FR 55864). This followed publication of a final rule covering the new byproduct materials on
October 1, 2007 (72 FR 55863). The regulations set forth in that rule became effective on
November 30, 2007, for some licensees and later for others. Accordingly, the transition plan set
forth the applicable dates for waiver terminations.
438

PART II: Topical Chapters

PART II-3: Materials Topics

On October 4, 2007, the NRC issued Regulatory Information Summary (RIS) 2007-22 informing
recipients of the recent issuance of regulations concerning the new byproduct materials. The
RIS notified recipients that the Commission would be terminating waivers in phases, beginning
November 30, 2007, and ending August 7, 2009. The RIS explained that upon waiver
termination, all persons in possession of material newly defined as byproduct material in
specified States, U.S. Territories or areas of exclusive federal jurisdiction would be expected to
be in compliance with NRC regulations. In addition, the RIS identified that such persons would
be required to (1) submit license amendment requests for NARM within 6 months from the date
the waiver is terminated if they hold an NRC specific byproduct materials license, or (2) submit a
license application for NARM within 12 months from the date the waiver is terminated.
The RIS also explained that some of the newly defined byproduct materials may already be
covered by existing NRC licenses, since the new definition included NARM material. Therefore,
recipients were asked to review their license and contact the NRC regional office with questions
about whether a license amendment was necessary. For materials regulated as generally
licensed devices, the RIS stated that upon waiver termination, it would be necessary to follow
registration and /or reporting requirements in the new regulations. Users of the new byproduct
materials in Agreement States were advised to contact the State regulatory agency for
questions related to regulation of the materials.
Upon receipt of either a license amendment request or a new license application, the respective
NRC regional office will notify the applicant of its receipt of the request. The notification will
document that the applicant complied with this aspect of the regulations. In cases where the
currently held license had been broadly written such that no license amendment was required to
encompass the NARM isotopes and locations of use, licensees are required to include all
existing NARM activities with the existing byproduct material licensed activities and meet all the
existing commitments of the current license.
Notwithstanding the issuance of the Federal Register notice and the RIS, it is recognized that
some entities (in particular, entities who solely possess radium) may not know about NRC’s new
requirements. Customers of manufacturers and distributors (M&Ds) still supporting radium
devices could have been made aware of the new requirements, as NRC has conducted
extensive outreach to M&Ds. However, entities who possess radium devices that are no longer
manufactured and/or supported by M&Ds, may not be aware of the new requirements or know
they are required to apply for licensee status.
A small number of NRC licensees missed the dates for submitting a license amendment
request, and self-reported. It is reasonable to believe that there will be additional instances of
such errors identified in the future.

Disposition of Violations of NARM Requirements
If an inspector identifies a potential noncompliance with a licensee’s implementation of the
NARM requirements, he or she should notify the applicable Regional Branch Chief before
conducting the exit meeting with the licensee. All potential noncompliances of NARM
requirements shall be brought back to the applicable Regional Office for disposition. The
Regional Office will evaluate each potential noncompliance and make one of two conclusions as
discussed below. Discretion can be considered both for failure to initially apply for or amend a
license, as well as violations in the implementation of the requirements. The guidance below
also applies to an applicant.
439

PART II: Topical Chapters

PART II-3: Materials Topics

A. The Regions may use enforcement discretion to not issue a violation for failure either:
(1) to submit a license application or amendment request to include NARM activities; or
(2) in cases where the license had been broadly written such that no license amendment
was required to encompass the NARM isotopes and locations of use, to include all
existing NARM activities with the existing byproduct material licensed activities.
If this is the licensee’s or permittee’s first occurrence after the effective date of the
NARM requirements (waiver termination date), the Regions may consider using
enforcement discretion and not issue a violation, if all four of the following conditions are
met:
1. The licensee's failure did not result in an actual safety, health, or security
consequence;
2. The licensee’s failure was not willful;
3. The licensee has provided a reasonable argument that they had reason to believe
that the new requirement did not apply to them, or that they were unaware of the new
requirement; and
4. The licensee has committed to submit an initial license application within 60 days; or
to submit a license amendment request within 30 days; or the licensee confirms that
all existing NARM activities will be included with the existing byproduct material
licensed activities and will meet all the existing commitments of the current license
within 30 days.
NOTE:
Typically, the first day of the inspection will be the start date, and the
inspection findings will be documented in the inspection record to describe
the noncompliance(s), the licensee’s corrective actions and the schedule for
taking corrective actions. These cases will be issued an EA number.

B. Use the normal enforcement process for NARM implementation violations
1. The Regional Office will use the normal enforcement process to evaluate the noncompliance, if the licensee has not met the conditions listed above.
2. Typically, citing a severity level IV will be appropriate with a consideration of
escalated enforcement for willfulness or any safety significant issues.

440

PART II: Topical Chapters

PART II-4: Reactors Under Construction

PART II - 4 REACTORS UNDER CONSTRUCTION
This section provides information regarding:
•

various reactor under construction issues, including enforcement activities involving
facility construction, safeguards, emergency preparedness, and enforcement actions
involving fitness-for-duty (FFD)

•

construction reactor oversight process (cROP)

441

PART II: Topical Chapters

PART II-4: Reactors Under Construction

Reactors under the Construction Reactor Oversight
Process
General Enforcement Approach
A. Screening of construction issues of concern is conducted using the guidance in IMC
0613, Appendix B.
B. Performance deficiencies that are of more-than-minor significance are considered
findings whose significance is determined using the construction SDP per the guidance
in IMC 2519, with the following exceptions.
1. The significance of findings associated with operational programs once the
respective combined license implementation milestone has been met will be
determined using the applicable SDP in IMC 0609.
2. The significance of construction and operational security program findings will be
determined using the Security SDP in IMC 0609, Appendix E.
C. Each combined license (COL) contains inspections, tests, analyses, and acceptance
criteria (ITAAC) which must be met by the licensee. Citations cannot be normally be
issued against an ITAAC. Normally, violation for ITAAC-related work activities will be
cited against the related quality assurance requirements.
D. After the Commission has made the 10 CFR Part 52.103(g) finding, the ITAAC do not,
by virtue of their inclusion in the combined license, constitute regulatory requirements
either for licensees or for renewal of the license; except for the specific ITAAC for which
the Commission has granted a hearing, all ITAAC expire upon final Commission action
in the proceeding.
E. Technical specifications apply once the 10 CFR Part 52.103(g) finding has been made.
After this time, the enforcement guidance for operating reactors applies.
F. Enforcement actions associated with an ESP application are not anticipated in the predocketing application phase. However, the information submitted with the application
will become subject to NRC regulations, including enforcement actions for willful,
wrongdoing, or fraudulent information.
G. During the post-docketing phase, the applicant will be subject to 10 CFR Part 21 and
10 CFR Part 50, Appendix B, requirements and may be subject to enforcement actions,
such as notices of violation and nonconformance. Violations of NRC requirements
identified prior to the issuance of an LWA and/or a COL to an applicant are dispositioned
using a traditional enforcement approach.
H. For most violations committed by licensees granted a LWA and/or COL, the significance
of a violation is assessed using the construction SDP under the cROP as discussed in
Enforcement Guidance Memorandum (EGM) 11-06, “Enforcement Actions Related to
the Construction Reactor Oversight Process.” With the exceptions noted below,
violations associated with cROP inspection findings are not normally assigned severity
levels, nor are they normally subject to civil penalties, although civil penalties are
442

PART II: Topical Chapters

PART II-4: Reactors Under Construction

considered for any violation that involves actual consequences. Typically, the types of
violations dispositioned using traditional enforcement include the following:
1. Violations that resulted in actual safety or security consequences. Violations with
actual safety or security consequences are rarely expected in a construction
environment.
2. Violations that may impact the ability of the NRC to perform its regulatory oversight
function. These types of violations include failures to provide complete and accurate
information; failures to receive prior NRC approval for changes in licensed activities,
failures to notify the NRC of required changes in licensed activities, or failures to
perform change analyses required by 10 CFR Part 52.98; failures to maintain an upto-date and accurate FSAR; and failures to comply with 10 CFR Part 50.55(e)
reporting requirements, etc.
3. Violations involving willfulness.
4. Violations of NRC requirements for which there are no associated SDP performance
deficiencies. Such violations are documented in accordance with the appropriate
Inspection Manual Chapter.
I.

Violations of minor safety or security concern generally do not warrant enforcement
action or documentation in inspection reports but must be corrected. Examples of minor
violations can be found in the NRC Enforcement Manual and in IMC 0613.

J. Severity Level IV violations and violations associated with green cROP findings are
normally dispositioned as NCVs. The NRC’s confidence in the corrective action program
portion (finding and fixing problems) of a licensee’s QA program is one basis for
dispositioning Severity Level IV violations as NCVs. NRC-identified and self-revealing
Severity Level IV violations will not be dispositioned as NCVs unless the licensee’s
corrective action program has been determined to be adequate and all other NCV
criteria are met.
K. Applicant/Licensee Enforcement Approach. Pursuant to 10 CFR Part 50, Appendix B,
requirements, the licensee may delegate to others, such as contractors, agents, or
consultants, the work of establishing and executing the quality assurance program but
shall retain the responsibility for its successful implementation. It is NRC policy to hold
licensees and applicants responsible for the acts of their employees, contractors, or
vendors and their employees, and the NRC may cite the licensee or applicant for
violations committed by its employees, contractors, or vendors and their employees.
While licensees may choose to rely on a consortium approach to building new reactors,
licensees hold the final responsibility for constructing the plant in accordance with NRC
regulations. Therefore, the NRC will hold licensees responsible for the acts of
consortium members (i.e., licensee agents) performing construction or the functional
equivalent of construction.

Changes during Construction
A. New nuclear power plant construction must be conducted in accordance with the COL
current licensing basis (CLB), the Atomic Energy Act, and the applicable regulations.
The change process for the COL is set forth in 10 CFR Section 52.98(f). Changes to the
443

PART II: Topical Chapters

PART II-4: Reactors Under Construction

facility, procedures, and conduct of special tests or experiments are to be evaluated to
determine if prior NRC approval is needed.
1. The licensee’s evaluation process comprises several successive steps, including an
applicability determination evaluation, the safety-security interface evaluation, the
construction impacts evaluation and the “10 CFR 50.59 like” screening evaluation.
2. The “10 CFR 50.59 like” criteria are set forth in Sections VIII B.5.b and VIII.B.5.c of
the Part 52 Appendices for each certified design. Changes not within the scope of
the certified design are governed by 10 CFR Part 50 change processes.
B. Interim Staff Guidance on Changes during Construction (CdC) Under 10 CFR Part 52
(COL-ISG-025) describes the license amendment request (LAR) preliminary amendment
request (PAR) process.
C. If an inspector identifies a change from the CLB that is identified in a PAR, the potential
finding should be documented as an Unresolved Item (URI). If the LAR is subsequently
approved, the staff will verify that the observations are in agreement with the approved
license amendment and the URI shall be closed with no violation. If the LAR is
subsequently denied, the staff will verify that the licensee returned component to CLB
requirements. If the component was returned to CLB requirements, the URI should be
closed with no violation. If the component was not returned to CLB requirements, the
URI should be closed and enforcement action should be taken for any violations that
occurred as a result of the departure from the CLB.
D. If during an inspection, an inspector identifies an issue of concern associated with a
change to the CLB that does not require prior NRC approval (e.g., a change to a Tier 2
item), that change would be evaluated as follows:
1. If the licensee has not evaluated the change as required by the appropriate Section
of the Part 52 Appendix that applies, it would be a violation and may result in a
finding if it is more than minor.
2. If the licensee has evaluated the change, it typically would not result in a violation as
long as the change did not require a license amendment.
E. Violations identified that are associated with changes to the facility should start with the
applicable 10 CFR Part 52.98 section followed by either the appropriate section of the
Part 52 Appendix that applies or the appropriate Part 50 change process section, as
follows:
1. 10 CFR Part 52.98(c)(1) states that changes within the scope of the design
certification rule are subject to the change process in that rule. The change process
is contained in Section VIII of each 10 CFR Part 52 Appendix. Section VIII separates
the change rules into sub-section A for Tier 1 information and sub-section B for Tier
2 information. Sub-section B covers both Tier 2 and Tier 2* criteria.
2. 10 CFR Part 52.98(c)(2) states that changes that are not within the scope of the
design certification rule should be made in accordance with the applicable 10 CFR
Part 50 change processes. These changes include those that have no involvement
with the DCD such as facility changes associated with items described in the FSAR,
444

PART II: Topical Chapters

PART II-4: Reactors Under Construction

changes to procedures described in the FSAR, or special tests or experiments.
Guidance for implementation of 10 CFR Part 50.59 is contained in NRC endorsed
NEI 96-07. Refer to Chapter 7 for enforcement guidance regarding 10 CFR 50.59
and related FSAR violations.
F. If a departure from the CLB is identified during an inspection of activities other than
construction (e.g., procurement, fabrication, etc.), the inspectors should ensure that the
departure is conducted pursuant to controls in the applicable quality assurance program.
If the departure from the CLB is not completed pursuant to the applicable quality
assurance program, the inspectors should initiate the appropriate enforcement action. If
the departure is completed pursuant to the applicable quality assurance program, and a
PAR/LAR is not in place, the inspector may initiate a URI to ensure the proper change
process is implemented to support construction in accordance with the CLB.

Regulatory Treatment of Non-Safety Systems (RTNSS) and Design
Reliability Assurance Program (D-RAP)
A. For SSCs included in the RTNSS, the quality requirements are identified in Chapter 17
of the AP1000 Design Control Document (DCD), and are included in the Quality
Assurance Manual, PART III, “Nonsafety-Related SSC Quality Control.” Violations
associated with AP1000 SSCs that are included in the RTNSS should be cited against
10 CFR Part 50.55(f)(4), which states that each holder of a combined license shall
implement the quality assurance program for design and construction described or
referenced in the safety analysis report, including changes to that report.
B. The D-RAP ensures that the reliability of SSCs within the scope of the Reliability
Assurance Program is properly considered and designed into the plant and is
implemented through the reactor design, procurement, fabrication, construction, and
preoperational test activities and programs. The SSCs included in the RTNSS are also
included in the D-RAP. Issues identified during field inspections that are associated with
safety-related systems in the D-RAP should be cited against 10 CFR Part 50 Appendix
B. Issues associated with non-safety related systems identified in the D-RAP should be
dispositioned similar to the RTNSS enforcement approach (i.e., cited against 10 CFR
Part 50.55(f)(4)).

Reportability Under 10 CFR Part 50.55(e) and 10 CFR Part 21
10 CFR Part 50.55(e) reporting violations committed by a licensee or its agent shall be cited
against the licensee. These violations are dispositioned using traditional enforcement since the
failure to make a required report impacts the ability of the NRC to perform its regulatory
oversight function. 10 CFR Part 21 reporting violations committed by suppliers will be cited
against the supplier. The severity level of 10 CFR Part 50.55(e) and 10 CFR Part 21 violations
should be determined using the guidance and examples in the Chapter 7 of this Enforcement
Manual and Section 6 of the Enforcement Policy.

Citations Against 10 CFR Part 50, Appendix B
Enforcement Manual, Part II-2 (Reactor Topics) provides specific guidance concerning
enforcement practices for Quality Assurance (QA) issues that are violations of 10 CFR Part 50,
Appendix B.
445

PART II: Topical Chapters

PART II-4: Reactors Under Construction

Safeguards
Enforcement Manual, Part II-2 (Reactor Topics) provides specific guidance concerning
enforcement practices for safeguards issues.

Emergency Preparedness
Enforcement Manual, Part II-2 (Reactor Topics) provides specific guidance concerning
enforcement practices for emergency preparedness issues.

Enforcement Actions Involving Fitness-For-Duty (FFD)
Enforcement Manual, Part II-2 (Reactor Topics) provides specific guidance concerning
enforcement practices for FFD issues.

446

PART II: Topical Chapters

PART II-5: Import – Export Enforcement Topics

PART II - 5 IMPORT – EXPORT ENFORCEMENT
TOPICS
This section provides information regarding:
•

various issues, including enforcement activities involving violations of the NRC’s import
and export requirements

447

PART II: Topical Chapters

PART II-5: Import – Export Enforcement Topics

Dispositioning Violations of NRC Export and Import of
Nuclear Material Requirements (10 CFR Part 110)
General Enforcement Approach
A. In conjunction with its import and export licensing responsibilities, the Office of
International Programs (OIP) is responsible for reviewing advance notifications of export
and import shipments, as well as other Part 110 reporting requirements. In accordance
with 10 CFR 110.50(c), the NRC Operations Center is responsible for receiving advance
notifications for all export and import shipments. The NRC Operations Center provides
copies of the advance notifications to OIP, and the OIP Export Controls and
Nonproliferation Branch (ECNB) staff routinely reviews these reports for compliance with
NRC requirements.
B. If an apparent violation is identified, the ECNB Senior Licensing Officer (or other
representative) will coordinate with the assigned OE Enforcement Specialist to obtain an
EA number from the Enforcement Action Tracking System (EATS). EATS serves as the
means for tracking all escalated and non-escalated enforcement for OIP.
C. Certain violations that meet the criteria of Sections 5.1.2 and 5.1.3 may be treated as
minor violations.
D. For violations being dispositioned as non-escalated enforcement in accordance with
NRC Enforcement Policy, OIP/ECNB will prepare a draft enforcement package. The
non-escalated enforcement package will be prepared for the approval and final signature
of the Chief, ECNB.
E. If OIP proposes that the apparent violation be dispositioned as escalated enforcement,
then the ECNB Senior Licensing Officer (or other representative) will coordinate with OE
via the assigned OE Enforcement Specialist to process the proposed action in
accordance with the Enforcement Policy and Enforcement Manual. Section 6.15 of the
Policy, “Export and Import Activities,” provides severity level examples of various export
and import violations.
F. If any member of the OIP/ECNB suspects wrongdoing associated with a particular
export or import shipment, the staff member will coordinate with the NMSS/OIP
Allegations Coordinator ([email protected]), the NRR Allegations
coordinator ([email protected]) if the concern is related to reactor components,
or by calling 800-368-5642 to have the issue(s) of concern reviewed and dispositioned in
accordance with the allegations process.

Violations of Advance Notifications Made under 10 CFR 110.50(c)
A. Violations of 10 CFR 110.50(c)(3)(i)(D) and 10 CFR 110.50(c)(3)(ii)(D)
The regulations state that export and import notifications must contain information about
the radionuclides and activity levels in TBq, both for single and aggregate shipments. If
the staff identifies errors in specific activity levels indicated in advanced notifications that
fall within a tolerance band of ± 20 percent, the noncompliances will normally be
dispositioned as minor violations.
448

PART II: Topical Chapters

PART II-5: Import – Export Enforcement Topics

B. Violations of 10 CFR 110.50(c)(4)
The regulations state that import notifications must be received by the NRC at least 7
days in advance of each shipment. Violations of the 7-day import advanced notification
requirement will normally be dispositioned as minor violations if received in 3 or more
days in advance of the import.

Violations of Annual Reporting Requirements under 10 CFR 110.54
Violations of the annual reporting requirements are typically dispositioned as minor violations if
received within 30 days of the due dates specified within the regulations.

Dispositioning Violations Associated with the Additional Protocol
Treaty Obligations
Under the Protocol Additional to the Agreement between the United States of America and the
International Atomic Energy Agency for the Application of Safeguards in the United States
(Additional Protocol), certain reporting information is exempted from public disclosure.
Therefore, when dispositioning violations associated with the Additional Protocol, the standard
cover letter and NOV language should be revised as follows (shown below in “redline/strikeout”
format):
A. Cover Letter: Except for matters that are excepted from disclosure pursuant to 10 CFR
2.390(a), a copy of this letter, its enclosures, and your response will be made available
electronically for public inspection in the Public Document Room or from the NRC’s
Agencywide Documents Access and Management System, accessible from the NRC
Website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your
response should not include any personal privacy or proprietary information.
B. NOV: Except for matters that are excepted from disclosure pursuant to 10 CFR
2.390(a), your response will be made available electronically for public inspection in the
NRC Public Document Room or from the NRC’s document system (ADAMS) accessible
from the NRC Website at http://www.nrc.gov/reading-rm/adams.html. To the extent
possible, your response should not include any information that is exempted from
disclosure pursuant to 10 CFR 2.390(a) so that it can be made available to the public
without redaction.

449


File Typeapplication/pdf
File TitleEnforcement Manual Revision 11.0
File Modified2022-03-22
File Created2022-03-17

© 2024 OMB.report | Privacy Policy