Sample Statewide Trans Improvement Program

Sample STIP Commonwealth of Virginia.pdf

Metropolitan and Statewide and Nonmetropolitan Transportation Planning

Sample Statewide Trans Improvement Program

OMB: 2132-0529

Document [pdf]
Download: pdf | pdf
COMMONWEALTH OF VIRGINIA

Statewide Transportation
Improvement Program
(STIP)
Fiscal Constraint Demonstration
For Federal Fiscal Years

2024 through 2027

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

Contents

Acronyms .................................................................................................................................................... 4
1.

Introduction ........................................................................................................................................ 6

2.

MPO/TIP............................................................................................................................................. 8

3.

Financial Summary ............................................................................................................................ 8

4.

VDOT 2024 Estimated Budget .......................................................................................................... 9

5.

System-Level Estimates for Operations and Maintenance .............................................................. 9
Highway Systems Operations and Maintenance................................................................................. 10
Transit Systems Operations and Maintenance...................................................................................... 11

6.

Public and Local Government Involvement.................................................................................... 13
Six-Year Improvement Program Development ....................................................................................14
Secondary Six-Year Plan Development ...............................................................................................16
FY 2024-2027 STIP Development ...................................................................................................... 17

7.

STIP Program Notes ......................................................................................................................... 18

Appendix A: How to Read the STIP....................................................................................................... 22
Appendix B: STIP Project Grouping Definitions .................................................................................. 24
Appendix C: MPO/PDC Contacts............................................................................................................ 27
Appendix D: Statements of Certifications .............................................................................................. 39
Appendix E: Conformity Determinations .............................................................................................. 64
Appendix F: Performance-Based Planning and Programing ............................................................... 73
Safety Performance Measures.............................................................................................................. 78
Pavement and Bridge Performance Measures...................................................................................... 83
Highway System Performance Measures ............................................................................................ 87
Congestion Mitigation and Air Quality CMAQ) Program Performance Measures..............................91
Transit Asset Management ................................................................................................................... 94
Appendix G: FHWA-Eastern Federal Lands Division Projects ...........................................................97
Appendix H: District Project Listing.................................................................................................... 101
Bristol District ................................................................................................................................... 102
Culpeper District.................................................................................................................................116
Fredericksburg District.......................................................................................................................128
Hampton Roads District .................................................................................................................... 151
Lynchburg District ............................................................................................................................ 231
Northern Virginia District ...................................................................................................................... 244
Richmond District .............................................................................................................................. 282
2

Salem District ..................................................................................................................................... 319
Staunton District ................................................................................................................................333
Statewide............................................................................................................................................354
Appendix I: DRPT and Transit Agency Project Listings......................................................................367
Appendix J: Civil Rights Accomplishments......................................................................................... 433
Appendix K: Public Meeting Notices/Website Postings ...................................................................... 451

3

Acronyms
AADT
AC
CLRP
CMAQ
CTB
CVSP
DMV
DRPT
EPA
FAMPO
FAST Act
FHWA
FMCSA
FPMD
FTA
FY
GALA
HISP
HMOF
HRTPO
HSO
HSP
IIM
MAP-21
MERIT
MOA
MPA
MPO
MTP
MWCOG
NAAQS
NBI
NEVI
NHFP
NHFN
NHTSA
NHPP
NHS
NVTA
OIPI
PBPP
PDC
PL funds

Annual Average Daily Traffic
Advanced Construction
Constrained Long Range Plan
Congestion Mitigation and Air Quality
Commonwealth Transportation Board
Commercial Vehicle Safety Plan
Department of Motor Vehicles
Department of Rail and Public Transportation
Environmental Protection Agency
Fredericksburg Area Metropolitan Planning Organization
Fixing America’s Surface Transportation Act
Federal Highway Administration
Federal Motor Carrier Safety Administration
Federal Programs Management Division
Federal Transit Administration
Fiscal Year
Governance and Legislative Affairs
Highway Safety Improvement Program
Highway Maintenance and Operations Fund
Hampton Roads Transportation Planning Organization
Highway Safety Office
Highway Safety Plan
Instructional and Informational Memorandum
Moving Ahead for Progress in the 21st Century Act
Making Efficient and Responsible Investments in Transit
Memorandum of Agreement
Metropolitan Planning Area
Metropolitan Planning Organization
Metropolitan Transportation Plan
Metropolitan Washington Council of Governments
National Ambient Air Quality Standards
National Bridge Inventory
National Electric Vehicle Infrastructure
National Highway Freight Program
National Highway Freight Network
National Highway Traffic Safety Administration
National Highway Performance Program
National Highway System
Northern Virginia Transportation Authority
Office of Intermodal Planning and Investment
Performance-Based Planning and Programming
Planning District Commission
Metropolitan Planning funds

4

PROTECT
RJACC
RRTPO
RSTP
SGR
SHSP
SIP
SMART SCALE
SME
SPR funds
SRTS
SSYP
STARS
STBG
STIP
SYFP
SYIP
TAM
TAMP
TAP
TCAMPO
TIP
TMPD
TPB
VAPDC
VDOT
VFE
VSP

Promoting Resilient Operations for Transformative, Efficient, and CostSaving Transportation
Regional Jurisdiction and Agency Coordinating Committee
Richmond Regional Transportation Planning Organization
Regional Surface Transportation Program
State of Good Repair
Strategic Highway Safety Plan
State Implementation Plan
System Management and Allocation of Resources for Transportation:
Safety, Congestion, Accessibility, Land Use, Economic Development, and
Environment
Subject Matter Experts
State Planning and Research funds
Safe Routes to School
Secondary Six-Year Plan
Strategically Targeted and Affordable Roadway Solutions
Surface Transportation Block Grant
Statewide Transportation Improvement Program
Six-Year Financial Plan
Six-Year Improvement Program
Transportation Asset Management
Transportation Asset Management Plan
Transportation Alternatives Program
Tri-Cities Area Metropolitan Planning Organization
Transportation Improvement Program
Transportation and Mobility Planning Division
Transportation Planning Board
Virginia Association of Planning District Commissions
Virginia Department of Transportation
Virginia Freight Element
Virginia State Police

5

1. Introduction
The Statewide Transportation Improvement Program, or STIP, is Virginia's federally required
four-year transportation improvement program that identifies transportation projects
highway, passenger rail, freight, public transit, bicycle, and pedestrian that will utilize
federal transportation funding, are of regional significance, or otherwise require Federal
approval from the Federal Highway Administration FHWA or the Federal Transit
Administration (FTA). This document includes, by reference, the approved Transportation
Improvement Programs TIPs for the Bristol, Central Virginia, Charlottesville/Albemarle,
Danville, Fredericksburg, Harrisonburg/Rockingham, Hampton Roads, Kingsport, Virginia's
portion of the National Capital Region, New River Valley, Richmond Regional, Roanoke
Valley, Staunton/Augusta/Waynesboro, Tri-Cities, and Winchester/Frederick Metropolitan
Planning Organizations (MPO) metropolitan planning areas. Also included are all
transportation projects located in rural areas that will utilize federal transportation funding,
are of regional significance, or otherwise require FHWA or FTA approval. Lastly, projects
funded under the Federal Lands Access Program are included in the STIP, along with projects
to improve roadways in Virginia's National Parks, National Forests, and Indian Reservation.
23 CFR Part 450 requires each State to "develop a statewide transportation improvement
program (STIP) for all areas of the State. The STIP shall cover a period of no less than 4
years and shall be updated at least every 4 years, or more frequently if the Governor of the
State elects a more frequent update cycle." In addition, the State is required to "carry out a
continuing, cooperative, and comprehensive statewide transportation planning process that
provides for consideration and implementation of projects, strategies, and services that will
address" several factors, including, but not limited to, increased safety and security of the
transportation system for motorized and non-motorized users, increased accessibility and
mobility of people and freight, protection and enhancement of the environment, efficient
system management and operation, emphasized preservation of the existing transportation
system, and enhanced travel and tourism.
23 CFR Part 450 also requires that the statewide transportation planning process "provide for
the establishment and use of a performance-based approach to transportation decision
making" in support of the national Federal-aid Highway Program performance goals. States
must establish performance measures, in coordination with relevant MPOs, and consider
these performance measures and targets when developing policies, programs, and investment
priorities that are reflected in the long-range statewide transportation plan and the STIP.
Information on Virginia's performance-based approach to planning is incorporated throughout
this document; Virginia's performance measures, objectives, and targets are included in
Appendix F: Performance-Based Planning and Programming.

6

Federal regulations require each State to certify that the transportation planning process is
being carried out in accordance with all applicable laws and regulations. Sections of this
report address many applicable requirements including, but not limited to, fiscal constraint,
public participation, and performance measures. Additionally, several accomplishments
associated with Title VI are highlighted in Appendix J: Civil Rights Accomplishments. The
Commonwealth of Virginia certifies that the statewide transportation planning process is
carried out in conformance with 23 CFR Part 450 and other applicable federal requirements.
In the Fiscal Year (FY) 2024-2027 STIP submittal letter to FHWA and FTA, Virginia s
Secretary of Transportation has certified Virginia s conformance with applicable laws and
regulations.
Federal regulations also require MPOs to certify to FHWA and FTA that the transportation
planning process is being carried out in accordance with all applicable laws and federal
regulations. These MPO certifications are included in each individual TIP. The full STIP is
submitted to FHWA and FTA for approval. A copy of each certification is included in
Appendix D: Statements of Certifications. A listing of the MPOs and Planning District
Commissions (PDCs) in Virginia, along with their corresponding contact information, is
included in Appendix C: MPO/PDC Contacts.
The Clean Air Act requires States to demonstrate that their transportation plans and programs
conform to their regional Air Quality Plan for those areas designated as non-attainment or
maintenance for any applicable criteria pollutant. Currently in Virginia, there is one area that
has been designated non-attainment or maintenance that is required to meet transportation
conformity requirements. The Northern Virginia area, including Washington, D.C., and a
portion of the state of Maryland that forms the National Capital Region, has been designated
as an 8-hour ozone non-attainment area, and therefore must meet transportation conformity
requirements. The National Capital Region Transportation Planning Board (TPB) , the MPO
responsible for transportation planning in the Washington, D.C. region, completed an air
quality conformity analysis that demonstrated that the 2022 Update to the Visualize 2045
Long Range Transportation Plan (LRTP) and the FY 2023-2026 TIP conforms to the
applicable State Implementation Plans SIPs . This conformity analysis was reviewed by the
Environmental Protection Agency (EPA) , FHWA, and FTA, and a subsequent conformity
finding was issued by FHWA and FTA in August 2022 consistent with all applicable
guidelines established by the EPA and the Transportation Conformity Rule at 40 CFR Part 51
and 40 CFR Part 93. The conformity finding is included in Appendix E: Conformity
Determinations. All Northern Virginia projects that are a part of the FY 2024 - 2027 STIP
were either already included in the list of projects covered by the August 2022 conformity
finding or are exempt from the conformity requirements in accordance with federal
regulations.

7

In addition, there are three former non-attainment/maintenance areas in Virginia that are
currently in attainment with the NAAQS, although transportation conformity requirements
have been reinstated for the 1997 8-hour ozone NAAQS due to the South Coast ll court case.
As a result, the Richmond/Tri-Cities, Fredericksburg, and Hampton Roads regions were all
required to demonstrate that their FY 2024 - 2027 TIPs meet conformity requirements. The
MPOs responsible for transportation planning in these areas are the Richmond Regional
Transportation Planning Organization (RRTPO), Tri-Cities Area Metropolitan Planning
Organization (TCAMPO) , Fredericksburg Area Metropolitan Planning Organization
FAMPO , and the Hampton Roads Transportation Planning Organization (HRTPO ,
respectively. Each of these MPOs recently completed a regional conformity determination on
their respective FY 2024 -2027 TIPs that complies with the EPA's South Coast ll conformity
guidance, and these were reviewed by FHWA, FTA, and the EPA. A subsequent conformity
finding was issued for FAMPO, and HRTPO on June 14, and July 17, 2023, respectively.
The conformity finding for RRTPO/TCAMPO was issued August 11, 2023. These findings
are included in Appendix E: Conformity Determinations.

2. MPO/TIP
There are fifteen (15) MPOs in Virginia. An MPO is an organization designated to carry out
the metropolitan transportation planning process in a Metropolitan Planning Area (MPA). An
MPA is an urbanized area with a population of 50,000 or greater, as determined by the United
States Census Bureau, which exists under agreement between the MPO and the Governor. The
MPOs are responsible, in cooperation with the State, for the development of TIPs that establish
the transportation project priorities for their respective areas. These projects are incorporated,
along with rural area projects, projects of regional significance, and projects otherwise
requiring FHWA or FTA approval to form the STIP.
Complete copies of the MPO TIP reports may be obtained by contacting the individual MPOs
shown in Appendix C: MPO/PDC Contacts or by visiting their websites.

3. Financial Summary
Virginia's Six-Year Financial Plan (SYFP) and Six-Year Improvement Program (SYIP)
serve as the "financial plan" for the STIP. Updates to the SYFP and SYIP take place annually,
based on the most recent revenue estimates, and are approved by the Commonwealth
Transportation Board (CTB). Annual updates to the SYIP also incorporate revisions/updates
in priorities and project schedule and cost changes.

8

23 CFR Part 450 requires the STIP and TIP to be financially constrained by federal fiscal year
and by funding category. To certify that this requirement has been met, Tables B and C at the
end of this section, which identify projected versus planned obligations, have been developed
using the FY 2023-2028 SYIP.
Projected obligation is derived as follows:
Federal revenues are based on apportionment tables prepared by FHWA and projected
apportionment under the Infrastructure Investment and Jobs Act (IIJA). The amounts in FY
2024 are based on the funding assumptions included in the Virginia Department of
Transportation's (VDOT) FY 2023-2028 SYFP and corresponding annual budget. These
amounts also include reconciling adjustments from previous years that were not previously
budgeted. The expected federal funds have been reduced by a factor to represent obligation
authority, a budgetary limit representing the total amount of federal funds that may be
obligated each year.
Planned obligations are based on the funding anticipated to be obligated each federal fiscal year
based on project estimates and schedules.

4. VDOT 2024 Estimated Budget
In FY 2024, VDOT estimates an allocation of $3.6 billion to highway construction programs, a
slight reduction of less than 1percent compared to FY 2023. The decrease is attributable to the
one-time General Fund Transportation Initiatives funding, as enumerated in Chapter 2, 2022
Special Session I, Acts of Assembly, Item 452.

5. System-Level Estimates for Operations and Maintenance
Federal planning regulations require the STIP to include system-level estimates of costs and
revenues that are reasonably expected to be available to adequately operate and maintain
Federal-aid highways and public transportation. Typically, activities related to the operations
of Federal-aid highways include work related to signage, traffic flow/management,
signalization, pavement markings, guardrail, lighting, traffic-calming devices, etc.
Maintenance, in turn, encompasses activities that change the physical condition of core
transportation assets and extend their useful life, and is often referred to as preventive
maintenance. In contrast, ordinary or routine maintenance, which is not eligible for federal
participation, is activities that do not normally change the physical condition of an asset.

9

Highway Systems Operations and Maintenance

Development of the budget for operations and maintenance is driven, in part, by performance
targets adopted by the CTB, which guide investment decisions:
Pavements:
• No less than 82% of interstate pavements rated fair or better;
• No less than 82% of primary and secondary pavements rated fair or better with an
AADT≥3,500
• No less than 75% of primary pavements rated fair or better with a AADT <3,500;
• No less than 60% of secondary pavements rated fair or better with an AADT <3,500.
Bridges
•
•
•
•

excludes Special Structure categories Tunnels and Movable Bridges):
The bridges and culverts maintain an average general condition rating of ≥5.6.
No less than 97% of interstate bridges fair or better and no posted bridges;
No less than 93% of primary bridges fair or better;
No less than 90% of secondary bridges fair or better.

VDOT uses an asset management methodology and generally accepted engineering principles
and business practices to identify and prioritize operations and maintenance needs, identify
performance standards to determine those needs, and provide funding to meet those needs.
Each year, VDOT reports to the CTB on the status of progress made in achieving the
performance standards. With this information, the CTB establishes goals and sets priorities for
the upcoming fiscal year. A team consisting of district and central office program managers
develops budget scenarios for achieving the CTB goals. These scenarios are reviewed by the
district maintenance managers and regional operations directors, who provide feedback so that
detailed budgets can be developed. The final operations and maintenance budget is then
approved by the Chief of Maintenance and Operations, Commissioner, and finally by the CTB.
For the most part, highway operations and maintenance is accounted for in three groupings in
the STIP: Preventative Maintenance and System Preservation, Preventative Maintenance for
Bridges, and Traffic and Safety Operations. A description of the maintenance activities covered
by these groupings is found in Appendix B: STIP Project Grouping Definitions. When the STIP
is developed, specific maintenance activities have not yet been identified and a lump sum is set
aside in each project grouping with a note that funding will be obligated as projects are
identified.
Table 1 below provides an estimated distribution of funding to each area of the Maintenance and
Operations Program is estimated to receive $2 billion annually from FY 2024 – FY 2027. The
funding provided represents both federal and state funding.

10

Table 1: Estimated Distribution of Funding for Maintenance and Operations Program (in millions

Interstate Maintenance
Primary Maintenance
Secondary Maintenance
Transportation Operations Services
Total

FY 2024
$364.7
$510.9
$603.3
$436.3
$2.0

FY 2025
$364.7
$510.9
$603.3
$436.3
$2.0

FY 2026
364.7
$510.9
$603.3
$436.3
2.0

FY 2027
$364.7
$510.9
$603.3
$436.3
2.0

Additionally, VDOT provides funding to localities that maintain their own roads. These funds,
shown in Table 2, can be used to maintain federal-aid routes. The amount of funding provided
grows at the same rate as the VDOT Maintenance and Operations Program.
Table 2: Anticipated Funding for Financial Assistance for Localities (in millions)
Financial Assistance to Localities
for Ground Transportation

FY 2024

FY 2025

FY 2026

FY 2027

$549.0

$545.4

$557.3

$569.9

Estimated based on FY 2023-2028 Six-Year Financial Plan.

Transit Systems Operations and Maintenance

The Department of Rail and Public Transportation (DRPT) provides operating assistance
funding to public transit providers throughout Virginia. DRPT's transit funding program is
referred to as "MERIT" - Making Efficient and Responsible Investments in Transit. The
MERIT program includes transit funding for operating, capital, technical assistance, workforce
development, and transit demonstrations.
The Operating Assistance program provides funding for operating expenses for many types of
transit services, including fixed route, demand response, commuter bus, bus rapid transit, ferry,
commuter rail and light rail services. Operating Assistance supports transit operations,
maintenance, repairs, and administrative costs. The goal of the Operating Assistance program is
to improve the quality and efficiency of public transportation services. State operating assistance
is distributed among all eligible public transportation service providers utilizing a performancebased funding methodology. This methodology is based on several different service delivery
factors, including sizing and performance metrics. The sizing factors represent an agency s
relative size to other agencies across the Commonwealth, whereas the performance factors
represent an agency s performance trend for a given metric relative to statewide trends for all
agencies.

11

The Capital Assistance program under MERIT, often referred to as “MERIT Capital”,
supports public transportation capital projects necessary to maintain, improve, or expand
public transportation services. The MERIT Capital program provides funding for transit assets
such as vehicles, transit facilities, customer amenities,,maintenance equipment, machinery,
and heavy equipment. The goals of the program are to maintain a state of good repair for
public transportation capital assets and to improve or expand public transportation services in
a fiscally responsible way that improves transit service for Virginians. The MERIT Capital
program is guided by a prioritization process for capital needs that allows DRPT to allocate
and assign limited resources into projects and investments identified as most critical. The
prioritization process determines which projects achieve policy objectives of maintaining a
state-of-good-repair of existing assets, and determines which projects receive funding for new
investments.
In addition to the state sponsored programs, DRPT oversees the allocation of other federal
funding programs used to support transit and human services capital, maintenance, and
operating costs. Through the Section 5311 rural formula grant program, DRPT provides
additional support for capital, operating, and technical assistance projects to rural public
transportation service providers. Decisions regarding the distribution of these funds happens
in tandem with state programs. The Section 5310 Enhancement Mobility program is also
administered by DRPT, and provides funding for capital, maintenance, and operating costs
associated with providing human service transportation programs for seniors (age 65+) and
individuals with disabilities.
Table 3 below provides estimated funding based on the budgets provided by transit providers.
The funding provided represents both federal and state funding.

Table 3: Estimated Distribution of Funding for Transit Operations (in millions)
FY 2024 FY 2025 FY 2026 FY 2027

Transit Operating Assistance

$109.5

12

$114.3

$116.6

$119.0

6. Public and Local Government Involvement
Virginia is committed to providing reasonable notice and opportunity for the public to review,
comment, and participate in the transportation planning and programming of highways, rail, and
public transportation projects consistent with 23 CFR 450, state laws, and policies. While
VDOT and DRPT perform lead roles in Virginia for transportation planning and programming,
state, regional, and local officials also play important roles in helping the State to understand
and meet the transportation needs of the public.
In accordance with 23 CFR 450.210(a), Virginia has a documented public involvement process
for transportation planning and programming which provides opportunities for public review
and comments at key decision points. The opportunity to review and comment on the STIP is
just one of many opportunities for the public to participate in the transportation planning and
programming process. Virginia’s public participation methods include, but are not limited to:
•

Formal multimodal transportation meetings and/or hearings on CTB proposals to
allocate funds to update the SYIP

•

Informal fall multimodal transportation meetings to provide information on
multimodal performance-based planning and programming initiatives.
Quarterly planning and programming meetings with MPOs and PDCs
Transportation presentations and updates at various meetings and events
Public involvement during both the planning (study) phase as well as citizen
information meetings and public hearings during the project development process
General communication activities such as local government/community public
forums
Use of the internet to provide information to the public on transportation plans,
projects, and the planning and programming process, and the receive comments
from the public on plans and programs
Informal communication activities such as email, phone calls, and meetings
with VDOT and DRPT contact persons

•
•
•
•
•

•

Virginia’s documented public involvement process is available on VDOT’s website at the
following link: Public Participation in Virginia’s Transportation Planning and Programming
Process.
Also, in accordance with 23 CFR 450.210(b), VDOT and DRPT have developed procedures for
consulting with non-metropolitan local officials in the transportation planning and programming
process, including STIP development. These procedures are also available on VDOT’s website at
the following link: 2023 Non-Metropolitan Area Consultation Process.

13

The public involvement process for the STIP and SYIP occur concurrently, with many public
involvement opportunities for the SYIP serving as the public involvement opportunities for the
STIP. In addition, when in a STIP development cycle, the Draft STIP is posted to VDOT’s
website for a minimum of 30 days for public review and comment. The 2024-2027 STIP was
posted to VDOT’s website on July 31, 2023. Public comment ended August 30, 2023. See
Appendix K: Public Meeting Notices/Website Postings for additional details from the STIP
website.
Details on development of the SYIP are described in the section below followed by a section on
development of the FY 2024-2027 STIP.

Six-Year Improvement Program Development

Section § 2.2-229 of the Code of Virginia grants to the Office of Intermodal Planning and
Investment OIPI the responsibility to oversee and coordinate with VDOT and DRPT in the
development of the SYIP for the CTB. This includes planning for financing of transportation
needs, including operational, maintenance, and capital improvements for highways, railways,
seaports, airports, and public transportation, and to allocate funds for these needs in the SYIP.
Section § 33.2-214 of the Code of Virginia further requires that the CTB adopt a SYIP by July 1
of each year; the SYIP is the mechanism by which funding is allocated for transportation needs.
Virginia’s SYIP is a current, fiscally responsible allocation plan which programs transportation
funds from all sources for all projects for the next six years, and forms the foundation for the
four-year STIP.
Each year, in updating the SYIP, the CTB must approve a capital improvement program that
outlines planned spending for transportation projects for proposed construction development or
study for the next six years. The SYIP includes projects on the interstate, primary, secondary,
and urban highway systems, as well as transit and rail projects. The DRPT portion of the
program includes six years of transit capital improvements, six years of rail improvements, and
one year of transit operation and special projects.
The SYIP is updated each year as revenue estimates are updated, priorities revised, project
schedules and costs updated, and study results reviewed and considered. Funds are allocated to
projects based on guiding principles that include, but are not limited to:
•
•
•
•
•

Fund deficits on current projects
Maximize use of federal funds
Fund project phases underway as well as project phases that start in the
current federal fiscal year
Allocate funds consistent with planned obligations and expenditures
Redirect inactive balances on projects

14

Virginia actively practices a performance-based planning and programming process to ensure
that projects selected for funding aid in achieving the long-term goals established in VTrans,
Virginia’s long-range multimodal policy plan, and short-term investment strategies, resulting
in cost-effective investments that improve the performance of the surface transportation
system.
Candidate projects are submitted to various funding programs for screening, scoring, and
prioritization. Candidate projects are based on planning studies that adopt a performance-based,
targeted approach- analyzing performance issues and developing the most cost-effective
solutions to address those issues. All VDOT supported planning studies must include a public
engagement element by policy. Studies typically have at least two or more public information
meetings- the first to introduce and validate performance issues, and subsequent meetings to the
present potential transportation solutions.
Virginia’s SMART SCALE program, a statewide prioritization process which began in 2015, is
one of the most notable funding programs. The SMART SCALE prioritization process requires
all candidate capital projects submitted through the program to meet a need identified in
VTrans. In addition, SMART SCALE applications must meet readiness requirements- including
being based on a planning study that included public involvement, as well as having a formal
written endorsement typically a local or regional resolution) supporting the project. Projects
submitted through the SMART SCALE process must be screened, scored, and selected for
funding by the CTB to be included in the SYIP. The Code of Virginia requires that the scoring
results of the prioritization process must be made public not less than 150 days prior to any vote
to approve projects for funding submitted through the process. Therefore, CTB policy informs
an initial staff recommended funding scenario based on scoring results. This scenario is used to
develop initial programming of funding available through SMART SCALE and included in the
Draft SYIP released for public comment and review. A consensus scenario is then adopted by
the CTB based on public feedback and used to inform final programming of the final SYIP
adopted by the CTB in June.
Additional funding programs that are exempt from SMART SCALE include but are not limited
to: regional transportation funds specific to Northern Virginia, Hampton Roads, and the Central
Virginia regions; the Revenue Sharing Program, the Transportation Alternatives Program
TAP , the Virginia Highway Safety Improvement Program (VHSIP) , Interstate Operations and
Enhancement Program (IOEP) , and the State of Good Repair (SGR) program. Each of these
programs includes public engagement in the planning and project selection phase and include
citizens information meetings and formal public hearings once projects are included in the SYIP
and enter the project development phase. Regardless of the funding program, all transportation
projects for proposed construction development or study for the next six years must be included
in the SYIP.

15

Planning for the SYIP begins in the summer of years when SMART SCALE or other funding
programs are accepting applications. Following application submission, fall multimodal
transportation public meetings and other outreach opportunities are conducted throughout the
Commonwealth where public comment is sought on existing projects included in the current
SYIP and on candidate projects submitted through the various funding programs. Since 2019,
VDOT has implemented policy requiring enhanced public involvement (which includes
virtual components) on all VDOT sponsored planning studies.
VDOT, DRPT, and the CTB also hold public hearings, other ongoing outreach opportunities
such as CTB meetings, as well as the spring public meetings is used to inform funding
decisions in the development of the draft SYIP. Copies of the STIP are made available at any
statewide public meetings held in the fall or spring of each year.
Table 4: Public Meeting Dates

Spring 2023
April 20, 2023
April 24, 2023
May 1, 2023
May 2, 2023
May 3, 2023
May 8, 2023
May 15, 2023
May 16, 2023
May 17, 2023
A draft SYIP is released for public review and comment prior to final adoption by the CTB.
Public comment was open April 10, 2023 through May 24, 2023. During the public review
and comment period, available allocation totals and project selections are finalized for
formal adoption by the CTB no later than July 1 of each year.
The FY 2023-2028 SYIP is the basis of the FY 2024-2027 STIP.
General information on the SYIP and its development is available
at: http://www.virginiadot.org/projects/syp-default.asp.
The SYIP database which contains the list of projects in the approved SYIP is available at:
http://syip.virginiadot.org/Pages/allProjects.aspx.

Secondary Six-Year Plan Development

In addition to annual development of the SYIP, a separate project listing, by county, is
prepared for state secondary road improvement projects. Section § 33.2-331 of the Code of
Virginia requires that each county’s governing body cooperate with VDOT to hold a public
hearing for updating a Six-Year Plan for secondary roads and the secondary highways budget
for the county
16

for the upcoming fiscal year. A public hearing is required in any year in which a proposed new
funding allocation to an individual project and/or program in the Secondary Six-Year Plan
SSYP or the Secondary Six-Year Plan budget is greater than $100,000. Following the public
hearing and consideration of comments, the governing body officially adopts a SSYP and
approves a secondary highways budget for the county for the upcoming fiscal year. VDOT
works closely with each county and attends a meeting of the Board of Supervisors as project
recommendations are made. Projects vetted through the Secondary Six-Year Plan development
may be submitted as candidate projects for funding through the SMART SCALE process or
other available funding programs.

FY 2024-2027 STIP Development

The FY 2024-2027 STIP is based on the allocation plan included in the FY 2024-2029 SYIP.
All federally funded transportation projects and all regionally significant projects are included.
This includes multimodal projects (highway, passenger rail, freight, public transit, bicycle, and
pedestrian) as well as projects on roadways in Virginia’s National Parks, National Forests, and
Indian Reservation. Appendix A: How to Read the STIP provides an explanation of how to read
the STIP with a breakdown of the various sections/columns, what each means, and how it
functions within the program.
VDOT assists the MPOs in development of their TIP documents by first providing the project
listing and planned funding and obligations, and then working collaboratively with each MPO
as they prepare their TIP document to ensure consistency between each organization and for
incorporation into the STIP. In the development of the public transportation portion of the
MPO’s TIP document, the MPOs are responsible for collaborating with the transit providers in
their MPO area to develop their project list and planned funding. Each MPO’s TIP is subject to
a public participation process and reasonable public comment period as required by 23 CFR
450.316 Interested parties, participation, and consultation, as well as approval and
certification by their board. A copy of each certification has been included in Appendix D:
Statements of Certifications. The STIP directly incorporates all projects included in each
MPO’s TIP with a breakout by VDOT construction district, consistent with the SYIP. STIP
projects located in MPO aBreas are designated as such. Each MPO maintains their TIP
document and may include more project information than is included in the STIP document.
Access to each MPO’s TIP is provided on http://www.virginiadot.org/about/stip.asp along with
general information on the STIP.
Several other key elements involved in development of the STIP are listed below:
•

For those MPOs that qualify for Regional Surface Transportation Block Grant
Program (RSTBG) and/or Congestion Mitigation and Air Quality (CMAQ)
funds, the SYIP and STIP include all projects selected in accordance with an
MPO’s prioritization process. The RSTBG and CMAQ funds are allocated by
the MPO for each year of the SYIP and planned obligations are identified for
the required STIP years.
17

7. STIP Program Notes
The FY 2024-2027 STIP is based on the CTB’s approved FY 2024-2029 SYIP and the
approved TIPs from the 15 MPOs in Virginia. Self-certifications are also submitted with the
approval of the TIPs and are included in this document in Appendix D: Statements of
Certifications.
The projects in the first year of the STIP constitute the agreed-to list of projects for subsequent
scheduling and implementation and no further action under 23 CFR 450.220 is required for the
implementing agency to proceed with these projects. However, it should be recognized that the
STIP is a dynamic document, and therefore, the planned obligations in the STIP may
ultimately differ from the actual obligations published in the Annual Obligation Report. The
STIP may be amended or adjusted based on changes to status of projects, the available
obligation authority, and the needs of the agencies (FHWA, FTA, VDOT, and DRPT), MPOs,
and local governments. Often projects are delayed in the development stage, and if other
projects must be accelerated to take their place, then a STIP administrative modification or
amendment is necessary.
STIP amendments or administrative modifications will use the agreed upon procedures
outlined in the Commonwealth of Virginia Statewide Transportation Improvement Program
STIP Procedures. Once approved, such amendments and administrative modifications will be
reflected in the LIVE STIP Report available on the VDOT public website.
During the development of the FY 2024-2027 STIP, a point in time (January 2023) project list
was created and after assessment, was provided to MPO’s for review and approval. Once
approved, this project list is submitted to FHWA and FTA for approval as part of the
FY2024-2027 STIP. Amendments occurring after list development are amended to the current
2021-2024 STIP and are managed through the "rollover" process. Accordingly, as was practiced
with the previous STIP, projects falling into this category will be “rolled over” into the FY
2024-2027 STIP after October 1, 2023. VDOT, MPOs, and FHWA worked collaboratively to
develop and document the STIP rollover amendment process. Affected MPOs will be notified
when the rollover amendment has been submitted to FHWA and FTA. Once a response is
received that the rollover has been noted, the MPOs will be notified so their respective TIPs can
be updated accordingly.
The Moving Ahead for Progress in the 21st Century Act (MAP-21), signed into law in 2012,
included provisions that transformed the federal surface transportation program to focus on
achieving performance outcomes related to goals for the national transportation system.

18

On November 6, 2021, Congress passed the Bipartisan Infrastructure Law (BIL/IIJA), a
five-year reauthorization of the FAST Act coupled with broader infrastructure investments
beyond traditional surface transportation programs. In accordance with the requirements
of MAP-21 and FAST Act, Virginia established performance targets in the areas of safety,
asset management, and system performance. The performance targets were developed in
collaboration with DRPT, Virginia's MPOs and PDCs, as well as other agencies within the
Commonwealth and were first reported to FHWA and FTA in 2018. Additional
information on the subject is found in Appendix F: Performance-Based Planning and
Programming.

19

TABLE B
FEDERAL FUNDING CATEGORIES STATEWIDE
FISCAL CONSTRAINT OF THE FY24-FY27 STIP
Transit Projects (in $1,000)

Fund Source

Previous Funding
Projected
Planned
Obligations Obligations

FFY2024
Projected
Planned
Obligations Obligations

FFY2025
FFY2026
FFY2027
Projected
Planned
Projected
Planned
Projected
Planned
Obligations Obligations Obligations Obligations Obligations Obligations

FTA 5307

71,442

71,442

144,128

144,128

78,807

78,807

68,372

68,372

58,442

58,442

FTA 5309

282

282

-

-

-

-

-

-

-

-

FTA 5310

2,146

2,146

6,128

6,128

4,596

4,596

4,642

4,642

5,007

5,007

FTA 5311

4,727

4,727

45,026

45,026

45,330

45,330

45,727

45,727

45,241

45,241

FTA 5329

-

-

529

529

529

529

529

529

529

529

FTA 5337

47,133

47,133

9,921

9,921

9,074

9,074

7,822

7,822

5,747

5,747

FTA 5339

13,500

13,500

7,539

7,539

11,360

11,360

6,016

6,016

5,884

5,884

2,444

2,444

756

756

-

-

-

-

-

-

FTA ADTAP

-

-

1,784

1,784

1,784

1,784

1,784

1,784

1,784

1,784

FTA RTAP

-

-

386

386

386

386

386

386

386

386

5,681

5,681

1,251

1,251

-

-

-

-

375

375

CMAQ

54,407

54,407

29,723

29,723

15,738

15,738

47,948

47,948

5,759

5,759

RSTP

78,666

78,666

20,412

20,412

19,676

19,676

18,480

18,480

2,753

2,753

Other Federal

65,218

65,218

38,054

38,054

63,065

63,065

1,617

1,617

2,370

2,370

State

238,225

238,225

195,627

195,627

399,313

399,313

436,742

436,742

787,089

787,089

Local

340,537

340,537

98,744

98,744

98,263

98,263

84,482

84,482

351,468

351,468

-

-

5,418

5,418

5,418

5,418

5,418

5,418

5,418

5,418

3,341

3,341

7,588

7,588

7,411

7,411

7,554

7,554

8,167

8,167

927,749

927,749

613,013

613,013

760,750

760,750

737,518

737,518

1,286,418

1,286,418

Federal Stimulus

Flexible STP

Local-in-Kind
Revenues
TRANSIT TOTAL

20

TABLE C
FEDERAL FUNDING CATEGORIES STATEWIDE
FISCAL CONSTRAINT OF YEAR
Highway Projects
Unmatched for FFY 2024 - 2027
FFY 2024

Fund Source

Projected
Obligation
Authority

FFY 2025

Planned
Obligations

Projected
Obligation
Authority

FFY 2026
Projected
Obligation
Authority

Planned
Obligations

FFY 2027

Planned
Obligations

Projected
Obligation
Authority

TOTAL

Planned
Obligations

Projected
Obligation
Authority

Planned
Obligations

Formula OA
BR

$141,790,156

$49,871,289

$142,314,134

$57,810,621

$142,848,592

$211,441,608

$27,802,484

$126,614,214

$454,755,366

$445,737,732

CMAQ (1)

$61,011,597

$49,075,449

$62,231,828

$47,380,108

$63,476,465

$29,428,970

$64,745,993

$22,473,841

$251,465,883

$148,358,368

CRP

$33,144,239

$0

$33,807,125

$3,119,527

$34,483,267

$3,543,449

$35,172,932

$0

$136,607,563

$6,662,976

HSIP

$101,539,993

$74,851,355

$103,722,001

$44,359,247

$105,950,976

$12,311,366

$108,227,930

$12,837,167

$419,440,900

$144,359,135

NHFP

$35,982,824

$54,385,484

$36,702,480

$27,498,867

$37,436,530

$25,706,403

$38,185,261

$22,116,009

$148,307,095

$129,706,763

$703,228,994

$407,652,163

$717,293,574

$380,375,732

$731,639,445

$412,655,031

$746,272,234

$358,901,058 $2,898,434,247

$1,559,583,984

$0

($12,800,000)

$0

$0

$0

$0

$0

$0

$0

$37,687,377

$1,845,000

$38,441,125

$0

$39,209,948

$0

$39,994,147

$0

$155,332,597

$1,845,000

RSTP (1)

$108,387,274

$124,775,509

$110,555,020

$53,757,643

$112,766,120

$47,600,819

$115,021,442

$100,721,118

$446,729,856

$326,855,089

STP/STBG

$196,199,869

$338,136,351

$200,024,670

$293,092,872

$203,925,967

$329,535,431

$207,905,290

$303,758,599

$808,055,796

$1,264,523,253

$36,826,319

$19,357,576

$37,544,751

$18,318,712

$38,277,201

$24,600,254

$39,023,938

$2,437,646

$151,672,209

$64,714,188

$949,859,652 $5,870,801,512

$4,079,546,488

NHS/NHPP
NSFH (4)
PROTECT

TAP (2)
Subtotal -- Formula OA

$1,455,798,642 $1,107,150,176 $1,482,636,708

$925,713,329 $1,510,014,511 $1,096,823,331 $1,422,351,651

($12,800,000)

Special OA
APD (3)

$0

$33,448,988

$0

$916,529

$0

$0

$0

$0

$0

$1,647,658

$32,866,414

$1,665,782

$1,322,436

$1,684,106

$2,735,768

$1,702,631

$1,434,407

$6,700,177

$38,359,025

EB/MG

$0

($1,032,889)

$0

$0

$0

$0

$0

$0

$0

($1,032,889)

HIP (3)

$0

$21,187,765

$0

$7,458,469

$0

$1,600,000

$0

$4,000,000

$0

$34,246,234

DEMO (3)

$34,365,517

NEVI

$21,275,226

$0

$21,275,226

$0

$21,275,226

$0

$0

$0

$63,825,678

$0

NHPP/E

$17,167,796

$9,381,881

$17,511,152

$4,987,394

$17,861,375

$7,272,104

$18,218,603

$6,037,508

$70,758,926

$27,678,887

$1,800,000

$0

$1,800,000

$0

$1,800,000

$0

$1,800,000

$0

$7,200,000

$0

$0

$206,799

$0

$0

$0

$0

$0

$0

$0

$206,799

$41,890,680

$96,058,958

$42,252,160

$14,684,828

$42,620,707

$11,607,872

$21,721,234

$11,471,915

$148,484,781

$133,823,573

$961,331,567 $6,019,286,293

$4,213,370,061

PUBLIC LANDS
SAFETEA-LU EARMARKS (3)
Subtotal -- Special OA
Highway Total

$1,497,689,322 $1,203,209,134 $1,524,888,868

(1)

CMAQ and RSTP planned obligations include both DRPT and VDOT

(2)

Includes Flexible and Urbanized Areas TAP

(3)

Projected obligation authority includes obligation authority from previous years

(4)

Also known as INFRA Grants Program, formerly FASTLANE Grant Program

$940,398,157 $1,552,635,218 $1,108,431,203 $1,444,072,885

21

COMMONWEALTH OF VIRGINIA

APPENDIX A

How to Read the STIP

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

Appendix A: How to Read the STIP

23

COMMONWEALTH OF VIRGINIA

APPENDIX B

STIP Project Grouping Definitions

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

Appendix B: STIP Project Grouping Definitions

25

26

COMMONWEALTH OF VIRGINIA

APPENDIX C

MPO/PDC Contacts

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

Appendix C: MPO/PDC Contacts
Metropolitan Planning Organization Contact Information
1.

Bristol Metropolitan Planning
Organization

Address/Phone:
P.O. Box 1189
Bristol, TN 37621-1189
(423) 989-5517
Contacts:
Ambre Torbett, Chairman
Tyler Gillenwater, Transportation Planning Manager
Email: [email protected]
Micah Bray, Transportation Planner [email protected]

2.

Charlottesville/Albemarle
Metropolitan Planning Organization

Address/Phone:
Thomas Jefferson Planning District Commission
P.O. Box 1505
401 East Water Street
Charlottesville, VA 22902-1505
(434) 979-1597
Contacts:
Brian Pinkston, Chair
Christine Jacobs, Executive Director
Email: [email protected]

3.

Central Virginia Metropolitan
Planning Organization

Sandy Shackelford, Director of Planning & Transportation
Email: [email protected]
Address/Phone:
Central Virginia Planning District Commission
828 Main Street, 12th Floor
Lynchburg, VA 24504
(434) 845-3491
Contacts:
Dwayne Tuggle, Chairman
Alexander Brebner, Executive Director
Email: [email protected]
Kelly Hitchcock, Transportation Planning Director
Email: [email protected]

28

Metropolitan Planning Organization Contact Information
4.

Danville Metropolitan Planning
Organization

Address/Phone:
West Piedmont Planning District Commission
P.O. Box 5268
Martinsville, VA 24115-5268
(276) 638-3987
Contacts:
Robert Warren, Chairman
Michael Armbrister, Executive Director
Email: [email protected]
Joseph Bonanno, Transportation Planner
Email: [email protected]

5.

Fredericksburg Area Metropolitan
Planning Organization

Michael Armbrister, Deputy Director
Email: [email protected]
Address/Phone:
406 Princess Anne Street
Fredericksburg, VA 22401
(540) 642-1564
Contacts:
Jason Graham, Chairman
Ian Ollis, Executive Director
Email: [email protected]

6.

Hampton Roads Transportation
Planning Organization

Address/Phone:
Hampton Roads Planning District Commission
The Regional Building
723 Woodlake Drive
Chesapeake, VA 23320
(757) 420-8300
Contacts:
Supervisor William M. McCarty, Chair, Isle of Wight
Robert Crum, Executive Director/Secretary
Email: [email protected]
Pavithra Parthasarathi, HRTPO Deputy Executive Director
Email: [email protected]

29

Metropolitan Planning Organization Contact Information
7.

Harrisonburg/Rockingham
Metropolitan Planning Organization

Address/Phone:
Central Shenandoah PDC
112 MacTanly Place
Staunton, VA 24401
(540) 885-5174
Contacts:
Rick Chandler, Chairman
Bonnie Riedesel, Executive Director
Email: [email protected]

8.

Ann Cundy, Transportation Director
Email: [email protected]
Address/Phone:
Kingsport Metropolitan
Transportation Planning Organization 415 Broad Street
Kingsport, TN 37660
(423) 224-2670
Contacts:
Paul Montgomery, Chairman
Lesley Phillips, MTPO Coordinator
Email: [email protected]

9.

National Capital Region
Transportation Planning Board

Address/Phone:
Metropolitan Washington Council of Governments
777 North Capitol Street, Suite 300
Washington, DC 20002-4201
(202) 962-3260
Contacts:
Reuben Collins, Chairman
Clark Mercer, Executive Director
Email: [email protected]

10.

New River Valley Metropolitan
Planning Organization

Kanathur Srikanth, Director of Transportation Planning
Email: [email protected]
Address/Phone:
County Government Center
755 Roanoke Street, Suite 21
Christiansburg, VA 24073
(540) 394-2145
Contacts:
Craig Meadows, Chairman
Dan Brugh, Executive Director
Email: [email protected]

30

11.

Metropolitan Planning Organization

Contact Information

Richmond Regional Transportation Planning
Organization

Address/Phone:
Richmond Regional Planning District
Commission 424 Hull Street, Suite 300
Richmond, VA 23224
(804) 323-2033
Contacts:
John L. Lumpkins, Jr, Chairman
Martha Shickle, Executive Director
Email: [email protected]

12.

Chet Parsons, Director of Transportation Planning
Email: [email protected]
Address/Phone:
Roanoke Valley-Alleghany Regional Commission
313 Luck Avenue, SW, 24016
P.O. Box 2569
Roanoke, VA 24010
(540) 343-4417

Roanoke Valley Area Transportation Planning
Organization

Contacts:
Billy Martin, Sr., Chair
Jeremy Holmes, Executive Director
Email: [email protected]
Vacant, Director of Transportation Email:
[email protected]

13.

Bryan W. Hill, Regional Planner
Email: [email protected]
Address/Phone:
Central Shenandoah PDC
112 MacTanly Place Staunton, VA
24401-2373
(540) 885-5174

Staunton/Augusta/Waynesboro
Metropolitan Planning Organization

Contacts:
Scott Seaton, Chairman
Bonnie Riedesel, Executive Director
Email: [email protected]
Ann Cundy, Director of Transportation
Email: [email protected]

31

14.

Metropolitan Planning Organization

Contact Information

Tri-Cities Area Metropolitan Planning
Organization

Address/Phone:
Crater Planning District Commission
P.O. Box 1808
Petersburg, VA 23805
(804) 861-1666 ext: 234
Contacts:
John Partin, Chairman
Ron Svejkovsky, Director of Transportation
Email: [email protected]

15.

Jay Ellington, Executive Director
Email: [email protected]
Address/Phone:
400 E. Kendrick Lane
Front Royal, VA 22630
(540) 636-8800

Winchester/Frederick County Metropolitan
Planning Organization

Contacts:
Judith McCann-Slaughter, Chair
Brandon Davis, Executive Director
Email: [email protected]
Karen Taylor, Director Transportation Planning
Email: [email protected]

32

District
1

Planning District Commission

Contact Information

LENOWTSCO PDC

Address/Phone:
372 Technology Trail Lane, Suite 101
Duffield, VA 24244-5330
(276) 431-2206
Contacts:
Duane A. Miller, Executive Director
Email: [email protected]
Marshall Tipton, Chairman
Thomas Lawson, Planner
Email: [email protected]

2

Cumberland Plateau PDC

Address/Phone:
P.O. Box 548
Lebanon, VA 24266
(276) 889-1778
Contacts:
Scotty Wampler, Executive Director
Email: [email protected]
Steve Breeding, Chairman
Angie Beavers, Planner
Email: [email protected]

3

Mount Rogers PDC

Address/Phone:
1021 Terrace Drive
Marion, VA 24354
(276) 783-5103
Contacts:
Aaron Sizemore, Executive Director
Email: [email protected]
Willie Greene, Chairman
Mason Gragg, Planner
Email: [email protected]

33

District
4

Planning District Commission

Contact Information

New River Valley Regional Commission

Address/Phone:
6580 Valley Center Drive, Suite 124
Radford, VA 24141
(540) 639-9313
Contacts:
Kevin Byrd, Executive Director
Email: [email protected]
Hil Johnson, Chairman

5

Elijah Sharp, Planner
Email: [email protected]
Roanoke Valley/Alleghany Regional Commission Address/Phone:
P.O. Box 2569
Roanoke, VA 24010
(540) 343-4417
Contacts:
Jeremy Holmes, Executive Director
Email: [email protected]
Temple Kessinger, Jr., Chairman
Alison Stinnette, Planner
Email: [email protected]
Jonathan Stanton, Planner
Email: [email protected]

6

Central Shenandoah Planning District Commission Address/Phone:
112 MacTanly Place
Staunton, VA 24401-2373
(540) 885-5174
Contacts:
Bonnie Riedesel, Executive Director
Email: [email protected]
Scott Seaton, Chairman
Ann Cundy, Planner – Director of Transportation
Email: [email protected]

34

District
7

Planning District Commission

Contact Information
Address/Phone:
400 E. Kendrick Lane
Front Royal, VA 22630
(540) 636-8800

Northern Shenandoah Valley Regional
Commission

Contacts:
Brandon Davis, Executive Director
Email: [email protected]
Dennis Morris, Chairman Karen Taylor, Planner
Email: [email protected]

8

Northern Virginia Regional Commission

Address/Phone:
3040 Williams Dr., Suite 200
Fairfax, VA 22031
(703) 642-0700
Contacts:
Robert W. Lazaro, Executive Director
Email: [email protected]

9

Rappahannock-Rapidan Regional Commission

John T. Chapman, Chairman
Address/Phone:
420 Southridge Parkway, Suite 106
Culpeper, VA 22701
(540) 829-7450
Contacts:
Patrick Mauney, Executive Director
Email: [email protected]
Fred Catlin, Chairman

10

John Otto, Planner
Email: [email protected]
Thomas Jefferson Planning District Commission Address/Phone:
P.O. Box 1505
Charlottesville, VA 22902
(434) 979-1597
Contacts:
Christine Jacobs, Executive Director
Email: [email protected]
Ned Gallaway, Chairman
Sandy Shackelford, Director of Planning &
Transportation
Email: [email protected]

35

District
11

Planning District Commission

Contact Information

Central Virginia Planning District Commission

Address/Phone:
828 Main Street, 12th Floor
Lynchburg, VA 24504
(434) 845-3491
Contacts:
Alexander Brebner, Executive Director
Email: [email protected]
Frank Rogers, Chairman
Sandy Dobyns, Finance Director
Email: [email protected]

12

West Piedmont Planning District Commission

Address/Phone:
P.O. Box 5268; 1100 Madison Street
Martinsville, VA 24115-5268
(276) 638-3987
Contacts:
Michael Armbrister, Executive Director
Email: [email protected]
Jim Adams, Chairman

13

Southside Planning District Commission

Joseph Bonanno, Planner
Email: [email protected]
Address/Phone:
P.O. Box 150
200 South Mecklenburg Avenue
South Hill, VA 23970
(434) 447-7101 Ext. 209
Contacts:
Deborah B. Gosney, Executive Director
Email: [email protected]
Tom Tanner, Chairman

14

Chad Neese, Planner
Email: [email protected]
Address/Phone:
P.O. Box P, One Mill Street, Suite 202
Farmville, VA 23901
(434) 392-6104

Commonwealth Regional Council

Contacts:
Melody Foster, Executive Director
Email: [email protected]
J. David Emert, Chairman
Lauren Jones, Planner
Email: [email protected]

36

District
15

Planning District Commission

Contact Information

Richmond Regional Planning District CommissionAddress/Phone:
424 Hull Street, Suite 200
Richmond, VA 23224
(804) 323-2033
Contacts:
Martha Shickle, Executive Director
Email: [email protected]
Sean Davis, Chairman

16

George Washington Regional Commission

Chet Parsons, Planner
Email: [email protected]
Address/Phone:
406 Princess Anne Street
Fredericksburg, VA 22404
(540) 642-1580
Contacts:
Chip Boyles, Executive Director
Email: [email protected]
Jim Howard, Chairman

17

Northern Neck Planning District Commission

Kate Gibson, Planner
Email: [email protected]
Address/Phone:
P.O. Box 1600
Warsaw, VA 22572
(804) 333-1900
Contacts:
Jerry W. Davis, Executive Director
Email: [email protected]
James Long, Chairman

18

John Bateman, Planner
Email: [email protected]
Middle Peninsula Planning District Commission Address/Phone:
P.O. Box 286
Saluda, VA 23149
(804) 758-2311
Contacts:
Lewis Lawrence, Executive Director
Email: [email protected]
Edwin E. "Bud" Smith, Chairman
Curt Smith, Planner
Email: [email protected]

37

District
19

Planning District Commission

Contact Information

Crater Planning District Commission

Address/Phone:
P.O. Box 1808
1964 Wakefield Street
Petersburg, VA 23805
(804) 861-1666
Contacts:
Jay Ellington, Executive Director
Email: [email protected]
Michelle Johnson, Chairman

22

Accomack-Northampton Planning District
Commission

Ron Svejkovsky, Planner
Email: [email protected]
Address/Phone:
P.O. Box 417
Accomac, VA 23301
(757) 787-2936
Contacts:
Elaine Meil, Executive Director
Email: [email protected]
Oliver Bennett, Chairman
Ashley Mills, Planner
Email: [email protected]

23

Hampton Roads Planning District Commission

Address/Phone:
723 Woodlake Drive
Chesapeake, VA 23320
(757) 420-8300
Contacts:
Robert Crum, Jr., Executive Director
Email: [email protected]
Mayor Douglas G. Pons, City
of Williamsburg, Chairman
Dale Stith, Planner
Email: [email protected]

38

COMMONWEALTH OF VIRGINIA

APPENDIX D
Statements of Certification

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

COMMONWEALTH OF VIRGINIA

APPENDIX E
Conformity Determinations

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

U.S. Department
of Transportation

Federal Transit Administration
Region III
1760 Market Street, Suite 500
Philadelphia, PA 19103
215-656-7100
215-656-7260 (fax)

Federal Highway Administration
VA Division
400 North 8th Street, Room 750
Richmond, VA 23240
804-775-3320
804-775-3356 (fax)

June 14, 2023
Mr. Stephen Brich
Commissioner
Virginia Department of Transportation
1401 East Broad Street
Richmond, Virginia 23219
Re: Joint FHWA/FTA Conformity Finding for the 1997 8-hour ozone standard;
Fredericksburg, Virginia
Dear Mr. Brich:
The Federal Highway Administration FHWA and Federal Transit Administration FTA have
completed a joint review of the Fredericksburg Area Metropolitan Planning Organization’s
FAMPO 2050 Long Range Transportation Plan (LRTP and FY 2024-2027 Transportation
Improvement Program (TIP .
In accordance with the 1990 Clean Air Act Amendments CAAA), the FHWA and the FTA are
required to make a joint air quality conformity finding. Based on our evaluation of the materials
submitted, coordination with the U.S. Environmental Protection Agency - Region 3 Office
EPA , and input from FAMPO, the FHWA and FTA therefore find that the Conformity
Determination submittal for the FY 2050 LRTP and FY 2024-2027 TIP for the Fredericksburg
1997 8-hour Ozone Area demonstrates conformity as prescribed by EPA’s Transportation
Conformity Rule (40 CFR Part 93), subsequent amendments, and guidance issued by EPA in
November 2018 for areas affected by the February 2018 South Coast court decision. The EPA,
by letter dated May 15, 2023, concurred on the overall conformity determination.
This letter represents that joint conformity finding. This conformity finding remains valid for a
period of four years provided no regionally significant projects are amended to or removed from
the LRTP or TIP and provided no metropolitan transportation planning deadlines come due
before then. Based on our transportation planning regulatory requirements (23 USC 134 and 49
USC 5303), our day-to-day involvement with the FAMPO, and extensive review of their fiscal
analysis reports, FTA and FHWA find the financial information needed to support our fiscal
constraint determination complete.

65

If you have any questions or need additional information, please contact Steven Minor of
FHWA at (804) 775-3359 or Dan Koenig of FTA at (202) 366-8224.
Sincerely,

EDWARD S
SUNDRA
for Terry Garcia Crews
Regional Administrator
Federal Transit Administration
cc:

Digitally signed by EDWARD
S SUNDRA
Date: 2023.06.15 10:00:45
-04'00'

Edward Sundra
Director of Program Development
Federal Highway Administration

Mr. Ian Ollis, FAMPO/GWRC (via e-mail)
Ms. Marsha Fiol, VDOT via email)
Mr. Eric Stringfield, VDOT via email)
Mr. James Ponticello,VDOT (via email)
Mr. Ivan Rucker, FHWA via email
Mr. Steven Minor, FHWA via email
Mr. Tony Tarone, FTA via mail
Ms. Laura Keeley, FTA via email
Ms. Chelsea Beytas, FTA (via e-mail)
Mr. Michael Gordon, EPA (via email)
Mr. Gregory Becoat, EPA via email

66

67

68

U.S. Department
of Transportation

Federal Transit Administration
Region III
1835 Market Street, Suite 1910
Philadelphia, PA 19103
215-656-7100

Federal Highway Administration
DC Division
1200 New Jersey Avenue, SE (E61-205)
Washington, DC 20590
202-493-7020

The Honorable Pamela Sebesky, Chairperson
National Capital Region Transportation Planning Board
c/o, Mr. Kanti Srikanth, Director Department of Transportation Planning
Metropolitan Washington Council of Governments
777 North Capital Street, NW, Suite 300
Washington, D.C. 20002-4201
Re: Air Quality Conformity Determination of the 2022 Update to the Visualize 2045 LongRange Transportation Plan and The FY 2023-2026 Transportation Improvement Program
Dear Chairwoman Sebesky:
The 1990 Amendments to the Clean Air Act (CAA require transportation air quality conformity
determinations for Metropolitan Transportation Plans, Transportation Improvement Programs
TIP , sections of a State Transportation Improvement Program (STIP covering rural
nonattainment/maintenance areas, and projects in areas that are designated as air quality
nonattainment and maintenance areas. Section 176(d) of the CAA establishes priority
requirements for programs supported by the Federal government that target nonattainment or
maintenance areas to provide for timely implementation of eligible portions of air quality plans.
On August 16, 2022, in an e-mail to the Federal Highway Administration’s FHWA District of
Columbia Division, the Environmental Protection Agency (EPA concurred that the conformity
determination met the requirements of the CAA. EPA’s review considered the 2008 8-Hour
Ozone National Ambient Air Quality Standard NAAQS and the 2015 8-Hour Ozone NAAQS
Conformity Determinations for the Fiscal Year FY 2023-2026 Transportation Improvement
Program (TIP and the Visualize 2045 Long Range Transportation Plan (LRTP for the
Metropolitan Washington Region as adopted by the National Capital Region Transportation
Planning Board (TPB .
FTA and FHWA are jointly making this air quality conformity determination. FTA and FHWA
find the planning process to be continuing, cooperative, and comprehensive transportation
planning carried on cooperatively by the TPB, the Washington Metropolitan Area Transit
Authority (WMATA , the states of Maryland and Virginia, and the District of Columbia in
accordance with the requirements of 23 USC 134 and 49 USC and Section 5303.
Based on our transportation planning regulatory requirements, our day-to-day involvement, and
extensive review of technical analysis reports, and in accordance with the provisions of Section
134(h) 2) B , Title 23 USC, FTA and FHWA find the financial information needed to support
our fiscal constraint determination is complete.

69

Any questions concerning this determination should be directed to Ms. Sandra Jackson,
Community Planner of the FHWA District of Columbia Division, at 202) 493-7031 or Daniel
Koenig, Community Planner of the FTA Region 3 Office, at (202) 366-8224.
Sincerely,

70

U.S. Department
of Transportation

Federal Transit Administration
Region III
1835 Market, Suite 1910
Philadelphia, PA 19103
215-656-7100
215-656-7260 (fax)

Federal Highway Administration
Virginia Division
400 N. 8th Street, Suite 750
Richmond, VA 23219
Phone: 804-775-3320
804-775-3356 (fax)

August 11, 2023
Mr. Stephen Brich
Commissioner
Virginia Department of Transportation
1401 East Broad Street
Richmond, Virginia 23219
Re: Joint FHWA/FTA Conformity Finding for the 1997 8-hour ozone standard;
Richmond-Petersburg, Virginia
Dear Mr. Brich:
The Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA)
have completed a joint review of the Richmond Regional Transportation Planning
Organization’s (RRTPO) and Tri-Cities Metropolitan Planning Organization’s (TCMPO) Fiscal
Year (FY) 2045 Long-Range Transportation Plans (LRTPs) and FY 2024-2027 Transportation
Improvement Programs (TIPs).
In accordance with the 1990 Clean Air Act Amendments (CAAA), the FHWA and the FTA are
required to make a joint air quality conformity finding. Based on our evaluation of the materials
submitted, coordination with the U.S. Environmental Protection Agency - Region 3 Office
(EPA), and input from RRTPO and TCMPO, the FHWA and FTA therefore find that the
Conformity Determination submittal for the FY 2045 LRTPs and FY 2024-2027 TIPs for the
Richmond-Petersburg 1997 8-hour Ozone Area demonstrates conformity as prescribed by EPA’s
Transportation Conformity Rule (40 CFR Part 93), subsequent amendments, and guidance issued
by EPA in November 2018 for areas affected by the February 2018 South Coast court decision.
The EPA, by letter dated July 18, 2023, concurred on the overall conformity determination.
This letter represents that joint conformity finding. This conformity finding remains valid for a
period of four years provided no regionally significant projects are amended to or removed from
the LRTPs or TIPs and provided no metropolitan transportation planning deadlines come due
before then. Based on our transportation planning regulatory requirements (23 USC 134 and 49
USC 5303), our day-to-day involvement with the RRTPO and TCMPO, and extensive review of
their fiscal analysis reports, FTA and FHWA find the financial information needed to support
our fiscal constraint determination complete.

71

Re: Joint FHWA/FTA Conformity Finding for the 1997 8-hour ozone standard;
Richmond-Petersburg, Virginia

Page 2

If you have any questions or need additional information, please contact Steven Minor, FHWAVirginia Division, at (804) 775-3359, Chelsea Beytas of FTA at (215) 656-7961 or Dan Koenig
of FTA at (202) 366-8224.
Sincerely,

Digitally signed by
THERESA GARCIA
CREWS
Date: 2023.08.11
10:47:17 -04'00'

EDWARD S
SUNDRA

Terry Garcia Crews
Regional Administrator
Federal Transit Administration
cc:

Digitally signed by
EDWARD S SUNDRA
Date: 2023.08.11
14:23:42 -04'00'

Edward Sundra
Director of Program Development
Federal Highway Administration

Ms. Martha Heeter, RRTPO (via email)
Mr. Alec Brebner, TCAMPO (via email)
Ms. Marsha Fiol, VDOT (via email)
Mr. Mark Riblett, VDOT (via email)
Mr. James Ponticello, VDOT (via email)
Mr. Steven Minor, FHWA (via email)
Mr. Tony Tarone, FTA (via email)
Ms. Laura Keeley, FTA (via email)
Ms. Chelsea Beytas, FTA (via email)
Mr. Daniel Koenig, FTA (via email)
Mr. Michael Gordon, EPA (via email)
Mr. Gregory Becoat, EPA (via email)

72

COMMONWEALTH OF VIRGINIA

APPENDIX F

Performance Based Planning
and Programming

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

Appendix F: Performance-Based Planning and Programing
In accordance with the requirements of MAP-21 and FAST Act, Virginia has established
performance targets in the areas of safety, asset management, and system performance. The
performance targets were developed in collaboration with DRPT, Virginia's MPOs and PDCs,
as well as other agencies within the Commonwealth and were first reported to FHWA and
FTA in 2018. Virginia has established targets utilizing data-driven approaches for each
performance measure. This appendix outlines the federal transportation performance
requirements and Virginia’s approach to Performance-Based Planning and Programming as
well as Virginia's performance targets for each of the measures.
The Moving Ahead for Progress in the 21st Century Act (MAP-21), signed into law in 2012,
included provisions that transformed the federal surface transportation program to focus on
achieving performance outcomes related to goals for the national transportation system. The
provisions are administered by agencies within the U.S. Department of Transportation
USDOT , including several under the Federal Highway Administration (FHWA) and
Federal Transit Administration (FTA) . In 2015, the Fixing America's Surface Transportation
(FAST Act) built on the MAP-21 changes and provided funding certainty for surface
transportation infrastructure planning and investment.
The FHWA and FTA purpose and approach for performance management is consistent with
direction developed by the CTB and implemented by OIPI, VDOT, and DRPT
Performance based planning and programming (PBPP) is a strategic approach that uses
system information to inform investment and policy decisions to achieve transportation
system performance goals. The Commonwealth Transportation Board (CTB) established a
performance framework to assess performance of Virginia’s transportation system in December
2015, when it adopted goals, objectives, and guiding principles for VTrans, Virginia’s long range
transportation plan. At the federal level, in 2016 and 2017, new performance management rules
were established by the Federal Highway Administration FHWA and Federal Transit
Administration (FTA) for state Departments of Transportation, Metropolitan Planning
Organizations (MPO) , and public transit operators that help institutionalize PBPP concepts.

74

Virginia’s PBPP process in Figure 1 connects statewide, regional, and local planning, project
development, project prioritization and funding, and performance management.
For PBPP to meaningfully shape planning and investment decisions, consistent goals,
objectives, and performance measures, supported by accessible and reliable data, must
guide the process. These are the core fundamentals of performance management.
Performance management for surface transportation addresses a combination of federal and State
requirements and CTB policy, while also reflecting emerging best planning and programming
practices and data sources managed by Virginia’s transportation agencies.
The Office of Intermodal Planning and Investment (OIPI), Virginia Department of
Transportation (VDOT), Department of Rail and Public Transportation (DRPT , Virginia’s 40
public transit operators, and Virginia's 15 MPOs have worked together since 2016 to incorporate
the new federal performance management requirements into planning and programming
activities. The federal performance management requirements include performance monitoring
and target setting activities as well as integration of performance management into agency
transportation planning and programming activities, including development of the Six-Year
Improvement Program (SYIP /Statewide Transportation Improvement Program) (STIP) and
Virginia MPO’s Transportation Improvement Programs (TIP). A listing of the FHWA and FTA

75

Transportation Performance Areas are listed in the table below.
All federal performance measures included in this appendix are connected to VTrans,
Virginia's long-range multimodal plan, which provides the overarching vision, goals,
objectives, and guiding principles for transportation in the Commonwealth. VTrans identifies
the most critical transportation needs in Virginia using a data-driven approach that considers
highway system performance measures and targets in addition to other performance
indicators. Virginia's long- range multimodal plan also provides direction to state and
regional transportation agencies on strategies and policies to be incorporated into their plans
and programs. The most recent approved long-range multimodal plan is VTrans. The newest
update of VTrans is currently under development.
Virginia will report annually on its safety performance targets and on its 2-year progress and
any adjusted 4-year targets in the federally required Mid Performance Period Progress Report
to FHWA, due October 1, 2024.
FHWA and FTA Transportation Performance Areas
Performance Area

What is Measured

Where it is Measured

Roadway fatalities and serious
injuries for motorized vehicles,
All public roads
bicyclists, and pedestrians
Highway Safety (Highway Safety Improvement Program) – 23 CFR 490.200: This section of federal code
details the definitions, methodology, and target setting approach for the five highway safety measures
including annual state reporting on implementation of the Highway Safety Improvement Program (HSIP).
Highway Safety (PM1)

Highway Asset
Physical condition of pavement and
All National Highway System NHS
Management (PM2)
bridges
roads
Asset Condition (Bridge and Pavement Measures) –23 CFR 490.300 & 490.400: This section of federal code
details the definitions, methodology, and target setting approach for the six bridge and pavement measures.
Asset Management Plans (Highway) – 23 CFR 515: This section of federal code details the requirement for
states to develop and implement risk-based Transportation Asset Management Plans (TAMPs) for the NHS to
improve or preserve asset condition. The Asset Management Plan rule is not a performance measure rule;
however, it does require that states develop investment strategies in their TAMP that will lead to a program of
projects that would make progress toward achieving desired performance for pavement and bridge condition.
VDOT’s 2019 TAMP is available here.[1]

Highway System
Performance (PM3)

Reliability of highway passenger
travel
Reliability of highway truck freight
travel
Highway congestion and emissions

All Interstate and non-Interstate NHS
roads
Interstate System
Air quality non-attainment and
maintenance areas

System Performance (Travel Reliability of People and Freight, Congestion, and Emissions Measures) –
23 CFR 490.500, 490.600, 490.700, 490.800: This section of federal code details the definitions, methodology,
and target setting approach for reliability, freight, congestion, and emissions measures.

76

Transit Asset Management

Physical condition of transit vehicles,
equipment, and facilities

Eligible public transportation providers 40
total) operating in Virginia

Transit Asset Management – 49 CFR 625 & 49 CFR 630: This section of federal code details the data
submission guidelines, definitions, methodology, and target setting approach for the four unique state of good
repair measures for transit assets (revenue vehicles, non-revenue vehicles, facilities, and infrastructure).
Asset Management Plans (Transit) – 49 CFR 625: Every agency must develop a transit asset management
(TAM) plan if it owns, operates, or manages capital assets used to provide public transportation and receives
federal financial assistance under 49 U.S.C. Chapter 53 as a recipient or subrecipient. Agencies are required
to update their Transit Asset Management (TAM) plan in its entirety at least once every four years. The first
compliant TAM plans were due October 2018 and agencies must complete an updated plan every four years
beginning in October 2022. DRPT’s group TAM plan covering 34 transit operators is available here [2]
Transit Safety

Transit related fatalities, serious
injuries, and incidents

Eligible public transportation providers 40
total) operating in Virginia

Public Transportation Agency Safety Plan (PTASP) – 49 CFR 673: This section of federal code details the
requirements associated with processes for transit providers to improve public transportation safety. It
requires certain recipients and sub-recipients of FTA grants to develop and implement safety plans that
establish processes and procedures to support the implementation of Safety Management Systems (SMS).
More information on DRPTs approach to meet PTASP requirements is available here.[3]

[1]
[2]
[3]

https://virginiadot.org/projects/resources/legstudies/2019_-_Final_TAMP.pdf
https://drpt.virginia.gov/guidelines-and-requirements/transit-asset-management-plan/
https://drpt.virginia.gov/guidelines-and-requirements/public-transportation-agency-safety-plan-ptasp/

77

Safety Performance Measures
Performance Measures and Targets
Virginia has established safety performance objectives as published in Virginia's 2022 - 2026
Strategic Highway Safety Plan SHSP and, starting in 2017, annual targets in the Highway
Safety Improvement Program HSIP Annual Report. The SHSP performance measures and
objectives are indicated in Table 4 below and based on VTrans trends yielding a goal of 50
percent reduction in fatalities and serious injuries by 2045. A linear reduction produces about a
two percent annual reduction in the early years increasing to four percent by 2045.
Table 4: 2022 - 2026 SHSP Safety Performance Measures and
Objectives
Per Year
Reduction

Performance Measure
1

Number of Fatalities

2

Rate of Fatalities per 100 Million Vehicle Miles Traveled

2%

3

Number of Serious Injuries

2%

4

Rate of Serious Injuries per 100 Million Vehicle Miles Traveled

2%

5

Number of Non-Motorized Fatalities and Non-Motorized Serious Injuries

2%

2%

For safety performance measures 1, 2, and 3, annual targets are developed collaboratively by
the Department of Motor Vehicles DMV Highway Safety Office HSO and VDOT HSIP
staff.3 The DMV HSO includes these measures in their Highway Safety Plan (HSP)
submitted to the National Highway Traffic Safety Administration (NHTSA) every June.
Virginia's transportation policy board, the CTB, approves all five annual targets; VDOT
includes these targets, converted to five-year averages, in the HSIP Annual Report submitted
to FHWA each August. Within 180 days of VDOT's HSIP Annual Report submission to
FHWA, MPOs must indicate their support of the state targets or submit to the State their
unique regional targets for one or more of the safety measures.
VDOT recently developed a Virginia-specific statistical model using state-specific data
sources to aid in target setting. The predictive methodology controls for influences outside the
state's control (e.g., regional snowfall and alcohol sales) and includes impacts of behavioral
and infrastructure program investments. This new approach was first incorporated into the
It is a federal requirement that safety performance measures 1, 2, and 3 are identical targets for NHTSA's Highway Safety
Grants Program and FHWA s Highway Safety Improvement Program. This requirement allows States to align their safety
performance targets and work in a collaborative manner to achieve the targets.

3

78

CTB-approved 2020 safety performance targets. With this greater understanding of the crash
data and the adopted targets in 2020, the Code of Virginia was amended to establish the
Virginia Highway Safety Improvement Program (§ 33.2-373) which includes the requirement
for the CTB to adopt investment strategy to guide the investments of the Program. The CTB
most recently adopted the investment strategy in September 2022.
The 2024 annual safety performance targets approved by the CTB in June 2022 are included in
Table 5 below. These targets and interim-year predictions are used to calculate the five-year
average measures that are required to be submitted to NHTSA HSP and FHWA HSIP .
Table 5: 2024 Safety Performance Targets
2024 Targets

Performance Measure
1

Number of Fatalities

2

Rate of Fatalities per 100 Million Vehicle Miles Travelled

1.187

3

Number of Serious Injuries

7137

4

Rate of Serious Injuries per 100 Million Vehicle Miles Travelled

8.429

5

Number of Non-Motorized Fatalities and Non-Motorized Serious Injuries

1005

765

Connection to Other Performance-Based Planning Documents
The federally required SHSP, a five-year multi-agency comprehensive plan focused on reducing
fatalities and serious injuries on all public roads, serves as the coordinating document for other
plans and programs that involve traffic safety. This coordination involves VTrans, the
metropolitan transportation plans (MTP), and three plans that implement parts of the SHSP - the
HSP, the HSIP, and the Commercial Vehicle Safety Plan (CVSP) . This integration is
important for improving overall safety coordination amongst various partners and leads to more
comprehensive transportation safety planning.
Safety and performance management is included in the VTrans Vision, Goals
Guiding Principles:
•

•

Objectives, and

Guiding Principle 2: Ensure Safety, Security, and Resiliency - Provide a transportation
system that is safe for all users, responds immediately to short-term shocks such as
weather events or security emergencies, and adapts effectively to long-term stressors
such as sea level rise.
Guiding Principle 5: Ensure Transparency and Accountability and Promote
Performance Management - work openly with partners and engage stakeholders in
project development and implementation and establish performance targets that
79

consider the needs of all communities, measure progress towards targets, and to adjust
programs and policies as necessary to achieve the established targets.
•

Goal C: Safety for All Users - provide a safe transportation system for passengers
and goods on all travel modes.
o Objectives:
■ Reduce the number and rate of motorized fatalities and serious injuries.
■ Reduce the number of non-motorized fatalities and injuries.

MTPs are similar to VTrans however an MTP covers a specific metropolitan planning area.
MTPs include goals and objectives for their respective areas/regions and identify strategies for
advancing long-term transportation investments in a specific region.
The HSP is now a tri-annual plan to address highway user behaviors that will improve safety
through education and enforcement campaigns. The HSP and associated NHTSA grants are
administered through DMV's HSO. Furthermore, each year Virginia State Police (VSP)
submits a CVSP to the Federal Motor Carrier Safety Administration FMCSA as a
requirement of obtaining related enforcement grants.
Metropolitan Transportation Plans

Long-Range Statewide Transportation Plan

State Strategic Highway Safety Plan
(SHSP)

Commercial Vehicle Safety Plan
(CVSP)
Highway Safety Plan
(HSP)

Other State Plans
Transit
Rail
Bike/Ped

Highway Safety Improvement Program
(HSIP)

Transportation Improvement
Programs (TIPs)

Statewide Transportation Improvement Program
(STIP)

The relationship between the various plans and programs is shown below:
Projects in the STIP are directly linked to the safety objectives outlined in the SHSP through the
strategies and actions that are priorities in Virginia.
Funding for Safety Projects
Safety-targeted infrastructure improvements are implemented through Virginia’s HSIP projects.
Each year Virginia is allocated federal HSIP funding which include set-aside for Railway Grade
Crossing improvements. VDOT provides the additional 10 percent match of state funds.
Further, starting in 2020 additional state funds are allocated to the VHSIP (VDOT) and the
HSP DMV . The FY24 to 29 forecast is a total of approximately $125 million per year for the
next
80

six years. Virginia is also subject to a Penalty Transfer provision, Section 154 of Title 23,
U.S.C., "Open Container," such that 2.5% of National Highway Performance Program (NHPP)
and Surface Transportation Block Grant (STBG) apportionments are reserved for NHTSA
Alcohol-Impaired Driving and/or HSIP projects. The State determines what proportion goes to
each program. Of the total HSIP funds, about 15 percent is set aside for non-motorized safety
projects and 20 percent of the remainder for improvements on locally maintained roadways.
How Do Safety Projects Get Selected for Inclusion in the STIP?
In December 2019 the CTB approved its first HSIP Program Project Prioritization Policy that
shifts from funding higher cost spot intersection and segment improvements to lower cost
systemic improvements that target specific crash types and/or roadway characteristics that are
factors in crashes across the network. The CTB approved a new Highway Safety Investment
Strategy in September 2022. VDOT has developed annual updates to the Six- Year
Implementation Plan for the deployment of systemic and hybrid safety countermeasures across the
network. As part of the new investment strategy and starting in FY 23 spot location projects
were again funded on VDOT maintained roadways.
Examples of systemic improvements include traffic signal devices and timing at intersections;
curve signing; crosswalks and signs; and rumble strips on segments. Spot improvements that
address a dire and immediate safety need and meet certain minimum thresholds related to
benefit-to-cost ratio from expected crash reductions, project implementation time, and
proposed scope may be considered by the CTB for funding upon recommendation by the
VDOT Commissioner.
In addition to reporting to the CTB annually on the advancement of systemic safety
improvements, VDOT must also report on the funding distribution, anticipated benefits of
investments and performance to date, as well as make any recommendations for changes to the
HSIP Project Prioritization Policy.
The HSIP project planning and delivery follows these steps:
•

•
•

Each year highway segments and intersection locations that have the highest potential
for safety improvements are identified based on the previous five years of traffic crash
and volume data. These above average crash locations are provided to VDOT Districts
and localities to determine appropriate locations and countermeasures for HSIP
funding. Further, location and crash specific VHSIP systemic priority countermeasure
e.g., curve signing and rumble strips funds are distributed to the Districts. The
potential for vehicle-train crashes at each at-grade railroad crossing is also distributed
for project applications.
HSIP project proposals are submitted through the SMART Portal for the
appropriate safety program.
VDOT- and locality-submitted HSIP proposals are reviewed and prioritized based on the
number of targeted crashes and the benefit-to-cost ratio or the potential risk reduction for
non-motorized and highway-rail grade crossing improvements.

81

•

Projects are selected and programmed using available remaining funds but primarily
for the last two or three years of the SYIP.

Safety improvements are also included within projects funded with non- HSIP funds. The
SMART SCALE scoring and prioritization process for inclusion of projects in the SYIP,
considers safety benefits from improvements addressing travel of all modes. Many of the large
SMART SCALE projects, upon completion, will have distinct impacts on safety performance in
the Commonwealth. In addition, projects funded through other state and federal sources in the
SYIP, such as the TAP, including Safe Routes to School (SRTS) grants, Revenue Sharing, and
even some CMAQ and maintenance projects, will also have crash reduction benefits that
contribute to improved safety performance.
The funding to meet Virginia s safety objectives and targets is allocated to projects in the CTBapproved SYIP and is consistent with both the goals and objectives as well as the needs included
in VTrans. Since the SYIP is the foundation for the STIP, the program of projects in the STIP
demonstrates support to achieve Virginia's safety performance objectives and targets and is
consistent with Virginia's SHSP and the HSIP.

82

Pavement and Bridge Performance Measures
Performance Targets
Federal performance measures for pavement condition are required for the National
Highway System (NHS), while bridge condition requirements relate to structures
identified as part of the National Bridge Inventory (NBI) on the NHS. The pavement
condition measures and established performance targets for the 2022-2025 performance
period are indicated in Table 6 below.
Table 6: Pavement Condition Measures and Performance
Targets
CY 2022-2023
Two-Year Target
45%
3.0%
2022-2023
Two-Year Target
25.0%
5.0%

Interstate Pavement Condition Measures
Percentage of Pavements in Good Condition
Percentage of Pavements in Poor Condition
Non-Interstate NHS Pavement Condition Measures
Percentage of Non-Interstate Pavements in Good Condition
Percentage of Non-Interstate Pavements in Poor Condition

CY 2022-2025
Four-Year Target
45.0%
3.0%
2022-2025
Four-Year Target
25.0%
5.0%

Bridge condition measures and established performance targets for the 2022-2025
performance period are indicated in Table 7 below.
Table 7: NHS Bridge Condition Measures and
Performance Targets
NHS Bridge Condition Measures
Percentage of Deck Area of NBI Bridges on the NHS in Good Condition
Percentage of Deck Area of NBI Bridges on the NHS in Poor Condition

CY 2022-2023
Two-Year Target
27.2%
3.3%

CY 2022-2025
Four-Year Target
25.1%
3.6%

Background/History
Virginia's history of monitoring asset conditions and utilizing performance information to
determine investment strategies based on available funding levels spans over 11 years for
pavements and bridges.
VDOT maintains a comprehensive inventory of all pavement and bridges on the state-maintained
network. This inventory, which includes location, maintenance responsibility, ownership, and
current condition or inspection information, serves as the foundation for life-cycle planning,
performance forecasting, maintenance and rehabilitation needs estimation, as well as
prioritization of work to maximize asset life given available funding. Condition information is
also important for communicating with external stakeholders, including the general public.
VDOT s commitment to responsible Transportation Asset Management TAM practice is

83

demonstrated through VDOT's annual condition data collection programs and its
establishment and publication of network-level pavement and bridge performance goals.
VDOT's condition measures and performance goals are fully integrated into VDOT's
budgeting process and investment strategies. In 2019 VDOT performed a comprehensive
review related to several asset and service investment strategies in order to ensure long-term
sustainable performance measures and targets (over a 20-year period). The CTB approved
new statewide performance measures for pavements and structures in December 2019, which
impact the entire network managed by VDOT and Virginia's localities. Additionally, and as
identified above, the CTB has adopted pavement and bridge targets for the second
performance period of 2022 – 2025 and pursuant to the federal requirements. The federal
pavement and bridge performance measures apply to a limited portion of the network for
which VDOT is responsible less than 15% of all lane miles and 18% of the bridge
inventory, by count .
Connection to Other Performance-Based Planning Documents
Performance management, specifically as it relates to pavements and bridges, is included in the
VTrans Vision, Goals & Objectives, and Guiding Principles as noted below:
•

•

Guiding Principle 5: Ensure Transparency and Accountability and Promote
Performance Management - Work openly with partners and engage stakeholders in
project development and implementation and establish performance targets that
consider the needs of all communities, measure progress towards targets, and to
adjust programs and policies as necessary to achieve the established targets.
Goal D: Proactive System Management - maintain the transportation system in
good condition and leverage technology to optimize existing and new
infrastructure.
o Objectives:
■ Improve the condition of all bridges based on deck area.
■ Increase the lane miles of pavement in good or fair condition.

Virginia's federally required Transportation Asset Management Plan (TAMP) presents
pavement and bridge inventory and conditions, along with the Commonwealth's performance
objectives, measures, and associated risks as they relate to the federal requirements. Asset
funding, investment strategies, forecasts, goals, and gaps are also included. The TAMP is
specific to the NHS and provides the Commonwealth's TAM processes and methodology to
meet federal requirements. Pavement and bridge projects included in the STIP are consistent
with Virginia's reported TAM processes and methodology.
The program of projects in the STIP is directly linked to the pavement and bridge objectives
outlined in VTrans and the TAMP through the strategies and actions that are priorities in
Virginia.

84

Funding for Pavement and Bridge Projects
There are three key funding sources for pavement and bridge projects, the Highway
Maintenance and Operations Fund (HMOF), the Special Structures Fund, and State of Good
Repair (SGR) program funds. The pavement and bridge funding is used for differing projects
from routine maintenance to reconstructive work. Funds are allocated to pavement and
bridge projects based on an annual needs assessment process supported by a data-driven
prioritization and selection process. The prioritization process is the same for the various
funding sources; however, the
State of Good Repair program funds are designated for deteriorated pavements and
structurally deficient bridges.
VDOT has developed a robust asset management program, placing maintenance of the
transportation network at the forefront of VDOT's investment decisions. This commitment to
responsible asset management practice is demonstrated through VDOT's annual collection of
condition data on pavements and bridges, along with its establishment and publication of
network-level pavement and bridge performance targets. For more than a decade, VDOT has
monitored pavement and bridge conditions using performance information (measures and
targets) to determine investment strategies based on available funding levels.
In the annual needs assessment process, VDOT assesses 100% of the pavement network on
Virginia s Interstate and Primary systems and approximately 20% of the Secondary system.
The pavement condition data is compiled, analyzed, and reviewed to report the optimized
needs at a roadway system and district level. VDOT s pavement program selects resurfacing
projects, in relation to needs, and optimizes the timing of projects through a data-driven
pavement management system.
For bridges, VDOT follows national standards in performing safety inspections and
determining general condition of the structures. Condition assessments are performed by
certified safety inspection personnel. The inspection program requires a qualified inspector
to complete a "hands-on" review of the structure or bridge during each inspection. By
federal regulation, VDOT is required to conduct detailed inspections of most NBI structures
at intervals not to exceed 24 months. Additionally, VDOT's bridge inspection program
exceeds federal requirements by mandating inspection of non- NBI bridges and culverts on a
regular basis.
VDOT uses BrM software to store bridge condition and inventory data for each structure and to
program, schedule, and track bridge and structure inspections. The data collected during
inspections allows VDOT to use a proactive approach to maintenance. Preventive
maintenance and timely intervention repairs are performed to avoid and slow deterioration
that leads to greater rehabilitation or replacement cost. Virginia's bridge maintenance
program is large and complex, so in order to direct its efforts more easily, performance

85

targets have been developed.
VDOT uses a prioritization process when determining funding for its pavement and bridge
programs and prioritizes work ranging from preventative maintenance to replacement. The
prioritization processes account for factors such as condition, cost effectiveness,
maintenance history, and traffic volumes. While the systematic prioritization processes are a
guide to assist in funding projects, districts direct the work performed as the local experts.
How Do Pavement and Bridge Projects Get Selected for Inclusion in the STIP?
As noted above, the funding to meet Virginia's pavement and bridge objectives and targets is
allocated to projects and is consistent with VTrans. The program of projects in the STIP
demonstrates support to achieve Virginia's pavement and bridge performance objectives and
targets and is consistent with Virginia s TAMP.

86

Highway System Performance Measures
Performance Targets
Performance of the NHS is measured by the level of travel time reliability. The travel time
reliability performance measures and performance targets for the 2022-2025 performance period
are indicated in Table 8 below.
Table 8: National Highway System Travel Time Reliability Performance Measures and
Targets
NHS Travel Time Reliability Performance
Percent of Person Miles Traveled on the Interstate That Are Reliable
Percent of Person Miles Traveled on the Non-Interstate NHS That Are Reliable

CY 2022-2023
Two-Year Target
85
88

CY 2023-2025
Four-Year Target
85
88

The assessment for freight reliability is based on the truck travel time reliability index. The truck
travel time reliability performance measure and performance targets for the 2022-2025
performance period are indicated in Table 9 below.
Table 9: Freight Reliability Performance Measure and Targets
Truck Travel Time Reliability Performance
Truck Travel Time Reliability Index

CY 2022-2023
Two-Year Target
1.64

CY 2022-2025
Four-Year Target
1.64

The CTB approves the performance measures and targets developed for Virginia's surface
transportation network. Such targets, including those for Highway System Performance, are
linked to the goals and objectives in VTrans.
Connection to Other Performance-Based Planning Documents
Performance management, as it relates to the reliability of the NHS and freight, is included in the
VTrans Vision, Goals & Objectives, and Guiding Principles as noted below:
•

•

Guiding Principle 4: Consider Operational Improvements and Demand Management First
- Maximize capacity of the transportation network through increased use of technology
and operational improvements as well as managing demand for the system before
investing in major capacity expansions.
Goal A - Economic Competitiveness and Prosperity: invest in a transportation
system that supports a robust, diverse, and competitive economy.
o Objectives:
■ Reduce the amount of travel that takes place in severe congestion.

87

•

■ Reduce the number and severity of freight bottlenecks.
■ Improve reliability on key corridors for all modes.
Goal B - Accessible and Connected Places: increase the opportunities for people
and businesses to efficiently access jobs, services, activity centers, and distribution
hubs.
o Objectives:
■ Reduce average peak-period travel times in metropolitan areas.
■ Reduce average daily trip lengths in metropolitan areas.
■ Increase the accessibility to jobs via transit, walking, and driving
in metropolitan areas.

Additionally, the Virginia Freight Plan, discusses freight system trends, needs, and issues. The
Freight Plan also includes freight policies, strategies, and performance measures that guide
Virginia's freight-related investment decisions.
Projects included in the STIP are directly linked to the Highway System Performance objectives
outlined in VTrans, including the Freight Plan, through the strategies and actions that are
priorities in Virginia.
Funding for Highway System Performance Projects
SMART SCALE, Virginia's data-driven prioritization process for funding transportation
projects, considers the potential of a project to improve reliability. To be considered for
SMART SCALE, a project must first meet a need identified in VTrans, thus strengthening the
connection between the planning and programming processes. Congestion mitigation, safety,
accessibility, economic development, environment, and land use are the factors used to score
SMART SCALE projects. Freight considerations are included in the economic development
factor.
The FAST Act established a National Highway Freight Program (NHFP) , including a freightspecific funding program to highlight the focus on freight transportation needs. Projects eligible
for NHFP funding must contribute to the efficient movement of freight on the National Highway
Freight Network (NHFN) and be included in the VFE. VDOT uses NHFP funding to construct
freight-beneficial projects identified through the SMART SCALE process.
SMART SCALE screening and scoring results, along with public feedback and CTB guidance,
are used to develop the SYIP.
In addition to SMART SCALE, Virginia has established the Interstate Operations and

Enhancement Program (IOEP) in 2020, which is intended to improve the safety, reliability,
and travel flow along interstate highway corridors in the Commonwealth. The IOEP was
developed in accordance with Chapters 1230 and 1275 of the 2020 Virginia Acts of Assembly,
as codified in §33.2-372 and through amendments to §§ 33.2-232 and 33.2-358 of the Code of
89

Virginia, in which the General Assembly of Virginia directed the Commonwealth
Transportation Board CTB to prepare interstate corridor improvement plans for those
interstate corridors with more than 10 percent of their vehicle miles traveled comprised of
Federal Highway Administration FHWA Class 6 vehicles and above. These corridors (I-81,
I-95 and I-64) receive dedicated funding from the IOEP.
More information and copies of the interstate corridor plans are provided on the CTB’s website
at http://www.ctb.virginia.gov/planning/ioep/default.asp.
As part of each corridor plan, needs were identified, scored and prioritized. The CTB then
selects projects using the dedicated interstate funding to advance projects designed to improve
safety, reliability, and travel flow along the interstate. Completion of projects during the
performance period should aid in achieving projected performance levels.
Other projects selected for funding are subject to program-specific prioritization processes
approved by the CTB. All funding federal, state, and other sources for transportation projects
is allocated to projects in the CTB-approved SYIP.
How Do Highway System Performance Projects Get Selected for Inclusion in the STIP?
As noted above, the funding for all transportation projects, including funding for projects to
meet Virginia's NHS system performance and freight movement targets is allocated to projects
in the CTB-approved SYIP, and is consistent with VTrans and the Freight Plan. Since the SYIP
is the foundation of the STIP, the program of projects in the STIP demonstrates support to
achieve Virginia's NHS and Freight Reliability performance objectives and targets.

90

Congestion Mitigation and Air Quality (CMAQ) Program Performance Measures
Performance Targets
The CMAQ Program traffic congestion and on-road mobile source emissions performance
measures and targets for the 2022-2025 performance period are indicated in Table 10 and Table
11 respectively. The Northern Virginia region is the only area subject to the CMAQ
performance measures. VDOT closely coordinated with the National Capital Region
Transportation Planning Board (TPB), of the Metropolitan Washington Council of
Governments ((MWCOG), the District Department of Transportation, and the Maryland
Department of Transportation in developing the target-setting methodology and measures and
establishing performance targets.
Table 10: Traffic Congestion Performance Measures and Targets
CMAQ
Program
Traffic
Congestion4

Performance Measures
Annual Peak Hour Excessive Delay PHED)
Per Capita
Mode Share - Percent of Non-SOV Travel on
the NHS

Federal Fiscal Year
2022-2023
Two-Year Target

Federal Fiscal Year
2022-2025
Four-Year Target

22.5

22.7

37.4%

37.7%

Table 11: Total Emissions Reduction Performance Measures and
Targets

CMAQ Program

Type of Emissions

Total Emissions Reduction5

Nitrogen Oxides NOx
Volatile Organic Compounds VOCs

Federal Fiscal Year
2022-2023
Two-Year Target

Federal Fiscal Year
2022-2025
Four-Year Target

0.612

4.911

0.323

3.013

The CTB approves the performance measures and targets developed for Virginia's surface
transportation network. Such targets, including those for the CMAQ Program, are linked to the
goals and objectives in VTrans.
Connection to Other Performance-Based Planning Documents
Performance management, specifically as it relates to the CMAQ Program, is included in the
VTrans Vision, Goals & Objectives, and Guiding Principles as noted below:
Traffic Congestion performance targets are applicable only to Northern Virginia.
Total Emissions Reduction performance targets are applicable only to the Virginia portion of the Washington, DC-MD-VA 8hour ozone non-attainment area.

4
5

91

•

•

Goal A - Economic Competitiveness and Prosperity: invests in a transportation
system that supports a robust, diverse, and competitive economy.
o Objectives:
■ Reduce the amount of travel that takes place in severe congestion.
■ Reduce the number and severity of freight bottlenecks.
■ Improve reliability on key corridors for all modes.
Goal E - Healthy Communities and Sustainable Transportation Communities: support a
variety of community types promoting local economies and healthy lifestyles that
provide travel options, while preserving agricultural, natural, historic and cultural
resources.
o Objectives:
■ Reduce per-capita vehicle miles traveled.
■ Reduce transportation related NOx, VOC, PM, and CO emissions.
■ Increase the number of trips traveled by active transportation
bicycling and walking).

The program of projects in the STIP is directly linked to the CMAQ Program performance
goals and objectives outlined in VTrans through the strategies and actions that are priorities in
Virginia.
Funding for CMAQ Program Projects
The CMAQ Program is designed to help States and local governments meet the requirements
of the Clean Air Act. To be eligible for CMAQ funds a transportation project or program must
reduce congestion and improve air quality for current or former non-attainment or
maintenance areas.
In the Northern Virginia region, the Northern Virginia Transportation Authority (NVTA), a
regional governmental body established to plan, prioritize, and fund regional transportation
projects, coordinates the annual programming of federal CMAQ projects. Recommendations
for programming are provided through the Regional Jurisdiction and Agency Coordinating
Committee (RJACC) with final approval given by the CTB. Projects recommended for CMAQ
funding go through an application process and must include an air quality benefit calculation,
and a resolution of support from the respective governing bodies.
SMART SCALE, Virginia's data-driven prioritization process for funding transportation projects,
considers congestion mitigation and the environment. To be considered eligible for SMART SCALE, a
project must first meet a need identified in VTrans. Congestion mitigation, safety, accessibility, economic
development, environment, and land use are the factors used to score SMART SCALE projects. The
measures associated with the environment scoring factor are consistent with the CMAQ Program
performance measures. SMART SCALE screening and scoring results, along with public feedback and
CTB guidance, are used to develop the SYIP. Virginia established the Interstate Operations and

Enhancement Program (IOEP) in 2020, which is intended to improve the safety, reliability, and
92

travel flow along interstate highway corridors in the Commonwealth. The IOEP directed the
Commonwealth Transportation Board (CTB) to prepare interstate corridor improvement plans
for those interstate corridors with more than 10 percent of their vehicle miles traveled comprised
of Federal Highway Administration (FHWA Class 6 vehicles and above. These corridors
(I-81, I-95 and I-64) receive dedicated funding from the IOEP.
More information and copies of the interstate corridor plans are provided on the CTB’s website
at http://www.ctb.virginia.gov/planning/ioep/default.asp.
As part of each corridor plan, needs were identified, scored and prioritized. The CTB then
selects projects using the dedicated interstate funding to advance projects designed to improve
safety, reliability, and travel flow along the interstate. Completion of projects during the
performance period should aid in achieving projected performance levels.
All funding federal, state, and other sources for transportation projects are allocated to
projects in the CTB approved SYIP.
How Do Projects Get Selected for Inclusion in the STIP?
As noted above, the funding to meet Virginia's CMAQ Program objectives and targets is
allocated to projects in the CTB-approved SYIP and is consistent with VTrans. Since the SYIP
is the foundation for the STIP, the program of projects in the STIP demonstrates support to
achieve Virginia's traffic congestion and on-road mobile source emissions performance
measures and targets.

93

Transit Asset Management
The National Transit Asset Management System Final Rule, 49 U.S.C. 625, requires all transit
agencies that receive federal financial assistance under 49 U.S.C. Chapter 53, and own,
operate, or manage capital assets used in the provision of public transportation, create a Transit
Asset Management TAM plan. Transit agencies are required to fulfill this requirement
through an individual or group plan. Group plans are designed to collect TAM information
about groups (typically smaller subrecipients of the 5311-grant program) that do not have a
direct financial relationship with the Federal Transit Administration FTA . FTA defines two
tiers of transit agencies based on sizing and operating perimeters. Each tier has different
requirements for TAM plans.
•
•

A Tier I agency operates rail, OR has 101 vehicles or more in all fixed route modes, OR
has 101 vehicles or more in one non-fixed route mode.
A Tier II agency is a subrecipient of FTA 5311 funds, OR is an American Indian Tribe,
OR has 100 or less vehicles across all fixed route modes, OR has 100 vehicles or less in
one non-fixed route mode.

Tier II agencies have the option of participating in a group plan. In Virginia, the DRPT is the
Group Plan sponsor and has thus developed a Tier II Group TAM Plan covering 33 eligible
Tier II agencies in the Commonwealth.
Performance Measures
As indicated in 49 CFR Part 625, there are four performance measures which apply to the capital
asset categories of equipment, rolling stock, infrastructure, and facilities. Table 12 describes each
of these measures.
Table 12: TAM Performance Measures by Asset Category
Asset
Category

Relevant Assets

Measure

Measure
Type

Desired
Direction

Equipment

Service support, maintenance, and other
non-revenue vehicles

Percentage of vehicles that have met
or exceeded their ULB

Age-based

Minimize
percentage

Rolling
Stock

Buses, vans, and sedans; light and heavy
rail cars; commuter rail cars and
locomotives; ferry boats

Percentage of revenue vehicles that
have met or exceeded their ULB

Age-based

Minimize
percentage

Infrastructure

Fixed guideway track

Percentage of track segments with
performance speed restrictions, by
mode

Performancebased

Minimize
percentage

Percentage of assets with condition
ConditionMinimize
rating lower than 3.0 on FTA TERM
based
percentage
Scale*
*Useful Life Benchmark (ULB) - the expected life cycle or the acceptable period of use in service for a capital asset, as determined by a transit
provider, or the default benchmark provided by FTA.6 As an example, FTA's default ULB of a bus is 14 years7
**FTA Transit Economic Requirements Model (TERM) Scale-a rating system used to describe asset condition. The scale values are 1 (poor), 2
(marginal), 3 (adequate), 4 (good), and 5 (excellent).
Facilities

6
7

Passenger stations, parking facilities,
administration and maintenance facilities

Definition as included in 49 CFR Part 625.
Default Useful Life Benchmark ULB Cheat Sheet

94

In Virginia, the DRPT has sponsored a Tier II Group TAM Plan for smaller
agencies in the Commonwealth. As part of this planning effort, DRPT has worked
with participating transit agencies to develop statewide TAM targets for the TAM performance
measures.
The FY22-2025 Virginia Group Tier II Transit Asset Management Plan was
adopted October 1, 2022. The TAM plan sets Statewide Group TAM plan Targets
for FY22 and will continue to be updated with revised targets each year for the life
of the TAM plan. A copy of the TAM plan is maintained on DRPT's website
https://drpt.virginia.gov/guidelines-and-requirements/transit-asset-managementplan/.
In accordance with TAM guidance, DRPT has provided FTA with targets for Federal Fiscal
Year 2022 on behalf of the Tier II Group TAM Plan participants. These updated targets are
listed in Table 13.
Table 13: TAM Targets for Rolling Stock and
Facilities
Asset Category - Performance Measure

Asset Class

2022 Target

Revenue Vehicles

Age - % of revenue vehicles within a particular asset class that have met or
exceeded their Useful Life Benchmark ULB

AB - Articulated Bus

5%

BU - Bus

15%

CU - Cutaway

10%

MB - Minibus

20%

BR - Over-the-Road Bus

15%

VN - Van

20%

Non-Revenue/Service Automobile

30%

Trucks and other Rubber Tire Vehicles

30%

Administrative and Maintenance Facility

10%

Administrative Office

10%

Maintenance Facility

15%

Passenger Facilities

10%

Equipment
Age - % of vehicles that have met or exceeded their Useful Life Benchmark
ULB
Facilities

Condition - % of facilities with a condition rating below 3.0 on the FTA TERM
Scale

95

For Tier I agencies, any TIP or MTP that was adopted after October 1, 2018, is in compliance
with the TAM plans developed by the Tier I transit providers within the MPO as well as the
regional performance measures adopted by the MPO as a whole. The performance
measurements and targets for Tier I plans can be found in each agency's individual TAM plan
and applicable TIPs. The following is the listing of MPOs whose TIPs will contain the regional
TAM plans:
Richmond Regional Transportation Planning Organization
Hampton Roads Transportation Planning Organization
Metropolitan Washington Council of Government's National Capital Region Transportation
Planning Board
Fredericksburg Area Metropolitan Planning Organization
The planning process for each MPO in the Commonwealth of Virginia will integrate, either
directly or by reference, the goals, objectives, performance measures, and targets described in the
applicable Tier I and Tier II group plans.
DRPT prioritizes State capital assistance provided to transit agencies via the MERIT Capital
Assistance Program. The MERIT program is guided by a project prioritization process for capital
needs that allows DRPT to allocate and assign limited resources to projects and investments
identified as the most critical. The prioritization process is designed to favor projects that:
1. Achieve the statewide policy objective of maintaining a state of good repair of
existing assets and;
2. Have the greatest impact on the provision of public transportation services throughout
the state.
The MERIT process scores state of good repair projects based on a combination of age and
condition of the asset. For vehicles, this includes the vehicle mileage and the vehicle age. The
scoring framework prioritized replacement of assets with the highest mileage and the oldest
age. DRPT first implemented MERIT for FY 2020 and will continue to utilize this approach
for the FY 2024 program of projects.

96

COMMONWEALTH OF VIRGINIA

APPENDIX G

FHWA-Eastern Federal Lands
Highway Division Projects

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

Appendix G: FHWA - Eastern Federal Lands Division Projects
Last Printed:
PROGRAM
FISCAL
YEAR
PROJECT

PARK, REFUGE, FOREST OR
OTHER PARTNER/AGENCY
STATE

COUNTY

PRIMARY FUND SOURCE

DESCRIPTION

TOTAL
PROGRAMMED
AMOUNT

12/13/2022

FUNDS
FROM TITLE

TYPE OF WORK

DELIVERED BY

STATUS

CONGRESSIONAL
DISTRICT

FLMA REGION

Virginia

VA ST TFHRC 50(6) Construct new
sidewalk

2021

VA

Fairfax

FHWA - Turner
Highway
Research Center

Construct new sidewalk

Other

Cooperative Research
and
Technology
Deployment

Study

FLTP - NPS

$400,000

Title 23

EFL

Construction

Various

NPS-NCR

Study

FLTP - NPS

$250,000

Title 23

NPS

Construction

VA-06

NPS-NER

3R

FLAP - EFL

$434,000

Title 23

state

Construction

VA-09

FS-08-South

Whitetop Trail Crossing

Other

FLAP - EFL

$738,000

Title 23

state

Construction

VA-09

FS-08-South

Mountain Lake Trails- Giles Co.
Fort Monroe Front Entrance
Improvements

Other

FLAP - EFL

$264,000

Title 23

local

Construction

VA-09

FS-08-South

1R

FLAP - EFL

$206,400

Title 23

local

Construction

VA-02

NPS-NER

Admin

FLAP - EFL

$469,896

Title 23

local

Construction

VA-06

NPS-NER

Rehabilitate James River Bridge 016P

BR1R

FLTP - NPS

$4,750,000

Title 23

EFL

Construction

VA-09

NPS-SER

Fairbank

NCR FLHP Support Technical
Assistance
Requests

2023

VA

Various

Various

Providing assistance to the Region outside
of normal project scope due to
emergency nature, or requiring minimal
effort of approximately 80 hours.

NER - Support from Volpe NER Program and Project Support from
Volpe

2023

VA

Amherst

Multiple

Support from VOLPE

VA FLAP 32 High Knob Road Capital
Improvements

2023

VA

Scott

High Knob Recreation Area FS High Knob Road Capital Improvements

VA FLAP 34 Whitetop Trail Crossing
VA FLAP 42 Mountain Lake TrailsGiles Co.
VA FLAP 46 Fort Monroe Front
Entrance
Improvements

2023

VA

Grayson

2023

VA

Giles

2023

VA

City of Hampton

George Washington &
Jefferson
NF
Washington & Jefferson NF
NPSAppalachian Trail
NPS- Fort Monroe National
Monument

VA FLAP FRKN TRL(1) Westlake MultiUse Trail
VA NP BLRI 1G27 Rehabilitate James
River Bridge 016P

2023

VA

Franklin

Two miles of 8-10 foot wide aggregate
Booker T. Washington National PED trail w/ 6 bridges connecting
Monument
retirement community to BOWA

2023

VA

Amherst

BLRI

VA NP COLO 1C14 1D48 1E15
Rehabilitation of 8 Bridges

2023

VA

York, James City,
&
COLO
Williamsburg

Rehabilitation of 8 bridges including 4290014, 016, 018, 020, 034, 028, 029 and 031

BR1R

2023

VA

Fairfax

GWMP

Reconstruction of GWMP Mount Vernon
Trail
(MVT) from milepost 11 to milepost 17.5

Trail

2023

VA

Fairfax

Fort Belvoir

Add left turn lane fr. SB FFCP to Kingman
Rd, extend NB Mt. Vernon Hwy left turn
lane at Walker ACP

Fort Lee

Add one additional EB driving lane on
Hickory
Hill Rd from .25 mi. E. of Jamestown Dr. to
Mahone Ave

4R

VA NP GWMP MVT(4) Reconstruct
6,5
Miles of Mount Vernon Trai
VA ST FB KNGMNWLKR GT Add left
turn lane fr. SB FFCP to Kingman Rd,
extend
NB Mt. Vernon Hwy left turn lane at
Walker ACP
VA ST FL MHN GT Add one
additional EB driving lane on Hickory
Hill Rd from .25 mi. E. of Jamestown
Dr. to Mahone Ave
VA ST JBMHH HTFLD GT Construct
ramp and two additional exit lanes
for access to Hatfield Gate from NB
Washington Blvd.

2023

VA

Prince George

$235,000

Other

EFL

Planned

VA-10

FHWA

FLTP - NPS
Reimbursable
Authority - NonFederal
Agreements
(advances)

$3,286,000

Title 23

EFL

Construction

VA-02

NPS-NER

$26,600,000

Other

EFL

Construction

VA-08

NPS-NCR

4R

Advances from Other
Federal Agencies Military

$5,720,000

Other

EFL

Construction

VA-11

USACE-NA

4R

Advances from Other
Federal Agencies Military

$1,890,500

Other

EFL

Construction

VA-04

USACE-NA

$3,250,000

Other

EFL

Construction

VA-08

USACE-NA

$50,000,000

Other

EFL

Construction

VA-02

NASA

2023

VA

Arlington

Joint Base Myer Henderson
Hall

Construct ramp and two additional exit
lanes for access to Hatfield Gate from NB
Washington Blvd.

VA ST NASA 1(9) Wallops Causeway
Bridge Replacement.

2023

VA

Accomack

NASA-Wallops Island

Wallops Causeway Bridge Replacement.

BR _New

NP BLRI 1G26 Rehabilitate Otter
Creek Culverts #2 and #4 on the
Mainline Road along the Blue Ridge
Parkway

2024

VA

Amherst

BLRI

Rehabilitate Otter Creek Culverts #2 and
#4 on the Mainline Road along the Blue
Ridge Parkway

3R

FLTP - NPS

$271,000

Title 23

EFL

In design

VA06

NPS-SER

NP BLRI BMS FY24(1) Bridge
Preventative Maintenance Projects

2024

VA

Various

BLRI

Bridge Preventative Maintenance Projects

BR1R

FLTP - NPS

$400,000

Title 23

EFL

In design

Various

NPS-SER

98

Advances from Other
Federal Agencies Military
Reimbursable
Authority - Federal
Agreements

Last Printed:
PROJECT

NP BLRI PVT PRES FY24(1) Pavement
Preservation Projects for BLRI for FY24

PROGRAM
FISCAL YEAR

2024

STATE

VA

COUNTY

Various

PARK, REFUGE, FOREST OR
OTHER PARTNER/AGENCY

DESCRIPTION

TYPE OF WORK

PRIMARY FUND SOURCE

TOTAL PROGRAMMED
AMOUNT

12/13/2022

FUNDS
FROM TITLE

DELIVERED BY

STATUS

CONGRESSIONAL
DISTRICT

FLMA REGION

BLRI

Pavement Preservation Projects for BLRI
for FY24.

1R

FLTP - NPS

$4,500,000

Title 23

EFL

In design

Various

NPS-SER

1R

FLTP - NPS

$5,265,000

Title 23

EFL

In design

Various

NPS-SER

NP SER PMS FY24(1) Pavement
Preservation Projects for Small Parks

2024

VA

Various

SER

Pavement Preservation - CANA, CASA,
DESO,
FOCA, FOFR, FOMA, FOPU, FOSU,

VA FTNP BLRI (TBD) Paint
Infrastructure
and Correct Safety and Erosion
Problems, I-77 Bridge

2024

VA

Carroll

BLRI

Paint Infrastructure and Correct Safety
and
Erosion Problems, I-77 Bridge

BR1R

FLTP - NPS

$1,000,000

Title 23

EFL

In design

VA09

NPS-SER

1R

FLTP - NPS

$1,621,000

Title 23

NPS

In design

VA-04

NPS-NER

3R

FLTP - NPS

$3,723,000

Title 23

EFL

In design

VA-06

NPS-SER

BR1R

FLTP - NPS

$2,600,000

Title 23

EFL

In design

VA-02

NPS-NER

4R

Advances from Other
Federal Agencies Military

$1,322,000

Other

EFL

Planned

VA-02

USACE-NA

Realignment of Strathmore and "G" Road
Intersection

4R

Advances from Other
Federal Agencies Military

$3,200,000

Other

EFL

Planned

VA-07

USACE-NA

VA FTNP PETE 310976 E-H PETE
Pavement Pres FY21

2024

VA

Dinwiddie

PETE

Pavement Preservation at Petersburg
National Battlefield

VA NP BLRI 226(1) Repair and
Stabilize
Sharp Top Mtn Road and Bus
Parking Area

2024

VA

BEDFORD

Blue Ridge Parkway (BLRI)

Repair and Stabilize Sharp Top Mtn Road
and
Bus Parking Area

VA NP COLO 1B38 Rehabilitation of
3
Bridges

2024

VA

Williamsburg

COLO

VA ST CP GNRL BTH Extend turning
lanes from General Booth Blvd to
Headquarters Rd and install traffic
signal at intersection

2024

VA

City of Virginia
Beach

Camp Pendleton

Rehabilitation of 3 including 4290-009, 008, -013

Extend turning lanes from General Booth
Blvd to Headquarters Rd and install traffic
signal at intersection

VA ST DSCR STRTHMR Realignment
of
Strathmore and "G" Road
Intersection

2024

VA

Chesterfield

Defense Supply
Richmond

VA ST FP MG750TRX Rehab Rt 750 fr
US 460 to Ft. Pickett Main Gate &
various tank/RR crossing
improvements

2024

VA

Nottoway and
Dinwiddie

Fort Pickett

Rehab Rt 750 fr US 460 to Ft. Pickett Main
Gate
& various tank/RR crossing improvements

4R

Advances from Other
Federal Agencies Military

$13,097,797

Other

EFL

Planned

VA-07

USACE-NA

3R

FLTP - NPS

$49,000,000

Title 23

EFL

Planned

VA-04

NPS-NER

Center,

NP COLO 1A20, 1B40, 1C16 Colonial
Parkway Segments A, D, E, and F

2025

VA

Chesterfield

COLO

exposed aggregate concrete pavement
4R, asphalt pavement rehabilitation,
asphalt pavement patching, drainage
improvements, bridge rehabilitation,
minor curb repairs, guardrail replacement,
signing, and other miscellaneous work.

VA ERFO COE 2020-1(1)

2025

VA

Franklin

Lake Philpott

Roadway reconstruction, ditch
reconditioning, and culvert replacement

Spot

ERFO

$1,820,000

Title 23

EFL

Not Started

VA-05

Craig, Pulaski

George Washington
Jefferson
National Forest

Repairs will include culvert replacements,
placement of fill material and aggregate,
road and ditch reconditioning and
brushing

Spot

ERFO

$6,237,400

Title 23

EFL

In Design

VA-09

FS-R8

Repairs will include 1 culvert replacement
and associated road segment repairs. The
culvert is on a native brook trout stream
and will need to be replaced with an
Aquatic Organism Passage
(AOP)
structure.

Spot

ERFO

$2,191,500

Title 23

EFL

In Design

VA-06

FS-R8

Emergency repair performed on October
18,
2018 to address heavily clogged
culverts (MP 0.06, 1.4, 1.6) and failing
roadway fill (MP 0.06). Need permanent
replacement of triple culverts (existing
60"x72" pipe arches) at MP 0.06 with a
clear span structure (betterment).

Spot

ERFO

$9,841,418

Title 23

EFL

In Design

VA-09

FS-R8

VA ERFO FS 2018-1(2),2(1)

VA ERFO FS 2018-2(2),3(1)

VA ERFO FS GWJEF808 2020-2(1)

2025

2025

2025

VA

VA

VA

Rockingham,
Augusta

Wythe, Tazewell,
Scott

George Washington
Jefferson
National Forest

and

and

George Washington &
Jefferson
NFs, George Washington &
Jefferson NF

99

USACE-Wilmington District

Last Printed:
PROJECT

VA ERFO FS GWJEF808 2020-2(2)
REPLACE LICK CREEK TRAIL BRIDGE

PROGRAM
FISCAL YEAR

2025

STATE

VA

COUNTY

Bland

PARK, REFUGE, FOREST OR
OTHER PARTNER/AGENCY

DESCRIPTION

TYPE OF WORK

PRIMARY FUND SOURCE

TOTAL PROGRAMMED
AMOUNT

FUNDS
FROM TITLE

DELIVERED BY

STATUS

12/13/2022
CONGRESSIONAL
DISTRICT

FLMA REGION

George Washington &
Jefferson
NF

Remove failed 1980 Appalachian Trail
bridge that was damaged multiple times
by debris during flood events. Replace
with a new single span trail bridge that
meets load requirements, minimum
elevation requirement, and current Forest
Service standards.

Spot

ERFO

$2,648,037

Title 23

EFL

In Design

VA-09

FS-R8

Spot

ERFO

$310,288

Title 23

EFL

In Design

VA-06

FS-R8

VA ERFO FS GWJEF808 2020-3(1)

2025

VA

Bedford

George Washington &
Jefferson
NF

Repair the corroded pipe with lean
concrete to seal the base, recompact
backfill around pipes/conc at each
approach, place concrete on each
approach to harden road surfacing,
place riprap to protect stream banks.

VA FTNP FRSP BRG(1) Rehabilitate 3
bridges (4370-001,-002, and - 003)

2025

VA

SPOTSYLVANIA

FRSP

Rehabilitate 3 bridges (4370-001,-002, and
-003)

BR3R

FLTP - NPS

$983,000

Title 23

EFL

In design

VA-01

NPS-NER

VA NP GWMP 105(2) Rehabilitate
Fort
Hunt Roads and Parking

2026

VA

Fairfax

GWMP

Rehabilitate Fort Hunt Roads and Parking

3R

FLTP - NPS

$2,400,000

Title 23

EFL

Planned

VA-08

NPS-NCR

100

COMMONWEALTH OF VIRGINIA

APPENDIX H

District Project Listings

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

COMMONWEALTH OF VIRGINIA

BRISTOL
DISTRICT

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

FFY 24-27 Working STIP

6/21/2023 8:52:03

Bristol District
Interstate Projects
MPO

NonMPO

UPC NO

120396 SCOPE

SYSTEM

Interstate

PROJECT

#OTHERINT - I-77 OPERATIONAL IMPROVEMENTS - TRIP

JURISDICTION

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

ROUTE/STREET

0077
MATCH

Federal - AC OTHER

MPO

OVERSIGHT
ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
CN
AC

Statewide

FY24
$0

FY25

$150,000

FY26

$150,000

FY27

$0

$0

$0

Bristol

UPC NO

110380 SCOPE

SYSTEM

Interstate

PROJECT

#HB2.FY17 I-81 AT RT 75 (Exit 17) INCHG GARVEE DEBT SERVICE

JURISDICTION

Multi-jurisdictional: Bristol MPO

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $3,935,820 GARVEE Debt Service Interest Prev, $612,284 FFY24 GARVEE Debt Service Interest,
$571,733 GARVEE Debt Service Interest FFY25, $513,989 GARVEE Debt Service Interest FFY26, $453,361
GARVEE Debt Service Interest FFY27, $1,460,910 GARVEE Debt Service Interest FFY28-38. Total GARVEE
Debt Service Interest
$7,548,097. Corresponding CN UPC 109419
0081
TOTAL COST
$16,881,824

FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$571,733

$513,989

$453,361

Federal - NHS/NHPP

$0

$612,284

$0

$0

$0

$0

$612,284

$571,733

$513,989

$453,361

PE TOTAL

102

FFY 24-27 Working STIP

6/21/2023 8:52:03

Bristol District
Primary Projects
MPO

NonMPO

UPC NO

85126 SCOPE

Preliminary Engineering

SYSTEM

Primary

PROJECT

RTE 121 - VDOT ALPHA/PIONEER OVERSIGHT CFX - FEDERAL

JURISDICTION

Buchanan County

DESCRIPTION

FROM: WEST VIRGINIA STATE LINE TO: ROUTE 23 (57.0000 MI)

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

US ROUTE 121 (0121)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$0

MPO

$0

FY26
$0

$0

90282 SCOPE

$0

New Construction Roadway

SYSTEM

Primary

PROJECT

121 CFX - 460 Corridor Q Poplar Creek Phase A Finish

DESCRIPTION

FROM: East end of Hawks Nest Section TO: 0.32 Mi. East Int. Route 604 (2.6100 MI)

ROUTE/STREET

121 CFX - 460 CORRIDOR Q POPLAR CREEK (0121)

FUND SOURCE

JURISDICTION

Federal - HPD

PE TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - HPD

CN
AC

Federal - AC OTHER

MPO

Buchanan County

MATCH

FY24

FY25

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

$178,879,832

FY26

FY27

$64,954

$259,815

$0

$0

$0

$0

$4,294,878

$0

$0

$0

$64,954

$4,554,693

$0

$0

$0

$5,294,380

$0

$0

$0

$51,883

$207,531

$0

$0

$0

$0

$28,259,726

$0

$0

$0

Federal - STP/STBG

NonMPO

UPC NO

104094 SCOPE

New Construction Roadway

SYSTEM

Primary

PROJECT

CFX - Poplar Creek Phase A - VDOT Oversight and RW Acq. Cost

DESCRIPTION

FROM: East end of Hawks Nest TO: Existing Route 604 (3.0000 MI)

ROUTE/STREET

121 CFX - 460 CORRIDOR Q POPLAR CREEK PHASE A (0121)

FUND SOURCE
PE

FY27

NonMPO

UPC NO

PE

$7,116,996

JURISDICTION

Buchanan County

MATCH

FY24

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FY25

$20,930,213

FY26

FY27

Federal - APD

$0

$781,917

$0

$0

$0

Federal - NHS/NHPP

$0

$281,917

$0

$0

$0

PE TOTAL

$0

$1,063,834

$0

$0

$0

PE AC Federal - AC OTHER

$0

$648,217

$0

$0

$0

RW

Federal - APD

$0

($500,000)

$0

$0

$0

CN

Federal - APD

$0

($104,921)

$0

$0

$0

103

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

NonMPO

UPC NO

64144 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

ROUTE 460 CONNECTOR PHASE I, VDOT Oversight

DESCRIPTION

FROM: KENTUCKY STATE LINE TO: 460 CONNECTOR PHASE II (.88Mi East KY ST Line) (0.8800 MI)

ROUTE/STREET

0460

FUND SOURCE

JURISDICTION

Buchanan County

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$17,916,658

FY26

FY27

PE

Federal - APD

$712,892

$2,851,568

$0

$0

$0

RW

Federal - APD

$246,216

$984,862

$0

$0

$0

CN

Federal - APD

$626,536

$2,506,145

$0

$0

$0

MPO

NonMPO

UPC NO

85914 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

New 460 Connector, Phase 1, Design Build

DESCRIPTION

FROM: Kentucky State Line TO: 0.833 Mile East Kentucky State Line (0.8330 MI)

ROUTE/STREET

US 460 CONNECTOR (0460)

FUND SOURCE

JURISDICTION

Buchanan County

MATCH

FY24

PE
Federal - APD
PE AC Federal - AC OTHER

FY25

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$103,284,632

FY26

FY27

$980,405
$0

$3,921,619
$882,531

$0
$0

$0
$0

$0
$0

RW

Federal - APD

($618,088)

($2,472,353)

$0

$0

$0

CN

Federal - APD

($2,624,028)

($10,496,110)

$0

$0

$0

MPO

NonMPO

UPC NO

88140 SCOPE

New Construction Roadway

SYSTEM

Primary

JURISDICTION

Buchanan County

OVERSIGHT

FO

PROJECT

Oversight Corridor Q - 460 Conn. 2, Interchange & Hawks Nest

ADMIN BY

VDOT

DESCRIPTION

FROM: 0.833 Mi. East Kentucky State Line TO: 0.53 Mi. East Rte. 614 (9.0000 MI)

PROGRAM NOTE Parent UPC of Child UPC's 100707 & 100708
ROUTE/STREET

US 460 / CORRIDOR Q (0460)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$12,582,878

FY26

FY27

PE

Federal - APD

$120,000

$480,000

$0

$0

$0

CN

Federal - APD

$0

($293,504)

$0

$0

$0

MPO

NonMPO

UPC NO

100468 SCOPE

Preliminary Engineering

SYSTEM

Primary

JURISDICTION

Buchanan County

PROJECT

Corridor Q Route 121-460 Intersection VDOT Oversight

DESCRIPTION

FROM: 460 Connector Phase II Section TO: Hawks Nest Section (0.5000 MI)

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate. Parent UPC of Child UPC 100520
ROUTE/STREET

INTERSECTION OF 460 PHASE II AND HAWKS NEST (0460)

FUND SOURCE

MATCH

FY24
$0

$0

104

TOTAL COST

$2,000,000

FY26

FY25
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

NonMPO

UPC NO

100520 SCOPE

New Construction Roadway

SYSTEM

Primary

JURISDICTION

Buchanan County

PROJECT

Corridor Q 121/460 Intersection

DESCRIPTION

FROM: 460 Connector Phase II Section TO: Hawks Nest Section (0.5700 MI)

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE Child UPC of Parent UPC 100468
ROUTE/STREET

INTERSECTION OF 460 PHASE II AND HAWKS NEST (0460)

FUND SOURCE

MATCH

FY24

TOTAL COST
FY25

$16,777,407

FY26

FY27

PE

Federal - APD

$0

($342,374)

$0

$0

$0

RW

Federal - APD

$0

($657,626)

$0

$0

$0

CN

Federal - APD

$0

($1,203,665)

$0

$0

$0

MPO

NonMPO

UPC NO

100707 SCOPE

New Construction Roadway

SYSTEM

Primary

PROJECT

ROUTE 460 CONNECTOR - PHASE II - Rough Grade

DESCRIPTION

FROM: 0.833 Mi. East Kentucky State Line TO: 7.033 Mi. East Kentucky State Line (6.2000 MI)

ROUTE/STREET

ROUTE 460 / CORRIDOR Q (0460)

FUND SOURCE
PE

JURISDICTION

Buchanan County

FO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

Federal - APD

OVERSIGHT

FY25

$120,000,000

FY26

FY27

$0

$3,501,608

$0

$0

$0

$51,700

$206,799

$0

$0

$0

$51,700

$3,708,407

$0

$0

$0

PE AC Federal - AC OTHER

$0

$7,082,146

$0

$0

$0

RW
AC

Federal - AC OTHER

$0

$1,362,912

$0

$0

$0

CN

Federal - APD

$0

($3,501,608)

$0

$0

$0

Federal - SAFETEA-LU
PE TOTAL

MPO

NonMPO

UPC NO

100708 SCOPE

New Construction Roadway

SYSTEM

Primary

JURISDICTION

Buchanan County

OVERSIGHT

FO

PROJECT

Corridor Q - 460 Connector Phase II Finish Grade

ADMIN BY

VDOT

DESCRIPTION

FROM: US Route 460 Connector Phase I TO: Route 121/Corridor Q Intersection (6.1890 MI)

PROGRAM NOTE Child UPC of Parent UPC 88140
ROUTE/STREET

ROUTE 460 / CORRIDOR Q (0460)

FUND SOURCE
CN
AC

Federal - AC OTHER

TOTAL COST

MATCH

FY24
$0

FY25
$1,096,691

105

$35,589,988

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

NonMPO

UPC NO

117788 SCOPE

New Construction Roadway

SYSTEM

Primary

JURISDICTION

Buchanan County

OVERSIGHT

NFO

PROJECT

CFX - Poplar Creek Phase B - VDOT Oversight and RW Acq. Cost

DESCRIPTION

FROM: End Poplar Creek Phase A TO: Ex. Route 460 Town of Grundy, 0.75 MI.W. of SC 1005 (2.0700 MI)

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

US 121/460 (0460)

FUND SOURCE

TOTAL COST
MATCH

FY24

FY25

$25,099,695

FY26

FY27

RW

Federal - STP/STBG

$1,002,431

$4,009,724

$0

$0

$0

CN

Federal - STP/STBG

$1,347,549

$5,390,195

$0

$0

$0

MPO

NonMPO

UPC NO

117789 SCOPE

New Construction Roadway

SYSTEM

Primary

PROJECT

CFX 121/460 Corridor Q Intersection/Hawk's Nest Oversight

DESCRIPTION

FROM: End 460 Connector Phase I I TO: Beginning 460 Poplar Creek Phase A (2.2100 MI)

ROUTE/STREET

ROUTE 121/460 (0460)

FUND SOURCE
CN

JURISDICTION

Federal - NHS/NHPP
CN TOTAL

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

Federal - APD

MPO

Buchanan County

FY24

FY25

$1,295,757

FY26

FY27

$135,920

$543,678

$0

$0

$0

$36,848

$147,393

$0

$0

$0

$172,768

$691,071

$0

$0

$0

NonMPO

UPC NO

117807 SCOPE

New Construction Roadway

SYSTEM

Primary

JURISDICTION

Buchanan County

OVERSIGHT

FO

PROJECT

121/460 Corridor Q Intersection/Hawk's Nest Finish Grade

DESCRIPTION

FROM: End Route 460 Connector Phase 2 TO: Beginning Route 460 Poplar Creek Phase A (2.2100 MI)

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

ROUTE 121/460 (0460)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$0
MPO

$0

$12,961,432

FY26
$0

FY27
$0

$0

NonMPO

UPC NO

117808 SCOPE

New Construction Roadway

SYSTEM

Primary

PROJECT

CFX - 121/460 Poplar Creek Phase B - PE/RW

DESCRIPTION

FROM: End Poplar Creek Phase A TO: Ex. Route 460 Town of Grundy, 0.75 MI.W. of SC 1005 (2.0700 MI)

ROUTE/STREET

121 CFX - 460 CORRIDOR Q POPLAR CREEK (0460)

FUND SOURCE

JURISDICTION

Buchanan County

MATCH

FY24

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
FY25

$10,041,213

FY26

FY27

PE

Federal - APD

$0

($410,000)

$0

$0

$0

RW

Federal - APD

$0

($222,050)

$0

$0

$0

106

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

NonMPO

UPC NO

118490 SCOPE

New Construction Roadway

SYSTEM

Primary

PROJECT

CFX - 121/460 Poplar Creek Phase B - Final Design and CN

DESCRIPTION

FROM: End Poplar Creek Phase A TO: Connect to Existing Route 460 (2.0700 MI)

ROUTE/STREET

US 121460 (0460)

FUND SOURCE

JURISDICTION

Buchanan County

MATCH

FY24

FY25

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$171,991,592

FY26

FY27

PE

Federal - APD

$263,418

$1,053,670

$0

$0

$0

RW

Federal - APD

$434,970

$1,739,879

$0

$0

$0

CN

Federal - APD

$35,004,782

$0

$0

$0

CN
AC

Federal - AC OTHER

$124,916,690

$0

$0

$0

$0

107

FFY 24-27 Working STIP

6/21/2023 8:52:03

Bristol District
Secondary
Projects
MPO

NonMPO

UPC NO

121429 SCOPE

SYSTEM

Secondary

PROJECT

#SMART20 - PROGRESS PARK CONNECTOR GARVEE DEBT SERVICE

DESCRIPTION

FROM: Int. Nye Road TO: Int. E. Lee Trinkle Dr. (Rte. 792) (2.2910 MI)

PROGRAM NOTE

Includes $318,643 FFY24 GARVEE Debt Service Interest, $667,846 GARVEE Debt Service Interest FFY25,
$679,258 GARVEE Debt Service Interest FFY26, $640,097 GARVEE Debt Service Interest FFY27, $3,944,698
GARVEE Debt Service Interest FFY28-39. Total GARVEE Debt Service Interest $6,250,542. Corresponding CN
UPC 115540
PROGRESS PARK CONNECTOR (9999)
TOTAL COST
$3,629,035

ROUTE/STREET

FUND SOURCE
PE

JURISDICTION

Wythe County

MATCH

FY24

FY25

Federal - AC CONVERSION

$0

$0

Federal - STP/STBG

OVERSIGHT

NFO

ADMIN BY

VDOT

FY26
$667,846

FY27
$679,258

$640,097

$0

$318,643

$0

$0

$0

PE TOTAL

$0

$318,643

$667,846

$679,258

$640,097

PE AC Federal - AC

$0

$5,931,899

$0

$0

$0

108

FFY 24-27 Working STIP

6/21/2023 8:52:03

Bristol District
MPO

Urban Projects

Bristol

UPC NO

105309 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#HB2.FY17 Widen Rte. 11 & I-81 south bound on & off ramps

DESCRIPTION

FROM: 500 feet west of Int. I-81 northbound off ramp TO: 450 feet east of Island Rd. (0.1300 MI)

ROUTE/STREET

LEE HIGHWAY (0011)

FUND SOURCE

JURISDICTION

Bristol

OVERSIGHT

FO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

PE

Federal - STP/SU

($5,000)

CN

Federal - DEMO
Federal - NHS/NHPP
Federal - STP/STBG

FY25

$6,728,429

FY26

FY27

($20,000)

$0

$0

$0

$0

$245,988

$0

$0

$0

$0

$2,974,141

$0

$0

$0

$0

$797,552

$0

$0

$0

CN TOTAL

$0

$4,017,681

$0

$0

$0

CN
AC

$0

$1,920,748

$0

$0

$0

Federal - AC OTHER

MPO

Bristol

UPC NO

121136 SCOPE

Bridge Rehab w/o Added Capacity

SYSTEM

Urban

PROJECT

#SGR23LB (FED ID 20001) Piedmont Ave over Beaver Crk Phase 1

DESCRIPTION

FROM: 0.00 PIED AVE TO: 0.30 8TH ST (0.2500 MI)

ROUTE/STREET

PIEDMONT AVENUE (0113)

FUND SOURCE
PE

JURISDICTION

Bristol

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$99,109,620

FY26

FY27

Federal - BR

$0

$3,500,000

$0

$0

$0

Federal - HIP/F

$0

$3,000,000

$0

$0

$0

PE TOTAL

$0

$6,500,000

$0

$0

$0

RW

Federal - BR

$0

$0

$0

$2,531,904

$0

Federal - NHS/NHPP

$0

$0

$0

$968,096

$0

$0

$0

$0

$3,500,000

$0

$0

$0

$0 $55,833,520

$0

$0

$0 $33,276,100

RW TOTAL
CN

Federal - BR

CN
AC

Federal - AC OTHER

$0

109

FFY 24-27 Working STIP

6/21/2023 8:52:03

Bristol District
Miscellaneous
Projects
MPO

Multiple MPOs

UPC NO

119654 SCOPE

Traffic Management/Engineering

SYSTEM

Miscellaneous

PROJECT

#I81CIP PARALLEL FACILITIES IMPROVEMENTS O&M FY 21-27

DESCRIPTION

FROM: State Line with Tennessee TO: State Line with West Virginia

ROUTE/STREET

ARTERIALS ADJANCET TO INTERSTATE 81 (0081)

FUND SOURCE
CN
AC

Federal - AC OTHER

JURISDICTION

Statewide

MATCH

FY25
$479,805

110

NFO

ADMIN BY

VDOT

TOTAL COST

FY24
$0

OVERSIGHT

$479,805

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Bristol District
Project
Groupings
MPO

NonMPO

GROUPING

Construction: Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET
FUND SOURCE
PE

MATCH

FY24

$298,616,134

FY26

FY27

Federal - AC CONVERSION

$184,946

$0

$0

$739,783

$0

Federal - BR

$697,667

$1,018,987

$632,000

$246,174

$893,507

Federal - NHS/NHPP

$647,958

$0

$800,000

$1,158,866

$632,964

$1,530,570

$1,018,987

$1,432,000

$2,144,823

$1,526,471

$0

$150,000

$924,729

$0

$0

Federal - AC CONVERSION

$217,675

$130,111

$740,588

$0

$0

Federal - BR

$222,977

$179,108

$712,800

$0

$0

$73,556

$278,154

$16,068

$0

$0

$514,207

$587,373

$1,469,456

$0

$0

$0

$162,639

$925,735

$0

$0

$3,298,043

$2,588,418

PE TOTAL
PE AC Federal - AC OTHER
RW

FY25

TOTAL COST

Federal - NHS/NHPP
RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION

$2,301,575

$2,519,840

$800,000

Federal - BR

$9,551,392

$5,365,300

$8,495,022

Federal - NHS/NHPP

$3,163,516

$767,947

$10,066,002

$1,820,113

$0

$492,768

$600,000

$393,010

$978,062

$0

$15,509,250

$9,253,087

$19,754,034

$0

$6,315,081

$3,567,714

Federal - STP/STBG
CN TOTAL
CN
AC

Federal - AC OTHER

MPO

NonMPO

GROUPING

Construction: Forest Highway

$12,914,770 $11,430,474

$19,010,988 $14,018,892
$5,360,985

TOTAL COST

ROUTE/STREET
FUND SOURCE

MATCH

FY24
$0

MPO

NonMPO

GROUPING

Construction: Rail

$0

$0

ROUTE/STREET
FUND SOURCE

$2,290,864

FY26

FY25

$0

FY27
$0

$0

TOTAL COST
MATCH

FY24
$0

FY25
$0

111

$365,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

NonMPO

GROUPING

Construction: Safety/ITS/Operational Improvements

ROUTE/STREET
FUND SOURCE
PE

MATCH

Federal - HSIP
Federal - STP/STBG

PE TOTAL
PE AC Federal - AC
Federal - AC OTHER
PE AC
RW

Federal - AC CONVERSION
Federal - NHS/NHPP
Federal - STP/STBG
Federal - TAP/F

$15,305

$101,149

$283,941
$299,246

TOTAL COST

$468,408,010

FY26

FY27

$36,595

$0

$0

$1,135,765

$0

$0

$0

$1,236,914

$36,595

$0

$0

$92,787

$186,300

$428,702

$0

$0

$0

$1,595,166

$0

$0

$0

$92,787

$1,781,466

$428,702

$0

$0

$179,935

$64,260

$655,480

$0

$0

$78,599

$0

$144,049

$170,347

$0

$395,477

$450,436

$0

$1,131,470

$0

$15,813

$0

$63,251

$0

$0

$514,696

$862,780

$1,301,817

$0

$3,650,300

$0

$5,203,495

$94,598

$0

$659,587

$191,794

$0

$0

$0

$0

$2,259,566

$0

Federal - NHS/NHPP

$1,463,589

$2,369,552

$0

$3,484,805

$0

Federal - STP/STBG

$1,792,674

$3,545,181

$560,000

$3,065,514

$0

Federal - TAP/F

$1,443,395

$0

$0

$5,773,580

$0

$8,444,555

$5,914,733

$6,423,082

$15,496,453 $20,973,909

$0

$37,233,286

$1,102,985

$37,668,579

Federal - AC CONVERSION
Federal - HSIP
Federal - NHFP

CN TOTAL
CN
AC

FY25

$669,823

RW TOTAL
CN

FY24

Federal - AC OTHER

MPO

NonMPO

GROUPING

Construction: Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

$721,194 $20,973,909

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0

$25,348,034

FY26

FY27

RW

Federal - TAP/F

$15,906

$4,000

$59,623

$0

$0

CN

Federal - TAP/F

$635,961

$688,859

$665,247

$1,189,736

$0

CN
AC

Federal - AC OTHER

$0

$272,967

$229,143

$430,764

$0

MPO

NonMPO

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE

TOTAL COST
MATCH

FY24
$0

FY25
$0

112

$23,727,211

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

Bristol

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$23,727,211

FY26

FY27

Federal - NHS/NHPP

$0

$3,475,421

$3,475,421

$3,475,421

$3,475,421

Federal - STP/STBG

$0

$2,441,178

$2,451,200

$2,461,392

$2,471,757

$0

$5,916,599

$5,926,621

$5,936,813

$5,947,178

CN TOTAL

MPO

NonMPO

GROUPING

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
TOTAL COST

ROUTE/STREET
FUND SOURCE

MATCH

FY24

FY25

$0

$0

MPO

Bristol

GROUPING

Maintenance : Preventive Maintenance for Bridges

$34,413,863

FY26

FY27

$0

$0

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$34,413,863

FY26

FY27

Federal - HSIP

$0

$0

$1,360,781

$0

$0

Federal - NHFP

$0

$930,506

$930,506

$930,506

$930,506

Federal - NHS/NHPP

$0

$1,133,333

$1,133,333

$1,133,333

$1,133,333

Federal - STP/STBG

$0

$6,162,617

$6,186,884

$6,211,563

$6,236,662

$0

$8,226,456

$9,611,504

$8,275,402

$8,300,501

CN TOTAL

MPO

NonMPO

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24
$0

FY25
$0

MPO

Bristol

GROUPING

Maintenance : Traffic and Safety Operations

$19,163,232

FY26

FY27

$0

$0

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

$19,163,232

FY26

FY27

Federal - HSIP

$0

$0

$1,360,781

$0

$0

Federal - NHS/NHPP

$0

$3,355,556

$3,355,556

$3,355,556

$3,355,556

Federal - STP/STBG

$0

$1,088,279

$1,092,747

$1,097,290

$1,101,911

$0

$4,443,835

$5,809,084

$4,452,846

$4,457,467

CN TOTAL

113

FFY 24-27 Working STIP

6/21/2023 8:52:03

Bristol MPO
Project
Groupings
GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$11,283,530

FY26

FY27

RW

Federal - NHS/NHPP

$177,546

$710,184

$0

$0

$0

CN

Federal - NHS/NHPP

$639,281

$0

$2,557,122

$0

$0

CN
AC

Federal - AC OTHER

$0

$0

$4,413,062

$0

$0

GROUPING

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET
FUND SOURCE
PE

MATCH

Federal - NHS/NHPP
Federal - STP/STBG

PE TOTAL
PE AC Federal - AC OTHER
RW

Federal - NHS/NHPP

FY24

FY25

TOTAL COST

$184,676,839

FY26

FY27

$30,000

$120,000

$0

$0

$0

$3,958

$0

$0

$15,833

$0

$33,958

$120,000

$0

$15,833

$0

$0

$0

$0

$849,405

$0

$70,000

$280,000

$0

$0

$0

$126,571

$100,000

$0

$406,285

$0

RW TOTAL

$196,571

$380,000

$0

$406,285

$0

CN

Federal - AC CONVERSION

$236,307

$145,228

$0

$0

$800,000

Federal - NHS/NHPP

$156,487

$0

$0

$625,949

$0

Federal - STP/STBG

$685,270

$1,186,063

$2,203,200

$537,880

$0

$1,078,064

$1,331,291

$2,203,200

$1,163,829

$800,000

$0

$6,902,149

$100,000

$7,137,973

$0

Federal - STP/STBG

CN TOTAL
CN
AC

Federal - AC OTHER

GROUPING

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY25

$542,527

FY26

FY27

Federal - HSIP

$26,964

$242,677

$0

$0

$0

Federal - TAP/F

$34,555

$138,220

$0

$0

$0

$61,519

$380,897

$0

$0

$0

$0

$55,109

$0

$0

$0

CN TOTAL
CN
AC

FY24

Federal - AC OTHER

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

FY26

$23,727,211
FY27

Federal - NHS/NHPP

$0

$3,475,421

$3,475,421

$3,475,421

$3,475,421

Federal - STP/STBG

$0

$2,441,178

$2,451,200

$2,461,392

$2,471,757

$0

$5,916,599

$5,926,621

$5,936,813

$5,947,178

CN TOTAL

114

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$34,413,863

FY26

FY27

Federal - HSIP

$0

$0

$1,360,781

$0

$0

Federal - NHFP

$0

$930,506

$930,506

$930,506

$930,506

Federal - NHS/NHPP

$0

$1,133,333

$1,133,333

$1,133,333

$1,133,333

Federal - STP/STBG

$0

$6,162,617

$6,186,884

$6,211,563

$6,236,662

$0

$8,226,456

$9,611,504

$8,275,402

$8,300,501

CN TOTAL

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

$19,163,232

FY26

FY27

Federal - HSIP

$0

$0

$1,360,781

$0

$0

Federal - NHS/NHPP

$0

$3,355,556

$3,355,556

$3,355,556

$3,355,556

Federal - STP/STBG

$0

$1,088,279

$1,092,747

$1,097,290

$1,101,911

$0

$4,443,835

$5,809,084

$4,452,846

$4,457,467

CN TOTAL

115

COMMONWEALTH OF VIRGINIA

CULPEPER
DISTRICT

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

FFY 24-27 Working STIP

6/21/2023 8:52:03

Culpeper District
Kingsport MPO
Project
Groupings
GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0
GROUPING

$0

$0

$0

Construction : Safety/ITS/Operational Improvements
TOTAL COST

FUND SOURCE
PE

Federal - HSIP

RW

Federal - TAP/F

CN

Federal - HSIP

MATCH

Federal - TAP/F
CN TOTAL
Federal - AC OTHER

GROUPING

FY27

$0

ROUTE/STREET

CN
AC

$8,908,123

FY26

FY24

FY25

$37,932,408

FY26

FY27

$0

$75,000

$0

$0

$0

$4,371

$0

$17,483

$0

$0

$0

$1,301,580

$924,190

$0

$0

$206,862

$0

$0

$827,446

$0

$206,862

$1,301,580

$924,190

$827,446

$0

$0

$0

$0

$264,041

$0

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$23,727,211

FY26

FY27

Federal - NHS/NHPP

$0

$3,475,421

$3,475,421

$3,475,421

$3,475,421

Federal - STP/STBG

$0

$2,441,178

$2,451,200

$2,461,392

$2,471,757

$0

$5,916,599

$5,926,621

$5,936,813

$5,947,178

CN TOTAL

GROUPING

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

$34,413,863

FY26

FY27

Federal - HSIP

$0

$0

$1,360,781

$0

$0

Federal - NHFP

$0

$930,506

$930,506

$930,506

$930,506

Federal - NHS/NHPP

$0

$1,133,333

$1,133,333

$1,133,333

$1,133,333

Federal - STP/STBG

$0

$6,162,617

$6,186,884

$6,211,563

$6,236,662

$0

$8,226,456

$9,611,504

$8,275,402

$8,300,501

CN TOTAL

117

FFY 24-27 Working STIP

6/21/2023 8:52:03

Culpeper District
GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

$19,163,232

FY26

FY27

Federal - HSIP

$0

$0

$1,360,781

$0

$0

Federal - NHS/NHPP

$0

$3,355,556

$3,355,556

$3,355,556

$3,355,556

Federal - STP/STBG

$0

$1,088,279

$1,092,747

$1,097,290

$1,101,911

$0

$4,443,835

$5,809,084

$4,452,846

$4,457,467

CN TOTAL

118

FFY 24-27 Working STIP

6/21/2023 8:52:03

Culpeper District
Interstate Projects
MPO

NonMPO

UPC NO

121648 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#ITTF23 INTERCHANGE LIGHTING AT EXIT 99

DESCRIPTION

FROM: Exit 99 TO: Exit 99 (0.2000 MI)

ROUTE/STREET

0064

FUND SOURCE
CN
AC

Federal - AC OTHER

JURISDICTION

Albemarle County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$2,500,000

119

$2,500,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Culpeper District
Primary Projects
MPO

Charlottesville

UPC NO

77383 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

RTE 29 - WIDENING & CORRIDOR IMPROVEMENTS

JURISDICTION

Albemarle County

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION

FROM: ROUTE 643 (POLO GROUNDS ROAD) TO: ROUTE 1719 (TOWN CENTER DRIVE) (1.8300 MI)

PROGRAM NOTE Linked with UPC 106136 & 106137
ROUTE/STREET

0029

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$50,235,940

FY26

FY27

PE

Federal - NHS/NHPP

$0

($304,685)

$0

$0

$0

RW

Federal - NHS/NHPP

$0

($4,612,073)

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$9,758,749

$0

$0

$0

MPO

Charlottesville

UPC NO

106136 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

JURISDICTION

Albemarle County

OVERSIGHT

FO

PROJECT

US-29 RIO ROAD GRADE SEPARATED INTERSECTION

DESCRIPTION

FROM: ROUTE 851 (DOMINION DRIVE) TO: ROUTE 1417 (WOODBROOK DRIVE) (1.0000 MI)

ADMIN BY

VDOT

PROGRAM NOTE Linked with UPC 77383 & 106137
ROUTE/STREET

SEMINOLE TRAIL (0029)

FUND SOURCE
RW
AC
CN
AC

TOTAL COST

MATCH

FY24

FY25

$66,463,579

FY26

FY27

Federal - AC OTHER

$0

$5,901,475

$0

$0

$0

Federal - AC OTHER

$0

$4,829,920

$0

$0

$0

MPO

Northern Virginia

UPC NO

110375 SCOPE

SYSTEM

Primary

JURISDICTION

Fauquier County

PROJECT

#HB2.FY17 CONST INTR AT RTE 15/17/29 BUS GARVEE DEBT SERVICE

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $3,672,641 GARVEE Debt Service Interest Prev, $784,078 FFY24 GARVEE Debt Service Interest,
$759,366 GARVEE Debt Service Interest FFY25, $693,133 GARVEE Debt Service Interest FFY26, $623,660
GARVEE Debt Service Interest FFY27, $2,541,912 GARVEE Debt Service Interest FFY28-38. Total GARVEE
Debt Service Interest
$9,074,790. Corresponding CN UPC 77384
ROUTE/STREET
0029
TOTAL COST
$18,424,156
FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$759,366

$693,133

$623,660

Federal - NHS/NHPP

$0

$784,078

$0

$0

$0

PE TOTAL

$0

$784,078

$759,366

$693,133

$623,660

PE AC Federal - AC

$0

$4,618,071

$0

$0

$0

120

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

NonMPO

UPC NO

120655 SCOPE

Safety

SYSTEM

Primary

PROJECT

ROUTE 522 / 20 ROUNDABOUT AT UNIONVILLE

JURISDICTION

DESCRIPTION

FROM: AT 522 / 20 INTERSECTION TO: AT 522 / 20 INTERSECTION (0.0300 MI)

ROUTE/STREET

ZACHARY TAYLOR HIGHWAY (0522)

FUND SOURCE

NFO

ADMIN BY

VDOT

FY24

FY25

$0

$0

$10,930,225

FY26
$0

FY27
$1,752,839

$0

NonMPO

UPC NO

114287 SCOPE

Safety

SYSTEM

Primary

PROJECT

CULPEPER DIST FUTURE YR FUNDS DISTRICT-WIDE RUMBLE STRIPS

DESCRIPTION

FROM: DISTRICT-WIDE TO: DISTRICT-WIDE

ROUTE/STREET

JURISDICTION

9999
MATCH

Federal - HSIP

MPO

Culpeper District-wide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
CN

OVERSIGHT

TOTAL COST

MATCH

PE AC Federal - AC OTHER

MPO

Orange County

FY24
$0

FY25
$3,567,461

$3,567,461

FY26
$0

FY27
$0

$0

NonMPO

UPC NO

121981 SCOPE

Resurfacing

SYSTEM

Primary

PROJECT

#SGR23VP PM-7G-23 Asphalt Resurfacing Primary System

DESCRIPTION

FROM: Varies TO: Varies

ROUTE/STREET

VARIES (9999)

FUND SOURCE

JURISDICTION

Culpeper District-wide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$4,150,712

FY26

FY27

CN

Federal - NHS/NHPP

$0

$1,750,000

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$2,400,712

$0

$0

$0

121

FFY 24-27 Working STIP

6/21/2023 8:52:03

Culpeper District
Secondary
Projects
MPO

Charlottesville

UPC NO

106137 SCOPE

New Construction Roadway

SYSTEM

Secondary

PROJECT

BERKMAR DRIVE EXTENDED (CONSTRUCTION OF NEW ROADWAY)

DESCRIPTION

FROM: HILTON HEIGHTS ROAD TO: TOWNCENTER DRIVE (2.3000 MI)

JURISDICTION

Albemarle County

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE Linked with UPC 77383 & 106136
ROUTE/STREET

BERKMAR DRIVE EXTENDED (1403)

FUND SOURCE

TOTAL COST

MATCH

FY24
$0

MPO

FY25

$46,211,254

FY26

$0

FY27

$0

$0

$0

Charlottesville

UPC NO

111779 SCOPE

Bridge Replacement w/o Added Capacity

SYSTEM

Secondary

PROJECT

RTE. 702 - BRIDGE REPLACEMENT STR. 6401

DESCRIPTION

FROM: 0.04 MI. W. MOREY CREEK TO: 0.04 MI. E. MOREY CREEK (0.0800 MI)

ROUTE/STREET

FONTAINCE AVE EXT (0702)

FUND SOURCE

JURISDICTION

Albemarle County

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24
$0

MPO

OVERSIGHT

FY25
$0

$3,499,960

FY26

FY27

$0

$0

$0

NonMPO

UPC NO

119546 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Secondary

PROJECT

RTE 1117 - RURAL ADDITION/EXT. EXISTING STATE MAINTAINED RD.

DESCRIPTION

FROM: INT. RTE. 1117 AND RTE. 1116 TO: 0.07 MI. N. INT. RTE 1117 AND RTE. 1116 (0.0700 MI)

ROUTE/STREET

PIEDMONT AVENUE (1117)

FUND SOURCE

JURISDICTION

Mineral

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$39,600

FY26

FY27

PE AC Federal - AC OTHER

$0

$0

$2,000

$0

$0

CN AC Federal - AC OTHER

$0

$0

$0

$37,600

$0

122

FFY 24-27 Working STIP

6/21/2023 8:52:03

Culpeper District
Urban Projects
MPO

Charlottesville

UPC NO

110381 SCOPE

SYSTEM

Urban

PROJECT

#HB2.FY17 EMMET ST. STR SCAPE & INTSECT GARVEE DEBT SERVICE

JURISDICTION

Charlottesville

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $1,552,308 GARVEE Debt Service Interest Prev, $382,163 GARVEE Debt Service Interest FFY24,
$380,421 GARVEE Debt Service Interest FFY25, $349,178 GARVEE Debt Service Interest FFY26, $316,432
GARVEE Debt Service Interest FFY27, $1,378,067 GARVEE Debt Service Interest FFY28-38. Total GARVEE
Debt Service Interest
$4,358,569. Corresponding CN UPC 109551
ROUTE/STREET
0000
TOTAL COST
$8,138,624
FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$380,421

$349,178

$316,432

Federal - NHS/NHPP

$0

$382,163

$0

$0

$0

PE TOTAL

$0

$382,163

$380,421

$349,178

$316,432

PE AC Federal - AC

$0

$2,424,098

$0

$0

$0

MPO

Charlottesville

UPC NO

75878 SCOPE

Bridge Replacement w/o Added Capacity

SYSTEM

Urban

PROJECT

#SGR19LB - RT 20 - BRIDGE REPLACEMENT

JURISDICTION

DESCRIPTION

FROM: GARRETT STREET/LEVY AVENUE (0.173 mi south of Water Street) TO: EAST MARKET STREET (0.095 north
of Water Street) (0.2680 MI)

ROUTE/STREET

9TH STREET NE (0020)

FUND SOURCE

Charlottesville

OVERSIGHT

FO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$38,078,180

FY26

FY27

PE

Federal - STP/STBG

$44,502

$178,006

$0

$0

$0

RW

Federal - STP/STBG

$0

($249,678)

$0

$0

$0

CN

Federal - NHS/NHPP

$0

$4,280,739

$0

$0

$0

Federal - STP/STBG
Other
CN TOTAL
CN
AC

$0

$0

$2,656,780

$0

$0

$6,160,904

$6,160,904

$0

$0

$0

$6,160,904

$10,441,643

$2,656,780

$0

$0

$0

$13,745,208

$0

$0

$0

Federal - AC OTHER

MPO

Charlottesville

UPC NO

60233 SCOPE

New Construction Roadway

SYSTEM

Urban

PROJECT

HILLSDALE DRIVE EXTENDED (3 LANES)

DESCRIPTION

FROM: GREENBRIER DRIVE TO: HYDRAULIC ROAD (0.8500 MI)

ROUTE/STREET

HILLSDALE DRIVE (U000)

FUND SOURCE
RW
AC
CN
AC

JURISDICTION

Charlottesville

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$27,081,640

FY26

FY27

Federal - AC OTHER

$0

$548,132

$0

$0

$0

Federal - AC OTHER

$0

$13,605,896

$0

$0

$0

123

FFY 24-27 Working STIP

6/21/2023 8:52:03

Culpeper District
Enhancement
Projects
MPO

NonMPO

UPC NO

111975 SCOPE

Rehabilitation of Historic Bldgs/Facilities

SYSTEM

Enhancement

PROJECT

Remington Depot - C502 Exterior Restoration

DESCRIPTION

FROM: Historic Remington Depot TO: Historic Remington Depot

JURISDICTION

Remington

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

EN09

FUND SOURCE

TOTAL COST
MATCH

FY24
$0

FY25
$0

124

$414,734

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Culpeper District
Project
Groupings
MPO

NonMPO

GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

PE
Federal - BR
PE AC Federal - AC OTHER
RW

$68,349
$0

Federal - AC CONVERSION

($88,374)
$0

FY27

$0
$0

$0
$0

$361,770
$342,063

$8,085

$61,072

$0

$0

$1,025,782

$294,275

$40,000

$0

$357,304

$1,033,867

$355,347

$40,000

$0

$0

$76,340

$0

$0

$0

Federal - AC CONVERSION

$1,726,859

$201,258

$0

$3,505,080

$3,201,098

Federal - BR

$6,280,985

$0

$5,835,518

$19,288,422

$0

$494,296

$0

$1,977,184

$0

$0

$8,502,140

$201,258

$7,812,702

$22,793,502

$3,201,098

$0

$0

$12,378,568

$5,289,459

$0

Federal - AC OTHER

Federal - STP/STBG
CN TOTAL
Federal - AC OTHER

MPO

NonMPO

GROUPING

Construction : Rail

ROUTE/STREET

TOTAL COST

FUND SOURCE
CN
CN
AC

$100,567,087

FY26

$17,289

RW TOTAL

CN
AC

FY25

$340,014

Federal - BR
RW
AC
CN

FY24

MATCH

Federal - STP/STBG
Federal - AC OTHER

FY24
$0
$0

FY25
$292,430
$102,570

MPO

NonMPO

GROUPING

Construction : Safety/ITS/Operational Improvements
MATCH

FY24

FY27

$217,586
$47,414

ROUTE/STREET
FUND SOURCE

$721,815

FY26

FY25

$0
$0

$0
$0

TOTAL COST

$139,321,063

FY26

FY27

PE

Federal - AC CONVERSION

$40,047

$179,314

$181,105

$0

$0

RW

Federal - AC CONVERSION

$70,193

$0

$99,462

$181,309

$0

$219,778

$0

$0

$879,113

$0

$1,110,969

$700,538

$1,954,970

$1,788,368

$0

$1,400,940

$700,538

$2,054,432

$2,848,790

$0

$0

$350,963

$155,790

$1,173,502

$0

$950,476

$1,336,414

$2,040,000

$231,694

$436,041

Federal - NHS/NHPP
Federal - STP/STBG
RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION
Federal - HSIP

$290,803

$2,411,130

$0

$206,100

$0

Federal - NHS/NHPP

$1,254,366

$0

$0

$351,122

$4,666,342

Federal - STP/STBG

$2,936,388

$1,999,872

$930,418

$3,289,510

$5,525,750

$5,432,033

$5,747,416

$2,970,418

$0

$6,391,178

$1,093,846

CN TOTAL
CN
AC

Federal - AC OTHER

125

$4,078,426 $10,628,133
$20,969,184

$141,013

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

NonMPO

GROUPING

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$28,181,926

FY26

FY27

PE

Federal - TAP/F

$19,561

$78,244

$0

$0

$0

RW

Federal - TAP/F

$157,369

$64,180

$553,834

$11,463

$0

CN

Federal - TAP/F

$756,622

$197,036

$1,265,124

$1,108,146

$456,182

CN
AC

Federal - AC OTHER

$0

$1,321,716

$415,407

$348,625

$170,590

MPO

NonMPO

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
TOTAL COST

ROUTE/STREET
FUND SOURCE

MATCH

FY24

FY25

$0

$49,752,817

FY26

$0

FY27

$0

MPO

Charlottesville

GROUPING

Maintenance : Preventive Maintenance and System Preservation

$0

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$49,752,817

FY26

FY27

Federal - AC CONVERSION

$0

$0

$851,879

$0

$0

Federal - NHS/NHPP

$0

$5,150,000

$0

$0

$0

Federal - STP/STBG

$0

$10,482,284

$10,525,317

$10,569,082

$10,613,591

CN TOTAL

$0

$15,632,284

$11,377,196

$10,569,082

$10,613,591

CN
AC

$0

$1,560,664

$0

$0

$0

Federal - AC OTHER

MPO

Charlottesville

GROUPING

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

FY26

$18,387,625
FY27

Federal - NHFP
Federal - NHS/NHPP

$0
$0

$1,877,503
$528,620

$1,877,503
$528,620

$1,877,503
$528,620

$1,877,503
$528,620

Federal - STP/STBG

$0

$2,177,888

$2,186,388

$2,195,033

$2,203,824

$0

$4,584,011

$4,592,511

$4,601,156

$4,609,947

CN TOTAL

126

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

Charlottesville

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

Federal - STP/STBG

TOTAL COST
MATCH

FY24
$0

FY25
$2,046,632

127

FY26
$2,055,034

$8,237,514
FY27

$2,063,579

$2,072,269

COMMONWEALTH OF VIRGINIA

FREDERICKSBURG
DISTRICT

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

FFY 24-27 Working STIP

6/21/2023 8:52:03

Fredericksburg District
Interstate Projects
Fredericksburg

MPO
UPC NO

101595 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

#HB2.FY17 I-95 RAPPAHANNOCK RIVER CROSSING (SOUTHBOUND)

DESCRIPTION

FROM: 1.29 Miles South of Rte 3 (Exit 130) TO: 0.31 Miles North of Truslow Road (5.9500 MI)

JURISDICTION

Fredericksburg

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE Includes $2,313,742 GARVEE Debt Service Principal Prev, $1,854,133 GARVEE Debt Service Principal FFY24,
$2,086,375 GARVEE Debt Service Principal FFY25, $2,183,223 GARVEE Debt Service Principal FFY26,
$2,283,664 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $39,134,623.
Corresponding GARVEE Debt Service UPC 111980. Linked with CN UPC 110595 & CN UPC 112046.
ROUTE/STREET

INTERSTATE 95 (0095)

FUND SOURCE

MATCH

FY24

FY25

$0

MPO

$0

TOTAL COST

$114,712,280

FY26

FY27

$0

$0

$0

Fredericksburg

UPC NO

105510 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

I-95 Rappahannock River Crossing - Northbound

DESCRIPTION

FROM: 0.97 MI. S OF ROUTE 3 TO: 0.07 MI. N OF ENON ROAD (6.7170 MI)

JURISDICTION

Fredericksburg

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

INTERSTATE 95 (0095)

FUND SOURCE

MATCH

FY24

FY25

$0

MPO

$0

TOTAL COST

$127,000,000

FY26

FY27

$0

$0

$0

Fredericksburg

UPC NO

111980 SCOPE

SYSTEM

Interstate

JURISDICTION

Fredericksburg

PROJECT

#HB2.FY17 I-95 RAPPAHANCK RVR CROSS SB - GARVEE Debt Service

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $2,176,230 GARVEE Debt Service Interest Prev, $1,498,680 FFY24 GARVEE Debt Service Interest,
$1,536,681 GARVEE Debt Service Interest FFY25, $1,440,169 GARVEE Debt Service Interest FFY26,
$1,339,151 GARVEE Debt Service Interest FFY27, $6,919,896 GARVEE Debt Service Interest FFY28-38.
Total GARVEE Debt Service Interest $14,910,807. Corresponding CN UPC 101595. Linked with CN UPC
110595 & CN UPC 112046
0095
TOTAL COST
$19,712,710

FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$1,536,681

$1,440,169

$1,339,151

Federal - NHS/NHPP

$0

$1,498,680

$0

$0

$0

PE TOTAL

$0

$1,498,680

$1,536,681

$1,440,169

$1,339,151

PE AC Federal - AC

$0

$11,235,897

$0

$0

$0

129

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Fredericksburg

UPC NO

119112 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

#SMART22-I-95 EXIT 126 STARS STUDY IMPROVEMENTS

JURISDICTION

Spotsylvania County

DESCRIPTION

FROM: Exit 126 TO: Exit 126

ROUTE/STREET

0095

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$22,434,591

FY26

RW

Federal - NHS/NHPP

$0

$0

$0

CN

Federal - NHS/NHPP

$0

$0

CN
AC

Federal - AC OTHER

$0

$0

MPO

OVERSIGHT

FY27
$580,137

$0

$0

$7,631,380

$0

$0

$11,599,999

$0

Fredericksburg

UPC NO

13558 SCOPE

Relocation

SYSTEM

Interstate

PROJECT

I-95 – REL OF INT @ RTE 630 W SBGPL OPT BETW EXITS 143 & 140

JURISDICTION

Stafford County

OVERSIGHT

FO

ADMIN BY

VDOT

DESCRIPTION

FROM: 0.983 Miles South of ROUTE 630 TO: 0.809 Miles North of Route 630 (1.7920 MI)

PROGRAM NOTE Includes $27,947,808 GARVEE Debt Service Principal Prev, $6,415,795 GARVEE Debt Service Principal FFY24,
$6,830,245 GARVEE Debt Service Principal FFY25, $7,170,445 GARVEE Debt Service Principal FFY26,
$7,526,917 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $107,316,659.
Corresponding GARVEE Debt Service UPC 110382. Linked with CN UPC 4632 & CN UPC 108573.
ROUTE/STREET

0095

FUND SOURCE

MATCH

FY24

FY25

TOTAL COST

$149,258,063

FY26

FY27

PE

Federal - NHS/NHPP

$0

($145,198)

$0

$0

$0

RW

Federal - AC CONVERSION

$0

$0

$1,324,811

$0

$0

Federal - NHS/NHPP

$0

$6,560,993

$0

$0

$0

RW TOTAL

$0

$6,560,993

$1,324,811

$0

$0

RW
AC

Federal - AC

$0

$1,324,811

$0

$0

$0

CN

Federal - AC CONVERSION

$0

$0

$5,505,434

$7,170,445

$7,526,917

CN
AC

Federal - AC

$0

$72,953,056

$0

$0

$0

Federal - AC OTHER

$0

$9,817,099

$0

$0

$0

$0

$82,770,155

$0

$0

$0

CN AC
MPO

Fredericksburg

UPC NO

108573 SCOPE

Other

SYSTEM

Interstate

JURISDICTION

Stafford County

OVERSIGHT

NFO

PROJECT

#HB2.FY17 COMMUTER LOT EXPANSION I-95 E OF EXIT 140

ADMIN BY

VDOT

DESCRIPTION

FROM: COMMUTER LOT EXPANSION E OF EXIT 140 TO: I-95 EAST OF EXIT 140 (0.0100 MI)

PROGRAM NOTE Linked with UPC 13558, 110382, 4632,
ROUTE/STREET

I-95 (0095)

FUND SOURCE

TOTAL COST
MATCH

FY24
$0

FY25
$0

130

$9,719,243

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Fredericksburg

UPC NO

110382 SCOPE

SYSTEM

Interstate

JURISDICTION

Stafford County

PROJECT

I-95 REL INT 630WSBGPL B/T EXITS 143&140 GARVEE DEBT SERVICE

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $22,262,818 GARVEE Debt Service Interest Prev, $3,651,381 FFY24 GARVEE Debt Service Interest,
$3,412,670 GARVEE Debt Service Interest FFY25, $3,072,938 GARVEE Debt Service Interest FFY26,
$2,716,094 GARVEE Debt Service Interest FFY27, $8,943,654 GARVEE Debt Service Interest FFY28-38.
Total GARVEE Debt Service Interest $44,059,554. Corresponding CN UPC 13558. Linked with CN UPC
4632 & CN UPC108573
0095
TOTAL COST
$97,635,185

FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$3,412,669

$3,072,938

$2,716,094

Federal - NHS/NHPP

$0

$3,651,381

$0

$0

$0

PE TOTAL

$0

$3,651,381

$3,412,669

$3,072,938

$2,716,094

PE AC Federal - AC

$0

$18,145,355

$0

$0

$0

MPO

Fredericksburg

UPC NO

110527 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

FRED EX - I95 EXPRESS LANES EXT EXITS 143-133 Oversight Prog

JURISDICTION

Stafford County

OVERSIGHT

FO

ADMIN BY

VDOT

DESCRIPTION

FROM: US Route 17 (Warrenton Road) TO: Route 610 (Garrisonville Road) (10.0000 MI)

PROGRAM NOTE Linked with UPC 116369
ROUTE/STREET

0095

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$35,000,000

FY26

FY27

RW

Federal - NSFH

($25,000)

($100,000)

$0

$0

$0

CN

Federal - NSFH

($1,375,000)

($5,500,000)

$0

$0

$0

MPO

Fredericksburg

UPC NO

110595 SCOPE

Bridge Rehab w/o Added Capacity

SYSTEM

Interstate

JURISDICTION

PROJECT

#SGR18VB - RT 95 SB&NB OVER RT 17 BR REPLACE ID 18083/18085

DESCRIPTION

FROM: Exit 133 TO: Exit 133 (0.0300 MI)

ROUTE/STREET

INTERSTATE 95 (0095)

FUND SOURCE

Stafford County

FO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24
$0

MPO

OVERSIGHT

FY25
$0

$13,333,628

FY26
$0

FY27
$0

$0

Fredericksburg

UPC NO

112046 SCOPE

Bridge Replacement w/ Added Capacity

SYSTEM

Interstate

PROJECT

I-95 SB AT RTE 17 - FRED EX CONNECTION

DESCRIPTION

FROM: Exit 133 TO: Exit 133 (0.0250 MI)

ROUTE/STREET

INTERSTATE 95 (0095)

FUND SOURCE

JURISDICTION

Stafford County

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24
$0

FY25
$0

131

$4,000,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Fredericksburg

UPC NO
SYSTEM
PROJECT

114620 SCOPE
Interstate

Reconstruction w/ Added Capacity

JURISDICTION

Stafford County

FRED EX - I95 EXPRESS LANES EXTENSION. EXIT 143 TO EXIT 133

OVERSIGHT

FO

ADMIN BY

VDOT

DESCRIPTION

FROM: US Route 17 (Warrenton Road) TO: USMC Truck Road (Russell Road) (10.0000 MI)

ROUTE/STREET

0095

FUND SOURCE

MATCH

FY24

FY25

TOTAL COST

$488,200,000

FY26

FY27

RW

Other

$0

$2,500,000

$0

$0

$0

CN

Other

$0

$485,700,000

$0

$0

$0

Fredericksburg

MPO
UPC NO

116369 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

FRED-EX - I95 EXPRESS LANES EXTENSION; EXIT 143 TO EXIT 133

DESCRIPTION

FROM: US ROUTE 17 (Warrenton Road) TO: Route 610 (Garrisonville Road) (10.0000 MI)

JURISDICTION

Stafford County

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate Linked with UPC 110527
ROUTE/STREET

0095

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0

MPO

$0

$0

FY27
$0

$0

Multiple MPOs

UPC NO

102711 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

I-95 HOV/HOT Lanes Project PPTA Develop & Mgmt. Oversight

DESCRIPTION

FROM: Garrisonville Road TO: 1 Mile North of Edsall Road (28.0000 MI)

ROUTE/STREET

JURISDICTION

0095

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
CN

$5,000,000

FY26

MATCH

FY24

FY25

$48,159,488

FY26

FY27

Federal - DEMO

$0

$4,278,750

$0

$0

$0

Federal - NHS/NHPP

$0

$11,872,992

$0

$0

$0

$0

$16,151,742

$0

$0

$0

CN TOTAL

MPO

Northern Virginia

UPC NO

103106 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

Statewide

PROJECT

I-95 HOV/HOT Lanes Construction

DESCRIPTION

FROM: Garrisonville Road TO: 1 Mile North of Edsall Road (28.0000 MI)

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE All funding obligated based on current allocations/estimate. Waiting Financial Closure. Linked with UPC
102710, 103019, 103020, 102711, 103591 ,103222
ROUTE/STREET

0095

FUND SOURCE

MATCH

FY24
$0

FY25
$0

132

$0

TOTAL COST

$785,756,087

FY26

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Multiple MPOs

UPC NO

103222 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

I-95 HOV/HOT Lanes Debt Service

JURISDICTION

DESCRIPTION

FROM: Garrisonville Road TO: 1 mile North of Edsall Road (28.0000 MI)

ROUTE/STREET

0095

FUND SOURCE
PE

Statewide

MATCH

FY24

FY25

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$110,089,071

FY26

FY27

Federal - AC CONVERSION

$0

$0

Federal - NHS/NHPP

$0

$7,119,194

$0

$0

$0

$0

$7,119,194

$7,113,319

$7,112,177

$7,119,521

PE TOTAL

MPO

$7,113,319

$7,112,177

$7,119,521

Multiple MPOs

UPC NO

108315 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

I-95 SOUTHERN EXTENSION EXPRESS LANES PROJECT

JURISDICTION

Statewide

OVERSIGHT

FO

ADMIN BY

DESCRIPTION

FROM: MM 142.5 (South of Garrisonville Road) TO: MM 145.0 (North of Garrisonville Road) (2.5000 MI)

VDOT

PROGRAM NOTE Includes $5,873,205 GARVEE Debt Service Principal Prev, $835,933 GARVEE Debt Service Principal FFY24,
$878,363 GARVEE Debt Service Principal FFY25, $922,804 GARVEE Debt Service Principal FFY26, $969,457
GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $13,873,591. Corresponding
GARVEE Debt Service UPC 110379.
ROUTE/STREET
I-95 (0095)
TOTAL COST
$39,776,717
FUND SOURCE
PE
CN

MATCH

FY24

FY25

FY26

FY27

Federal - NHS/NHPP
Federal - AC CONVERSION

$0
$0

($427,683)
$0

$0
$878,363

$0
$922,804

$0
$969,457

Federal - NHS/NHPP

$0

$1,263,616

$0

$0

$0

CN TOTAL

$0

$1,263,616

$878,363

$922,804

$969,457

CN
AC

Federal - AC

$0

$7,164,453

$0

$0

$0

Federal - AC OTHER

$0

$25,903,126

$0

$0

$0

$0

$33,067,579

$0

$0

$0

CN AC

MPO

Multiple MPOs

UPC NO

110379 SCOPE

SYSTEM

Interstate

JURISDICTION

Statewide

PROJECT

I-95 SOUTHERN EXT EXPRESS LANES PROJECT GARVEE DEBT SERVICE

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $4,726,745 GARVEE Debt Service Interest Prev, $389,698 FFY24 GARVEE Debt Service Interest,
$347,379 GARVEE Debt Service Interest FFY25, $302,913 GARVEE Debt Service Interest FFY26, $256,194
GARVEE Debt Service Interest FFY27, $508,528 GARVEE Debt Service Interest FFY28-31. Total GARVEE Debt
Service Interest
$6,531,457. Corresponding CN UPC 108315.
ROUTE/STREET
0095
TOTAL COST
$16,115,464
FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$347,379

$302,913

Federal - NHS/NHPP

$0

$389,698

$0

$0

$0

PE TOTAL

$0

$389,698

$347,379

$302,913

$256,194

PE AC Federal - AC

$0

$1,415,014

$0

$0

$0

133

$256,194

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Multiple MPOs

UPC NO

116656 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#I95CIP VARIABLE SPEED LIMITS - PROGRAM UPC

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095
MATCH

Federal - NHS/NHPP

MPO

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
PE

Statewide

FY24
$0

FY25
$4,912,629

$4,912,629

FY26
$0

FY27
$0

$0

Multiple MPOs

UPC NO

116657 SCOPE

Safety

SYSTEM

Interstate

JURISDICTION

PROJECT

#I95CIP RAMP METERING PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

PE
Federal - NHS/NHPP
PE AC Federal - AC OTHER

MPO

Statewide

FY24
$0
$0

FY25
$3,500,000
$2,200,000

$5,700,000

FY26
$0
$0

FY27
$0
$0

$0
$0

Multiple MPOs

UPC NO
SYSTEM
PROJECT
DESCRIPTION

116658 SCOPE
Interstate

Statewide

#I95CIP GEOFENCED EMERGENCY NOTIFICATIONS - PROGRAM UPC

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
FY26

FY27

FROM: Various TO: Various

ROUTE/STREET
0095
FUND SOURCE

MATCH

PE AC Federal - AC OTHER
MPO

Safety

JURISDICTION

FY24
$0

FY25
$200,000

$0

$200,000
$0

$0

Multiple MPOs

UPC NO

116659 SCOPE

Safety

SYSTEM

Interstate

JURISDICTION

PROJECT

#I95CIP ADVANCED WORK ZONE TECHNOLOGY - PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

PE AC Federal - AC OTHER
MPO

Statewide

FY24
$0

FY25
$950,000

$950,000

FY26
$0

FY27
$0

$0

Multiple MPOs

UPC NO

116661 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#I95CIP CORRIDOR TECHNOLOGY IMPROVEMENTS - PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

FUND SOURCE
PE AC Federal - AC OTHER

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$3,202,500

134

$3,202,500

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Fredericksburg District
Primary Projects
MPO

Fredericksburg

UPC NO

110932 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Primary

PROJECT

#SMART18 - TWIN LAKE-KENSINGTON BIKE/PED CONNECTOR

JURISDICTION

DESCRIPTION

FROM: 0.0045 MI S Twin Lake Dr TO: 0.2557 MI N Twin Lake Dr

ROUTE/STREET

LAFAYETTE BOULEVARD (0001)

FUND SOURCE
RW
AC
CN
AC

Fredericksburg

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$2,373,970

FY26

FY27

Federal - AC OTHER

$0

$700,000

$0

$0

$0

Federal - AC OTHER

$0

$1,048,970

$0

$0

$0

MPO

Fredericksburg

UPC NO

113997 SCOPE

Safety

SYSTEM

Primary

JURISDICTION

PROJECT

ROUTE 1 SAFETY UPGRADES AT THE PRINCESS ANNE/HANSON INTX

DESCRIPTION

FROM: 0.049 MI. SOUTH OF HANSON AVE TO: 0.069 MI. NORTH OF HANSON AVE (0.1180 MI)

ROUTE/STREET

EMANCIPATION HIGHWAY (0001)

FUND SOURCE

Fredericksburg

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$1,554,193

FY26

FY27

RW

Federal - HSIP

$0

$125,664

$0

$0

$0

CN

Federal - HSIP

$0

$1,114,193

$0

$0

$0

MPO

Fredericksburg

UPC NO

115123 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Primary

PROJECT

#SMART20 LAFAYETTE BLVD/KENMORE AVE/CHARLES ST ROUNDABOUTS

DESCRIPTION

FROM: KENMORE AVE TO: CHARLES ST (0.1000 MI)

ROUTE/STREET

LAFAYETTE BLVD (0001)

FUND SOURCE

JURISDICTION

Fredericksburg

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$5,800,000

FY26

FY27

RW

Federal - CMAQ

$360,000

$0

$1,440,000

$0

$0

CN

Federal - CMAQ

$24,065

$0

$0

$96,260

$0

$228,444

$0

$0

$913,775

$0

$0

$0

$0

$1,978,826

$0

$252,509

$0

$0

$2,988,861

$0

$0

$0

$0

$58,630

$0

Federal - RSTP
Federal - STP/STBG
CN TOTAL
CN
AC

Federal - AC OTHER

135

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Fredericksburg

UPC NO

109474 SCOPE

Safety

SYSTEM

Primary

PROJECT

#HB2.FY17 -- NEW COMMUTER PRKG LOT RTE 1 AT COMMONWEALTH DR

JURISDICTION

DESCRIPTION

FROM: 0.234 MI. SOUTH OF COMM. DR. TO: 0.175 MI. NORTH OF COMM. DR. (0.4090 MI)

ROUTE/STREET

JEFFERSON DAVIS HIGHWAY (0001)

FUND SOURCE

Spotsylvania County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$17,487,079

FY26

FY27

RW

Federal - NHS/NHPP

$0

($40,916)

$0

$0

$0

CN

Federal - NHS/NHPP

$0

$3,897,092

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$1,270,473

$0

$0

$0

MPO

Fredericksburg

UPC NO

110914 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

#SMART18 - I-95 EXIT 126, RTE 1 SB ONTO SOUTHPOINT PKWY

JURISDICTION

DESCRIPTION

FROM: 0.058 Mi. SOUTH OF INT. RTE 1 & RTE 711 TO: 0.065 Mi. NORTH OF INT. RTE 1 & I-95 EXIT 126 RAMP C
(0.4550 MI)

ROUTE/STREET

ROUTE 1 (0001)

FUND SOURCE
CN
AC

NFO

ADMIN BY

VDOT

FY24
$0

FY25

$18,935,220

FY26

$4,534,319

FY27

$0

$0

$0

Fredericksburg

UPC NO

121802 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

RTE 1 AND EXIT 126 SB IMPROVEMENTS

DESCRIPTION

FROM: 0.1 Mi North of Market Street TO: 0.1 Mi South of I-95 SB On-ramp

ROUTE/STREET

ROUTE 1 (0001)

FUND SOURCE
PE

OVERSIGHT

TOTAL COST
MATCH

Federal - AC OTHER

MPO

Spotsylvania County

Federal - AC CONVERSION
Federal - CMAQ

JURISDICTION

Spotsylvania County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$208,635

$0

$22,434,591

FY26

FY27

$0

$834,541

$0

$5,330

$0

$21,318

$0

$0

$142,238

$0

$568,950

$0

$0

PE TOTAL

$356,202

$0

$590,268

$834,541

$0

PE AC Federal - AC

$208,635

$0

$834,541

$0

$0

$0

$0

$842,062

$0

$0

$208,635

$0

$1,676,603

$0

$0

Federal - RSTP

Federal - AC OTHER
PE AC

136

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Fredericksburg

UPC NO

115124 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Primary

PROJECT

#SMART20 ROUTE 3 STARS AND I-95 OFF-RAMP IMPROVEMENTS

JURISDICTION

DESCRIPTION

FROM: GATEWAY BLVD TO: DIXON STREET (2.6000 MI)

ROUTE/STREET

PLANK ROAD (0003)

FUND SOURCE
RW

Fredericksburg

FY24

Federal - NHS/NHPP
Federal - RSTP

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

RW TOTAL

OVERSIGHT

FY25

$11,500,000

FY26

FY27

$0

$0

$275,561

$0

$0

$60,957

$0

$243,828

$0

$0

$60,957

$0

$519,389

$0

$0

$83,931

$0

$335,723

$0

$0

RW
AC

Federal - AC

CN

Federal - NHS/NHPP

$0

$0

$0

$3,924,439

$0

CN
AC

Federal - AC OTHER

$0

$0

$0

$4,975,561

$0

MPO

NonMPO

UPC NO

115633 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

#SMART20 KILMARNOCK RIGHT TURN LANE

JURISDICTION

DESCRIPTION

FROM: Route 3 - N. Main Street TO: Route 688

ROUTE/STREET

ROUTE 3 - N. MAIN STREET (0003)

FUND SOURCE
RW
AC
CN
AC

Lancaster County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$1,100,000

FY26

FY27

Federal - AC OTHER

$0

$223,613

$0

$0

$0

Federal - AC OTHER

$0

$576,387

$0

$0

$0

MPO

Fredericksburg

UPC NO
SYSTEM

105535 SCOPE
Primary

Bridge Rehab w/o Added Capacity

JURISDICTION

Stafford County

OVERSIGHT

NFO

ADMIN BY

VDOT

PROJECT

#SGR17VB - RT 3(BUS) RAPP RIVER, BR REHABILITATION, ID 18073

DESCRIPTION

FROM: 0.044 Miles West of City/County Line TO: 0.256 Miles East of City/County Line (0.3000 MI)

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

0003

FUND SOURCE

TOTAL COST
MATCH

FY24
$0

FY25
$0

137

$20,819,472

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

NonMPO

UPC NO

110384 SCOPE

SYSTEM

Primary

PROJECT

#HB2.FY17 RT 3 PASS LA PMAC MILS/FL IRON GARVEE DEBT SERVICE

JURISDICTION

Westmoreland County

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $2,055,962 GARVEE Debt Service Interest Prev, $175,994 FFY24 GARVEE Debt Service Interest,
$156,882 GARVEE Debt Service Interest FFY25, $136,800 GARVEE Debt Service Interest FFY26, $115,702
GARVEE Debt Service Interest FFY27, $229,659 GARVEE Debt Service Interest FFY28-31. Total GARVEE Debt
Service Interest
$2,870,999. Corresponding CN UPC 109478.
0003
TOTAL COST
$8,044,406

FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$156,882

$136,800

$115,702

Federal - STP/STBG

$0

$175,994

$0

$0

$0

PE TOTAL

$0

$175,994

$156,882

$136,800

$115,702

PE AC Federal - AC

$0

$639,043

$0

$0

$0

MPO

Hampton Roads

UPC NO

98806 SCOPE

Safety

SYSTEM

Primary

JURISDICTION

Gloucester County

PROJECT

ROUTE 17 SIGNAL UPGRADES-MULTIPLE LOCATIONS

DESCRIPTION

FROM: Coleman Bridge TO: Route 17/17B Intersection (11.3000 MI)

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

ROUTE 17 (0017)

FUND SOURCE

TOTAL COST
MATCH

FY24

FY25

$0
MPO

$0

$2,800,995

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

110627 SCOPE

Safety

SYSTEM

Primary

PROJECT

RTE 17 - WIDENING PHASE 1 - GEORGE WASHINGTON MEMORIAL HIGHW

DESCRIPTION

FROM: Int. of Rte. 17 and Farmwood Road TO: 0.19 Mi N of Int. Rte 17 and Hook Road (1.5000 MI)

ROUTE/STREET

GEORGE WASHINGTON MEMORIAL HIGHWAY (0017)

FUND SOURCE
PE

Federal - HIP/F
Federal - RSTP

PE TOTAL
RW

Federal - RSTP

JURISDICTION

Gloucester County

MATCH

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

FY24

FY25

$61,846,920

FY26

FY27

$0

$1,000,000

$0

$0

$0

$685,713

$2,742,851

$0

$0

$0

$685,713

$3,742,851

$0

$0

$0

$4,305,962

$0

$0

$0 $17,223,846

138

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Fredericksburg

UPC NO

107140 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

#HB2.FY17 #SGR21VB RT 17 I95 BRIDGE TO HOSPITAL BLVD

DESCRIPTION

FROM: 0.553 MILES WEST INT of GERMANNA POINT DR/HOSPITAL BLVD TO: 0.399 MILES EAST OF INT
GERMANNA POINT DR/HOSPITAL BLVD (0.9520 MI)

ROUTE/STREET

MILLS DRIVE (0017)

FUND SOURCE

JURISDICTION

Spotsylvania County

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

MPO

OVERSIGHT

FY25

FY26

$0

FY27

$0

$0

$21,87
0,821
$0

NonMPO

UPC NO

114048 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Primary

JURISDICTION

King George County

PROJECT

NICE BRIDGE REPLACEMENT - APPROACH ROADWAY IMPROVMENTS

DESCRIPTION

FROM: 142.235 TO: 142.735 (0.5000 MI)

OVERSIGHT

NFO

ADMIN BY

Other

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

0301

FUND SOURCE

TOTAL COST
MATCH

FY24
$0

MPO

FY25

$13,000,000

FY26

$0

FY27

$0

$0

$0

NonMPO

UPC NO

115116 SCOPE

Traffic Management/Engineering

SYSTEM

Primary

PROJECT

#SMART20 ROUTE 301 UNIVERSITYDR/MARKET CTR DOUBLE R-CUT

DESCRIPTION

FROM: UNIVERSITY DRIVE TO: MARKET CENTER (0.3800 MI)

ROUTE/STREET

JAMES MADISON HIGHWAY (0301)

FUND SOURCE

JURISDICTION

King George County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$3,500,000

FY26

FY27

PE

Federal - NHS/NHPP

$0

$80,251

$0

$0

$0

RW

Federal - NHS/NHPP

$0

$0

$300,000

$0

$0

CN

Federal - NHS/NHPP

$0

$0

$0

$2,480,000

$0

CN
AC

Federal - AC OTHER

$0

$0

$0

$120,000

$0

MPO

NonMPO

UPC NO

115120 SCOPE

Traffic Management/Engineering

SYSTEM

Primary

PROJECT

#SMART20 ROUTE 301 AND ROUTE 3 MEDIAN U-TURN INTERSECTION

DESCRIPTION

FROM: INTERSECTION OF KINGS HIGHWAY TO: JAMES MADISON HIGHWAY (0.0050 MI)

ROUTE/STREET

JAMES MADISON HIGHWAY (0301)

FUND SOURCE
RW
AC

Federal - AC OTHER

JURISDICTION

King George County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24
$0

FY25
$200,000

139

$3,300,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Fredericksburg

UPC NO

120796 SCOPE

Transit

SYSTEM

Primary

PROJECT

FRED REGIONAL TRANSIT / BUS PURCHASE REPLACMENT (3)

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

ROUTE/STREET

9999

FUND SOURCE
CN

Federal - AC CONVERSION

CN
AC

Federal - AC

CN AC

Federal - AC OTHER

JURISDICTION

Fredericksburg District-wide

OVERSIGHT

NFO

ADMIN BY

Other

TOTAL COST
MATCH

FY24

FY25

$356,945

FY26

FY27

$0

$0

$71,246

$214,310

$0

$71,389

$285,556

$0

$0

$0

$0

$1,275,055

$0

$0

$0

$71,389

$1,560,611

$0

$0

$0

140

FFY 24-27 Working STIP

6/21/2023 8:52:03

Fredericksburg District
Secondary
Projects
MPO

Fredericksburg

UPC NO

105463 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

JURISDICTION

Spotsylvania County

PROJECT

RTE 606 - RECONSTRUCTION OF MUDD TAVERN ROAD

DESCRIPTION

FROM: Bridge over I-95 TO: 0.55 Mi East of Bridge over I-95 (0.5500 MI)

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE Linked with UPC 100829
ROUTE/STREET

MUDD TAVERN ROAD (0606)

FUND SOURCE
CN
AC

TOTAL COST

MATCH

FY24

Federal - AC OTHER

MPO

$0

FY25
$924,175

$14,047,315

FY26
$0

FY27
$0

$0

Fredericksburg

UPC NO

105464 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

#HB2.FY17 RTE. 606 WEST - RECONSTRUCTION MUDD TAVERN ROAD

JURISDICTION

DESCRIPTION

FROM: 0.176 Miles West of Route 1 TO: 0.054 Miles West of Route 95 SBL (0.6270 MI)

ROUTE/STREET

MUDD TAVERN ROAD (0606)

FUND SOURCE

Spotsylvania County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$21,631,545

FY26

FY27

PE

Other

$450,000

$450,000

$0

$0

$0

RW

Other

$3,688,742

$3,688,742

$0

$0

$0

RW
AC

Federal - AC OTHER

$0

$978,486

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$11,275,575

$0

$0

$0

MPO

Fredericksburg

UPC NO

4632 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

RTE 630 - WIDEN TO 4 LANES

DESCRIPTION

FROM: 0.10 MILES WEST OF ROUTE 628 TO: 0.22 MILE WEST OF ROUTE 732 (1.7300 MI)

JURISDICTION

Stafford County

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate Linked with UPC 13558, 110382 &108753
ROUTE/STREET

COURTHOUSE ROAD (0630)

FUND SOURCE

TOTAL COST

MATCH

FY24
$0

FY25
$0

141

$34,168,987

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Fredericksburg District
Urban Projects
MPO

Fredericksburg

UPC NO

88699 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

FALL HILL AVE. BRIDGE & APPROACHES RECONSTRUCTION & WIDENING

JURISDICTION

Fredericksburg

OVERSIGHT

FO

ADMIN BY

VDOT

DESCRIPTION

FROM: 0.12 Miles West of Gordon W. Shelton Blvd. TO: 0.03 Miles West of Rappahannock Canal Bridge
(2.1900 MI)
PROGRAM NOTE Includes $10,168,399 GARVEE Debt Service Principal Prev, $1,791,027 GARVEE Debt Service Principal FFY24,
$1,881,936 GARVEE Debt Service Principal FFY25, $1,977,153 GARVEE Debt Service Principal FFY26,
$2,077,109 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $27,309,613.
Corresponding GARVEE Debt Service UPC 110383.
ROUTE/STREET
FALL HILL AVENUE (U000)
TOTAL COST
$38,117,591
FUND SOURCE

MATCH

PE AC Federal - AC OTHER
RW
Federal - AC CONVERSION
Federal - STP/STBG

FY24

FY25

$0
$0

$173,911
$0

FY26
$0
$1,881,936

FY27
$0
$1,464,332

$0
$0

$0

$1,791,027

$0

$0

$0

RW TOTAL

$0

$1,791,027

$1,881,936

$1,464,332

$0

RW
AC
CN

Federal - AC

$0

$3,346,268

$0

$0

$0

Federal - AC CONVERSION

$0

$0

$0

$512,821

$2,077,109

CN
AC

Federal - AC

$0

$12,003,918

$0

$0

$0

Federal - AC OTHER

$0

$7,380,688

$0

$0

$0

$0

$19,384,606

$0

$0

$0

CN AC
MPO

Fredericksburg

UPC NO

111682 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

JURISDICTION

PROJECT

VCR TRAIL - BRIDGES OVER RTE. 3 AND US 1 - STUDY

Fredericksburg

DESCRIPTION

FROM: RTE 3/US 1 TO: RTE 3/US 1

ROUTE/STREET
RTE 3 / US 1 (9999)
FUND SOURCE
MATCH

FY24

FY25

$0
MPO

$0

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
FY26

$107,850
FY27

$0

$0

$0

Fredericksburg

UPC NO

110383 SCOPE

SYSTEM

Urban

PROJECT

FALL HILL AVE BR APPRCHS RECON/WIDENING GARVEE DEBT SERVICE

JURISDICTION

Fredericksburg

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $7,819,212 GARVEE Debt Service Interest Prev, $834,947 FFY24 GARVEE Debt Service Interest,
$744,276 GARVEE Debt Service Interest FFY25, $649,005 GARVEE Debt Service Interest FFY26, $548,909
GARVEE Debt Service Interest FFY27, $1,089,545 GARVEE Debt Service Interest FFY28-31. Total GARVEE
Debt Service Interest
$11,685,894. Corresponding CN UPC 88699.
U000
TOTAL COST
$29,804,867

FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$744,276

$649,005

$548,909

Federal - STP/STBG

$0

$834,947

$0

$0

$0

PE TOTAL

$0

$834,947

$744,276

$649,005

$548,909

PE AC Federal - AC

$0

$3,031,735

$0

$0

$0

142

FFY 24-27 Working STIP

6/21/2023 8:52:03

Fredericksburg District
Miscellaneous
Projects
MPO

Fredericksburg

UPC NO

103685 SCOPE

Transit

SYSTEM

Miscellaneous

JURISDICTION

PROJECT

GW Ride Connect / TDM Assistance

DESCRIPTION

FROM: N/A TO: N/A

ROUTE/STREET

N/A (0000)

Multi-jurisdictional: Fredericksburg
MPO

NFO

ADMIN BY

Locally

TOTAL COST

FUND SOURCE

MATCH

FY24
$0

$932,728

FY26

FY25

$0

MPO

OVERSIGHT

$0

FY27
$0

$0

Fredericksburg

UPC NO

120974 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Miscellaneous

PROJECT

BANKSIDE TRAIL - PHASE 1

DESCRIPTION

FROM: The Riverfront Park (700 Block) TO: The Rappahannock Regional Library (1208-1210 Block) (0.5000 MI)

ROUTE/STREET

SOPHIA STREET (9999)

FUND SOURCE
PE

JURISDICTION

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - CMAQ

Fredericksburg

FY24

FY25

$65,000

$0

MPO

Multiple MPOs

UPC NO

T20741

SCOPE

SYSTEM

Miscellaneous

JURISDICTION

PROJECT

VEHICLE FUEL CONVERSION PROGRAM MARKETING

$2,050,000

FY26
$0

Statewide

FY27
$0

$260,000

OVERSIGHT

NFO

ADMIN BY

Other

DESCRIPTION
ROUTE/STREET

9999

FUND SOURCE
CN

TOTAL COST
MATCH

Federal - CMAQ

FY24
$72,000

FY25
$288,000

MPO

Multiple MPOs

UPC NO

T11802

SCOPE

Other

SYSTEM

Miscellaneous

JURISDICTION

Statewide

PROJECT

Vehicle Fuel Conversion Program

DESCRIPTION

FROM: 1 TO: 1

ROUTE/STREET

9999

FUND SOURCE
CN

Federal - CMAQ

$360,000

FY26
$0

FY27
$0

OVERSIGHT

FO

ADMIN BY

Other

TOTAL COST
MATCH

FY24
$1,235,482

FY25
$4,941,927

143

$8,640,000

FY26
$0

$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Fredericksburg

UPC NO

113538 SCOPE

Other

SYSTEM

Miscellaneous

PROJECT

FAMPO 2050 LRTP SUPPORT

DESCRIPTION

FROM: FAMPO TO: PLANNING ASSISTANCE

ROUTE/STREET

LRTP

FUND SOURCE

JURISDICTION

Fredericksburg

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$0

144

$418,318

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Fredericksburg District
Public
Transportation
Projects
MPO

Fredericksburg

UPC NO

T6742

SCOPE

Transit

SYSTEM

Public
Transportation

JURISDICTION

Multi-jurisdictional: Fredericksburg
MPO

PROJECT

Fredericksburg Regional Transit - New Buses

DESCRIPTION

FROM: New bus Fred service TO: Expansion

ROUTE/STREET

0000
MATCH

FY24
$0

FY25
$0

Locally
$420,000

FY26

FY27

$0

120797 SCOPE

$0

$0

Transit

SYSTEM

Public
Transportation

PROJECT

SPOTSYLVANIA NEW TRANSIT AND LEASED COMMUTER PARKING

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

ROUTE/STREET

9999

FUND SOURCE
Federal - AC CONVERSION

PE AC Federal - AC
Federal - AC OTHER
PE AC

ADMIN BY

Fredericksburg

UPC NO

PE

NFO

TOTAL COST

FUND SOURCE

MPO

OVERSIGHT

JURISDICTION

Spotsylvania County

OVERSIGHT

NFO

ADMIN BY

Other

TOTAL COST
MATCH

FY24

FY25

$547,230

FY26

FY27

$0

$0

$0

$437,784

$0

$109,446

$437,784

$0

$0

$0

$0

$3,192,770

$0

$0

$0

$109,446

$3,630,554

$0

$0

$0

145

FFY 24-27 Working STIP

6/21/2023 8:52:03

Fredericksburg District
Project
Groupings
MPO

NonMPO

GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE
PE

MATCH

Federal - BR
Federal - STP/STBG

FY24

FY25

$60,000
$170,608

$240,000
$0

$0
$0

PE TOTAL

$230,608

$240,000

RW

$146,426

$287,601

$6,600

$26,400

RW TOTAL

$153,026

CN

$180,000

Federal - BR

$1,200,000

Federal - NHS/NHPP

$2,543,508
$410,792

Federal - NHS/NHPP
Federal - STP/STBG
Federal - AC CONVERSION

Federal - STP/STBG
CN TOTAL
CN
AC

Federal - AC OTHER

MPO

NonMPO

GROUPING

Construction : Rail

ROUTE/STREET
FUND SOURCE
RW

$0
$682,432

$0

$0

$682,432

$0

$291,358

$6,744

$0

$0

$0

$314,001

$0

$291,358

$6,744

$0

$720,000

$0

$0

$0

$0

$4,800,000

$0

$0

$5,170,011

$5,004,021

$0

$84,000

$1,559,166

$0

$0

$4,334,300

$84,000

$7,449,177

$9,804,021

$0

$0

$3,804,936

$622,081

$0

$0

FY24
$0

$40,181

NonMPO

GROUPING

Construction : Safety/ITS/Operational Improvements

PE
RW

MATCH

FY24

Federal - NHS/NHPP
Federal - NHS/NHPP

$291,259
$119,944

Federal - STP/STBG

TOTAL COST
FY26

FY25

MPO

ROUTE/STREET
FUND SOURCE

FY27
$0
$0

MATCH

Federal - AC CONVERSION

$73,409,505

FY26

$0

$550,000
FY27
$0

TOTAL COST
FY26

FY25

$0

$71,467,478
FY27

$0
$479,774

$0
$0

$1,165,036
$0

$0
$0

$120,000

$0

$0

$0

$480,000

RW TOTAL

$239,944

$479,774

$0

$0

$480,000

CN

Federal - AC CONVERSION

$181,500

$1,026,900

$606,600

$0

$0

Federal - NHS/NHPP

$354,673

$0

$0

$1,418,691

$0

$536,173

$1,026,900

$606,600

$1,418,691

$0

$0

$0

$0

$107,901

$0

CN TOTAL
CN
AC

Federal - AC OTHER

MPO

NonMPO

GROUPING

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET
FUND SOURCE

TOTAL COST
MATCH

FY24

FY25

$8,154,687

FY26

FY27

RW

Federal - TAP/F

$41,196

$0

$164,785

$0

$0

CN

Federal - TAP/F

$601,776

$609,386

$0

$1,797,717

$0

CN
AC

Federal - AC OTHER

$0

$275,433

$0

$808,795

$0

146

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

NonMPO

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0

$63,832,338

FY26

$0

FY27

$0

MPO

Fredericksburg

GROUPING

Maintenance : Preventive Maintenance and System Preservation

$0

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

Federal - STP/STBG

FY24
$0

FY25
$15,859,311

MPO

NonMPO

GROUPING

Maintenance : Preventive Maintenance for Bridges

$63,832,338

FY26
$15,924,419

FY27
$15,990,634

$16,057,974

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
TOTAL COST

ROUTE/STREET
FUND SOURCE

MATCH

FY24

FY25

$0

$0

MPO

Fredericksburg

GROUPING

Maintenance : Preventive Maintenance for Bridges

$31,814,444

FY26

FY27

$0

$0

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$31,814,444

FY26

FY27

Federal - NHS/NHPP

$0

$5,468,748

$1,224,822

$781,145

$781,145

Federal - STP/STBG

$0

$5,117,306

$5,137,672

$5,158,385

$5,179,450

CN TOTAL

$0

$10,586,054

$6,362,494

$5,939,530

$5,960,595

CN
AC

$0

$850,000

$2,115,771

$0

$0

Federal - AC OTHER

MPO

Fredericksburg

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

Federal - STP/STBG

TOTAL COST
MATCH

FY24
$0

FY25
$2,753,477

147

FY26
$2,764,781

$11,082,503
FY27

$2,776,277

$2,787,968

FFY 24-27 Working STIP

6/21/2023 8:52:03

Fredericksburg MPO
Project
Groupings
GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET
FUND SOURCE
PE

MATCH

FY24

FY25

TOTAL COST

$142,754,888

FY26

FY27

Federal - BR

$137,778

$0

$0

$0

$551,112

Federal - NHS/NHPP

$761,908

$0

($100,000)

$0

$3,147,631

PE TOTAL

$899,686

$0

($100,000)

$0

$3,698,743

RW

Federal - BR

$359,393

$0

$1,437,572

$0

$0

CN

Federal - AC CONVERSION
Federal - BR
Federal - NHS/NHPP

CN TOTAL
CN
AC

Federal - AC OTHER

GROUPING

$18,172

$0

$0

$0

$72,688

$4,967,762

$0

$0

$19,871,047

$0

$588,674

$0

$2,354,697

$0

$0

$5,574,608

$0

$2,354,697

$19,871,047

$72,688

$0

$0

$3,786,214

$5,119,499

$0

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET
FUND SOURCE
PE

Federal - AC CONVERSION

FY25

TOTAL COST

$366,171,231

FY26

FY27

$458,482

$178,720

$0

$0

$81,500

$733,500

$0

$0

$0

Federal - NHS/NHPP

$220,000

$880,000

$0

$0

$0

Federal - STP/STBG

$100,000

$400,000

$0

$0

$0

$508,810

$2,471,982

$178,720

$0

$0

$0

$0

$0

$0

$65,000

$3,252,021

$1,960,703

$1,102,245

$4,034,903

$5,910,233

$118,667

$425,965

$48,704

$0

$0

$22,000

$0

$0

$63,000

$135,000

$3,630,760

$126,312

$5,249,296

$9,147,430

$0

Federal - RSTP

$378,475

$1,513,899

$0

$0

$0

Federal - STP/STBG

$964,504

$1,779,559

$2,078,456

$0

$0

$8,366,426

$5,806,438

$8,478,701

$13,245,333

$6,045,233

$0

$13,150,598

$15,078,152

$199,999

$0

$1,380,578

$57,132

$1,281,594

$0

$4,183,585

$341,693

$1,842,238

$0

$0

$1,233,000

PE TOTAL
PE AC Federal - AC OTHER
Federal - AC CONVERSION
Federal - CMAQ
Federal - HSIP
Federal - NHS/NHPP

RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION
Federal - HSIP
Federal - NHPP/E
Federal - NHS/NHPP
Federal - RSTP
Federal - STP/STBG

CN TOTAL
CN
AC

FY24
$107,310

Federal - HSIP

RW

MATCH

Federal - AC OTHER

$79,489

$317,954

$0

$0

$0

$2,282,155

$3,120,000

$0

$772,570

$5,236,048

$212,437

$0

$0

$849,746

$0

$2,818,474

$0

$788,619

$0

$336,000

$5,084,969

$5,337,324

$1,617,594

$0

$11,502,557

$14,180,463

148

$4,440,790 $10,652,633
$40,429,111

$7,192,585

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$19,192,255

FY26

FY27

PE

Federal - AC CONVERSION

$53,793

$125,984

$89,186

$0

$0

RW

Federal - AC CONVERSION

$29,600

$0

$118,400

$0

$0

Federal - RTAP

$24,173

$96,692

$0

$0

$0

Federal - TAP/F

$217,288

$176,908

$692,245

$0

$0

$271,061

$273,600

$810,645

$0

$0

$0

$148,000

$0

$0

$0

RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION

$92,433

$0

$369,732

$0

$0

Federal - CMAQ

$18,614

$74,456

$0

$0

$0

Federal - STP/STBG

$263,402

$1,053,607

$0

$0

$0

Federal - TAP/F

$246,291

$209,148

$512,692

$263,322

$0

Federal - TAP/SU

$102,551

$410,204

$0

$0

$0

$723,290

$1,747,415

$882,424

$263,322

$0

$0

$1,511,382

$244,135

$2,113,864

$0

CN TOTAL
CN
AC

Federal - AC OTHER

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

Federal - STP/STBG

GROUPING

FY24
$0

FY25
$15,859,311

$63,832,338

FY26
$15,924,419

FY27
$15,990,634

$16,057,974

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$31,814,444

FY26

FY27

Federal - NHS/NHPP

$0

$5,468,748

$1,224,822

$781,145

$781,145

Federal - STP/STBG

$0

$5,117,306

$5,137,672

$5,158,385

$5,179,450

CN TOTAL

$0

$10,586,054

$6,362,494

$5,939,530

$5,960,595

CN
AC

$0

$850,000

$2,115,771

$0

$0

Federal - AC OTHER

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

Federal - STP/STBG

TOTAL COST
MATCH

FY24
$0

FY25
$2,753,477

149

FY26
$2,764,781

$11,082,503
FY27

$2,776,277

$2,787,968

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Transit : Amenities

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24
$0

GROUPING

FY25
$0

$256,000

FY26
$0

FY27
$0

$0

Transit : Ridesharing

ROUTE/STREET
FUND SOURCE

TOTAL COST
MATCH

FY24
$0

FY25
$0

150

$3,424,348

FY26
$0

FY27
$0

$0

COMMONWEALTH OF VIRGINIA

HAMPTON ROADS
DISTRICT

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

FFY 24-27 Working STIP

6/21/2023 8:52:03

Hampton Roads District
Interstate Projects
MPO

Hampton Roads

UPC NO

106692 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

Chesapeake

PROJECT

#SMART18 - I-64 Southside Widening and High-Rise Bridge Ph 1

DESCRIPTION

FROM: 0.295 Mile East of I-264 (at Bowers Hill) TO: 1.018 Mile East of I-464 (9.0304 MI)

ROUTE/STREET

I-64 (0064)

JURISDICTION

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

$0

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$431,956,220

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO

108990 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

#SMART18 - I-64 Southside Widening & High-Rise Bridge Ph 1

JURISDICTION

Chesapeake

DESCRIPTION

FROM: I-464 TO: I-664/I-264 (8.2100 MI)

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE Includes $22,399,442 GARVEE Debt Service Principal Prev, $4,925,477 GARVEE Debt Service Principal FFY24,
$5,175,510 GARVEE Debt Service Principal FFY25, $5,438,118 GARVEE Debt Service Principal FFY26,
$5,713,762 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $80,470,545.
Corresponding GARVEE Debt Service UPC 111982.
ROUTE/STREET
I-64 (0064)
TOTAL COST
$92,657,545
FUND SOURCE
CN

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$5,175,510

$5,438,118

Federal - NHS/NHPP

$0

$4,925,477

$0

$0

$0

CN TOTAL

$0

$4,925,477

$5,175,510

$5,438,118

$5,713,762

CN
AC

Federal - AC

$0

$53,145,626

$0

$0

$0

Federal - AC OTHER

$0

$12,187,000

$0

$0

$0

$0

$65,332,626

$0

$0

$0

CN AC

MPO

$5,713,762

Hampton Roads

UPC NO

111982 SCOPE

SYSTEM

Interstate

JURISDICTION

Chesapeake

PROJECT

#SMART18 I-64 SS Widen & High-Rise Br Ph 1 DEBT SERVICE

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $18,438,503 GARVEE Debt Service Interest Prev, $2,789,132 FFY24 GARVEE Debt Service Interest,
$2,539,759 GARVEE Debt Service Interest FFY25, $2,277,715 GARVEE Debt Service Interest FFY26,
$2,002,421 GARVEE Debt Service Interest FFY27, $5,478.311 GARVEE Debt Service Interest FFY28-33.
Total GARVEE Debt Service Interest $33,525,841. Corresponding CN UPC 108990. Linked with UPC
106992
0064
TOTAL COST
$75,557,339

FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$2,539,759

$2,277,715

$2,002,421

Federal - NHS/NHPP

$0

$2,789,132

$0

$0

$0

PE TOTAL

$0

$2,789,132

$2,539,759

$2,277,715

$2,002,421

PE AC Federal - AC

$0

$12,298,206

$0

$0

$0

152

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

120375 SCOPE

Other

SYSTEM

Interstate

JURISDICTION

PROJECT

#I64CIP I-64 and I-464 (Exit 291) Interchange Improvements

DESCRIPTION

FROM: MP 291 TO: MP 292.62 (2.0440 MI)

ROUTE/STREET

HAMPTON ROADS BELTWAY (0064)

FUND SOURCE
RW
AC
CN
AC

Chesapeake

MATCH

FY24

FY25

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

$140,000,000

FY26

FY27

Federal - AC

$0

$14,560,000

$0

$0

$0

Federal - AC

$0

$0

$0

$76,774,822

$0

Federal - AC OTHER

$0

$0

$0

$40,165,178

$0

$0

$0

$0

$116,940,000

$0

CN AC

MPO

Hampton Roads

UPC NO

117841 SCOPE

Bridge Replacement w/ Added Capacity

SYSTEM

Interstate

PROJECT

HAMPTON ROADS EXPRESS LANES, SEGMENT 4C - PHASE 1 PE

DESCRIPTION

FROM: 0.139 Mi. East of LaSalle Ave. TO: 0.379 Mi. East of Settlers Landing Rd. (2.4000 MI)

ROUTE/STREET

0064

JURISDICTION

Hampton

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0

$0

$6,062,743

FY26
$0

FY27
$0

$0

Hampton Roads

MPO
UPC NO

119638 SCOPE

Bridge Replacement w/ Added Capacity

SYSTEM

Interstate

PROJECT

HAMPTON ROADS EXPRESS LANES, SEGMENT 4C

DESCRIPTION

FROM: 0.139 Mi. East of LaSalle Ave. TO: 0.379 Mi. East of Settlers Landing Rd (2.4250 MI)

JURISDICTION

Hampton

OVERSIGHT
ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

I-64 (0064)

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

$0

TOTAL COST

$407,153,311

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO
SYSTEM
PROJECT

106665 SCOPE
Interstate

Reconstruction w/ Added Capacity

JURISDICTION

Hampton Roads District-wide

I-64 CAPACITY IMPROVEMENTS - SEGMENT II

OVERSIGHT

FO

ADMIN BY

VDOT

DESCRIPTION

FROM: 1.05 Miles West of Rte 199 (Humelsine Pkwy/Marquis Ctr Pkwy) TO: 0.54 Miles East of Rte 238
(Yorktown Rd) (7.0800 MI)

ROUTE/STREET

0064

FUND SOURCE

MATCH

FY24

FY25

TOTAL COST

$175,832,897

FY26

FY27

PE

Other

$0

($170,000)

$0

$0

$0

CN

Other

$0

($13,104,774)

$0

$0

$0

153

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

106689 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

#HB2.FY17 I-64 CAPACITY IMPROVEMENTS - SEGMENT III

JURISDICTION

DESCRIPTION

FROM: 1.257 Miles West of Rt 199 - Lightfoot (Exit 234) TO: 1.052 Miles West of Rt 199 - Humelsine Pkwy (Exit
242) (8.3560 MI)

ROUTE/STREET

0064

FUND SOURCE
CN

MATCH

Other

MPO

Hampton Roads District-wide

FY24
$0

FY25
$3,316,849

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$122,893,996

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO

109383 SCOPE

Other

SYSTEM

Interstate

PROJECT

I-64 CAPACITY IMPROVEMENTS - SEGMENT I - DEBT SERVICE

DESCRIPTION

FROM: 0.50 miles east of Route 238 (Yorktown Road) TO: 1.55 miles west of Route 143 (Jefferson Ave)
(5.6700 MI)
0064
TOTAL COST
$90,058,453

ROUTE/STREET

JURISDICTION

FUND SOURCE

Hampton Roads District-wide

MATCH

FY24
$0

MPO

FY25
$0

OVERSIGHT

FO

ADMIN BY

VDOT

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

110577 SCOPE

Other

SYSTEM

Interstate

PROJECT

HRCS Preferred Alternative Refinement

DESCRIPTION

FROM: I-664 TO: I-564

Multi-jurisdictional: Hampton Roads
MPO

JURISDICTION

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

0064

TOTAL COST

FUND SOURCE

MATCH

FY24
$0

MPO

FY25
$0

$30,000,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

112923 SCOPE

Traffic Management/Engineering

SYSTEM

Interstate

PROJECT

I-64 Express Lanes- Segment 2

DESCRIPTION

FROM: 0.424 miles west of I-464 TO: 2.090 miles east of Indian River Road (7.6530 MI)

ROUTE/STREET

I-64 (0064)

FUND SOURCE

JURISDICTION

Multi-jurisdictional: Hampton Roads
MPO

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$25,005,662

FY26

FY27

PE

Other

$0

($456,338)

$0

$0

$0

CN

Other

$0

$462,000

$0

$0

$0

154

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO
SYSTEM

113543 SCOPE
Interstate

Other

JURISDICTION

PROJECT

Multi-jurisdictional: Hampton Roads
MPO
Hampton Roads Express Lanes Network Study

DESCRIPTION

FROM: various TO: various

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate.
ROUTE/STREET

0064

TOTAL COST

FUND SOURCE

MATCH

FY24
$0

MPO

FY25
$0

$1,500,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO
SYSTEM

115008 SCOPE

Bridge, New Construction

PROJECT

Multi-jurisdictional: Hampton Roads OVERSIGHT
MPO
I-64 HRBT Expansion Project - Design-Build Contract
ADMIN BY

DESCRIPTION

FROM: Settlers Landing Road TO: I-564

Interstate

JURISDICTION

FO
VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

I64 (0064)

TOTAL COST

FUND SOURCE

MATCH

FY24
$0

MPO

Hampton Roads

UPC NO
SYSTEM

Interstate

115009 SCOPE

FY25

$3,004,569,251

FY26

$0

$0

FY27
$0

$0

Other

JURISDICTION

PROJECT

Multi-jurisdictional: Hampton Roads
MPO
I-64 HRBT Expansion Project - Owners Oversight

DESCRIPTION

FROM: Settlers Landing Road TO: I-564

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST
FY26

$548,900,330
FY27

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET
I64 (0064)
FUND SOURCE

MATCH

FY24
$0

MPO

FY25
$0

$0

$0

Hampton Roads

UPC NO

115010 SCOPE

Other

SYSTEM

Interstate

PROJECT

#SMART20 I-64 HRBT Expansion Project - Design-Build Contract

DESCRIPTION

FROM: Settlers Landing Road TO: I-564

ROUTE/STREET

I64 (0064)

FUND SOURCE
CN

$0

JURISDICTION

Multi-jurisdictional: Hampton Roads
MPO

MATCH

FY24

FY25

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$199,999,999

FY26

FY27

Federal - AC CONVERSION

$0

$0

$11,779,458

$0

$0

Federal - NHFP

$0

$11,244,322

$0

$0

$0

Federal - NHS/NHPP

$0

$26,214,354

$0

$0

$0

Federal - STP/STBG

$0

$813,024

$0

$0

$0

CN TOTAL

$0

$38,271,700

$11,779,458

$0

$0

CN
AC

$0

$11,779,458

$0

$0

$0

Federal - AC

155

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

115011 SCOPE

Bridge Replacement w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

PROJECT

#SGR20VB - I-64 HRBT Expansion Project - South Trestles

DESCRIPTION

FROM: Willoughby Spit Shoreline TO: HRBT South Island Shoreline

ROUTE/STREET

I64 (0064)

FUND SOURCE
CN

Multi-jurisdictional: Hampton Roads
MPO

MATCH

FY24

FY25

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$108,527,646

FY26

FY27

Federal - AC CONVERSION

$0

$0

$18,052,250

$17,027,488

$0

Federal - NHFP

$0

$32,740,954

$0

$0

$0

Federal - NHS/NHPP

$0

$1,280,444

$0

$0

$0

CN TOTAL

$0

$34,021,398

$18,052,250

$17,027,488

$0

CN
AC

Federal - AC

$0

$35,079,738

$0

$0

$0

Federal - AC OTHER

$0

$24,461,583

$0

$0

$0

$0

$59,541,321

$0

$0

$0

CN AC

MPO

Hampton Roads

UPC NO

118376 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

PROJECT

Hampton Roads Express Lanes - Segment 3

DESCRIPTION

FROM: SETTLERS LANDING RD TO: I564 INTERCHANGE (9.7000 MI)

ROUTE/STREET

0064
MATCH

Other

MPO

FY24
$0

NFO

ADMIN BY

VDOT

FY25
$1,361,556

$18,789,474

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO
SYSTEM

122037 SCOPE
Interstate

Traffic Management/Engineering

PROJECT

Multi-jurisdictional: Hampton Roads
MPO
I-64 EXPRESS LANES - SEGMENT 2B "UNVEILING PROJECT"

DESCRIPTION

FROM: 0.424 west of I-464 TO: 2.090 east of Indian River Road (7.9900 MI)

JURISDICTION

ROUTE/STREET
I-64 (0064)
FUND SOURCE
CN
AC

OVERSIGHT

TOTAL COST

FUND SOURCE
PE

Multi-jurisdictional: Hampton Roads
MPO

MATCH

Federal - AC OTHER

MPO

FY24
$0

FY25
$3,100,000

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
FY26

$3,100,000
FY27

$0

$0

$0

Hampton Roads

UPC NO

114812 SCOPE

Other

SYSTEM

Interstate

PROJECT

I-64 ACCESS EVALUATION

DESCRIPTION

FROM: Jefferson Avenue TO: Ft Eustis Blvd.

ROUTE/STREET

0064

FUND SOURCE
PE AC Federal - AC OTHER

JURISDICTION

Newport News

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$225,000

156

$225,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

119217 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

#SMART22 I-64 DENBIGH BOULEVARD INTERCHANGE

JURISDICTION

DESCRIPTION

FROM: 0.400 Mi. South of Rte 173 (Denbigh Blvd) TO: Rte 173 (Denbigh Blvd) (0.4000 MI)

ROUTE/STREET

INTERSTATE 64 (0064)

FUND SOURCE
RW
AC

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

MATCH

Federal - AC

MPO

Newport News

FY24

FY25

$0

$0

$73,803,752

FY26
$0

FY27
$8,628,579

$0

Hampton Roads

UPC NO

119824 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

HAMPTON ROADS EXPRESS LANE, SEGMENT 4A-4B

JURISDICTION

Newport News

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION

FROM: 1.200 Mi. West of Denbigh Blvd TO: 0.139 Mi. East of LaSalle Avenue (13.3870 MI)

PROGRAM NOTE Parent UPC of Child UPC's 120324 & 121054
ROUTE/STREET

I-64 (0064)

FUND SOURCE
RW
AC
CN
AC

MATCH

FY24

FY25

TOTAL COST

$150,305,930

FY26

FY27

Federal - AC OTHER

$0

$2,369,034

$0

$0

$0

Federal - AC OTHER

$0

$137,884,376

$0

$0

$0

MPO

Hampton Roads

UPC NO

120324 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Interstate

JURISDICTION

PROJECT

#I64CIP I-64 EB - EXIT 256

DESCRIPTION

FROM: MP 256 TO: MP 257 (1.0000 MI)

ROUTE/STREET

HAMPTON ROADS BELTWAY (0064)

FUND SOURCE

Newport News

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$3,000,000

FY26

FY27

PE

Federal - NHS/NHPP

$0

$600,000

$0

$0

$0

RW

Federal - NHS/NHPP

$0

$183,333

$0

$0

$0

RW
AC

Federal - AC OTHER

$0

$466,667

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$0

$1,750,000

$0

$0

MPO

Hampton Roads

UPC NO

121054 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

#BF - HREL SEGMENT 4A-4B BRIDGE MAINTENANCE YEARS 2-5

JURISDICTION

Newport News

DESCRIPTION

FROM: 1.2 Miles West of Denbigh Blvd TO: 0.139 Miles East of LaSalle Avenue

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE Child UPC of Parent UPC 119824
ROUTE/STREET

I-64 (0064)

FUND SOURCE

TOTAL COST
MATCH

FY24

FY25

$18,000,000

FY26

FY27

PE

Federal - BR

$0

$1,500,000

$0

$0

$0

CN

Federal - BR

$0

$0

$0

$16,500,000

$0

157

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

110321 SCOPE

SYSTEM

Interstate

PROJECT

I-64 Express Lanes-Segment I

DESCRIPTION

FROM: I-264 TO: I-564 (8.4000 MI)

ROUTE/STREET

0064

Traffic Management/Engineering

JURISDICTION

Norfolk

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$18,945,988

FY26

FY27

PE

Other

$0

$2,845,988

$0

$0

$0

CN

Other

$0

$16,100,000

$0

$0

$0

MPO

Hampton Roads

UPC NO

119637 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

Norfolk

OVERSIGHT

PROJECT

HAMPTON ROADS EXPRESS LANES, SEGMENT 1A

DESCRIPTION

FROM: 0.15 miles east of Patrol Road TO: 0.663 miles east of Tidewater Drive (2.2000 MI)

ROUTE/STREET

I-64 (0064)

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$92,079,565

FY26

FY27

PE

Other

$0

$2,918,320

$0

$0

$0

RW

Other

$0

$500,000

$0

$0

$0

CN

Other

$0

$57,911,759

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$30,749,486

$0

$0

$0

MPO

Hampton Roads

UPC NO

120731 SCOPE

Bridge Rehab w/o Added Capacity

SYSTEM

Interstate

JURISDICTION

Norfolk

PROJECT

#SS-WILLOUGHBY BAY BRIDGE- HRBT EXP - BR REPAIR WORK OPTION

DESCRIPTION

FROM: 0.48mi from 4th View St TO: 0.57 mi to Hampton City line

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

I-64 (0064)

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

$0

$39,637,410

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO

120863 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

Norfolk

OVERSIGHT

NFO

PROJECT

HAMPTON ROADS EXPRESS LANES, SEGMENT 1B

DESCRIPTION

FROM: 0.661 miles East of Tidewater Drive TO: 1.04 miles East of I-264 (7.0000 MI)

ADMIN BY

VDOT

PROGRAM NOTE Parent UPC of Child UPC's 121052 and 121258
ROUTE/STREET

I-64 (0064)

FUND SOURCE

MATCH

FY24

FY25

TOTAL COST

$208,860,180

FY26

FY27

PE

Other

$0

$5,360,180

$0

$0

$0

RW

Other

$0

$0

$0

$500,000

$0

158

FFY 24-27 Working STIP

CN

6/21/2023 8:52:03

Other

MPO

$0

$0

$0

$0 $203,000,000

Hampton Roads

UPC NO

121052 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

Norfolk

PROJECT

#BF - HREL SEGMENT 1B BRIDGE MAINTENANCE YEARS 2-5

DESCRIPTION

FROM: 0.661 miles East of Tidewater Drive TO: 1.04 miles East of I-264

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE Child UPC of Parent UPC 120863
ROUTE/STREET

I-64 (0064)

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$40,000,000

FY26

FY27

PE

Federal - BR

$0

$1,000,000

$0

$0

$0

CN

Federal - BR

$0

$0

$0

$39,000,000

$0

MPO

Hampton Roads

UPC NO

121258 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Interstate

JURISDICTION

PROJECT

#I64CIP I-64 EB-WB EXITS 278 - 284

DESCRIPTION

FROM: MP 278 TO: MP 285

Norfolk

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE Child UPC of Parent UPC 120863
ROUTE/STREET

HAMPTON ROADS BELTWAY (0064)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$21,400,000

FY26

FY27

PE

Federal - NHS/NHPP

$0

$3,700,000

$0

$0

$0

RW

Federal - NHS/NHPP

$0

$2,365,000

$0

$0

$0

CN

Federal - AC CONVERSION

$0

$0

$0

$1,286,667

$0

Federal - NHS/NHPP

$0

$0

$8,572,500

$0

$0

CN TOTAL

$0

$0

$8,572,500

$1,286,667

$0

CN
AC

Federal - AC

$0

$0

$1,286,667

$0

$0

Federal - AC OTHER

$0

$0

$5,475,833

$0

$0

$0

$0

$6,762,500

$0

$0

CN AC
MPO

Hampton Roads

UPC NO

121360 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

HAMPTON ROADS EXPRESS LANES, SEGMENT 1A (CN Phase Only)

DESCRIPTION

FROM: 0.15 miles east of Patrol Bridge Road TO: 0.663 miles east of Tidewater Drive

ROUTE/STREET

I-64 (0064)

FUND SOURCE
CN
CN
AC

Federal - HIP/F
Federal - AC OTHER

JURISDICTION

Norfolk

OVERSIGHT
ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$196,173
$0

FY25
$784,690
$36,602,567

159

$85,068,097

FY26
$0
$0

FY27
$0
$0

$0
$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

Hampton Roads

UPC NO

121361 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

PROJECT

HAMPTON ROADS EXPRESS LANES, SEGMENT 1A (CN Phase Only)

DESCRIPTION

FROM: 0.15 miles east of Patrol Bridge Road TO: 0.663 miles east of Tidewater Drive

ROUTE/STREET

I-64 (0064)

FUND SOURCE
CN

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

Federal - HIP/F

MPO

Norfolk

FY24
$1,606,381

FY25

$8,031,903

FY26

$6,425,522

FY27

$0

$0

$0

Hampton Roads

UPC NO

109790 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

York County

OVERSIGHT

FO

PROJECT

#HB2.FY17 I-64 CAPACITY IMPROVEMENTS - SEGMENT III

DESCRIPTION

FROM: 1.15 Mile West of Rt 199 - Lightfoot (Exit 234) TO: 1.05 Miles West of Rt 199 - Humelsine Pkwy (Exit 242)
(8.2500 MI)

ADMIN BY

VDOT

ROUTE/STREET

0064

TOTAL COST

FUND SOURCE

MATCH

RW Federal - NHPP/E

FY24

FY25

$121,151,977

FY26

FY27

$0

($5,704,221)

$0

$0

$0

$0

($16,500,196)

$0

$0

$0

RW TOTAL

$0

($22,204,417)

$0

$0

$0

CN Federal - NHPP/E

$0

$5,704,221

$0

$0

$0

Federal - NHS/NHPP

$0

$16,500,196

$0

$0

$0

CN TOTAL

Federal - NHS/NHPP

$0

$22,204,417

$0

$0

$0

CN Federal - AC OTHER
AC

$0

$3,129,316

$0

$0

$0

MPO

Hampton Roads

UPC NO

103037 SCOPE

Bridge, New Construction

SYSTEM

Interstate

PROJECT

DT/MT/MLK Interstate Debt Service

DESCRIPTION

FROM: Downtown and Midtown Tunnels; extension of MLK to I-264 TO: Downtown and Midtown Tunnels;
extension of MLK to I-264 (3.9000 MI)
0264
TOTAL COST
$14,872,373

ROUTE/STREET

FUND SOURCE
PE

Federal - AC CONVERSION
Federal - NHS/NHPP

JURISDICTION

Hampton Roads District-wide

MATCH

FY24
$0
$0

FY25

OVERSIGHT

FO

ADMIN BY

VDOT

FY26

FY27

$0
$943,278

$943,382
$0

$943,407
$0

$943,359
$0

PE TOTAL

$0

$943,278

$943,382

$943,407

$943,359

PE Federal - AC
AC

$0

$2,890,829

$0

$0

$0

160

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

97175 SCOPE

Preliminary Engineering

PROJECT

Multi-jurisdictional: Hampton Roads
MPO
I-264 DOWNTOWN TUNNEL PPTA DEV. & MGNT. OVERSIGHT DT/MT/MLK

DESCRIPTION

DOWNTOWN TUNNEL PROJECT

ROUTE/STREET

0264

SYSTEM

Interstate

JURISDICTION

MATCH

Federal - NHS/NHPP

MPO

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
PE

OVERSIGHT

FY24

FY25

$0

$1,404,316

FY26

$821,897

$0

FY27
$0

$0

Hampton Roads

UPC NO

106693 SCOPE

SYSTEM

Interstate

PROJECT

I-64/I-264 Interchange-Phase III

Reconstruction w/ Added Capacity

JURISDICTION

Norfolk

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
ROUTE/STREET

I-264 (0264)

FUND SOURCE

TOTAL COST
MATCH

FY24

FY25

$0
MPO

$10,000,000
FY27

FY26

$0

$0

$0

$0

Hampton Roads

UPC NO

111788 SCOPE

Traffic Management/Engineering

SYSTEM

Interstate

PROJECT

#SMART18 - I-264 W Off-Ramp at Ballentine Boulevard

DESCRIPTION

FROM: 450 Feet East of Ballentine Boulevard TO: Ballentine Boulevard (0.1230 MI)

ROUTE/STREET

I-264 W RAMP 12A (0264)

FUND SOURCE

JURISDICTION

Norfolk

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

RW Federal - STP/STBG

$0

CN Federal - STP/STBG
CN Federal - AC OTHER
AC

FY25

$1,710,000

FY26

FY27

$180,000

$0

$0

$0

$0

$0

$330,000

$0

$0

$0

$1,000,000

$0

$0

$0

161

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

117033 SCOPE

Other

SYSTEM

Interstate

JURISDICTION

PROJECT

ERC I-264 Noise Barriers

DESCRIPTION

FROM: .3 M East Rte 337 (Portsmouth Blvd) TO: .51 West Rte 141 (Effingham St) (2.3000 MI)

ROUTE/STREET

0264
MATCH

FY24

Federal - AC OTHER

MPO

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
CN
AC

Portsmouth

$0

FY25
$1,015,854

$24,413,923

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO

17630 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

Virginia Beach

OVERSIGHT

FO

PROJECT

#SMART18 - I-264/WITCHDUCK RD INTERCHANGE & RAMP EXTENSION

ADMIN BY

VDOT

DESCRIPTION

FROM: 0.383 MILE EAST OF WBL I-64 TO: 0.472 MILE EAST OF WITCHDUCK RD (2.3000 MI)

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

0264

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

$0

$66,754,249

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO

121886 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Interstate

JURISDICTION

PROJECT

POINDEXTER SIDEWALKS EXTENSION

DESCRIPTION

FROM: Jordan Bridge/ Truxton Street TO: Bainbridge Boulevard

ROUTE/STREET

POINDEXTER STREET (0464)

FUND SOURCE

Chesapeake

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$2,400,000

FY26

FY27

PE

Federal - DEMO

$590,000

$2,360,000

$0

$0

$0

RW

Federal - DEMO

$2,000

$0

$8,000

$0

$0

CN

Federal - DEMO

$419,000

$0

$0

$1,676,000

$0

Hampton Roads

MPO
UPC NO

104000 SCOPE

New Construction Roadway

SYSTEM

Interstate

PROJECT

I-564 Intermodal Connector

DESCRIPTION

FROM: I-564 TO: Norfolk Naval Base / Norfolk International Terminals (1.6000 MI)

JURISDICTION

Norfolk

OVERSIGHT

FO

ADMIN BY

Other

PROGRAM NOTE All funds obligated based on current allocations/estimate. Child project of UPC 18968
ROUTE/STREET

I-564 (0564)

FUND SOURCE

MATCH

FY24
$0

FY25
$0

162

$0

TOTAL COST

$164,441,946

FY26

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

111427 SCOPE

SYSTEM

Interstate

PROJECT

Bowers Hill Interchange

DESCRIPTION

FROM: I64I264 TO: I664

ROUTE/STREET

I-664 (0664)

JURISDICTION

Chesapeake

MATCH

FY24

Other

MPO

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
PE

Reconstruction w/ Added Capacity

FY25

$7,904,630

FY26

$3,904,630

$0

FY27
$0

$0

Hampton Roads

UPC NO

105388 SCOPE

Safety

SYSTEM

Interstate

JURISDICTION

PROJECT

I-664 CORR CONGEST IMPROV COMM UPGRADES MMMBT TUNNEL

DESCRIPTION

FROM: College Drive TO: 21st Street (6.5000 MI)

ROUTE/STREET

I-664 (0664)

FUND SOURCE

Multi-jurisdictional: Hampton Roads
MPO

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$0

$620,448

FY26

$0

$0

MPO

Hampton Roads

UPC NO

T24778

SCOPE

Other

SYSTEM

Interstate

JURISDICTION

Multi-jurisdictional: Hampton Roads
MPO

PROJECT

HREL Toll Integration - Systems Integrator - HRTAC

FY27
$0

$0

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
ROUTE/STREET

I64 (9999)

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$39,156,351

FY26

FY27

PE

Other

$0

$5,873,452

$0

$0

$0

CN

Other

$0

$33,282,898

$0

$0

$0

MPO

Hampton Roads

UPC NO

18968 SCOPE

New Construction Roadway

SYSTEM

Interstate

PROJECT

R000 - I-564 INTERMODAL CONNECTOR

DESCRIPTION

FROM: I-564 TO: NORFOLK NAVAL BASE/N.I.T. (1.6000 MI)

ROUTE/STREET

R000

FUND SOURCE

JURISDICTION

Norfolk

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

163

FY26

FY25
$0

$36,960,347

$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Hampton Roads District
Primary Projects
MPO

Hampton Roads

UPC NO

119216 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Primary

JURISDICTION

PROJECT

#SMART22 RT 10 (BENNS CHURCH BLVD) AT RT 644 (TURNER DR)

DESCRIPTION

FROM: Rte 644 (Turner Dr) TO: 0.076 i. East of Rte 644 (Turner Dr) (0.0760 MI)

ROUTE/STREET

BENNS CHURCH BLVD (0010)

FUND SOURCE

NFO

ADMIN BY

VDOT

FY24

FY25

$0

$0

120648 SCOPE

FY27

$141,680

$0

$0

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

ROUTE 10/32 DIVERGING DIAMOND INTERCHANGE

DESCRIPTION

FROM: Route 10/32 TO: Route 10/32 (0.5000 MI)

ROUTE/STREET

ROUTE 10/32 (0010)

JURISDICTION

FUND SOURCE

MPO

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

PE AC Federal - AC OTHER
RW
Federal - AC OTHER
AC
CN AC Federal - AC OTHER

FY24

FY25

$16,401,046

FY26

FY27

$0
$0

$1,698,001
$541,081

$0
$0

$0
$0

$0
$0

$0

$0

$14,161,964

$0

$0

NonMPO

UPC NO

115510 SCOPE

Safety and Education of Pedestrians /Bicyclists

SYSTEM

Primary

PROJECT

#SMART20 Bicycle Lane on US Business 13

DESCRIPTION

FROM: Rt. T-1306 (Wilson Road) TO: US 13 Bypass (1.0200 MI)

ROUTE/STREET

JURISDICTION

US BUSINESS 13 (0013)

FUND SOURCE

Northampton County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

Federal - STP/STBG
Federal - STP/STBG

MPO

FY24
$0
$0

FY25
$240,445
$0

$2,360,061

FY26

FY27

$0
$0

$0
$0

$0
$430,500

NonMPO

UPC NO

115529 SCOPE

Other

SYSTEM

Primary

PROJECT

#SMART20 Median crossover to Rte 13

DESCRIPTION

FROM: 0.06 Miles North of Capeville Drive TO: 0.03 Miles North of Arlington Road (1.0000 MI)

ROUTE/STREET

ROUTE 13 (0013)

FUND SOURCE
PE

$972,244

FY26

Hampton Roads

UPC NO

PE
RW

OVERSIGHT

TOTAL COST

MATCH

PE AC Federal - AC OTHER
MPO

Isle of Wight County

JURISDICTION

Northampton County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$1,120,000

FY26

FY27

Federal - NHS/NHPP

$0

$200,000

$0

$0

$0

PE AC Federal - AC OTHER

$0

$75,000

$0

$0

$0

CN
AC

$0

$0

$0

$845,000

$0

Federal - AC OTHER

164

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO
Hampton Roads
UPC NO
109382 SCOPE
Bridge Rehab w/ Added Capacity
SYSTEM
Primary
JURISDICTION
Chesapeake
PROJECT
#HB2.FY17 Deep Creek Bridge Replacement
DESCRIPTION
FROM: George Washington Highway TO: Moses Grandy Trail (0.7900 MI)
ROUTE/STREET
DOMINION BOULEVARD (0017)
FUND SOURCE
MATCH
FY24
FY25
RW
AC
CN
AC

NFO
Locally

TOTAL COST
FY26

$62,267,013
FY27

Federal - AC OTHER

$0

$9,840,000

$0

$0

$0

Federal - AC OTHER

$0

$45,883,013

$0

$0

$0

MPO

Hampton Roads

UPC NO

109481 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

#HB2.FY17 RTE 17 AT US RTE 258 INT CAPACITY IMPROVEMENTS

DESCRIPTION

FROM: 0.185 Miles South US 258 TO: 0.106 Miles North US 258 (0.2910 MI)

JURISDICTION

Isle of Wight County

ROUTE/STREET
RTE 17 AT 258 (0017)
FUND SOURCE
MATCH
PE
RW

OVERSIGHT
ADMIN BY

FY24

Federal - NHPP/E
Federal - NHPP/E

MPO

FY25
$190
($190)

$0

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
FY26

$5,318,937
FY27

$0
$0

$0
$0

$0
$0

Hampton Roads

UPC NO
120649 SCOPE
Reconstruction w/ Added Capacity
SYSTEM
Primary
JURISDICTION
Suffolk
PROJECT
ROUTE 17 (BRIDGE ROAD) ROADWAY WIDENING
DESCRIPTION
FROM: Windward Lane TO: Harbour View Blvd. (1.0000 MI)
ROUTE/STREET
ROUTE 17 (0017)
FUND SOURCE
MATCH
FY24
FY25
PE AC Federal - AC OTHER
RW
Federal - AC OTHER
AC
CN AC Federal - AC OTHER
MPO

OVERSIGHT
ADMIN BY

NFO
Locally

TOTAL COST
FY26

$12,796,731
FY27

$0
$0

$1,505,499
$3,763,744

$0
$0

$0
$0

$0
$0

$0

$0

$7,527,488

$0

$0

Hampton Roads

UPC NO

111787 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

#SMART18 - Route 17 Widening between Rte 630 and Rte 173

DESCRIPTION

FROM: 0.154 mi. S. Int. Grafton Dr. TO: 0.266 mi. S. Int. Old York-Hampton Hwy (Route 634) (0.7130 MI)

ROUTE/STREET

GEORGE WASHINGTON MEMORIAL HIGHWAY (0017)

FUND SOURCE
PE
RW

Federal - NHS/NHPP
Federal - AC CONVERSION

JURISDICTION

York County

MATCH

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FY24

FY25

$23,249,807

FY26

FY27

$0
$510,000

$214,976
$0

$0
$0

$0
$1,200,000

$0
$840,000

Federal - NHPP/E

$0

$2,098,117

$0

$0

$0

Federal - NHS/NHPP

$0

$1,705,464

$0

$0

$0

RW TOTAL

$510,000

$3,803,581

$0

$1,200,000

$840,000

RW
AC

$510,000

$2,040,000

$0

$0

$0

Federal - AC
Federal - AC OTHER

RW AC
CN
AC

Federal - AC OTHER

$0

$2,442,581

$0

$0

$0

$510,000

$4,482,581

$0

$0

$0

$0

$0

$0

$12,714,114

$0

165

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

NonMPO

UPC NO

111342 SCOPE

Bridge Replacement w/o Added Capacity

SYSTEM

Primary

PROJECT

#SGR18VB - RT 40 over Otterdam Swamp (Fed 18185) REPLACE

DESCRIPTION

FROM: 0.178 Miles W. of Rte. 601 (Hickory Hill Road) TO: 0.004 Miles W. of Rte. 601 (Hickory Hill Road) (0.1090
MI)
MARTIN LUTHER KING HIGHWAY (0040)
TOTAL COST
$4,115,612

ROUTE/STREET

JURISDICTION

FUND SOURCE

Surry County

MATCH

FY24

FY25

OVERSIGHT

NFO

ADMIN BY

VDOT

FY26

FY27

CN

Federal - NHS/NHPP

$0

$115,151

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$4,000,461

$0

$0

$0

MPO

Hampton Roads

UPC NO

76642 SCOPE

Preliminary Engineering

SYSTEM

Primary

PROJECT

RTE 58 - PPTA PROJECT DEV. & MGMT. OVERSIGHT (DT/MT/MLK)

JURISDICTION

Hampton Roads District-wide

DESCRIPTION

MIDTOWN TUNNEL CORRIDOR

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

0058

TOTAL COST

FUND SOURCE

MATCH

FY24
$0

MPO

FY25

$49,951,826

FY26

$0

FY27

$0

$0

$0

Hampton Roads

UPC NO

103036 SCOPE

Bridge, New Construction

SYSTEM

Primary

PROJECT

DT/MT/MLK Primary Debt Service

DESCRIPTION

FROM: Downtown and Midtown Tunnels; extension of MLK to I-264 TO: Downtown and Midtown Tunnels;
extension of MLK to I-264 (3.9000 MI)

ROUTE/STREET

0058

FUND SOURCE
PE

JURISDICTION

Hampton Roads District-wide

MATCH

FY24

FY25

Federal - AC CONVERSION

$0

$0

Federal - NHS/NHPP

$36,741,485

$0

$36,738,006

$0

PE TOTAL

$0

$36,738,006

$36,741,485

PE AC Federal - AC

$0

$0

$118,421,868

166

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$560,164,639

FY26

FY27
$36,741,356 $36,740,024
$0

$0

$36,741,356 $36,740,024
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

NonMPO

UPC NO

119213 SCOPE

SYSTEM

Primary

PROJECT

Reconstruction w/o Added Capacity

JURISDICTION

Southampton County

OVERSIGHT

NFO

#SMART22 NEW MARKET ROAD TURN LANE IMPROVMENTS

ADMIN BY

VDOT

SOUTHAMPTON PARKWAY (0058)

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE

MATCH

FY24

FY25

$1,151,163

FY26

FY27

PE AC Federal - AC OTHER

$0

$411,965

$0

$0

$0

RW

Federal - NHPP/E

$0

$0

$228,231

$0

$0

Federal - STP/STBG

$0

$0

$50,000

$0

$0

RW TOTAL

$0

$0

$278,231

$0

$0

RW
AC

Federal - AC OTHER

$0

$0

$22,563

$0

$0

CN
AC

Federal - AC OTHER

$0

$0

$0

$438,404

$0

MPO

NonMPO

UPC NO

119218 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Primary

PROJECT

#SMART22 CAMP PARKWAY CGT

DESCRIPTION

FROM: 0.082 Mile West of Camp Parkway TO: 0.148 Mile East of Camp Parkway (0.2300 MI)

ROUTE/STREET

SOUTHAMPTON PARKWAY (0058)

FUND SOURCE
PE

JURISDICTION

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

Federal - STP/STBG

MPO

Southampton County

FY24
$0

FY25
$0

$2,349,105

FY26

FY27

$752,283

$0

$0

NonMPO

UPC NO

119282 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

#SMART22 SOUTHAMPTON HIGH SCHOOL US 58 CROSSOVER

DESCRIPTION

FROM: Meherrin Road Interchange TO: 1.05 Miles W. of Meherrin Road Interchange

ROUTE/STREET

0058

FUND SOURCE

JURISDICTION

Southampton County

OVERSIGHT
ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$3,644,419

FY26

FY27

PE

Federal - STP/STBG

$0

$823,929

$0

$0

$0

RW

Federal - NHS/NHPP

$0

$0

$0

$77,476

$0

CN

Federal - NHS/NHPP

$0

$0

$0

$2,400,000

$0

Federal - STP/STBG

$0

$0

$0

$98,595

$0

CN TOTAL

$0

$0

$0

$2,498,595

$0

CN
AC

$0

$0

$0

$244,419

$0

Federal - AC OTHER

167

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

118375 SCOPE

Safety

SYSTEM

Primary

JURISDICTION

Suffolk

OVERSIGHT

NFO

PROJECT

SPSA Interchange Improvement

ADMIN BY

VDOT

DESCRIPTION

FROM: 0.429 Miles East of US 13/58/460 TO: 2.536 Miles West of Suffolk City Limits (1.1180 MI)

ROUTE/STREET

000 (0058)

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$40,194,275

FY26

FY27

PE AC Federal - AC OTHER

$0

$6,720,000

$0

$0

$0

Federal - AC OTHER

$0

$3,697,500

$0

$0

$0

CN AC Federal - AC OTHER

$0

$29,776,775

$0

$0

$0

RW
AC

MPO

Hampton Roads

UPC NO

105404 SCOPE

SYSTEM

Primary

PROJECT

Safety

JURISDICTION

Hampton Roads District-wide

OVERSIGHT

NFO

I64 Corr Tech Adv-60, 143, 199 Signal Comm Cam - NN to Nw Kn

ADMIN BY

VDOT

VARIOUS (0060)

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE

MATCH

FY24
$0

MPO

FY25
$0

$277,435

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

17633 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Primary

PROJECT

Sidewalk and Bikeway on Rte 60 from Croaker to Old Church Rd

JURISDICTION

DESCRIPTION

FROM: Richmond Rd and Croaker Rd TO: Richmond Rd and Old Church Road (0.3300 MI)

ROUTE/STREET

RICHMOND ROAD (0060)

FUND SOURCE
CN

Federal - CMAQ

CN
AC

Federal - AC OTHER

MPO

James City County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$3,767,028

FY26

FY27

$3,787

$15,147

$0

$0

$0

$0

$2,054

$0

$0

$0

Hampton Roads

UPC NO

100200 SCOPE

New Construction Roadway

SYSTEM

Primary

JURISDICTION

James City County

PROJECT

#SMART18 - SKIFFES CREEK CONNECTOR

DESCRIPTION

FROM: Route 60 TO: Route 143

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

SKIFFES CREEK CONNECTOR (0060)

FUND SOURCE

TOTAL COST

MATCH

FY24
$0

FY25
$0

168

$40,641,836

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

102980 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Primary

JURISDICTION

PROJECT

Pocahontas Trail Reconstruction

DESCRIPTION

FROM: James City County Fire Station #2 (8429 Pocahontas Trail) TO: James City County Elementary
School (8901 Pocahontas Trail) (1.8000 MI)

ROUTE/STREET

POCAHONTAS TRAIL (0060)

FUND SOURCE
RW

FY24

Federal - AC CONVERSION

RW TOTAL

ADMIN BY

VDOT

FY25

$50,197,157

FY26

FY27

$245,639

$0

$0

$982,557

$0

$0

$11,312,911

$0

$0

$654,894

$0

$2,619,574

$0

$0

$1,186,698

$0

$4,746,791

$0

$0

$4,915,458

$0

$18,679,276

$982,557

$0

$245,639

$0

$982,557

$0

$0

Federal - AC

MPO

NFO

$2,828,228

Federal - HIP/F
Federal - RSTP

OVERSIGHT

TOTAL COST

MATCH

Federal - CMAQ

RW
AC

James City County

Hampton Roads

UPC NO

115559 SCOPE

Restoration and Rehabilitation

SYSTEM

Primary

JURISDICTION

PROJECT

Denbigh Fringe Park & Ride Improvements

DESCRIPTION

FROM: Entrance into Parking Lot TO: End of Parking Lot

ROUTE/STREET

WARWICK BOULEVARD (0060)

FUND SOURCE
PE
CN

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

Federal - CMAQ
Federal - CMAQ

MPO

Newport News

FY24

FY25

$3,939
$36,134

$15,756
$144,536

$200,365

FY26
$0
$0

FY27
$0
$0

$0
$0

Hampton Roads

UPC NO

Bridge Replacement w/o Added Capacity

97737 SCOPE

SYSTEM

Primary

JURISDICTION

PROJECT

Lesner Bridge Replacement Project, VA Beach

DESCRIPTION

FROM: E Stratford Rd TO: Vista Circle (0.5900 MI)

ROUTE/STREET

SHORE DRIVE (0060)

FUND SOURCE

Virginia Beach

FO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$0
MPO

OVERSIGHT

$0

$98,400,461

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

93077 SCOPE

Bridge Replacement w/o Added Capacity

SYSTEM

Primary

PROJECT

#SGR17VB - Replace Denbigh Blvd BR over I-64 and CSX RR

DESCRIPTION

FROM: 0.438 Mile West of Richneck Road TO: 0.083 Mile East of Richneck Road (0.5210 MI)

ROUTE/STREET

DENBIGH BOULEVARD (0064)

FUND SOURCE

JURISDICTION

Newport News

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$34,848,245

FY26

FY27

PE AC Federal - AC OTHER

$0

$1,015

$0

$0

$0

Federal - AC OTHER

$0

$137,330

$0

$0

$0

CN AC Federal - AC OTHER

$0

$1,067,555

$0

$0

$0

RW
AC

169

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

111791 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

JURISDICTION

PROJECT

#SMART18 - Route 171 Widening between Route 17 and Route 134

DESCRIPTION

FROM: 0.009 Miles East of Route 17 (George Washington Hwy) TO: 0.016 Miles West of Route 134 (Hampton
Hwy) (0.3400 MI)

ROUTE/STREET

VICTORY BOULEVARD (0171)

FUND SOURCE

York County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$4,587,811

FY26

FY27

RW

Federal - STP/STBG

$0

$675,411

$0

$0

$0

CN

Federal - STP/STBG

$0

$403,212

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$2,667,053

$0

$0

$0

MPO

Hampton Roads

UPC NO

113633 SCOPE

Safety

SYSTEM

Primary

JURISDICTION

PROJECT

Route 171 (Victory Blvd.) Right Turn Lane Extension

DESCRIPTION

FROM: 0.04 Miles W. Int. with Kiln Creek Parkway TO: 0.18 Miles W. of Int. with Kiln Creek Parkway (0.1790 MI)

ROUTE/STREET

VICTORY BOULEVARD (0171)

FUND SOURCE
PE
CN

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

Federal - HSIP
Federal - HSIP

MPO

York County

$0
$0

FY25
$22,335
$364,936

$454,936

FY26
$0
$0

FY27
$0
$0

$0
$0

NonMPO

UPC NO

119283 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Primary

JURISDICTION

Accomack County

PROJECT

#SMART22 ROUTE 179-MARKET STREET ROAD

DESCRIPTION

FROM: Intersection of Rte. 718 (Hill Street) TO: Intersection of Shore Parkway

ROUTE/STREET
MARKET STREET (0179)
FUND SOURCE
MATCH

FY24
$0

MPO

FY25
$0

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

$1,728,540
FY27

FY26
$0

$0

$0

Hampton Roads

UPC NO

102951 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Primary

PROJECT

Main Street Pedestrian Improvements

DESCRIPTION

FROM: Route 10 TO: Route 10 (Intersection)

ROUTE/STREET

MAIN STREET (0258)

FUND SOURCE

JURISDICTION

Isle of Wight County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$1,492,341

FY26

FY27

PE

Federal - CMAQ

$3,036

$12,145

$0

$0

$0

RW

Federal - CMAQ

$1,000

$4,000

$0

$0

$0

CN

Federal - CMAQ

$155,228

$620,910

$0

$0

$0

Federal - STP/STBG
CN TOTAL
CN
AC

Federal - AC OTHER

$0

$19,689

$0

$0

$0

$155,228

$640,599

$0

$0

$0

$0

$541,333

$0

$0

$0

170

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

Hampton Roads

UPC NO

120650 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

JURISDICTION

PROJECT

MAIN STREET (U.S. RTE 258) AT RTE 10 BYPASS

DESCRIPTION

FROM: Main Street TO: Route 10

ROUTE/STREET

MAIN STREET (0258)

FUND SOURCE

Isle of Wight County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$8,451,458

FY26

FY27

PE AC Federal - AC OTHER

$0

$944,115

$0

$0

$0

Federal - AC OTHER

$0

$720,598

$0

$0

$0

CN AC Federal - AC OTHER

$0

$0

$0

$6,786,745

$0

RW
AC

MPO

Hampton Roads

UPC NO

118380 SCOPE

Safety

SYSTEM

Primary

JURISDICTION

PROJECT

Safety Improvements on Route 258

DESCRIPTION

FROM: Eastbound Rte. 58 Ramp TO: Amber Street (0.5500 MI)

ROUTE/STREET

SOUTH STREET (0258)

FUND SOURCE
CN

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

Federal - RSTP

MPO

Multi-jurisdictional: Hampton Roads
MPO

FY24
$276,381

FY25
$1,105,525

$1,706,906

FY26

FY27

$0

$0

$0

Multiple MPOs

UPC NO

103754 SCOPE

SYSTEM

Primary

PROJECT

Route 460 PPTA Debt Service

DESCRIPTION

FROM: Intersection with Route 58, City of Suffolk TO: Intersection with I-295, Prince George County (55.0000
MI)
0460
TOTAL COST
$148,622,688

ROUTE/STREET

FUND SOURCE
PE

JURISDICTION

Statewide

MATCH

FY24

FY25

OVERSIGHT

FO

ADMIN BY

VDOT

FY26

FY27

Federal - AC CONVERSION

$0

$0

$7,864,709

$7,863,525

$7,863,845

Federal - NHS/NHPP

$0

$7,864,630

$0

$0

$0

PE TOTAL

$0

$7,864,630

$7,864,709

$7,863,525

$7,863,845

PE
AC

$0

$31,454,523

$0

$0

$0

Federal - AC

171

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

119376 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Primary

JURISDICTION

PROJECT

#SMART22 AIRPORT, MOORETOWN, AND RICHMOND RD IMPROVEMENTS

DESCRIPTION

FROM: Intersection of Richmond Road (Rte 60) TO: Intersection of Mooretown Road (Rte 603) (0.1400 MI)

ROUTE/STREET

AIRPORT ROAD (0645)

FUND SOURCE
PE

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

Other

MPO

James City County

FY25

$0

$0

$12,569,213

FY26
$1,221,396

FY27
$0

$0

Hampton Roads

UPC NO

111237 SCOPE

Safety

SYSTEM

Primary

JURISDICTION

PROJECT

JAMES CITY COUNTY TRANSPORTATION MASTER PLAN

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

ROUTE/STREET

VARIOUS LOCATIONS THROUGHT THE COUNTY (9999)

FUND SOURCE
PE

MATCH

Federal - RSTP

MPO

James City County

FO

ADMIN BY

Locally

TOTAL COST

FY24
$10,000

OVERSIGHT

FY25
$40,000

$500,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

117776 SCOPE

Other

SYSTEM

Primary

JURISDICTION

PROJECT

VDOT OVERSIGHT - ENTRANCE ACCESS TO CAMP PENDLETON

DESCRIPTION

FROM: General Booth Blvd TO: Headquarters Road

ROUTE/STREET

CAMP PENDLETON (9999)

FUND SOURCE

Virginia Beach

NFO

ADMIN BY

Other

TOTAL COST

MATCH

FY24
$0

MPO

OVERSIGHT

FY25
$0

$10,000
FY27

FY26
$0

$0

$0

Hampton Roads

UPC NO

50651 SCOPE

Preliminary Engineering

SYSTEM

Primary

PROJECT

HOV MARKETING & ANALYSIS - REGIONWIDE

DESCRIPTION

HOV MARKETING & ANALYSIS

PROGRAM
NOTE
ROUTE/STREET

All funds obligated based on current allocations/estimate

JURISDICTION

Hampton Roads District-wide

HOVM

FUND SOURCE

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$0

172

$7,550,700

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Hampton Roads District
Secondary
Projects
MPO

NonMPO

UPC NO

84027 SCOPE

Resurfacing

SYSTEM

Secondary

PROJECT

Rte 633 Reconstruction

JURISDICTION

DESCRIPTION

FROM: 0.7 Miles North of Intersection Route 627 TO: 1.2 Miles North of Intersection Route 627 (0.5390 MI)

ROUTE/STREET

INDEPENDENCE CHURCH ROAD (0633)

FUND SOURCE
PE
CN

Federal - STP/R
Federal - STP/STBG

CN
AC

Federal - AC OTHER

MPO

Greensville County

MATCH

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FY24

FY25

FY26

FY27

($30,000)
$45,793

($120,000)
$183,173

$0
$0

$0
$0

$0
$0

$0

$158,509

$0

$0

$0

Hampton Roads

UPC NO

109314 SCOPE

New Construction Roadway

SYSTEM

Secondary

PROJECT

#HB2.FY17 NIKE PARK RD EXTENSION FROM REYNOLDS DR TO RTE 17

DESCRIPTION

FROM: 0.052 MLES NORTH OF ROUTE 665 TO: 0.0018 MLES WEST OF ROUTE 17 (0.9320 MI)

ROUTE/STREET

JURISDICTION

NIKE PARK (0669)

FUND SOURCE
RW
CN
AC

$987,694

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

Federal - STP/STBG
Federal - AC OTHER

MPO

Isle of Wight County

$0
$0

FY25
$2,587,321
$0

$16,302,392

FY26
$0
$10,749,078

FY27
$0
$0

$0
$0

Hampton Roads

UPC NO

103021 SCOPE

Traffic Management/Engineering

SYSTEM

Secondary

JURISDICTION

PROJECT

Turner Drive Intersection Improvements at Benns Church Blvd

DESCRIPTION

FROM: Benns Church (Route 10/32) TO: Benns Church (Intersection) (0.0800 MI)

ROUTE/STREET

TURNER DRIVE (0644)

FUND SOURCE

Isle of Wight County

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$0

MPO

OVERSIGHT

FY25
$0

$554,394
FY27

FY26
$0

$0

$0

Hampton Roads

UPC NO

102944 SCOPE

Traffic Management/Engineering

SYSTEM

Secondary

JURISDICTION

James City County

OVERSIGHT

NFO

PROJECT

Centerville Road Intersection Improvements at News Road

DESCRIPTION

FROM: 0.086 mi South of News Rd Intersection TO: 0.172 mi North of News Rd Intersection (0.2580 MI)

ADMIN BY

VDOT

PROGRAM NOTE Waiting Financial Closure
ROUTE/STREET

CENTERVILLE ROAD (0614)

FUND SOURCE
CN

Federal - STP/STBG

TOTAL COST

MATCH

FY24
($68,985)

FY25
($275,940)

173

$3,255,073

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

100920 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

Croaker Road - Four Lane Widening From Library to Rte 60

JURISDICTION

DESCRIPTION

FROM: 0.512 Miles South of Rose Lane TO: 0.233 Miles North of Rose Lane (0.7450 MI)

ROUTE/STREET

CROAKER ROAD (0607)

FUND SOURCE

James City County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$27,202,519

FY26

FY27

PE

Federal - RSTP

$77,780

$311,120

$0

$0

$0

RW

Federal - RSTP

$175,775

$703,099

$0

$0

$0

Hampton Roads

MPO
UPC NO

100921 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

#HB2.FY17 Longhill Rd Widening

DESCRIPTION

FROM: 0.205 Mi. N. Int. Rte. 658 Olde Towne Road TO: 0.105 Mi. S. of Williamsburg West Drive (0.7080 MI)

JURISDICTION

James City County

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

LONGHILL RD. (RTE. 612) (0612)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$0

MPO

$0

$19,770,859

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

16314 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Secondary

PROJECT

Penniman Rd/Government Rd/ROADWAY IMPROVEMENTS

DESCRIPTION

FROM: 0.010 Mi. West of Int. Rte. 723 (Fillmore Dr) TO: 0.045 Mi. East of Int. Rte. 705 (Alexander Lee Pkwy)
(0.3080 MI)

ROUTE/STREET

PENNIMAN ROAD (0641)

FUND SOURCE
PE

Federal - HIP/F

JURISDICTION

York County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$6,233,482

FY26

FY27

$0

$126,237

$0

$0

$0

$24,426

$97,704

$0

$0

$0

PE TOTAL

$24,426

$223,941

$0

$0

$0

RW

Federal - BR

$26,761

$107,042

$0

$0

$0

CN

Federal - BR

$29,618

$118,472

$0

$0

$0

Federal - RSTP

Federal - HIP/F
Federal - STP/STBG
CN TOTAL
CN
AC

Federal - AC OTHER

$0

$24,147

$0

$0

$0

$68,460

$273,841

$0

$0

$0

$98,078

$416,460

$0

$0

$0

$0

$3,363,955

$0

$0

$0

174

FFY 24-27 Working STIP

6/21/2023 8:52:03

Hampton Roads District
Urban Projects
MPO

Hampton Roads

UPC NO

119232 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#SMART22 BATTLEFIELD BLVD CONTINUOUS RTL VOLVO TO WALMART WY

JURISDICTION

DESCRIPTION

FROM: Coastal Way TO: 270' North of Coastal Way (0.2700 MI)

ROUTE/STREET

BATTLEFIELD BLVD NB (0168)

FUND SOURCE

FY24

FY25

$0

$0

119409 SCOPE

Locally

$2,836,383

FY26

FY27

$328,378

$0

$0

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

CHESAPEAKE SIGNAL TIMING - PHASES 1-4

DESCRIPTION

FROM: Military Highway TO: Kempville Road (0.0200 MI)

ROUTE/STREET

JURISDICTION

CITYWIDE LOCATIONS (0000)

FUND SOURCE
Federal - CMAQ

MPO

Chesapeake

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$600,000

FY26

FY27

$60,000

$0

$0

$0

$240,000

$0

$0

$0

$0

$300,000

PE AC Federal - AC OTHER

Hampton Roads

UPC NO

115423 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

George Washington Highway Widening

DESCRIPTION

FROM: Yadkin Road TO: Canal Drive (1.5000 MI)

ROUTE/STREET

GEORGE WASHINGTON HIGHWAY (0017)

FUND SOURCE
PE

NFO

ADMIN BY

Hampton Roads

UPC NO

PE

OVERSIGHT

TOTAL COST

MATCH

PE AC Federal - AC OTHER

MPO

Chesapeake

Federal - AC CONVERSION
Federal - HIP/F

JURISDICTION

Chesapeake

MATCH

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

FY24

FY25

$47,822,292

FY26

FY27

$349,021

$0

$1,200,000

$196,084

$0

$0

$1,000,000

$0

$0

$0

$200,000

$800,000

$0

$0

$0

PE TOTAL

$549,021

$1,800,000

$1,200,000

$196,084

$0

PE AC Federal - AC

$349,021

$1,396,084

$0

$0

$0

Federal - RSTP

RW

Federal - AC CONVERSION

$1,241,226

$0

$0

$3,379,230

$1,585,674

RW
AC

Federal - AC

$1,241,226

$4,964,904

$0

$0

$0

CN

Federal - AC CONVERSION

$1,753,582

$0

$0

$0

$7,014,326

CN
AC

Federal - AC

$1,753,582

$0

$7,014,326

$0

$0

$0

$0

$29,103,149

$0

$0

$1,753,582

$0

$36,117,475

$0

$0

Federal - AC OTHER
CN AC

175

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

119264 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

DEEP CREEK ELEMENTARY SCHOOL TRAFFIC SIGNAL IMPROVEMENT

JURISDICTION

DESCRIPTION

FROM: Forehand Drive/Margaret Booker Drive TO: Forehand Drive/Margaret Booker Drive (0.0100 MI)

ROUTE/STREET

GEORGE WASHINGTON HWY (U000)

FUND SOURCE
PE

MATCH

Federal - CMAQ

MPO

Chesapeake

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
FY24

FY25

$30,000

$2,100,000

FY26

$0

FY27

$0

$0

$120,000

Hampton Roads

UPC NO

110753 SCOPE

Safety

SYSTEM

Urban

PROJECT

GREAT BRIDGE BLVD. RIGHT TURN LANE

JURISDICTION

DESCRIPTION

FROM: Battlefield Boulevard TO: Kempsville Road (0.1000 MI)

ROUTE/STREET

GREAT BRIDGE BOULEVARD (0190)

FUND SOURCE

Chesapeake

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$1,330,838

FY26

FY27

PE AC Federal - AC OTHER

$0

$283,000

$0

$0

$0

Federal - AC OTHER

$0

$232,500

$0

$0

$0

CN AC Federal - AC OTHER

$0

$815,338

$0

$0

$0

RW
AC

MPO

Hampton Roads

UPC NO

119219 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

JURISDICTION

PROJECT

#SMART22 WESTERN BRANCH RAILS TO TRAILS PHASE 2

DESCRIPTION

FROM: Chesapeake City Line TO: Taylor Rd.

ROUTE/STREET

GUM ROAD (0907)

FUND SOURCE

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

PE AC Federal - AC OTHER

MPO

Chesapeake

FY24

FY25

$0

$2,575,728

FY26

$0

$0

FY27
$464,466

$0

Hampton Roads

UPC NO

119209 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#SMART22 BATTLEFIELD BLVD & JOHNSON RD INTERSECTION IMPROV

DESCRIPTION

FROM: Battlefield Blvd. TO: Mt. Pleasant Rd. (0.1000 MI)

ROUTE/STREET

JOHNSTOWN RD/MT. PLEASANT RD (0168)

FUND SOURCE

JURISDICTION

Chesapeake

MATCH

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

FY24

FY25

$3,247,706

FY26

FY27

PE AC Federal - AC OTHER

$0

$663,323

$0

$0

$0

Federal - AC OTHER

$0

$0

$806,199

$0

$0

CN AC Federal - AC OTHER

$0

$0

$0

$1,778,184

$0

RW
AC

176

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

115526 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

PROJECT

#SMART20 Mt Pleasant Rd/Great Bridge BYP Interchange Imprvmt

JURISDICTION

DESCRIPTION

FROM: Mt Pleasant Road TO: Chesapeake Expressway (Rte 168)

ROUTE/STREET

MT PLEASANT RD/GREAT BRIDGE BYPASS (0168)

FUND SOURCE

Chesapeake

MATCH

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

FY24

FY25

$6,000,708

FY26

FY27

PE

Federal - NHS/NHPP

$0

$616,500

$0

$0

$0

CN

Federal - NHS/NHPP

$0

$0

$5,347,008

$0

$0

CN
AC

Federal - AC OTHER

$0

$0

$37,200

$0

$0

MPO

Hampton Roads

UPC NO

107032 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Chesapeake Signal Timing - Phase 2

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE
PE

Chesapeake

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

Other

PE AC Federal - AC OTHER

MPO

OVERSIGHT

FY25

$173,671

FY26

FY27

$4,734

$0

$0

$0

$18,937

$0

$0

$0

Hampton Roads

UPC NO

107033 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

JURISDICTION

PROJECT

Chesapeake Signal Timing - Phase 3

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE

Chesapeake

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$0

MPO

OVERSIGHT

FY25
$0

$150,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

109418 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Chesapeake Signal Timing & Incident Management Plans

DESCRIPTION

FROM: Various TO: Various

JURISDICTION

Chesapeake

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

VARIOUS (U000)

FUND SOURCE

TOTAL COST
MATCH

FY24
$0

FY25
$0

177

$150,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

109803 SCOPE

Safety

SYSTEM

Urban

PROJECT

Chesapeake Signal Timing - Phase 1B

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE
PE

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

Federal - CMAQ

MPO

Chesapeake

$514

FY25

$117,057

FY26

$2,057

FY27

$0

$0

$0

Hampton Roads

UPC NO

110801 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Chesapeake Signal System - Phase 4

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE

Chesapeake

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$500,000

FY26

FY27

PE

Federal - CMAQ

$16,000

$64,000

$0

$0

$0

CN

Federal - CMAQ

$84,000

$0

$336,000

$0

$0

MPO

Hampton Roads

UPC NO

113828 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

JURISDICTION

PROJECT

Traffic Signal System Preemption Upgrade

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (9999)

FUND SOURCE
PE

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

Federal - CMAQ

MPO

Chesapeake

FY24
($1,302)

FY25

$188,397

FY26

($5,208)

FY27

$0

$0

$0

Hampton Roads

UPC NO

115369 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Citywide Traffic Signal System Upgrade

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE

JURISDICTION

Chesapeake

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$875,000

FY26

FY27

PE

Federal - CMAQ

$25,000

$0

$100,000

$0

$0

CN

Federal - AC CONVERSION

$35,000

$0

$0

$0

$140,000

Federal - CMAQ

$80,000

$0

$0

$320,000

$0

$115,000

$0

$0

$320,000

$140,000

$35,000

$0

$0

$140,000

$0

$0

$0

$0

$175,000

$0

$35,000

$0

$0

$315,000

$0

CN TOTAL
CN
AC

Federal - AC
Federal - AC OTHER

CN AC

178

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

115520 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Chesapeake Signal Timing-All Phases

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (0000)

FUND SOURCE
PE

Federal - CMAQ
PE TOTAL
PE AC Federal - AC

FY24

FY25

Locally
$600,000

FY26

$60,000

$0

$0

FY27
$120,000

$120,000

$60,000

$0

$240,000

$0

$0

$120,000

$0

$240,000

$120,000

$120,000

$60,000

$0

$240,000

$0

$0

115507 SCOPE

Safety

SYSTEM

Urban

PROJECT

#SMART20 HWY 301S Sidewalk Greensville Project

DESCRIPTION

FROM: HWY 301 South TO: Brookridge Apartment Complex (0.1820 MI)

ROUTE/STREET

JURISDICTION

HWY 301 (0301)

FUND SOURCE

Greensville County

MPO

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

$576,903

FY26

FY25

$0

$0

FY27
$0

$0

Hampton Roads

UPC NO

113988 SCOPE

Other

SYSTEM

Urban

PROJECT

Coliseum Drive Extension - Segment B

DESCRIPTION

FROM: Butler Farm Road TO: N. Campus Pway & Magruder Blvd

ROUTE/STREET

JURISDICTION

COLISEUM DRIVE (9999)

FUND SOURCE

Hampton

FY24

FY25

Other

MPO

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

PE AC Federal - AC OTHER

$2,342,501

FY26

FY27

$214,705

$0

$0

$0

$1,396,740

$0

$0

$0

Hampton Roads

UPC NO

102866 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

Cunningham Drive Sidewalk Project

DESCRIPTION

FROM: Todds Lane TO: Executive Drive (1.6000 MI)

ROUTE/STREET

CUNNINGHAM DRIVE (0152)

FUND SOURCE
CN

NFO

ADMIN BY

NonMPO

UPC NO

PE

OVERSIGHT

TOTAL COST
MATCH

Federal - AC CONVERSION

MPO

Chesapeake

Federal - CMAQ

JURISDICTION

Hampton

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$153,325

FY25
$613,301

179

$920,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

115242 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

#SMART20 Hampton Roads Center Pkwy Bike & Pedestrian Access

JURISDICTION

DESCRIPTION

FROM: N. Armistead Avenue TO: Coliseum Drive (0.4000 MI)

ROUTE/STREET

HAMPTON ROADS CENTER PKWY (0000)

FUND SOURCE

Hampton

MATCH

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

FY24

FY25

$2,163,325

FY26

FY27

PE

Federal - NHS/NHPP

$0

$445,918

$0

$0

RW

Federal - NHS/NHPP

$0

$0

$0

$21,000

$0

CN

Federal - NHS/NHPP

$0

$0

$0

$0

$1,450,489

CN
AC

Federal - AC OTHER

$0

$0

$0

$0

$245,918

MPO

$0

Hampton Roads

UPC NO

109304 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

JURISDICTION

PROJECT

#HB2.FY17 Little Back River Road Reconstruction/ Realignment

DESCRIPTION

FROM: N. King Street TO: Valirey Drive (0.8500 MI)

ROUTE/STREET

LITTLE BACK RIVER ROAD (U000)

FUND SOURCE

Hampton

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$9,270,000

FY26

FY27

PE AC Federal - AC OTHER

$0

$124,759

$0

$0

$0

Federal - AC OTHER

$0

$1,435,000

$0

$0

$0

CN AC Federal - AC OTHER

$0

$6,160,241

$0

$0

$0

RW
AC

MPO

Hampton Roads

UPC NO

115527 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#SMART20 Little Back River Peak Directional & 2Way Left Turn

JURISDICTION

DESCRIPTION

FROM: Harris Creek Road TO: Clemwood Parkway (1.2000 MI)

ROUTE/STREET

LITTLE BACK RIVER ROAD (U000)

FUND SOURCE

Hampton

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$8,835,000

FY26

FY27

PE

Federal - STP/STBG

$0

$0

$955,000

$0

$0

RW

Federal - STP/STBG

$0

$0

$0

$0

$580,000

MPO

Hampton Roads

UPC NO

119233 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

#SMART22 NORTH CAMPUS PKWY BICYCLE & PED IMPROVEMENTS

DESCRIPTION

FROM: Magruder Blvd TO: Commandar Shepard Blvd (0.7510 MI)

ROUTE/STREET

N CAMPUS PKWY (9999)

FUND SOURCE
PE AC Federal - AC OTHER

JURISDICTION

Hampton

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$0

FY25
$0

180

FY26
$0

$3,166,096
FY27

$480,625

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

119212 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

#SMART22 N KING ST CORRIDOR IMPROVEMENTS SEGMENT 5

JURISDICTION

DESCRIPTION

FROM: Quash Street TO: Old Fox Hill Road (0.7150 MI)

ROUTE/STREET

N KING STREET (0985)

FUND SOURCE

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

PE AC Federal - AC OTHER

MPO

Hampton

FY24

FY25

$0

$0

$5,018,859

FY26
$0

FY27
$565,765

$0

Hampton Roads

UPC NO

111016 SCOPE

Safety

SYSTEM

Urban

PROJECT

#SMART18 - POWER PLANT PARKWAY SIDEWALKS

JURISDICTION

DESCRIPTION

FROM: Pine Chapel Road TO: Briarfield Road (0.5000 MI)

ROUTE/STREET

POWER PLANT PARKWAY (0415)

FUND SOURCE

Hampton

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

PE

Federal - STP/STBG

$0

RW

Federal - STP/STBG

RW
AC

Federal - AC OTHER

CN
AC

Federal - AC OTHER

FY25

$753,500

FY26

FY27

$4,262

$0

$0

$0

$0

$4,252

$0

$0

$0

$0

$112,748

$0

$0

$0

$0

$503,000

$0

$0

$0

Hampton Roads

MPO
UPC NO

102867 SCOPE

SYSTEM

Urban

PROJECT

Traffic Signal System Retiming

DESCRIPTION

FROM: Various TO: Various

Traffic Management/Engineering

JURISDICTION

Hampton

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funding obligated based on current allocations/estimate. Waiting Financial Closure
ROUTE/STREET

VARIOUS (0000)

FUND SOURCE

TOTAL COST
MATCH

FY24
$0

MPO

FY25
$0

$1,392,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO
SYSTEM

109410 SCOPE
Urban

Traffic Management/Engineering

JURISDICTION

Hampton

PROJECT

Traffic Signal System Retimings Phase II

DESCRIPTION

FROM: Various TO: Various

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

VARIOUS (0164)

FUND SOURCE

TOTAL COST
MATCH

FY24
$0

FY25
$0

181

$1,055,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

113752 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

JURISDICTION

PROJECT

Inst. Emer. Vehicle Preemption Software & Hardware - Hampton

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (0064)

FUND SOURCE

Hampton

ADMIN BY

Locally

FY24

FY25
$0

$204,000

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO

116318 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Citywide Traffic Signal Upgrades Phase IV - CN only

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

JURISDICTION

VARIOUS (0064)

FUND SOURCE
CN

NFO

TOTAL COST
MATCH
$0

MPO

OVERSIGHT

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

Federal - CMAQ

MPO

Hampton

FY24

FY25

$78,539

$314,156

$2,770,021

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO

97715 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

Wythe Creek Road - Widen to 3 Lanes

JURISDICTION

DESCRIPTION

FROM: 0.965 Mi. S. of Hampton City Limits TO: Hampton City Limits (0.9650 MI)

ROUTE/STREET

WYTHE CREEK ROAD (0172)

FUND SOURCE
PE

Federal - RSTP

RW
CN
CN
AC

Federal - AC OTHER

Hampton

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$61,453,423

FY26

FY27

$64,000

$256,000

$0

$0

$0

Federal - RSTP

($283,664)

($1,134,656)

$0

$0

$0

Other

$5,326,327

$5,326,327

$0

$0

$0

$0

$44,713,012

$0

$0

$0

MPO

Hampton Roads

UPC NO

115528 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

PROJECT

#SMART20 U.S. Route 460 at U.S. Route 258 Turn Lane Improve

DESCRIPTION

FROM: Route 258 TO: Rout 460 (0.1530 MI)

ROUTE/STREET

ROUTE 258 (0460)

FUND SOURCE

JURISDICTION

Isle of Wight County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$3,234,936

FY26

FY27

PE

Federal - NHS/NHPP

$0

$520,603

$0

$0

$0

RW

Federal - NHS/NHPP

$0

$466,069

$0

$0

$0

CN

Federal - NHS/NHPP

$0

$0

$0

$2,195,546

$0

CN
AC

Federal - AC OTHER

$0

$0

$0

$52,718

$0

182

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

115512 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

#SMART20 Longhill Road Shared Use Path

JURISDICTION

DESCRIPTION

FROM: DePue Drive TO: Lane Place

ROUTE/STREET

LONGHILL ROAD (U000)

FUND SOURCE
RW

Federal - STP/STBG

CN

Other

CN
AC

Federal - AC

MPO

James City County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$4,400,000

FY26

FY27

$135,092

$540,369

$0

$0

$0

$0

$1,300,000

$0

$0

$0

$380,908

$1,523,631

$0

$0

$0

Hampton Roads

UPC NO

4483 SCOPE

New Construction Roadway

SYSTEM

Urban

PROJECT

#HB2.FY17 ATKINSON BLVD - 4 LANES

JURISDICTION

Newport News

OVERSIGHT

NFO

ADMIN BY

Locally

DESCRIPTION

FROM: WARWICK BOULEVARD (ROUTE 60) TO: JEFFERSON AVENUE (ROUTE 143) (1.2000 MI)

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

ATKINSON BLVD. (U000)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$0

MPO

$0

$67,619,241

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

108980 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

JURISDICTION

PROJECT

Briarfield Sidewalk

DESCRIPTION

FROM: Marshall Avenue TO: Chestnut Avenue (0.5100 MI)

ROUTE/STREET

BRIARFIELD ROAD (0000)

FUND SOURCE

Newport News

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$1,493,131

FY26

FY27

RW

Federal - CMAQ

$91,049

$0

$364,194

$0

$0

CN

Federal - CMAQ

$80,559

$0

$322,234

$0

$0

CN
AC

Federal - AC OTHER

$0

$413,096

$0

$0

$0

MPO

Hampton Roads

UPC NO

103059 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

Newport News Pedestrian Improvements

DESCRIPTION

FROM: Various locations TO: Various locations

ROUTE/STREET

CITYWIDE (0000)

FUND SOURCE
CN

Federal - CMAQ

CN
AC

Federal - AC OTHER

JURISDICTION

Newport News

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$1,390,600

FY26

FY27

$233,603

$934,412

$0

$0

$0

$0

$8,585

$0

$0

$0

183

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

107058 SCOPE

Safety

SYSTEM

Urban

PROJECT

NEWPORT NEWS CITYWIDE SIGNAL RETIMING AND UPGRADES

JURISDICTION

DESCRIPTION

FROM: Citywide TO: Citywide

ROUTE/STREET

CITYWIDE (0000)

FUND SOURCE
CN

FY24

FY25

$208,502

NFO

ADMIN BY

Locally
$1,676,585

FY26

FY27

$834,008

$0

$0

$0

$0

$354,075

$0

$0

$0

$208,502

$1,188,083

$0

$0

$0

Other
CN TOTAL

Hampton Roads

UPC NO

113820 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

Harpersville Road Sidewalk

DESCRIPTION

FROM: Bayberry Drive TO: Daphia Circle

ROUTE/STREET

JURISDICTION

HARPERSVILLE ROAD (0965)

FUND SOURCE
CN

OVERSIGHT

TOTAL COST
MATCH

Federal - CMAQ

MPO

Newport News

Newport News

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

Federal - HSIP

MPO

OVERSIGHT

FY25
$1,097,600

$1,272,600

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

100856 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

JURISDICTION

Newport News

OVERSIGHT

NFO

PROJECT

OAKLAND INDUSTRIAL PARK SIDEWALK, PHASE 2

DESCRIPTION

FROM: ON: Harwood Dr FRM Enterprise Dr to Enterprise Dr TO: ON: Pickett's Line FRM: Enterprise Dr to
Warwick Blvd (1.5500 MI)

ADMIN BY

Locally

PROGRAM NOTE Waiting Financial Closure
ROUTE/STREET

HARWOOD DRIVE & PICKETT'S LINE (U000)

FUND SOURCE
CN

MATCH

Federal - CMAQ

MPO

TOTAL COST

FY24
$43,380

FY25
$173,518

$597,295

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

114388 SCOPE

Safety

SYSTEM

Urban

JURISDICTION

Newport News

OVERSIGHT

NFO

PROJECT

Citywide ITS Upgrades- Multi Locations- CN Phase

DESCRIPTION

FROM: Warwick, Jefferson, Denbigh, Huntington, 25th St. TO: various intersecting streets

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

INTERSECTION ON VARIOUS ROUTES (SEE PROJ PURPOSE) (0060)

FUND SOURCE

MATCH

FY24
$0

$0

184

TOTAL COST

FY25

$1,119,497

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

102969 SCOPE

New Construction Roadway

SYSTEM

Urban

JURISDICTION

PROJECT

Streetscaping, storm, sanitary, underground utilities

DESCRIPTION

FROM: 24th Street TO: 12th Street (0.7000 MI)

ROUTE/STREET

JEFFERSON AVENUE (0000)

FUND SOURCE

Newport News

FY24

FY25

Locally
$11,959,036

FY26

$0

113849 SCOPE

FY27

$0

$0

$0

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

Jefferson Avenue Sidewalk

DESCRIPTION

FROM: Shields Road TO: Sea Pine Lane

ROUTE/STREET

JURISDICTION

JEFFERSON AVENUE (0143)

FUND SOURCE

Newport News

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

Federal - HSIP

MPO

$0

FY25

$1,010,000

FY26

$835,000

FY27

$0

$0

$0

Hampton Roads

UPC NO

119360 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

#SMART22 OYSTER POINT RD IMPRV JEFFERSON AVE TO OPERATION DR

DESCRIPTION

FROM: Operation Dr TO: Criston Dr (0.1500 MI)

ROUTE/STREET

JURISDICTION

OYSTER POINT RD (0171)

FUND SOURCE
PE

ADMIN BY

Hampton Roads

UPC NO

CN

NFO

TOTAL COST

MATCH
$0

MPO

OVERSIGHT

MPO

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - NHS/NHPP

Newport News

FY24
$252,719

FY25

$15,985,681

FY26

$0

$0

FY27
$1,010,877

$0

Hampton Roads

UPC NO

115373 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Opticom Emergency Vehicle Preemption (EVP)

DESCRIPTION

FROM: Various - Newport news wide TO: Various - Newport News wide

ROUTE/STREET

U000

FUND SOURCE

JURISDICTION

Newport News

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$775,000

FY26

FY27

PE

Federal - CMAQ

$10,000

$0

$40,000

$0

$0

CN

Federal - CMAQ

$145,000

$0

$0

$580,000

$0

185

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

115376 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Permanent Message Boards

JURISDICTION

Newport News

DESCRIPTION

FROM: Various - Newport News Wide TO: Various - Newport News Wide

ROUTE/STREET

U000

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$500,000

FY26

FY27

PE

Federal - CMAQ

$20,000

$0

$80,000

$0

$0

CN

Federal - CMAQ

$80,000

$0

$0

$0

$320,000

MPO

Hampton Roads

UPC NO

115519 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

JURISDICTION

PROJECT

Signal Retiming Improvements

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

U000
MATCH

Federal - CMAQ

MPO

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

FUND SOURCE
PE

Newport News

FY24

FY25

$270,000

$0

$1,350,000

FY26
$0

FY27
$1,080,000

$0

Hampton Roads

UPC NO

103016 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

JURISDICTION

PROJECT

Newport News Signal Timing Improvements

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (0000)

FUND SOURCE

Newport News

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$0

$1,000,000

FY26

FY25

$0
MPO

OVERSIGHT

$0

FY27
$0

$0

Hampton Roads

UPC NO

108981 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

Warwick Boulevard Sidewalk Widening

DESCRIPTION

FROM: Lucas Creek Road TO: Atkinson Way (1.5000 MI)

ROUTE/STREET

WARWICK BOULEVARD (0000)

FUND SOURCE

JURISDICTION

Newport News

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$1,239,671

FY26

FY27

PE

Federal - CMAQ

($6,916)

($27,663)

$0

$0

$0

RW

Federal - CMAQ

$41,728

$166,913

$0

$0

$0

CN

Federal - CMAQ

$150,959

$603,835

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$122,850

$0

$0

$0

186

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

111091 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#SMART18 - Jefferson Ave/Yorktown Rd Intersection Improvement

JURISDICTION

DESCRIPTION

FROM: 0.25 mil south of Jefferson Avenue TO: 0.25mi north of Jefferson Avenue (0.5000 MI)

ROUTE/STREET

YORKTOWN ROAD (0000)

FUND SOURCE

Newport News

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$2,460,000

FY26

FY27

RW

Federal - STP/STBG

$0

$508,000

$0

$0

$0

CN

Federal - STP/STBG

$0

$1,051,390

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$505,610

$0

$0

$0

MPO

Hampton Roads

UPC NO

110385 SCOPE

SYSTEM

Urban

PROJECT

RTE 165 - 6 & 8 LANES DEBT SERVICE GARVEE DEBT SERVICE

JURISDICTION

Norfolk

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $11,159,097 GARVEE Debt Service Interest Prev, $1,365,913 FFY24 GARVEE Debt Service Interest,
$1,229,161 GARVEE Debt Service Interest FFY25, $1,085,462 GARVEE Debt Service Interest FFY26, $934,492
GARVEE Debt Service Interest FFY27, $2,173,187 GARVEE Debt Service Interest FFY28-33. Total GARVEE Debt
Service Interest $17,947,313. Corresponding CN UPC 1765. Linked with CN UPC 9783 & CN UPC 84243
0165
TOTAL COST
$43,615,714

FUND SOURCE
PE

MATCH

Federal - NHS/NHPP

PE AC Federal - AC

MPO

FY24

FY25

FY26

FY27

$0

$1,365,913

$1,229,161

$1,085,462

$934,493

$0

$6,788,216

$0

$0

$0

Hampton Roads

UPC NO

110387 SCOPE

SYSTEM

Urban

PROJECT

ROBIN HOOD RD & MILITARY HWY PHASE 1 GARVEE DEBT SERVICE

JURISDICTION

Norfolk

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $1,016,076 GARVEE DS Int Prev, $108,498 FFY24, $96,716 GARVEE DS Int FFY25, $84,336 GARVEE DS
Int FFY26, $71,328 GARVEE DS Int FFY27, $141,582 GARVEE DS Int FFY28-31. Total GARVEE DS Int $1,518,536.
Corresponding CN UPC 84243. Linked with CN UPC's 1765 & 9783
ROUTE/STREET

0165

FUND SOURCE
PE

TOTAL COST
MATCH

FY24

FY25

Federal - AC CONVERSION

$0

$0

Federal - NHS/NHPP

$3,873,025

FY26
$96,716

FY27
$84,336

$71,328

$0

$108,498

$0

$0

$0

PE TOTAL

$0

$108,498

$96,716

$84,336

$71,328

PE AC Federal - AC

$0

$393,962

$0

$0

$0

187

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

59175 SCOPE

New Construction Roadway

SYSTEM

Urban

PROJECT

AIR TERMINAL INTERCHANGE - INTERMODAL CONNECTOR

JURISDICTION

DESCRIPTION

FROM: I-564 TO: Hampton Blvd (1.5000 MI)

ROUTE/STREET

0564
MATCH

FY24

Federal - AC OTHER

MPO

$0

FY25
$4,000,000

119276 SCOPE

VDOT
$67,616,743

FY26
$0

FY27
$0

$0

Bridge Rehab w/o Added Capacity

SYSTEM

Urban

PROJECT

BRAMBLETON AVENUE BRIDGE REHABILITATION

DESCRIPTION

FROM: 2nd Street TO: Botetourt Street (0.1230 MI)

ROUTE/STREET

JURISDICTION

BRAMBLETON (0337)

FUND SOURCE

Norfolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - RSTP

MPO

FY24

FY25

$800,000

$0

$4,000,000

FY26
$0

FY27
$0

$3,200,000

Hampton Roads

UPC NO

107039 SCOPE

Bridge Rehab w/o Added Capacity

SYSTEM

Urban

PROJECT

Campostella Bridge Rehabilitation

DESCRIPTION

FROM: Kimball Terrance TO: Fillmore Street (0.6000 MI)

ROUTE/STREET

JURISDICTION

CAMPOSTELLA BRIDGE (0168)

FUND SOURCE
CN

FO

ADMIN BY

Hampton Roads

UPC NO

CN

OVERSIGHT

TOTAL COST

FUND SOURCE
RW
AC

Norfolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - RSTP

MPO

Norfolk

FY24
$1,189,848

FY25
$4,759,392

$6,000,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

118642 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

JURISDICTION

Norfolk

PROJECT

St. Paul's Roadway Improvements - Phase 2

DESCRIPTION

FROM: Freemason Street (Tidewater Garden area) TO: Virgin Street

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

CHURCH STREET (0460)

FUND SOURCE

TOTAL COST

MATCH

FY24
$0

FY25
$0

188

$27,958,265

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

105592 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Norfolk ATMS Phase 4C

JURISDICTION

DESCRIPTION

FROM: Citywide TO: Citywide

ROUTE/STREET

CITYWIDE (0000)

FUND SOURCE

Norfolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$2,106,646

FY26

FY27

PE

Federal - CMAQ

$1,152

$4,609

$0

$0

$0

CN

Federal - CMAQ

$41,035

$164,140

$0

$0

$0

MPO

Hampton Roads

UPC NO

109572 SCOPE

Transit

SYSTEM

Urban

JURISDICTION

PROJECT

Norfolk BusShelters and Pedestrian Improvements

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

CITYWIDE (0000)

FUND SOURCE

Norfolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$1,291,509

FY26

FY27

PE

Federal - CMAQ

$15,000

$60,000

$0

$0

$0

CN

Federal - CMAQ

$136,302

$545,207

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$535,000

$0

$0

$0

MPO

Hampton Roads

UPC NO

112759 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

JURISDICTION

Norfolk

PROJECT

Citywide Pedestrian Safety Improvements – Corridors

DESCRIPTION

FROM: Various TO: Various

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

CITYWIDE (0000)

FUND SOURCE

TOTAL COST
MATCH

FY24
$0

MPO

FY25
$0

$3,000,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

111021 SCOPE

Other

SYSTEM

Urban

PROJECT

#SMART18 - Granby Street Bike Lanes

DESCRIPTION

FROM: Willow Wood Drive TO: Admiral Taussig Boulevard (2.0000 MI)

ROUTE/STREET

GRANBY STREET (0460)

FUND SOURCE

JURISDICTION

Norfolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$822,000

FY26

FY27

CN

Federal - NHS/NHPP

$0

$84,000

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$630,000

$0

$0

$0

189

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

1765 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

RTE 165 - 6 & 8 LANES

JURISDICTION

Norfolk

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION

FROM: 0.307 MILES SOUTH OF NORTHAMPTON BOULEVARD TO: 0.454 MILES NORTH OF NORTHAMPTON
(0.7600 MI)

PROGRAM NOTE Includes $14,153,319 GARVEE Debt Service Principal Prev, $2,701,248 GARVEE Debt Service Principal FFY24,
$2,838,328 GARVEE Debt Service Principal FFY25, $2,982,177 GARVEE Debt Service Principal FFY26,
$3,132,177 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $42,317,149.
Corresponding GARVEE Debt Service UPC 110385. Linked with CN UPC 9783 & CN UPC 84243.
ROUTE/STREET

MILITARY HIGHWAY (0165)

FUND SOURCE
RW

TOTAL COST

MATCH

FY24

Federal - AC CONVERSION

MPO

$0

FY25
$2,701,248

$57,098,769

FY26
$2,838,328

FY27
$2,982,177

$3,132,973

Hampton Roads

UPC NO

9783 SCOPE

SYSTEM

Urban

PROJECT

RTE 13 - 8 LANES

New Construction Roadway

JURISDICTION

Norfolk

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION

FROM: 0.023 MILE SOUTH OF LOWERY ROAD TO: 0.012 MILE SOUTH OF NORTHAMPTON BOULEVARD (0.8190
MI)
ROUTE/STREET
MILITARY HIGHWAY (0013)
TOTAL COST
$21,456,890
FUND SOURCE
MATCH
FY24
FY25
FY26
FY27
CN
AC

Federal - AC

MPO

$278,527

$1,114,109

$0

$0

$0

Hampton Roads

UPC NO

84243 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

JURISDICTION

PROJECT

Robin Hood Rd & Military Hwy Phase 1, link w/ UPC 1765 &9783

Norfolk

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $1,321,344 GARVEE DS Prin Prev, $232,737 FFY24, $244,550 FFY25, $256,924 FFY26, $269,912 FFY27.
Total GARVEE DS Prin $3,548,777. Corresponding DS UPC 110387. Linked with CN UPC's 1765 & 9783
ROUTE/STREET
MILITARY HIGHWAY (0165)
TOTAL COST
$19,079,287
FUND SOURCE
CN

MATCH

FY24

Federal - AC CONVERSION
Federal - NHS/NHPP

$0
$0

FY25

FY26

FY27

$0
$232,737

$244,550
$0

$256,924
$0

$269,912
$0

CN TOTAL

$0

$232,737

$244,550

$256,924

$269,912

CN
AC

$0

$1,888,514

$0

$0

$0

Federal - AC

MPO

Hampton Roads

UPC NO

115379 SCOPE

Preliminary Engineering

SYSTEM

Urban

PROJECT

Newtown Road Corridor Study

DESCRIPTION

FROM: Arrowhead Drive TO: Paca Lane (1.6900 MI)

ROUTE/STREET

NEWTOWN ROAD (0403)

FUND SOURCE
PE

Federal - CMAQ

JURISDICTION

Norfolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$50,000

FY25
$0

190

$250,000

FY26
$200,000

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

111019 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#SMART18 - Brambleton Ave/Park Ave Intersection Improvements

JURISDICTION

DESCRIPTION

FROM: Park Avenue TO: Brambleton Avenue (0.0500 MI)

ROUTE/STREET

PARK AVENUE (0166)

FUND SOURCE
PE

Norfolk

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - STP/STBG

OVERSIGHT

FY24

FY25

$1,339,077

FY26

FY27

$0

$157,510

$0

$0

$0

PE AC Federal - AC OTHER

$0

$167,737

$0

$0

$0

RW
AC

Federal - AC OTHER

$0

$187,504

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$826,326

$0

$0

$0

MPO

Hampton Roads

UPC NO

112758 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

JURISDICTION

PROJECT

Citywide Pedestrian Safety Improvements – Intersections

DESCRIPTION

FROM: Church Street TO: Ballentine Road

ROUTE/STREET

PRINCESS ANNE ROAD (0000)

FUND SOURCE

Norfolk

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$0

MPO

OVERSIGHT

FY25
$0

$3,219,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

102950 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Norfolk Signal Timing Improvements - Phase III

DESCRIPTION

FROM: Various TO: Various

JURISDICTION

Norfolk

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

TIDEWATER/ LITTLE CREEK/ CHESAPEAKE/ MILITARY (0000)

FUND SOURCE

MATCH

FY24
$0

TOTAL COST
FY25

$0

$600,000

FY26
$0

FY27
$0

$0

Hampton Roads

MPO
UPC NO
SYSTEM

111023 SCOPE
Urban

Facilities for Pedestrians and Bicycles

JURISDICTION

Norfolk

PROJECT

Install and upgrade Countdown Pedestrian Signals

DESCRIPTION

FROM: Various TO: Various

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

VARIOUS (0460)

FUND SOURCE

TOTAL COST
MATCH

FY24
$0

FY25
$0

191

$2,123,933

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

113866 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Emergency Vehicle Preemption - Norfolk

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (0337)

FUND SOURCE

Norfolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$237,313

FY26

FY27

PE

Federal - CMAQ

($5,566)

($22,262)

$0

$0

$0

CN

Federal - CMAQ

$5,566

$22,262

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$33,312

$0

$0

$0

MPO

Hampton Roads

UPC NO

115370 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Traffic Signal Detection Upgrades

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE

Norfolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$1,000,000

FY26

FY27

PE

Federal - CMAQ

$20,000

$0

$80,000

$0

$0

CN

Federal - CMAQ

$180,000

$0

$0

$720,000

$0

MPO

Hampton Roads

UPC NO

115372 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

JURISDICTION

PROJECT

Transportation Information and Decision Support System

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE

Norfolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$800,000

FY26

FY27

PE

Federal - CMAQ

$20,000

$0

$80,000

$0

$0

CN

Federal - CMAQ

$140,000

$0

$0

$560,000

$0

MPO

Hampton Roads

UPC NO

115377 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Traffic Signal System Communications Network Upgrades

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE

JURISDICTION

Norfolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$1,000,000

FY26

FY27

PE

Federal - CMAQ

$50,000

$0

$200,000

$0

$0

CN

Federal - CMAQ

$150,000

$0

$0

$600,000

$0

192

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

115424 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

Southside Bike Lane Network

JURISDICTION

DESCRIPTION

FROM: Various TO: Various (3.4000 MI)

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE

Norfolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$1,015,900

FY26

FY27

PE

Federal - RSTP

$20,800

$83,200

$0

$0

$0

CN

Federal - RSTP

$182,380

$0

$0

$729,520

$0

MPO

Hampton Roads

UPC NO

115518 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

JURISDICTION

PROJECT

Citywide Signal Retiming Phase 4

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE
PE

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

Federal - CMAQ

MPO

Norfolk

FY24

FY25

$68,000

$0

$340,000

FY26

FY27

$272,000

$0

$0

Hampton Roads

UPC NO

102982 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

JURISDICTION

Poquoson

PROJECT

South Lawson Park Multi-Use Path

DESCRIPTION

FROM: 1000ft south of Poquoson Avenue TO: South Lawson Park (0.0100 MI)

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

SOUTH LAWSON ROAD (0000)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$0
MPO

$0

$179,273

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO

115524 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#SMART20 Victory Blvd Enhancement App 2: Poquoson Segment

DESCRIPTION

FROM: Wythe Creek Road TO: East Yorktown Road

ROUTE/STREET

VICTORY BLVD (RTE. 171) (0171)

FUND SOURCE

JURISDICTION

Poquoson

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$3,729,000

FY26

FY27

PE

Federal - STP/STBG

$0

$680,000

$0

$0

$0

RW

Federal - STP/STBG

$0

$0

$185,000

$0

$0

CN

Federal - STP/STBG

$0

$0

$0

$1,694,814

$0

CN
AC

Federal - AC OTHER

$0

$0

$0

$1,169,186

$0

193

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

102999 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

JURISDICTION

Poquoson

PROJECT

Wythe Creek Road Traffic Signal Upgrade

DESCRIPTION

FROM: Hampton City Line TO: Yorktown Road

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

TOTAL COST

WYTHE CREEK (0000)

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

$0

$218,530

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

13427 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

JURISDICTION

PROJECT

RTE 172 - CITY OF POQUOSON - PHASE I

DESCRIPTION

FROM: Poquoson City Limits TO: 0.927 Mi. North of Poquoson City Limits (0.9270 MI)

ROUTE/STREET

WYTHE CREEK RD. (0172)

FUND SOURCE

Poquoson

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$17,114,385

FY26

FY27

PE

Federal - RSTP

$16,000

$64,000

$0

$0

$0

RW

Federal - RSTP

$108,070

$432,281

$0

$0

$0

MPO

Hampton Roads

UPC NO

98824 SCOPE

Safety

SYSTEM

Urban

JURISDICTION

PROJECT

Citywide Signal Timing - Phase 4

DESCRIPTION

FROM: Citywide TO: Citywide

ROUTE/STREET

CITYWIDE (0000)

FUND SOURCE

NFO

ADMIN BY

Locally

FY24

FY25

$0

$3,000

$135,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

110757 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Portsmouth Citywide Signal Timing - Phase 1

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

CITYWIDE (0000)

FUND SOURCE
PE

OVERSIGHT

TOTAL COST
MATCH

PE AC Federal - AC OTHER

MPO

Portsmouth

Federal - CMAQ

JURISDICTION

Portsmouth

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$24,000

FY25
$96,000

194

$120,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

113830 SCOPE

Safety

SYSTEM

Urban

PROJECT

Install Emergency Vehicle Preemption Software & Hardware

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

CITYWIDE (9999)

FUND SOURCE
CN

FY24
$64,777

FY25
$259,107

107035 SCOPE

Locally
$347,933

FY26
$0

FY27
$0

$0

Safety

SYSTEM

Urban

PROJECT

George Washington Highway Corridor Improvements

DESCRIPTION

FROM: Andrews Street TO: Mulberry Street (0.4000 MI)

ROUTE/STREET

JURISDICTION

GEORGE WASHINGTON HIGHWAY (0017)

FUND SOURCE

RW TOTAL
Federal - RSTP

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

FY24

Federal - HIP/F

MPO

Portsmouth

MATCH

Federal - RSTP
CN

NFO

ADMIN BY

Hampton Roads

UPC NO

RW

OVERSIGHT

TOTAL COST
MATCH

Federal - CMAQ

MPO

Portsmouth

FY25

$5,950,000

FY26

FY27

$0

$1,034,234

$0

$0

$0

$93,153

$372,613

$0

$0

$0

$93,153

$1,406,847

$0

$0

$0

$780,000

$0

$3,120,000

$0

$0

Hampton Roads

UPC NO

102985 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

Westhaven Bicycle Improvements

JURISDICTION

Portsmouth

OVERSIGHT

NFO

ADMIN BY

Locally

DESCRIPTION

FROM: Intersection of Clifford St and Powhatan Avenue TO: Intersection of Bart Street and Airline Blvd
(1.1500 MI)
PROGRAM NOTE All funding obligated based on current allocations/estimate.
ROUTE/STREET

SOUTH STREET (0000)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$0

MPO

$0

FY27
$0

$0

Hampton Roads

UPC NO

103025 SCOPE

Safety

SYSTEM

Urban

PROJECT

Portsmouth Traffic Signal Upgrades

DESCRIPTION

FROM: Various TO: Various (6.4000 MI)

ROUTE/STREET

VARIOUS (0000)

FUND SOURCE
CN

$0

$437,456

FY26

Federal - CMAQ

JURISDICTION

Portsmouth

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$774,953

FY25
$3,099,812

195

$4,936,344

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

115863 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Portsmouth Signal Timing - Phases 1-4

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE
PE

Portsmouth

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$480,000

FY26

Federal - AC CONVERSION

$48,000

$0

$0

Federal - CMAQ

FY27
$96,000

$96,000

$48,000

$0

$192,000

$0

$0

PE TOTAL

$96,000

$0

$192,000

$96,000

$96,000

PE AC Federal - AC

$48,000

$0

$192,000

$0

$0

MPO

Hampton Roads

UPC NO

110508 SCOPE

Other

SYSTEM

Urban

JURISDICTION

Smithfield

PROJECT

Alternative Analysis-Benns Ch Blvd/ US 258/ Rt.10 Bypass

DESCRIPTION

FROM: Benns Church Blvd TO: Rt. 10 Bypass

ROUTE/STREET

0000
MATCH

FY24
$0

ADMIN BY

Locally

$0

$180,470

FY26

FY25
$0

FY27
$0

$0

Hampton Roads

UPC NO

108982 SCOPE

Other

SYSTEM

Urban

PROJECT

Suffolk Transportation Operation Center

DESCRIPTION

FROM: Carolina Road TO: Carolina Rd

ROUTE/STREET

JURISDICTION

0000

CN

Federal - CMAQ

CN
AC

Federal - AC OTHER

MPO

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$2,096,839

FY26

FY27

$387,506

$1,550,024

$0

$0

$0

$0

$89,309

$0

$0

$0

Hampton Roads

UPC NO

108983 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

SUFFOLK CITYWIDE SIGNAL TIMINGS AND EQUIPMENT INSTALLATION

DESCRIPTION

FROM: Citywide TO: Various Locations

ROUTE/STREET

0000

FUND SOURCE
CN

NFO

TOTAL COST

FUND SOURCE

MPO

OVERSIGHT

Federal - CMAQ

JURISDICTION

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$85,336

FY25
$341,345

196

$726,681

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

110634 SCOPE

New Construction Roadway

SYSTEM

Urban

PROJECT

Nansemond Pkwy/Wilroy Rd Overpass over Commonwealth Railway

DESCRIPTION

FROM: South of Nansemond Pkwy/Wilroy Intersection TO: North of Bridlewood Lane/Nansemond Parkway
(0.7200 MI)
0000
TOTAL COST
$27,478,741

ROUTE/STREET

JURISDICTION

FUND SOURCE
CN

MATCH

FY24

Federal - AC CONVERSION
Federal - STP/STBG
Other

CN TOTAL
CN
AC

Suffolk

FY25

OVERSIGHT

NFO

ADMIN BY

Locally

FY26

FY27

$0
$0

$0
$4,859,878

$2,079,021
$0

$0
$0

$0
$0

$3,826,260

$3,826,260

$0

$0

$0

$3,826,260

$8,686,138

$2,079,021

$0

$0

Federal - AC

$0

$2,079,021

$0

$0

$0

Federal - AC OTHER

$0

$7,684,872

$0

$0

$0

$0

$9,763,893

$0

$0

$0

CN AC

MPO

Hampton Roads

UPC NO

110389 SCOPE

SYSTEM

Urban

PROJECT

#HB2.FY17 RTE 58/ HOLLAND RD. Corridor GARVEE DEBT SERVICE

JURISDICTION

Suffolk

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $611918 GARVEE Debt Service Int Prev, $742994 GARVEE Debt Service Int FFY24, $1m478,541
GARVEE Debt Service Int FFY25, $1,495,355 GARVEE Debt Service Int FFY26, $1,404,239 GARVEE Debt
Service Int FFY27,
$8,474,377 GARVEE Debt Service Int FFY28-39. Total GARVEE Debt Service Int $14,207,424. Corresponding
CN UPC 100937
ROUTE/STREET
0058
TOTAL COST
$19,159,590
FUND SOURCE
PE

Federal - AC CONVERSION
Federal - NHS/NHPP

MATCH

FY24
$0
$0

FY25

FY26

FY27

$0
$742,994

$1,478,541
$0

$1,495,355
$0

$1,404,239
$0

PE TOTAL

$0

$742,994

$1,478,541

$1,495,355

$1,404,239

PE AC Federal - AC

$0

$12,852,512

$0

$0

$0

197

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

69050 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

PROJECT

#HB2.FY17 Bridge Rd & Shoulders Hill Rd Intersection Imps

DESCRIPTION

FROM: .4 Miles W. of Rte 626 & .35 Miles S. of Rte 17 TO: .4 Miles E. of Rte 626 & .035 Miles N. of Rte 17 (0.2000
MI)
BRIDGE RD (RTE 17) AT SHOULDERS HILL RD (RTE 626) (0626)
TOTAL COST
$29,141,569

ROUTE/STREET

JURISDICTION

FUND SOURCE
PE
RW

MATCH

FY24

FY25

NFO

ADMIN BY

Locally

FY26

($684,850)
$1,688,620

$0
$0

$0
$0

$0
$0

Federal - STP/STBG

$0

$1,361,359

$0

$0

$0

$0

$3,049,979

$0

$0

$0

$815,000

$0

$3,260,000

$0

$0

$0

$1,688,620

$0

$0

$0

$900,000

$3,600,000

$0

$0

$0

$0

$1,361,359

$0

$0

$0

$2,543,064

$2,543,064

$0

$0

$0

$4,258,064

$9,193,043

$3,260,000

$0

$0

Federal - AC CONVERSION
Federal - RSTP
Federal - STP/STBG
Other

CN TOTAL
MPO

Hampton Roads

UPC NO

102991 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Bridge Road Traffic Signal Upgrades

DESCRIPTION

FROM: College Drive TO: Eclipse Drive (6.8000 MI)

ROUTE/STREET

JURISDICTION

BRIDGE ROAD (0017)

FUND SOURCE

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - CMAQ

MPO

FY24
$4,658

FY25
$18,632

$2,332,158

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO

119266 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

CONSTANCE ROAD AT WILROY ROAD INTERSECTION

DESCRIPTION

FROM: Constance Road/ Wilroy Road TO: Constance Road/Wilroy Road (0.0100 MI)

ROUTE/STREET

CONSTANCE ROAD (U000)

JURISDICTION

FUND SOURCE
PE

FY27

$0
$0

Federal - NHS/NHPP

CN

OVERSIGHT

Federal - HIP/U
Federal - NHS/NHPP

RW TOTAL
CN

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - CMAQ

MPO

Suffolk

FY24
$60,000

FY25
$0

$2,900,000

FY26
$0

FY27
$240,000

$0

Hampton Roads

UPC NO

119230 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

#SMART22 SUFFOLK SEABOARD COASTLINE TRAIL - PHASE IIIA

DESCRIPTION

FROM: Driver Lane TO: Nansemond River High School (1.7500 MI)

ROUTE/STREET

DRIVER TRAILHEAD TO NANSEMOND RIVER HIGH SCHOOL (0337)

FUND SOURCE
PE AC Federal - AC OTHER

JURISDICTION

Suffolk

MATCH

FY24
$0

198

NFO

ADMIN BY

Locally

TOTAL COST

FY25
$0

OVERSIGHT

$3,452,238

FY26
$405,501

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

119334 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#SMART22 GODWIN BOULEVARD IMPROVEMENTS

JURISDICTION

DESCRIPTION

FROM: Suffolk Bypass (US 460/58/13) TO: Kings Fork Road (1.5000 MI)

ROUTE/STREET

GODWIN BLVD. (0010)

FUND SOURCE

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$11,060,753

FY26

FY27

PE

Federal - NHS/NHPP

$0

$1,013,001

$0

$0

$0

RW

Federal - NHS/NHPP

$0

$798,084

$0

$0

$0

CN

Federal - NHPP/E

$0

$0

$1,004,329

$0

$0

Federal - NHS/NHPP

$0

$0

$5,638,915

$0

$0

Other

$0

$0

$2,499,999

$0

$0

CN TOTAL

$0

$0

$9,143,243

$0

$0

CN
AC

$0

$0

$106,425

$0

$0

Federal - AC OTHER

MPO

Hampton Roads

UPC NO

100937 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

JURISDICTION

Suffolk

OVERSIGHT

FO

PROJECT

#HB2.FY17 Route 58/ Holland Road Corridor Improvements

DESCRIPTION

FROM: Rte 58/13/32 bypass TO: .7 miles west of Manning Bridge Road (3.1000 MI)

ADMIN BY

Locally

PROGRAM NOTE Includes $795,762 GARVEE Debt Service Principal Prev, $937,765 GARVEE Debt Service Principal FFY24,
$1,894,342 GARVEE Debt Service Principal FFY25, $2,093,225 GARVEE Debt Service Principal FFY26,
$2,183,602 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $39,155,340.
Corresponding GARVEE Debt Service UPC 110389.
ROUTE/STREET
HOLLAND ROAD (0058)
TOTAL COST
$83,781,184
FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$1,894,342

$32,557

$0

Federal - NHS/NHPP

$0

$937,764

$0

$0

$0

PE TOTAL

$0

$937,764

$1,894,342

$32,557

$0

PE AC Federal - AC

$0

$1,926,899

$0

$0

$0

RW

Federal - AC CONVERSION

$0

$0

$0

$2,060,668

$2,183,602

RW
AC

Federal - AC

$0

$29,890,274

$0

$0

$0

CN

Federal - STP/STBG

$0

$140,544

$0

$0

$0

$17,000,000

$17,000,000

$0

$0

$0

$17,000,000

$17,140,544

$0

$0

$0

Federal - AC

$0

$1,360,372

$0

$0

$0

Federal - AC OTHER

$0

$10,450,300

$0

$0

$0

$0

$11,810,672

$0

$0

$0

Other
CN TOTAL
CN
AC
CN AC

199

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

102990 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

JURISDICTION

PROJECT

Nansemond Parkway Traffic Signal Upgrades

DESCRIPTION

FROM: Intersection of Bridge Road and Shoulders Hill Road TO: Intersection of Wilroy Road and Route 58

ROUTE/STREET

NANSEMOND PARKWAY (0000)

FUND SOURCE
CN

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

Federal - CMAQ

MPO

Suffolk

($38,612)

FY25

FY26

($154,449)

$0

111036 SCOPE

$0

$0

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Suffolk Bypass/Godwin Blvd - Wilroy Road - Pruden Blvd IMR

DESCRIPTION

FROM: Wilroy Road Interchange TO: Pruden Boulevard Interchange (4.8000 MI)

ROUTE/STREET

JURISDICTION

ROUTE 58 (0058)

FUND SOURCE

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

Federal - RSTP

MPO

FY27

Hampton Roads

UPC NO

PE

$1,401,969

FY24
$400,000

FY25
$1,600,000

$2,000,000

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO

121101 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

JURISDICTION

PROJECT

SHOULDER'S HILL ROAD WIDENING, 2-4 LANES PHASE 3

DESCRIPTION

FROM: Bennett's Creek Park Road TO: Pughsville Road (0.7500 MI)

ROUTE/STREET

SHOULDER'S HILL ROAD (0626)

FUND SOURCE

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

PE Federal - AC OTHER
AC

MPO

Suffolk

FY24
$0

FY25
$0

$15,715,793

FY26

FY27

$0

$0

$1,399,639

Hampton Roads

UPC NO

121102 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

SHOULDER'S HILL ROAD WIDENING, 2-4 LANES PHASE 2

DESCRIPTION

FROM: Laycock Lane TO: Bennett's Creek Park Road (0.6500 MI)

ROUTE/STREET

SHOULDER'S HILL ROAD (0626)

FUND SOURCE
PE Federal - AC OTHER
AC

JURISDICTION

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$0

FY25
$0

200

FY26
$0

$9,603,344
FY27

$950,466

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

102992 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

Shoulders Hill Road Multi-Use Path

DESCRIPTION

FROM: Bennett's Creek Park Road TO: Weatherby Way/Belmont Blvd, 1090' South of Start Location (0.2500
MI)
SHOULDERS HILL ROAD (0000)
TOTAL COST
$649,781

ROUTE/STREET

JURISDICTION

FUND SOURCE
CN

MATCH

Federal - CMAQ

MPO

Suffolk

FY24
$100,956

FY25
$403,825

NFO

ADMIN BY

Locally

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

102994 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Suffolk Bypass ITS Improvements

DESCRIPTION

FROM: City of Chesapeake limits TO: Holland Road (11.6000 MI)

ROUTE/STREET

SUFFOLK BYPASS (0058)

JURISDICTION

FUND SOURCE
PE

OVERSIGHT

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$2,403,026

FY26

FY27

Federal - RSTP

$200

$800

$0

$0

$0

CN Federal - RSTP

$104,262

$417,047

$0

$0

$0

$0

$65,717

$0

$0

$0

CN Federal - AC OTHER
AC
MPO

Hampton Roads

UPC NO

107057 SCOPE

Safety

SYSTEM

Urban

PROJECT

West End Suffolk Bypass Interchange IMR Study

JURISDICTION

DESCRIPTION

FROM: West end of Suffolk Bypass TO: Holland Road

ROUTE/STREET

SUFFOLK BYPASS (0000)

FUND SOURCE

Suffolk

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$0

MPO

OVERSIGHT

$0

$43,814

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

108984 SCOPE

Bridge Replacement w/o Added Capacity

SYSTEM

Urban

PROJECT

#SGR18LB - Speights Spillway Bridge Replacement

DESCRIPTION

FROM: Turlington Road TO: Turlington Road (0.1000 MI)

ROUTE/STREET

TURLINGTON ROAD (0000)

FUND SOURCE

JURISDICTION

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$2,128,000

FY26

FY27

RW Federal - RSTP

$1,000

$4,000

$0

$0

$0

CN Federal - RSTP

$214,000

$856,000

$0

$0

$0

$0

$778,000

$0

$0

$0

CN Federal - AC OTHER
AC

201

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

115525 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

JURISDICTION

PROJECT

#SMART20 Seaboard Coastline Trail Segment 1

DESCRIPTION

FROM: Moore Avenue TO: Suburban Drive (1.5000 MI)

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$4,223,089

FY26

FY27

PE

Federal - STP/STBG

$0

$355,949

$0

$0

$0

RW

Federal - STP/STBG

$0

$0

$77,875

$0

$0

CN

Federal - STP/STBG

$0

$0

$0

$1,740,718

$0

CN
AC

Federal - AC OTHER

$0

$0

$0

$2,048,547

$0

MPO

Hampton Roads

UPC NO

119378 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

WILROY ROAD AT PROGRESS ROAD INTERSECTION

DESCRIPTION

FROM: Wilroy Road/ Progress Road Intersection TO: Wilroy Road/Progress Road Intersection (0.0100 MI)

ROUTE/STREET

WILROY ROAD (U000)

FUND SOURCE
PE

Federal - CMAQ

JURISDICTION

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$60,000

FY25
$0

202

$2,500,000

FY26
$240,000

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

103005 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

JURISDICTION

Virginia Beach

PROJECT

Centerville Turnpike Widening Phase 2

DESCRIPTION

FROM: Kempsville Road TO: Indian River Road (1.8300 MI)

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

CENTERVILLE TURNPIKE (0000)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$0

MPO

$0

$42,907,026

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO

109381 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#HB2.FY17 Centerville Turnpike - Phase III

JURISDICTION

DESCRIPTION

FROM: .43 Mile South of Lynnhaven Parkway TO: .75 Mile North of Lynnhaven Parkway (1.1500 MI)

ROUTE/STREET

CENTERVILLE TURNPIKE (U000)

FUND SOURCE

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$44,597,954

FY26

FY27

PE

Federal - DEMO

$0

$731,023

$0

$0

$0

RW

Federal - DEMO

$0

$5,268,977

$0

$0

$0

RW
AC

Federal - AC OTHER

$0

$1,453,121

$0

$0

$0

MPO

Hampton Roads

UPC NO

110803 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#SMART18 - Cleveland Street Phase IV

DESCRIPTION

FROM: Witchduck Road TO: Independence Boulevard (1.2000 MI)

ROUTE/STREET

CLEVELAND STREET (U000)

FUND SOURCE

JURISDICTION

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$24,347,000

FY26

FY27

RW

Federal - STP/STBG

$0

$3,943,900

$0

$0

$0

RW
AC

Federal - AC

$0

$2,109,657

$0

$0

$0

Federal - AC OTHER

$0

$2,679,443

$0

$0

$0

RW AC

$0

$4,789,100

$0

$0

$0

CN
AC

$0

$0

$0

$13,394,000

$0

Federal - AC OTHER

203

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

110802 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

Dam Neck Road/Holland Road Intersection Improvements

JURISDICTION

DESCRIPTION

FROM: Dam Neck TO: Holland Road

ROUTE/STREET

DAM NECK ROAD (U000)

FUND SOURCE
PE

Federal - CMAQ

RW

Federal - CMAQ

CN

Federal - CMAQ

MPO

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$36,000

FY25

FY27

$144,000

$0

$0

$0

$50,000

$200,000

$0

$0

$0

$352,000

$1,408,000

$0

$0

$0

Hampton Roads

UPC NO

15828 SCOPE

New Construction Roadway

SYSTEM

Urban

PROJECT

Elbow Road Phase 2B

DESCRIPTION

FROM: Margaret Drive/Meadow Crest Way TO: Chesapeake City Line (1.2000 MI)

ROUTE/STREET

JURISDICTION

ELBOW ROAD (U000)

FUND SOURCE
PE

Federal - RSTP

RW

Federal - STP/STBG

CN

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$51,283,300

FY26

FY27

$206,800

$827,201

$0

$0

$0

($9,841)

($39,362)

$0

$0

$0

Federal - RSTP

$1,185,986

$4,743,943

$0

$0

$0

Other

$9,000,000

$9,000,000

$0

$0

$0

$10,185,986

$13,743,943

$0

$0

$0

$0

$13,950,371

$0

$0

$0

CN TOTAL
CN
AC

$2,190,000

FY26

Federal - AC OTHER

MPO

Hampton Roads

UPC NO

112317 SCOPE

SYSTEM

Urban

PROJECT

Elbow Road Phase 2C

New Construction Roadway

JURISDICTION

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

DESCRIPTION
ROUTE/STREET

ELBOW ROAD (U000)

FUND SOURCE
CN

Federal - HIP/F
Federal - RSTP

CN TOTAL

TOTAL COST

MATCH

FY24

FY25

$24,834,137

FY26

FY27

$687,418

$2,749,670

$0

$0

$0

$4,179,410

$16,717,640

$0

$0

$0

$4,866,828

$19,467,310

$0

$0

$0

204

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

112318 SCOPE

New Construction Roadway

SYSTEM

Urban

PROJECT

Elbow Road Phase 2D

JURISDICTION

DESCRIPTION

FROM: Salem Road TO: Amphitheater West Parking Area (1.2000 MI)

ROUTE/STREET

ELBOW ROAD/DAM NECK (U000)

FUND SOURCE
PE

Federal - RSTP

RW
CN
CN
AC

Federal - AC OTHER

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$27,273,632

FY26

FY27

$358,800

$1,435,200

$0

$0

$0

Federal - RSTP

$650,000

$0

$0

$2,600,000

$0

Federal - RSTP

$2,507,547

$0

$0

$0 $10,030,186

$0

$0

$0

$0

MPO

$9,691,899

Hampton Roads

UPC NO

15827 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

JURISDICTION

PROJECT

HOLLAND ROAD - UPGRADE TO 4 LANES

DESCRIPTION

FROM: 0.207 MILE NORTH OF DAM NECK ROAD TO: 0.152 MILE SOUTH OF NIMMO PARKWAY (2.7200 MI)

ROUTE/STREET

HOLLAND ROAD (U000)

FUND SOURCE

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$68,272,339

FY26

FY27

PE

Federal - STP/STBG

$59,098

$236,392

$0

$0

$0

RW

Federal - STP/STBG

$0

$5,555,074

$0

$0

$0

RW
AC

Federal - AC OTHER

$0

$1,705,767

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$8,780,497

$0

$0

$0

MPO

Hampton Roads

UPC NO

119222 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#SMART22 HOLLAND ROAD PHASE 1

JURISDICTION

DESCRIPTION

FROM: S Independence Blvd TO: S Plaza Trl (0.5700 MI)

ROUTE/STREET

HOLLAND ROAD (0410)

FUND SOURCE

NFO

ADMIN BY

Locally

FY24
$0

FY25
$0

$24,510,485

FY26

FY27

$3,411,683

$0

$0

Hampton Roads

UPC NO

119265 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

PROJECT

HOLLAND ROAD PHASE II

DESCRIPTION

FROM: S Plaza Trail TO: Rosemont Rd (1.3200 MI)

ROUTE/STREET

HOLLAND ROAD

FUND SOURCE
PE

OVERSIGHT

TOTAL COST

MATCH

PE AC Federal - AC OTHER

MPO

Virginia Beach

Federal - CMAQ

JURISDICTION

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$35,103

FY25
$0

205

FY26
$0

$1,053,746
FY27

$140,413

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

84366 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

PROJECT

Intersection Improvements - Indian River Rd & Kempsville Rd

JURISDICTION

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

DESCRIPTION

FROM: Indian River Rd and Kempsville Rd Intersection Improvements TO: Indian River Rd and Kempsville Rd
Intersection Improvements

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

INDIAN RIVER RD (U000)

FUND SOURCE
RW

MATCH

Federal - CMAQ

MPO

TOTAL COST
FY24
($21,440)

FY25

$23,109,458

FY26

($85,760)

FY27

$0

$0

$0

Hampton Roads

UPC NO

15829 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#HB2.FY17 INDIAN RIVER ROAD Ph 7A

JURISDICTION

Virginia Beach

DESCRIPTION

FROM: LYNNHAVEN PARKWAY TO: ELBOW ROAD (2.2000 KM)

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE Includes $4,644,769 GARVEE Debt Service Principal Prev, $818,114 GARVEE Debt Service Principal FFY24,
$1,075,229 GARVEE Debt Service Principal FFY25, $1,159,453 GARVEE Debt Service Principal FFY26,
$1,215,997 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $17,474,612.
Corresponding GARVEE Debt Service UPC 110386.
ROUTE/STREET
INDIAN RIVER ROAD (U000)
TOTAL COST
$54,465,000
FUND SOURCE

MATCH

FY24

FY25

FY26

FY27

PE AC Federal - AC OTHER

$0

$1,335,097

$0

$0

$0

RW

Federal - AC CONVERSION

$0

$0

$1,075,229

$1,159,453

$1,215,997

Federal - STP/STBG

$0

$818,114

$0

$0

$0

$0

$818,114

$1,075,229

$1,159,453

$1,215,997

$0

$4,587,129

$0

$0

$0

RW TOTAL
RW
AC

Federal - AC

MPO

Hampton Roads

UPC NO

108959 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

Traffic Adaptive Corridor Implementation

DESCRIPTION

FROM: Military Highway TO: Indian Lakes Boulevard (1.0000 MI)

ROUTE/STREET

INDIAN RIVER ROAD (0407)

FUND SOURCE

JURISDICTION

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$390,000

FY26

FY27

PE

Federal - CMAQ

$9,000

$36,000

$0

$0

$0

CN

Federal - CMAQ

$69,000

$276,000

$0

$0

$0

206

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

110804 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#SMART18 - Indian River Road Phase 7B

JURISDICTION

DESCRIPTION

FROM: Lynnhaven Parkway TO: Elbow Road (2.2000 MI)

ROUTE/STREET

INDIAN RIVER ROAD (U000)

FUND SOURCE
RW
AC
CN
AC

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$11,430,000

FY26

FY27

Federal - AC OTHER

$0

$710,000

$0

$0

$0

Federal - AC OTHER

$0

$9,860,000

$0

$0

$0

MPO

Hampton Roads

UPC NO

12546 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

JURISDICTION

PROJECT

#HB2.FY17 RTE 58 - WIDEN TO 6-LANE DIVIDED FACILITY

DESCRIPTION

FROM: 0.28 Miles WEST OF FIRST COLONIAL ROAD TO: 0.32 Miles EAST OF BIRDNECK ROAD (2.1000 MI)

ROUTE/STREET

LASKIN ROAD (0058)

FUND SOURCE

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$88,226,263

FY26

FY27

RW

Federal - NHS/NHPP

$0

($49,477)

$0

$0

$0

CN

Federal - NHS/NHPP

$0

$3,364,109

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$27,284,982

$0

$0

$0

MPO

Hampton Roads

UPC NO

111711 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#SMART18 - Laskin Road Phase 1-A

JURISDICTION

DESCRIPTION

FROM: Republic Road TO: Fremac Drive (1.0000 MI)

ROUTE/STREET

LASKIN ROAD (0058)

FUND SOURCE

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$61,788,325

FY26

FY27

PE AC Federal - AC OTHER

$0

$2,557

$0

$0

$0

Federal - AC OTHER

$0

$4,992,976

$0

$0

$0

CN AC Federal - AC OTHER

$0

$27,938,101

$0

$0

$0

RW
AC

MPO

Hampton Roads

UPC NO

119275 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

LASKIN ROAD PHASE III

DESCRIPTION

FROM: west of Phillips Ave. TO: Republic Rd (0.7000 MI)

ROUTE/STREET

LASKIN ROAD (0058)

FUND SOURCE
PE

Federal - RSTP

JURISDICTION

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$733,800

FY25
$0

207

FY26
$0

$31,503,154
FY27

$2,935,200

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

115371 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

N. Great Neck/London Bridge & Virginia Beach Blvd Int Improv

JURISDICTION

DESCRIPTION

FROM: London Bridge Rd TO: Virginia Beach Blvd

ROUTE/STREET

N. GREAT NECK RD. (0058)

FUND SOURCE
PE
CN

Federal - CMAQ
Federal - AC CONVERSION
Federal - CMAQ
Federal - AC

MPO

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

CN TOTAL
CN
AC

Virginia Beach

FY24

FY25

FY27

$58,579
$80,000

$234,317
$0

$0
$0

$0
$0

$0
$320,000

$292,841

$0

$0

$1,171,363

$0

$372,841

$0

$0

$1,171,363

$320,000

$80,000

$0

$0

$320,000

$0

Hampton Roads

UPC NO

115543 SCOPE

New Construction Roadway

SYSTEM

Urban

PROJECT

Nimmo Parkway Phase VIIB

DESCRIPTION

FROM: Albuquerque Drive TO: Western terminus of Sandbridge Road (1.6000 MI)

ROUTE/STREET

JURISDICTION

NIMMO PARKWAY (0000)

FUND SOURCE
PE

$2,157,100

FY26

Virginia Beach

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - AC CONVERSION
Federal - RSTP

OVERSIGHT

FY24
$546,900
$100,000

FY25

$45,552,800

FY26

FY27

$0
$400,000

$2,187,600
$0

$0
$0

$0
$0

PE TOTAL

$646,900

$400,000

$2,187,600

$0

$0

PE AC Federal - AC

$546,900

$2,187,600

$0

$0

$0

RW

$809,000

$0

$0

$3,236,000

$0

Federal - RSTP

MPO

Hampton Roads

UPC NO

119234 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

JURISDICTION

PROJECT

#SMART22 NORTHAMPTON BLVD/DIAMOND SPRINGS INT. IMPROVEMENTS

DESCRIPTION

FROM: Northampton Blvd TO: Diamond Springs Rd (0.2200 MI)

ROUTE/STREET

NORTHAMPTON BOULEVARD (0013)

FUND SOURCE
PE

MATCH

Federal - NHS/NHPP

MPO

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
FY24

$0

FY25
$0

$13,431,136

FY26
$1,508,853

FY27
$0

$0

Hampton Roads

UPC NO

113468 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

Parliament Drive Sidewalk Phase II

DESCRIPTION

FROM: Green Kemp Road TO: Arrowhead Plaza Shopping Center (0.2000 MI)

JURISDICTION

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

PARLIAMENT DRIVE (0000)

FUND SOURCE

TOTAL COST

MATCH

FY24
$0

FY25
$0

208

$2,484,610

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

105623 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

JURISDICTION

PROJECT

Rosemont Road

DESCRIPTION

FROM: Lynnhaven Parkway TO: Dam Neck Road (1.5000 MI)

ROUTE/STREET

ROSEMONT ROAD (0000)

FUND SOURCE

Virginia Beach

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$0
MPO

OVERSIGHT

$18,541,000

FY26

$0

FY27

$0

$0

$0

Hampton Roads

UPC NO

108966 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

JURISDICTION

PROJECT

Rosemont Rd/South Plaza Trail Intersection Improvements

DESCRIPTION

FROM: Rosemont Road TO: S. Plaza Trail

ROUTE/STREET

ROSEMONT ROAD (0411)

FUND SOURCE

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$1,025,000

FY26

FY27

PE

Federal - CMAQ

$30,000

$120,000

$0

$0

$0

RW

Federal - CMAQ

$12,000

$48,000

$0

$0

$0

CN

Federal - CMAQ

$160,000

$0

$640,000

$0

$0

CN
AC

Federal - AC OTHER

$0

$0

$15,000

$0

$0

MPO

Hampton Roads

UPC NO

119231 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

PROJECT

#SMART22 INDEPENDENCE BLVD/EDWIN DRIVE INTS. IMPROVEMENTS

JURISDICTION

DESCRIPTION

FROM: Independence Blvd TO: Edwin Dr (0.4000 MI)

ROUTE/STREET

S. INDEPENDENCE BLVD (0225)

FUND SOURCE
PE

Virginia Beach

PE AC Federal - AC

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - AC CONVERSION

OVERSIGHT

FY24

FY25

$14,592,026

FY26

FY27

$0

$0

$0

$1,349,780

$0

$0

$0

$1,349,780

$0

$0

Hampton Roads

MPO
UPC NO

110386 SCOPE

SYSTEM

Urban

PROJECT

#HB2.FY17 INDIAN RIVER RD Ph 7A GARVEE DEBT SERVICE

JURISDICTION

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $3,571,696 GARVEE Debt Service Int Prev, $381,391 GARVEE Debt Service Int FFY24, $523,030
GARVEE Debt Service Int FFY25, $497,077 GARVEE Debt Service Int FFY26, $440,342 GARVEE Debt Service
Int FFY27,
$1,719,854 GARVEE Debt Service Int FFY28-39. Total GARVEE Debt Service Int $7,133,390. Corresponding
CN UPC 15829
ROUTE/STREET
U000
TOTAL COST
$15,659,978
FUND SOURCE

MATCH

FY24
$0

FY25
$0

209

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

107064 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

Bus Stop Infrastructure and Accessibility Improvements

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$398,969

FY26

FY27

PE

Federal - RSTP

$16,000

$64,000

$0

$0

$0

CN

Federal - RSTP

$47,394

$189,575

$0

$0

$0

MPO

Hampton Roads

UPC NO

108955 SCOPE

Traffic Management/Engineering

SYSTEM

Urban

JURISDICTION

PROJECT

Corridor Retiming - Kempsville Rd & Newtown Area

DESCRIPTION

FROM: Kempsville Road TO: Newtown Road

ROUTE/STREET

VARIOUS (U000)

FUND SOURCE
PE

MATCH

FY24
$104,236

FY25
$416,944

119280 SCOPE

ADMIN BY

Locally
$521,180

FY26

FY27

$0

$0

$0

Traffic Management/Engineering

SYSTEM

Urban

PROJECT

VIRGINIA BEACH TRAFFIC SIGNAL SYSTEM RETIMING

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (0000)

JURISDICTION

FUND SOURCE

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

Federal - CMAQ

MPO

FY24

FY25

$132,600

$0

$663,000

FY26
$0

FY27
$530,400

$0

Hampton Roads

UPC NO
SYSTEM
PROJECT

113818 SCOPE
Urban

Virginia Beach

Regional EVP (Opticom) Project - Virginia Beach
FROM: Various TO: Various

ROUTE/STREET

VARIOUS INTERSECTIONS (9999)

FUND SOURCE
Other

Traffic Management/Engineering

JURISDICTION

DESCRIPTION

CN

NFO

Hampton Roads

UPC NO

PE

OVERSIGHT

TOTAL COST

Federal - CMAQ

MPO

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$0

FY25
$19,135

210

$223,135

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

113469 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

Violet Bank Trail

JURISDICTION

Virginia Beach

DESCRIPTION

FROM: Kittery Drive TO: Selwood Drive (0.6000 MI)

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

VIOLET BANK DRIVE (0000)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$0

MPO

$0

$2,002,460

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

91334 SCOPE

Environmental Only

SYSTEM

Urban

PROJECT

Design and Build the Nimmo Pkwy Wetland Mitigation Site

DESCRIPTION

FROM: East Bank of West Neck Creek TO: West Neck Road

JURISDICTION

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE All funding obligated based on current allocations/estimate. Waiting Financial Closure
ROUTE/STREET

WEST NECK ROAD (0000)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$0

MPO

$0

$1,337,501

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

55202 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

JURISDICTION

Virginia Beach

PROJECT

WITCH DUCK ROAD - 6 LANES

DESCRIPTION

FROM: I-264 TO: VIRGINIA BEACH BLVD (0.7000 MI)

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

WITCH DUCK ROAD (U000)

FUND SOURCE
PE

Other

MPO

TOTAL COST

MATCH

FY24
$0

FY25
$132,126

$0

FY27
$0

$0

Hampton Roads

UPC NO

111018 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#SMART18 - IRONBOUND ROAD IMPROVEMENTS - PHASE 2

DESCRIPTION

FROM: Treyburn Rd. TO: Richmond Rd. (0.5000 MI)

ROUTE/STREET

IRONBOUND RD (UR-7081) (7081)

FUND SOURCE
RW
AC
CN
AC

$57,694,158

FY26

JURISDICTION

Williamsburg

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$1,922,700

FY26

FY27

Federal - AC OTHER

$0

$469,000

$0

$0

$0

Federal - AC OTHER

$0

$0

$1,143,600

$0

$0

211

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

111020 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#SMART18 - IRONBOUND ROAD IMPROVEMENTS - PHASE 3

JURISDICTION

DESCRIPTION

FROM: Treyburn Drive TO: DePue Drive (1.0000 MI)

ROUTE/STREET

IRONBOUND RD (UR-7081) (7081)

FUND SOURCE
RW
AC
CN
AC

Williamsburg

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$3,312,400

FY26

FY27

Federal - AC OTHER

$0

$1,117,100

$0

$0

$0

Federal - AC OTHER

$0

$1,743,700

$0

$0

$0

MPO

Hampton Roads

UPC NO

119279 SCOPE

Other

SYSTEM

Urban

PROJECT

YORK COUNTY ROADWAY NEEDS ASSESSMENT

DESCRIPTION

FROM: Main Street TO: Alexander Hamilton Blvd

ROUTE/STREET

BALLARD STREET (0000)

FUND SOURCE
PE

OVERSIGHT

Federal - RSTP

JURISDICTION

York County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$120,000

FY25
$0

212

$600,000

FY26
$0

FY27
$0

$480,000

FFY 24-27 Working STIP

6/21/2023 8:52:03

Hampton Roads District
Enhancement
Projects
MPO

Hampton Roads

UPC NO

117102 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

JURISDICTION

PROJECT

Old Buckroe Rd Pedestrian Improvements

DESCRIPTION

FROM: Pembroke Avenue TO: Fox Hill Road/Silver Isles Boulevard (1.3700 MI)

ROUTE/STREET

OLD BUCKROE ROAD

FUND SOURCE
RW

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - TAP/F

MPO

Hampton

FY24
$58,494

FY25
$233,975

$1,570,969

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO

117119 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

Parliament Drive Sidewalk Phase I

DESCRIPTION

FROM: Coventry Road TO: Green Kemp Road (0.2500 MI)

ROUTE/STREET

PARLIAMENT DRIVE

FUND SOURCE

JURISDICTION

Virginia Beach

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$0

$1,083,386

FY26

FY25

$0
MPO

OVERSIGHT

FY27

$0

$0

$0

Hampton Roads

UPC NO

121110 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

BOAT MUP WARWICK, ELMHURST, & YORKTOWN

DESCRIPTION

FROM: Existing Bike Trail in Newport News Park TO: Chelsea Place & Yorktown Road

ROUTE/STREET

0060

FUND SOURCE

JURISDICTION

Newport News

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$2,909,000

FY26

FY27

PE

Federal - TAP/F

$80,600

$322,400

$0

$0

$0

RW

Federal - TAP/F

$114,800

$0

$459,200

$0

$0

CN

Federal - TAP/F

$4,600

$0

$0

$18,400

$0

$0

$0

$0

$1,909,000

$0

$4,600

$0

$0

$1,927,400

$0

Other
CN TOTAL

213

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

121108 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

JURISDICTION

Newport News

OVERSIGHT

NFO

PROJECT

BOAT TRAIL MUP YORKTOWN RD TO NEWPORT NEWS PARK

DESCRIPTION

FROM: Existing Bike Trail in Newport News Park TO: Chelsea Place & Yorktown Rd

ADMIN BY

Locally

ROUTE/STREET

0238

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$4,291,000

FY26

FY27

PE

Federal - TAP/F

$135,600

$542,400

$0

$0

$0

RW

Federal - TAP/F

$49,200

$0

$196,800

$0

$0

CN

Federal - TAP/F

$15,200

$0

$0

$60,800

$0

$0

$0

$0

$3,291,000

$0

$15,200

$0

$0

$3,351,800

$0

Other
CN TOTAL

MPO

Hampton Roads

UPC NO

121109 SCOPE

Preservation of Abandoned Railway Corridors

SYSTEM

Enhancement

PROJECT

SEABOARD COASTLINE TRAIL PHASE 3B

DESCRIPTION

FROM: Nansemond Parkway TO: Pine Tree Way/Cherry Blossom Dr (1.5000 MI)

ROUTE/STREET

SEABOARD COASTLINE TRAIL (0337)

FUND SOURCE

JURISDICTION

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$2,270,200

FY26

FY27

PE

Federal - TAP/F

$92,010

$368,038

$0

$0

$0

RW

Federal - TAP/F

$7,907

$0

$0

$31,626

$0

CN

Federal - TAP/F

$263,316

$0

$0

$1,053,263

$0

CN
AC

Federal - AC OTHER

$0

$0

$0

$454,040

$0

MPO

Hampton Roads

UPC NO

122177 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

COLLEGE WOODS CIRCUIT - PH 2

DESCRIPTION

FROM: Ironbound Road TO: Berkeley Lane

ROUTE/STREET

STRAWBERRY PLAINS RD (0616)

FUND SOURCE

JURISDICTION

Williamsburg

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$2,277,199

FY26

FY27

PE

Federal - TAP/F

$36,141

$144,564

$0

$0

$0

RW

Federal - TAP/F

$27,389

$0

$109,555

$0

$0

214

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

121107 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

CHESAPEAKE TRAIL PH3 - TAYLOR TO SUFFOLK

DESCRIPTION

FROM: Suffolk City Line TO: Taylor Road (1.0000 MI)

ROUTE/STREET

CHESAPEAKE TRAIL (0953)

FUND SOURCE
RW

JURISDICTION

MATCH

FY24

NFO

ADMIN BY

Locally

RW TOTAL

FY25

$2,610,282

FY26

FY27

$37,120

$0

$148,479

$0

$0

$0

$0

$102,414

$0

$0

$37,120

$0

$250,893

$0

$0

$0

$0

$0

$2,101,408

$0

Other
Other

MPO

OVERSIGHT

TOTAL COST

Federal - TAP/F

CN

Chesapeake

Hampton Roads

UPC NO

121105 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

JURISDICTION

Newport News

OVERSIGHT

NFO

PROJECT

WASHINGTON AVE & 25TH PED IMPROVEMENTS

DESCRIPTION

FROM: 28th St at Washington St TO: 25th St from West Ave to Huntington Ave

ADMIN BY

Locally

ROUTE/STREET

1032

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$2,238,000

FY26

FY27

PE

Federal - TAP/F

$23,600

$94,400

$0

$0

$0

RW

Federal - TAP/F

$5,000

$0

$0

$20,000

$0

CN

Federal - TAP/F

$171,400

$0

$0

$0

$685,600

CN
AC

Federal - AC OTHER

$0

$0

$0

$0

$1,238,000

MPO

Hampton Roads

UPC NO

121184 SCOPE

Safety and Education of Pedestrians /Bicyclists

SYSTEM

Enhancement

PROJECT

WILLIAMSBURG JCC SRTS PROGRAM COORDINATOR

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

ROUTE/STREET

9999

FUND SOURCE
PE

Federal - TAP/F

JURISDICTION

James City County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$33,625

FY25
$134,500

215

$168,125

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

101794 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

JURISDICTION

Isle of Wight County

PROJECT

Construction of a pedestrian/bicycle trail

DESCRIPTION

FROM: Battery Park Road TO: Nike District Park (1.8000 MI)

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE Waiting Financial Closure
ROUTE/STREET

NIKE PARK ROAD (EN08)

FUND SOURCE
RW
AC
CN

Federal - AC OTHER

CN
AC

Federal - AC OTHER

Other

MPO

TOTAL COST

MATCH

FY24

FY25

$5,775,843

FY26

FY27

$0

$25,943

$0

$0

$0

$1,314,437

$1,314,437

$0

$0

$0

$0

$1,462,615

$0

$0

$0

Hampton Roads

UPC NO

107956 SCOPE

SYSTEM

Enhancement

PROJECT

Thalia Creek Greenway Phase III

DESCRIPTION

FROM: 1 TO: 2

Facilities for Pedestrians and Bicycles

JURISDICTION

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

VARIOUS (EN12)

FUND SOURCE

TOTAL COST
MATCH

FY24
$0

MPO

FY25

$2,796,197

FY26

$0

$0

FY27
$0

$0

Hampton Roads

UPC NO

106157 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

Portsmouth Rail to Trail

DESCRIPTION

FROM: Portsmouth/Chesapeake city limits TO: intersection of West Norfolk Road with Old Coast Guard Blvd
(1.8100 MI)
All funds obligated based on current allocations/estimate

PROGRAM
NOTE
ROUTE/STREET

JURISDICTION

Portsmouth

EN14

FUND SOURCE

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$0

FY25
$0

216

$2,951,621

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

107665 SCOPE

SYSTEM

Enhancement

PROJECT

Safety

JURISDICTION

OVERSIGHT

NFO

Bus Stop Infrastructure and Accessibility Improvements - HRT

ADMIN BY

Locally

EN15

TOTAL COST

Multi-jurisdictional: Hampton Roads
MPO

DESCRIPTION
ROUTE/STREET

FUND SOURCE

MATCH

FY24

FY25

$350,000

FY26

FY27

PE

Federal - TAP/F

$8,000

$32,000

$0

$0

$0

CN

Federal - TAP/F

$62,000

$248,000

$0

$0

$0

MPO

Hampton Roads

UPC NO

109059 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

JURISDICTION

Newport News

PROJECT

Washington Ave Streetscape and Pedestrian Improvements

DESCRIPTION

FROM: 28th Street TO: 34th Street

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

EN16

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

$0

FY27

$0

$0

$0

Hampton Roads

UPC NO

111308 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

Foxfire Pedestrian Trail - Ph 1

DESCRIPTION

FROM: North Landing Road TO: Foxfire Park/Esplanade Drive (1.0000 MI)

ROUTE/STREET

FOXFIRE TRAIL (EN17)

FUND SOURCE

JURISDICTION

Virginia Beach

MPO

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$0

$1,228,530

FY26

$0

FY27

$0

$0

$0

Hampton Roads

UPC NO

121111 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

CNI-BATES DRIVE MULTI-USE PATH

DESCRIPTION

FROM: King-Lincoln Park TO: 18th Street and Jefferson Ave

ROUTE/STREET

EN22

FUND SOURCE
PE

$1,395,737

FY26

JURISDICTION

Newport News

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$3,223,000

FY26

FY27

Federal - TAP/F

$103,000

$412,000

$0

$0

$0

RW Federal - TAP/F

$13,200

$0

$0

$52,800

$0

CN Federal - TAP/F

$36,760

$0

$0

$0

$147,040

Other

$0

$0

$0

$0

$2,458,200

CN TOTAL

$36,760

$0

$0

$0

$2,605,240

217

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

121183 SCOPE

Safety and Education of Pedestrians /Bicyclists

SYSTEM

Enhancement

PROJECT

NEWPORT NEWS SRTS PROGRAM COORDINATOR

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

ROUTE/STREET

EN22
MATCH

Federal - TAP/F

MPO

Newport News

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

FUND SOURCE
PE

JURISDICTION

FY24
$54,750

FY25
$219,000

$273,750

FY26

FY27

$0

$0

$0

Hampton Roads

UPC NO

121630 SCOPE

Rehabilitation of Historic Bldgs/Facilities

SYSTEM

Enhancement

PROJECT

CAPE HENRY LIGHTHOUSE RESTORATION-APP ID 8130

DESCRIPTION

FROM: 583 Atlantic Avenue TO: 583 Atlantic Avenue

ROUTE/STREET

EN22

FUND SOURCE

JURISDICTION

Virginia Beach

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$1,918,119

FY26

FY27

PE

Federal - TAP/F

$66,349

$265,394

$0

$0

$0

CN

Federal - TAP/F

$240,551

$0

$0

$962,202

$0

CN
AC

Federal - AC OTHER

$0

$0

$0

$383,624

$0

218

FFY 24-27 Working STIP

6/21/2023 8:52:03

Hampton Roads District
Miscellaneous
Projects
MPO

NonMPO

UPC NO

T19178

SCOPE

SYSTEM

Miscellaneous

JURISDICTION

PROJECT

CN: RAIL

Hampton Roads District-wide

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
ROUTE/STREET

0000

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0

MPO

$0

$0

FY27
$0

$0

Hampton Roads

UPC NO

103928 SCOPE

Environmental Only

SYSTEM

Miscellaneous

PROJECT

Green Operator Truck Replacement

DESCRIPTION

FROM: N/A TO: N/A

ROUTE/STREET

N/A (0000)

JURISDICTION

Hampton Roads District-wide

MATCH

FY24

FY25

$0

MPO

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

FUND SOURCE

$0

$5,042,249

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

105492 SCOPE

Other

SYSTEM

Miscellaneous

PROJECT

Regional Transportation Operations Strategic Plan

DESCRIPTION

FROM: Various Locations TO: Various Locations

ROUTE/STREET

0000

JURISDICTION

Hampton Roads District-wide

MATCH

FY24
$0

MPO

OVERSIGHT

NFO

ADMIN BY

Other

TOTAL COST

FUND SOURCE

FY25
$0

$400,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

103004 SCOPE

Traffic Management/Engineering

SYSTEM

Miscellaneous

PROJECT

Regional Traffic Signal Upgrades

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (0000)

FUND SOURCE
PE

FY26

Federal - RSTP

JURISDICTION

Multi-jurisdictional: Hampton Roads
MPO

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$26,600

FY25
$106,400

219

$133,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

121735 SCOPE

Environmental Only

SYSTEM

Miscellaneous

JURISDICTION

Chesapeake

PROJECT

DISMAL SWAMP ENVIRONMENTAL AND ACCESS STUDY

DESCRIPTION

FROM: Dismal Swamp TO: Dismal Swamp

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

TOTAL COST

0017

FUND SOURCE

MATCH

FY24
$0

MPO

FY25
$0

$200,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

119274 SCOPE

Transit

SYSTEM

Miscellaneous

JURISDICTION

Suffolk

OVERSIGHT

NFO

PROJECT

#SMART22 COLLEGE DRIVE BUS PULLOUT

ADMIN BY

VDOT

DESCRIPTION

FROM: University Boulevard TO: 0.04 M north of University Boulevard (0.0400 MI)

ROUTE/STREET

0135

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$871,930

FY26

FY27

PE AC Federal - AC OTHER

$0

$164,846

$0

$0

Federal - AC OTHER

$0

$0

$0

$35,465

RW
AC

MPO

Hampton Roads

UPC NO

109409 SCOPE

Preliminary Engineering

SYSTEM

Miscellaneous

PROJECT

Port of Virginia - ITS Masterplan for Hampton Roads

DESCRIPTION

FROM: Various Port Facilities TO: Various Port Facilities

ROUTE/STREET

4 PORT FACILITIES (0406)

FUND SOURCE

JURISDICTION

Norfolk

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$0

MPO

OVERSIGHT

FY25
$0

$350,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

119214 SCOPE

Other

SYSTEM

Miscellaneous

PROJECT

#SMART22 GREENWOOD PARK & RIDE LOT

DESCRIPTION

FROM: At 4690 Greenwood Drive TO: At 4690 Greenwood Drive

ROUTE/STREET

GREENWOOD DRIVE (8540)

FUND SOURCE
PE AC Federal - AC OTHER

JURISDICTION

Portsmouth

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24
$0

FY25
$0

220

$6,407,605

FY26
$555,283

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

Multiple MPOs

UPC NO

T20741

SCOPE

SYSTEM

Miscellaneous

JURISDICTION

PROJECT

VEHICLE FUEL CONVERSION PROGRAM MARKETING

Statewide

OVERSIGHT

NFO

ADMIN BY

Other

DESCRIPTION
ROUTE/STREET

9999

TOTAL COST

FUND SOURCE
CN

MATCH

Federal - CMAQ

FY24
$72,000

FY25
$288,000

MPO

Multiple MPOs

UPC NO

T11802

SCOPE

Other

SYSTEM

Miscellaneous

JURISDICTION

Statewide

PROJECT

Vehicle Fuel Conversion Program

DESCRIPTION

FROM: 1 TO: 1

ROUTE/STREET

9999
MATCH

Federal - CMAQ

MPO

$0

FY27
$0

FY24
$1,235,482

FY25
$4,941,927

$0

OVERSIGHT

FO

ADMIN BY

Other

TOTAL COST

FUND SOURCE
CN

$360,000

FY26

$8,640,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

113826 SCOPE

Traffic Management/Engineering

SYSTEM

Miscellaneous

PROJECT

City of Suffolk Emergency Vehicle Preemption Deployment

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (9999)

FUND SOURCE

JURISDICTION

Suffolk

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$0

FY25
$0

221

$157,161

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Hampton Roads District
Public
Transportation
Projects
MPO

Hampton Roads

UPC NO

T9125

SCOPE

Environmental Only

SYSTEM

Public
Transportation

JURISDICTION

HRT - DRPT

PROJECT

Environmental Management System

DESCRIPTION

FROM: 1 TO: 1

ROUTE/STREET

0000

FO

ADMIN BY

Locally

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0

$0

MPO

Hampton Roads

UPC NO

T9093

SYSTEM

Public
JURISDICTION
HRT - DRPT
Transportation
Regional Fixed Guideway Studies & ROW

PROJECT

OVERSIGHT

SCOPE

$449,979

FY26
$0

FY27
$0

$0

Transit
OVERSIGHT

FO

ADMIN BY

DRPT

DESCRIPTION
ROUTE/STREET

0000

TOTAL COST

FUND SOURCE
PE

MATCH

Federal - RSTP

MPO

FY24
$1,295,832

FY25
$5,183,326

$30,913,307

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO
SYSTEM
PROJECT

Transit

102734 SCOPE

Newport News
Public
JURISDICTION
Transportation
Amtrak Station Relocation - Amtrak Multimodal Station Reloc

OVERSIGHT

FO

ADMIN BY

Locally

DESCRIPTION
PROGRAM NOTE All funding obligated based on current allocations/estimate. Waiting Financial Closure
ROUTE/STREET

0000

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

$0

$5,361,283

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

109075 SCOPE

Transit

SYSTEM

Public
Transportation

PROJECT

Amtrak Multimodal Station - Site Grading and Drainage

DESCRIPTION

FROM: SW of Intersection of CSX RR and TO: Bland Boulevard

ROUTE/STREET

0000

FUND SOURCE
CN

Federal - RSTP

CN
AC

Federal - AC OTHER

JURISDICTION

Newport News

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$9,728,350

FY26

FY27

$120,000

$480,000

$0

$0

$0

$0

$1,101,730

$0

$0

$0

222

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

109076 SCOPE

Transit

SYSTEM

Public
Transportation

PROJECT

Amtrak Multimodal Station - Station, Platform, Parking Lot

DESCRIPTION

FROM: SW of Intersection of CSX RR and TO: Bland Boulevard

ROUTE/STREET

0000

Federal - CMAQ

CN
AC

Federal - AC OTHER

MPO

Newport News

MATCH

FY24

ADMIN BY

Locally

FY25

$16,876,322

FY26

FY27

$439,240

$0

$1,756,961

$0

$0

$0

$528,149

$0

$0

$0

119277 SCOPE

Transit

SYSTEM

Public
Transportation

PROJECT

FIVE (5) BUS PURCHASE REPLACEMENT

DESCRIPTION

FROM: Pocahontas Trail TO: Pocahontas Trail

ROUTE/STREET

POCAHONTAS TRAIL (0060)

FUND SOURCE

JURISDICTION

Williamsburg

OVERSIGHT

NFO

ADMIN BY

DRPT

TOTAL COST

MATCH

Federal - CMAQ

MPO

FY24
$740,000

FY25
$0

$3,700,000

FY26
$0

FY27
$0

$2,960,000

Hampton Roads

UPC NO

119278 SCOPE

Transit

SYSTEM

Public
Transportation

PROJECT

WILLIAMSBURG AREA TRANSIT AUTHORITY - STUDY ONLY

DESCRIPTION

FROM: Pocahontas Trail TO: Pocahontas Trail

ROUTE/STREET

POCAHONTAS TRAIL (0060)

FUND SOURCE
PE

NFO

Hampton Roads

UPC NO

CN

OVERSIGHT

TOTAL COST

FUND SOURCE
CN

JURISDICTION

JURISDICTION

OVERSIGHT

NFO

ADMIN BY

DRPT

TOTAL COST

MATCH

Federal - RSTP

MPO

Williamsburg

FY24
$72,000

FY25
$0

$360,000

FY26
$0

FY27
$0

$288,000

Hampton Roads

UPC NO

Transit

120317 SCOPE

SYSTEM

Public
Transportation

PROJECT

#I64CIP I-64 BOTH - ROUTE 972 (TIDEWATER TO NNSB VIA HRBT)

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0064

FUND SOURCE

JURISDICTION

Multi-jurisdictional: Hampton Roads
MPO

OVERSIGHT

NFO

ADMIN BY

DRPT

TOTAL COST
MATCH

FY24
$0

FY25
$0

223

$898,598

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Hampton Roads

UPC NO

120318 SCOPE

Transit

SYSTEM

Public
Transportation

JURISDICTION

PROJECT

#I64CIP I-64 BOTH-NEWPORT NEWS 106(NN,WARWICK BLVD DENBIGH)

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0064

Newport News

MATCH

FY24

FY25

$0

$0

DRPT
$4,033,729

FY26
$0

120319 SCOPE

FY27
$0

$0

Transit

SYSTEM

Public
Transportation

PROJECT

#I64CIP I-64 BOTH NWPRT NWS RTE 107 NWPRT NWS/WWCK BLVD/DNB

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0064

JURISDICTION

Newport News

MATCH

FY24

Other

$0

FY25
$3,511,492

NFO

ADMIN BY

DRPT

Hampton Roads

UPC NO

T4162

SCOPE

Transit

SYSTEM

Public
Transportation

JURISDICTION

WAT - DRPT

PROJECT

Purchase 8 electric/diesel buses to expand Sunday service

DESCRIPTION

Purchase Buses

ROUTE/STREET

VEHICLE PURCHASE (8) (PB00)

FUND SOURCE

$3,511,492

FY26
$0

MPO

FY27
$0

MATCH

FY24

FY25
$0

$0

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

$0
MPO

OVERSIGHT

TOTAL COST

FUND SOURCE

$2,100,000

FY26
$0

FY27
$0

$0

Hampton Roads

UPC NO

108954 SCOPE

Transit

SYSTEM

Public
Transportation

PROJECT

Light Rail Extension to Chesapeake

DESCRIPTION

FROM: Norfolk Light Rail TO: Greenbrier Area

ROUTE/STREET

U000

FUND SOURCE
PE

ADMIN BY

Hampton Roads

UPC NO

PE

NFO

TOTAL COST

FUND SOURCE

MPO

OVERSIGHT

Federal - RSTP

JURISDICTION

Chesapeake

OVERSIGHT

NFO

ADMIN BY

DRPT

TOTAL COST
MATCH

FY24
$400,000

FY25
$1,600,000

224

$2,000,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Hampton Roads District
Project
Groupings
MPO

NonMPO

GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET
FUND SOURCE
RW

MATCH

Federal - AC CONVERSION

FY24

FY25

$65,675

$0

$0

Federal - BR

$100,000

$0

Federal - NHS/NHPP

$129,058

$0

$294,733
$0

RW TOTAL

TOTAL COST

$104,723,535

FY26

FY27
$0

$262,701

$400,000

$0

$0

$0

$516,231

$0

$0

$400,000

$516,231

$262,701

$0

$0

$328,376

$0

RW
AC

Federal - AC OTHER

CN

Federal - BR

$1,073,403

$0

$0

$4,293,610

$0

Federal - NHS/NHPP

$1,129,540

$2,380,859

$0

$0

$2,137,299

$2,202,942

$2,380,859

$0

$4,293,610

$2,137,299

$0

$3,529,187

$0

CN TOTAL
CN
AC

Federal - AC OTHER

MPO

NonMPO

GROUPING

Construction : Federal Lands Highway

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0

$0

MPO

NonMPO

GROUPING

Construction : Safety/ITS/Operational Improvements

FUND SOURCE
Federal - STP/STBG

PE AC Federal - AC OTHER
RW

Federal - HSIP
Federal - STP/STBG

RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - HSIP
Federal - STP/STBG

CN TOTAL
CN
AC

Federal - AC OTHER

$136,540

FY26

FY27

$0

ROUTE/STREET

PE

$92,626 $25,877,800

$0

TOTAL COST
MATCH

FY24

FY25

$33,859,811

FY26

$50,794

$122,475

$80,699

$0

FY27
$0

$0

$0

$0

$249,126

$0

$0

$7,854

$0

$0

$70,687

$0

$2,711

$0

$0

$0

$10,845

$10,565

$0

$0

$70,687

$10,845

$0

$0

$0

$0

$350,000

$57,804

$0

$0

$0

$520,235

$200,000

$800,000

$0

$0

$0

$257,804

$800,000

$0

$0

$520,235

$0

$1,289,737

$0

$0

$0

225

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

NonMPO

GROUPING

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

PE

Federal - STP/STBG

($60,000)

RW

Federal - AC CONVERSION
Federal - STP/STBG

RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION

CN
AC

Federal - AC OTHER

FY25

$16,236,389

FY26

FY27

($240,000)

$0

$0

$0

$413,498

$0

$1,653,992

$0

$0

$660,000

$2,640,000

$0

$0

$0

$1,073,498

$2,640,000

$1,653,992

$0

$0

$0

$2,067,490

$0

$0

$0

$266,502

$0

$1,066,008

$0

$0

$3,632,510

$0

$0

$0

MPO

NonMPO

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
TOTAL COST

ROUTE/STREET
FUND SOURCE

MATCH

FY24

FY25

$0

$52,109,317

FY26

$0

FY27

$0

MPO

Hampton Roads

GROUPING

Maintenance : Preventive Maintenance and System Preservation

$0

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

Federal - NHS/NHPP

$0

Federal - STP/STBG

$0

$8,737,224

$8,773,092

$0

$12,972,914

$13,008,782

CN TOTAL

$4,235,690

MPO

Hampton Roads

GROUPING

Maintenance : Preventive Maintenance for Bridges

$52,109,317

FY26
$4,235,690

FY27
$4,235,690

$4,235,690

$8,809,571

$8,846,670

$13,045,261 $13,082,360

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

Federal - NHFP

$0

Federal - NHPP/E
Federal - NHS/NHPP
Federal - STP/STBG

FY25

$61,326,778

FY26

FY27

$1,996,466

$1,996,466

$0

$0

$1,000,000

$0

$3,980,538

$3,116,498

$3,466,498 $16,569,365

$0

$3,618,513

$3,631,833

$3,645,380

CN TOTAL

$0

$9,595,517

$9,744,797

$9,108,344 $22,224,987

CN
AC

$0

$4,646,000

$2,013,000

Federal - AC OTHER

226

$1,996,466

$1,996,466

$0

$0

$0

$3,659,156
$3,994,133

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

Hampton Roads

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

FY26

Federal - NHS/NHPP

$0

$11,789,226

$11,789,226

Federal - STP/STBG

$0

$4,070,616

$4,087,327

$0

$15,859,842

$15,876,553

CN TOTAL

227

$63,540,777
FY27

$11,789,226 $11,789,226
$4,104,323

$4,121,607

$15,893,549 $15,910,833

FFY 24-27 Working STIP

6/21/2023 8:52:03

Hampton Roads MPO
Project
Groupings
GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$56,710,825

FY26

FY27

PE

Federal - BR

$0

$380,000

$0

$0

$0

RW

Federal - AC CONVERSION

$0

$60,000

$0

$0

$0

Federal - BR

$0

$0

$130,000

$0

$0

RW TOTAL

$0

$60,000

$130,000

$0

$0

CN

Federal - AC CONVERSION

$0

$0

$1,000,000

$0

$0

Federal - BR

$0

$0

$0

$2,575,000

$0

Federal - NHS/NHPP

$0

$2,873,433

$0

$0

$0

Federal - STP/STBG

$0

$540,007

$0

$0

$0

Other

$0

$3,349,923

$0

$0

$0

$0

$6,763,363

$1,000,000

$2,575,000

$0

CN TOTAL

GROUPING

Construction : Federal Lands Highway

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$7,582,017

FY26

FY27

CN

Federal - FLH

$0

$0

$206,400

$0

$0

CN
AC

Federal - AC OTHER

$0

$0

$4,162,600

$0

$0

GROUPING

Construction : Rail

ROUTE/STREET
FUND SOURCE

TOTAL COST
MATCH

FY24

FY25

$3,764,206

FY26

FY27

PE

Federal - STP/STBG

$0

$346,332

$0

$0

$0

CN

Federal - STP/STBG

$0

$793,468

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$67,105

$0

$0

$0

228

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET
FUND SOURCE
PE

MATCH

FY25

TOTAL COST

$216,101,840

FY26

FY27

Federal - AC CONVERSION

$183,284

$460,328

$469,227

$0

$0

Federal - CMAQ

$575,068

$360,000

$102,000

$0

$1,838,272

$26,700

$240,300

$0

$0

$0

Federal - NHPP/E

$133,529

$0

$0

$0

$534,116

Federal - NHS/NHPP

$625,241

$2,004,142

$0

$496,822

$0

$40,000

$0

$0

$0

$160,000

$399,083

$1,596,333

$0

$0

$0

$1,982,905

$4,661,103

$571,227

$496,822

$2,532,388

$0

$0

$0

$0

$723,960

Federal - AC CONVERSION

$624,463

$0

$572,636

$0

$1,925,217

Federal - CMAQ

$251,637

$414,549

$440,000

$152,000

$0

$19,500

$126,000

$49,500

$0

$0

$2,417,725

$2,361,835

$1,911,360

$797,951

$4,599,755

Federal - HSIP

Federal - RSTP
Federal - STP/STBG
PE TOTAL
PE AC Federal - AC OTHER
RW

FY24

Federal - HSIP
Federal - NHS/NHPP
Federal - STP/STBG
RW TOTAL

$369,441

$1,557

$0

$1,476,208

$0

$3,682,767

$2,903,941

$2,973,496

$2,426,159

$6,524,972

$0

$6,360,947

$0

$0

$2,750,000

RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION

$653,468

$0

$2,736,945

$0

$0

Federal - CMAQ

$852,641

$960,000

$0

$2,174,965

$275,600

Federal - HSIP

$845,505

$2,971,878

$3,350,249

$1,287,414

$0

Federal - NHPP/E
Federal - NHS/NHPP
Federal - STP/STBG
CN TOTAL
CN
AC

Federal - AC OTHER

GROUPING

$21,759

$0

$87,034

$0

$0

$2,060,337

$280,000

$6,097,986

$286,343

$1,577,019

$802,885

$0

$0

$1,049,520

$2,162,020

$5,236,594

$4,211,878

$12,272,214

$4,798,242

$4,014,639

$0

$8,057,112

$9,913,319

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET
FUND SOURCE
PE

Federal - AC CONVERSION

MATCH

FY24

FY25

$36,450,515

FY26

FY27

$7,621

$30,482

$0

$0

$0

$0

$0

$0

$205,296

$58,945

$30,482

$0

$0

$205,296

Federal - RTAP

$6,296

$0

$25,182

$0

$0

Federal - TAP/F

$82,960

$0

$331,840

$0

$0

$89,256

$0

$357,022

$0

$0

Federal - RTAP

$213,564

$561,850

$81,942

$210,465

$0

Federal - TAP/F

$250,897

$540,129

$141,142

$322,318

$0

$0

$467,664

$140,029

$540,629

$0

$464,462

$1,569,643

$363,113

$1,073,412

$0

PE TOTAL

RW TOTAL
CN

TOTAL COST

$51,324

Federal - CMAQ
RW

$4,248,979 $18,482,728

Other
CN TOTAL

229

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$52,109,317

FY26

FY27

Federal - NHS/NHPP

$0

$4,235,690

$4,235,690

$4,235,690

$4,235,690

Federal - STP/STBG

$0

$8,737,224

$8,773,092

$8,809,571

$8,846,670

$0

$12,972,914

$13,008,782

CN TOTAL

GROUPING

$13,045,261 $13,082,360

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$61,326,778

FY26

FY27

Federal - NHFP

$0

$1,996,466

$1,996,466

$1,996,466

$1,996,466

Federal - NHPP/E

$0

$0

$1,000,000

$0

$0

Federal - NHS/NHPP

$0

$3,980,538

$3,116,498

$3,466,498 $16,569,365

Federal - STP/STBG

$0

$3,618,513

$3,631,833

$3,645,380

CN TOTAL

$0

$9,595,517

$9,744,797

$9,108,344 $22,224,987

CN
AC

$0

$4,646,000

$2,013,000

Federal - AC OTHER

GROUPING

$0

$3,659,156
$3,994,133

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

Federal - NHS/NHPP
Federal - STP/STBG

CN TOTAL

GROUPING

FY24

FY27

$0
$0

$11,789,226
$4,070,616

$11,789,226
$4,087,327

$11,789,226 $11,789,226
$4,104,323 $4,121,607

$0

$15,859,842

$15,876,553

$15,893,549 $15,910,833

TOTAL COST
MATCH

FY24
$0

FY25
$0

$6,217,924

FY26
$0

FY27
$0

$0

Transit : Engineering

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

PE
Federal - RSTP
PE AC Federal - AC OTHER

GROUPING

$63,540,777

FY26

Transit : Amenities

ROUTE/STREET
FUND SOURCE

GROUPING

FY25

FY24
$48,000
$0

FY25
$0
$0

$300,000

FY26
$192,000
$60,000

FY27
$0
$0

$0
$0

Transit : Vehicles

ROUTE/STREET
FUND SOURCE

TOTAL COST
MATCH

FY24
$0

FY25
$0

230

$7,959,337

FY26
$0

FY27
$0

$0

COMMONWEALTH OF VIRGINIA

LYNCHBURG
DISTRICT

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

FFY 24-27 Working STIP

6/21/2023 8:52:03

Lynchburg District
Primary Projects
MPO

Lynchburg

UPC NO

T26574

SCOPE

Bridge Rehab w/o Added Capacity

SYSTEM

Primary

JURISDICTION

Campbell County

PROJECT

#BF - LYNCHBURG YEAR 5 STRUCTURE RECOATING

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
ROUTE/STREET

WARDS ROAD (0029)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$959,000

FY26

FY27

PE

Federal - BR

$0

$0

$0

$100,000

$0

CN

Federal - BR

$0

$0

$0

$0

$859,000

MPO

NonMPO

UPC NO

122819 SCOPE

Bridge Replacement w/o Added Capacity

SYSTEM

Primary

JURISDICTION

PROJECT

#SGR23VB - BRIDGE REPL - RTE 360 OVER GR XING FED ID 13897

DESCRIPTION

FROM: 0.20 MILES WEST OF GRADE CROSSING TO: 0.36 MILES EAST OF GRADE CROSSING (0.5600 MI)

ROUTE/STREET

PATRICK HENRY HIGHWAY (0360)

FUND SOURCE
PE

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

Federal - STP/STBG

MPO

Prince Edward County

FY24
$0

FY25
$0

$11,131,186

FY26
$0

FY27
$0

$1,098,074

Lynchburg

UPC NO

121775 SCOPE

Safety

SYSTEM

Primary

PROJECT

#ITTF23 ATSPM OPERATIONS EVALUATION

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

ROUTE/STREET

VARIOUS (9999)

FUND SOURCE

JURISDICTION

Lynchburg District-wide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$1,200,000

FY26

FY27

PE AC Federal - AC OTHER

$0

$100,000

$0

$0

$0

CN AC Federal - AC OTHER

$0

$1,100,000

$0

$0

$0

232

FFY 24-27 Working STIP

6/21/2023 8:52:03

Lynchburg District
Secondary
Projects
MPO

Lynchburg

UPC NO

110390 SCOPE

SYSTEM

Secondary

JURISDICTION

Amherst County

PROJECT

#HB2.FY17 RTE 682 - RECONSTRUCTION GARVEE DEBT SERVICE

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $900,872 GARVEE Debt Service Interest Prev, $233,335 FFY24 GARVEE Debt Service Interest,
$228,451 GARVEE Debt Service Interest FFY25, $210,030 GARVEE Debt Service Interest FFY26, $190,713
GARVEE Debt Service Interest FFY27, $828,740 GARVEE Debt Service Interest FFY28-38. Total GARVEE Debt
Service Interest
$2,592,141. Corresponding CN UPC 109550.
0682
TOTAL COST
$4,949,775

FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$228,451

$210,030

Federal - STP/STBG

$0

$233,335

$0

$0

$0

PE TOTAL

$0

$233,335

$228,451

$210,030

$190,713

PE AC Federal - AC

$0

$1,457,934

$0

$0

$0

233

$190,713

FFY 24-27 Working STIP

6/21/2023 8:52:03

Lynchburg District
Urban Projects
MPO

Lynchburg

UPC NO

110391 SCOPE

SYSTEM

Urban

PROJECT

#HB2.FY17 ODDFELL'S RD SEG B2 RECON GARVEE DEBT SERVICE

JURISDICTION

Lynchburg

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $3,427,366 GARVEE Debt Service Interest Prev, $456,096 FFY24 GARVEE Debt Service Interest,
$412,848 GARVEE Debt Service Interest FFY25, $367,407 GARVEE Debt Service Interest FFY26, $319,663
GARVEE Debt Service Interest FFY27, $797,027 GARVEE Debt Service Interest FFY28-33. Total GARVEE Debt
Service Interest
$5,780,407. Corresponding CN UPC 109554.
9999
TOTAL COST
$13,562,105

FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$412,848

$367,407

$319,663

Federal - STP/STBG

$0

$456,096

$0

$0

$0

PE TOTAL

$0

$456,096

$412,848

$367,407

$319,663

PE AC Federal - AC

$0

$1,896,945

$0

$0

$0

MPO

NonMPO

UPC NO

121053 SCOPE

Bridge Rehab w/o Added Capacity

SYSTEM

Urban

JURISDICTION

PROJECT

#SGR23LB - UR 6020 (BEDFORD AVE) - BRDG REPLACEMENT OVER NSR

DESCRIPTION

FROM: 0.02 MILES NORTH OF NSRR TO: 0.02 MILES SOUTH OF NSRR (0.0400 MI)

ROUTE/STREET

BEDFORD AVE (6020)

FUND SOURCE
PE

Lynchburg

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$14,714,539

FY26

FY27

Federal - AC CONVERSION

$0

$0

$34,715

$0

$0

Federal - STP/STBG

$0

$1,400,000

$0

$0

$0

PE TOTAL

$0

$1,400,000

$34,715

$0

$0

PE AC Federal - AC

$0

$34,715

$0

$0

$0

RW

$0

$0

$0

$0

$1,190,601

Federal - STP/STBG

MPO

Lynchburg

UPC NO

106320 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

JURISDICTION

Lynchburg

OVERSIGHT

NFO

PROJECT

UR-6056 - D/B WIDEN FROM 2 TO 4 LANES (GREENVIEW DRIVE)

DESCRIPTION

FROM: 0.010 MI NORTH OF SC 1541 (HERMITAGE RD) TO: 0.215 MI SOUTH OF UR-6066 (LEESVILLE RD) (0.6200
MI)

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

GREENVIEW DRIVE (6056)

FUND SOURCE

TOTAL COST

MATCH

FY24
$0

FY25
$0

234

$13,612,461

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Lynchburg

UPC NO

106537 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

JURISDICTION

PROJECT

UR-6056 - D/B WIDEN FR 2-4 LNS (GREENVIEW DR) DEBT SERVICE

DESCRIPTION

FROM: SC-1541 (HERMITAGE RD) TO: 0.220Mi. S. UR-6066 (LEESVILLE RD) (0.4500 MI)

ROUTE/STREET

GREENVIEW DRIVE (6056)

FUND SOURCE
PE

Lynchburg

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$8,565,629

FY26

FY27

Federal - AC CONVERSION

$0

$0

$699,747

$699,673

Federal - STP/STBG

$0

$699,720

$0

$0

$0

PE TOTAL

$0

$699,720

$699,747

$699,673

$699,678

PE AC Federal - AC

$0

$3,521,322

$0

$0

$0

MPO

$699,678

Lynchburg

UPC NO

105515 SCOPE

New Construction Roadway

SYSTEM

Urban

JURISDICTION

Lynchburg

OVERSIGHT

FO

PROJECT

RTE 29/460 - D/B INTERCHANGE & EXTENSION (ODD FELLOWS ROAD)

DESCRIPTION

FROM: 0.48 MI. W. OF ODD FELLOWS ROAD TO: 0.54 MI. E. OF ODD FELLOWS ROAD (1.0220 MI)

ADMIN BY

VDOT

PROGRAM NOTE All funding obligated based on current allocations/estimate. Linked with UPC 106533 & 100023
ROUTE/STREET

RICHMOND HIGHWAY (6029)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$0
MPO

$33,716,693

FY26

$0

$0

FY27
$0

$0

Lynchburg

UPC NO

113116 SCOPE

SYSTEM

Urban

PROJECT

Reconstruction w/ Added Capacity

JURISDICTION

Lynchburg

OVERSIGHT

NFO

#SMART20 RTE 221/501 - INTERSECTION IMPROVEMENT (SPLIT PAIR)

ADMIN BY

Locally

ROUTE 501 (LYNCHBURG EXPRESSWAY) (0221)

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE

MATCH

FY24

FY25

$47,282,472

FY26

FY27

RW

Federal - STP/STBG

$0

$5,666,663

$0

$0

$0

RW
AC
CN
AC

Federal - AC OTHER

$0

$4,765,337

$0

$0

$0

Federal - AC OTHER

$0

$0

$32,244,450

$0

$0

MPO

Lynchburg

UPC NO

100023 SCOPE

New Construction Roadway

SYSTEM

Urban

JURISDICTION

Lynchburg

PROJECT

LYNCHBURG - ODD FELLOWS/GREENVIEW - D/B DEVELOPMENT

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE Linked with UPC 105515 & 106533
ROUTE/STREET

VARIOUS (0460)

FUND SOURCE

TOTAL COST
MATCH

FY24

FY25

$2,526,865

FY26

FY27

PE

Federal - STP/SU

$0

($38,178)

$0

$0

$0

RW

Federal - STP/STBG

$0

$7,198

$0

$0

$0

235

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Lynchburg

UPC NO

106533 SCOPE

New Construction Roadway

SYSTEM

Urban

PROJECT

RTE 29/460 - INTCHG & EXT (ODD FELLOWS RD) DEBT SERVICE

JURISDICTION

Lynchburg

DESCRIPTION

FROM: VARIOUS TO: Various

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE Linked with UPC 106533 & 100023
ROUTE/STREET

VARIOUS (6029)

FUND SOURCE
PE

TOTAL COST
MATCH

FY24

FY25

$37,759,481

FY26

FY27

Federal - AC CONVERSION

$0

$0

$2,676,745

$2,676,594

$2,676,522

Federal - NHS/NHPP

$0

$2,676,581

$0

$0

$0

PE TOTAL

$0

$2,676,581

$2,676,745

$2,676,594

$2,676,522

PE AC Federal - AC

$0

$16,173,336

$0

$0

$0

236

FFY 24-27 Working STIP

6/21/2023 8:52:03

Lynchburg District
Enhancement
Projects
MPO

Danville

UPC NO

121045 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

#TAP23 PHASE II - KEMPER ROAD - CONSTRUCT SIDEWALK

DESCRIPTION

FROM: EDMONDS STREET TO: ARLINGTON PLACE (0.5060 MI)

ROUTE/STREET

KEMPER ROAD (3708)

FUND SOURCE

JURISDICTION

Danville

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$603,423

FY26

FY27

PE

Federal - TAP/F

$21,102

$84,406

$0

$0

$0

RW

Federal - TAP/F

$2,434

$0

$9,737

$0

$0

CN

Federal - TAP/F

$87,549

$0

$0

$350,195

$0

CN
AC

Federal - AC OTHER

$0

$0

$0

$48,000

$0

MPO

NonMPO

UPC NO

121047 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

#TAP23 ARNETT BLVD - PEDESTRIAN IMPROVEMENTS

DESCRIPTION

FROM: BUS 29 (PINEY FOREST RD) TO: DALTON STREET (BUS STOP) (0.1330 MI)

ROUTE/STREET

ARNETT BLVD (3747)

FUND SOURCE

JURISDICTION

Danville

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$569,259

FY26

FY27

PE

Federal - TAP/F

$15,775

$63,098

$0

$0

$0

RW

Federal - TAP/F

$4,687

$0

$18,746

$0

$0

CN

Federal - TAP/F

$93,391

$0

$0

$373,563

$0

MPO

NonMPO

UPC NO

121044 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

#TAP23 PHASE I - FARMVILLE RIVERWALK TRAIL

DESCRIPTION

FROM: NORTH MAIN STREET TO: APPOMATTOX RIVER (0.1230 MI)

ROUTE/STREET

NORTH MAIN STREET (9999)

FUND SOURCE

JURISDICTION

Farmville

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$1,074,670

FY26

FY27

PE

Federal - TAP/F

$39,665

$158,660

$0

$0

$0

RW

Federal - TAP/F

$24,603

$98,412

$0

$0

$0

CN

Federal - TAP/F

$150,666

$0

$0

$602,664

$0

237

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

NonMPO

UPC NO

121043 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

#TAP23 MILLRACE DR PEDESTRIAN IMPROVEMENTS

DESCRIPTION

FROM: GRAVES MILL ROAD TO: CUL-DE-SAC (0.5680 MI)

ROUTE/STREET

MILLRACE DR (9999)

FUND SOURCE
PE

Federal - TAP/F

RW
CN

JURISDICTION

Lynchburg

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$35,556

$142,223

$0

Federal - TAP/F

$17,727

$70,906

Federal - TAP/F

$110,187

$0

238

$817,348

FY26

FY27
$0

$0

$0

$0

$0

$0

$440,749

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Lynchburg District
Project
Groupings
MPO

NonMPO

GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$83,942,664

FY26

FY27

PE
CN

Federal - STP/STBG
Federal - NHS/NHPP

$0
$66,476

$0
$265,904

$0
$0

$0
$0

$1,831,247
$0

CN
AC

Federal - AC OTHER

$0

$21,493,090

$0

$0

$0

MPO

NonMPO

GROUPING

Construction : Rail

ROUTE/STREET
FUND SOURCE
CN

MATCH

Federal - AC CONVERSION

FY24
$0

TOTAL COST
FY26

FY25
$458,500

MPO

NonMPO

GROUPING

Construction : Safety/ITS/Operational Improvements

$0

ROUTE/STREET
FUND SOURCE
PE

MATCH

Federal - NHS/NHPP
Federal - STP/STBG

PE TOTAL
PE AC Federal - AC OTHER
RW

$0

TOTAL COST

$157,403,373

FY26

FY27

$89,233
$20,520

$0
$40,000

$0
$0

$356,933
$42,080

$0
$0

$109,753

$40,000

$0

$399,013

$0

$0

$616,612

$0

$1,214,548

$0

$927,377

$0

$2,032,785

$683,512

$993,211

Federal - NHS/NHPP

$221,360

$885,438

$0

$0

$0

Federal - STP/STBG

$486,063

$1,503,185

$285,458

$155,608

$0

$1,634,799

$2,388,623

$2,318,243

$839,120

$993,211

$0

$2,540,981

$854,390

$1,241,514

$0

$1,211,543

$208,191

$2,535,633

$400,000

$2,944,124

$25,000

$225,000

$0

$0

$0

Federal - NHS/NHPP

$1,386,456

$0

$1,408,167

$4,137,656

$0

Federal - STP/STBG

$3,766,012

$1,699,295

$2,156,590

$3,144,040

$8,064,122

$6,389,010

$2,132,486

$6,100,390

$7,681,696

$11,008,246

$0

$7,564,754

$2,550,270

$5,754,862

$0

Federal - AC OTHER
Federal - AC CONVERSION
Federal - HSIP

CN TOTAL
CN
AC

FY25

$0

Federal - AC CONVERSION

RW TOTAL
RW
AC
CN

FY24

$945,000
FY27

Federal - AC OTHER

MPO

NonMPO

GROUPING

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET
FUND SOURCE

TOTAL COST
MATCH

FY24

FY25

$6,365,326

FY26

FY27

PE

Federal - TAP/F

$70,918

$283,672

$0

$0

$0

CN

Federal - TAP/F

$174,322

$0

$534,603

$162,686

$0

CN
AC

Federal - AC OTHER

$0

$0

$143,634

$146,742

$0

239

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

NonMPO

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE

MATCH

FY24

FY25

$0

$0

TOTAL COST

$109,397,318

FY26

FY27

$0

MPO

Lynchburg

GROUPING

Maintenance : Preventive Maintenance and System Preservation

$0

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

MATCH

Federal - STP/STBG

FY24
$0

FY25
$26,725,567

MPO

Lynchburg

GROUPING

Maintenance : Preventive Maintenance for Bridges

TOTAL COST

$109,397,318

FY26

FY27

$27,136,691

$27,554,174

$27,980,886

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$35,452,434

FY26

FY27

Federal - AC CONVERSION

$0

$281,400

$485,100

$1,746,850

Federal - BR

$0

$1,940,400

$6,987,400

$0

$0

Federal - NHS/NHPP

$0

$818,182

$818,182

$4,179,582

$818,182

Federal - STP/STBG

$0

$3,495,559

$3,509,232

$3,523,137

$3,537,278

CN TOTAL

$0

$6,535,541

$11,799,914

$9,449,569

$4,355,460

CN
AC

$0

$485,100

$1,746,850

$1,080,000

$0

Federal - AC OTHER

MPO

Lynchburg

GROUPING

Maintenance : Traffic and Safety Operations

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

Federal - STP/STBG

TOTAL COST
MATCH

FY24
$0

FY25
$1,908,362

240

FY26
$1,916,197

$7,680,990
FY27

$1,924,164

$1,932,267

FFY 24-27 Working STIP

6/21/2023 8:52:03

Danville MPO
Project
Groupings
GROUPING

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0
GROUPING

$31,261,398

FY26

$0

FY27

$0

$0

$0

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$1,643,364

FY26

FY27

RW

Federal - TAP/F

$19,249

$76,996

$0

$0

$0

CN

Federal - TAP/F

$166,463

$209,196

$456,657

$0

$0

CN
AC

Federal - AC OTHER

$0

$198,580

$202,141

$0

$0

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

MATCH

Federal - STP/STBG

GROUPING

FY24
$0

FY25
$26,725,567

TOTAL COST

$109,397,318

FY26

FY27

$27,136,691

$27,554,174

$27,980,886

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$35,452,434

FY26

FY27

Federal - AC CONVERSION

$0

$281,400

$485,100

$1,746,850

$0

Federal - BR

$0

$1,940,400

$6,987,400

$0

$0

Federal - NHS/NHPP

$0

$818,182

$818,182

$4,179,582

$818,182

Federal - STP/STBG

$0

$3,495,559

$3,509,232

$3,523,137

$3,537,278

CN TOTAL

$0

$6,535,541

$11,799,914

$9,449,569

$4,355,460

CN
AC

$0

$485,100

$1,746,850

$1,080,000

$0

Federal - AC OTHER

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

Federal - STP/STBG

TOTAL COST
MATCH

FY24
$0

FY25
$1,908,362

241

FY26
$1,916,197

$7,680,990
FY27

$1,924,164

$1,932,267

FFY 24-27 Working STIP

6/21/2023 8:52:03

Lynchburg MPO
Project
Groupings
GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET
FUND SOURCE
RW
CN

MATCH

FY25

FY27

$4,233,972
$0

$0
$0

$0
$5,319,900

$0
$3,155,281

Federal - NHS/NHPP

$4,452,362

$0

$17,809,447

$0

$0

$6,571,157

$0

$17,809,447

$5,319,900

$3,155,281

$0

$0

$31,101,682

$0

$0

Federal - AC OTHER

Construction : Rail

ROUTE/STREET
FUND SOURCE

MATCH

FY24

GROUPING

TOTAL COST
FY26

FY25

$0

$0

$0

$450,000
FY27
$0

$0

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET
FUND SOURCE

MATCH

Federal - HSIP

PE AC Federal - AC OTHER
RW

$111,342,892

FY26

$1,058,493
$2,118,795

GROUPING

PE

TOTAL COST

Federal - NHS/NHPP
Federal - AC CONVERSION

CN TOTAL
CN
AC

FY24

Federal - AC CONVERSION
Federal - HSIP
Federal - NHS/NHPP
Federal - STP/STBG

RW TOTAL

FY24

FY25

TOTAL COST

$135,967,387

FY26

FY27

$19,000

$171,000

$0

$0

$0

$0

$350,000

$0

$0

$0

$4,156

$0

$37,406

$0

$0

$11,018

$31,662

$67,500

$0

$0

$402,434

$0

$1,609,734

$0

$0

$53,240

$212,960

$0

$0

$0

$470,848

$244,622

$1,714,640

$0

$0

$0

$41,563

$4,484,650

$0

$0

RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION

$162,361

$256,939

$51,676

$0

$1,152,631

Federal - HSIP

$113,947

($447,223)

$1,046,554

$426,195

$0

Federal - STP/STBG
CN TOTAL
CN
AC

Federal - AC OTHER

GROUPING

$865,488

$3,461,953

$0

$0

$0

$1,141,796

$3,271,669

$1,098,230

$426,195

$1,152,631

$0

$670,579

$1,113,945

$0

$0

Construction : Transportation Alternatives/Byway/Non-Traditional
TOTAL COST

ROUTE/STREET
FUND SOURCE

MATCH

FY24
$0

FY25
$0

242

$2,000,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

MATCH

Federal - STP/STBG

FY24
$0

FY25
$26,725,567

TOTAL COST

$109,397,318

FY26

FY27

$27,136,691

GROUPING

Maintenance : Preventive Maintenance for Bridges

PROGRAM
NOTE
ROUTE/STREET

Funding identified to be obligated districtwide as projects are identified.

$27,554,174

TOTAL COST

FUND SOURCE

MATCH

CN Federal - AC CONVERSION

FY24

FY25

$27,980,886

$35,452,434

FY26

FY27

$0

$281,400

$485,100

$1,746,850

$0

Federal - BR

$0

$1,940,400

$6,987,400

$0

$0

Federal - NHS/NHPP

$0

$818,182

$818,182

$4,179,582

$818,182

Federal - STP/STBG

$0

$3,495,559

$3,509,232

$3,523,137

$3,537,278

CN TOTAL

$0

$6,535,541

$11,799,914

$9,449,569

$4,355,460

CN Federal - AC OTHER
AC

$0

$485,100

$1,746,850

$1,080,000

$0

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM
NOTE
ROUTE/STREET

Funding identified to be obligated districtwide as projects are identified.

FUND SOURCE
CN Federal - STP/STBG

TOTAL COST
MATCH

FY24
$0

FY25
$1,908,362

243

FY26
$1,916,197

$7,680,990
FY27

$1,924,164

$1,932,267

COMMONWEALTH OF VIRGINIA

NORTHERN VIRGINIA
DISTRICT

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

FFY 24-27 Working STIP

6/21/2023 8:52:03

Northern Virginia District
Interstate Projects
MPO

Northern Virginia

UPC NO

108424 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

I-66 INSIDE THE BELTWAY INITIATIVES

JURISDICTION

DESCRIPTION

FROM: Exit 67 DULLES AIRPORT ACCESS ROAD TO: Exit 71 N. GEORGE MASON DRIVE (3.6440 MI)

PROGRAM NOTE

Includes $23,584,311 GARVEE Debt Service Principal Prev, $5,049,577 GARVEE Debt Service Principal FFY24,
$5,305,082 GARVEE Debt Service Principal FFY25, $5,574,631 GARVEE Debt Service Principal FFY26,
$5,855,759 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $79,821,435.
Corresponding Debt Service UPC 110392

ROUTE/STREET

I-66 (0066)

FUND SOURCE
CN

Northern Virginia District-wide

MATCH

FY24

FY25

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$111,200,000

FY26

FY27

Federal - NHS/NHPP

$0

$5,049,577

$0

$0

$0

Other

$0

$29,118,398

$0

$0

$0

CN TOTAL

$0

$34,167,975

$0

$0

$0

CN
AC

$0

$51,187,547

$0

$0

$0

Federal - AC

MPO

Northern Virginia

UPC NO

110392 SCOPE

SYSTEM

Interstate

PROJECT

I-66 INSIDE THE BELTWAY INITIATIVES GARVEE DEBT SERVICE

JURISDICTION

Northern Virginia District-wide

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $18,735,863 GARVEE Debt Service Interest Prev, $2,729,355 GARVEE Debt Service Int FFY24,
$2,473,724 GARVEE Debt Service Int FFY25, $2,205,130 GARVEE Debt Service Int FFY26, $1,922,938 GARVEE
Debt Service Interest FFY27, $5,196,006 GARVEE Debt Service Interest FFY28-35. Total GARVEE Debt Service
Interest
$33,263,016. Corresponding CN UPC 108424
ROUTE/STREET
0066
TOTAL COST
$77,350,827
FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$2,473,724

$2,205,130

$1,922,938

Federal - NHS/NHPP

$0

$2,729,355

$0

$0

$0

PE TOTAL

$0

$2,729,355

$2,473,724

$2,205,130

$1,922,938

PE AC Federal - AC

$0

$11,797,798

$0

$0

$0

MPO

Northern Virginia

UPC NO

110496 SCOPE

Other

SYSTEM

Interstate

PROJECT

TRANSFORM I-66 OVERSIGHT PROJECT

DESCRIPTION

FROM: ROUTE 15 IN HAYMARKET TO: I-495/CAPITAL BELTWAY

ROUTE/STREET

I-66 (0066)

FUND SOURCE

JURISDICTION

Northern Virginia District-wide

MATCH

FY24

FY25

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$120,824,714

FY26

FY27

PE

Other

$0

$3,000,000

$0

$0

$0

RW

Other

$0

$25,400,000

$0

$0

$0

245

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

110741 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

TRANSFORM66 OUTSIDE THE BELTWAY

JURISDICTION

DESCRIPTION

FROM: 0.07 Miles West of Route 15 (Haymarket) TO: 0.10 Miles East of I-495 (Capital Beltway)

ROUTE/STREET

I-66 (0066)
MATCH

Other

MPO

OVERSIGHT

FO

ADMIN BY

VDOT
$3,031,403,
774
FY27

TOTAL COST

FUND SOURCE
CN

Northern Virginia District-wide

FY24
$0

FY25

FY26

$3,031,403,774

$0

$0

$0

Northern Virginia

UPC NO

100566 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

Prince William County

PROJECT

I-66 / ROUTE 15 INTERCHANGE RECONSTRUCTION

DESCRIPTION

FROM: 0.224 Miles West of Rte 15 TO: 0.371 Miles East of Rte 15 (0.5950 MI)

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE Includes $12,710,906 GARVEE Debt Service Principal Prev, $1,989,068 GARVEE Debt Service Principal FFY24,
$2,090,022 GARVEE Debt Service Principal FFY25, $2,195,792 GARVEE Debt Service Principal FFY26,
$2,306,784 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $31,849,466.
Corresponding GARVEE Debt Service UPC 110376.
ROUTE/STREET
I-66 (0066)
TOTAL COST
$52,143,108
FUND SOURCE
CN

MATCH

FY24

FY25

FY26

Federal - AC CONVERSION

$0

$0

$2,090,022

Federal - NHS/NHPP

$0

$1,989,068

$0

CN TOTAL

$0

$1,989,068

$2,090,022

CN
AC

$0

$21,701,172

$0

Federal - AC

MPO

FY27
$2,195,792 $2,306,784
$0

$0

$2,195,792 $2,306,784
$0

$0

Northern Virginia

UPC NO

110376 SCOPE

SYSTEM

Interstate

JURISDICTION

Prince William County

PROJECT

I-66 / ROUTE 15 INTCHNG RECONSTRUCTION GARVEE DEBT SERVICE

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $9,925,855 GARVEE Debt Service Interest Prev, $932,370 FFY24 GARVEE Debt Service Interest,
$831,672 GARVEE Debt Service Interest FFY25, $725,867 GARVEE Debt Service Interest FFY26, $614,702
GARVEE Debt Service Interest FFY27, $1,234,243 GARVEE Debt Service Interest FFY28-32. Total GARVEE
Debt Service Interest
$14,264,709. Corresponding CN UPC 100566.
0066
TOTAL COST
$38,940,193

FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$831,672

$725,867

$614,702

Federal - NHS/NHPP

$0

$932,370

$0

$0

$0

PE TOTAL

$0

$932,370

$831,672

$725,867

$614,702

PE AC Federal - AC

$0

$3,406,484

$0

$0

$0

246

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

115999 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

I-95 SB AUXILIARY LANE BETWEEN RTE 123 AND RTE 294

JURISDICTION

DESCRIPTION

FROM: Route 294 Exit Ramp TO: Route 123 Entrance Ramp (1.4000 MI)

ROUTE/STREET

INTERSTATE 95 SOUTHBOUND (0095)

FUND SOURCE
PE

FY24
$0

NFO

ADMIN BY

VDOT

FY25

$23,721,497

FY26

$141,388

FY27

$0

$0

$0

Multiple MPOs

UPC NO

102711 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

I-95 HOV/HOT Lanes Project PPTA Develop & Mgmt. Oversight

DESCRIPTION

FROM: Garrisonville Road TO: 1 Mile North of Edsall Road (28.0000 MI)

ROUTE/STREET

JURISDICTION

0095

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
CN

OVERSIGHT

TOTAL COST

MATCH

Other

MPO

Prince William County

MATCH

FY24

FY25

$48,159,488

FY26

FY27

Federal - DEMO

$0

$4,278,750

$0

$0

$0

Federal - NHS/NHPP

$0

$11,872,992

$0

$0

$0

$0

$16,151,742

$0

$0

$0

CN TOTAL

MPO

Northern Virginia

UPC NO

103106 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

Statewide

PROJECT

I-95 HOV/HOT Lanes Construction

DESCRIPTION

FROM: Garrisonville Road TO: 1 Mile North of Edsall Road (28.0000 MI)

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE All funding obligated based on current allocations/estimate. Waiting Financial Closure. Linked with UPC
102710, 103019, 103020, 102711, 103591 ,103222
ROUTE/STREET

0095

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

$0

$785,756,087

FY26

FY27

$0

$0

$0

Multiple MPOs

UPC NO

103222 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

I-95 HOV/HOT Lanes Debt Service

DESCRIPTION

FROM: Garrisonville Road TO: 1 mile North of Edsall Road (28.0000 MI)

ROUTE/STREET

0095

FUND SOURCE
PE

TOTAL COST

JURISDICTION

Statewide

MATCH

FY24

FY25

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$110,089,071

FY26

FY27

Federal - AC CONVERSION

$0

$0

$7,113,319

$7,112,177

Federal - NHS/NHPP

$0

$7,119,194

$0

$0

$0

$0

$7,119,194

$7,113,319

$7,112,177

$7,119,521

PE TOTAL

247

$7,119,521

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Multiple MPOs

UPC NO

116656 SCOPE

Safety

SYSTEM

Interstate

JURISDICTION

PROJECT

#I95CIP VARIABLE SPEED LIMITS - PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095
MATCH

Federal - NHS/NHPP

MPO

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
PE

Statewide

FY24
$0

FY25
$4,912,629

$4,912,629

FY26
$0

FY27
$0

$0

Multiple MPOs

UPC NO

116657 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#I95CIP RAMP METERING PROGRAM UPC

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

PE
Federal - NHS/NHPP
PE AC Federal - AC OTHER

MPO

Statewide

FY24
$0
$0

FY25
$3,500,000
$2,200,000

$5,700,000

FY26
$0
$0

FY27
$0
$0

$0
$0

Multiple MPOs

UPC NO
SYSTEM
PROJECT

116658 SCOPE
Interstate

Statewide

#I95CIP GEOFENCED EMERGENCY NOTIFICATIONS - PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

PE AC Federal - AC OTHER
MPO

Safety

JURISDICTION

FY24
$0

FY25
$200,000

$200,000

FY26
$0

FY27
$0

$0

Multiple MPOs

UPC NO

116659 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#I95CIP ADVANCED WORK ZONE TECHNOLOGY - PROGRAM UPC

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

PE AC Federal - AC OTHER
MPO

Statewide

FY24
$0

FY25
$950,000

$950,000

FY26
$0

FY27
$0

$0

Multiple MPOs

UPC NO

116661 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#I95CIP CORRIDOR TECHNOLOGY IMPROVEMENTS - PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

FUND SOURCE
PE AC Federal - AC OTHER

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$3,202,500

248

$3,202,500

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

110729 SCOPE

Other

SYSTEM

Interstate

PROJECT

I395 AUXILIARY LANE - SOUNDWALLS

JURISDICTION

DESCRIPTION

FROM: 0.280 MI. N. of Duke Street TO: 0.048 MI. S. of Sanger Avenue

ROUTE/STREET

SHIRLEY HIGHWAY (0395)

FUND SOURCE
CN

FY24

FY25

$0

FO

ADMIN BY

VDOT

$350,000

$6,650,000

FY26
$0

FY27
$0

$0

Northern Virginia

UPC NO

110728 SCOPE

Traffic Management/Engineering

SYSTEM

Interstate

PROJECT

I-395 NORTHERN EXTENSION MULTI-MODAL ACCESS TO PENTAGON (2B)

DESCRIPTION

FROM: Shirley Hwy TO: Shirley Hwy

ROUTE/STREET

JURISDICTION

SHIRLEY HWY (0395)

FUND SOURCE
CN

OVERSIGHT

TOTAL COST

MATCH

Other

MPO

Alexandria

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

Other

MPO

Arlington County

FY25

$0

$250,000

$10,000,000

FY26
$0

FY27
$0

$0

Northern Virginia

UPC NO

108361 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

I-395 NORTHERN EXTENSION PROJECT OWNER COSTS (2A)

JURISDICTION

Northern Virginia District-wide

DESCRIPTION

FROM: Edsall Road TO: Washington, D. C. Line

ROUTE/STREET

I-395 (0395)

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$33,850,000

FY26

FY27

RW

Federal - NHFP

$70,000

$280,000

$0

$0

$0

CN

Federal - NSFH

($1,800,000)

($7,200,000)

$0

$0

$0

MPO

Northern Virginia

UPC NO

110739 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

I-395 EXPRESS LANES NORTHERN EXTENSION

JURISDICTION

Northern Virginia District-wide

DESCRIPTION

FROM: TURKEY COCK RUN TO: VICINITY OF EADS STREET

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$462,000,000

FY26

FY27

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

SHIRLEY HIGHWAY (0395)

FUND SOURCE

MATCH

FY24
$0

FY25
$0

249

$0

$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

116423 SCOPE

Landscaping/Beautification

SYSTEM

Interstate

JURISDICTION

Northern Virginia District-wide

PROJECT

I-395 NORTHERN EXTENSION PROJECT OWNER COST (2A) LANDSCAPING

DESCRIPTION

FROM: Turkeycock Run Near Duke Street TO: Vicinity of Eads Street

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE Linked to UPC 108361
ROUTE/STREET

0395

TOTAL COST

FUND SOURCE
CN

MATCH

Other

MPO

FY24
$0

FY25
$656,288

$746,030

FY26
$0

FY27
$0

$0

Northern Virginia

UPC NO

89486 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Interstate

JURISDICTION

Fairfax County

PROJECT

I-495 HOT Lane Support

DESCRIPTION

FROM: Springfield Interchange TO: Dulles Toll/Access Road (12.0000 MI)

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE WAITING FINANCIAL CLOSURE
ROUTE/STREET

0495

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$61,397,469

FY26

FY27

Federal - NHPP/E

$0

$1,493,599

$0

$0

$0

Federal - NHS/NHPP

$0

$16,248,187

$0

$0

$0

$0

$17,741,786

$0

$0

$0

CN TOTAL

MPO

Northern Virginia

UPC NO

94611 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Interstate

JURISDICTION

Fairfax County

PROJECT

GEC Design Services I495/DAAH Interchange Improvements

DESCRIPTION

FROM: 0.10 M E of Spring Hill Road (Rte. 684) TO: I-495 Capital Beltway

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE WAITING FINANCIAL CLOSURE
ROUTE/STREET

0495

TOTAL COST

FUND SOURCE
CN

MATCH

Federal - NHS/NHPP

MPO

FY24
$0

FY25
$5,058,192

$54,591,382

FY26
$0

FY27
$0

$0

Northern Virginia

UPC NO

104005 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Interstate

PROJECT

HOT Lanes Bicycle/Pedestrian Facilities - Phase II

DESCRIPTION

FROM: Provincial Drive TO: Tysons One Place (0.5000 MI)

ROUTE/STREET

0495

FUND SOURCE

JURISDICTION

Fairfax County

OVERSIGHT
ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

PE

Other

$0

RW

Other

CN

Other

FY25

$13,405,718

FY26

FY27

$2,220

$0

$0

$0

$0

$28,205

$0

$0

$0

$0

$4,368,587

$0

$0

$0

250

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

106025 SCOPE

Other

SYSTEM

Interstate

JURISDICTION

PROJECT

I-495 NORTHERN SECTION SHOULDER USE DEBT SERVICE

DESCRIPTION

FROM: South of Old Dominion Drive Overpass TO: George Washington Memorial Highway

ROUTE/STREET
0495
FUND SOURCE
CN

Fairfax County

MATCH

Federal - AC CONVERSION
Federal - NHS/NHPP

FY24

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST
FY26

FY25

$18,662,537
FY27

$0
$0

$0
$1,221,024

$1,221,039
$0

$1,220,854
$0

$1,220,685
$0

CN TOTAL

$0

$1,221,024

$1,221,039

$1,220,854

$1,220,685

CN
AC

$0

$7,007,258

$0

$0

$0

Federal - AC

MPO

Northern Virginia

UPC NO

113414 SCOPE

Environmental Only

SYSTEM

Interstate

JURISDICTION

Fairfax County

OVERSIGHT

NFO

PROJECT

I-495 EXPRESS LANES NORTHERN EXTENSION

DESCRIPTION

FROM: South of Existing Express Lanes, Northern Termini TO: American Legion Bridge (2.1100 MI)

ADMIN BY

VDOT

PROGRAM NOTE Parent UPC to child UPC 116729. Linked to UPC 68805, 155401, 116754, 116729, -25415 and 120823.
ROUTE/STREET
I-495 (0495)
FUND SOURCE
PE

MATCH

Other

MPO

FY24
$0

TOTAL COST
FY26

FY25
$13,799,970

$0

$19,799,970
FY27
$0

$0

Northern Virginia

UPC NO

115401 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

Fairfax County

OVERSIGHT

FO

PROJECT

I-495 EXPRESS LANES NORTHERN EXTENSION - PHASE 1

DESCRIPTION

FROM: South of Existing Express Lanes, Northern Termini TO: American Legion Bridge (3.1000 MI)

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET
I-495 (0495)
FUND SOURCE

MATCH

FY24
$0

MPO

TOTAL COST
FY26

FY25
$0

$0

$0

$0

Northern Virginia

UPC NO

116754 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

#OTHERINT - I-495 NEXT PH 1- VDOT OVERSIGHT & TMP

DESCRIPTION

FROM: S. of Existing Express Lanes, Northern Termini TO: American Legion Bridge

ROUTE/STREET

I-495 (0495)

FUND SOURCE
RW
AC
CN

$559,323,951
FY27

JURISDICTION

Fairfax County

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$52,400,000

FY26

FY27

Federal - AC

$0

$5,000,000

$0

$0

$0

Federal - NHPP/E

$0

$3,609,140

$0

$0

$0

Federal - NHS/NHPP

$0

$27,106,621

$0

$0

$0

Other

$0

$15,236,682

$0

$0

$0

CN TOTAL

$0

$45,952,443

$0

$0

$0

CN
AC

$0

$6,447,557

$0

$0

$0

Federal - AC

251

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

120823 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

Fairfax County

OVERSIGHT

NFO

PROJECT

#OTHERINT - I-495 NEXT TRANSIT INVESTMENT

DESCRIPTION

ADMIN BY

DRPT

FROM: S. of Existing Express Lanes, Northern Terminus TO: American Legion Bridge

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

I-495 (0495)

FUND SOURCE

TOTAL COST
MATCH

FY24
$0

FY25
$0

252

$5,200,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Northern Virginia District
Primary Projects
MPO

Northern Virginia

UPC NO

90339 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

ROUTE 1 WIDENING (FRALEY BLVD) - PE ONLY

JURISDICTION

DESCRIPTION

FROM: 0.1 Mi S. of Brady's Hill Road TO: 0.2 Mi. N. of Dumfries Road (Route 234) (2.1490 MI)

ROUTE/STREET

FRALEY BLVD (0001)

FUND SOURCE
PE

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

Federal - RSTP

MPO

Dumfries

FY24

FY25

$50,246

$3,820,693

FY26

$0

FY27

$200,982

$0

$0

Northern Virginia

UPC NO

119481 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

#SMART22 - ROUTE 1 (FRALEY BLVD) WIDENING

JURISDICTION

Dumfries

OVERSIGHT

NFO

ADMIN BY

Locally

DESCRIPTION

FROM: 0.016 Mi S. of Brady's Hill Road TO: 0.022 Mi. N. of Dumfries Road (Route 234) (1.8790 MI)

PROGRAM NOTE Linked to UPCs 90339 and 120060
ROUTE/STREET

FRALEY BLVD (0001)

FUND SOURCE

MATCH

FY24

FY25

TOTAL COST

$177,035,188

FY26

FY27

PE

Federal - NHS/NHPP

$0

$3,958,000

$0

$0

$0

RW

Federal - AC CONVERSION

$0

$0

$24,912,935

$10,536,435

$0

Federal - NHS/NHPP

$0

$11,379,363

$0

$0

$0

Other

$0

$9,887,895

$0

$0

$0

RW TOTAL

$0

$21,267,258

$24,912,935

$10,536,435

$0

RW
AC

Federal - AC

$0

$35,449,370

$0

$0

$0

CN

Other

$0

$0

$0

$0 $116,360,560

MPO

Northern Virginia

UPC NO

120060 SCOPE

SYSTEM

Primary

PROJECT

VDOT OVERSIGHT - #SMART22 ROUTE 1 (FRALEY BLVD) WIDENING

DESCRIPTION

FROM: 0.1 Mi S. of Brady's Hill Road TO: .2 Mi. N. of Dumfries Road (Route 234)

ROUTE/STREET

FRALEY BLVD (0001)

FUND SOURCE

JURISDICTION

Dumfries

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$442,000

FY26

FY27

PE

Other

$0

$427,000

$0

$0

$0

RW

Other

$0

$0

$15,000

$0

$0

253

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

107187 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

RICHMOND HIGHWAY CORRIDOR IMPROVEMENTS

JURISDICTION

DESCRIPTION

FROM: Jeff Todd Way TO: 0.13 Miles North of Frye Road (1.4500 MI)

ROUTE/STREET

RICHMOND HIGHWAY (0001)

FUND SOURCE
PE

Federal - RSTP

RW

Federal - DEMO

MATCH

FY24
$2,618,327

FY25

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$258,948,692

FY26

FY27

$10,473,307

$0

$0

$0

$0

$2,241,406

$0

$0

$0

Federal - RSTP

$2,831,304

$11,325,215

$0

$0

$0

Other

$1,948,000

$105,906,738

$0

$0

$0

$4,779,304

$119,473,359

$0

$0

$0

$0

$0

$104,452,245

$0

$0

RW TOTAL
CN

Fairfax County

Other

MPO

Northern Virginia

UPC NO

115549 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

JURISDICTION

Fairfax County

PROJECT

#SMART20 - RICHMOND HIGHWAY- BUS RAPID TRANSIT - VDOT O/S

DESCRIPTION

FROM: FORT BELVOIR TO: HUNTINGTON METRORAIL STATION

OVERSIGHT

NFO

ADMIN BY

DRPT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

RICHMOND HIGHWAY (0001)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$0
MPO

$0

$2,289,501

FY26

FY27

$0

$0

$0

Northern Virginia

UPC NO

120800 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

RICHMOND HIGHWAY CORRIDOR IMPROVEMENTS, PH 2

JURISDICTION

Fairfax County

DESCRIPTION

FROM: 0.13 Mi. N. of Frye Road TO: Sherwood Hall Road Rte 626 (1.6200 MI)

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE Linked to UPC 107187
ROUTE/STREET

RICHMOND HIGHWAY (0001)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$204,930,787

FY26

FY27

PE

Federal - RSTP

$190,000

$760,000

$0

$0

$0

RW

Federal - RSTP

$362,715

$0

$1,450,858

$0

$0

$0

$0

$85,219,934

$0

$0

$362,715

$0

$86,670,792

$0

$0

$0

$0

$0

$114,847,280

$0

Other
RW TOTAL
CN

Other

254

FFY 24-27 Working STIP

6/21/2023 8:52:03

Northern Virginia

MPO
UPC NO
SYSTEM

16422 SCOPE
Primary

Bridge Replacement w/o Added Capacity

JURISDICTION

Prince William County

OVERSIGHT

NFO

ADMIN BY

VDOT

PROJECT

REPLACE AND WIDEN BRIDGE AND APPROACHES AT NEABSCO CREEK

DESCRIPTION

FROM: 0.117 MI S CARDINAL DRIVE TO: 0.131 MI N BLACKBURN ROAD (0.4330 MI)

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

JEFF DAVIS HWY (0001)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$0

MPO

$36,834,922

FY26

$0

FY27

$0

$0

$0

Northern Virginia

UPC NO

104303 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

#HB2.FY17 WIDEN ROUTE 1 TO SIX LANES

JURISDICTION

DESCRIPTION

FROM: FEATHERSTONE ROAD TO: MARY'S WAY (1.3360 MI)

ROUTE/STREET

JEFFERSON DAVIS HIGHWAY (0001)

FUND SOURCE

Prince William County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$87,019,366

FY26

FY27

RW

Other

$0

$14,217,574

$0

$0

$0

CN

Other

$0

$29,107,044

$0

$0

$0

MPO

Northern Virginia

UPC NO

99478 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

JURISDICTION

Fairfax County

PROJECT

#HB2.FY17 RTE 7 CORRIDOR IMPROVEMENTS - PHASE 1 and PHASE 2

DESCRIPTION

FROM: Reston Avenue TO: Jarrett Valley Drive (6.8100 MI)

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE Includes $ 12,270,896 GARVEE Debt Service Principal Prev, $4,425,379 GARVEE Debt Service Principal FFY24,
$4,866,301 GARVEE Debt Service Principal FFY25, $5,120,356 GARVEE Debt Service Principal FFY26,
$5,369,619 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $77,781,048.
Corresponding Debt Service UPC 110377. Parent of child UPC 106917.
ROUTE/STREET
LEESBURG PIKE (0007)
TOTAL COST
$195,914,112
FUND SOURCE
RW

MATCH

FY24

FY25

Federal - AC CONVERSION

$0

$0

Federal - NHS/NHPP

$0

$4,425,379

$0

$4,425,379
$6,611,636

RW TOTAL

FY26
$4,866,301

FY27
$1,745,335

$0

$0

$0

$0

$4,866,301

$1,745,335

$0

$0

$0

$0

RW
AC

Federal - AC

$0

CN

Federal - AC CONVERSION

$0

$0

$0

$3,375,021

$5,369,619

Federal - DEMO

$0

$14,373,682

$0

$0

$0

Federal - HIP/F

$0

$1,686,307

$0

$0

$0

Federal - NHS/NHPP

$0

$5,829,437

$0

$0

$0

Federal - STP/STBG

$0

$1,264,539

$0

$0

$0

Other

$0

$26,643,269

$0

$0

$0

CN TOTAL

$0

$49,797,234

$0

$3,375,021

$5,369,619

CN
AC

$0

$71,220,011

$0

$0

$0

Federal - AC

255

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

106917 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

JURISDICTION

PROJECT

#HB2.FY17 RTE 7 CORRIDOR IMPROVEMENTS - PHASE 2

Fairfax County

DESCRIPTION

FROM: Reston Avenue TO: Jarrett Valley Drive (3.2500 MI)

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE Includes $8,027,754 GARVEE Debt Service Principal Prev, $2,057,588 GARVEE Debt Service Principal FFY24,
$2,211,374 GARVEE Debt Service Principal FFY25, $2,320,273 GARVEE Debt Service Principal FFY26,
$2,433,955 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $36,082,370.
Corresponding GARVEE Debt Service UPC 110378.
ROUTE/STREET
LEESBURG PIKE (0007)
TOTAL COST
$117,957,626
FUND SOURCE
CN

MATCH

FY24

FY25

Federal - AC CONVERSION
Federal - NHS/NHPP

$0
$0

$0
$2,057,588

Other

FY26
$2,211,374
$0

FY27
$2,320,273
$0

$2,433,955
$0

$0

$15,520,552

$0

$0

$0

CN TOTAL

$0

$17,578,140

$2,211,374

$2,320,273

$2,433,955

CN
AC

$0

$31,149,039

$0

$0

$0

Federal - AC

MPO

Northern Virginia

UPC NO

110377 SCOPE

SYSTEM

Primary

JURISDICTION

Fairfax County

PROJECT

#HB2.FY17 RTE 7 CORRR IMPVEMENT PH 1&2 GARVEE DEBT SERVICE

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $9,942,060 Prev GARVEE Debt Service Interest, $2,825,254 GARVEE Debt Service Interest FFY24,
$2,797,308 GARVEE Debt Service Interest FFY25, $2,572,065 GARVEE Debt Service Interest FFY26 $2,321,618
GARVEE Debt Service Interest FFY27, $9,406,780 GARVEE Debt Service Interest FFY28-39. Total GARVEE DS
Int
$29,865,085. Corresponding CN UPC 99478
ROUTE/STREET
0007
TOTAL COST
$53,057,645
FUND SOURCE
PE

MATCH

Federal - AC CONVERSION
Federal - NHS/NHPP

FY24

FY25

FY26

FY27

$0
$0

$0
$2,825,254

$2,797,308
$0

$2,572,065
$0

$2,321,618
$0

PE TOTAL

$0

$2,825,254

$2,797,308

$2,572,065

$2,321,618

PE AC Federal - AC

$0

$17,097,771

$0

$0

$0

MPO

Northern Virginia

UPC NO

110378 SCOPE

SYSTEM

Primary

PROJECT

#HB2.FY17 RT 7 CORRIDOR IMPR PHASE 2 GARVEE DEBT SERVICE

JURISDICTION

Fairfax County

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $6,426,055 GARVEE Debt Service Interest Prev, $1,256,733 FFY24 GARVEE Debt Service Interest,
$1,199,847 GARVEE Debt Service Interest FFY25, $1,091,160 GARVEE Debt Service Interest FFY26, $977,109
GARVEE Debt Service Interest FFY27, $3,763,714 GARVEE Debt Service Interest FFY28-38. Total GARVEE Debt
Service Interest $14,714,618. Corresponding CN UPC 106917.
0007
TOTAL COST
$29,786,907

FUND SOURCE
PE

Federal - AC CONVERSION
Federal - NHS/NHPP

MATCH

FY24

FY25

FY26

FY27

$0
$0

$0
$1,256,733

$1,199,847
$0

$1,091,160
$0

$977,109
$0

PE TOTAL

$0

$1,256,733

$1,199,847

$1,091,160

$977,109

PE AC Federal - AC

$0

$7,031,830

$0

$0

$0

256

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

Northern Virginia

UPC NO

T23875

SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

JURISDICTION

Loudoun County

PROJECT

ROUTE 7 IMPROVEMENTS (ROUTE 9 TO THE DULLES GREENWAY)

DESCRIPTION

FROM: DULLES GREENWAY RTE 15 BYPASS TO: ROUTE 9 PURCELLVILE (3.5000 MI)

ROUTE/STREET

ROUTE 7 (0007)

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

$0

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

$130,992,500

FY26

FY27

$0

$0

$0

Northern Virginia

UPC NO

105584 SCOPE

Bridge, New Construction

SYSTEM

Primary

PROJECT

ROUTE 7/GEORGE WASHINGTON BLVD OVERPASS

JURISDICTION

DESCRIPTION

FROM: 0. 270 MI. S. OF INT. RESEARCH PLACE TO: 0.014 MI. N. OF INT. RESEARCH PLACE (0.2840 MI)

ROUTE/STREET

HARRY BIRD HIGHWAY (0007)

FUND SOURCE

Loudoun County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$29,011,199

FY26

FY27

PE

Federal - HIP/U

$0

($37,113)

$0

$0

$0

RW

Federal - HIP/F

$0

$37,113

$0

$0

$0

Other

$0

$537,114

$0

$0

$0

RW TOTAL

$0

$574,227

$0

$0

$0

CN

$0

$5,056,782

$0

$0

$0

Other

MPO

Northern Virginia

UPC NO

111666 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

#SMART18 - ROUTE 7/ROUTE 690 INTERCHANGE

DESCRIPTION

FROM: 0.7 miles West of Rte 690 Overpass over Rte 7 TO: 0.6 miles East of Rte 690 Overpass over Rte 7
(1.1700 MI)
ROUTE 7 AND ROUTE 690 (0007)
TOTAL COST
$52,685,000

ROUTE/STREET

FUND SOURCE
CN

JURISDICTION

Loudoun County

MATCH

FY24

Other

$0

FY25
$43,553,533

NFO

ADMIN BY

Locally

FY26

FY27

$0

MPO

Northern Virginia

UPC NO

T23869

SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Primary

JURISDICTION

Loudoun County

PROJECT

ROUTE 15 ROUNDABOUT AND BRADDOCK ROAD

DESCRIPTION

FROM: Route 15 at the intersection of TO: Braddock Road

ROUTE/STREET

0015

FUND SOURCE

OVERSIGHT

$0

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$0

$7,900,000

FY26

FY27

PE

Federal - CMAQ

$200,000

$800,000

$0

$0

RW

Federal - CMAQ

$240,000

$0

$0

$960,000

$0

CN

Federal - CMAQ

$400,961

$0

$0

$0

$1,603,842

Federal - RSTP

$739,040

$0

$0

$0

$2,956,158

$1,140,000

$0

$0

$0

$4,560,000

CN TOTAL

257

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

108720 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

#HB2.FY17 WIDEN RT 28 FROM 4 TO 6 LANES DIVIDED

JURISDICTION

DESCRIPTION

FROM: 0.073 MI SOUTH OF PRINCE WILLIAM COUNTY LINE TO: 0.057 MI NORTH OF ROUTE 29 (2.3400 MI)

ROUTE/STREET

CENTREVILLE ROAD (0028)

FUND SOURCE

Fairfax County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$79,457,408

FY26

FY27

PE

Other

$0

$750,000

$0

$0

$0

CN

Other

$10,000,000

$35,747,937

$0

$0

$0

MPO

Northern Virginia

UPC NO

68627 SCOPE

Bridge Replacement w/ Added Capacity

SYSTEM

Primary

PROJECT

RTE 28 - BRIDGE REPLACEMENT OVER BROAD RUN

JURISDICTION

DESCRIPTION

FROM: 0.280 MILE WEST BROAD RUN TO: 0.302 MILE EAST BROAD RUN (0.5820 MI)

ROUTE/STREET

0028
MATCH

Federal - RSTP

MPO

NFO

ADMIN BY

VDOT

FY24
$9,910

FY25

$12,810,770

FY26

$39,640

FY27

$0

$0

$0

Northern Virginia

UPC NO

92080 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

RT 28 WIDEN TO 6 LNS & RT 215 REALIGN (Ph1) & TO 4 LNS (Ph2)

DESCRIPTION

FROM: Fitzwater Dr. (Rt 652) TO: Linton Hall Road Rte. 619 (3.2840 MI)

ROUTE/STREET

JURISDICTION

NOKESVILLE ROAD - RTE. 28 (0028)

FUND SOURCE
RW
CN

OVERSIGHT

TOTAL COST

FUND SOURCE
RW

Prince William County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - RSTP
Federal - RSTP

MPO

Prince William County

FY24
$206,312
($209,707)

FY25
$825,249
($838,829)

$43,846,252

FY26

FY27

$0
$0

$0
$0

$0
$0

Northern Virginia

UPC NO

110329 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

JURISDICTION

Fairfax County

OVERSIGHT

NFO

PROJECT

#SMART18 - ROUTE 29 WIIDENING - PH II

DESCRIPTION

FROM: 0.208 Mile West of Union Mill Road (Rte 659) TO: 0.460 Mile East of Buckley's Gate Drive (2.1370 MI)

ADMIN BY

VDOT

PROGRAM NOTE Includes $1,450,684 GARVEE Debt Service Principal Prev, $277,632 GARVEE Debt Service Principal FFY24,
$291,695 GARVEE Debt Service Principal FFY25, $306,552 GARVEE Debt Service Principal FFY26, $321,976
GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $4,520,400. Corresponding
GARVEE Debt Service UPC 111986. Linked with CN UPC 120509
ROUTE/STREET
ROUTE 29 LEE HIGHWAY (0029)
TOTAL COST
$15,231,225
FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$291,695

$306,552

$321,976

Federal - NHS/NHPP

$0

$277,632

$0

$0

$0

Other

$0

$978,131

$0

$0

$0

PE TOTAL

$0

$1,255,763

$291,695

$306,552

$321,976

PE AC Federal - AC

$0

$2,792,084

$0

$0

$0

RW

$0

$9,732,694

$0

$0

$0

Other

258

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

111986 SCOPE

SYSTEM

Primary

PROJECT

#SMART18 - ROUTE 29 WIIDENING - PH II GARVEE DEBT SERVICE

JURISDICTION

Fairfax County

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $1,185,566 GARVEE Debt Service Interest Prev, $150,058 FFY24 GARVEE Debt Service Interest,
$136,003 GARVEE Debt Service Interest FFY25, $121,235 GARVEE Debt Service Interest FFY26, $105,717
GARVEE Debt Service Interest FFY27, $266,904 GARVEE Debt Service Interest FFY28-32. Total GARVEE Debt
Service Interest
$1,965,483. Corresponding CN UPC 1110329.
0029
TOTAL COST
$5,213,883

FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$136,003

$121,235

$105,717

Federal - NHS/NHPP

$0

$150,058

$0

$0

$0

PE TOTAL

$0

$150,058

$136,003

$121,235

$105,717

PE AC Federal - AC

$0

$0

$629,859

$0

$0

MPO

Northern Virginia

UPC NO

120509 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

JURISDICTION

Fairfax County

OVERSIGHT

NFO

PROJECT

#SMART18 - ROUTE 29 WIDENING - PH II

DESCRIPTION

FROM: 0.208 Mile West of Union Mill Road (Rte 659) TO: 0.460 Mile East of Buckley's Gate Drive (2.1370 MI)

ADMIN BY

VDOT

PROGRAM NOTE Includes $66,917 GARVEE Debt Service Principal FFY24, $79,619 GARVEE Debt Service Principal FFY25,
$83,030 GARVEE Debt Service Principal FFY26, $86,575 GARVEE Debt Service Principal FFY27. Total GARVEE
Debt Service Principal $1,552,880. Linked with CN UPC 110329
ROUTE/STREET

ROUTE 29 - LEE HIGHWAY (0029)

FUND SOURCE
CN

TOTAL COST

MATCH

FY24

FY25

$81,789,458

FY26

FY27

Federal - AC CONVERSION

$0

$0

$14,846,764

$25,585,128

$86,575

Federal - NHS/NHPP

$0

$1,438,309

$0

$0

$0

Other

$0

$38,595,942

$0

$0

$0

CN TOTAL

$0

$40,034,251

$14,846,764

$25,585,128

$86,575

CN
AC

$0

$41,755,207

$0

$0

$0

Federal - AC

MPO

Northern Virginia

UPC NO

T23893

SCOPE

New Construction Roadway

SYSTEM

Primary

JURISDICTION

Loudoun County

PROJECT

RTE 50 COLLECTOR ROAD

DESCRIPTION

FROM: RTE 50 TO: RTE 28

ROUTE/STREET

RTE 50 COLLETOR ROAD (0050)

FUND SOURCE

MATCH

FY24
$0

FY25
$0

259

$0

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

$114,200,000

FY26

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

68757 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

WIDEN TO 6-LANES FROM SULLY ROAD (RT 28) TO POLAND ROAD

JURISDICTION

Northern Virginia District-wide

DESCRIPTION

FROM: VA RTE 742 (POLAND RD) TO: VA RTE 28 (SULLY RD) (3.6000 MI)

ROUTE/STREET

0050

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$95,411,444

FY26

FY27

PE

Federal - STP/STBG

$0

($168,190)

$0

$0

$0

RW

Federal - STP/STBG

($222,101)

($7,018,042)

$0

$0

$0

CN

Federal - NHS/NHPP

$0

$3,846,857

$0

$0

$0

Federal - RSTP

$462,177

$1,848,708

$0

$0

$0

Federal - STP/STBG

$790,479

$3,161,915

$0

$0

$0

$1,252,656

$8,857,480

$0

$0

$0

CN TOTAL

MPO

Northern Virginia

UPC NO

51135 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

JURISDICTION

Fairfax County

OVERSIGHT

FO

PROJECT

RTE 123 - WIDEN FROM 2 TO 4 LANES ON 6-LANE R/W

ADMIN BY

VDOT

DESCRIPTION

FROM: 0.330 KILOMETER NORTH DAVIS DRIVE TO: 0.287 KILOMETER SOUTH LEE CHAPEL ROAD (4.0600 KM)

PROGRAM NOTE Waiting Financial Closure
ROUTE/STREET

OX ROAD (0123)

FUND SOURCE

TOTAL COST
MATCH

FY24

FY25

$0
MPO

$0

$25,478,588

FY26
$0

FY27
$0

$0

Northern Virginia

UPC NO

14693 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Primary

PROJECT

CONSTRUCT INTERCHANGE @ ROUTE 1/123 IN PWC (PE & RW only)

DESCRIPTION

FROM: 0.51 Miles South of Occoquan Road (MP 175.1) TO: 0.11 Miles North of Annapolis Way (MP 176.4)
(1.2940 MI)
GORDON BLVD (0123)
TOTAL COST
$101,580,472

ROUTE/STREET

JURISDICTION

FUND SOURCE
RW

MATCH

Other

MPO

Prince William County

FY24
$0

FY25
$41,314,492

OVERSIGHT

FO

ADMIN BY

VDOT

FY26
$0

$0

$0

Northern Virginia

UPC NO

94102 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

CONSTRUCTION PHASE 1 (ROUTE 1 WIDENING ONLY)

DESCRIPTION

FROM: 0.569 Miles S. of Occoquan Rd TO: 0.113 Miles N. of Annapolis Way (1.2450 MI)

ROUTE/STREET

GORDON BLVD (0123)

FUND SOURCE
CN

FY27

Other

JURISDICTION

Prince William County

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24
$0

FY25
$11,514,391

260

$59,490,380

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

119091 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

ROUTE 1/123 INTERCHANGE PH2

JURISDICTION

DESCRIPTION

FROM: HORNER ROAD TO: BELMONT BAY DRIVE

ROUTE/STREET

GORDON BLVD (0123)

FUND SOURCE
PE

NFO

ADMIN BY

Locally

FY24

FY25

$1,100,000

$0

$67,084,000

FY26
$0

FY27
$0

$4,400,000

Northern Virginia

UPC NO

120783 SCOPE

Traffic Management/Engineering

SYSTEM

Primary

PROJECT

#ITTF22 HIGH SPEED COMMUNICATIONS FOR SIGNALS RTE 234

DESCRIPTION

FROM: Battlefield Parkway/Bulloch Drive TO: Godwin Drive (2.7660 MI)

ROUTE/STREET

JURISDICTION

SUDLEY ROAD (0234)

FUND SOURCE
CN

OVERSIGHT

TOTAL COST

MATCH

Federal - RSTP

MPO

Prince William County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

Other

MPO

Manassas

$0

FY25
$274,480

$274,480

FY26
$0

FY27
$0

$0

Northern Virginia

UPC NO

77404 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

MULLIGAN ROAD - REALIGN RTE 235 AND WIDEN RTE 619

DESCRIPTION

FROM: MOUNT VERNON HIGHWAY/ROUTE 1 TO: ROUTE 611 (TELEGRAPH ROAD) (2.3500 MI)

ROUTE/STREET

MULLIGAN ROAD (0235)

JURISDICTION

FUND SOURCE

Fairfax County

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$0

MPO

OVERSIGHT

$0

$41,983,499

FY26
$0

FY27
$0

$0

Northern Virginia

UPC NO

107937 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

RTE 286 (FAIRFAX COUNTY PARWAY) - WIDEN FROM 4 TO 6 LANES

DESCRIPTION

FROM: 0.25 Miles South of Nomes Court TO: 0.62 Miles North of Lee Highway (Route 29) (4.1660 MI)

ROUTE/STREET

FAIRFAX COUNTY PARKWAY (0286)

FUND SOURCE
PE

JURISDICTION

MATCH

Fairfax County

FY24

FY25

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

$110,333,178

FY26

FY27

Other

$3,995,013

$3,995,013

$0

$0

$0

PE AC Federal - AC

$1,501,995

$6,007,979

$0

$0

$0

RW

Other

$1,115,823

$1,115,823

$0

$0

$0

CN

Other

$4,888,721

$85,212,812

$0

$0

$0

261

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

111725 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

#SMART18 - VA 286 - POPES HEAD ROAD INTERCHANGE

JURISDICTION

Fairfax County

OVERSIGHT

DESCRIPTION

FROM: 0.83 Mi. S. of Rte. 654 Popes Head Road TO: 0.95 Mi. N. of Rte. 654 Popes Head Road (1.7800 MI)

ADMIN BY

VDOT

PROGRAM NOTE Includes $346,345 GARVEE Debt Service Principal FFY25, $411,779 GARVEE Debt Service Principal FFY26,
$429,265 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $8,032,505.
Corresponding GARVEE Debt Service UPC 111987.
ROUTE/STREET

FAIRFAX COUNTY PARKWAY (0286)

FUND SOURCE

TOTAL COST

MATCH

FY24

PE

Other

$0

RW

Federal - NHS/NHPP
Other

RW TOTAL
CN

FY25

$89,162,276

FY26

FY27

$3,700,000

$0

$0

$0

$0

$0

$346,345

$0

$0

$0

$10,292,030

$0

$0

$0

$0

$10,292,030

$346,345

$0

$0

Federal - AC CONVERSION

$0

$0

$0

$429,265

Federal - NHS/NHPP

$0

$0

$0

$37,845,793

$0

Other

$0

$0

$0

$29,703,727

$0

CN TOTAL

$0

$0

$0

$67,549,520

$429,265

CN
AC

$0

$0

$0

$7,274,381

$0

Federal - AC

MPO

Northern Virginia

UPC NO

111987 SCOPE

SYSTEM

Primary

JURISDICTION

Fairfax County

PROJECT

#SMART18 - VA286 POPES HEAD RD INTERCHGE GARVEE DEBT SERVICE

DESCRIPTION

FROM: Various TO: Various

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE Includes $294,081 GARVEE Debt Service Interest FFY25, $322,299 GARVEE Debt Service Interest FFY26,
$304,606 GARVEE Debt Service Interest FFY27, $1,963,410 GARVEE Debt Service Interest FFY28-39. Total
GARVEE Debt Service Interest $2,884,396. Corresponding CN UPC 111725.
ROUTE/STREET

VARIOUS (0286)

FUND SOURCE
PE

TOTAL COST
MATCH

FY24

FY25

$4,016,365

FY26

FY27

Federal - AC CONVERSION

$0

$0

$0

$322,299

$304,606

Federal - NHS/NHPP

$0

$0

$294,081

$0

$0

PE TOTAL

$0

$0

$294,081

$322,299

$304,606

PE AC Federal - AC

$0

$0

$2,590,315

$0

$0

MPO

Northern Virginia

UPC NO

T26691

SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Primary

JURISDICTION

Prince William County

PROJECT

PRINCE WILLIAM PARKWAY / MINNIEVILLE ROAD INTERCHANGE

DESCRIPTION

FROM: Elm Farm Road TO: Golansky Blvd

ROUTE/STREET

PRINCE WILLIAM PARKWAY (ROUTE 294) (0294)

FUND SOURCE

MATCH

FY25
$0

262

NFO

ADMIN BY

Locally

TOTAL COST

FY24
$0

OVERSIGHT

$70,000,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

99481 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

RTE 7 / BELMONT RIDGE ROAD (RTE 659) INTERCHANGE

DESCRIPTION

FROM: 0.7 Miles West of Rte. 659 TO: 0.8 Miles East of Rte. 659 (1.4680 MI)

ROUTE/STREET

HARRY BYRD HIGHWAY (6007)

FUND SOURCE
CN

JURISDICTION

Loudoun County

OVERSIGHT

FO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$76,914,600

FY26

FY27

Federal - STP/STBG

$0

$13,136,277

$0

$0

$0

Other

$0

$49,601,472

$0

$0

$0

$0

$62,737,749

$0

$0

$0

CN TOTAL

263

FFY 24-27 Working STIP

6/21/2023 8:52:03

Northern Virginia District
Miscellaneous
Projects
MPO

Multiple MPOs

UPC NO

T20741

SCOPE

SYSTEM

Miscellaneous

JURISDICTION

PROJECT

Statewide

OVERSIGHT

NFO

VEHICLE FUEL CONVERSION PROGRAM MARKETING

ADMIN BY

Other

9999

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE
CN

MATCH

Federal - CMAQ

FY24
$72,000

FY25
$288,000

MPO

Multiple MPOs

UPC NO

T11802

SCOPE

Other

SYSTEM

Miscellaneous

JURISDICTION

Statewide

PROJECT

Vehicle Fuel Conversion Program

DESCRIPTION

FROM: 1 TO: 1

ROUTE/STREET

9999

FY26
$0

FY27
$0

MATCH

Federal - CMAQ

FY24
$1,235,482

MPO

NonMPO

UPC NO

T15988

SCOPE

SYSTEM

Miscellaneous

JURISDICTION

PROJECT

FY25
$4,941,927

FO

ADMIN BY

Other
$8,640,000

FY26
$0

Northern Virginia District-wide

$0

OVERSIGHT

TOTAL COST

FUND SOURCE
CN

$360,000

FY27
$0

$0

OVERSIGHT

NFO

#HB2.FY17 HIGHWAY CONST DISTRICT GRANT PRGM - NOVA

ADMIN BY

VDOT

HDGP

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE

MATCH

FY24
$0

MPO

$0

FY27
$0

$0

Northern Virginia

UPC NO

118024 SCOPE

Bridge Rehab w/o Added Capacity

SYSTEM

Miscellaneous

PROJECT

AIRPORT ACCESS RD BRIDGE CRASHWALL STR #1091;FED STR #ID321

DESCRIPTION

FROM: RTE 1 TO: RTE 400

ROUTE/STREET

AIRPORT ACCESS ROAD BRIDGE (0233)

FUND SOURCE
CN

FY26

FY25
$0

$63,467,199

Other

JURISDICTION

Arlington County

MATCH

FY25
$1,458,696

264

NFO

ADMIN BY

VDOT

TOTAL COST

FY24
$0

OVERSIGHT

$1,458,696

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Northern Virginia District
Public
Transportation
Projects
MPO

Northern Virginia

UPC NO

115548 SCOPE

Transit

SYSTEM

Public
Transportation

PROJECT

#SMART20 - WEST END TRANSITWAY CORRIDOR INVESTMENTS - DRPT

DESCRIPTION

FROM: Van Dorn Metro Station TO: Intersection of King Street and Beauregard

ROUTE/STREET

VAN DORN METRO STATION (9999)

FUND SOURCE
CN

JURISDICTION

OVERSIGHT

NFO

ADMIN BY

DRPT

TOTAL COST

MATCH

Other

MPO

Alexandria

FY24
$0

FY25
$31,696,000

$31,696,000

FY26
$0

FY27
$0

$0

Northern Virginia

UPC NO

115667 SCOPE

Transit

SYSTEM

Public
Transportation

PROJECT

POTOMAC YARD METRORAIL STATION INCLUDING SOUTHWEST ENTRANCE

DESCRIPTION

FROM: E. Glebe and Potomac Ave TO: E. Glebe and Potomac Ave

JURISDICTION

Alexandria

OVERSIGHT

NFO

ADMIN BY

DRPT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

E. GLEBE AND POTOMAC AVE (9999)

FUND SOURCE

MATCH

TOTAL COST
FY24

FY25

$0

MPO

$0

$25,000,000

FY26
$0

FY27
$0

$0

Northern Virginia

UPC NO

113526 SCOPE

Transit

SYSTEM

Public
Transportation

PROJECT

VRE MANASSAS LINE CAPACITY EXPANSION

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

ROUTE/STREET

VRE MANASSAS LINE (9999)

FUND SOURCE

JURISDICTION

Manassas

MATCH

FY24

FY25

OVERSIGHT

FO

ADMIN BY

DRPT

TOTAL COST

$140,268,094

FY26

FY27

PE

Other

$0

$15,896,758

$0

$0

$0

RW

Other

$0

$26,703,305

$0

$0

$0

CN

Other

$0

$62,412,937

$0

$0

$0

265

FFY 24-27 Working STIP

6/21/2023 8:52:03

Northern Virginia District
Secondary
Projects
MPO

Northern Virginia

UPC NO

T23444

SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Secondary

JURISDICTION

Arlington County

PROJECT

LOCAL - CONNECTOR BRIDGE CRYSTAL CITY TO WASH NATIONAL AIRP

DESCRIPTION

FROM: Crystal City - Crystal Drive to VRE Station, TO: Metrorail Station Wash DC Airport

ROUTE/STREET

CRYSTAL DRIVE (9999)

FUND SOURCE
PE

MPO

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Other

OVERSIGHT

FY24

FY25

$0

$0

$18,000,000

FY26

FY27

$2,500,000

$0

$0

Northern Virginia

UPC NO

115562 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Secondary

JURISDICTION

Arlington County

OVERSIGHT

NFO

PROJECT

INTERMODAL CONNECTOR - ARLINGTON

ADMIN BY

Locally

DESCRIPTION

FROM: Crystal City - Crystal Drive to VRE Station, TO: Metrorail Station Wash DC Airport

PROGRAM NOTE Parent UPC of child UPC -23444. All funding obligated based on current allocations/estimate. Waiting
Financial Closure
ROUTE/STREET
CRYSTAL DRIVE (9999)
TOTAL COST
$9,500,000
FUND SOURCE

MATCH

FY24

FY25

$0

$0

MPO

Northern Virginia

UPC NO

T21255

SCOPE

Safety

SYSTEM

Secondary

JURISDICTION

Fairfax County

PROJECT

FY26

FY27

$0

$0

$0

OVERSIGHT

NFO

BRADDOCK ROAD S-CURVE

ADMIN BY

VDOT

BRADDOCK ROAD (0620)

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE

MATCH

FY24

FY25

$3,695,000

FY26

FY27

PE

Federal - HSIP

$0

$550,000

$0

$0

$0

RW

Federal - HSIP

$0

$0

$0

$1,000,000

$0

CN

Federal - HSIP

$0

$0

$0

$0

$2,145,000

MPO

Northern Virginia

UPC NO

106742 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

FRONTIER DRIVE EXTENSION AND BRAIDED RAMPS

DESCRIPTION

FROM: Franconia Springfield Parkway TO: Loisdale Road (1.2400 MI)

ROUTE/STREET

FRONTIER DRIVE (2677)

FUND SOURCE
PE

Other

JURISDICTION

Fairfax County

MATCH

FY24
$0

FY25
$2,600,000

266

$0

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

$180,200,000

FY26

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

Northern Virginia

UPC NO

T26071

SCOPE

Rail/Highway Crossing

JURISDICTION

Fairfax County

SYSTEM

Secondary

PROJECT

CSX OVERPASS AT NEWINGTON ROAD

DESCRIPTION

FROM: AT CSX RR TO: AT CSX RR (0.0200 MI)

ROUTE/STREET

NEWINGTON ROAD (0877)

FUND SOURCE

FY24
$0

$32,185,000

FY26

FY25

FY27

$0

$0

$0

Northern Virginia

UPC NO

106274 SCOPE

Other

SYSTEM

Secondary

PROJECT

SPRINGFIELD CBC COMMUTER PARKING GARAGE

DESCRIPTION

FROM: 0.06 mile West of Springfield Blvd TO: Springfield blvd (0.0600 MI)

ROUTE/STREET

OLD KEENE MILL ROAD (0644)

JURISDICTION

FUND SOURCE
PE

NFO
Rail

TOTAL COST

MATCH
$0

MPO

OVERSIGHT
ADMIN BY

MATCH

Fairfax County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
FY24

FY25

$58,373,120

FY26

FY27

Federal - CMAQ

$522,040

$2,088,158

$0

$0

$0

Other

$566,308

$566,308

$0

$0

$0

PE TOTAL

$1,088,348

$2,654,466

$0

$0

$0

RW

Federal - CMAQ

($583,573)

($2,334,290)

$0

$0

$0

CN

Federal - CMAQ

$795,000

$3,179,998

$0

$0

$0

MPO

Northern Virginia

UPC NO

5559 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

ROLLING ROAD - RTE 638 - WIDEN TO 4 LANES - PH II

DESCRIPTION

FROM: 0.369 MI. N. RTE. 286 (FAIRFAX COUNTY PARKWAY) TO: 1.879 Mi. N. RTE 286 (FAIRFAX COUNTY
PARKWAY) (1.3860 MI)

ROUTE/STREET

ROLLING ROAD (0638)

FUND SOURCE
PE

JURISDICTION

PE TOTAL
PE AC Federal - AC

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

Federal - RSTP
Other

Fairfax County

FY24

FY25

$73,220,039

FY26

FY27

$22,298
$439,683

$89,190
$439,683

$0
$0

$0
$0

$0
$0

$461,981

$528,873

$0

$0

$0

$163,250

$653,000

$0

$0

$0

RW

Other

$4,859,665

$4,859,665

$0

$0

$0

CN

Other

$1,827,789

$39,884,534

$0

$0

$0

MPO

Northern Virginia

UPC NO

T26956

SCOPE

New Construction Roadway

SYSTEM

Secondary

JURISDICTION

Fairfax County

PROJECT

SEVEN CORNERS RING ROAD (PHASE 1A SEGMENT 1A)

DESCRIPTION

FROM: Arlington Boulevard (Route 50)/RTE 7, Westbound Ramp TO: Castle Rd and RTE 7

ROUTE/STREET

RTE 50 WB RAMP AND CASTLE PL (0713)

FUND SOURCE
PE

Federal - RSTP

MATCH

FY24
$850,432

FY25
$0

267

$0

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

$136,989,484

FY26

FY27
$3,401,726

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

112479 SCOPE

New Construction Roadway

SYSTEM

Secondary

PROJECT

SOAPSTONE CONNECTOR NEW ROADWAY

JURISDICTION

Fairfax County

DESCRIPTION

FROM: Sunrise Valley Drive TO: Sunset Hills Road (0.5000 MI)

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

$235,000,000

FY26

FY27

PROGRAM NOTE Linked to UPC -24836
ROUTE/STREET

SOAPSTONE CONNECTOR (4720)

FUND SOURCE

MATCH

FY24

FY25

PE

Other

$0

$1,460,000

$0

$0

$0

RW

Other

$0

$136,806,963

$0

$0

$0

CN

Other

$0

$88,993,037

$0

$0

$0

MPO

Northern Virginia

UPC NO

T24212

SCOPE

Traffic Management/Engineering

SYSTEM

Secondary

JURISDICTION

Fairfax County

PROJECT

MULTIMODAL TRAVEL INFORMATION DISPLAYS (TID) FY24-FY26

DESCRIPTION

TYSONS CORNER AREA

ROUTE/STREET

VARIOUS (9999)

FUND SOURCE

ADMIN BY

VDOT

FY24
$0

$664,414

FY26

FY25
$0

FY27
$0

$0

Northern Virginia

UPC NO

121755 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

ARCOLA MILLS DRIVE - SEGMENT 1 WIDEN TO 4 LANES

DESCRIPTION

FROM: BELMONT RIDGE ROAD TO: STON SPRINGS BOULEVARD (0.4090 MI)

ROUTE/STREET

JURISDICTION

ARCOLA MILLS DRIVE (0659)

FUND SOURCE
PE

NFO

TOTAL COST
MATCH
$0

MPO

OVERSIGHT

Loudoun County

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

Other

MPO

OVERSIGHT

$0

FY25
$4,955,142

$66,163,375

FY26
$0

FY27
$0

$0

Northern Virginia

UPC NO

76244 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

JURISDICTION

Loudoun County

PROJECT

RTE 659 - RECONSTRUCT TO 4 LANES

DESCRIPTION

FROM: HAY ROAD TO: GLOUCESTER PARKWAY (1.9000 MI)

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

BELMONT RIDGE RD (0659)

FUND SOURCE

TOTAL COST

MATCH

FY24
$0

FY25
$0

268

$51,843,650

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

121756 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

NORTHSTAR BOULEVARD WIDEN TO 4 LANES

JURISDICTION

DESCRIPTION

FROM: TALL CEDARS PARKWAY TO: BRADDOCK ROAD (1.3130 MI)

ROUTE/STREET

LOUDOUN COUNTY PARKWAY (0606)

FUND SOURCE
PE

MATCH

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
FY24

Other

MPO

Loudoun County

$0

FY25
$2,888,456

$48,661,327

FY26

FY27

$0

$0

$0

Northern Virginia

UPC NO

106994 SCOPE

New Construction Roadway

SYSTEM

Secondary

PROJECT

NORTHSTAR BLVD EXTENSION SHREVEPORT DR TO ROUTE 50

JURISDICTION

DESCRIPTION

FROM: From John Mosby Hwy (Route 50) TO: 0.18 Mi. South of Shreveport Drive (1.6000 MI)

ROUTE/STREET

NORTHSTAR BOULEVARD (9999)

FUND SOURCE

Loudoun County

MATCH

FY24

FY25

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

$170,843,682

FY26

FY27

RW

Other

$9,600,000

$96,701,233

$0

$0

$0

CN

Other

$0

$34,926,961

$0

$0

$0

MPO

Northern Virginia

UPC NO

97529 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

JURISDICTION

Loudoun County

PROJECT

RTE 606 LOUDOUN COUNTY PARKWAY/ OLD OX ROAD RECONSTRUCTION

DESCRIPTION

FROM: Rte 621 TO: Rte 267 (5.2830 MI)

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocation/estimate. Linked with UPC 105064, 105575, 10795
ROUTE/STREET

TOTAL COST

OLD OX ROAD (0606)

FUND SOURCE

MATCH

FY24
$0

MPO

FY25
$0

$75,376,128

FY26

FY27

$0

$0

$0

Northern Virginia

UPC NO

120774 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

SYCOLIN ROAD-LOUDOUN CENTER PL to CROSSTRAIL BLVD

DESCRIPTION

FROM: Loudoun Center Place TO: Crosstrail Bkvd (0.8200 MI)

ROUTE/STREET

SYCOLIN ROAD (0625)

FUND SOURCE

JURISDICTION

Loudoun County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$42,595,790

FY26

FY27

PE

Other

$0

$3,878,437

$0

$0

$0

RW

Other

$0

$0

$0

$17,187,853

$0

CN

Other

$0

$0

$0

269

$0 $21,529,500

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

111670 SCOPE

New Construction Roadway

SYSTEM

Secondary

PROJECT

#SMART18 - WESTWIND DRIVE (LOUDOUN COUNTY PKWY TO ROUTE 606)

JURISDICTION

DESCRIPTION

FROM: Route 607 (Loudoun Co Parkway) TO: Route 606 (Old Ox Road) (1.1300 MI)

ROUTE/STREET

WESTWIND DRIVE (2988)

FUND SOURCE

Loudoun County

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

Other

$0

$0

$0

CN

Other

$0

$0

$0

FY27
$7,600,000

$0

$0 $31,024,700

Northern Virginia

UPC NO

114098 SCOPE

Preliminary Engineering

SYSTEM

Secondary

PROJECT

CONNECTOR RD-SUNRISE VALLEY DR TO INNOVATION AVE - STUDY

DESCRIPTION

FROM: Rte 5320 Sunrise Valley Drive TO: Rte 209 Innovation Avenue (0.6000 MI)

ROUTE/STREET

JURISDICTION

9999

Northern Virginia District-wide

MATCH

FY24
$0

MPO

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

$0

$1,000,000

FY26

FY25

FY27

$0

$0

$0

Northern Virginia

UPC NO

121761 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

DEVLIN RD WIDENING - LINTON HALL RD TO UNIVERSITY BOULEVARD

DESCRIPTION

FROM: LINTON HALL ROAD TO: UNIVERSITY BOULEVARD (0.9210 MI)

ROUTE/STREET

DEVLIN ROAD (0621)

JURISDICTION

FUND SOURCE
PE

$43,278,410

FY26

RW

MPO

OVERSIGHT

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - RSTP

MPO

Prince William County

FY24
$999,821

FY25
$3,999,282

$39,997,646

FY26

FY27

$0

$0

$0

Northern Virginia

UPC NO

120778 SCOPE

New Construction Roadway

SYSTEM

Secondary

PROJECT

NORTH WOODBRIDGE MOBILITY IMPROVEMENTS (MARINA WAY EXTENDED) ADMIN BY

DESCRIPTION

FROM: Rte 123 (Gordon Blvd) TO: Annapolis Way (0.2600 MI)

ROUTE/STREET

MARINA WAY (0639)

FUND SOURCE

JURISDICTION

Prince William County

OVERSIGHT

NFO
Locally

TOTAL COST

MATCH

FY24

FY25

$25,310,279

FY26

FY27

PE

Other

$0

$3,570,359

$0

$0

$0

RW

Other

$0

$0

$0

$10,071,060

$0

CN

Other

$0

$0

$0

270

$0 $11,668,860

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

107947 SCOPE

New Construction Roadway

SYSTEM

Secondary

JURISDICTION

PROJECT

#SMART18 - NEABSCO MILLS ROAD - WIDEN TO 4 LANES

DESCRIPTION

FROM: .018 Mi. S. of Rte 1 (Richmond Hwy) TO: 0.012 Mi. S. of Smoke Ct. (Rte. 1782) (0.7840 MI)

ROUTE/STREET

NEABSCO MILLS ROAD (0638)

FUND SOURCE
PE
RW

FY24

Federal - RSTP
Federal - RSTP

($16,339)
($155,664)

Federal - STP/STBG

CN TOTAL

MPO

ADMIN BY

Locally

FY25

$29,385,423

FY26

FY27

$0
$0

$0
$0

$0
$0

($148,140)

($592,559)

$0

$0

$0

($303,804)

($1,215,215)

$0

$0

$0

$376,869

$1,507,474

$0

$0

$0

$7,493,667

$7,493,667

$0

$0

$0

$7,870,536

$9,001,141

$0

$0

$0

Northern Virginia

UPC NO

122408 SCOPE

Safety

SYSTEM

Secondary

PROJECT

ROLLINS FORD ROAD @ BRAIDED STREAM ROAD SIGNAL IMPROVEMENTS

JURISDICTION

Prince William County

DESCRIPTION

FROM: BRAIDED STREAM DRIVE TO: ROLLINS FORD ROAD (0.1950 MI)

ROUTE/STREET

ROLLINS FORD ROAD (3500)

FUND SOURCE

MPO

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$0

$300,000

FY26

$0

$0

FY27
$0

$0

Northern Virginia

UPC NO

118313 SCOPE

New Construction Roadway

SYSTEM

Secondary

PROJECT

UNIVERSITY BLVD EXTENSION (DEVLIN RD TO WELLINGTON RD)

DESCRIPTION

FROM: Wellington Road TO: Devlin Road (2.5000 MI)

ROUTE/STREET

JURISDICTION

UNIVERSITY BOULEVARD (0840)

FUND SOURCE
PE
RW

NFO

($65,356)
($622,656)

Federal - DEMO
Other

OVERSIGHT

TOTAL COST

MATCH

RW TOTAL
CN

Prince William County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - RSTP
Federal - RSTP

MPO

Prince William County

FY24
$1,400,000
$3,600,000

FY25
$0
$0

$94,755,559

FY26
$5,600,000
$0

FY27
$0
$0
$0 $14,400,000

Northern Virginia

UPC NO

111985 SCOPE

SYSTEM

Secondary

PROJECT

#SMART18 - POTOMAC TOWN CENTER GARAGE - GARVEE DEBT SERVICE

DESCRIPTION

FROM: Various TO: Various

PROGRAM NOTE

Includes $445,334 FFY24 GARVEE Debt Service Interest, $933,378 GARVEE Debt Service Interest FFY25,
$949,327 GARVEE Debt Service Interest FFY26, $894,596 GARVEE Debt Service Interest FFY27, $5,513,086
GARVEE Debt Service Interest FFY28-39. Total GARVEE Debt Service Interest $8,735,721. Corresponding CN
UPC 111485.
VARIOUS (9999)
TOTAL COST
$12,163,970

ROUTE/STREET

FUND SOURCE
PE
Federal - STP/STBG
PE AC Federal - AC

JURISDICTION

Prince William County

MATCH

FY24
$0

FY25
$445,334
$8,290,387

271

OVERSIGHT

NFO

ADMIN BY

VDOT

FY26
$0
$0

FY27
$0
$0

$0
$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Northern Virginia District
Urban Projects
MPO

Northern Virginia

UPC NO

77378 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

EISENHOWER AVENUE WIDENING AND REMOVE TRAFFIC CIRCLE

JURISDICTION

DESCRIPTION

FROM: 60' WEST OF MILL ROAD TO: EAST END OF HOLLAND LANE INTERSECTION (0.4000 MI)

ROUTE/STREET

EISENHOWER AVE. (U000)

FUND SOURCE
CN

Alexandria

Locally

FY24

FY25

$11,531,358

FY26

FY27

Federal - RSTP

$11,550

$46,198

$0

$0

$0

Federal - STP/STBG

$43,443

$173,771

$0

$0

$0

$0

$6,118,947

$0

$0

$0

$54,992

$6,338,916

$0

$0

$0

CN TOTAL

MPO

Northern Virginia

UPC NO

122017 SCOPE

Bridge Rehab w/o Added Capacity

SYSTEM

Urban

PROJECT

#SGR23VB-RTE0 S.ABINGDON STOVER I-395 BRIDGE REHAB(FED ID 5)

DESCRIPTION

FROM: 34th STREET S. TO: S. ABINGDON STREET (0.1080 MI)

ROUTE/STREET

JURISDICTION

SOUTH ABINGDON STREET (0395)

FUND SOURCE

Arlington County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$9,550,000

FY26

FY27

Federal - BR

$0

$4,000,572

$0

$0

$0

Other

$0

$5,549,428

$0

$0

$0

$0

$9,550,000

$0

$0

$0

CN TOTAL

MPO

Northern Virginia

UPC NO

119479 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

#SMART22 - COUNTRY CLUB COMMONS CONNECTOR TRAIL

DESCRIPTION

FROM: BTW Spring Lake Terrace TO: BTW Fairfax Blvd

ROUTE/STREET

COUNTRY CLUB COMMONS (9999)

FUND SOURCE
PE

NFO

ADMIN BY
TOTAL COST

MATCH

Other

CN

OVERSIGHT

Other

JURISDICTION

Fairfax

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$0

FY25
$990,434

272

$5,142,624

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Northern Virginia

UPC NO

105521 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

#HB2.FY17 WIDEN EAST SPRING STREET

DESCRIPTION

FROM: 0.168 MILE WEST OF HERNDON PARKWAY TO: 0.063 MILE EAST OF FAIRFAX COUNTY PARKWAY ONRAMP (0.3660 MI)
SPRING STREET (0000)
TOTAL COST
$22,595,976

ROUTE/STREET

JURISDICTION

FUND SOURCE
PE

Herndon

MATCH

Federal - RSTP
Other

PE TOTAL

FY24

FY25

OVERSIGHT

NFO

ADMIN BY

VDOT

FY26

FY27

$37,222
$213,903

$148,888
$213,903

$0
$0

$0
$0

$0
$0

$251,125

$362,791

$0

$0

$0

RW

Other

$3,989,466

$3,989,466

$0

$0

$0

CN

Other

$796,495

$11,497,549

$0

$0

$0

MPO

Northern Virginia

UPC NO

102895 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

SYCOLIN ROAD - WIDEN TO FOUR LANES (PH IV)

JURISDICTION

DESCRIPTION

FROM: Claudia Drive TO: Tolbert Lane SE (1.0180 MI)

ROUTE/STREET

SYCOLIN ROAD (0000)

FUND SOURCE
CN

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - RSTP

MPO

Leesburg

FY24
$345,705

FY25
$1,382,818

$13,854,014

FY26

FY27

$0

$0

Northern Virginia

UPC NO

96721 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

ROUTE 28 WIDENING - MANASSAS

DESCRIPTION

FROM: 0.145 Mi South of Pennsylvania Avenue TO: 0.163 Mi North of Godwin Drive (1.0000 MI)

ROUTE/STREET

JURISDICTION

NOKESVILLE ROAD (0028)

FUND SOURCE
RW
CN

$0

Manassas

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$20,159,565

FY26

FY27

Federal - RSTP
Federal - RSTP

($19,068)
$49,193

($76,272)
$196,770

$0
$0

$0
$0

$0
$0

Other

$618,212

$5,315,961

$0

$0

$0

$667,405

$5,512,731

$0

$0

$0

CN TOTAL

MPO

Northern Virginia

UPC NO

122041 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Urban

PROJECT

G STREET SIDEWALK IMPROVEMENTS

DESCRIPTION

FROM: E E STREET TO: S 11TH STREET (0.1720 MI)

ROUTE/STREET

E G STREET (0015)

FUND SOURCE

JURISDICTION

Purcellville

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$2,824,221

FY26

FY27

PE

Federal - TAP/F

$138,546

$554,182

$0

$0

$0

RW

Federal - TAP/F

$36,766

$0

$0

$147,062

$0

$0

$0

$0

$730,651

$0

$36,766

$0

$0

$877,713

$0

Other
RW TOTAL

273

FFY 24-27 Working STIP

6/21/2023 8:52:03

Northern Virginia District
Enhancement
Projects
MPO

NonMPO

UPC NO

121569 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

JANNEY MILL TRAIL AND PEDESTRIAN BRIDGE

DESCRIPTION

FROM: Highwater Rd TO: Charles Town Pike

ROUTE/STREET

JANNEY MILL TRAIL (0009)

FUND SOURCE

JURISDICTION

Hillsboro

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$1,761,340

FY26

FY27

PE

Federal - TAP/F

$47,149

$188,596

$0

$0

$0

RW

Federal - TAP/F

$6,010

$0

$24,039

$0

$0

CN

Federal - TAP/F

$299,109

$0

$0

$1,196,437

$0

MPO

Northern Virginia

UPC NO

121561 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

TOKEN FOREST DRIVE SIDEWALK

DESCRIPTION

FROM: PURCELL ROAD TO: ALLSTART DRIVE (0.3190 MI)

ROUTE/STREET

TOKEN FOREST DRIVE (0751)

FUND SOURCE

JURISDICTION

Prince William County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$899,417

FY26

FY27

PE

Federal - TAP/F

$60,583

$242,330

$0

$0

$0

RW

Federal - TAP/F

$21,016

$0

$84,064

$0

$0

CN

Federal - TAP/F

$98,285

$0

$0

$393,139

$0

MPO

Northern Virginia

UPC NO

122014 SCOPE

Safety and Education of Pedestrians /Bicyclists

SYSTEM

Enhancement

PROJECT

PWCS SAFE ROUTES TO SCHOOL PROGRAM COORDINATOR /
DEVELOPMENT

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

9999

FUND SOURCE
PE

Federal - TAP/F

JURISDICTION

Prince William County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$34,967

FY25
$139,866

274

$174,832

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Northern Virginia District
Project
Groupings
MPO

NonMPO

GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

NonMPO

GROUPING

Construction : Rail

FY26

$0

FY27

$0

ROUTE/STREET

$0

$0

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0

FY26

$0

MPO

NonMPO

GROUPING

Construction : Safety/ITS/Operational Improvements

FY27

$0

ROUTE/STREET

$0

$0

TOTAL COST

FUND SOURCE

MATCH

FY24
$0

FY25

FY26

$0

FY27

$0

MPO

NonMPO

GROUPING

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

$0

$0

TOTAL COST

FUND SOURCE

MATCH

FY24
$0

FY25

FY26

$0

FY27

$0

MPO

Northern Virginia

GROUPING

Maintenance : Preventive Maintenance and System Preservation

$0

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

FY26

Federal - NHS/NHPP

$0

$15,726,599

$15,726,599

Federal - STP/STBG

$0

$638,902

$641,525

$0

$16,365,501

$16,368,124

CN TOTAL

275

$65,477,920
FY27

$15,726,599 $15,726,599
$644,192

$646,905

$16,370,791 $16,373,504

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

Northern Virginia

GROUPING

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

Federal - AC CONVERSION

FY24
$0

Federal - CMAQ
Federal - NHS/NHPP

$0

Federal - STP/STBG

FY25

$10,531,043

FY26

FY27

$0

$0

$0

$360,465

$0

$0

$274,495

$0

$1,623,569

$1,623,569

$1,623,569

$1,623,569

$0

$494,339

$495,034

$495,470

$496,459

CN TOTAL

$0

$2,117,908

$2,118,603

$2,393,534

$2,480,493

CN
AC

$0

$0

$0

$1,420,505

$0

Federal - AC OTHER

MPO

Northern Virginia

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$32,482,005

FY26

FY27

Federal - AC CONVERSION

$0

$0

$0

$0

Federal - CMAQ

$0

$0

$0

$274,495

$0

Federal - NHS/NHPP

$0

$3,189,226

$3,189,226

$3,189,226

$3,189,226

Federal - STP/STBG

$0

$4,390,067

$4,408,090

$4,426,419

$4,445,060

CN TOTAL

$0

$7,579,293

$7,597,316

$7,890,140

$7,994,751

CN
AC

$0

$0

$0

$1,420,505

$0

Federal - AC OTHER

MPO

NonMPO

GROUPING

Transit : Access

ROUTE/STREET
FUND SOURCE

TOTAL COST
MATCH

FY24
$0

FY25
$0

276

$1,704,928

FY26
$0

$360,465

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Northern Virginia MPO
Project
Groupings
GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE
PE

MATCH

FY27

$335,112

$0

$600,000

$0

$740,447

$672,548

$6,878,342

$1,533,600

$400,000

$0

Federal - NHS/NHPP

($30,215)

($120,859)

$0

$0

$0

$29,548

$0

$118,193

$0

$0

$1,006,993

$6,757,483

$2,251,793

$400,000

$740,447

$0

$750,000

$606,887

$925,559

$0

Federal - BR

$239,926

$0

$0

$4,186,297

$0

Federal - NHS/NHPP

$260,880

$0

$0

$1,043,518

$0

$0

$0

$0

$115,880

$0

$500,806

$0

$0

$5,345,695

$0

Federal - AC CONVERSION

$1,728,778

$3,366,998

$3,548,112

$0

$0

Federal - BR

$9,265,829

$2,000,000

$12,796,498

$38,721,704

$13,818,114

PE AC Federal - AC OTHER

Other
RW TOTAL

Federal - DEMO

$275,773

$0

$0

$0

$1,103,093

$4,657,140

$0

$0

$0

$18,628,560

Federal - RSTP

$440,262

$749,222

$1,011,824

$0

$0

Federal - STP/STBG

$330,452

$0

$1,321,806

$0

$0

$0

$0

$0

$0

$19,928,599

$16,698,233

$6,116,220

$18,678,240

$38,721,704

$53,478,366

$0

$7,458,544

$2,816,254

$1,828,855

$34,561,496

Federal - NHS/NHPP

Other
CN TOTAL
CN
AC

$266,161,505

FY26

Federal - BR

PE TOTAL

CN

FY25

Federal - AC CONVERSION

Federal - STP/STBG

RW

FY24

Federal - AC OTHER

GROUPING

Construction : Federal Lands Highway

ROUTE/STREET
FUND SOURCE

MATCH
$0

GROUPING

FY25

FY24
$0

TOTAL COST

$24,706,035

FY26

FY27

$0

$0

$0

Construction : Rail

ROUTE/STREET
FUND SOURCE

MATCH

FY24
$0

FY25
$0

277

$0

TOTAL COST

$12,500,000

FY26

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

GROUPING
Construction : Recreational Trails
ROUTE/STREET
FUND SOURCE
MATCH
PE
PE AC
RW
RW
AC
CN

Federal - AC CONVERSION
Federal - AC OTHER
Federal - AC CONVERSION
Federal - AC OTHER

Federal - CMAQ
Federal - RSTP
CN TOTAL
CN
Federal - AC OTHER
AC
GROUPING

FY24

TOTAL COST
FY26

FY25

$84,000
$0
$4,000
$0

$0
$0
$0
$0

$0
$420,000
$0
$0

$173,462
$0
$0
$20,000

$162,537
$0
$16,000
$0

$46,163
$110,939
$157,102
$0

$0
$0
$0
$0

$0
$0
$0
$0

$0
$0
$0
$0

$184,651
$443,756
$628,407
$774,491

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET
FUND SOURCE
PE

MATCH

FY24

FY25

$1,535,683,7
29
FY27

FY26

$3,036,905

$1,122,440

$4,587,257

Federal - CMAQ

$1,749,323

$4,287,667

Federal - NHS/NHPP

$1,303,887

$743,200

Federal - RSTP

$481,254

Federal - STP/STBG

$196,891

PE AC Federal - AC OTHER

$6,191,943

$512,000

$741,062

$0

$1,968,563

$681,948

$3,790,400

$0

($2,849,431)

$0

$1,520,000

$3,254,445

$359,597

$0

$427,965

$0

$6,768,259

$3,663,473

$6,010,267

$11,930,308

$5,735,008

$0

$18,075,645

$1,973,672

$4,551,458

$0

$0

$9,536,429

$8,669,403

Federal - CMAQ

$58,000

$0

$0

$232,000

$0

Federal - DEMO

$2,000

$1

$8,000

$0

$0

$20,937

$0

$83,746

$0

$0

Federal - AC CONVERSION

Federal - HIP/F
Federal - HSIP

$0 $18,358,010

$7,000

$0

$63,000

$0

$0

$156,856

$0

$0

$360,000

$267,422

Federal - NHS/NHPP

$5,221,178

$115,200

$10,248,722

$9,272,976

$1,247,814

Federal - RSTP

$2,022,501

$0

$1,465,469

$6,624,534

$0

$194,882

$438,292

$0

$341,237

$0

$12,234,811

$553,493

$11,868,937

$26,367,176 $10,184,639

$0

$2,346,028

$21,658,920

$15,569,936

Federal - NHPP/E

Federal - STP/STBG
RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION

$0

$2,079,752

$2,574,404

$2,200,949

$4,323,815

$0

Federal - CMAQ

$954,774

$400,753

$0

$2,739,543

$678,800

Federal - DEMO

$538,109

$0

$1,092,668

$1,059,768

$0

Federal - HIP/F

$420,699

$0

$1,682,796

$0

$0

Federal - HSIP

$124,721

$0

$339,488

$783,000

$0

$707,877

$0

Federal - NHPP/E
Federal - NHS/NHPP
Federal - RSTP
Federal - STP/STBG
CN TOTAL
CN
AC

TOTAL COST

Federal - AC CONVERSION

PE TOTAL
RW

$14,685,430
FY27

Federal - AC OTHER

$176,969

$0

$0

$21,412,943

$2,794,267

$4,908,022

$1,211,521

$361,244

$1,159,160

$16,548,863 $61,400,620
$2,317,508

$1,008,170

$1,347,851

$4,005,191

$2,129,815

$0

$3,166,216

$29,049,303

$6,130,668

$14,549,299

$29,828,225 $67,092,781

$0

$10,590,761

$41,322,008

$25,630,501 $47,114,767

278

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET
FUND SOURCE
PE

MATCH

Federal - AC CONVERSION
Federal - CMAQ
Federal - HIP/F
Federal - RSTP
Federal - TAP/F

PE TOTAL
PE AC Federal - AC OTHER
RW

FY25

TOTAL COST

$263,572,039

FY26

FY27

$36,530

$146,121

$0

$0

$0

$8,000

$0

$0

$0

$32,000

$0

$200,000

$0

$0

$0

$56,412

$225,649

$0

$0

$0

$114,734

$458,934

$0

$0

$0

$215,676

$1,030,704

$0

$0

$32,000

$0

$17,938

$0

$0

$0

Federal - AC CONVERSION

$585,478

$81,263

$2,260,650

$0

$0

Federal - CMAQ

$949,826

$3,115,304

$684,000

$0

$0

Federal - HSIP

$2,142

$19,278

$0

$0

$0

Federal - RSTP

$2,273,767

$8,975,068

$120,000

$0

$0

Federal - RTAP

$547,102

$383,708

$1,804,700

$0

$0

$5,299

$21,196

$0

$0

$0

$375,389

$453,377

$1,048,178

$0

$0

$0

$0

$524,293

$0

$0

$4,739,003

$13,049,194

$6,441,821

$0

$0

$0

$2,825,813

$1,011,858

$0

$0

$1,425,857

$1,789,080

$2,852,992

$1,061,357

$0

$0

$0

$800,000

$0

$0

Federal - STP/STBG
Federal - TAP/F
Other
RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - CMAQ
Federal - HIP/F
Federal - NHS/NHPP

$52,460

$209,840

$0

$0

$0

Federal - RSTP

$1,585,050

$1,728,173

$3,331,994

$0

$1,280,032

Federal - RTAP

$1,277,590

$830,808

$1,671,978

$1,762,750

$844,824

Federal - STP/STBG

$433,545

$0

$0

$0

$1,734,181

Federal - TAP/F

$495,116

$1,347,723

$182,279

$450,460

$0

Other
CN TOTAL
CN
AC

FY24

Federal - AC OTHER

GROUPING

$0

$0

$0

$2,121,987

$0

$5,269,618

$5,905,624

$8,839,243

$5,396,554

$3,859,037

$0

$17,546,627

$17,024,831

$8,980,681

$9,465,827

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

FY26

Federal - NHS/NHPP

$0

$15,726,599

$15,726,599

Federal - STP/STBG

$0

$638,902

$641,525

$0

$16,365,501

$16,368,124

CN TOTAL

279

$65,477,920
FY27

$15,726,599 $15,726,599
$644,192

$646,905

$16,370,791 $16,373,504

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

Federal - AC CONVERSION

FY24
$0

Federal - CMAQ
Federal - NHS/NHPP

$0

Federal - STP/STBG

FY25

$10,531,043

FY26

FY27

$0

$0

$0

$360,465

$0

$0

$274,495

$0

$1,623,569

$1,623,569

$1,623,569

$1,623,569

$0

$494,339

$495,034

$495,470

$496,459

CN TOTAL

$0

$2,117,908

$2,118,603

$2,393,534

$2,480,493

CN
AC

$0

$0

$0

$1,420,505

$0

Federal - AC OTHER

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$32,482,005

FY26

FY27

Federal - AC CONVERSION

$0

$0

$0

$0

$360,465

Federal - CMAQ

$0

$0

$0

$274,495

$0

Federal - NHS/NHPP

$0

$3,189,226

$3,189,226

$3,189,226

$3,189,226

Federal - STP/STBG

$0

$4,390,067

$4,408,090

$4,426,419

$4,445,060

CN TOTAL

$0

$7,579,293

$7,597,316

$7,890,140

$7,994,751

CN
AC

$0

$0

$0

$1,420,505

$0

Federal - AC OTHER

GROUPING

Transit : Access

ROUTE/STREET
FUND SOURCE
PE

MATCH

Federal - AC CONVERSION
Federal - CMAQ

PE TOTAL
PE AC Federal - AC OTHER
CN

Federal - AC CONVERSION
Federal - CMAQ

CN TOTAL
CN
AC

Federal - AC OTHER

GROUPING

FY24

FY25

TOTAL COST

$232,995,000

FY26

FY27

$896,800

$0

$3,587,199

$0

$0

$1,666,800

$6,667,200

$0

$0

$0

$2,563,600

$6,667,200

$3,587,199

$0

$0

$0

$4,483,999

$0

$0

$0

$160,000

$640,000

$0

$0

$0

$10,000

$0

$39,999

$0

$0

$170,000

$640,000

$39,999

$0

$0

$0

$0

$77,897,001

$0

$0

Transit : Amenities

ROUTE/STREET
FUND SOURCE

TOTAL COST
MATCH

FY24

FY25

$29,694,809

FY26

FY27

PE

Federal - CMAQ

$18,000

$0

$0

$0

$72,000

RW

Federal - CMAQ

$4,200

$0

$0

$0

$16,800

CN

Federal - CMAQ

$4,712

$0

$0

$0

$18,846

CN
AC

Federal - AC OTHER

$0

$13,300,000

$0

$0

$40,433

280

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Transit : Engineering

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24
$0

GROUPING

FY25
$0

TOTAL COST
MATCH

$0

FY24

FY25

$20,211,797

FY26

FY27

Federal - AC CONVERSION

$9,600

$0

$19,200

$19,200

$0

Federal - CMAQ

$6,400

$25,600

$0

$0

$0

$16,000

$25,600

$19,200

$19,200

$0

$0

$88,000

$0

$0

$66,000

CN TOTAL
Federal - AC OTHER

GROUPING

Transit : System Preservation

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

PE AC Federal - AC OTHER
CN

$0

Transit : Ridesharing

FUND SOURCE

CN
AC

FY27

$0

ROUTE/STREET
CN

$2,300,000

FY26

Federal - CMAQ

GROUPING

FY24

FY25

$3,714,740

FY26

FY27

$0

$0

$0

$0

$3,828,208

$594,359

$0

$0

$0

$2,377,434

Transit : Vehicles
TOTAL COST

ROUTE/STREET
FUND SOURCE

MATCH

FY24
$0

FY25
$0

281

$26,529,480

FY26
$0

FY27
$0

$0

COMMONWEALTH OF VIRGINIA

RICHMOND
DISTRICT

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

FFY 24-27 Working STIP

6/21/2023 8:52:03

Richmond District
Interstate Projects
MPO

Richmond

UPC NO

121682 SCOPE

Preliminary Engineering

SYSTEM

Interstate

PROJECT

I-64/ASHLAND RD INTERCHANGE IMR

JURISDICTION

DESCRIPTION

FROM: I-64 TO: I-64

ROUTE/STREET

I-64 (0064)
MATCH

Federal - RSTP

MPO

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
PE

Goochland County

FY24
$72,000

FY25
$288,000

$360,000

FY26

FY27

$0

$0

$0

Richmond

UPC NO

97565 SCOPE

Bridge Replacement w/o Added Capacity

SYSTEM

Interstate

PROJECT

RTE 64 - REPLACE BRIDGES OVER RTE 156 (FED ID 9760 & 9762)

JURISDICTION

Henrico County

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Linked with UPC 97566
ROUTE/STREET

INTERSTATE 64 (0064)

FUND SOURCE
CN
AC

MATCH

Federal - AC OTHER

MPO

TOTAL COST
FY24
$0

FY25
$16,925

$35,006,633

FY26

FY27

$0

$0

$0

Richmond

UPC NO

107458 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

#HB2.FY17 RTE 64 - MAJOR WIDENING

JURISDICTION

Henrico County

DESCRIPTION

FROM: RTE 295 TO: EXIT 205 (BOTTOM'S BR) (3.9300 MI)

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE Includes $14,188,774 GARVEE Debt Service Principal Prev, $2,711,638 GARVEE Debt Service Principal FFY24,
$2,849,102 GARVEE Debt Service Principal FFY25, $2,993,833 GARVEE Debt Service Principal FFY26,
$3,144,756 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $42,551,429.
Corresponding GARVEE Debt Service UPC 110394.
ROUTE/STREET

0064

FUND SOURCE

TOTAL COST
MATCH

FY24

FY25

$50,490,434

FY26

FY27

PE

Federal - NHS/NHPP

$0

$1,280

$0

$0

$0

CN

Federal - AC CONVERSION

$0

$0

$2,849,102

$2,993,833

$3,144,756

Federal - NHS/NHPP

$0

$2,710,358

$0

$0

$0

CN TOTAL

$0

$2,710,358

$2,849,102

$2,993,833

$3,144,756

CN
AC

Federal - AC

$0

$25,651,017

$0

$0

$0

Federal - AC OTHER

$0

$7,939,005

$0

$0

$0

$0

$33,590,022

$0

$0

$0

CN AC

283

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

110394 SCOPE

SYSTEM

Interstate

JURISDICTION

Henrico County

PROJECT

#HB2.FY17 RTE 64 - MAJOR WIDENING GARVEE DEBT SERVICE

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $11,286,114 GARVEE Debt Service Interest Prev, $1,384,651 GARVEE Debt Service Interest FFY24,
$1,247,381 GARVEE Debt Service Interest FFY25, $1,103,132 GARVEE Debt Service Interest FFY26, $951,577
GARVEE Debt Service Interest FFY27, $2,222,194 FFY28-32. Total GARVEE Debt Service Interest $18,195,049.
Corresponding CN UPC 107458
ROUTE/STREET
0064
TOTAL COST
$43,909,094
FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$1,247,381

$1,103,132

$951,577

Federal - NHS/NHPP

$0

$1,384,651

$0

$0

$0

PE TOTAL

$0

$1,384,651

$1,247,381

$1,103,132

$951,577

PE AC Federal - AC

$0

$5,524,284

$0

$0

$0

MPO

Richmond

UPC NO

113844 SCOPE

Traffic Management/Engineering

SYSTEM

Interstate

PROJECT

I-64 at Parham IMR

DESCRIPTION

FROM: .25 miles north of Mayland Drive TO: Fordson Road (0.2700 MI)

ROUTE/STREET

I-64 (0064)

FUND SOURCE

JURISDICTION

Henrico County

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$0
MPO

OVERSIGHT

$600,000

FY26

$0

FY27

$0

$0

$0

Richmond

UPC NO

120374 SCOPE

New Construction Roadway

SYSTEM

Interstate

PROJECT

#I64CIP - I-64WB EXIT 181 IMPROVE INTERCHANGE CONFIGURATION

DESCRIPTION

FROM: MM 181 TO: MM 181

ROUTE/STREET

0064

FUND SOURCE

JURISDICTION

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

PE AC Federal - AC
Federal - AC
RW
AC
CN AC Federal - AC OTHER

MPO

Henrico County

FY24

FY25

$12,000,000

FY26

FY27

$0
$0

$2,000,000
$0

$0
$1,000,000

$0
$0

$0
$0

$0

$0

$0

$9,000,000

$0

Richmond

UPC NO

120384 SCOPE

SYSTEM

Interstate

PROJECT

Transit

JURISDICTION

Henrico County

OVERSIGHT

NFO

#I64CIP - I-64 INCREASE BUS FREQUENCY- RTE7 / NINE MILE ROAD

ADMIN BY

DRPT

NINE MILE ROAD (0064)

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE
PE AC Federal - AC OTHER

MATCH

FY24
$0

FY25
$7,816,397

284

$7,816,397

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

120381 SCOPE

Transit

SYSTEM

Interstate

JURISDICTION

PROJECT

#I64CIP - E/WB EXPRESS BUS ROUTE-22x SHORT PUMP TO DOWNTOWN

Multi-jurisdictional: Richmond MPO

OVERSIGHT

NFO

ADMIN BY

DRPT

TOTAL COST
FY26

$3,017,484
FY27

DESCRIPTION
ROUTE/STREET
I-64 (0064)
FUND SOURCE

MATCH

PE AC Federal - AC OTHER
MPO

FY24

FY25

$0

$3,017,484

$0

$0

$0

Tri-Cities

UPC NO

120439 SCOPE

Other

SYSTEM

Interstate

PROJECT

#OTHERINT - I-85 - SIGNS AND MARKINGS US 1

JURISDICTION

DESCRIPTION

FROM: VA/NC State Line TO: I-95

ROUTE/STREET

I-85 (0085)

FUND SOURCE

Petersburg

MATCH

FY24

FY25

$0
MPO

$0

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
FY26

$250,000
FY27

$0

$0

$0

Richmond

UPC NO

111984 SCOPE

SYSTEM

Interstate

PROJECT

#SMART18 - I-95 AuxLanes b/w Rte.288/Rte.10-GARVEE Debt Serv

JURISDICTION

Chesterfield County

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $547,287 GARVEE Debt Service Interest Prev, $330,386 GARVEE Debt Service Interest FFY24,
$528,861 GARVEE Debt Service Interest FFY25, $523,506 GARVEE Debt Service Interest FFY26, $488,887
GARVEE Debt Service Interest FFY27, $2,800,788 GARVEE Debt Service Interest FFY25-39. Total GARVEE Debt
Service Interest
$5,219,715. Corresponding CN UPC 111466
ROUTE/STREET
0095
TOTAL COST
$7,597,000
FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$528,861

$523,506

$488,887

Federal - NHS/NHPP

$0

$330,386

$0

$0

$0

PE TOTAL

$0

$330,386

$528,861

$523,506

$488,887

PE AC Federal - AC

$0

$4,342,042

$0

$0

$0

MPO

Tri-Cities

UPC NO

85623 SCOPE

Safety

SYSTEM

Interstate

PROJECT

I95/TEMPLE AVE - INTERCHANGE IMPR (FED ID 20145, 20146)

DESCRIPTION

FROM: 0.041 MI W HAMILTON AVE TO: 0.069 MI E EXISTING I-95 RAMP (0.3690 MI)

ROUTE/STREET

TEMPLE AVE (0095)

FUND SOURCE

JURISDICTION

Colonial Heights

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$20,191,409

FY26

FY27

PE

Federal - NHS/NHPP

$0

$128,592

$0

$0

$0

RW

Federal - NHS/NHPP

$0

($2,638,610)

$0

$0

$0

CN

Federal - NHS/NHPP

$0

$2,510,018

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$5,083,393

$0

$0

$0

285

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

119673 SCOPE

Preliminary Engineering

SYSTEM

Interstate

PROJECT

I-95 at Commerce Road Access Study

JURISDICTION

Richmond

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
ROUTE/STREET

I-95 (0095)

TOTAL COST

FUND SOURCE
PE

MATCH

Federal - RSTP

MPO

FY24
$110,000

FY25
$440,000

$0

FY27
$0

$0

Multiple MPOs

UPC NO

116656 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#I95CIP VARIABLE SPEED LIMITS - PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

JURISDICTION

0095
MATCH

Federal - NHS/NHPP

MPO

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
PE

$550,000

FY26

FY24
$0

FY25
$4,912,629

$4,912,629

FY26
$0

FY27
$0

$0

Multiple MPOs

UPC NO

116657 SCOPE

Safety

SYSTEM

Interstate

JURISDICTION

PROJECT

#I95CIP RAMP METERING PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

PE
Federal - NHS/NHPP
PE AC Federal - AC OTHER

MPO

Statewide

FY24
$0
$0

FY25
$3,500,000
$2,200,000

$5,700,000

FY26
$0
$0

FY27
$0
$0

$0
$0

Multiple MPOs

UPC NO
SYSTEM
PROJECT

116658 SCOPE
Interstate

Statewide

#I95CIP GEOFENCED EMERGENCY NOTIFICATIONS - PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

PE AC Federal - AC OTHER
MPO

Safety

JURISDICTION

FY24
$0

FY25
$200,000

$200,000

FY26
$0

FY27
$0

$0

Multiple MPOs

UPC NO

116659 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#I95CIP ADVANCED WORK ZONE TECHNOLOGY - PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

FUND SOURCE
PE AC Federal - AC OTHER

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$950,000

286

$950,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Multiple MPOs

UPC NO

116661 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#I95CIP CORRIDOR TECHNOLOGY IMPROVEMENTS - PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

FUND SOURCE

JURISDICTION

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

PE AC Federal - AC OTHER

MPO

Statewide

FY24
$0

FY25
$3,202,500

$3,202,500

FY26
$0

FY27
$0

$0

Richmond

UPC NO

93087 SCOPE

Bridge Rehab w/o Added Capacity

SYSTEM

Interstate

JURISDICTION

Richmond

PROJECT

#SGR17VB - RT 195 - BR REPAIR OVER RT 76, CSX (Fed 21552)

DESCRIPTION

FROM: 0.145 MI N OF RTE 76 TO: 0.071 MI S OF RTE 76 (0.2160 MI)

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

0195

FUND SOURCE

TOTAL COST
MATCH

FY24
$0

FY25
$0

287

$14,697,630

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Richmond District
Primary Projects
MPO

Richmond

UPC NO

101020 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

#HB2.FY17 RTE 10 (BERMUDA TRIANGLE RD TO MEADOWVILLE RD)

JURISDICTION

Chesterfield County

OVERSIGHT

NFO

ADMIN BY

Locally

DESCRIPTION

FROM: 1.73 mi. W of Rte. 618 (OLD BERMUDA HUNDRED RD) TO: 0.27 mi. E of Rte. 618 (OLD BERMUDA
HUNDRED ROAD) (2.0000 MI)

PROGRAM NOTE Includes $3,601,251 GARVEE DS Prin Prev, $1,157,140 GARVEE DS Prin FFY24, $1,260,368 GARVEE DS Prin
FFY25, $1,321,439 GARVEE DS Prin FFY26, $1,384,964 GARVEE DS Prin FFY27 Total GARVEE DS Prin
$21,468,256. Corresponding DS UPC 110393
ROUTE/STREET

WEST HNDRD/MEADOWVILLE/OLD BERMUDA HNDRD/RVRSBND (0010)

FUND SOURCE
RW
AC
CN

MATCH

FY24

TOTAL COST

FY25

$66,061,655

FY26

FY27

Federal - AC OTHER

$0

$7,648,824

$0

$0

$0

Federal - AC CONVERSION

$0

$0

$1,260,368

$1,321,439

$1,384,964

Federal - NHS/NHPP

$0

$1,157,140

$0

$0

$0

CN TOTAL

$0

$1,157,140

$1,260,368

$1,321,439

$1,384,964

CN
AC

Federal - AC

$0

$16,709,865

$0

$0

$0

Federal - AC OTHER

$0

$0

$5,401,477

$0

$0

$0

$16,709,865

$5,401,477

$0

$0

CN AC

MPO

Richmond

UPC NO

102952 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

RTE 10 (I-95 - Rt 1) - WIDENING

DESCRIPTION

FROM: 0.087 MI W RTE 1(JEFF DAVIS HWY) TO: 0.507 MI E RTE 1 (JEFF DAVIS HWY) (0.5100 MI)

ROUTE/STREET

WEST HUNDRED ROAD (0010)

FUND SOURCE
CN

Federal - RSTP

CN
AC

Federal - AC OTHER

MPO

JURISDICTION

Chesterfield County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$8,996,859

FY26

FY27

$34,222

$136,888

$0

$0

$0

$0

$3,711,108

$0

$0

$0

Richmond

UPC NO

104889 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

JURISDICTION

Chesterfield County

PROJECT

RT 10 (Whitepine to Frith) WIDENING

DESCRIPTION

FROM: 0.787 MI N. of Rte. 288 TO: 1.110 MI S. of Rte. 288 (1.8970 MI)

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

IRONBRIDGE ROAD (0010)

FUND SOURCE

TOTAL COST

MATCH

FY24
$0

FY25
$0

288

$15,171,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

110393 SCOPE

SYSTEM

Primary

PROJECT

#HB2.FY17 RT 10 (BERM TRI TO MEADOWV) GARVEE DEBT SERVICE

JURISDICTION

Chesterfield County

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $2,973,055 GARVEE DS Int Prev, $774,993 GARVEE DS Int FFY24, $758,944 GARVEE DS Int FFY25,
$698,074 GARVEE DS Int FFY26, $634,246 GARVEE DS Int FFY27, $2,736,587 GARVEE DS Int FFY28-38. Total
GARVEE DS Int $8,575,899. Corresponding CN UPC 101020
ROUTE/STREET

0010

TOTAL COST

FUND SOURCE
PE

MATCH

FY24

FY25

Federal - AC CONVERSION

$0

$0

Federal - NHS/NHPP

$16,324,630

FY26
$758,944

FY27
$698,074

$634,246

$0

$774,993

$0

$0

$0

PE TOTAL

$0

$774,993

$758,944

$698,074

$634,246

PE AC Federal - AC

$0

$4,827,851

$0

$0

$0

MPO

Richmond

UPC NO

56181 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

RTE 33 - ADD LEFT TURN LANES AT THE INTERSECTION OF RTE 623

JURISDICTION

Hanover County

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION

FROM: 0.310 MI S RTE 623 (ASHLAND RD) TO: 0.285 MI N RTE 623 (ASHLAND RD) (0.5850 MI)

ROUTE/STREET

0033

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$9,026,104

FY26

FY27

PE

Other

$0

$8,853

$0

$0

$0

CN

Other

$0

$3,348,947

$0

$0

$0

MPO

Richmond

UPC NO

118145 SCOPE

Preliminary Engineering

SYSTEM

Primary

PROJECT

Route 60 Corridor Improvement Study

DESCRIPTION

FROM: Winterfield Rd/LeGordon Drive TO: Old Buckingham Road/Wooldridge Rd

ROUTE/STREET

ROUTE 60 (0060)

FUND SOURCE

JURISDICTION

Chesterfield County

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$0
MPO

OVERSIGHT

$0

$125,000

FY26
$0

FY27
$0

$0

Richmond

UPC NO

120380 SCOPE

Transit

SYSTEM

Primary

OVERSIGHT

NFO

PROJECT

#I64CIP - I-64 E/WB - BROAD STREET - SHORT PUMP BUS SERVICE

JURISDICTION

Henrico County

ADMIN BY

DRPT

I-64 (0064)

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE
PE AC Federal - AC OTHER

MATCH

FY24
$0

FY25
$3,744,635

289

$3,744,635

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

115534 SCOPE

Other

SYSTEM

Primary

JURISDICTION

PROJECT

Hopkins/Chippenham Interchange Modification Report (IMR)

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

CHIPPENHAM PARKWAY (0150)

FUND SOURCE

Chesterfield County

ADMIN BY

Locally

FY24

FY25
$0

$500,000

FY26

FY27

$0

$0

$0

Richmond

UPC NO

118470 SCOPE

Safety and Education of Pedestrians /Bicyclists

SYSTEM

Primary

PROJECT

W Broad St Pedestrian and Transit Improvements - Glenside Dr

DESCRIPTION

FROM: Glenside Drive TO: Parham Road (1.7900 MI)

ROUTE/STREET

JURISDICTION

WEST BROAD STREET (0250)

FUND SOURCE
PE

Federal - RSTP

RW
CN

Henrico County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$11,951,231

FY26

FY27

$315,587

$1,262,348

$0

$0

Federal - RSTP

$494,307

$0

$0

$1,977,226

$0

Federal - RSTP

$1,580,353

$0

$0

$0

$6,321,411

MPO

$0

Richmond

UPC NO

111467 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

#SMART18 - SB Rt 288 to WB US 360 WB Off-Ramp

DESCRIPTION

FROM: 0.046 MI. N of Route 360 (Hull Street Rd.)

ROUTE/STREET

ROUTE 288 (0288)

JURISDICTION

FUND SOURCE
PE
CN

NFO

TOTAL COST

MATCH
$0

MPO

OVERSIGHT

Chesterfield County

MATCH

OVERSIGHT

NFO

ADMIN BY

Locally

TO: 1.135 MI. N. of Route 360 (Hull Street Rd.)
(1.0890 MI)
TOTAL COST
$21,860,471

FY24

FY25

FY26

FY27

Federal - NHS/NHPP
Federal - HIP/F

$0
$0

$108,613
$1,144,699

$0
$0

$0
$0

$0
$0

Federal - HSIP

$0

$7,289,000

$0

$0

$0

Federal - NHS/NHPP

$0

$2,293,755

$0

$0

$0

CN TOTAL

$0

$10,727,454

$0

$0

$0

CN
AC

$0

$8,773,546

$0

$0

$0

Federal - AC OTHER

MPO

Richmond

UPC NO

118147 SCOPE

Preliminary Engineering

SYSTEM

Primary

PROJECT

IAR - Route 288 (West Creek Area)

DESCRIPTION

FROM: Broad Street Road TO: Tuckahoe Creek Parkway

ROUTE/STREET

ROUTE 288 (0288)

FUND SOURCE
PE

Federal - RSTP

JURISDICTION

Goochland County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$180

FY25
$720

290

$499,900

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

104890 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

RTE 360 E (Lonas Pkwy to Castle Rock Rd) - WIDENING

JURISDICTION

DESCRIPTION

FROM: 0.190 Miles West of Bridgewood Rd. TO: 0.029 Miles East of Castle Rock Rd. (0.5610 MI)

ROUTE/STREET

HULL STREET ROAD (0360)

FUND SOURCE
CN
AC

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - AC OTHER

MPO

Chesterfield County

FY24
$0

FY25

$7,034,227

FY26

$597,300

FY27

$0

$0

$0

Richmond

UPC NO

118144 SCOPE

Preliminary Engineering

SYSTEM

Primary

JURISDICTION

PROJECT

US 360 Superstreets Study

DESCRIPTION

FROM: Winterpock Rd TO: Harbour Point Parkway/Mockingbird Lane

ROUTE/STREET

US 360 (0360)

FUND SOURCE

Chesterfield County

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$0

$300,000

FY26

FY25

$0
MPO

OVERSIGHT

FY27

$0

$0

$0

Richmond

UPC NO

13551 SCOPE

Safety

SYSTEM

Primary

PROJECT

#SMART18 - RTE 360 WIDENING

JURISDICTION

DESCRIPTION

FROM: 0.61 MI W RTE 643 (LEE DAVIS RD) TO: 0.19 MI E RTE 643 (LEE DAVIS RD) (0.8000 MI)

ROUTE/STREET

MECHANICSVILLE TURNPIKE (0360)

FUND SOURCE

Hanover County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$34,744,037

FY26

FY27

PE AC Federal - AC OTHER

$0

$73,989

$0

$0

$0

Federal - AC OTHER

$0

$407,325

$0

$0

$0

CN AC Federal - AC OTHER

$0

$4,712,137

$0

$0

$0

RW
AC

MPO

Multiple MPOs

UPC NO

103754 SCOPE

SYSTEM

Primary

PROJECT

Route 460 PPTA Debt Service

DESCRIPTION

FROM: Intersection with Route 58, City of Suffolk TO: Intersection with I-295, Prince George County (55.0000
MI)
0460
TOTAL COST
$148,622,688

ROUTE/STREET

FUND SOURCE
PE

JURISDICTION

Statewide

MATCH

FY24

FY25

Federal - AC CONVERSION

$0

$0

Federal - NHS/NHPP

OVERSIGHT

FO

ADMIN BY

VDOT

FY26
$7,864,709

FY27
$7,863,525

$7,863,845

$0

$7,864,630

$0

$0

$0

PE TOTAL

$0

$7,864,630

$7,864,709

$7,863,525

$7,863,845

PE AC Federal - AC

$0

$31,454,523

$0

$0

$0

291

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

115202 SCOPE

SYSTEM

Primary

PROJECT

Countywide Sidewalk Plan

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (9999)

FUND SOURCE

Other

JURISDICTION

Chesterfield County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$0

FY25
$0

292

$124,935

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Richmond District
Secondary
Projects
MPO

Richmond

UPC NO

111713 SCOPE

New Construction Roadway

SYSTEM

Secondary

PROJECT

#SMART18 - BBC Ph 1 - Bailey Br Conn., Brad McNeer Conn.

JURISDICTION

DESCRIPTION

FROM: BRAD MC NEER PKWY TO: BAILEY BRIDGE ROAD

ROUTE/STREET

BAILEY BRIDGE CONNECTOR (0000)

FUND SOURCE

Chesterfield County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$26,374,800

FY26

FY27

PE

Federal - AC CONVERSION

$0

$0

$0

$2,000,000

$0

RW
AC

Federal - AC OTHER

$0

$2,000,000

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$0

$22,374,800

$0

$0

MPO

Richmond

UPC NO

115193 SCOPE

Other

SYSTEM

Secondary

PROJECT

Road Diet Study (Hopkins, Turner, Whitepine)

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

HOPKINS, TURNER, WHITEPINE (0637)

FUND SOURCE

JURISDICTION

Chesterfield County

NFO
Locally

TOTAL COST

MATCH

FY24
$0

MPO

OVERSIGHT
ADMIN BY

FY25
$0

$0

FY27
$0

$0

Tri-Cities

UPC NO

101028 SCOPE

Safety

SYSTEM

Secondary

PROJECT

RTE 600 (Matoaca/Hickory) - ROUNDABOUT

DESCRIPTION

FROM: 0.066 MI S RTE 628 (Hickory Road) TO: 0.076 MI N RTE 628 (Hickory Road) (0.1400 MI)

ROUTE/STREET

MATOACA ROAD (0600)

FUND SOURCE
CN
AC

$83,793

FY26

Federal - AC OTHER

JURISDICTION

Chesterfield County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$0

FY25
$33

293

$3,622,566

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Tri-Cities

UPC NO

112660 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

JURISDICTION

PROJECT

RTE 746 (N. Enon Ch Rd, Rt 10-Meadowville Tech Pk) WIDENING

DESCRIPTION

FROM: Route 10 TO: Meadowville Technology Parkway (0.7300 MI)

ROUTE/STREET

N. ENON CHURCH ROAD (0746)

FUND SOURCE
PE

Chesterfield County

FY24

Federal - AC CONVERSION

PE TOTAL

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

Federal - RSTP

OVERSIGHT

FY25

$4,214,960

FY26

FY27

$2

$0

$0

$7

$0

$131,378

$0

$525,513

$0

$0

$131,380

$0

$525,513

$7

$0

$2

$0

$7

$0

$0

PE AC Federal - AC
RW

Federal - RSTP

$184,492

$0

$0

$0

$737,968

CN

Federal - RSTP

$527,120

$0

$0

$0

$2,108,480

MPO

Richmond

UPC NO

77121 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

RTE 638 - CONSTRUCT LTL & ADD SB REC. LN

DESCRIPTION

FROM: 0.2 MILE SOUTH OF ROUTE 301 TO: INTERSECTION ROUTE 301 (0.2000 MI)

ROUTE/STREET

ATLEE ROAD (0638)

FUND SOURCE
CN

Federal - CMAQ

CN
AC

Federal - AC OTHER

MPO

JURISDICTION

Hanover County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$2,588,517

FY26

FY27

$4,906

$19,622

$0

$0

$0

$0

$160,430

$0

$0

$0

Richmond

UPC NO

115195 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

Atlee Station Rd Widening (Phase 2)

DESCRIPTION

FROM: RTE 1860 (Castle Tower Rd) TO: RTE 1255 ( Warren Ave) (2.0700 MI)

ROUTE/STREET

ATLEE STATION ROAD (0637)

FUND SOURCE

JURISDICTION

Hanover County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$31,529,239

FY26

FY27

RW

Federal - RSTP

$411,144

$0

$1,644,576

$0

$0

R
W
A
C
CN
AC

Federal - AC OTHER

$0

$0

$4,421,280

$0

$0

Federal - AC OTHER

$0

$0

$0

$0

$22,542,708

294

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

109988 SCOPE

Bridge Replacement w/ Added Capacity

SYSTEM

Secondary

PROJECT

#SGR21VB -RT 715 - BR ONLY OVER NEWFOUND RIVER (Fed 9578)

DESCRIPTION

FROM: 0.80 Miles North of Rte 781 TO: 0.90 Miles North of Rte 781 (0.0730 MI)

ROUTE/STREET

BEAVER DAM ROAD (0715)

FUND SOURCE
PE

JURISDICTION

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

Other

MPO

Hanover County

FY25

$0

$1,722,235

FY26

$1,676

$0

FY27
$0

$0

Richmond

UPC NO

81667 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Secondary

PROJECT

RTE 615 (CREIGHTON RD) - ROUNDABOUT

DESCRIPTION

FROM: COLD HARBOR RD - FR 0.16 MI N CREIGHTON RD TO 0.08 MI S TO: CREIGHTON RD - FR 0.12 MI W
COLD HARBOR RD TO 0.07 MI E (0.2000 MI)

ROUTE/STREET

CREIGHTON ROAD & COLD HARBOR ROAD (0615)

FUND SOURCE

JURISDICTION

Hanover County

MATCH

NFO

ADMIN BY

Locally

TOTAL COST

FY24

FY25

$0
MPO

OVERSIGHT

$7,599,275

FY26

$0

$0

FY27
$0

$0

Richmond

UPC NO

109260 SCOPE

Preliminary Engineering

SYSTEM

Secondary

PROJECT

POLE GREEN RD WIDENING

DESCRIPTION

FROM: Bell Creek Road TO: Rural Point Road (1.6300 MI)

ROUTE/STREET

POLE GREEN ROAD (0627)

FUND SOURCE

JURISDICTION

Hanover County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$20,506,116

FY26

FY27

RW Federal - RSTP

$932,365

$3,729,460

$0

$0

$0

CN Federal - RSTP

$1,365,726

$0

$0

$0

$5,462,905

$0

$0

$0

$0

$7,571,369

CN Federal - AC OTHER
AC
MPO

Richmond

UPC NO

104957 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

#HB2.FY17 RTE 656 - SLIDING HILL ROAD CORRIDOR

DESCRIPTION

FROM: 0.35 MI W RTE 1265 (TOTOPOTOMOY TRAIL) TO: 0.676 MI E RTE 1265 (TOTOPOTOMOY TRAIL) (1.0300
MI)

ROUTE/STREET

SLIDING HILL ROAD (0656)

FUND SOURCE
PE Federal - AC OTHER
AC
CN Federal - AC OTHER
AC

JURISDICTION

Hanover County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$10,248,817

FY26

FY27

$0

$569,190

$0

$0

$0

$0

$2,747,306

$0

$0

$0

295

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

50528 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

JURISDICTION

PROJECT

THREE CHOPT ROAD - WIDENING - PE ONLY

DESCRIPTION

FROM: BARRINGTON HILL DRIVE TO: GASKINS ROAD (1.5000 MI)

ROUTE/STREET

9999
MATCH

FY24

Federal - RSTP

MPO

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

FUND SOURCE
PE

Henrico County

FY25

$14,000

$2,933,000

FY26

$56,000

FY27

$0

$0

$0

Richmond

UPC NO

60933 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

JURISDICTION

PROJECT

RTE 9999 - DABBS HOUSE RD; RECONSTRUCTION

DESCRIPTION

FROM: INT. DABBS HOUSE ROAD AND NINE MILE ROAD TO: 0.075 MI. N OF INT. DABBS HOUSE RD & E
RICHMOND RD (0.8920 MI)

ROUTE/STREET

DABBS HOUSE ROAD (9999)

FUND SOURCE

Henrico County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$13,444,064

FY26

FY27

PE

Federal - RSTP

($107,936)

($431,742)

$0

$0

$0

RW

Federal - RSTP

$8,816

$35,262

$0

$0

$0

CN

Federal - RSTP

$99,120

$396,480

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$154,321

$0

$0

$0

MPO

Richmond

UPC NO

118150 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Secondary

PROJECT

Nuckols Road Pedestrian Improvements

DESCRIPTION

FROM: Springfield Road TO: Capital One way

ROUTE/STREET

NUCKOLS RD (0157)

FUND SOURCE
PE

JURISDICTION

Henrico County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$2,160,000

FY26

FY27

Federal - CMAQ

$66,400

$265,600

$0

$0

$0

RW Federal - CMAQ

$164,800

$0

$0

$659,200

$0

CN Federal - CMAQ

$200,800

$0

$0

$0

$803,200

296

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

115001 SCOPE

Other

SYSTEM

Secondary

PROJECT

Parham Road/Hungary Road Bicycle and Pedestrian Study

DESCRIPTION

FROM: Parham Road - Various TO: Hungary Road - Various

ROUTE/STREET

PARHAM ROAD (9999)

FUND SOURCE

JURISDICTION

Henrico County

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$0

$250,000

FY26

FY25

$0
MPO

OVERSIGHT

$0

FY27
$0

$0

Richmond

UPC NO

111716 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

JURISDICTION

Henrico County

PROJECT

#SMART18 - RICHMOND-HENRICO TURNPIKE -- SOUTH SGMT

DESCRIPTION

FROM: LABURNUM AVENUE TO: HUMMINGBIRD RD (1.1490 MI)

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE Linked to UPC 110911
ROUTE/STREET

RICHMOND-HENRICO TURNPIKE (7609)

FUND SOURCE

MATCH

TOTAL COST
FY24

FY25

$29,678,850

FY26

FY27

PE

Federal - STP/STBG

$0

$92,100

$0

$0

$0

RW

Federal - STP/STBG

$0

$1,732,358

$0

$0

$0

CN

Federal - STP/STBG

$0

$2,200,719

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$21,252,031

$0

$0

$0

MPO

Richmond

UPC NO

104880 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Secondary

PROJECT

RIDGEFIELD PKWY - CONSTRUCT SIDEWALK

DESCRIPTION

FROM: PUMP RD TO: FALCONBRIDGE DR (1.1800 MI)

ROUTE/STREET

RIDGEFIELD PARKWAY (9999)

FUND SOURCE
CN
AC

JURISDICTION

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

Federal - AC OTHER

MPO

Henrico County

$0

FY25
$1,999

$1,172,000

FY26
$0

FY27
$0

$0

Richmond

UPC NO

60934 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Secondary

PROJECT

RTE 9999 - SADLER RD; WIDEN & RECONSTRUCT; FED ESCROW PROJ

DESCRIPTION

FROM: 0.005 MI WEST OF DOMINION BOULEVARD TO: 0.030 MI EAST OF CEDAR FOREST ROAD (1.8830 MI)

ROUTE/STREET

SADLER ROAD (9999)

FUND SOURCE
PE

Federal - STP/STBG

JURISDICTION

Henrico County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24
$29,656

FY25
$118,623

297

$3,500,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

50529 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Secondary

PROJECT

RTE 9999 (THREE CHOPT ROAD) WIDEN TO 4 LANES

DESCRIPTION

FROM: 1.076 Mi W INT. COX ROAD TO: 0.241 MI E INT. GASKINS ROAD (2.1740 MI)

ROUTE/STREET

THREE CHOPT ROAD (9999)

FUND SOURCE

JURISDICTION

Henrico County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$30,818,528

FY26

FY27

RW

Federal - RSTP

$728,699

$2,914,796

$0

$0

$0

CN

Federal - RSTP

$2,700,499

$0

$10,801,994

$0

$0

CN
AC

Federal - AC OTHER

$0

$0

$9,903,733

$0

$0

MPO

NonMPO

UPC NO

115873 SCOPE

Safety

SYSTEM

Secondary

PROJECT

GUARDRAIL INSTALLATION

DESCRIPTION

FROM: Route 460 TO: Lunenburg County Line (8.6300 MI)

ROUTE/STREET

LEWISTON PLANK ROAD (0723)

FUND SOURCE

JURISDICTION

Nottoway County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$299,399

FY26

FY27

PE AC Federal - AC OTHER

$0

$25,000

$0

$0

$0

CN AC Federal - AC OTHER

$0

$274,399

$0

$0

$0

MPO

Richmond

UPC NO

101246 SCOPE

Bridge Rehab w/o Added Capacity

SYSTEM

Secondary

PROJECT

ROUTE 681 - BRIDGE REPAIR (SCOUR) OVER APPOMATTOX RIVER

DESCRIPTION

Rte 681 Over Appomattox River (VA Str 6910) (0.2700 MI)

ROUTE/STREET

CLEMENTON ROAD (0681)

FUND SOURCE

JURISDICTION

Powhatan County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$2,036,495

FY26

FY27

CN

Federal - BR

$0

$90,135

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$557,778

$0

$0

$0

298

FFY 24-27 Working STIP

6/21/2023 8:52:03

Richmond District
Urban Projects
MPO

Tri-Cities

UPC NO

101287 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

PROJECT

DUPUY AVE - MINOR WIDENING

DESCRIPTION

FROM: WCL COLONIAL HTS TO: 0.10 MI W RTE 1 (BOULEVARD) (0.3800 MI)

ROUTE/STREET

DUPUY AVENUE (9020)

FUND SOURCE
CN
AC

JURISDICTION

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

Federal - AC OTHER

MPO

Colonial Heights

$0

FY25
$111,696

$5,307,604

FY26

FY27

$0

$0

$0

Richmond

UPC NO

121681 SCOPE

Bridge Replacement w/o Added Capacity

SYSTEM

Urban

PROJECT

#BF- RTE 0 MEADOW RD (FED ID 9652) CR

DESCRIPTION

FROM: 2.15 miles TO GRAPEVINE RD TO: 0.15 miles TO 60 (0.0500 MI)

ROUTE/STREET

MEADOW ROAD (0000)

FUND SOURCE

JURISDICTION

Henrico County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$2,181,266

FY26

FY27

PE

Federal - BR

$0

$242,960

$0

$0

$0

RW

Federal - BR

$0

$0

$5,250

$0

$0

CN

Federal - BR

$0

$0

$0

$1,746,556

$0

CN
AC

Federal - AC OTHER

$0

$0

$0

$186,500

$0

MPO

Tri-Cities

UPC NO

1436 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

JURISDICTION

Hopewell

OVERSIGHT

NFO

PROJECT

CEDAR LEVEL ROAD WIDENING

ADMIN BY

VDOT

DESCRIPTION

FROM: 0.026 MI. NORTH INT. NORTH AVENUE TO: 0.071 MI. NORTH INT. RELOCA. MILES AVENUE (1.1600 MI)

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

CEDAR LEVEL ROAD (U000)

FUND SOURCE

TOTAL COST

MATCH

FY24
$0

MPO

FY25
$0

FY26
$0

FY27
$0

$0

Tri-Cities

UPC NO

90018 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

PROJECT

CEDAR LEVEL RD - WIDENING

DESCRIPTION

FROM: 0.056 MI. SOUTH INT. PORTSMOUTH ST. TO: 0.030 MI. NORTH INT. MILES AVE. (0.7140 MI)

ROUTE/STREET

CEDAR LEVEL ROAD (9047)

FUND SOURCE
CN

$5,639,239

Federal - RSTP

JURISDICTION

Hopewell

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24
$42,982

FY25
$171,927

299

$9,512,003

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Tri-Cities

UPC NO

117838 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

US ARMY PROJ FT PICKETT/DSCR/FT LEE -- RICHMOND

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

JURISDICTION

Petersburg

ROUTE/STREET
HICKORY HILL (0109)
FUND SOURCE
MATCH

FY24

FY25

$0
MPO

OVERSIGHT

$0

ADMIN BY

Other

TOTAL COST
FY26

FY27

$0

$0

15958 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Urban

PROJECT

COMMERCE ROAD - WIDENING

DESCRIPTION

FROM: BELLS ROAD (SOUTH JUNCTION) TO: 0.13 Mile N. of BELLEMEADE ROAD (1.8780 MI)

JURISDICTION

Richmond

OVERSIGHT
ADMIN BY

ROUTE/STREET
COMMERCE ROAD
FUND SOURCE
MATCH

FY24

Locally

TOTAL COST
FY26

FY25

$36,272,153
FY27

Federal - RSTP
Federal - NHS/NHPP

$100,159
$0

$400,635
$3,290,346

$0
$0

$0
$0

$0
$0

Federal - RSTP

$438,514

$1,754,054

$0

$0

$0

Federal - STP/STBG

$234,321

$937,283

$0

$0

$0

$672,834

$5,981,683

$0

$0

$0

$0

$20,934,577

$0

$0

$0

CN TOTAL
CN
AC

$0

Richmond

UPC NO

PE
CN

$127,000

Federal - AC OTHER

MPO

Richmond

UPC NO

19036 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

PROJECT

FOREST HILL AVENUE IMPROVEMENTS

JURISDICTION

Richmond

DESCRIPTION

FROM: HATHAWAY RD TO: POWHITE PARKWAY (0.7400 MI)

ROUTE/STREET
FOREST HILL AVENUE (U000)
FUND SOURCE
MATCH

FY24

FY25

$0
MPO

$0

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
FY26

$14,189,886
FY27

$0

$0

$0

Richmond

UPC NO

19035 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

PROJECT

JAHNKE ROAD - 2 LANE IMPROVEMENTS

DESCRIPTION

FROM: BLAKEMORE RD TO: FOREST HILL AVE (1.6000 MI)

ROUTE/STREET

JAHNKE ROAD (U000)

FUND SOURCE

JURISDICTION

Richmond

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$22,015,668

FY26

FY27

PE

Federal - RSTP

$82,000

$328,000

$0

$0

$0

RW

Federal - RSTP

$30,000

$120,000

$0

$0

$0

CN

Federal - CMAQ

$216,381

$865,522

$0

$0

$0

$1,279,354

$5,117,417

$0

$0

$0

$170,000

$680,000

$0

$0

$0

$1,665,735

$6,662,939

$0

$0

$0

$0

$9,126,994

$0

$0

$0

Federal - RSTP
Federal - STP/STBG
CN TOTAL
CN
AC

Federal - AC OTHER

300

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

104887 SCOPE

Bridge Rehab w/o Added Capacity

SYSTEM

Urban

JURISDICTION

PROJECT

RTE 60 - BRIDGE REHABILITATION

DESCRIPTION

AT RTE 161 (BELT BLVD)

ROUTE/STREET

MIDLOTHIAN TURNPIKE (0060)

FUND SOURCE

Richmond

OVERSIGHT

NFO

ADMIN BY

Locally

(0.1900 MI)
TOTAL COST

MATCH

FY24

FY25

$2,010,348

FY26

FY27

CN

Federal - RSTP

$0

$411,882

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$85,589

$0

$0

$0

MPO

Richmond

UPC NO

15955 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

PROJECT

RTE 1 - INTERSECTION IMPROVEMENTS AT HOPKINS RD & HARWOOD ST

JURISDICTION

DESCRIPTION

FROM: 0.008 MI S CHESTERMAN AVE TO: 0.435 MI N CHESTERMAN AVE (0.4430 MI)

ROUTE/STREET

RICHMOND HWY (0001)

FUND SOURCE

FY24

Federal - STP/STBG

$130,746

RW

Federal - CMAQ
Federal - EB/MG

($296,756)

RW TOTAL

NFO

ADMIN BY

VDOT

FY25

$15,494,494

FY26

FY27

$522,985

$0

$0

$0

($38,534)

($154,134)

$0

$0

$0

($258,222)

($1,032,889)

$0

$0

$0

($1,187,023)

$0

$0

$0

Richmond

UPC NO

115222 SCOPE

SYSTEM

Urban

PROJECT

Park-N-Ride Bus Purchase

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

VARIOUS (9999)

FUND SOURCE
CN

OVERSIGHT

TOTAL COST

MATCH

PE

MPO

Richmond

Federal - CMAQ

Other

JURISDICTION

Richmond

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$18,067

FY25
$72,268

301

$90,335

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Richmond District
Enhancement
Projects
MPO

Richmond

UPC NO

107535 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

DOREY PARK - SHARED-USE PATH - TAP

DESCRIPTION

FROM: 1.0 mi S of the int of Darbytown Rd and Dorey Pk TO: 0.1 mi S of the int of Darbytown Rd and Dorey
Pk
DOREY PARK DRIVE (EN15)
TOTAL COST
$364,863

ROUTE/STREET

FUND SOURCE

JURISDICTION

Henrico County

MATCH

FY24

FY25

OVERSIGHT

NFO

ADMIN BY

Locally

FY26

FY27

PE AC Federal - AC OTHER

$0

$17,315

$0

$0

$0

CN AC Federal - AC OTHER

$0

$13,798

$0

$0

$0

MPO

Richmond

UPC NO

107515 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

JURISDICTION

Richmond

PROJECT

CARNATION STREET - ADD SIDEWALK - TAP

DESCRIPTION

FROM: RTE 60 (MIDLOTHIAN TPKE) TO: HIOAKS RD

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

CARNATION STREET (EN15)

FUND SOURCE

TOTAL COST

MATCH

FY24

FY25

$0
MPO

$0

FY26
$0

FY27
$0

$0

Richmond

UPC NO

110968 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

FOUR MILE CREEK VCT IMPROVEMENTS

DESCRIPTION

FROM: 0.1 mi E of Farmer's Circle Drive TO: 0.1 mi W of Farmer's Circle Drive (0.2000 MI)

ROUTE/STREET

EN17

FUND SOURCE
CN
AC

$591,991

Federal - AC OTHER

JURISDICTION

Henrico County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
$0

FY25
$387,242

302

$1,234,975

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Richmond District
Miscellaneous
Projects
MPO

Richmond

UPC NO

103393 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Miscellaneous

JURISDICTION

Ashland

PROJECT

ASHLAND TROLLEY LINE TRAIL

DESCRIPTION

FROM: MAPLE ST EXTENSION TO: TROLLEY LINE TRAIL PARK (0.2700 MI)

ROUTE/STREET

0000

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

Richmond

UPC NO

T23339

SCOPE

SYSTEM

Miscellaneous

JURISDICTION

PROJECT

PE for Parking Lots - Henrico County

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0000

$0

$1,710,156

FY26
$0

Henrico County

FY27
$0

$0

OVERSIGHT

NFO

ADMIN BY

DRPT

TOTAL COST

FUND SOURCE

MATCH

FY24

PE AC Federal - AC OTHER

FY25

$0

$99,999

MPO

Richmond

UPC NO

T206

SCOPE

Transit

SYSTEM

Miscellaneous

JURISDICTION

Richmond

PROJECT

$507,318

FY26
$0

FY27
$0

$0

OVERSIGHT

NFO

Alternative Fuel Trolley Vehicle Replacement

ADMIN BY

Locally

GREATER RICHMOND TRANSIT COMPANY (0000)

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE

MATCH

FY24

MPO

$0

$0

FY27
$0

$0

Richmond

UPC NO

109193 SCOPE

SYSTEM

Miscellaneous

PROJECT

CRAC CNG BUS PURCHASE

DESCRIPTION

FROM: various TO: various

ROUTE/STREET

9999

FUND SOURCE
PE

FY26

FY25

$0

$180,000

Federal - CMAQ

Transit

JURISDICTION

Henrico County

OVERSIGHT

NFO

ADMIN BY

Other

TOTAL COST
MATCH

FY24
$28,000

FY25
$112,000

303

$140,150

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

86357 SCOPE

SYSTEM

Miscellaneous

PROJECT

Other

JURISDICTION

Multi-jurisdictional: Richmond MPO

OVERSIGHT

NFO

RAMPO Travel Demand Modeling On-Call Consultant Support

ADMIN BY

Other

9999

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE

MATCH

FY24
$0

MPO

FY25
$0

$800,000

FY26
$0

FY27
$0

$0

Tri-Cities

UPC NO

115085 SCOPE

Other

SYSTEM

Miscellaneous

PROJECT

MPO STAFF SALARY FUNDING SUPPLEMENT: CRATER PDC FY19 & FY20

DESCRIPTION

FROM: 0 TO: 0

JURISDICTION

Multi-jurisdictional: Tri-Cities MPO

OVERSIGHT

NFO

ADMIN BY

Locally

PROGRAM NOTE Linked to UPC 72904
ROUTE/STREET

CRATER PDC OFFICE (9999)

FUND SOURCE

TOTAL COST

MATCH

FY24
$0

MPO

FY25
$0

$56,874

FY26
$0

FY27
$0

$0

Tri-Cities

UPC NO

117863 SCOPE

SYSTEM

Miscellaneous

PROJECT

Other

JURISDICTION

Multi-jurisdictional: Tri-Cities MPO

OVERSIGHT

NFO

RSTP SUPPLEMENT FOR MPO PLANNING STAFF SALARIES -- FY21

ADMIN BY

Locally

VARIOUS (9999)

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE
PE

MATCH

Federal - RSTP

MPO

FY24
$17,000

FY25
$68,000

$85,000

FY26
$0

FY27
$0

$0

Tri-Cities

UPC NO

117865 SCOPE

SYSTEM

Miscellaneous

PROJECT

Other

JURISDICTION

Multi-jurisdictional: Tri-Cities MPO

OVERSIGHT

NFO

RSTP SUPPLEMENT FOR MPO PLANNING STAFF SALARIES -- FY23

ADMIN BY

Locally

VARIOUS (9999)

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE
PE

Federal - RSTP

PE AC Federal - AC OTHER

MATCH

FY24

FY25

$45,000

FY26

FY27

$9,000

$36,000

$0

$0

$0

$0

$40,000

$0

$0

$0

304

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Tri-Cities

UPC NO

117866 SCOPE

Other

SYSTEM

Miscellaneous

OVERSIGHT

NFO

PROJECT

RSTP SUPPLEMENT FOR MPO PLANNING STAFF SALARIES -- FY24

JURISDICTION

Multi-jurisdictional: Tri-Cities MPO

ADMIN BY

Locally

VARIOUS (9999)

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE
PE

MATCH

Federal - RSTP

FY24

$45,000

FY26

FY27

$9,000

$36,000

$0

$0

$0

$0

$40,000

$0

$0

$0

PE AC Federal - AC OTHER

MPO

FY25

Tri-Cities

UPC NO

117867 SCOPE

SYSTEM

Miscellaneous

PROJECT

Other

JURISDICTION

Multi-jurisdictional: Tri-Cities MPO

OVERSIGHT

NFO

RSTP SUPPLEMENT FOR MPO PLANNING STAFF SALARIES -- FY25

ADMIN BY

Locally

VARIOUS (9999)

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE
PE

MATCH

Federal - RSTP

FY24

FY26

FY27

$9,000

$0

$36,000

$0

$0

$0

$0

$40,000

$0

$0

PE AC Federal - AC OTHER

MPO

FY25

$45,000

Tri-Cities

UPC NO

122860 SCOPE

SYSTEM

Miscellaneous

PROJECT

Other

JURISDICTION

Multi-jurisdictional: Tri-Cities MPO

OVERSIGHT

NFO

RSTP SUPPLEMENT FOR MPO PLANNING STAFF SALARIES -- FY27

ADMIN BY

Locally

VARIOUS (9999)

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE
PE

MATCH

Federal - RSTP

MPO

FY24

FY25

$9,000

$0

$45,000

FY26
$0

FY27
$36,000

$0

Richmond

UPC NO

115815 SCOPE

Other

SYSTEM

Miscellaneous

JURISDICTION

PROJECT

I-64 Express Barge Service Expansion

Richmond

OVERSIGHT

NFO

ADMIN BY

Other

DESCRIPTION
ROUTE/STREET

RMT (9999)

FUND SOURCE
CN

Federal - CMAQ

TOTAL COST
MATCH

FY24
$600,000

FY25
$2,400,000

305

$3,000,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Richmond

UPC NO

118143 SCOPE

Preliminary Engineering

SYSTEM

Miscellaneous

PROJECT

RRTPO Scenario Planning Pilot

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

9999

FUND SOURCE
PE

JURISDICTION

Richmond District-wide

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

Federal - RSTP

FY24
$48,710

FY25
$194,840

MPO

Multiple MPOs

UPC NO

T20741

SCOPE

SYSTEM

Miscellaneous

JURISDICTION

PROJECT

VEHICLE FUEL CONVERSION PROGRAM MARKETING

$243,550

FY26

FY27

$0

Statewide

$0

$0

OVERSIGHT

NFO

ADMIN BY

Other

DESCRIPTION
ROUTE/STREET

9999

FUND SOURCE
CN

TOTAL COST
MATCH

Federal - CMAQ

FY24
$72,000

FY25
$288,000

MPO

Multiple MPOs

UPC NO

T11802

SCOPE

Other

SYSTEM

Miscellaneous

JURISDICTION

Statewide

PROJECT

Vehicle Fuel Conversion Program

DESCRIPTION

FROM: 1 TO: 1

ROUTE/STREET

9999

FUND SOURCE
CN

FY24
$1,235,482

$4,941,927

Tri-Cities

UPC NO

T204

SCOPE

Other

SYSTEM

Miscellaneous

JURISDICTION

Petersburg

PROJECT

Nonattainment Area

DESCRIPTION

Tri-Cities MPO Air Quality Maintenance Area

ROUTE/STREET

DEQ/MRAQC (MRAQ)

Federal - CMAQ

$0

FY25

MPO

PE

FY27
$0

$0

OVERSIGHT

FO

ADMIN BY

Other

TOTAL COST
MATCH

Federal - CMAQ

FUND SOURCE

$360,000

FY26

$8,640,000

FY26

FY27

$0

$0

$0

OVERSIGHT

NFO

ADMIN BY

DRPT

TOTAL COST

MATCH

FY24
$28,000

FY25
$28,000

306

FY26
$28,000

$750,000
FY27

$28,000

$28,000

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

Richmond

UPC NO

T41

SCOPE

Transit

SYSTEM

Miscellaneous

JURISDICTION

Richmond

PROJECT

OVERSIGHT

NFO

Renovation of Transportation Facility

ADMIN BY

VDOT

GREATER RICHMOND TRANSIT COMPANY (Mtch)

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE

MATCH

FY24
$0

$0

MPO

Richmond

UPC NO

T203

SCOPE

Transit

SYSTEM

Miscellaneous

JURISDICTION

Richmond

PROJECT

Regionwide Air Pollution Reduction Program - Ridefinders

DESCRIPTION

Regionwide Air Pollution Reduction Program

ROUTE/STREET

COMPOOL INC.(RIDEFINDERS) (RAPR)

FUND SOURCE
PE

MATCH

Federal - CMAQ

MPO

FY26

FY25

$0

$3,786,000
FY27
$0

OVERSIGHT

NFO

ADMIN BY

DRPT

TOTAL COST
FY24

$201,800

FY25
$407,200

$0

$17,688,219

FY26
$400,000

FY27
$0

$0

Richmond

UPC NO

113832 SCOPE

Other

SYSTEM

Miscellaneous

JURISDICTION

Richmond

PROJECT

Richmond Marine Terminal (RMT) - Drop Lot

DESCRIPTION

FROM: various TO: various

PROGRAM
NOTE
ROUTE/STREET

All funds obligated based on current allocations/estimate. Linked to UPCs 122142, 122142 & 122143.
RMT TERMINAL (U000)

FUND SOURCE

OVERSIGHT

NFO

ADMIN BY

Other

TOTAL COST

MATCH

FY24
$0

FY25
$0

307

$2,764,062

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Richmond District
Public
Transportation
Projects
MPO

Richmond

UPC NO

T2131

SCOPE

Transit

SYSTEM

Public
Transportation

JURISDICTION

Chesterfield County

PROJECT

Expansion of Bus Service

DESCRIPTION

Expansion of Bus Service

ROUTE/STREET

0000

FUND SOURCE

MATCH

FY24

FY25
$0

ADMIN BY

VDOT

Richmond

UPC NO

T20113

SCOPE

Transit

SYSTEM

Public
Transportation

JURISDICTION

Richmond

PROJECT

GRTC REPLACEMENT OF ROLLING STOCK CNG BUSES (FY22)

DESCRIPTION

FROM: N/A TO: N/A

ROUTE/STREET

9999

$2,595,508

FY26
$0

MPO

CN

NFO

TOTAL COST
$0

FUND SOURCE

OVERSIGHT

FY27
$0

OVERSIGHT

NFO

ADMIN BY

DRPT

TOTAL COST
MATCH

Federal - CMAQ

FY24
$139,630

FY25
$558,520

MPO

Tri-Cities

UPC NO

T9443

SCOPE

Transit

SYSTEM

Public
Transportation

JURISDICTION

Hopewell

PROJECT

Hopewell Circulator Bus Route

$0

$2,550,420

FY26
$0

FY27
$0

$0

OVERSIGHT

NFO

ADMIN BY

DRPT - Admin
Flexed

DESCRIPTION
ROUTE/STREET

RANDOLPH RD (HCRB)

FUND SOURCE

TOTAL COST

MATCH

FY24
$0

FY25
$0

308

$1,415,736

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Richmond District
Project
Groupings
MPO

NonMPO

GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET
FUND SOURCE
PE

MATCH

$0

$0

$160,000

$1,408,600

$235,352

$0

$0

$941,408

$0

Federal - NHS/NHPP

$652,312

$0

$0

$2,609,248

$0

Federal - STP/STBG

$200,000

$0

$800,000

$0

$0

$1,479,814

$0

$800,000

$3,710,656

$1,408,600

Federal - NHS/NHPP

RW TOTAL

$0

$0

$285,630

$1,675,120

$0

$34,891

$0

$139,565

$0

$0

$115,768

$0

$0

$0

$463,072

$150,659

$0

$139,565

$0

$463,072

Federal - BR

$1,559,429

$0

$0

$6,237,716

$0

Federal - NHS/NHPP

$1,750,696

$0

$0

$0

$7,002,785

Federal - STP/STBG

$1,814,107

$1,751,569

$0

$0

$5,504,857

$5,124,232

$1,751,569

$0

$0

$2,397,071

$0

CN TOTAL
Federal - AC OTHER

MPO

NonMPO

GROUPING

Construction : Rail

ROUTE/STREET

$6,237,716 $12,507,642
$0

$8,906

TOTAL COST

FUND SOURCE
CN

FY27

$392,150

Federal - STP/STBG

CN
AC

FY26

Federal - BR

PE AC Federal - AC OTHER

CN

FY25

$117,665,320

Federal - AC CONVERSION

PE TOTAL
RW

FY24

TOTAL COST

MATCH

Federal - STP/STBG

FY24

FY25

$0

$0

MPO

NonMPO

GROUPING

Construction : Safety/ITS/Operational Improvements

PE

Federal - STP/STBG

RW

Federal - AC CONVERSION

FY27

$495,000

ROUTE/STREET
FUND SOURCE

$570,000

FY26
$0

TOTAL COST
MATCH

FY24

FY25

$0

$51,250,580

FY26

FY27

($20,599)

($82,396)

$0

$0

$0

$96,934

$0

$0

$387,734

$0

Federal - NHS/NHPP

$422,710

$615,542

$1,075,298

$0

$0

Federal - STP/STBG

$405,148

$907,246

$0

$713,346

$0

$924,792

$1,522,788

$1,075,298

$1,101,080

$0

$0

$484,667

$0

$0

$0

RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION

$512,738

$0

$0

$465,380

$1,585,570

Federal - NHS/NHPP

$458,441

$0

$827,157

$0

$1,006,606

$3,638,792

$0

$139,752

$13,799,380

$616,037

$4,609,971

$0

$966,909

$14,264,760

$3,208,213

$0

$0

$3,291,936

$8,229,748

$1,668,724

Federal - STP/STBG
CN TOTAL
CN
AC

Federal - AC OTHER

309

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

NonMPO

GROUPING

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE
RW

Federal - TAP/F

RW
AC

Federal - AC OTHER

CN

Federal - TAP/F

CN
AC

Federal - AC OTHER

MATCH

FY24

FY25

$6,969,211

FY26

FY27

$103,002

$7,000

$405,006

$0

$0

$0

$0

$243,567

$0

$0

$173,573

$334,314

$359,978

$0

$0

$0

$104,473

$114,680

$1,393,087

$0

MPO

NonMPO

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE

MATCH

FY24

FY25

$0

$0

TOTAL COST

$134,737,913

FY26

FY27

$0

MPO

Richmond

GROUPING

Maintenance : Preventive Maintenance and System Preservation

$0

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

MATCH

FY24

FY25

$134,737,913

FY26

FY27

Federal - NHFP

$0

Federal - NHS/NHPP

$0

$2,258,586

$2,258,586

Federal - STP/STBG

$0

$31,116,665

$31,244,409

$31,374,325 $31,506,450

$0

$33,490,681

$33,618,425

$33,748,341 $33,880,466

CN TOTAL

$115,430

TOTAL COST

MPO

Richmond

GROUPING

Maintenance : Preventive Maintenance for Bridges

$115,430

$115,430

$115,430

$2,258,586

$2,258,586

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

$93,219,475

FY26

FY27

Federal - BR

$0

$354,545

$50,000

$1,237,719

$0

Federal - CMAQ

$0

$0

$4,195,000

$0

$0

Federal - HSIP

$0

$3,000,000

$0

$0

$0

Federal - NHFP

$0

$751,472

$751,472

$751,472

$751,472

Federal - NHPP/E

$0

$176,284

$0

$0

$0

Federal - NHS/NHPP

$0

$2,543,612

$6,728,208

$4,037,999

$2,102,357

Federal - STP/STBG

$0

$6,926,117

$6,953,560

$6,981,469

$7,009,853

CN TOTAL

$0

$13,752,030

$18,678,240

$13,008,659

$9,863,682

CN
AC

$0

$7,896,875

$16,803,314

$13,216,675

$0

Federal - AC OTHER

310

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

Richmond

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

$32,977,411

FY26

FY27

Federal - CMAQ

$0

$0

$4,195,000

$0

$0

Federal - HSIP

$0

$3,000,000

$0

$0

$0

Federal - STP/STBG

$0

$6,405,707

$6,432,005

$6,458,750

$6,485,949

$0

$9,405,707

$10,627,005

$6,458,750

$6,485,949

CN TOTAL

311

FFY 24-27 Working STIP

6/21/2023 8:52:03

Richmond MPO
Project
Groupings
GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET
FUND SOURCE
PE

Federal - NHS/NHPP

MATCH

TOTAL COST

$360,510,344

FY26

FY27

($11,472,000)

$0

$0

$0

$678,712

$0

$0

$2,714,848

$0

($2,189,288)

($11,472,000)

$0

$2,714,848

$0

Federal - BR

$452,815

$0

$0

$1,811,259

$0

Federal - NHS/NHPP

$233,560

$0

$0

$934,241

$0

$686,375

$0

$0

$2,745,500

$0

$0

$385,735

$0

$801,491

$0

$8,285,484

$12,100,763

$0

$82,829

$0

$0

$0

$331,314

$1,000,000

$0

$0

$0

$4,000,000
$1,844,181

PE TOTAL

RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - BR
Federal - DEMO
Federal - HIP/F
Federal - NHPP/E
Federal - NHS/NHPP
Federal - RSTP
Federal - STP/STBG

CN TOTAL
CN
AC

FY25

($2,868,000)

Federal - STP/STBG
RW

FY24

$461,045

$0

$0

$0

$5,443,430

$1,300,924

$0

$0 $20,472,795

$323,520

$0

$0

$0

$1,294,080

$0

$2,434,482

$608,621

$0

$0

$16,204,928

$13,401,687

$0

$2,955,154 $48,462,869

$0

$1,463,845

$0

$12,991,883 $87,002,028

Federal - AC OTHER

GROUPING

Construction : Rail

ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

Federal - STP/STBG

CN
AC

Federal - AC

GROUPING

$2,955,154 $18,086,017

MATCH

FY24

FY25

$4,132,882

FY26

FY27

$139,296

$1,253,662

$0

$0

$0

$0

$374,908

$0

$0

$0

Construction : Recreational Trails
TOTAL COST

ROUTE/STREET
FUND SOURCE

MATCH

FY24
$0

FY25
$0

312

$16,171,265

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET
FUND SOURCE
PE

FY25

TOTAL COST

$660,445,403

FY26

FY27

$452,297

$1,479,467

$504,396

$249,559

$137,119

Federal - CMAQ

$603,551

$1,116,160

$861,563

$0

$436,480

$0

($25,405)

$0

$0

$0

Federal - NHS/NHPP

$154,882

$619,529

$0

$0

$0

Federal - RSTP

$167,661

$670,642

$0

$0

$0

Federal - STP/STBG

$440,623

$1,391,127

$0

$1,112,902

$649,590

$1,819,013

$5,251,520

$1,365,959

$1,362,461

$1,223,189

PE TOTAL
PE AC Federal - AC OTHER

$0

$823,125

$0

$0

$504,400

$887,039

$0

$200,066

$310,487

$3,037,602

Federal - CMAQ

$1,005,197

$320,000

$0

$3,700,786

$0

Federal - CRP/F

Federal - AC CONVERSION

$1,665,744

$0

$3,119,527

$3,543,449

$0

Federal - HSIP

$62,000

$0

$0

$405,000

$153,000

Federal - NHFP

$81,751

$327,004

$0

$0

$0

Federal - NHPP/E

$208,810

$835,240

$0

$0

$0

Federal - NHS/NHPP

$2,076,831

$4,034,102

$3,910,503

$362,719

$0

Federal - RSTP

$1,781,213

$10,000

$3,611,712

$783,918

$2,719,222

Federal - STP/STBG
RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION

$60,044

$0

$0

$540,394

$0

$7,828,628

$5,526,346

$10,841,808

$9,646,753

$5,909,824

$0

$1,628,884

$388,109

$7,163,522

$0

$2,812,358

$373,207

$6,131,538

$4,781,962

$1,997,060

Federal - CMAQ

$541,840

$0

$0

$1,622,400

$544,959

Federal - HIP/F

$326,409

$1,305,636

$0

$0

$0

Federal - HSIP

$2,630,475

$13,018,711

$4,726,541

$2,523,420

$3,405,600

Federal - NHPP/E

$1,533,065

$0

$400,000

$2,340,471

$3,391,789

Federal - NHS/NHPP

$4,003,703

$1,356,231

$2,270,926

$7,667,979

$4,719,674

Federal - RSTP

$6,113,690

$10,812,862

$976,400

$5,272,656

$7,392,843

Federal - STP/STBG

$1,359,509

$4,645,585

$0

$0

$792,452

$19,321,048

$31,512,232

$14,505,405

$24,208,888 $22,244,377

$0

$21,453,159

$29,924,421

$11,644,188 $38,615,200

CN TOTAL
CN
AC

FY24

Federal - AC CONVERSION
Federal - NHFP

RW

MATCH

Federal - AC OTHER

313

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET
FUND SOURCE
PE

MATCH

TOTAL COST

$154,510,696

FY26

FY27

$76,199

$211,757

$93,040

$0

$0

Federal - NHS/NHPP

$93,400

$373,600

$0

$0

$0

Federal - RTAP

$56,945

$227,779

$0

$0

$0

$226,544

$813,136

$93,040

$0

$0

PE AC Federal - AC OTHER

$0

$116,300

$0

$0

$0

Federal - AC CONVERSION

$487,165

$0

$466,400

$1,482,260

$0

Federal - CMAQ

$195,811

$275,600

$507,642

$0

$0

Federal - HIP/F

$6,000

$24,000

$0

$0

$0

Federal - NHS/NHPP

$23,882

$95,528

$0

$0

$0

Federal - RSTP

$24,000

$96,000

$0

$0

$0

Federal - RTAP
Federal - STP/STBG
Federal - TAP/F
RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION

$29,321

$76,872

$40,410

$0

$0

$496,560

$417,600

$1,568,640

$0

$0

$2,000

$0

$8,000

$0

$0

$1,264,738

$985,600

$2,591,092

$1,482,260

$0

$0

$3,930,106

$7,330,960

$0

$0

$638,036

$0

$0

$2,552,142

$0

Federal - CMAQ

$1,434,883

$0

$2,691,225

$1,424,000

$1,624,308

Federal - DEMO

$53,760

$215,038

$0

$0

$0

Federal - HIP/F

$422,979

$0

$1,691,917

$0

$0

Federal - NHPP/E

$175,500

$0

$0

$702,000

$0

Federal - NHS/NHPP

$928,618

$0

$3,198,311

$516,160

$0

Federal - RSTP

$208,640

$0

$0

$834,560

$0

Federal - RTAP

$744,519

$1,284,713

$759,214

$934,148

$0

Federal - STP/STBG

$554,666

$0

$2,218,664

$0

$0

Federal - TAP/F
CN TOTAL
CN
AC

FY25

Federal - AC CONVERSION

PE TOTAL
RW

FY24

Federal - AC OTHER

GROUPING

$753,413

$1,614,859

$1,288,507

$110,284

$0

$5,915,013

$3,114,610

$11,847,838

$7,073,294

$1,624,308

$0

$7,090,893

$15,837,228

$11,036,098

$0

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

MATCH

FY24

FY25

TOTAL COST

$134,737,913

FY26

FY27

Federal - NHFP

$0

$115,430

$115,430

$115,430

$115,430

Federal - NHS/NHPP

$0

$2,258,586

$2,258,586

$2,258,586

$2,258,586

Federal - STP/STBG

$0

$31,116,665

$31,244,409

$31,374,325 $31,506,450

$0

$33,490,681

$33,618,425

$33,748,341 $33,880,466

CN TOTAL

314

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$93,219,475

FY26

FY27

Federal - BR

$0

$354,545

$50,000

$1,237,719

$0

Federal - CMAQ

$0

$0

$4,195,000

$0

$0

Federal - HSIP

$0

$3,000,000

$0

$0

$0

Federal - NHFP

$0

$751,472

$751,472

$751,472

$751,472

Federal - NHPP/E

$0

$176,284

$0

$0

$0

Federal - NHS/NHPP

$0

$2,543,612

$6,728,208

$4,037,999

$2,102,357

Federal - STP/STBG

$0

$6,926,117

$6,953,560

$6,981,469

$7,009,853

CN TOTAL

$0

$13,752,030

$18,678,240

$13,008,659

$9,863,682

CN
AC

$0

$7,896,875

$16,803,314

$13,216,675

$0

Federal - AC OTHER

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

FY26

FY27

Federal - CMAQ

$0

$0

$4,195,000

$0

$0

Federal - HSIP

$0

$3,000,000

$0

$0

$0

Federal - STP/STBG

$0

$6,405,707

$6,432,005

$6,458,750

$6,485,949

$0

$9,405,707

$10,627,005

$6,458,750

$6,485,949

CN TOTAL

GROUPING

Transit : Access

ROUTE/STREET

TOTAL COST

FUND SOURCE
PE

$32,977,411

MATCH

Federal - NHS/NHPP

GROUPING

FY24
$407,236

FY25
$0

FY26
$0

FY27
$0

$1,628,943

Transit : Ridesharing

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24
$0

GROUPING

$26,803,183

FY25
$0

FY26
$0

FY27
$0

$0

Transit : Vehicles

ROUTE/STREET
FUND SOURCE

TOTAL COST
MATCH

FY24
$0

FY25
$0

315

$3,355,697

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Tri-Cities MPO
Project
Groupings
GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE
PE

MATCH

Federal - STP/STBG

GROUPING

FY24

FY25

$235,362

$0

$0

FUND SOURCE
Federal - AC CONVERSION

$941,448

$0

MATCH

FY24

FY25

TOTAL COST

$129,060,397

FY26

FY27

$191,597

$298,823

$484,500

$0

$0

Federal - NHS/NHPP

($8,024)

$0

$0

($32,095)

$0

Federal - RSTP

$95,713

($19,800)

$0

$0

$402,651

Federal - STP/STBG

$22,270

$89,078

$0

$0

$0

$301,556

$368,101

$484,500

($32,095)

$402,651

PE TOTAL
PE AC Federal - AC OTHER
RW

FY27

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET
PE

$20,420,605

FY26

$0

$550,000

$0

$0

$415,563

Federal - AC CONVERSION

$560,361

$2,043

$761,521

$1,309,732

$169,284

Federal - HIP/F

$200,000

$800,000

$0

$0

$0

Federal - NHS/NHPP

$226,483

$905,932

$0

$0

$0

Federal - STP/STBG

$164,651

$658,605

$0

$0

$0

$1,151,496

$2,366,580

$761,521

$1,309,732

$169,284

$0

$5,871,876

$0

$0

$0

RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION

$300,970

$1,176,415

$190,530

$0

$0

Federal - CMAQ

$144,791

$579,164

$0

$0

$0

Federal - HSIP

$51,568

$87,957

$0

$376,155

$0

Federal - NHPP/E

$80,472

$0

$321,887

$0

$0

$765,313

$0

$495,822

$0

$2,565,428

($439)

($1,754)

$0

$0

$0

$544,965

$367,544

$1,812,316

$0

$0

$1,887,640

$2,209,326

$2,820,555

$376,155

$2,565,428

$0

$4,695,025

$3,958,185

$10,022,534

$7,036,854

Federal - NHS/NHPP
Federal - RSTP
Federal - STP/STBG
CN TOTAL
CN
AC

Federal - AC OTHER

316

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE
PE

MATCH

Federal - AC CONVERSION
Federal - CMAQ
Federal - RSTP

PE TOTAL
PE AC Federal - AC OTHER
RW

$21,815
$230,185

$0
$0

$45,865,407

FY26
$0
$240,000

FY27
$0
$680,738

$87,261
$0

$10,000

$40,000

$0

$0

$0

$262,000

$40,000

$240,000

$680,738

$87,261

$0

$0

$0

$109,077

$0

$0

$179,040

$0

$0

Federal - HIP/F

$400,000

$0

$0

$1,600,000

$0

Federal - RSTP

$25,440

$101,760

$0

$0

$0

Federal - RTAP

$8,640

$0

$0

$34,560

$0

Federal - TAP/F
Federal - AC OTHER
Federal - AC CONVERSION
Federal - CMAQ

$3,106

$0

$12,424

$0

$0

$481,946

$101,760

$191,464

$1,634,560

$0

$0

$223,800

$0

$2,185,284

$0

$74,896

$0

$85,983

$0

$213,600

$66,282

$0

$0

$0

$265,129

Federal - RSTP

$118,416

$230,784

$0

$242,880

$0

Federal - RTAP

$161,637

$277,902

$215,184

$153,460

$0

Federal - TAP/F
CN TOTAL
CN
AC

FY25

$44,760

Federal - AC CONVERSION

RW TOTAL
RW
AC
CN

FY24

Federal - AC OTHER

GROUPING

$88,837

$114,151

$110,113

$131,082

$0

$510,067

$622,837

$411,280

$527,422

$478,729

$0

$323,402

$117,281

$632,246 $19,898,419

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$134,737,913

FY26

FY27

Federal - NHFP
Federal - NHS/NHPP

$0
$0

$115,430
$2,258,586

$115,430
$2,258,586

$115,430
$2,258,586

$115,430
$2,258,586

Federal - STP/STBG

$0

$31,116,665

$31,244,409

$31,374,325

$31,506,450

$0

$33,490,681

$33,618,425

$33,748,341

$33,880,466

CN TOTAL

GROUPING

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

$93,219,475

FY26

FY27

Federal - BR

$0

$354,545

$50,000

$1,237,719

$0

Federal - CMAQ

$0

$0

$4,195,000

$0

$0

Federal - HSIP

$0

$3,000,000

$0

$0

$0

Federal - NHFP

$0

$751,472

$751,472

$751,472

$751,472

Federal - NHPP/E

$0

$176,284

$0

$0

$0

Federal - NHS/NHPP

$0

$2,543,612

$6,728,208

$4,037,999

$2,102,357

Federal - STP/STBG

$0

$6,926,117

$6,953,560

$6,981,469

$7,009,853

CN TOTAL

$0

$13,752,030

$18,678,240

$13,008,659

$9,863,682

CN
AC

$0

$7,896,875

$16,803,314

$13,216,675

$0

Federal - AC OTHER

317

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

$32,977,411

FY26

FY27

Federal - CMAQ

$0

$0

$4,195,000

$0

$0

Federal - HSIP

$0

$3,000,000

$0

$0

$0

Federal - STP/STBG

$0

$6,405,707

$6,432,005

$6,458,750

$6,485,949

$0

$9,405,707

$10,627,005

$6,458,750

$6,485,949

CN TOTAL

318

COMMONWEALTH OF VIRGINIA

SALEM
DISTRICT

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

FFY 24-27 Working STIP

6/21/2023 8:52:03

Salem District
Interstate Projects
MPO

NonMPO

UPC NO

120396 SCOPE

SYSTEM

Interstate

JURISDICTION

PROJECT

#OTHERINT - I-77 OPERATIONAL IMPROVEMENTS - TRIP

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

ROUTE/STREET

0077
MATCH

Federal - AC OTHER

MPO

OVERSIGHT
ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
CN
AC

Statewide

FY24
$0

FY25
$150,000

$150,000

FY26

FY27

$0

$0

$0

Roanoke

UPC NO

110395 SCOPE

SYSTEM

Interstate

JURISDICTION

Roanoke County

PROJECT

#HB2.FY17 I-81 AUX LN FR EXIT 141 -143 GARVEE DEBT SERVICE

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $3,480,347 GARVEE Debt Service Interest Prev, $695,246 FFY24 GARVEE Debt Service Interest,
$667,675 GARVEE Debt Service Interest FFY25, $607,737 GARVEE Debt Service Interest FFY26, $544,853
GARVEE Debt Service Interest FFY27, $2,140,800 GARVEE Debt Service Interest FFY28-38. Total GARVEE
Debt Service Interest
$8,136,658. Corresponding CN UPC 108906.
ROUTE/STREET
0081
TOTAL COST
$16,827,213
FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$667,675

$607,737

Federal - NHS/NHPP

$0

$695,246

$0

$0

$0

PE TOTAL

$0

$695,246

$667,675

$607,737

$544,853

PE AC Federal - AC

$0

$3,961,065

$0

$0

$0

MPO

$544,853

Roanoke

UPC NO

111983 SCOPE

SYSTEM

Interstate

JURISDICTION

Roanoke County

PROJECT

#SMART18 - 81 SB Aux Ln frm Exit 143-141 GARVEE Debt Service

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $424,071 FFY24 GARVEE Debt Service Interest, $464,749 GARVEE Debt Service Interest FFY25,
$439,246 GARVEE Debt Service Interest FFY26, $412,640 GARVEE Debt Service Interest FFY27, $2,418,619
GARVEE Debt Service Interest FFY28-38. Total GARVEE Debt Service Interest $4,159,325. Corresponding CN
UPC 111373.
0081
TOTAL COST
$5,791,593

FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$464,749

$439,246

$412,640

Federal - NHS/NHPP

$0

$424,071

$0

$0

$0

PE TOTAL

$0

$424,071

$464,749

$439,246

$412,640

PE AC Federal - AC

$0

$3,735,254

$0

$0

$0

320

FFY 24-27 Working STIP

6/21/2023 8:52:03

Salem District
Primary Projects
MPO

Roanoke

UPC NO

T24740

SCOPE

Safety

SYSTEM

Primary

JURISDICTION

Botetourt County

PROJECT

Route 220 Superstreet Improvement

DESCRIPTION

FROM: Tinker Mountain Dr TO: Catawba Rd (0.8000 MI)

ROUTE/STREET

ROANOKE ROAD (0220)

FUND SOURCE

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$0

MPO

OVERSIGHT

$0

$15,460,811

FY26
$0

FY27
$0

$0

NonMPO

UPC NO

105543 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Primary

PROJECT

RTE. 220 Safety Improvement Project – Ph. 1, 2, & 3

DESCRIPTION

FROM: 1.899 Mi. South of Rte. 694 (Gala Loop Rd.) TO: 2.873 Mi. North of Rte. 696 (Buhrman Rd.) (8.5270 MI)

ROUTE/STREET

BOTETOURT ROAD (0220)

FUND SOURCE

JURISDICTION

Botetourt County

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$80,033,815

FY26

FY27

PE

Federal - STP/STBG

$0

$133,367

$0

$0

$0

CN

Federal - NHS/NHPP

$0

$72,575

$0

$0

$0

Federal - STP/STBG

$0

$405,872

$0

$0

$0

CN TOTAL

$0

$478,447

$0

$0

$0

CN
AC

$0

$605,836

$0

$0

$0

Federal - AC OTHER

MPO

NonMPO

UPC NO

110916 SCOPE

Other

SYSTEM

Primary

PROJECT

EIS-Martinsville Southern Connector Study

JURISDICTION

Henry County

DESCRIPTION

FROM: Rte 58/220 By-pass TO: NC State Line

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

US 220 CORRIDOR (0220)

FUND SOURCE

TOTAL COST

MATCH

FY24
$0

FY25
$0

321

$4,600,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Roanoke

UPC NO

121433 SCOPE

SYSTEM

Primary

PROJECT

#SMART20 RTE 419&220 DIVERGING DIAMOND GARVEE DEBT SERVICE

JURISDICTION

Roanoke County

DESCRIPTION

FROM: 0.5 Mi. W. Rte. 220 TO: 0.23 Mi. E. Rte. 220 (0.7300 MI)

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE Includes $108,628 GARVEE Debt Service Interest FFY24, $119,047 GARVEE Debt Service Interest FFY25,
$112,515 GARVEE Debt Service Interest FFY26, $105,700 GARVEE Debt Service Interest FFY27, $619,539
GARVEE Debt Service Interest FFY28-38, Total GARVEE Debt Service Interest $1,065,429. Corresponding CN
UPC 115460
ROUTE/STREET
ELECTRIC ROAD (0419)
TOTAL COST
$1,213,841
FUND SOURCE
PE

MATCH

FY24

FY25

Federal - AC CONVERSION

$0

$0

Federal - NHS/NHPP

FY26
$119,047

FY27
$112,515

$105,700

$0

$108,628

$0

$0

$0

PE TOTAL

$0

$108,628

$119,047

$112,515

$105,700

PE AC Federal - AC

$0

$956,801

$0

$0

$0

MPO

New River Valley

UPC NO

99425 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

RTE 460 - Southgate Dr. Interchange & Connector

DESCRIPTION

FROM: 0.156 Mi. W. Int. Southgate Dr. TO: 0.799 Mi. E. Int. Southgate Dr. (0.9556 MI)

ROUTE/STREET

RTE. 460 BYPASS (0460)

FUND SOURCE

JURISDICTION

Blacksburg

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$51,757,465

FY26

FY27

RW

Federal - STP/STBG

$0

$49,482

$0

$0

$0

CN

Federal - NHS/NHPP

$0

$921,306

$0

$0

$0

Federal - STP/STBG

$0

$300,788

$0

$0

$0

CN TOTAL

$0

$1,222,094

$0

$0

$0

CN
AC

$0

$11,987,193

$0

$0

$0

Federal - AC OTHER

MPO

Roanoke

UPC NO

123136 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Primary

PROJECT

I-581-Exit 2 (PETERS CREEK RD) INTERCHANGE IMPROVEMENTS PH 1

DESCRIPTION

FROM: Peters Creek Road TO: Valleypointe Parkway intersection

ROUTE/STREET

I-581 AT EXIT 2 (0581)

FUND SOURCE

JURISDICTION

Multi-jurisdictional: Roanoke MPO

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24
$0

FY25
$0

322

$16,997,515

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Salem District
Secondary
Projects
MPO

NonMPO

UPC NO

121894 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Secondary

PROJECT

RESERVOIR RD/SR 689 RECONSTRUCTION & UPGRADE - HENRY CO

DESCRIPTION

FROM: Greensboro Rd/Rte 220 TO: 0.8 from Greensboro Rd/Rte 220

ROUTE/STREET

RESERVOIR RD (0689)

FUND SOURCE

JURISDICTION

Henry County

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$3,031,692

FY26

FY27

PE

Federal - APD

$0

$283,471

$0

$0

$0

RW

Federal - APD

$0

$0

$59,700

$0

$0

CN

Federal - APD
Other

CN TOTAL

MPO

$0

$0

$856,829

$0

$0

$915,846

$0

$915,846

$0

$0

$915,846

$0

$1,772,675

$0

$0

NonMPO

UPC NO

109947 SCOPE

Bridge Rehab w/ Added Capacity

SYSTEM

Secondary

PROJECT

BOX CULVERT EXTENSION

DESCRIPTION

FROM: INTERSECTION ROUTE 672 TO: INTERSECTION ROUTE 672 (0.0010 MI)

ROUTE/STREET

JULIA SIMPKINS ROAD (0693)

FUND SOURCE

JURISDICTION

Pulaski County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$165,175

FY26

FY27

RW

Federal - STP/STBG

$1,000

$4,000

$0

$0

$0

CN

Federal - STP/STBG

$32,035

$128,140

$0

$0

$0

MPO

NonMPO

UPC NO

110958 SCOPE

Resurfacing

SYSTEM

Secondary

PROJECT

RTE. 708 Ivy Ridge Hard Surface Non-Hard Surfaced Roadway

DESCRIPTION

FROM: INT ROUTE 221 TO: END OF STATE MAINTENANCE (0.4400 MI)

ROUTE/STREET

IVY RIDGE ROAD (0708)

FUND SOURCE
CN
AC

Federal - AC OTHER

JURISDICTION

Roanoke County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24
$0

FY25
$200,000

323

$200,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Salem District
Urban Projects
MPO

NonMPO

UPC NO

108898 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

JURISDICTION

PROJECT

#HB2.FY17 Cranberry Road Improvements

DESCRIPTION

FROM: Route 887 (Glendale Road) TO: Routes 58/221 (East Stuart Drive) (0.2500 MI)

ROUTE/STREET

CRANBERRY ROAD (4060)

FUND SOURCE
RW
AC
CN
AC

Galax

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$2,279,922

FY26

FY27

Federal - AC OTHER

$0

$81,279

$0

$0

$0

Federal - AC OTHER

$0

$152,146

$0

$0

$0

MPO

NonMPO

UPC NO

76402 SCOPE

New Construction Roadway

SYSTEM

Urban

PROJECT

CONSTRUCT NEW 2 LANE CONNECTOR - PHASE 1

DESCRIPTION

FROM: Rte 177 (Tyler Avenue) TO: Rte 688(Auburn Ave), 0.268 miles east of Rte 177(Tyler Ave) (0.3000 MI)

ROUTE/STREET

TYLER/E. MAIN CN

FUND SOURCE

JURISDICTION

Radford

OVERSIGHT
ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$4,075,928

FY26

FY27

PE

Federal - STP/STBG

$9,986

$39,944

$0

$0

$0

RW

Federal - STP/STBG

($6,773)

($27,092)

$0

$0

$0

CN

Federal - STP/STBG

$78,568

$314,273

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$2,576,287

$0

$0

$0

MPO

Roanoke

UPC NO

688 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Urban

PROJECT

13TH STREET IMPROVEMENTS

DESCRIPTION

FROM: .046 MILE SOUTH OF CHURCH AVENUE TO: INT. OF NORFOLK AVENUE (0.2443 MI)

ROUTE/STREET

13TH ST (U000)

FUND SOURCE
CN

Federal - NHS/NHPP
Federal - STP/STBG
Other

CN TOTAL
CN
AC

Federal - AC OTHER

JURISDICTION

Roanoke

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$25,294,957

FY26

FY27

$0

$3,074,186

$0

$0

$0

$59,323

$237,291

$0

$0

$0

$450,619

$450,619

$0

$0

$0

$509,942

$3,762,096

$0

$0

$0

$0

$3,172,621

$0

$0

$0

324

FFY 24-27 Working STIP

6/21/2023 8:52:03

Salem District
Project
Groupings
MPO

NonMPO

GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET
FUND SOURCE
PE

MATCH

Federal - AC CONVERSION

FY27

$504,800

$0

$0

$0

$35,038

$0

$0

$0

$134,960

$539,838

$0

$0

$0

$0

$1,390,255

$0

$0

$0

Federal - BR

$380,542

$0

$1,172,745

$349,422

$0

Federal - NHS/NHPP

$130,000

$320,000

$200,000

$0

$0

$510,542

$320,000

$1,372,745

$349,422

$0

Federal - AC CONVERSION

$3,245,064

$0

$0

$6,200,758

$6,779,498

Federal - BR

$1,385,279

$0

$580,122

$0

$4,960,995

Federal - NHS/NHPP

$1,756,279

$0

$0

$7,025,116

$0

Federal - STP/STBG

$1,335,897

$0

$139,171

$2,642,506

$2,561,910

$7,722,519

$0

$719,293

$0

$0

$16,687,232

PE AC Federal - AC OTHER

RW TOTAL

CN TOTAL
CN
AC

FY26

$8,760

PE TOTAL

CN

FY25

$206,270,984

$126,200

Federal - BR

RW

FY24

TOTAL COST

Federal - AC OTHER

MPO

NonMPO

GROUPING

Construction : Federal Lands Highway

ROUTE/STREET

$15,868,380 $14,302,403
$7,597,998

TOTAL COST

FUND SOURCE

MATCH

FY24
$0

MPO

NonMPO

GROUPING

Construction : Rail

FY25
$0

ROUTE/STREET
FUND SOURCE

$1,564,549
FY27

FY26
$0

$0

$0

$0

TOTAL COST
MATCH

FY24
$0

FY25
$0

325

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

NonMPO

GROUPING

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET
FUND SOURCE
PE

Federal - AC CONVERSION

RW

Federal - AC CONVERSION

MATCH
$773

FY25
$3,093

TOTAL COST

$168,432,166

FY26

FY27

$0

$0

$0

$39,778

$0

$0

$159,110

$0

Federal - NHS/NHPP

$413,708

$749,084

$905,747

$0

$0

Federal - STP/STBG

$346,917

$0

$1,387,667

$0

$0

$800,402

$749,084

$2,293,414

$159,110

$0

$0

$198,888

$0

$0

$0

$2,306,235

$0

$1,782,000

$2,156,889

$6,276,051

RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION
Federal - HSIP

$46,192

$415,731

$0

$0

$0

Federal - NHS/NHPP

$3,580,317

$2,942,705

$4,368,186

$7,010,377

$0

Federal - STP/STBG

$2,045,990

$0

$720,000

$7,463,960

$0

$7,978,734

$3,358,436

$6,870,186

$16,631,226

$6,276,051

$0

$8,630,061

$7,429,019

$11,825,042

$0

CN TOTAL
CN
AC

FY24

Federal - AC OTHER

MPO

NonMPO

GROUPING

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$15,620,371

FY26

FY27

RW

Federal - TAP/F

$2,841

$0

$11,364

$0

$0

CN

Federal - TAP/F

$298,949

$243,791

$555,053

$396,953

$0

CN
AC

Federal - AC OTHER

$0

$798,506

$939,514

$145,301

$0

MPO

NonMPO

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE

MATCH

FY24
$0

FY25
$0

TOTAL COST

$104,336,573

FY26

FY27

$0

MPO

Roanoke

GROUPING

Maintenance : Preventive Maintenance and System Preservation

$0

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

MATCH

FY24

FY25

TOTAL COST

$104,336,573

FY26

FY27

Federal - NHFP

$0

$2,981,154

$2,981,154

$2,981,154

$2,981,154

Federal - NHS/NHPP

$0

$2,049,832

$2,049,832

$2,049,832

$2,049,832

Federal - STP/STBG

$0

$20,922,848

$21,008,743

$21,096,099 $21,184,939

$0

$25,953,834

$26,039,729

$26,127,085 $26,215,925

CN TOTAL

326

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

NonMPO

GROUPING

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
TOTAL COST

ROUTE/STREET
FUND SOURCE

MATCH

FY24

FY25

$0

FY26

$0

MPO

Roanoke

GROUPING

Maintenance : Preventive Maintenance for Bridges

$77,508,932
FY27

$0

$0

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$77,508,932

FY26

FY27

Federal - AC CONVERSION

$0

$145,000

$1,428,329

Federal - BR

$0

$705,620

$6,450,972

Federal - NHFP

$0

$1,166,078

$1,166,078

$1,166,078

$1,166,078

Federal - NHS/NHPP

$0

$1,350,842

$7,381,798

$1,350,842

$1,350,842

Federal - STP/STBG

$0

$3,536,160

$6,248,910

$3,558,309

$3,569,666

CN TOTAL

$0

$6,903,700

$22,676,087

CN
AC

$0

$3,078,000

$1,239,280

Federal - AC OTHER

MPO

Roanoke

GROUPING

Maintenance : Traffic and Safety Operations

$0

$0

$19,947,300 $11,502,750

$26,022,529 $17,589,336
$0

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

FY26

$11,824,327
FY27

Federal - NHS/NHPP

$0

$1,278,114

$1,278,114

$1,278,114

$1,278,114

Federal - STP/STBG

$0

$1,667,582

$1,674,428

$1,681,390

$1,688,471

$0

$2,945,696

$2,952,542

$2,959,504

$2,966,585

CN TOTAL

327

FFY 24-27 Working STIP

6/21/2023 8:52:03

New River Valley MPO
Project
Groupings
GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0
GROUPING

$0

$0

$0

Construction : Rail
TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0

$1,131,404

FY26

$0

FY27

$0

$0

$0

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET
FUND SOURCE
RW

FY27

$0

ROUTE/STREET

GROUPING

$38,232,007

FY26

MATCH

Federal - NHS/NHPP
Federal - STP/STBG

RW TOTAL

FY24

FY25

TOTAL COST

$322,036,362

FY26

FY27

$177,597

$710,388

$0

$0

$0

$76,918

$0

$307,671

$0

$0

$254,515

$710,388

$307,671

$0

$0

$0

$0

$68,811

$0

$0

RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION

$964,069

$0

$0

$2,284,000

$1,572,276

Federal - NHS/NHPP

$191,403

$0

$765,611

$0

$0

$1,155,472

$0

$765,611

$2,284,000

$1,572,276

$0

$0

$4,820,346

$3,851,008

$0

CN TOTAL
CN
AC

Federal - AC OTHER

GROUPING

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

RW

Federal - TAP/F

$18,525

CN

Federal - TAP/F

CN
AC

Federal - AC OTHER

GROUPING

FY25

$7,759,178

FY26

FY27

$0

$74,100

$0

$0

$461,579

$76,369

$1,339,660

$430,288

$0

$0

$1,373,324

$13,945

$0

$0

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

MATCH

FY24

FY25

TOTAL COST

$104,336,573

FY26

FY27

Federal - NHFP

$0

$2,981,154

$2,981,154

$2,981,154

$2,981,154

Federal - NHS/NHPP

$0

$2,049,832

$2,049,832

$2,049,832

$2,049,832

Federal - STP/STBG

$0

$20,922,848

$21,008,743

$21,096,099 $21,184,939

$0

$25,953,834

$26,039,729

$26,127,085 $26,215,925

CN TOTAL

328

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$77,508,932

FY26

FY27

Federal - AC CONVERSION

$0

$145,000

$1,428,329

Federal - BR

$0

$705,620

$6,450,972

Federal - NHFP

$0

$1,166,078

$1,166,078

$1,166,078

$1,166,078

Federal - NHS/NHPP

$0

$1,350,842

$7,381,798

$1,350,842

$1,350,842

Federal - STP/STBG

$0

$3,536,160

$6,248,910

$3,558,309

$3,569,666

CN TOTAL

$0

$6,903,700

$22,676,087

CN
AC

$0

$3,078,000

$1,239,280

Federal - AC OTHER

GROUPING

$0

$0

$19,947,300 $11,502,750

$26,022,529 $17,589,336
$0

$0

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

FY26

$11,824,327
FY27

Federal - NHS/NHPP

$0

$1,278,114

$1,278,114

$1,278,114

$1,278,114

Federal - STP/STBG

$0

$1,667,582

$1,674,428

$1,681,390

$1,688,471

$0

$2,945,696

$2,952,542

$2,959,504

$2,966,585

CN TOTAL

329

FFY 24-27 Working STIP

6/21/2023 8:52:03

Roanoke MPO
Project
Groupings
GROUPING
Construction : Bridge Rehabilitation/Replacement/Reconstruction
ROUTE/STREET
FUND SOURCE
MATCH
FY24
FY25
CN

Federal - BR
Federal - STP/STBG
CN TOTAL
CN
Federal - AC OTHER
AC
GROUPING

$201,074
$68,976
$270,050
$0

$804,297
$275,902
$1,080,199
$8,362,745

MATCH

$0

MATCH

FY24

$1,733,750
FY27
$0

$0

TOTAL COST
FY26

$0

$0

FY27
$0

$0

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET
FUND SOURCE

MATCH

FY24

TOTAL COST
FY26

FY25

$1,090,287,898
FY27

Federal - AC CONVERSION

$185,534

$1,416,420

$253,382

$0

$0

Federal - NHS/NHPP

$142,607

$570,428

$0

$0

$0

Federal - RSTP
PE TOTAL
PE AC Federal - AC OTHER
Federal - AC CONVERSION

$16,659

$66,634

$0

$0

$0

$344,799

$2,053,482

$253,382

$0

$0

$0

$900,000

$0

$0

$0

$542,333

$1,600,000

$391,271

$178,060

$0

Federal - HSIP

$27,455

$247,098

$0

$0

$0

Federal - NHS/NHPP

$89,788

$250,903

$108,249

$0

$0

Federal - RSTP
RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION
Federal - DEMO
Federal - HIP/F
Federal - HSIP
Federal - NHS/NHPP
Federal - RSTP

CN TOTAL
CN
AC

$0

FY25

$0

RW

$0
$0
$0
$0

Construction : Rail

ROUTE/STREET
FUND SOURCE

PE

$0
$0
$0
$0

TOTAL COST
FY26

FY25

FY24
$0

GROUPING

$0
$0
$0
$0

$43,170,414
FY27

Construction : Federal Lands Highway

ROUTE/STREET
FUND SOURCE

GROUPING

TOTAL COST
FY26

Federal - AC OTHER

$536,579

($177,384)

$507,068

$1,816,631

$0

$1,196,155

$1,920,617

$1,006,588

$1,994,691

$0

$0

$0

$222,576

$0

$0

$2,962,880

$0

$3,610,857

$3,364,722

$4,875,941

$411,019

$1,644,075

$0

$0

$0

$3,304

$0

$13,214

$0

$0

$234,484

$1,743,174

$367,182

$0

$0

$1,029,214

$1,429,096

$0

$2,687,759

$0

$835,671

$1,173,367

$0

$1,763,354

$405,964

$5,476,571

$5,989,712

$3,991,253

$7,815,835

$5,281,905

$0

$25,001,380

$7,642,989

$18,730,025

$17,826,769

330

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE
PE

Federal - STP/STBG

RW

Federal - AC CONVERSION

MATCH

FY25

$73,727,803

FY26

FY27

$30,316

$0

$0

$121,265

$0

$3,157

$0

$0

$0

$12,628

Federal - HIP/F

$57,797

$8,000

$223,186

$0

$0

Federal - NHS/NHPP

$30,000

$120,000

$0

$0

$0

Federal - RTAP

$1,116

$0

$4,465

$0

$0

$289,444

$0

$0

$1,157,776

$0

$381,514

$128,000

$227,651

$1,157,776

$12,628

$0

$0

$0

$15,785

$0

$1,206,835

$1,067,339

$0

$1,760,000

$2,000,000

Federal - HIP/F

$100,877

$59,473

$344,036

$0

$0

Federal - NHS/NHPP

$437,062

$1,748,248

$0

$0

$0

Federal - RSTP

$773,952

$2,801,250

$294,556

$0

$0

Federal - RTAP

$128,291

$157,628

$355,534

$0

$0

Federal - STP/STBG

$369,020

$0

$60,000

$1,028,708

$387,372

$51,793

$207,171

$0

$0

$0

$3,067,829

$6,041,109

$1,054,126

$2,788,708

$2,387,372

$0

$2,448,440

$6,079,953

$7,756,741

$2,017,132

Federal - STP/STBG
RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION

Federal - TAP/F
CN TOTAL
CN
AC

FY24

Federal - AC OTHER

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

MATCH

FY24

FY25

TOTAL COST

$104,336,573

FY26

FY27

Federal - NHFP

$0

$2,981,154

$2,981,154

$2,981,154

$2,981,154

Federal - NHS/NHPP

$0

$2,049,832

$2,049,832

$2,049,832

$2,049,832

Federal - STP/STBG

$0

$20,922,848

$21,008,743

$21,096,099 $21,184,939

$0

$25,953,834

$26,039,729

$26,127,085 $26,215,925

CN TOTAL

GROUPING

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

$77,508,932

FY26

FY27

Federal - AC CONVERSION

$0

$145,000

$1,428,329

Federal - BR

$0

$705,620

$6,450,972

Federal - NHFP

$0

$1,166,078

$1,166,078

$1,166,078

$1,166,078

Federal - NHS/NHPP

$0

$1,350,842

$7,381,798

$1,350,842

$1,350,842

Federal - STP/STBG

$0

$3,536,160

$6,248,910

$3,558,309

$3,569,666

CN TOTAL

$0

$6,903,700

$22,676,087

CN
AC

$0

$3,078,000

$1,239,280

Federal - AC OTHER

331

$0

$0

$19,947,300 $11,502,750

$26,022,529 $17,589,336
$0

$0

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$11,824,327

FY26

FY27

Federal - NHS/NHPP

$0

$1,278,114

$1,278,114

$1,278,114

$1,278,114

Federal - STP/STBG

$0

$1,667,582

$1,674,428

$1,681,390

$1,688,471

$0

$2,945,696

$2,952,542

$2,959,504

$2,966,585

CN TOTAL

GROUPING

Transit : Vehicles
TOTAL COST

ROUTE/STREET
FUND SOURCE

FY24

MATCH
$0

FY25
$0

332

FY26
$0

FY27
$0

$0

COMMONWEALTH OF VIRGINIA

STAUNTON
DISTRICT

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

FFY 24-27 Working STIP

6/21/2023 8:52:03

Staunton District
Interstate Projects
MPO

SAW

UPC NO

116269 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

#I81CIP NB & SB MM 221 TO 225, 3-LANE WIDENING (ID #61)

DESCRIPTION

FROM: MM 221.45 TO: MM 225.6 (4.1800 MI)

ROUTE/STREET

0081

FUND SOURCE

JURISDICTION

Augusta County

MATCH

OVERSIGHT

FY24

ADMIN BY

FY25

VDOT

TOTAL COST

$178,270,127

FY26

FY27

PE AC Federal - AC OTHER

$0

($5,722,005)

$0

$0

$0

Federal - AC OTHER

$0

$1,150,000

$0

$0

$0

CN AC Federal - AC OTHER

$0

$171,544,132

$0

$0

$0

RW
AC

MPO

SAW

UPC NO

116271 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Interstate

PROJECT

#I81CIP NB MT. SIDNEY EXTEND ACCELERATION LANE (ID #43)

DESCRIPTION

FROM: MM 232.4 TO: MM 232.8 (0.4000 MI)

ROUTE/STREET

0081

FUND SOURCE

JURISDICTION

Augusta County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$4,985,473

FY26

FY27

PE AC Federal - AC OTHER

$0

$509,600

$0

$0

$0

Federal - AC OTHER

$0

$0

$344,760

$0

$0

CN AC Federal - AC OTHER

$0

$0

$0

$4,131,113

$0

RW
AC

MPO

SAW

UPC NO

116276 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Interstate

PROJECT

#I81CIP SB MT. SIDNEY EXTEND ACCELERATION LANE (ID #57)

DESCRIPTION

FROM: MM231.9 TO: MM 232.5 (0.6000 MI)

ROUTE/STREET

0081

FUND SOURCE

JURISDICTION

Augusta County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$1,285,376

FY26

FY27

PE AC Federal - AC OTHER

$0

$128,800

$0

$0

$0

Federal - AC OTHER

$0

$0

$114,920

$0

$0

CN AC Federal - AC OTHER

$0

$0

$0

$1,041,656

$0

RW
AC

334

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

SAW

UPC NO

116277 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

#I81CIP NB MM 234 TO 237, WEYERS CAVE TCL (ID #44)

JURISDICTION

DESCRIPTION

FROM: MM 234.1 TO: MM 237.7 (3.1000 MI)

ROUTE/STREET

0081

ADMIN BY

MATCH

FY24

FY25

FY27

$342,471

$0

$0

$0

Federal - AC OTHER

$0

$56,028,731

$0

$0

$0

SAW
116278 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

#I81CIP SB MM 234 TO 237, WEYERS CAVE TCL (ID #55)

DESCRIPTION

FROM: MM 234.2 TO: MM 237.9 (3.1000 MI)

ROUTE/STREET

JURISDICTION

0081

Augusta County

OVERSIGHT
ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$62,686,156

FY26

FY27

Federal - AC OTHER

$0

$1,210,554

$0

$0

$0

Federal - AC OTHER

$0

$56,076,102

$0

$0

$0

MPO

Winchester

UPC NO

115717 SCOPE

Bridge Replacement w/ Added Capacity

SYSTEM

Interstate

PROJECT

#SMART20 I-81 EXIT 313 BRIDGE CAPACITY IMPROVMENT

DESCRIPTION

FROM: Bridge Replacement over I-81 TO: And interchange Improvements (0.3900 MI)

ROUTE/STREET

0081

JURISDICTION

MATCH

Federal - AC OTHER

MPO

Frederick County

OVERSIGHT
ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

FY24
$0

FY25
$5,264,400

$5,264,400

FY26
$0

FY27
$0

$0

Harrisonburg

UPC NO

116280 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

#I81CIP NB & SB MM 242 TO 248, 3-LANE WIDENING (ID #62)

DESCRIPTION

FROM: MM 242.0 TO: MM 248.8 (6.8600 MI)

ROUTE/STREET

0081

FUND SOURCE
RW
AC

$61,770,702

FY26

$0

UPC NO

CN
AC

VDOT

Federal - AC OTHER

MPO

RW
AC
CN
AC

OVERSIGHT

TOTAL COST

FUND SOURCE
RW
AC
CN
AC

Augusta County

Federal - AC OTHER

JURISDICTION

Harrisonburg

MATCH

OVERSIGHT

FY24
$0

FY25
$0

335

$10,270,000

ADMIN BY

VDOT

TOTAL COST

$320,016,035

FY26

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

NonMPO

UPC NO

116282 SCOPE

Reconstruction w/o Added Capacity

SYSTEM

Interstate

PROJECT

#I81CIP NB & SB SHOULDER IMPROVEMENTS (ID #60)

DESCRIPTION

FROM: SB MM 195.1, NB MM 202.0 TO: SB MM 204.5, NB MM 204.0 (9.4000 MI)

ROUTE/STREET

0081

FUND SOURCE

JURISDICTION

Rockbridge County

OVERSIGHT
ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$85,227,710

FY26

FY27

PE AC Federal - AC OTHER

$0

$7,050,400

$0

$0

$0

Federal - AC OTHER

$0

$0

$0

$1,420,440

$0

CN AC Federal - AC OTHER

$0

$0

$0

$76,756,870

$0

RW
AC

MPO

NonMPO

UPC NO

116268 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

#I81CIP SB MM 296 TO 299, 3-LANE WIDENING (ID #50)

DESCRIPTION

FROM: MM 295.4 TO: MM 299.6 (4.1100 MI)

ROUTE/STREET

0081

FUND SOURCE

JURISDICTION

Shenandoah County

MATCH

FY24

OVERSIGHT

FY25

ADMIN BY

VDOT

TOTAL COST

$126,220,508

FY26

FY27

PE AC Federal - AC OTHER

$0

($1,854,103)

$0

$0

$0

Federal - AC OTHER

$0

$5,982,174

$0

$0

$0

CN AC Federal - AC OTHER

$0

$111,266,437

$0

$0

$0

RW
AC

336

FFY 24-27 Working STIP

6/21/2023 8:52:03

Staunton District
Primary Projects
MPO

NonMPO

UPC NO

121156 SCOPE

Restoration and Rehabilitation

SYSTEM

Primary

JURISDICTION

PROJECT

#SGR23LP LEXINGTON S. MAIN ST. PRIMARY EXT. PAVE.

Lexington

DESCRIPTION

FROM: Int. Rte. 251 TO: White Street (0.8470 MI)

ROUTE/STREET
SOUTH MAIN STREET (0011)
FUND SOURCE
MATCH
PE AC Federal - AC OTHER
CN AC Federal - AC OTHER

MPO

FY24
$0
$0

FY25
$2,000
$0

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
FY26

$408,200
FY27

$0
$413,700

$0
$0

$0
$0

Harrisonburg

UPC NO

108810 SCOPE

Reconstruction w/ Added Capacity

SYSTEM
PROJECT
DESCRIPTION
PROGRAM NOTE

Primary
JURISDICTION
Rockingham County
OVERSIGHT
#HB2.FY17 Route 11 S. Valley Pike Roadway Improvements
ADMIN BY
VDOT
FROM: INT. ROUTE 704 TO: 0.005 MILES NORTH INT. ROUTE 701 (1.2850 MI)
Includes $2,043,949 GARVEE Debt Service Principal Prev, $822,541 GARVEE Debt Service Principal FFY24,
$1,038,439 GARVEE Debt Service Principal FFY25, $1,102,891 GARVEE Debt Service Principal FFY26,
$1,153,288 GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $18,789,084.
Corresponding Debt Service UPC 110397
ROUTE/STREET
SOUTH VALLEY PIKE (0011)
TOTAL COST
$20,125,738
FUND SOURCE
MATCH
FY24
FY25
FY26
FY27
PE
RW

Federal - STP/STBG
Federal - AC CONVERSION
Federal - STP/STBG
RW TOTAL
RW
Federal - AC
AC
CN
Federal - AC
AC
Federal - AC OTHER
CN AC
MPO

$0
$0
$0
$0

$496,991
$0
$325,550
$325,550

$0
$1,038,439
$0
$1,038,439

$0
$1,102,891
$0
$1,102,891

$0
$1,153,288
$0
$1,153,288

$0

$6,302,548

$0

$0

$0

$0

$9,620,046

$0

$0

$0

$0
$0

$1,336,654
$10,956,700

$0
$0

$0
$0

$0
$0

Harrisonburg

UPC NO

110397 SCOPE

SYSTEM

Primary

JURISDICTION

Rockingham County

PROJECT

#HB2.FY17 Rt 11 S Valley Pk Rdwy Improve GARVEE DEBT SERVICE

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $1,623,407 GARVEE Debt Service Interest Prev, $566,052 FFY24 GARVEE Debt Service Interest,
$678,357 GARVEE Debt Service Interest FFY25, $644,817 GARVEE Debt Service Interest FFY26, $594,122
GARVEE Debt Service Interest FFY27, $3,056,540 GARVEE Debt Service Interest FFY28-39. Total GARVEE
Debt Service Interest
$7,163,295. Corresponding CN UPC 108810
ROUTE/STREET
0011
TOTAL COST
$11,504,259
FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$678,357

$644,817

Federal - STP/STBG

$0

$566,052

$0

$0

$0

PE TOTAL

$0

$566,052

$678,357

$644,817

$594,122

PE AC Federal - AC

$0

$4,973,836

$0

$0

$0

337

$594,122

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

NonMPO

UPC NO

121158 SCOPE

Restoration and Rehabilitation

SYSTEM

Primary

PROJECT

#SGR23LP BUENA VISTA W. 29TH ST. PRIMARY EXT. PAVE.

DESCRIPTION

FROM: Int. Rte. 501 TO: 1.316 Mi. E. Int. Rte. 501 (1.3160 MI)

ROUTE/STREET

WEST 29TH STREET (0060)

FUND SOURCE

JURISDICTION

Buena Vista

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$855,820

FY26

FY27

PE AC Federal - AC OTHER

$0

$3,000

$0

$0

$0

CN AC Federal - AC OTHER

$0

$0

$852,820

$0

$0

MPO

NonMPO

UPC NO

115125 SCOPE

Safety

SYSTEM

Primary

PROJECT

#SMART20 Hot Springs - US 220 & VA 615 Int. Imp.

DESCRIPTION

FROM: Intersection and Pedestrian TO: Improvements (0.1200 MI)

ROUTE/STREET

SAM SNEAD HIGHWAY (0220)

FUND SOURCE

JURISDICTION

Bath County

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

MATCH

FY24

FY25

$560,769

FY26

FY27

PE AC Federal - AC OTHER

$0

$89,693

$0

$0

$0

Federal - AC OTHER

$0

$0

$0

$136,050

$0

RW
AC

MPO

NonMPO

UPC NO

121157 SCOPE

Restoration and Rehabilitation

SYSTEM

Primary

PROJECT

#SGR23LP LEXINGTON THORNHILL RD. PRIMARY EXT. PAVE.

DESCRIPTION

FROM: 0.62 Mi. W. Int. Rte. 11 TO: Int. Rte. 11 (0.6200 MI)

ROUTE/STREET

THORNHILL ROAD (0251)

FUND SOURCE

JURISDICTION

Lexington

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$348,405

FY26

FY27

PE AC Federal - AC OTHER

$0

$2,000

$0

$0

$0

CN AC Federal - AC OTHER

$0

$0

$346,405

$0

$0

MPO

SAW

UPC NO

121201 SCOPE

Restoration and Rehabilitation

SYSTEM

Primary

PROJECT

#SGR23LP STAUNTON NEW HOPE RD. PRIMARY EXT. PAVE.

DESCRIPTION

FROM: Int. Rte. 261 TO: 1.0 Mi. E. Int. Rte 261 (1.0000 MI)

ROUTE/STREET

NEW HOPE ROAD (0254)

FUND SOURCE

JURISDICTION

Staunton

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$218,618

FY26

FY27

PE AC Federal - AC OTHER

$0

$1,000

$0

$0

$0

CN AC Federal - AC OTHER

$0

$0

$217,618

$0

$0

338

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

SAW

UPC NO

121203 SCOPE

Restoration and Rehabilitation

SYSTEM

Primary

JURISDICTION

PROJECT

#SGR23LP STAUNTON W. BEVERLY ST. PRIMARY EXT. PAVE.

DESCRIPTION

FROM: West Corp. Limits TO: Grubert Ave. (0.8160 MI)

ROUTE/STREET

WEST BEVERLY STREET (0254)

FUND SOURCE

Staunton

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$416,421

FY26

FY27

PE AC Federal - AC OTHER

$0

$2,000

$0

$0

$0

CN AC Federal - AC OTHER

$0

$0

$414,421

$0

$0

MPO

SAW

UPC NO

121204 SCOPE

Restoration and Rehabilitation

SYSTEM

Primary

JURISDICTION

PROJECT

#SGR23LP STAUNTON N. JEFFERSON ST. PRIMARY EXT. PAVE.

DESCRIPTION

FROM: From Frederick Street TO: W. Beverly Street (0.1500 MI)

ROUTE/STREET

NORTH JEFFERSON STREET (0254)

FUND SOURCE

Staunton

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$97,518

FY26

FY27

PE AC Federal - AC OTHER

$0

$2,000

$0

$0

$0

CN AC Federal - AC OTHER

$0

$0

$95,518

$0

$0

MPO

SAW

UPC NO

121205 SCOPE

Restoration and Rehabilitation

SYSTEM

Primary

PROJECT

#SGR23LP STAUNTON W. BEVERLY ST. 2 PRIMARY EXT. PAVE.

JURISDICTION

DESCRIPTION

FROM: West Corporate Limits TO: Grubert Ave. (0.8160 MI)

ROUTE/STREET

WEST BEVERLY STREET (0254)

FUND SOURCE

Staunton

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$322,921

FY26

FY27

PE AC Federal - AC OTHER

$0

$2,000

$0

$0

$0

CN AC Federal - AC OTHER

$0

$0

$320,921

$0

$0

MPO

Harrisonburg

UPC NO

121202 SCOPE

Restoration and Rehabilitation

SYSTEM

Primary

PROJECT

#SGR23LP BRIDGEWATER NORTH MAIN ST. PRIMARY EXT. PAVE.

DESCRIPTION

FROM: North Main Street TO: North Main Street (0.8460 MI)

ROUTE/STREET

NORTH MAIN STREET (0257)

FUND SOURCE

JURISDICTION

Bridgewater

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

MATCH

FY24

FY25

$206,282

FY26

FY27

PE AC Federal - AC OTHER

$0

$2,000

$0

$0

$0

CN AC Federal - AC OTHER

$0

$0

$204,282

$0

$0

339

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Winchester

UPC NO

110396 SCOPE

SYSTEM

Primary

JURISDICTION

Frederick County

PROJECT

#HB2.FY17 RTE 277 - WIDEN TO 5 LANES GARVEE DEBT SERVICE

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE

ROUTE/STREET

Includes $3,871,858 GARVEE Debt Service Interest Prev, $920,863 FFY24 GARVEE Debt Service Interest,
$882,324 GARVEE Debt Service Interest FFY25, $808,758 GARVEE Debt Service Interest FFY26, $731,563
GARVEE Debt Service Interest FFY27, $2,929,499 GARVEE Debt Service Interest FFY28-38. Total GARVEE
Debt Service Interest
$10,144,865. Corresponding CN UPC 18003.
0277
TOTAL COST
$19,705,940

FUND SOURCE
PE

MATCH

FY24

FY25

Federal - AC CONVERSION

$0

$0

Federal - STP/STBG

FY26
$882,324

FY27
$808,758

$731,563

$0

$920,863

$0

$0

$0

PE TOTAL

$0

$920,863

$882,324

$808,758

$731,563

PE AC Federal - AC

$0

$5,352,144

$0

$0

$0

MPO

Multiple MPOs

UPC NO

120968 SCOPE

Resurfacing

SYSTEM

Primary

PROJECT

#SGR23VP District Wide Plant Mix Schedule (PM-8H-23)

DESCRIPTION

FROM: VARIOUS TO: VARIOUS (5.8500 MI)

ROUTE/STREET

9999

FUND SOURCE
CN
AC

Federal - AC OTHER

JURISDICTION

Staunton District-wide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$1,487,863

340

$1,487,863

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Staunton District
Secondary
Projects
MPO

NonMPO

UPC NO

T26771

SCOPE

Bridge Rehab w/o Added Capacity

SYSTEM

Secondary

JURISDICTION

Rockingham County

PROJECT

#BF - Staunton YR3 Adjacent Slab Preservation

DESCRIPTION

FROM: Slabs Adjacent TO: To Structures

ROUTE/STREET

0820

FUND SOURCE
CN

Federal - BR

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$1,724,451

341

$1,724,451

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Staunton District
Urban Projects
MPO

SAW

UPC NO

111048 SCOPE

New Construction Roadway

SYSTEM

Urban

PROJECT

#SMART18 - (St) STAUNTON CROSSING STREET EXTENSION

DESCRIPTION

FROM: E. Int. Rte. 250 TO: Valley Center Drive (0.8500 MI)

ROUTE/STREET

CROSSING WAY

FUND SOURCE

JURISDICTION

Staunton

OVERSIGHT
ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$9,162,366

FY26

FY27

CN

Federal - STP/STBG

$0

$0

$1,918,169

$0

$0

CN
AC

Federal - AC OTHER

$0

$902,222

$0

$0

$0

MPO

SAW

UPC NO

105907 SCOPE

New Construction Roadway

SYSTEM

Urban

PROJECT

#HB2.FY17 Constr. 2-Lane Roadway Southern Connector

DESCRIPTION

FROM: 1.009 miles west of South River Bridge TO: 0.633 miles east of South River Bridge (1.6000 MI)

ROUTE/STREET

SHENANDOAH VILLAGE DRIVE (0209)

FUND SOURCE
CN

Other

CN
AC

Federal - AC OTHER

JURISDICTION

Waynesboro

MATCH

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
FY24

FY25

$22,969,859

FY26

FY27

$2,137,241

$2,137,241

$0

$0

$0

$0

$12,435,377

$0

$0

$0

342

FFY 24-27 Working STIP

6/21/2023 8:52:03

Staunton District
Enhancement
Projects
MPO

NonMPO

UPC NO

121163 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

JURISDICTION

Berryville

PROJECT

EAST FAIRFAX ST. SIDEWALK ENHANCEMENT

DESCRIPTION

FROM: Sidewalk on TO: East Fairfax (0.1500 MI)

ROUTE/STREET

EN22

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$109,221

FY26

FY27

PE

Federal - TAP/F

$3,303

$13,211

$0

$0

$0

RW

Federal - TAP/F

$200

$0

$800

$0

$0

CN

Federal - TAP/F

$16,342

$0

$0

$65,366

$0

CN
AC

Federal - AC OTHER

$0

$0

$0

$9,999

$0

MPO

NonMPO

UPC NO

121170 SCOPE

Facilities for Pedestrians and Bicycles

SYSTEM

Enhancement

PROJECT

WEST FAIRFAX ST. PEDESTRIAN IMPROVEMENTS ENHANCEMENT

DESCRIPTION

FROM: Pedestrian Improvements TO: On West Fairfax Street (0.1500 MI)

ROUTE/STREET

EN22

FUND SOURCE
PE

Federal - TAP/F

RW
CN

JURISDICTION

Berryville

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$31,918

$127,670

$0

Federal - TAP/F

$32,923

$0

Federal - TAP/F

$195,535

$0

343

$1,301,875

FY26

FY27
$0

$0

$131,692

$0

$0

$0

$782,138

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Staunton District
Miscellaneous
Projects
MPO

Multiple MPOs

UPC NO

119654 SCOPE

Traffic Management/Engineering

SYSTEM

Miscellaneous

PROJECT

#I81CIP PARALLEL FACILITIES IMPROVEMENTS O&M FY 21-27

DESCRIPTION

FROM: State Line with Tennessee TO: State Line with West Virginia

ROUTE/STREET

ARTERIALS ADJANCET TO INTERSTATE 81 (0081)

FUND SOURCE
CN
AC

JURISDICTION

MATCH
$0

NFO

ADMIN BY

VDOT

FY25
$479,805

$479,805

FY26

FY27

$0

$0

$0

NonMPO

UPC NO

120765 SCOPE

Safety

SYSTEM

Miscellaneous

PROJECT

SYSTEMIC ROAD DEPARTURE COUNTERMEASURES WITH RUMBLE STRIPS

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

9999

JURISDICTION

Staunton District-wide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
CN

OVERSIGHT

TOTAL COST

FY24

Federal - AC OTHER

MPO

Statewide

MATCH

FY24

FY25

$7,168,548

FY26

FY27

Federal - AC CONVERSION

$0

$0

$0

$1,106,720

$0

Federal - HSIP

$0

$6,061,828

$0

$0

$0

CN TOTAL

$0

$6,061,828

$0

$1,106,720

$0

CN
AC

$0

$1,106,720

$0

$0

$0

Federal - AC

MPO

Winchester

UPC NO

116851 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Miscellaneous

PROJECT

GREEN CIRCLE TRAIL WIDENING

DESCRIPTION

FROM: Handley Avenue TO: West of Harvest Drive (0.2700 MI)

ROUTE/STREET

U000

FUND SOURCE

JURISDICTION

Winchester

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24

FY25

$2,100,714

FY26

FY27

PE

Federal - TAP/F

$48,691

$194,762

$0

$0

$0

RW

Federal - TAP/F

$24,345

$0

$0

$97,381

$0

344

FFY 24-27 Working STIP

6/21/2023 8:52:03

Staunton District
Project
Groupings
MPO

NonMPO

GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET
FUND SOURCE

MATCH

FY24

FY25

TOTAL COST

$214,800,877

FY26

FY27

PE

Federal - AC CONVERSION

$39,997

$159,986

$0

$0

$0

RW

Federal - BR

$248,330

$449,312

$285,738

$0

$258,270

Federal - NHS/NHPP

$150,108

($199,801)

$800,234

$0

$0

$398,438

$249,511

$1,085,972

$0

$258,270

Federal - AC CONVERSION

$1,317,969

$1,460,500

$1,009,443

$640,288

$2,161,644

Federal - BR

$2,575,452

$371,683

$3,304,824

$5,383,836

$1,241,466

Federal - NHS/NHPP

$1,228,693

$0

$0

$4,914,773

$0

Federal - STP/STBG

$2,150,333

$320,000

$0

$8,281,330

$0

$7,272,447

$2,152,183

$4,314,267

$19,220,227

$3,403,110

$0

$358,297

$1,775,923

$10,202,169

$4,023,167

RW TOTAL
CN

CN TOTAL
CN
AC

Federal - AC OTHER

MPO

NonMPO

GROUPING

Construction : Forest Highway
TOTAL COST

ROUTE/STREET
FUND SOURCE

MATCH

FY24
$0

MPO

NonMPO

GROUPING

Construction : Rail

FY26

FY25
$0

$0

ROUTE/STREET
FUND SOURCE
CN

Federal - STP/STBG

$6,043,211
FY27

TOTAL COST
MATCH

FY24
$0

FY25
$1,020,000

345

$1,118,860

FY26
$0

$0

$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

NonMPO

GROUPING

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET
FUND SOURCE
PE

MATCH

Federal - AC CONVERSION
Federal - NHS/NHPP

PE TOTAL
PE AC Federal - AC OTHER

FY24

FY25

TOTAL COST

$149,895,025

FY26

FY27

$24,077

$0

$0

$0

$96,307

$3,000

$12,000

$0

$0

$0

$27,077

$12,000

$0

$0

$96,307

$0

$10,000

$0

$0

$0

$57,200

$228,800

$0

$0

$0

$399,434

$470,460

$789,420

$0

$337,855

RW TOTAL

$456,634

$699,260

$789,420

$0

$337,855

CN

Federal - AC CONVERSION

$152,925

$360,000

$0

$0

$451,699

Federal - HSIP

$112,200

$0

$1,009,800

$0

$0

Federal - NHS/NHPP

$362,088

$0

$0

$1,448,351

$0

Federal - STP/STBG

$687,391

$0

$1,147,841

$516,747

$1,084,976

$1,314,604

$360,000

$2,157,641

$1,965,098

$1,536,675

$0

$0

$942,768

$4,304,457

$571,685

RW

Federal - NHS/NHPP
Federal - STP/STBG

CN TOTAL
CN
AC

Federal - AC OTHER

MPO

NonMPO

GROUPING

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$10,516,079

FY26

FY27

RW

Federal - TAP/F

$26,831

$88,918

$18,405

$0

$0

CN

Federal - TAP/F

$369,815

$405,894

$674,906

$398,461

$0

CN
AC

Federal - AC OTHER

$0

$441,918

$1,040,964

$286,921

$0

MPO

NonMPO

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24
$0

FY25

$90,996,464

FY26

$0

FY27

$0

MPO

Winchester

GROUPING

Maintenance : Preventive Maintenance and System Preservation

$0

$0

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

Federal - STP/STBG

TOTAL COST
MATCH

FY24
$0

FY25
$22,608,309

346

FY26
$22,701,124

$90,996,464
FY27

$22,795,517

$22,891,514

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

Winchester

GROUPING

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

FY26

$29,779,836
FY27

Federal - NHS/NHPP

$0

$755,556

$755,556

$755,556

$755,556

Federal - STP/STBG

$0

$6,648,943

$6,675,613

$6,702,736

$6,730,320

$0

$7,404,499

$7,431,169

$7,458,292

$7,485,876

CN TOTAL

MPO

Winchester

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

Federal - STP/STBG

TOTAL COST
MATCH

FY24
$0

FY25
$3,070,544

347

FY26
$3,083,149

$12,358,669
FY27

$3,095,969

$3,109,007

FFY 24-27 Working STIP

6/21/2023 8:52:03

Harrisonburg MPO
Project
Groupings
GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$66,047,163

FY26

FY27

PE

Federal - STP/STBG

$130,000

$520,000

$0

$0

$0

CN

Federal - STP/STBG

$122,289

$489,156

$0

$0

$0

CN
AC

Federal - AC OTHER

$0

$6,891,281

$0

$0

$0

GROUPING

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET

TOTAL COST

FUND SOURCE
PE

MATCH

$88,335,225

FY26

FY27

$42,209

$181,643

$192,837

$2,400

$0

Federal - TAP/F

$13,222

$52,886

$0

$0

$0

$55,430

$234,529

$192,837

$2,400

$0

Federal - AC CONVERSION

$369,964

$202,682

$1,277,173

$0

$0

Federal - STP/STBG

$229,696

$1,620,844

$0

$0

$0

$17,099

$67,597

$800

$0

$0

$616,759

$1,891,123

$1,277,973

$0

$0

$0

$2,049,757

$0

$0

$0

$280,000

$0

$1,120,000

$0

$0

$58,974

$235,896

$0

$0

$0

$1,290,144

$4,012,699

$1,147,878

$0

$0

$225,048

$0

$228,092

$672,098

$0

$1,854,166

$4,248,595

$2,495,970

$672,098

$0

$0

$6,762,165

$7,059,194

$109,964

$0

Federal - TAP/F
RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION
Federal - NHS/NHPP
Federal - STP/STBG
Federal - TAP/F

CN TOTAL
CN
AC

FY25

Federal - AC CONVERSION

PE TOTAL
RW

FY24

Federal - AC OTHER

GROUPING

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

Federal - TAP/F

CN
AC

Federal - AC OTHER

GROUPING

MATCH

FY24

FY25

$2,264,339

FY26

FY27

$69,384

$277,535

$0

$0

$0

$0

$87,979

$0

$0

$0

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

Federal - STP/STBG

TOTAL COST
MATCH

FY24
$0

FY25
$22,608,309

348

FY26
$22,701,124

$90,996,464
FY27

$22,795,517

$22,891,514

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

FY26

$29,779,836
FY27

Federal - NHS/NHPP

$0

$755,556

$755,556

$755,556

$755,556

Federal - STP/STBG

$0

$6,648,943

$6,675,613

$6,702,736

$6,730,320

$0

$7,404,499

$7,431,169

$7,458,292

$7,485,876

CN TOTAL

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

Federal - STP/STBG

TOTAL COST
MATCH

FY24
$0

FY25
$3,070,544

349

FY26
$3,083,149

$12,358,669
FY27

$3,095,969

$3,109,007

FFY 24-27 Working STIP

6/21/2023 8:52:03

SAW MPO
Project
Groupings
GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0
GROUPING

$0

FY27

$0

$0

$0

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET
FUND SOURCE
PE

$20,849,287

FY26

MATCH

Federal - AC CONVERSION

FY24

FY25

TOTAL COST

$124,141,965

FY26

FY27

$122,146

$488,584

$0

$0

$0

$57,746

$0

$74,524

$156,460

$0

PE TOTAL

$179,892

$488,584

$74,524

$156,460

$0

RW

Federal - AC CONVERSION

$259,039

$0

$0

$591,027

$445,127

Federal - STP/STBG

$536,988

$319,076

$1,794,449

$34,428

$0

$796,027

$319,076

$1,794,449

$625,455

$445,127

$0

$0

$1,240,384

$56,965

$0

$237,056

$0

$0

$0

$948,224

$1,416,799

$0

$4,411,703

$0

$1,255,492

$1,653,855

$0

$4,411,703

$0

$2,203,716

$0

$278,000

$2,293,003

$11,541,094

$2,381,734

Federal - STP/STBG

RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION
Federal - STP/STBG

CN TOTAL
CN
AC

Federal - AC OTHER

GROUPING

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$23,329,236

FY26

FY27

RW

Federal - STP/STBG

$24,528

$15,462

$82,651

$0

$0

CN

Federal - AC CONVERSION

$234,016

$332,098

$0

$368,165

$235,800

Federal - STP/STBG

$753,273

$0

$0

$3,013,093

$0

Federal - TAP/F
CN TOTAL
CN
AC

Federal - AC OTHER

GROUPING

$126,762

$0

$0

$507,046

$0

$1,114,051

$332,098

$0

$3,888,304

$235,800

$0

$226,247

$1,884,959

$0

$0

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

Federal - STP/STBG

TOTAL COST
MATCH

FY24
$0

FY25
$22,608,309

350

FY26
$22,701,124

$90,996,464
FY27

$22,795,517

$22,891,514

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

FY26

$29,779,836
FY27

Federal - NHS/NHPP

$0

$755,556

$755,556

$755,556

$755,556

Federal - STP/STBG

$0

$6,648,943

$6,675,613

$6,702,736

$6,730,320

$0

$7,404,499

$7,431,169

$7,458,292

$7,485,876

CN TOTAL

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

Federal - STP/STBG

TOTAL COST
MATCH

FY24
$0

FY25
$3,070,544

351

FY26
$3,083,149

$12,358,669
FY27

$3,095,969

$3,109,007

FFY 24-27 Working STIP

6/21/2023 8:52:03

Winchester MPO
Project
Groupings
GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE
RW

MATCH

Federal - AC CONVERSION
Federal - NHS/NHPP

RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION

FY25

$31,328,926

FY26

FY27

$51,894

$0

$207,574

$0

$0

$833,466

$3,333,862

$0

$0

$0

$885,359

$3,333,862

$207,574

$0

$0

$0

$259,468

$0

$0

$0

$3,087,033

$0

$0

$6,233,100

$6,115,032

Federal - NHS/NHPP

$767,981

$3,071,924

$0

$0

$0

Federal - STP/STBG

$200,344

$0

$801,377

$0

$0

$4,055,358

$3,071,924

$801,377

$6,233,100

$6,115,032

$0

$0

$20,540,503

$0

$0

CN TOTAL
CN
AC

FY24

Federal - AC OTHER

GROUPING

Construction : Rail

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$2,173,530

FY26

FY27

PE

Federal - STP/STBG

$7,900

$0

$71,100

$0

$0

CN

Federal - STP/STBG

$83,600

$279,000

$473,400

$0

$0

GROUPING

Construction : Safety/ITS/Operational Improvements

ROUTE/STREET
FUND SOURCE

MATCH

FY24

FY25

TOTAL COST

$116,256,887

FY26

FY27

PE

Federal - NHS/NHPP

($373)

($1,492)

$0

$0

$0

RW

Federal - NHS/NHPP

$27,958

$111,832

$0

$0

$0

Federal - STP/STBG

$24,069

$96,276

$0

$0

$0

$52,027

$208,108

$0

$0

$0

$0

$93,261

$0

$0

$0

$194,000

$0

$1,746,000

$0

$0

$15,000

$135,000

$0

$0

$0

Federal - NHS/NHPP

$143,747

$574,989

$0

$0

$0

Federal - STP/STBG

$101,958

$375,824

$32,009

$0

$0

$454,706

$1,085,813

$1,778,009

$0

$0

$0

$4,799,652

$801,122

$0

$0

RW TOTAL
RW
AC

Federal - AC OTHER

CN

Federal - AC CONVERSION
Federal - HSIP

CN TOTAL
CN
AC

Federal - AC OTHER

352

FFY 24-27 Working STIP

GROUPING

6/21/2023 8:52:03

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE
PE

Federal - AC CONVERSION

RW

Federal - HSIP

MATCH

Federal - STP/STBG
RW TOTAL

FY24

FY25

$16,260,565

FY26

FY27

$38,840

$155,360

$0

$0

$0

$50

$450

$0

$0

$0

$99,284

$397,135

$0

$0

$0

$99,334

$397,585

$0

$0

$0

$0

$503,581

$0

$0

$0

RW
AC

Federal - AC OTHER

CN

Federal - HSIP

$98,890

$0

$890,010

$0

$0

Federal - TAP/F

$24,400

$0

$97,600

$0

$0

$123,290

$0

$987,610

$0

$0

$0

$0

$7,222,100

$0

$0

CN TOTAL
CN
AC

Federal - AC OTHER

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

Federal - STP/STBG

GROUPING

FY24
$0

FY25
$22,608,309

FY26
$22,701,124

$90,996,464
FY27

$22,795,517

$22,891,514

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

FY26

$29,779,836
FY27

Federal - NHS/NHPP

$0

$755,556

$755,556

$755,556

$755,556

Federal - STP/STBG

$0

$6,648,943

$6,675,613

$6,702,736

$6,730,320

$0

$7,404,499

$7,431,169

$7,458,292

$7,485,876

CN TOTAL

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

Federal - STP/STBG

TOTAL COST
MATCH

FY24
$0

FY25
$3,070,544

353

FY26
$3,083,149

$12,358,669
FY27

$3,095,969

$3,109,007

COMMONWEALTH OF VIRGINIA

STATEWIDE

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

FFY 24-27 Working STIP

6/21/2023 8:52:03

Statewide District
Interstate Projects
MPO

NonMPO

UPC NO

120396 SCOPE

SYSTEM

Interstate

PROJECT

#OTHERINT - I-77 OPERATIONAL IMPROVEMENTS - TRIP

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

ROUTE/STREET

0077

FUND SOURCE
CN
AC

JURISDICTION

ADMIN BY

FY24
$0

FY25
$150,000

120517 SCOPE

$150,000

FY26
$0

FY27
$0

$0

Safety

SYSTEM

Interstate

PROJECT

#OtherInt - I-77 OPERATIONAL IMPROVEMENTS - PCMS

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

ROUTE/STREET

0077

FUND SOURCE

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

Federal - AC OTHER

MPO

FY24
$0

FY25
$210,000

$210,000

FY26
$0

FY27
$0

$0

NonMPO

UPC NO

120518 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#OtherInt I-77 OPERATIONAL IMPROVEMENTS - PSAP INTEGRATIONS

DESCRIPTION

FROM: VARIOUS TO: VARIOUS

ROUTE/STREET

0077

FUND SOURCE
CN
AC

VDOT

NonMPO

UPC NO

CN
AC

OVERSIGHT

TOTAL COST
MATCH

Federal - AC OTHER

MPO

Statewide

JURISDICTION

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

Federal - AC OTHER

MPO

Statewide

FY24
$0

FY25
$270,000

$270,000

FY26
$0

FY27
$0

$0

NonMPO

UPC NO

115579 SCOPE

SYSTEM

Interstate

PROJECT

I-81 CORRIDOR NUTRIENT CREDITS

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
ROUTE/STREET

0081

FUND SOURCE
PE AC Federal - AC OTHER

TOTAL COST
MATCH

FY24
$0

FY25
$4,000,000

355

$4,000,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Multiple MPOs

UPC NO

117220 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#ITTF21 I-81 OPERATIONAL IMPROVEMENTS - PROGRAM UPC

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0081

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
PE

Statewide

MATCH

FY24

FY25

$9,618,000

FY26

FY27

Federal - NHS/NHPP

$0

$118,206

$0

$0

$0

PE AC Federal - AC OTHER

$0

$9,499,794

$0

$0

$0

MPO

Multiple MPOs

UPC NO

102711 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

PROJECT

I-95 HOV/HOT Lanes Project PPTA Develop & Mgmt. Oversight

DESCRIPTION

FROM: Garrisonville Road TO: 1 Mile North of Edsall Road (28.0000 MI)

ROUTE/STREET

0095

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
CN

Statewide

MATCH

FY24

FY25

$48,159,488

FY26

FY27

Federal - DEMO

$0

$4,278,750

$0

$0

$0

Federal - NHS/NHPP

$0

$11,872,992

$0

$0

$0

$0

$16,151,742

$0

$0

$0

CN TOTAL

MPO

Northern Virginia

UPC NO

103106 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

JURISDICTION

Statewide

PROJECT

I-95 HOV/HOT Lanes Construction

DESCRIPTION

FROM: Garrisonville Road TO: 1 Mile North of Edsall Road (28.0000 MI)

OVERSIGHT

FO

ADMIN BY

VDOT

PROGRAM NOTE All funding obligated based on current allocations/estimate. Waiting Financial Closure. Linked with UPC
102710, 103019, 103020, 102711, 103591 ,103222
ROUTE/STREET

0095

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

$0

$785,756,087

FY26

FY27

$0

$0

$0

Multiple MPOs

UPC NO

103222 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

I-95 HOV/HOT Lanes Debt Service

DESCRIPTION

FROM: Garrisonville Road TO: 1 mile North of Edsall Road (28.0000 MI)

ROUTE/STREET

0095

FUND SOURCE
PE

TOTAL COST

JURISDICTION

Statewide

MATCH

FY24

FY25

OVERSIGHT

FO

ADMIN BY

VDOT

TOTAL COST

$110,089,071

FY26

FY27

Federal - AC CONVERSION

$0

$0

$7,113,319

$7,112,177

$7,119,521

Federal - NHS/NHPP

$0

$7,119,194

$0

$0

$0

$0

$7,119,194

$7,113,319

$7,112,177

$7,119,521

PE TOTAL

356

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Multiple MPOs

UPC NO

108315 SCOPE

Reconstruction w/ Added Capacity

SYSTEM

Interstate

PROJECT

I-95 SOUTHERN EXTENSION EXPRESS LANES PROJECT

JURISDICTION

Statewide

OVERSIGHT

FO

ADMIN BY

VDOT

DESCRIPTION

FROM: MM 142.5 (South of Garrisonville Road) TO: MM 145.0 (North of Garrisonville Road) (2.5000 MI)

PROGRAM NOTE Includes $5,873,205 GARVEE Debt Service Principal Prev, $835,933 GARVEE Debt Service Principal FFY24,
$878,363 GARVEE Debt Service Principal FFY25, $922,804 GARVEE Debt Service Principal FFY26, $969,457
GARVEE Debt Service Principal FFY27. Total GARVEE Debt Service Principal $13,873,591. Corresponding
GARVEE Debt Service UPC 110379.
ROUTE/STREET
I-95 (0095)
TOTAL COST
$39,776,717
FUND SOURCE

MATCH

FY24

FY25

FY26

FY27

PE

Federal - NHS/NHPP

$0

($427,683)

$0

$0

$0

CN

Federal - AC CONVERSION

$0

$0

$878,363

$922,804

$969,457

Federal - NHS/NHPP

$0

$1,263,616

$0

$0

$0

CN TOTAL

$0

$1,263,616

$878,363

$922,804

$969,457

CN
AC

Federal - AC

$0

$7,164,453

$0

$0

$0

Federal - AC OTHER

$0

$25,903,126

$0

$0

$0

$0

$33,067,579

$0

$0

$0

CN AC

MPO

Multiple MPOs

UPC NO

110379 SCOPE

SYSTEM

Interstate

PROJECT

I-95 SOUTHERN EXT EXPRESS LANES PROJECT GARVEE DEBT SERVICE

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

DESCRIPTION
PROGRAM NOTE Includes $4,726,745 GARVEE Debt Service Interest Prev, $389,698 FFY24 GARVEE Debt Service Interest,
$347,379 GARVEE Debt Service Interest FFY25, $302,913 GARVEE Debt Service Interest FFY26, $256,194
GARVEE Debt Service Interest FFY27, $508,528 GARVEE Debt Service Interest FFY28-31. Total GARVEE Debt
Service Interest
$6,531,457. Corresponding CN UPC 108315.
ROUTE/STREET
0095
TOTAL COST
$16,115,464
FUND SOURCE
PE

MATCH

FY24

FY25

FY26

FY27

Federal - AC CONVERSION

$0

$0

$347,379

$302,913

$256,194

Federal - NHS/NHPP

$0

$389,698

$0

$0

$0

PE TOTAL

$0

$389,698

$347,379

$302,913

$256,194

PE AC Federal - AC

$0

$1,415,014

$0

$0

$0

MPO

Multiple MPOs

UPC NO

116656 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#I95CIP VARIABLE SPEED LIMITS - PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

FUND SOURCE
PE

Federal - NHS/NHPP

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$4,912,629

357

$4,912,629

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Multiple MPOs

UPC NO

116657 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#I95CIP RAMP METERING PROGRAM UPC

JURISDICTION

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE
PE

Statewide

MATCH

FY24

FY25

$5,700,000

FY26

FY27

Federal - NHS/NHPP

$0

$3,500,000

$0

$0

$0

PE AC Federal - AC OTHER

$0

$2,200,000

$0

$0

$0

MPO

Multiple MPOs

UPC NO
SYSTEM
PROJECT

116658 SCOPE
Interstate

Statewide

#I95CIP GEOFENCED EMERGENCY NOTIFICATIONS - PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

PE AC Federal - AC OTHER

MPO

Safety

JURISDICTION

FY24
$0

FY25
$200,000

$200,000

FY26
$0

FY27
$0

$0

Multiple MPOs

UPC NO

116659 SCOPE

Safety

SYSTEM

Interstate

JURISDICTION

PROJECT

#I95CIP ADVANCED WORK ZONE TECHNOLOGY - PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST

FUND SOURCE

MATCH

PE AC Federal - AC OTHER

MPO

Statewide

FY24
$0

FY25
$950,000

$950,000

FY26
$0

FY27
$0

$0

Multiple MPOs

UPC NO

116661 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#I95CIP CORRIDOR TECHNOLOGY IMPROVEMENTS - PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

0095

FUND SOURCE
PE AC Federal - AC OTHER

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$3,202,500

358

$3,202,500

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

Multiple MPOs

UPC NO

115869 SCOPE

Safety

SYSTEM

Interstate

PROJECT

#ITTF20 STATEWIDE TECHNOLOGY FOR OPERATIONS

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

9999

FUND SOURCE
PE

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24

FY25

$2,000,000

FY26

FY27

Federal - NHS/NHPP

$0

$913,491

$0

$0

$0

PE AC Federal - AC OTHER

$0

$1,086,509

$0

$0

$0

MPO

NonMPO

UPC NO

118915 SCOPE

SYSTEM

Interstate

PROJECT

INCIDENT DETOUR PROGRAM UPC

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET

9999

FUND SOURCE
PE

Federal - HSIP

Safety

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$403,850

359

$403,850

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Statewide District
Primary Projects
MPO

Multiple MPOs

UPC NO

103754 SCOPE

SYSTEM

Primary

PROJECT

Route 460 PPTA Debt Service

DESCRIPTION

FROM: Intersection with Route 58, City of Suffolk TO: Intersection with I-295, Prince George County (55.0000
MI)
0460
TOTAL COST
$148,622,688

ROUTE/STREET

JURISDICTION

FUND SOURCE
PE

Statewide

MATCH

FY24

FY25

OVERSIGHT

FO

ADMIN BY

VDOT

FY26

FY27

Federal - AC CONVERSION

$0

$0

$7,864,709

$7,863,525

$7,863,845

Federal - NHS/NHPP

$0

$7,864,630

$0

$0

$0

PE TOTAL

$0

$7,864,630

$7,864,709

$7,863,525

$7,863,845

PE AC Federal - AC

$0

$31,454,523

$0

$0

$0

MPO

NonMPO

UPC NO

16621 SCOPE

Historic Preservation

SYSTEM

Primary

PROJECT

HIGHWAY MARKER REPLACEMENT PROGRAM

DESCRIPTION

FROM: CONDUCT RESEARCH AND DRAFT NEW HISTORIC MARKER TEXTS. TO: REPLACE ERRONEOUS AND/OR
MISSING MARKERS.

ROUTE/STREET

EN96

FUND SOURCE
CN

Federal - TAP/F

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

Locally

TOTAL COST
MATCH

FY24
($8,276)

FY25
($33,104)

360

$1,687,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Statewide District
Miscellaneous
Projects
MPO

NonMPO

UPC NO

122985 SCOPE

SYSTEM

Miscellaneous

PROJECT

JURISDICTION

Statewide

OVERSIGHT

FO

Hurricane Evacuation Plan

ADMIN BY

VDOT

0000

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE
PE

MATCH

Federal - PROTECTPRGM

MPO

FY24
$0

FY25
$1,170,000

FY26
$0

FY27
$0

$0

Multiple MPOs

UPC NO

119654 SCOPE

Traffic Management/Engineering

SYSTEM

Miscellaneous

PROJECT

#I81CIP PARALLEL FACILITIES IMPROVEMENTS O&M FY 21-27

DESCRIPTION

FROM: State Line with Tennessee TO: State Line with West Virginia

ROUTE/STREET

ARTERIALS ADJANCET TO INTERSTATE 81 (0081)

FUND SOURCE
CN
AC

$1,170,000

JURISDICTION

Statewide

MATCH

Federal - AC OTHER

MPO

NonMPO

UPC NO

T26149

SCOPE

SYSTEM

Miscellaneous

JURISDICTION

PROJECT

NFO

ADMIN BY

VDOT

TOTAL COST

FY24
$0

OVERSIGHT

FY25
$479,805

$479,805

FY26
$0

Statewide

FY27
$0

$0

OVERSIGHT

FO

JUVENILE LICENSING CEREMONY VIDEO

ADMIN BY

VDOT

9999

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE
CN
AC

MATCH

Federal - AC OTHER

FY24
$0

MPO

NonMPO

UPC NO

T26142

SCOPE

SYSTEM

Miscellaneous

JURISDICTION

PROJECT

FY25
$800,000

$800,000

FY26
$0

Statewide

FY27
$0

$0

OVERSIGHT

FO

NHTSA ALCOHOL IMPAIRED DRIVING ASSESS & LAW REVIEW

ADMIN BY

VDOT

9999

TOTAL COST

DESCRIPTION
ROUTE/STREET

FUND SOURCE
CN
AC

Federal - AC OTHER

MATCH

FY24
$0

FY25
$100,000

361

$100,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

Multiple MPOs

UPC NO

T20741

SCOPE

SYSTEM

Miscellaneous

JURISDICTION

PROJECT

VEHICLE FUEL CONVERSION PROGRAM MARKETING

Statewide

OVERSIGHT

NFO

ADMIN BY

Other

DESCRIPTION
ROUTE/STREET

9999

TOTAL COST

FUND SOURCE
CN

MATCH

Federal - CMAQ

FY24
$72,000

FY25
$288,000

MPO

Multiple MPOs

UPC NO

T11802

SCOPE

Other

SYSTEM

Miscellaneous

JURISDICTION

Statewide

PROJECT

Vehicle Fuel Conversion Program

DESCRIPTION

FROM: 1 TO: 1

ROUTE/STREET

9999
MATCH

Federal - CMAQ

MPO

$0

$0

OVERSIGHT

FO

ADMIN BY

Other

FY24
$1,235,482

FY25
$4,941,927

$8,640,000

FY26
$0

FY27
$0

$0

NonMPO

UPC NO

116650 SCOPE

Traffic Management/Engineering

SYSTEM

Miscellaneous

PROJECT

#I95CIP PARALLEL ARTERIAL IMPROVEMENTS

DESCRIPTION

FROM: Various TO: Various

ROUTE/STREET
VARIOUS (9999)
FUND SOURCE
CN
AC

$0

FY27

TOTAL COST

FUND SOURCE
CN

$360,000

FY26

JURISDICTION

MATCH

Federal - AC OTHER

MPO

Statewide

FY24
$0

FY25
$656,618

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
FY26

FY27

$0

$656,618
$0

$0

NonMPO

UPC NO

120531 SCOPE

SYSTEM

Miscellaneous

PROJECT

VIRGINIA BREEZE INTERCITY BUS

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

DRPT

DESCRIPTION
ROUTE/STREET

9999

TOTAL COST

FUND SOURCE
CN
AC

MATCH

Federal - AC OTHER

MPO

$0

FY25
$1,558,000

$1,558,000

FY26
$0

FY27
$0

$0

NonMPO

UPC NO

121363 SCOPE

SYSTEM

Miscellaneous

PROJECT

Resilience Plan

DESCRIPTION

FROM: 0 TO: 0

ROUTE/STREET

9999

FUND SOURCE
PE

FY24

Federal - PROTECTPRGM

Other

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$675,000

362

$675,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

MPO

6/21/2023 8:52:03

NonMPO

UPC NO

121364 SCOPE

SYSTEM

Miscellaneous

PROJECT

Carbon Reduction Strategy

DESCRIPTION

FROM: 0 TO: 0

Other

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

PROGRAM NOTE All funds obligated based on current allocations/estimate
ROUTE/STREET

TOTAL COST

9999

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

FY26
$0

FY27
$0

$0

NonMPO

UPC NO

122024 SCOPE

SYSTEM

Miscellaneous

PROJECT

Electric Vehicle Infrastructure Plan

DESCRIPTION

FROM: 0 TO: 0

ROUTE/STREET

9999

FUND SOURCE
PE

$0

$500,000

Federal - HIP/F

Other

JURISDICTION

Statewide

OVERSIGHT

NFO

ADMIN BY

VDOT

TOTAL COST
MATCH

FY24
$0

FY25
$500,000

363

$500,000

FY26
$0

FY27
$0

$0

FFY 24-27 Working STIP

6/21/2023 8:52:03

Statewide District
Project
Groupings
MPO

NonMPO

GROUPING

Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0
MPO

NonMPO

GROUPING

Construction : Rail

FY26

$0

$0

ROUTE/STREET

$0

$0

TOTAL COST

FUND SOURCE
CN

FY27

MATCH

Federal - STP/STBG

FY24
$0

FY25

FY26

$334,750

MPO

NonMPO

GROUPING

Construction : Safety/ITS/Operational Improvements

$638,404
FY27

$0

ROUTE/STREET

$0

TOTAL COST

FUND SOURCE

MATCH

FY24

FY25

$0

$44,883,000

FY26

FY27

PE

Federal - AC CONVERSION

$1,885,720

$5,400,000

$5,400,000

$3,871,881

$2,299,600

CN

Federal - AC CONVERSION

$1,000,000

$0

$9,000,000

$0

$0

Federal - HSIP

$1,000,000

$9,000,000

$0

$0

$0

$2,000,000

$9,000,000

$9,000,000

$0

$0

$0

$10,000,000

$0

$0

$0

CN TOTAL
CN
AC

Federal - AC OTHER

MPO

NonMPO

GROUPING

Construction : Transportation Alternatives/Byway/Non-Traditional

ROUTE/STREET

TOTAL COST

FUND SOURCE
PE

MATCH

Federal - AC CONVERSION
Federal - TAP/F

PE TOTAL
PE AC Federal - AC OTHER

FY24

FY25

$228,000

$0

$1,746,318

FY26
$304,000

FY27
$304,000

$304,000

$76,000

$304,000

$0

$0

$0

$304,000

$304,000

$304,000

$304,000

$304,000

$0

$2,280,000

$0

$0

$0

MPO

NonMPO

GROUPING

Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET
FUND SOURCE
CN

TOTAL COST
MATCH

FY24

FY25

FY26

$7,916,904
FY27

Federal - NHS/NHPP

$0

$1,917,845

$1,917,845

$1,917,845

$1,917,845

Federal - STP/STBG

$0

$61,381

$61,381

$61,381

$61,381

$0

$1,979,226

$1,979,226

$1,979,226

$1,979,226

CN TOTAL

364

FFY 24-27 Working STIP

6/21/2023 8:52:03

MPO

NonMPO

GROUPING

Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

FY24

FY25

$7,269,920

FY26

FY27

Federal - NHS/NHPP

$0

$1,513,805

$1,513,805

$1,513,805

$1,513,805

Federal - STP/STBG

$0

$303,675

$303,675

$303,675

$303,675

$0

$1,817,480

$1,817,480

$1,817,480

$1,817,480

CN TOTAL

MPO

NonMPO

GROUPING

Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.
ROUTE/STREET

TOTAL COST

FUND SOURCE
CN

MATCH

Federal - STP/STBG

MPO

NonMPO

GROUPING

Transit : Vehicles

FY24
$0

FY25
$3,575,944

FY26
$3,590,624

ROUTE/STREET
FUND SOURCE

$14,392,860
FY27

$3,605,554

TOTAL COST
MATCH

FY24
$0

FY25
$0

365

$3,750,000

FY26
$0

$3,620,738

FY27
$0

$0

COMMONWEALTH OF VIRGINIA

RAIL & PUBLIC
TRANSPORTATION

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

COMMONWEALTH OF VIRGINIA

APPENDIX I

DRPT and Transit
Agency Project
Listings

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Bristol MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA ADTAP
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Total

438
161
128
727

Previous
Funding

Central Virginia TPO
(Lynchburg)
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA Adjustment
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Total

Previous
Funding

-

Charlottesville MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Total

Previous
Funding
5,410
4,170
1,665
68
10,431
9,815
697
32,256

58
107
48
213

154
37
36
227

FY 2024

FY 2024

FY 2024
5,414
103
4,104
1,984
9,590
11,785
506
33,486

144
124
52
320

FY 2025

100
115
50
265

FY 2026

-

FY2024 - FY2027

FY 2027

Total
FY 2024-2027
302
346
150
798

145
154
768
155
154
1,376

964
154
2,287
443
442
4,290

133
154
1,200
201
200
1,888

Total
FY 2024-2027
1,242
616
4,255
836
832
7,781

FY 2025
5,171
163
4,282
1,530
8,426
13,186
409
33,167

FY 2026
5,485
169
3,823
1,265
7,502
13,120
424
31,788

FY 2027
4,024
178
3,775
27
4,542
14,370
906
27,822

Total
FY 2024-2027
20,094
613
15,984
4,806
30,060
52,461
2,245
126,263

FY 2025

368

FY 2026

FY 2027

Statewide

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Fredericksburg MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Total

Previous
Funding
4,744
773
7,704
721
2,971
2,570
265
19,748
Previous
Funding

-

FY 2025
36,194
1,181
557
4,826
2,396
5,809
19,676
23,729
43,039
33,756
1,725
172,888

FY 2026
30,008
1,211
1,422
3,202
1,154
4,400
18,480
1,617
22,037
21,047
1,777
106,355

FY 2027
30,575
1,211
909
5,747
1,094
1,953
2,753
2,370
20,010
19,027
1,830
87,479

Total
FY 2024-2027
139,298
4,383
3,418
17,159
7,621
18,080
56,190
34,781
126,474
102,881
6,975
517,260

FY 2025
4,897
2,034
1,398
2,360
10,689

FY 2026
4,665
2,020
1,423
2,431
10,539

FY 2027
4,551
2,080
1,451
2,504
10,586

Total
FY 2024-2027
61,123
122
16,612
7,586
9,538
94,981

13,948
23,798
107
121
37,974

FY 2024
42,521
780
530
3,384
2,977
5,918
15,281
7,065
41,388
29,051
1,643
150,538

Harrisonburg MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Total

Previous
Funding
4,518
254
5,252
546
2,225
12,795

FY 2024
47,010
122
10,478
3,314
2,243
63,167

369

-

FY 2026

375
75
19
469

FY 2027

Total
FY 2024-2027
4,643
774
1,567
1,622
2,279
273
11,158

FY 2024
4,643
774
1,192
1,547
2,260
273
10,689

Hampton Roads TPO
FTA 5307
FTA 5307(h)
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA Adjustment
Flexible STP
CMAQ
RSTP
Federal Stimulus
Other Federal
State
Local
Revenues
Total

FY 2025

FY2024 - FY2027

Statewide

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

FY2024 - FY2027

New River Valley MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Federal Stimulus
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Total

Previous
Funding
3,542
822
10,239
2,444
4,960
28,890
10,515
93
61,505

FY 2024
2,677
276
2,265
756
59
9,161
9,760
125
25,079

FY 2025
2,239
227
1,972
10,969
9,879
118
25,404

FY 2026
2,306
198
539
5,316
8,859
122
17,340

FY 2027
2,375
257
2,528
13,387
10,867
126
29,540

MWCOG
FTA 5307
FTA 5309
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Total

Previous
Funding
51,540
282
39,429
680
40,459
54,868
65,150
189,202
316,345
757,955

FY 2024
14,229
6,537
23,247
363
30,989
100,785
11,908
188,058

FY 2025
11,364
4,248
9,929
39,336
313,930
9,264
388,071

FY 2026
5,165
4,620
43,548
375,925
8,993
438,251

FY 2027

3,806
730,590
275,290
1,009,686

Total
FY 2024-2027
30,758
15,405
80,530
363
70,325
1,521,230
305,455
2,024,066

FY 2024
11,236
1,417
558
11,611
2,430
27,252

FY 2025
11,294
11,279
2,326
24,899

FY 2026
11,759
12,407
2,392
26,558

FY 2027
8,885
5,428
1,981
16,294

Total
FY 2024-2027
43,174
1,417
558
40,725
9,129
95,003

Richmond Regional
TPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Total

-

Previous
Funding

370

Total
FY 2024-2027
9,597
958
7,304
756
59
38,833
39,365
491
97,363

Statewide

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Previous
Funding

Roanoke Valley TPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Total

-

Staunton-AugustaWaynesboro MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Total

Previous
Funding
1,250
557
916
1,026
428
61
4,238

Tri-Cities MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Total

-

Previous
Funding

FY2024 - FY2027

FY 2024
6,461
368
354
97
4,768
4,463
1,938
2,314
20,763

FY 2025
3,415
368
354
874
3,799
1,992
2,314
13,116

FY 2026
4,591
368
354
97
6,127
2,106
2,314
15,957

FY 2027
4,451
368
354
97
5,787
2,086
2,314
15,457

Total
FY 2024-2027
18,918
1,472
1,416
1,165
4,768
20,176
8,122
9,256
65,293

FY 2024
1,212
680
767
434
90
3,183

FY 2025
1,387
62
779
831
472
91
3,622

FY 2026
1,372
62
770
846
489
92
3,631

FY 2027
1,511
62
845
927
532
93
3,970

Total
FY 2024-2027
5,482
186
3,074
3,371
1,927
366
14,406

FY 2024
1,440
216
1,162
956
394
4,168

FY 2025
1,665
3,820
1,431
1,117
394
8,427

FY 2026
1,665
674
774
959
394
4,466

FY 2027
1,665
316
938
827
1,051
394
5,191

Total
FY 2024-2027
6,435
316
5,648
4,194
4,083
1,576
22,252

371

Statewide

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Previous
Funding

Winchester MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Total

297
185
69
551

All MPOs
FTA 5307
FTA 5307(h)
FTA 5309
FTA 5310
FTA 5311
FTA 5329
FTA 5337
FTA 5339
Federal Stimulus
FTA ADTAP
FTA Adjustment
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Total

Previous
Funding
71,442
282
2,146
4,727
47,133
13,500
2,444
5,681
54,407
78,666
65,218
238,225
340,537
3,341
927,749

Rurals and Statewide
(Non-MPO)
FTA 5310
FTA 5311
FTA 5339
FTA ADTAP
FTA RTAP
FTA 5329
State
Local
Local-in-Kind
Revenues
Total

-

Previous
Funding

FY2024 - FY2027

FY 2024
7,227
244
1,506
391
9,368

892
551
272
234
1,949

292
590
205
169
1,256

272
571
210
161
1,214

Total
FY 2024-2027
8,683
1,956
2,193
955
13,787

FY 2024
144,128
4,238
5,668
9,921
7,539
756
1,251
29,723
20,412
38,054
192,602
74,311
7,588
536,191

FY 2025
78,807
2,706
5,972
9,074
11,360
15,738
19,676
63,065
396,289
73,830
7,411
683,928

FY 2026
68,372
2,752
6,369
7,822
6,016
47,948
18,480
1,617
433,717
60,049
7,554
660,696

FY 2027
58,442
3,117
5,883
5,747
5,884
375
5,759
2,753
2,370
784,064
327,035
8,167
1,209,596

Total
FY 2024-2027
349,749
12,813
23,892
32,564
30,799
756
1,626
99,168
61,321
105,106
1,806,672
535,225
30,720
3,090,411

FY 2024
1,890
39,358
1,784
386
529
3,025
24,433
5,418
76,822

FY 2025
1,890
39,358
1,784
386
529
3,025
24,433
5,418
76,822

FY 2026
1,890
39,358
1,784
386
529
3,025
24,433
5,418
76,822

FY 2027
1,890
39,358
1,784
386
529
3,025
24,433
5,418
76,822

Total
FY 2024-2027
7,560
157,431
7,137
1,544
2,116
12,099
97,731
21,672
307,289

FY 2025

372

FY 2026

FY 2027

Statewide

This page intentionally left blank

Total Funding
FTA 5307
FTA 5307(h)
FTA 5309
FTA 5310
FTA 5311
FTA 5329
FTA 5337
FTA 5339
Federal Stimulus
FTA ADTAP
FTA RTAP
FTA Adjustment
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Local-in-Kind
Revenues
Total

Previous
Funding
71,442
282
2,146
4,727
47,133
13,500
2,444
5,681
54,407
78,666
65,218
238,225
340,537
3,341
927,749

FY 2024
144,128
6,128
45,026
529
9,921
7,539
756
1,784
386
1,251
29,723
20,412
38,054
195,627
98,744
5,418
7,588
613,013

FY 2025
78,807
4,596
45,330
529
9,074
11,360
1,784
386
15,738
19,676
63,065
399,313
98,263
5,418
7,411
760,750

373

FY 2026
68,372
4,642
45,727
529
7,822
6,016
1,784
386
47,948
18,480
1,617
436,742
84,482
5,418
7,554
737,518

FY 2027
58,442
5,007
45,241
529
5,747
5,884
1,784
386
375
5,759
2,753
2,370
787,089
351,468
5,418
8,167
1,286,418

Total
FY 2024-2027
349,749
20,372
181,323
2,116
32,564
30,799
756
7,137
1,544
1,626
99,168
61,321
105,106
1,818,771
632,956
21,672
30,720
3,397,700

Statewide

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

BRISTOL METROPOLITAN PLANNING ORGANIZATION
STIP ID:
FTA 5307
State
Local
Year Total:
Description:

BVT-G1
226
92
45
363

Title: Transit System Preservation
95
95
45
45
140
140

Recipient:
95
45
140

Bristol Virginia Transit
FTA 5307
State
Local
Total Funds:

285
135
420

STIP ID:

BVT-G3

Title: Transit Vehicles and Equipment

Recipient:

Bristol Virginia Transit

FTA 5307
State
Local
Year Total:
Description:

78
16
4
98

58
12
3
73

100
20
5
125

-

STIP ID:

DIST3-G1

Title: Transit System Preservation Mount

Recipient:

District Three Governmental Cooperative

FTA 5307
State
Local
Year Total:
Description:

134
53
79
266

-

-

-

City of Bristol

Previous Funding

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA ADTAP
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals

304
108
49
461

District Three
Governmental
Cooperative

Previous Funding

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA ADTAP
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals

134
53
79
266

144
29
7
180

FY 2024

58
107
48
213

FY 2025
144
124
52
320

FY 2024

-

FY 2026
100
115
50
265

FY 2025

-

374

FTA 5307
State
Local
Total Funds:
FY 2027

-

FY 2026

-

FTA 5307
State
Local
Total Funds:

-

-

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA ADTAP
Flexible STP
RSTP
Other Federal
State
Local
Revenues

FY 2027

302
61
15
378

302
346
150
798

Total FY 2024-2027

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA ADTAP
Flexible STP
RSTP
Other Federal
State
Local
Revenues
-

-

Bristol MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding
Bristol MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA ADTAP
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals

FY 2024

Previous Funding
438
161
128
727

FY 2025

FY 2024
58
107
48
213

FY 2026

FY 2025
144
124
52
320

FY 2027

FY 2026
100
115
50
265

375

FY 2027
-

FY2024 - FY2027

Total FY 2024-2027
Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA ADTAP
Flexible STP
RSTP
Other Federal
State
Local
Revenues

302
346
150
798

Bristol MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding
CENTRAL VIRGINIA
STIP ID:
FTA 5339
State
Local
Year Total:
Description:

FY 2024

FY 2025

TRANSPORTATION PLANNING ORGANIZATION
GLTC001
Title: Trolley Replacement
520
65
65
650

FY 2026
Recipient:
-

FY 2027

FY2024 - FY2027

Total FY 2024-2027

Greater Lynchburg Transit Company
FTA 5339
State
Local
Total Funds:

520
65
65
650

Recipient:

Greater Lynchburg Transit Company

-

Title: ADA Accessible Minivans
(Microtran
180
22
22
224

-

-

STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local

GLTC003
-

Title: Shelter Replacement
50
6
6
62

Recipient:
-

Greater Lynchburg Transit Company
FTA 5339
State
Local
Total Funds:

50
6
6
62

GLTC004
-

Title: Support Vehicle Replacements
40
5
5
50

Recipient:
-

Greater Lynchburg Transit Company
FTA 5307
State
Local
Total Funds:

40
5
5
50

GLTC0005
-

Title: IT Hardware
-

40
5
5

Recipient:
-

Greater Lynchburg Transit Company
FTA 5307
State
Local

40
5
5

Year Total:
Description:
STIP ID:
FTA 5307
State
Local

-

-

50

-

-

50

GLTC0006
-

Title: IT Software Replacement
25
3
3

Recipient:
-

Greater Lynchburg Transit Company
FTA 5307
State
Local

25
3
3

Year Total:
Description:

-

-

-

-

31

STIP ID:

GLTC002

FTA 5339
State
Local
Year Total:
Description:

31

376

FTA 5339
State
Local
Total Funds:

Total Funds:

Total Funds:

180
22
22
224

Central VA (Lynchburg)

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

CENTRAL VIRGINIA TRANSPORTATION PLANNING ORGANIZATION
Title: HVAC Hardware/Software
STIP ID:
GLTC0007
Updates
FTA 5307
40
State
10
Local
10

Total FY 2024-2027

FY 2027

Recipient:

Greater Lynchburg Transit Company

-

-

FTA 5307
State
Local

40
10
10

-

-

Total Funds:

60

Year Total:
Description:
STIP ID:

-

-

GLTC0008

Recipient:

Greater Lynchburg Transit Company

FTA 5339
State
Local

-

Title: Kemper Street Bus Bay Expansion
E
18
2
2

-

-

FTA 5339
State
Local

18
2
2

Year Total:
Description:
STIP ID:
FTA 5339
State
Local

-

-

-

-

Total Funds:

22

GLTC0009
-

Title: 3 Replacement 35' Buses
-

Recipient:
178
22
22

Greater Lynchburg Transit Company
FTA 5339
State
Local

178
22
22

Year Total:
Description:
STIP ID:
FTA 5339
State
Local

-

-

222

-

222

GLTC0010
-

Title: 3 Replacement 35' Buses
-

Recipient:
2,000
250
250

Greater Lynchburg Transit Company
FTA 5339
State
Local

2,000
250
250

Year Total:

-

-

2,500

-

2,500

Description:
STIP ID:
FTA 5339
State
Local

GLTC0011
-

Title: Support Vehicle Replacements
-

Recipient:
109
14
14

Greater Lynchburg Transit Company
FTA 5339
State
Local

109
14
14

Year Total:

-

-

137

-

137

GLTC0012

Title: Radio System Equipment
Replaceme
-

Recipient:

Greater Lynchburg Transit Company

496
62
62
620

-

Recipient:

Greater Lynchburg Transit Company

120
15
15
150

-

Greater Lynchburg Transit Company
FTA 5307
State
Local
Total Funds:

Description:
STIP ID:

60

FY 2026

FY2024 - FY2027

22

-

-

-

Total Funds:

Total Funds:

Total Funds:

FTA 5307
State
Local
Year Total:
Description:

-

STIP ID:

GLTC0013

FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:

-

Title: Replacement and Upgrade of
Securit
-

GLTC0014
-

Title: 3 Replacement BOC's
-

Recipient:
288
36
36
360

GLTC0015

Greater Lynchburg Transit Company

-

Title: Replacement of Maintenance
Truck
-

Recipient:

FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:

60
7
7
74

-

GLTC0016
-

Title: IT Software Replacements
-

Recipient:
-

Greater Lynchburg Transit Company
48
FTA 5339
6
State
6
Local
60
Total Funds:

377

FTA 5307
State
Local
Total Funds:

FTA 5307
State
Local
Total Funds:

FTA 5307
State
Local
Total Funds:

496
62
62
620

120
15
15
150

288
36
36
360

60
7
7
74

48
6
6
60

Central VA (Lynchburg)

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding
CENTRAL VIRGINIA
Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:

FY 2024

FY 2025

FY 2026

FY 2027

FY2024 - FY2027

Total FY 2024-2027

TRANSPORTATION PLANNING ORGANIZATION
GLTC0017
-

Title: IT Software Replacements
-

Recipient:
-

Greater Lynchburg Transit Company
48
FTA 5339
6
State
6
Local
60
Total Funds:

48
6
6
60

GLTC0018
-

Title: 4 Replacement BOC's
-

Recipient:
-

Greater Lynchburg Transit Company
384
FTA 5339
48
State
48
Local
480
Total Funds:

384
48
48
480

GLTC0019
-

Title: Support Vehicle Replacements
-

Recipient:
-

Greater Lynchburg Transit Company
116
FTA 5339
14
State
14
Local
144
Total Funds:

116
14
14
144

STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:

GLTC0020
-

Title: Replacement of Stop Signage
-

Recipient:
-

Greater Lynchburg Transit Company
84
FTA 5339
10
State
10
Local
104
Total Funds:

84
10
10
104

GLTC0021

Recipient:

Greater Lynchburg Transit Company

FTA 5307
State
Local
Year Total:
Description:
STIP ID:

-

Title: Addition of Solar Lighting and
eInk D
-

-

81
10
10
101

FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:

-

Description:

FTA 5307
State
Local
Total Funds:

81
10
10
101

-

Title: Property & Facilities - ConstructionRecipient:
o
-

460
57
57
574

GLTC0023
-

Title: Forklift Replacement
-

Recipient:
-

Greater Lynchburg Transit Company
52
FTA 5307
6
State
6
Local
64
Total Funds:

GLTC0024

Title: Replacement of Maintenance
Truck
-

Recipient:

Greater Lynchburg Transit Company

-

60
7
7
74

CVACL01
-

Title: Paratransit Vehicles
108
108

Recipient:
108

27
135

27
135

Central Va Alliance for Community Living (CVACL)
108
FTA 5310
432
State
27
Local
108
135
Total Funds:
540

CVACL02
-

Title: Operating Assistance
46
46
37
37
9
9
92
92

Recipient:
46
37
9
92

Central Va Alliance for Community Living (CVACL)
46
FTA 5310
184
37
State
148
9
Local
36
92
Total Funds:
368

GLTC0022

27
135

378

Greater Lynchburg Transit Company
FTA 5339
State
Local
Total Funds:

FTA 5339
State
Local
Total Funds:

460
57
57
574

52
6
6
64

60
7
7
74

Central VA (Lynchburg)

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding
CENTRAL VIRGINIA
Greater
Lynchburg Transit
Company
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA Adjustment
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals
Human Service
Transportation
Providers
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals
Central VA TPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA Adjustment
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals

FY 2024

FY 2025

FY 2026

FY 2027

FY2024 - FY2027

Total FY 2024-2027

TRANSPORTATION PLANNING ORGANIZATION
Previous Funding
-

FY 2024
-

Previous Funding

FY 2025
145
768
118
118
1,149

FY 2024

-

154
37
36
227

Previous Funding
-

154
37
36
227

FY 2025
154
37
36
227

FY 2024

FY 2026
964
2,287
406
406
4,063

145
154
768
155
154
1,376

FY 2026
154
37
36
227

FY 2025

FY 2027
133
1,200
164
164
1,661

964
154
2,287
443
442
4,290

379

FY 2027
154
37
36
227

FY 2026

133
154
1,200
201
200
1,888

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA Adjustment
Flexible STP
RSTP
Other Federal
State
Local
Revenues

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues

FY 2027

1,242
4,255
688
688
6,873

616
148
144
908

Total FY 2024-2027
FTA 5307
1,242
FTA 5310
616
FTA 5311
FTA 5337
FTA 5339
4,255
FTA Adjustment
Flexible STP
RSTP
Other Federal
State
836
Local
832
Revenues
7,781

Central VA (Lynchburg)

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

CHARLOTTESVILLE- ALBEMARLE METROPOLITAN PLANNING ORGANIZATION

FY2024 - FY2027

FY 2027

Total FY 2024-2027

STIP ID:
FTA 5307
State
Local
Revenues
Year Total:
Description:

CAT0001
4,453
3,231
3,514
107
11,305

Title: Operating Assistance
4,462
4,209
3,105
2,972
4,125
5,252
110
112
11,802
12,545

Recipient:
4,514
2,839
5,325
115
12,793

Charlottesville Area Transit
3,043
FTA 5307
2,896
State
6,525
Local
585
Revenues
13,049
Total Funds:

16,228
11,812
21,227
922
50,189

STIP ID:
FTA 5339
State
Local
Year Total:
Description:

CAT0002
519
1,262
74
1,855

Title: Expansion Rolling Stock
621
984
1,508
2,389
89
140
2,218
3,513

Recipient:
577
1,401
82
2,060

Charlottesville Area Transit
FTA 5339
State
Local
Total Funds:

2,182
5,298
311
7,791

STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local

CAT0003
898
2,180
128
3,206

Title: Replacement - Rolling Stock
1,058
517
2,571
1,255
151
74
3,780
1,846

Recipient:
577
1,401
82
2,060

Charlottesville Area Transit
FTA 5339
State
Local
Total Funds:

2,152
5,227
307
7,686

CAT0007
-

Title: Passenger Shelters
64
26
156
62
9
4
229
92

Recipient:
26
62
4
92

Charlottesville Area Transit
26
FTA 5339
62
State
4
Local
92
Total Funds:

142
342
21
505

CAT0009
25
61
4
90

Title: Purchase Support Vehicles
14
34
2
50
-

Recipient:
28
68
4
100

Charlottesville Area Transit
FTA 5339
State
Local
Total Funds:

42
102
6
150

CAT0011
98
238
14

Title: Purchase Shop Equipment
63
153
9
-

Recipient:
-

Charlottesville Area Transit
FTA 5339
State
Local

63
153
9

Year Total:

350

225

-

-

Total Funds:

225

CAT0012
-

Title: Purchase Vehicle Locator System
154
374
22
550
-

Recipient:
-

Charlottesville Area Transit
FTA 5339
State
Local
Total Funds:

154
374
22
550

CAT0014
70
171
10
251

Title: Purchase Misc Equipment
4
3
10
7
1
15
10

Recipient:
1
3
4

Charlottesville Area Transit
1
FTA 5339
3
State
Local
4
Total Funds:

9
23
1
33

CAT0017
55
135
190

Title: Purchase Surveillance/Security
6
14
20
-

Recipient:
56
136
192

Charlottesville Area Transit
FTA 5339
State
Local
Total Funds:

62
150
212

CAT0020
35
183
218

Title: Purchase Transit Radio System
-

Recipient:
-

Charlottesville Area Transit
FTA 5339
State
Local
Total Funds:

-

Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:

-

380

Charlottesville

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

CHARLOTTESVILLE- ALBEMARLE METROPOLITAN PLANNING ORGANIZATION

FY 2026

FY2024 - FY2027

FY 2027

Total FY 2024-2027

STIP ID:
FTA 5304
FTA 5311
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
FTA 5311
Federal Stimulus
Other Federal
State
Local
Revenues

TJPDC1
-

Title: Governance Study
49
26
75
-

Recipient:
-

Thomas Jefferson PDC
FTA 5304
FTA 5311
State
Local
Total Funds:

49
26
75

TJPDC2
-

Title: Mobility Management
103
163
21
33
5
8
129
204

Recipient:
169
34
8
211

Thomas Jefferson PDC
178
FTA 5310
36
State
9
Local
223
Total Funds:

613
124
30
767

JNT0001
957
2,455
600
68
2,552
4,632
590

Title: Operating Assistance
952
962
2,641
2,667
1,162
1,174
6,276
6,527
396
297

Recipient:
971
2,694
1,185
6,788
309

JAUNT, Inc.
981
2,721
1,197
7,060
321

FTA 5307
FTA 5311
Federal Stimulus
Other Federal
State
Local
Revenues

3,866
10,723
4,718
26,651
1,323

Year Total:

11,854

11,427

11,947

12,280

Total Funds:

47,281

11,627

Description:
STIP ID:

JNT0002

Title: Replacement Rolling Stock

Recipient:

JAUNT, Inc.

FTA 5311

1,576

956

914

923

960

FTA 5311

3,753

FTA 5339
Other Federal
State
Local
Year Total:
Description:

520
1,154
3,250

315
700
1,971

302
669
1,885

305
676
1,904

317
703
1,980

FTA 5339
Other Federal
State
Local
Total Funds:

1,239
2,748
7,740

STIP ID:
FTA 5311
State
Local
Year Total:
Description:
STIP ID:
FTA 5311
State
Local
Year Total:
Description:
STIP ID:
FTA 5311
State
Local
Year Total:
Description:
STIP ID:
FTA 5311
State
Local
Year Total:
Description:
STIP ID:
FTA 5311
State
Local
Year Total:
Description:

JNT0006
139
46
102
287

Title: ADP Hardware
99
33
72
204

115
38
84
237

Recipient:
43
14
32
89

JAUNT, Inc.
38
12
28
78

FTA 5311
State
Local
Total Funds:

295
97
216
608

JNT0009
-

Title: ADP Software
320
106
234
660

455
150
333
938

Recipient:
27
9
20
56

JAUNT, Inc.
11
4
8
23

FTA 5311
State
Local
Total Funds:

813
269
595
1,677

JNT0012
-

Title: Rehab Renovation Facility
59
59
19
20
43
43
121
122

Recipient:
60
20
44
124

JAUNT, Inc.
12
4
9
25

FTA 5311
State
Local
Total Funds:

190
63
139
392

JNT0013
-

Title: Spare Parts/ACM Items
14
31
4
10
10
22
28
63

Recipient:
32
11
23
66

JAUNT, Inc.
33
11
24
68

FTA 5311
State
Local
Total Funds:

110
36
79
225

JNT0015
-

Title: Support Vehicles
15
41
5
14
11
30
31
85

Recipient:
44
14
32
90

JAUNT, Inc.
-

FTA 5311
State
Local
Total Funds:

100
33
73
206

381

Charlottesville

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

FY 2027

Total FY 2024-2027

CHARLOTTESVILLE- ALBEMARLE METROPOLITAN PLANNING ORGANIZATION
Charlottesville Transit
FTA 5307
FTA 5310
FTA 5311

Previous Funding

FY 2024

FY 2025

FY 2026

FY 2027

Total FY 2024-2027

4,453
-

4,462
103
-

4,209
163
-

4,514
169
-

3,043
178
-

FTA 5307
FTA 5310
FTA 5311

16,228
613
-

FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal

1,665
-

1,984
-

1,530
-

1,265
-

27
-

FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal

4,806
-

State
Local
Revenues
Totals

7,313
3,927
107
17,465

7,946
4,439
110
19,044

6,718
5,478
112
18,210

5,944
5,505
115
17,512

2,997
6,538
585
13,368

State
Local
Revenues

23,605
21,960
922
68,134

JAUNT, Inc.
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Federal Stimulus
Flexible STP

Previous Funding
957
4,170
600
-

952
4,104
-

RSTP
Other Federal
State
Local
Revenues
Totals

68
3,118
5,888
590
15,391

1,644
7,346
396
14,442

Charlottesville MPO

Previous Funding

FY 2024

962
4,282
-

FY 2025

1,708
7,708
297
14,957
FY 2024

971
3,823
-

FY 2026

1,558
7,615
309
14,276
FY 2025

981
3,775
-

FY 2027

1,545
7,832
321
14,454

FY 2026

FY 2027

Total FY 2024-2027
FTA 5307
3,866
FTA 5310
FTA 5311
15,984
FTA 5337
FTA 5339
Federal Stimulus
Flexible STP
RSTP
Other Federal
State
Local
Revenues

6,455
30,501
1,323
58,129

Total FY 2024-2027

FTA 5307
FTA 5310
FTA 5311
FTA 5337

5,410
4,170
-

5,414
103
4,104
-

5,171
163
4,282
-

5,485
169
3,823
-

4,024
178
3,775
-

FTA 5307
FTA 5310
FTA 5311
FTA 5337

20,094
613
15,984
-

FTA 5339
FTA ADTAP
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals

1,665
68
10,431
9,815
697
32,256

1,984
9,590
11,785
506
33,486

1,530
8,426
13,186
409
33,167

1,265
7,502
13,120
424
31,788

27
4,542
14,370
906
27,822

FTA 5339
FTA ADTAP
Flexible STP
RSTP
Other Federal
State
Local
Revenues

4,806
30,060
52,461
2,245
126,263

382

Charlottesville

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

FREDERICKSBURG AREA METROPOLITAN PLANNING ORGANIZATION
STIP ID:
FTA 5307
State
Local
Revenues
Year Total:
Description:
STIP ID:
FTA 5307
FTA 5339
Flexible STP
State
Local
Year Total:
Description:

FRT0001
4,197
775
1,943
265
7,180

Title: Operating Assistance
4,323
798
2,001
273
7,395
-

Recipient:
-

Fredericksburg Transit (FRED)
FTA 5307
State
Local
Revenues
Total Funds:

4,323
798
2,001
273
7,395

FRT0002
300
167
406
24
897

Title: Replacement Rolling Stock
300
167
406
24
897
-

Recipient:
-

Fredericksburg Transit (FRED)
FTA 5307
FTA 5339
Flexible STP
State
Local
Total Funds:

300
167
406
24
897

STIP ID:

FRT0003

Title: Bike Racks, ITS, or Misc Equipment Recipient:

Fredericksburg Transit (FRED)

Flexible STP
State
Local
Year Total:
Description:
STIP ID:
Flexible STP
State
Local
Year Total:
Description:
STIP ID:
Flexible STP

-

375
75
19
469

-

375
75
19
469

Flexible STP
State
Local
Total Funds:

750
150
38
938

FRT0004
199
40
10
249

Title: Expansion Rolling Stock
305
61
15
381
-

Recipient:
-

Fredericksburg Transit (FRED)
Flexible STP
State
Local
Total Funds:

305
61
15
381

FRT0005
-

Title: Bus Rehab/Renovation of
-

Recipient:
-

Fredericksburg Transit (FRED)
Flexible STP

-

State
Local
Year Total:
Description:
STIP ID:
Flexible STP
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:

-

-

-

-

-

FRT0007
20
5
25

Title: Furniture and Fixtures
20
5
25
-

Recipient:
-

Fredericksburg Transit (FRED)
Flexible STP
State
Local
Total Funds:

20
5
25

FRT0009
207
207

Title: Preventative Maintenance
20
5
25
-

Recipient:
-

Fredericksburg Transit (FRED)
FTA 5307
State
Local
Total Funds:

20
5
25

-

-

383

State
Local
Total Funds:

Fredericksburg

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Previous Funding

FY 2024

FY 2025

FREDERICKSBURG AREA METROPOLITAN PLANNING ORGANIZATION

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

STIP ID:
FTA 5307
FTA 5339
Flexible STP
State
Local
Year Total:
Description:
STIP ID:
Flexible STP
State
Local
Year Total:
Description:
STIP ID:
Flexible STP
State
Local
Year Total:
Description:
STIP ID:
Flexible STP
State
Local
Year Total:
Description:
STIP ID:
Flexible STP
State
Local
Year Total:
Description:
STIP ID:

FRT0010
40
9
49

Title: Support Vehicles
-

Recipient:
-

Fredericksburg Transit (FRED)
FTA 5307
FTA 5339
Flexible STP
State
Local
Total Funds:

-

FRT0011
272
54
14
340

Title: Spare Parts
272
54
14
340

Recipient:
-

Fredericksburg Transit (FRED)
Flexible STP
State
Local
Total Funds:

272
54
14
340

FRT0012
-

Title: Security Equipment
-

Recipient:
-

Fredericksburg Transit (FRED)
Flexible STP
State
Local
Total Funds:

-

FRT0013
22
4
6
32

Title: Computer Software
12
2
3
17
-

Recipient:
-

Fredericksburg Transit (FRED)
Flexible STP
State
Local
Total Funds:

12
2
3
17

FRT0014
41
17
2
60

Title: Passenger Bus Shelters
41
17
2
60
-

Recipient:
-

Fredericksburg Transit (FRED)
Flexible STP
State
Local
Total Funds:

41
17
2
60

FRT0022

Fredericksburg Transit (FRED)

7,704
1,541
385
9,630

Title: Fredericksburg Station
Rehabilitation
-

Recipient:

FTA 5337
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Revenues
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Revenues
Year Total:
Description:

-

-

RAAA001
150
120
30
300

Title: Operating Assistance
150
120
30
300
-

Recipient:
-

Rappahannock Area Agency on Aging
FTA 5310
150
State
120
Local
30
Revenues
Total Funds:
300

RAAA002
71
14
4
89

Title: Mobility Management
72
14
4
90
-

Recipient:
-

Rappahannock Area Agency on Aging
FTA 5310
72
State
14
Local
4
Revenues
Total Funds:
90

-

384

FTA 5337
State
Local
Total Funds:

-

Fredericksburg

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Previous Funding

FY 2024

FY 2025

FREDERICKSBURG AREA METROPOLITAN PLANNING ORGANIZATION

STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

RAAA003
312
78
390

Title: Paratransit Vehicles
312
78
390
-

Recipient:
-

Rappahannock Area Agency on Aging
FTA 5310
312
State
Local
78
Total Funds:
390

RACS001
240
60
300

Title: Paratransit Vehicles
240
60
300
-

Recipient:
-

Rappahannock Area CSB
FTA 5310
State
Local
Total Funds:

240
60
300

Fredericksburg
Transit
FTA 5307

4,744

4,643

-

-

-

FTA 5307

4,643

FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP

7,704
721
-

1,192
-

-

-

375
-

FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP

1,567
-

Other Federal
State
Local
Revenues
Totals

2,837
2,398
265
18,669

1,413
2,088
273
9,609

-

-

75
19
469

Other Federal
State
Local
Revenues

1,488
2,107
273
10,078

Previous Funding

FY 2024

FY 2025

FY 2026

Total FY 2024-2027

FY 2027

Human Service
Transportation
Providers
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP

773
-

774
-

-

-

-

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP

774
-

RSTP

-

-

-

-

-

RSTP

-

Other Federal
State
Local
Revenues
Totals

134
172
1,079

134
172
1,080

-

-

-

Other Federal
State
Local
Revenues

134
172
1,080

Fredericksburg
MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues

4,744
773
7,704
721
2,971
2,570
265

4,643
774
1,192
1,547
2,260
273

-

-

375
75
19
-

Totals

19,748

10,689

-

-

469

Previous Funding

FY 2024

Previous Funding

FY 2025

FY 2024

FY 2026

FY 2025

FY 2026

385

Total FY 2024-2027

FY 2027

FY 2027

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues

4,643
774
1,567
1,622
2,279
273
11,158

Fredericksburg

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION
Recipient:

Hampton Roads Transit

-

Title: Replacement Vans - Paratransit &
TRAFFIX
36
438
87
1,063
5
63
128
1,564

1,135
58
2,895
170
4,258

658
1,598
94
2,350

HRT0004
-

Title: Support Vehicles
34
45
159
110
41
6
234
161

Recipient:
101
246
14
361

Hampton Roads Transit
67
FTA 5307
FTA 5337
163
State
10
Local
240
Total Funds:

247
678
71
996

HRT0006
-

Title: Shop Equipment
-

Recipient:
-

Hampton Roads Transit
FTA 5307
State
Local
Total Funds:

-

HRT0026
-

Title: Replacement Rolling Stock
2,978
5,000
1,931
1,803
1,632
650
8,654
5,958
509
350
15,704
13,761

Recipient:
2,000
3,955
121
294
17
6,387

Hampton Roads Transit
1,953
CMAQ
RSTP
914
FTA 5339
FTA 5307
2,220
State
131
Local
5,218
Total Funds:

3,953
11,933
4,769
2,282
17,126
1,007
41,070

HRT0032
-

Title: ADP Software
172
417
24
613

669
1,624
96
2,389

Recipient:
-

Hampton Roads Transit
560
FTA 5307
1,360
FTA 5337
80
State
Local
2,000
Total Funds:

1,401
3,401
200
5,002

HRT0033
-

Title: ADP Hardware
271
659
39
969

133
322
19
474

Recipient:
62
151
9
222

Hampton Roads Transit
78
FTA 5307
189
State
11
Local
278
Total Funds:

544
1,321
78
1,943

HRT0041
-

Title: CIP Program - General
238
112
350
-

Recipient:
-

Hampton Roads Transit
FTA 5307
State
Local
Total Funds:

238
112
350

STIP ID:

HRT0003

FTA 5307
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
FTA 5337
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
CMAQ
RSTP
FTA 5339
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
FTA 5337
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:

FTA 5307
FTA 5339
State
Local
Total Funds:

2,267
58
5,643
332
8,300

STIP ID:

HRT0052

Title: Transfer Center Upgrades

Recipient:

Hampton Roads Transit

FTA 5307

-

881

2,825

221

132

FTA 5307

4,059

State
Local
Year Total:

-

779
647
2,307

5,832
7,787
16,444

534
31
786

320
19
471

State
Local
Total Funds:

7,465
8,484
20,008

HRT0054
-

Title: Preventive Maintenance
14,418
13,769
1,880
1,793
4,074
3,890
20,372
19,452

Recipient:
13,769
1,793
3,890
19,452

Hampton Roads Transit
13,769
FTA 5307
1,793
FTA 5337
State
3,890
Local
19,452
Total Funds:

55,725
7,259
15,744
78,728

Description:
STIP ID:
FTA 5307
FTA 5337
State
Local
Year Total:
Description:

386

Hampton Roads

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION
HRT0066
-

Title: Light Rail Capital Projects, includes Recipient:
483
284
783
1,192
689
1,903
79
40
112
1,754
1,013
2,798

Hampton Roads Transit
1,919
FTA 5337
411
FTA 5307
5,662
State
333
Local
8,325
Total Funds:

3,469
411
9,446
564
13,890

HRT0067
-

Title: Capital Cost of Contracting
3,051
3,253
6,484
6,913
9,535
10,166

Recipient:
3,253
6,913
10,166

Hampton Roads Transit
3,253
FTA 5307
State
6,913
Local
10,166
Total Funds:

12,810
27,223
40,033

HRT0068
-

Title: ADA Operations
2,410
2,432
602
608
3,012
3,040

Recipient:
2,432
608
3,040

Hampton Roads Transit
2,432
FTA 5307
State
608
Local
3,040
Total Funds:

9,706
2,426
12,132

HRT0075
-

Title: Surveillance / Security Equipment Recipient:
86
572
515
208
1,305
1,390
34
123
81
328
1,943
2,043

Hampton Roads Transit
34
FTA 5307
FTA 5337
83
State
5
Local
122
Total Funds:

692
515
2,986
243
4,436

HRT0082
-

Title: Rehab/Renov
-

Recipient:
1,506
1,506

Hampton Roads Transit
FTA 5307
RSTP
State
Local
Total Funds:

5,006
5,006

STIP ID:
CMAQ
RSTP
State
Local

HRT0083 (T14104)
-

Title: HRT Traffix Program
800
800
200
200
-

Recipient:
800
200
-

Hampton Roads Transit
CMAQ
800
RSTP
200
State
Local

3,200
800
-

Year Total:

-

1,000

1,000

1,000

4,000

STIP ID:

HRT0086 (T11777)

Title: Purchase 29-Ft Replacement BusesRecipient:

Hampton Roads Transit

CMAQ
State
Local
Year Total:

8,428
8,428

-

-

STIP ID:
FTA 5337
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
FTA 5337
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
RSTP
State
Local
Year Total:

of Admin/Maint
3,500
3,500

Description:

1,000

Total Funds:

Description:

-

-

CMAQ
State
Local
Total Funds:

-

Description:
STIP ID:

HRT0087 (T11778)

Title: Purchase 40-Ft Replacement BusesRecipient:

Hampton Roads Transit

CMAQ
RSTP
State
Local
Year Total:
Description:

4,607
4,163
8,770

-

-

-

-

387

CMAQ
RSTP
State
Local
Total Funds:

-

Hampton Roads

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION
HRT0090
-

Title: Transit Bus Mid-Life
179
511
434
1,241
26
73
639
1,825

Recipient:
745
1,810
106
2,661

Hampton Roads Transit
1,027
FTA 5307
FTA 5339
2,495
State
147
Local
3,669
Total Funds:

1,717
745
5,980
352
8,794

HRT0096
-

Title: Ferry Boat Construction
-

Recipient:
-

Hampton Roads Transit
FTA 5337
Local
Total Funds:

-

HRT0103
-

Title: Light Rail Vehicle SGR
604
610
1,467
1,480
86
87
2,157
2,177

Recipient:
626
1,519
89
2,234

Hampton Roads Transit
675
FTA 5337
1,638
State
96
Local
2,409
Total Funds:

2,515
6,104
358
8,977

HRT0105 (T16054)
11,590
11,590

Title: Transit Bus Replacement
5,000
5,000

Recipient:
3,955
3,955

Hampton Roads Transit
CMAQ
1,953
RSTP
Federal Stimulus
State
1,953
Total Funds:

10,908
10,908

HRT0108 (UPC 108954)
-

Title: Light Rail Extension To ChesapeakeRecipient:
-

Hampton Roads Transit
RSTP
State
Total Funds:

-

STIP ID:

HRT0109

Recipient:

Hampton Roads Transit

FTA 5307
Other Federal
State
Local
Year Total:

-

Title: New Southside
Operating Division/Repower
11,212
4,490
5,000
22,500
16,380
16,380
11,514
7,582
44,106
50,952

2,490
4,980
2,490
9,960

1,956
1,957
1,957
1,957
7,827

Recipient:

Hampton Roads Transit

-

-

RSTP
State

-

-

-

Total Funds:

-

STIP ID:
FTA 5307
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5337
Local
Year Total:
Description:
STIP ID:
FTA 5337
State
Local
Year Total:
Description:
STIP ID:
CMAQ
RSTP
Federal Stimulus
State
Year Total:
Description:
STIP ID:
RSTP
State
Year Total:
Description:

FTA 5307
Other Federal
State
Local
Total Funds:

20,148
29,457
39,697
23,543
112,845

Description:
STIP ID:

HRT0110 (UPC 115871)

RSTP
State

-

Title: Newport News
Shipyard - Gloucester HRT
MAX Service
-

Year Total:

-

-

-

Description:
STIP ID:

HRT0111 (T17990)

Hampton Roads Transit

6,000
-

Title: Naval Station Norfolk Transit
Extension Study FEIS/PE
-

Recipient:

RSTP
State
Local

6,000
-

-

RSTP
State
Local

6,000
-

Year Total:

6,000

-

6,000

-

Total Funds:

6,000

-

Description:
STIP ID:

HRT0112 (T19477)

Hampton Roads Transit

2,045
2,045

Title: Peninsula Corridor
DESI/Conceptual
5,955
5,955
-

Recipient:

RSTP
State
Year Total:

-

-

Description:
STIP ID:
FTA 5307
Local
Year Total:
Description:

HRT0113
-

Title: Transit Bus Expansion
-

Recipient:
-

Hampton Roads Transit
FTA 5307
Local
Total Funds:

388

RSTP
State
Total Funds:

5,955
5,955

-

Hampton Roads

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION
HRT0114
-

56
57
113

STIP ID:
FTA 5307
State
Local
Year Total:
Description:

HRT0115
-

-

STIP ID:

HRT0116

FTA 5307
State
Local
Year Total:

-

STIP ID:
FTA 5307
State
Local
Year Total:

Recipient:
38
91
5
134

Hampton Roads Transit
FTA 5307
State
Local
Total Funds:

72
230
67
369

Recipient:
-

Hampton Roads Transit
FTA 5307
State
Local
Total Funds:

-

Title: Hampton Facility NonRevenue Electric Charging Pilot
66
159
9
234

Recipient:

Hampton Roads Transit

77
187
11
275

-

Title: Technology Planning
34
83
5
122

Description:
Title: Fare Collection System
-

FTA 5307
State
Local
Total Funds:

143
346
20
509

Description:
STIP ID:

HRT0117

Title: Workspace Renovation and
Reconfiguration

Recipient:

Hampton Roads Transit

FTA 5307
State
Local
Year Total:
Description:

-

347
842
50
1,239

-

-

STIP ID:
FTA 5307

HRT0118
-

Title: Facility Site Redevelopment
-

Recipient:
-

Hampton Roads Transit
FTA 5307

-

State
Local
Year Total:
Description:
STIP ID:

-

-

-

-

State
Local
Total Funds:

80
80
160

FTA 5307

-

230

45

46

-

FTA 5307

321

State
Local
Year Total:
Description:
STIP ID:
FTA 5307

-

560
33
823

109
6
160

112
7
165

-

State
Local
Total Funds:

781
46
1,148

-

Title: Gate Replacement Project
252
-

-

FTA 5307

252

State

-

612

-

-

-

State

612

Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local

-

36
900

-

-

-

Local
Total Funds:

36
900

-

Title: Light Rail Assessment Study
51
51
-

-

FTA 5307
State
Local

51
51

Year Total:

-

102

-

Total Funds:

102

HRT0119

HRT0120

HRT0121

Description:
STIP ID:

134
326
19
479

80
80
160
Title: Facilities State of Good Repair

-

FTA 5307
State
Local
Total Funds:

481
1,168
69
1,718

Recipient: Hampton Roads Transit

Recipient: Hampton Roads Transit
-

Recipient: Hampton Roads Transit
-

FTA 5307
State
Local

-

Title: Paratransit Vehicle Mid-Life
Overhau
92
75
223
182
13
11

-

-

FTA 5307
State
Local

167
405
24

Year Total:

-

328

-

-

Total Funds:

596

FTA 5307
State
Local

73
176
10

Total Funds:

259

HRT0122

Recipient: Hampton Roads Transit

268

Description:
HRT0123

STIP ID:
FTA 5307
State
Local

-

Title: Ferry Boat State of Good Repair
73
176
10
-

-

Year Total:

-

259

-

-

Recipient: Hampton Roads Transit
-

Description:

389

Hampton Roads

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION
HRT0124

STIP ID:
FTA 5307
State
Local
Year Total:

-

Description:
STIP ID:
FTA 5307
State
Local
Year Total:

-

HRT0125

Title: Paratransit Fleet Expansion
429
438
1,041
1,063
61
63
1,531
1,564

-

Recipient: Hampton Roads Transit
-

FTA 5307
State
Local
Total Funds:

867
2,104
124
3,095

Title: Bus Stop Amenity Program
1,065
2,753
1,065
2,753

Recipient: Hampton Roads Transit
3,523
1,790
3,523
1,790

FTA 5307
State
Local
Total Funds:

9,131
9,131

Title: Gate Replacement Project
252
612
36
900
-

-

Recipient: Hampton Roads Transit
-

FTA 5307
State
Local
Total Funds:

252
612
36
900

Description:
HRT0126

STIP ID:
FTA 5307
State
Local
Year Total:
Description:

-

STIP ID:

NOR0001 (UPC 109572)

CMAQ
RSTP
State
Local
Year Total:
Description:

Hampton Roads Transit

913

Title: Norfolk Bus Shelters and PedestrianRecipient:
Improvements
120
-

-

CMAQ

120

107
121
1,141

30
150

-

RSTP
State
Local
Total Funds:

30
150

FTA 5307
FTA 5311
State
Local
Revenues
Total Funds:

1,040
349
1,380
2,074
4,843

-

-

STIP ID:

SUF0001

Title: Operating Assistance

Recipient:

Suffolk Transit

FTA 5307
FTA 5311
State
Local
Revenues
Year Total:
Description:

-

342
340
683
1,365

349
347
349
1,045

352
350
352
1,054

346
343
690
1,379

STIP ID:

SUF0003

Title: Expansion Buses

Recipient:

Suffolk Transit

FTA 5307
State
Local
Year Total:
Description:

-

-

480
96
2
578

-

FTA 5307
State
Local
Total Funds:

624
125
9
758

STIP ID:
FTA 5307
FTA 5339
State

SUF0004
-

Title: Purchase Replacement Buses
191
208
614
80
161
58

Recipient:
111
41
30

Suffolk Transit
352
70

FTA 5307
FTA 5339
State

862
735
319

Local
Year Total:

-

40
1,006

8
190

18
440

Local
Total Funds:

80
1,996

Description:
STIP ID:

SUF0008

Suffolk Transit

-

Title: Administrative, Training, and
Indirect
10
10
-

Recipient:

FTA 5303
State

10
-

10
-

FTA 5303
State

40
-

Local
Revenues

-

10
-

10
-

10
-

10
-

Local
Revenues

40
-

Year Total:
Description:
STIP ID:
Other Federal

-

20

20

20

20

Total Funds:

80

SUF0009
-

Title: Transit Enhancements
-

Recipient:
-

Suffolk Transit
-

Other Federal

-

State
Local
Year Total:
Description:

-

13
13
26

7
7
14

7
7
14

State
Local
Total Funds:

35
35
70

144
29
7
180

14
360

8
8
16

390

Hampton Roads

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION
STIP ID:

SUF0012

Title: Force Account - Sidewalk

Recipient:

Suffolk Transit

FTA 5307

-

11

-

-

-

FTA 5307

11

State
Local
Year Total:
Description:
STIP ID:

-

2
1
14

8
8
16

7
7
14

7
7
14

State
Local
Total Funds:

24
23
58

SUF0013

Title: Capital Cost of Contracting

Recipient:

Suffolk Transit

FTA 5307

-

324

327

-

229

FTA 5307

880

FTA 5311
State
Local
Year Total:
Description:
STIP ID:
RSTP

-

98
425
847

99
429
855

500
100
433
1,033

319
101
437
1,086

FTA 5311
State
Local
Total Funds:

819
398
1,724
3,821

SUF0014
-

Title: Transit Operations Facility
48

Recipient:
1,464

Suffolk Transit
-

RSTP

1,512

State
Local

-

-

12
-

366
-

-

State
Local

378
-

Year Total:
Description:
STIP ID:
FTA 5307
FTA 5339
State
Local
Year Total:
Description:
STIP ID:

-

-

60

1,830

-

Total Funds:

1,890

SUF0015
-

Title: Paratransit New Vehicles
-

Recipient:
103
41
29
7
180

Suffolk Transit
-

FTA 5307
FTA 5339
State
Local
Total Funds:

103

SUF0016

Title: College Drive Bus Pull Out

Recipient:

Suffolk Transit

Other Federal
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:

-

-

872
872

-

Other Federal
State
Local
Total Funds:

872
872

SUF0017
-

Title: Electric Bus Charging Stations
33
7
8
48

Recipient:
-

Suffolk Transit
-

FTA 5339
State
Local
Total Funds:

7
8
15

STIP ID:
FTA 5307
FTA 5311
Other Federal
State
Local
Revenues
Year Total:

WAT0001
-

Title: Operating Assistance
3,635
3,817
530
557
180
180
2,395
2,515
1,492
1,567
1,643
1,725
9,875
10,361

Recipient:
3,931
573
180
2,590
1,614
1,777
10,665

Williamsburg Area Transit Authority
4,049
FTA 5307
590
FTA 5311
180
Other Federal
2,668
State
1,662
Local
1,830
Revenues
10,979
Total Funds:

15,432
2,250
720
10,168
6,335
6,975
41,880

Description:
STIP ID:
FTA 5307
Other Federal
State
Local
Year Total:

WAT0014
-

Title: Transit Enhancements
24
24
5
5
1
1
30
30

Recipient:
24
5
1
30

Williamsburg Area Transit Authority
FTA 5307
24
Other Federal
5
State
1
Local
30
Total Funds:

96
20
4
120

WAT0017
-

Title: Bus Shelters
163
21
20
204

Recipient:
94
19
5
118

Williamsburg Area Transit Authority
120
Other Federal
24
State
Other State
6
Local
150
Total Funds:

471
83
110
36
700

-

29
7
139

Description:
STIP ID:
Other Federal
State
Other State
Local
Year Total:

94
19
110
5
228

Description:

391

Hampton Roads

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION
WAT0022
-

Title: Support Vehicle Replacement
84
17
4
105
-

Recipient:
-

Williamsburg Area Transit Authority
FTA 5307
89
Other Federal
18
State
5
Local
112
Total Funds:

173
35
9
217

WAT0027
-

Title: Radios
-

Recipient:
-

Williamsburg Area Transit Authority
Other Federal
State
Local
Total Funds:

-

STIP ID:

WAT0028

Recipient:

Williamsburg Area Transit Authority

Other Federal
State
Local
Year Total:

-

Title: Office
Furniture
-

120
24
6
150

-

Description:
STIP ID:
Other Federal
State
Local
Year Total:

WAT0030
-

Title: Spare Parts, ACM
-

Recipient:
-

Williamsburg Area Transit Authority
Other Federal
State
Local
Total Funds:

-

Description:
STIP ID:
Other Federal
State
Local
Year Total:

WAT0032
-

Title: Misc Support Equipment
201
14
32
247
-

Recipient:
160
32
8
200

Williamsburg Area Transit Authority
Other Federal
State
Local
Total Funds:

361
46
40
447

STIP ID:
Other Federal
State
Local

WAT0033
-

Title: Bike Racks
-

-

Recipient:
-

Williamsburg Area Transit Authority
Other Federal
State
Local

-

Year Total:

-

-

-

-

-

-

STIP ID:
FTA 5307
State

WAT0036
-

Title: ADP Hardware - APC
200
38

Recipient:
-

Williamsburg Area Transit Authority
FTA 5307
State

200
38

Local

-

-

12

-

-

Local

12

Year Total:
Description:
STIP ID:
Other Federal

-

-

250

-

-

Total Funds:

250

WAT0037
-

Title: Bus Engineering & Design of AdminRecipient:
225
43
15

Williamsburg Area Transit Authority
Other Federal

283

State

-

-

-

-

-

State

-

Local
Year Total:
Description:
STIP ID:
Other Federal

-

26
251

5
48

2
17

-

Local
Total Funds:

33
316

WAT0038
-

Title: Surveillance / Security Equipment Recipient:
80
160

Williamsburg Area Transit Authority
Other Federal

240

State
Local
Year Total:
Description:
STIP ID:
RSTP

-

-

40
200

-

60
300

WAT0039 (UPC T11932)
-

Title: Administration and Operations
5,548
5,328

Recipient:
800

Williamsburg Area Transit Authority
RSTP

11,676

State
Local
Year Total:
Description:

-

1,387
6,935

200
1,000

-

2,919
14,595

STIP ID:
FTA 5307
Other Federal
State
Local
Year Total:
Description:
STIP ID:
Other Federal
State
Local
Year Total:

-

Description:

120
24
6
150

Other Federal
State
Local
Total Funds:

240
48
12
300

Description:

Total Funds:

Description:

20
100

1,332
6,660

392

State
Local
Total Funds:

State
Local
Total Funds:

Hampton Roads

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION
STIP ID:

WAT0041

Title: Route Signage (Bus Stop Signs)

Recipient:

Williamsburg Area Transit Authority

Other Federal

-

-

-

-

-

Other Federal

-

State
Local
Year Total:
Description:
STIP ID:

-

-

-

-

-

State
Local
Total Funds:

-

WAT0042

Title: ADP Software

Recipient:

Williamsburg Area Transit Authority

FTA 5307

-

104

52

66

67

FTA 5307

289

State
Local
Year Total:
Description:
STIP ID:

-

8
18
130

10
3
65

12
4
82

13
4
84

State
Local
Total Funds:

43
29
361

WAT0043

Title: Expansion Bus (Med Bus) Trolley

Recipient:

Williamsburg Area Transit Authority

Other Federal
State
Local
Year Total:

-

-

800
200
1,000

-

Other Federal
State
Local
Total Funds:

800
200
1,000

WAT0044 (T11780)
-

-

Recipient:
2,400
600
3,000

Williamsburg Area Transit Authority
CMAQ
State
Local
Total Funds:

5,329
1,333
6,662

WAT0045
-

Title: Replacement Buses
432
480
108
120
540
600

Recipient:
148
37
185

Williamsburg Area Transit Authority
180
FTA 5339
Other Federal
45
State
Local
225
Total Funds:

1,240
310
1,550

WAT0046
-

Title: Real Estate Acquisition Lightfoot
-

Recipient:
-

Williamsburg Area Transit Authority
FTA 5307
State
Local
Total Funds:

-

WAT0047
-

Title: Bus Third Party Audit
-

Recipient:
-

Williamsburg Area Transit Authority
Other Federal
State
Local
Total Funds:

-

-

Description:
STIP ID:
CMAQ
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
Other Federal
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:

Title: Purchase Replacement Buses
2,929
733
3,662

Description:
STIP ID:
Other Federal
State
Local
Year Total:
Description:
STIP ID:

WAT0048

Title: Purchase Expansion Buses

Recipient:

Other Federal
Other State
State
Local
Year Total:

-

334
334

-

-

STIP ID:
Other Federal
State

WAT0049
-

Title: Rehab/Rebuild Buses
-

Recipient:
-

Williamsburg Area Transit Authority
Other Federal
State

-

Local

-

-

-

-

-

Local

-

Year Total:

-

-

-

-

-

Total Funds:

-

WAT0050
-

Title: Replacement Bus Trolley
-

Recipient:
-

Williamsburg Area Transit Authority
Other Federal
State
Local
Total Funds:

-

Williamsburg Area Transit Authority
Other Federal
Other State
State
Local
Total Funds:

334
334

Description:

Description:
STIP ID:
Other Federal
State
Local
Year Total:

-

Description:

393

Hampton Roads

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY 2027

FY2024 - FY2027

Total FY 2024-2027

HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION
WAT0051
-

Title: Employee Education/Training
-

Recipient:
-

Williamsburg Area Transit Authority
Other Federal
State
Local
Total Funds:

-

WAT0053
-

Title: Capital Cost of Contracting
-

Recipient:
-

Williamsburg Area Transit Authority
FTA 5307
State
Local
Total Funds:

-

WAT0054
-

Title: Preventive Maintenance
1,673
1,093
418
273
2,091
1,366

Recipient:
1,121
280
1,401

Williamsburg Area Transit Authority
1,149
FTA 5307
State
287
Local
1,436
Total Funds:

5,036
1,258
6,294

WAT0055
-

Title: Project Administration
-

Recipient:
-

Williamsburg Area Transit Authority
FTA 5307
State
Local
Total Funds:

-

WAT0056
-

Title: Safety & Security Training and
35
9
44

Recipient:
-

Williamsburg Area Transit Authority
FTA 5307
State
Local
Total Funds:

35
9
44

STIP ID:
Other Federal
State
Local
Year Total:

WAT0057 (T17898)
-

Title: Construction,NEPA, Architectural
-

Recipient:
-

Williamsburg Area Transit Authority
Other Federal
State
Local
Total Funds:

-

Description:
STIP ID:
Other Federal
State
Local
Year Total:

WAT0058
-

Title: 3rd Party Project Management
288
672
72
168
360
840

Recipient:
-

Williamsburg Area Transit Authority
Other Federal
State
Local
Total Funds:

960
240
1,200

Description:
STIP ID:
Other Federal
State
Local
Year Total:

WAT0059
-

Title: 3rd Party Legal Services - Facility
12
2
1
15
-

Recipient:
-

Williamsburg Area Transit Authority
Other Federal
State
Local
Total Funds:

12
2
1
15

WAT0060 (T11779)

STIP ID:
Other Federal
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:

-

Description:

Description:
STIP ID:

Williamsburg Area Transit Authority

-

Title: Purchase Replacement CNG
Buses
2,458
614
3,072
-

Recipient:

CMAQ
State
Year Total:
Description:

-

-

STIP ID:
CMAQ
State
Local
Year Total:
Description:

WAT0061 (T11782)
-

Title: Purchase Replacement Trolley
-

Recipient:
-

Williamsburg Area Transit Authority
CMAQ
State
Local
Total Funds:

-

STIP ID:
FTA 5307
State
Local
Year Total:
Description:

WAT0062
-

-

Recipient:
-

Williamsburg Area Transit Authority
FTA 5307
State
Local
Total Funds:

-

-

Title: Intelligent Transportation System
-

394

CMAQ
State
Total Funds:

2,458
614
3,072

Hampton Roads

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY 2027

FY2024 - FY2027

Total FY 2024-2027

HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION
STIP ID:
FTA 5307
RSTP
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
RSTP
Other Federal
State
Local
Year Total:
Description:
STIP ID:
CMAQ
RSTP
State
Local
Year Total:
Description:
STIP ID:
CMAQ
RSTP
State
Local
Year Total:
Description:
STIP ID:
CMAQ
RSTP
State
Local
Year Total:
Description:

WAT0063
-

Title: Strategic Plan Study RSTP UPC #
149
38
187
-

Recipient:
-

Williamsburg Area Transit Authority
FTA 5307
RSTP
State
Local
Total Funds:

149
38
187

WAT0064
-

Title: CAD/AVL Replacement
816
163
41
1,020
-

Recipient:
-

Williamsburg Area Transit Authority
FTA 5307
RSTP
Other Federal
State
Local
Total Funds:

816
163
41
1,020

WAT0065 (T17890)
-

Title: CMAQ Demonstration Route York
855
2,880
214
720
1,069
3,600

Recipient:
-

Williamsburg Area Transit Authority
CMAQ
RSTP
State
Local
Total Funds:

3,735
934
4,669

WAT0066 (T17898)
-

Title: Transfer Station HUB
2,000
500
2,500
-

Recipient:
-

Williamsburg Area Transit Authority
CMAQ
RSTP
State
Local
Total Funds:

2,000
500
2,500

WAT0067 (T19468)
-

Title: Expansion of Bus Shelters
187
47
234
-

Recipient:
-

Williamsburg Area Transit Authority
CMAQ
RSTP
State
Local
-

187
47
-

-

234

Title: Upper York/New Kent County
Connector Demonstration Routes
298
75
373
-

Recipient:

Williamsburg Area Transit Authority

-

-

Title: ADP Hardware
8
2
10

-

Recipient:
16
3

-

1
20

Williamsburg Area Transit Authority
Other Federal
State
Local
Total Funds:

Recipient:

Williamsburg Area Transit Authority

48
12
60

-

Total Funds:

STIP ID:

WAT0068 (T19494)

CMAQ
RSTP
State
Local
Year Total:
Description:
STIP ID:
Other Federal
State

-

Local
Year Total:
Description:

-

STIP ID:

WAT0070

Other Federal
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local

-

Title: Bike Racks, ITS or Misc Equipment
Bus Stop Improvements
64
16
16
4
80
20

CBH0001
-

Title: Paratransit Vehicles
64
16
80

Recipient:
64
16
80

Colonial Behavioral Health
64
FTA 5310
State
16
Local
80
Total Funds:

192
48
240

EGS0001
-

Title: Paratransit Vehicles
64
16
80

Recipient:
64
16
80

Eggleston Services
64
16
80

192
48
240

Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:

WAT0069
-

395

CMAQ
RSTP
State
Local
Total Funds:

Other Federal
State
Local
Total Funds:

FTA 5310
State
Local
Total Funds:

298
75
373

24
5
1
30

128
32
160

Hampton Roads

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY 2027

FY2024 - FY2027

Total FY 2024-2027

HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5307(h)
State
Local
Year Total:
Description:

HHI0001
-

Title: Paratransit Vehicles
128
32
160

Recipient:
128
32
160

Heart Havens, Inc.
128
32
160

FTA 5310
State
Local
Total Funds:

384
96
480

HNN0001
-

Title: Paratransit Vehicles
64
64
16
16
80
80

Recipient:
64
16
80

Hampton Newport News CSB
64
FTA 5310
State
16
Local
80
Total Funds:

256
64
320

PAA0002
-

Title: Paratransit Vehicles
64
64
16
16
80
80

Recipient:
64
16
80

Peninsula Agency on Aging
64
FTA 5310
State
16
Local
80
Total Funds:

256
64
320

PAA0004
-

Title: Mobility Management
239
200
47
40
12
10
298
250

Recipient:
220
44
11
275

Peninsula Agency on Aging
220
FTA 5310
44
State
11
Local
275
Total Funds:

879
175
44
1,098

PAA0005
-

Title: Operating Assistance
44
44
35
35
8
8
87
87

Recipient:
48
38
10
96

Peninsula Agency on Aging
48
FTA 5310
38
State
10
Local
96
Total Funds:

184
146
36
366

SSV0001
-

Title: Paratransit Vehicles
300
300
60
60
360
360

Recipient:
300
60
360

Senior Services of Southeastern VA
300
FTA 5310
State
60
Local
360
Total Funds:

1,200
240
1,440

SSV0002
-

Title: Mobility Management
69
69
14
14
3
3
86
86

Recipient:
75
15
4
94

Senior Services of Southeastern VA
75
FTA 5310
15
State
4
Local
94
Total Funds:

288
58
14
360

TAW0001
-

Title: Paratransit Vehicles
64
16
80

Recipient:
64
16
80

The ARC of Greater Williamsburg
64
FTA 5310
State
16
Local
80
Total Funds:

192
48
240

VAR0001
-

Title: Paratransit Vehicles
120
30
150

Recipient:
120
30
150

VersAbility Resources, Inc.
120
FTA 5310
State
30
Local
150
Total Funds:

360
90
450

DRPT010
-

Title: Jamestown-Scotland Ferry Facility
-

Recipient:
-

Department of Rail and Public Transportation
FTA 5307(h)
State
Local
Total Funds:
-

396

Hampton Roads

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY2024 - FY2027

FY 2025

FY 2026

FY 2027

Total FY 2024-2027

FY 2025

FY 2026

FY 2027

Total FY 2024-2027

HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION
Department of Rail
and Public
Transportation
FTA 5307(h)
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA ADTAP
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals

-

City of Norfolk
FTA 5307

-

-

-

-

-

FTA 5307

FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals

-

-

-

-

-

FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues

Hampton Roads
Transit
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Federal Stimulus
Other Federal
State
Local
Revenues
Totals

13,948
23,798
107
121
37,974

Suffolk Transit
FTA 5307

-

868

1,025

694

933

FTA 5307

FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals

-

614
614
1,172
3,268

113
48
564
1,174
2,924

849
82
1,464
1,854
823
5,766

319
535
831
2,618

FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues

Previous Funding

FY 2024
-

Previous Funding

FY 2024

Previous Funding

FY 2025

FY 2024
36,057
3,384
1,931
120
9,733
5,000
34,684
25,664
116,573

Previous Funding

FY 2026

FY 2025
30,007
4,826
1,803
14,300
22,500
36,678
30,487
140,601

FY 2024

FY 2027

FY 2026
24,196
3,202
924
2,000
16,216
16,312
18,076
80,926

FY 2025

-

Total FY 2024-2027
-

Total FY 2024-2027

FY 2027
24,377
5,747
914
1,953
2,753
1,957
16,605
16,004
70,310

FY 2026

397

FTA 5307(h)
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA ADTAP
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Federal Stimulus
Other Federal
State
Local
Revenues

FY 2027

114,637
17,159
5,572
4,073
43,002
29,457
104,279
90,231
408,410

Total FY 2024-2027
3,520
1,168
735
1,512
3,567
4,000
14,502

Hampton Roads

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

HAMPTON ROADS TRANSPORTATION PLANNING ORGANIZATION
Williamsburg Area
Transit Authority
FTA 5307
FTA 5310

-

5,596
-

5,162
-

5,118
-

5,265
-

FTA 5307
FTA 5310

21,141
-

FTA 5311
FTA 5337
FTA 5339
FTA Adjustment
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals

-

530
432
5,798
5,548
2,065
5,994
2,100
1,643
29,706

557
480
5,809
5,328
1,229
5,708
1,872
1,725
27,870

573
148
2,400
800
1,617
3,774
1,921
1,777
18,128

590
180
413
2,773
1,965
1,830
13,016

FTA 5311
FTA 5337
FTA 5339
FTA Adjustment
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues

2,250
1,240
14,007
11,676
5,324
18,249
7,858
6,975
88,720

Previous Funding

FY 2024

FY 2025

FY 2026

Total FY 2024-2027

FY 2027

Human Service
Transportation
Providers
FTA 5307

-

-

-

-

-

FTA 5307

-

FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals

-

780
96
115
991

1,181
89
223
1,493

1,211
97
227
1,535

1,211
97
227
1,535

FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues

4,383
379
792
5,554

Hampton Roads
TPO
FTA 5307
FTA 5307(h)
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA Adjustment
Flexible STP
CMAQ
RSTP
Federal Stimulus
Other Federal
State
Local
Revenues
Totals

13,948
23,798
107
121
37,974

Previous Funding

Previous Funding

FY 2024

FY 2024
42,521
780
530
3,384
2,977
5,918
15,281
7,065
41,388
29,051
1,643
150,538

FY 2025

FY 2026

FY 2025
36,194
1,181
557
4,826
2,396
5,809
19,676
23,729
43,039
33,756
1,725
172,888

FY 2026
30,008
1,211
1,422
3,202
1,154
4,400
18,480
1,617
22,037
21,047
1,777
106,355

398

Total FY 2024-2027

FY 2027

FY 2027
30,575
1,211
909
5,747
1,094
1,953
2,753
2,370
20,010
19,027
1,830
87,479

Total FY 2024-2027
FTA 5307
FTA 5307(h)
FTA 5310
FTA 5311
FTA 5337
FTA 5339
FTA Adjustment
Flexible STP
CMAQ
RSTP
Federal Stimulus
Other Federal
State
Local
Revenues

139,298
4,383
3,418
17,159
7,621
18,080
56,190
34,781
126,474
102,881
6,975
517,260

Hampton Roads

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY 2027

FY2024 - FY2027

Total FY 2024-2027

HARRISONBURG-ROCKINGHAM METROPOLITAN PLANNING ORGANIZATION
HAR0001
2,802
1,477
253
2,225
6,757

Title: Operating Assistance
2,452
2,797
1,567
1,614
1,055
1,293
2,243
2,360
7,317
8,064

Recipient:
2,881
1,662
1,332
2,431
8,306

Harrisonburg Bus Service
2,968
FTA 5307
1,764
State
1,372
Local
2,504
Revenues
8,608
Total Funds:

11,098
6,607
5,052
9,538
32,295

HAR0004
1,120
2,720
160
4,000

Title: Replacement Rolling Stock
192
2,100
38
420
10
105
240
2,625

Recipient:
1,772
354
89
2,215

Harrisonburg Bus Service
192
FTA 5307
Flexible STP
38
State
10
Local
240
Total Funds:

4,256
850
214
5,320

HAR0005
176
35
9
220

Title: Expansion Rolling Stock
-

Recipient:
-

Harrisonburg Bus Service
FTA 5307
Flexible STP
State
Local
Total Funds:

-

STIP ID:
FTA 5307
Flexible STP
State
Local
Year Total:
Description:

HAR0008
-

Title: Passenger Shelters (Bus Shelters)
-

Recipient:
-

Harrisonburg Bus Service
FTA 5307
Flexible STP
State
Local
Total Funds:

-

STIP ID:
FTA 5307
Flexible STP
State
Local
Year Total:

HAR0010
-

Title: Spare Parts, ACM Items
-

Recipient:
-

Harrisonburg Bus Service
FTA 5307
Flexible STP
State
Local
Total Funds:

-

HAR0011
-

Title: Purchase Shop Equipment
44,206
8,841
2,211
55,258
-

Recipient:
-

Harrisonburg Bus Service
FTA 5307
Flexible STP
State
Local
Total Funds:

44,206
8,841
2,211
55,258

STIP ID:
FTA 5307
Flexible STP
State
Local
Year Total:
Description:

HAR0012
-

Title: Purchase ADP Hardware
-

Recipient:
-

Harrisonburg Bus Service
FTA 5307
Flexible STP
State
Local
Total Funds:

-

STIP ID:
FTA 5307
Flexible STP
State
Local
Year Total:
Description:

HAR0015
420
1,020
60
1,500

Title: ITS or Misc. Equip
160
32
8
200
-

Recipient:
-

Harrisonburg Bus Service
1,391
FTA 5307
Flexible STP
278
State
69
Local
1,738
Total Funds:

1,551
310
77
1,938

STIP ID:
FTA 5307
Flexible STP
State
Local
Year Total:

HAR0016
-

Title: Route Signage
-

Recipient:
-

Harrisonburg Bus Service
FTA 5307
Flexible STP
State
Local
Total Funds:

-

STIP ID:
FTA 5307
State
Local
Revenues
Year Total:
Description:
STIP ID:
FTA 5307
Flexible STP
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
Flexible STP
State
Local
Year Total:
Description:

Description:
STIP ID:
FTA 5307
Flexible STP
State
Local
Year Total:
Description:

Description:

399

Harrisonburg MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

HARRISONBURG-ROCKINGHAM METROPOLITAN PLANNING ORGANIZATION

FY 2027

FY2024 - FY2027

Total FY 2024-2027

STIP ID:
FTA 5307
Flexible STP
State
Local
Year Total:
Description:

HAR0017
-

Title: ADA Vehicle Equipment
-

Recipient:
-

Harrisonburg Bus Service
FTA 5307
Flexible STP
State
Local
Total Funds:

-

STIP ID:
Flexible STP
FTA5307
State
Local
Year Total:

HAR0018
-

Title: Purchase Radios
-

Recipient:
12
2
1
15

Harrisonburg Bus Service
Flexible STP
FTA5307
State
Local
Total Funds:

12
2
1
15

HAR0019
-

Title: Furniture and Fixtures
-

Recipient:
-

Harrisonburg Bus Service
FTA 5307
Flexible STP
State
Local
Total Funds:

-

HAR0020
-

Title: Support Vehicles
-

Recipient:
-

-

-

-

Harrisonburg Bus Service
FTA 5307
Flexible STP
State
Local
Total Funds:

-

HAR0021
-

Title: Transfer Center
-

Recipient:
-

Harrisonburg Bus Service
FTA 5307
Flexible STP
State
Local
Total Funds:

-

ARA0001
58
15
73

Title: Paratransit Vehicles
50
12
62
-

Recipient:
-

ARC of Harrisonburg/Rockingham
FTA 5310
State
Local
Total Funds:

50
12
62

FRI0001
56
14
70

Title: Paratransit Vehicles
-

Recipient:
-

Friendship Industries Inc.
FTA 5310
State
Local
Total Funds:

-

PLV0001
88
22
110

Title: Paratransit Vehicles
72
18
90
-

Recipient:
-

Pleasant View, Inc.
-

72
18
90

VPA0001
52
13
65

Title: Paratransit Vehicles
-

Recipient:
-

Valley Program for Aging Services
FTA 5310
State
Local
Total Funds:

Description:
STIP ID:
FTA 5307
Flexible STP
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
Flexible STP
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
Flexible STP
State
Local
Year Total:

-

Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:

400

FTA 5310
State
Local
Total Funds:

-

Harrisonburg MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY 2027

FY2024 - FY2027

Total FY 2024-2027

HARRISONBURG-ROCKINGHAM METROPOLITAN PLANNING ORGANIZATION

Harrisonburg Bus
Service
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals
Human Service
Transportation
Providers
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals

Harrisonburg MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals

Previous Funding
4,518
5,252
482
2,225
12,477

FY 2024
47,010
10,478
3,284
2,243
63,015

Previous Funding
254
64
318
Previous Funding
4,518
254
5,252
546
2,225
12,795

FY 2025
4,897
2,034
1,398
2,360
10,689

FY 2024
122
30
152

FY 2025
-

FY 2024
47,010
122
10,478
3,314
2,243
63,167

FY 2026
4,665
2,020
1,423
2,431
10,539

FY 2026
-

FY 2025
4,897
2,034
1,398
2,360
10,689

FY 2027
4,551
2,080
1,451
2,504
10,586

FY 2027
-

FY 2026
4,665
2,020
1,423
2,431
10,539

401

61,123
16,612
7,556
9,538
94,829

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues

FY 2027
4,551
2,080
1,451
2,504
10,586

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues

122
30
152

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues

61,123
122
16,612
7,586
9,538
94,981

Harrisonburg MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY 2027

FY2024 - FY2027

Total FY 2024-2027

NEW RIVER VALLEY METROPOLITAN PLANNING ORGANIZATION
BBT0001
0
2,173
2,976
6,905
93
12,147

Title: Operating Assistance
2,174
2,239
756
0
2,976
3,065
7,920
8,157
115
118
13,941
13,579

Recipient:
2,306
0
3,157
8,402
122
13,987

Blacksburg Transit
2,375
0
3,252
8,654
126
14,407

FTA 5307
Federal Stimulus
State
Local
Revenues
Total Funds:

9,094
756
12,450
33,133
481
55,914

BBT0002
0
1,427
2,139
3,347
9,257
993
17,163

Title: Replacement Rolling Stock
19
0
2,148
1,518
0
0
0
0
5,264
6,071
310
1,339
7,741
8,928

Recipient:
0
116
0
0
460
102
678

Blacksburg Transit
0
2,313
0
0
9,250
2,040
13,603

Flexible STP
FTA 5339
FTA 5307
State
State
Local
Total Funds:

19
6,095
21,045
3,791
30,950

STIP ID:

BBT0010

Recipient:

Blacksburg Transit

Flexible STP
Federal 5339
State
Local
Year Total:

4,800
0
600
600
6,000

Title: Eng Design /Construction MultiModal Transfer Facility
-

-

-

Flexible STP
Federal 5339
State
Local
Total Funds:

-

BBT0016
-

Title: Expansion Rolling Stock
-

Recipient:
-

Blacksburg Transit
-

FTA 5339
State
Local
Total Funds:

-

STIP ID:
FTA 5307
Federal Stimulus
State
Local
Revenues
Year Total:
Description:
STIP ID:
Flexible STP
FTA 5339
FTA 5307
State
State
Local
Year Total:
Description:

Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:

402

New River Valley

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

NEW RIVER VALLEY METROPOLITAN PLANNING ORGANIZATION

FY 2026

FY 2027

STIP ID:

BBT0017

FTA 5339
State
Local
Year Total:
Description:

-

-

Title: Passenger Shelters
9
36
8
53

Recipient:
10
40
9
59

Blacksburg Transit
6
24
6
36

STIP ID:

BBT0020

FTA 5339
State
Local
Year Total:
Description:

99
433
105
637

Title: ADP
Hardware
0
0
0
0

STIP ID:

BBT0021
160
163
619
241
1,183

Title: ADP Software

BBT0023
79
185
36
300

Flexible STP
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:

FY2024 - FY2027

Total FY 2024-2027

FTA 5339
State
Local
Total Funds:

25
100
23
148

Recipient:

Blacksburg Transit

68
270
60
398

72
287
63
422

62
246
55
363

FTA 5339
State
Local
Total Funds:

202
803
178
1,183

0
67
269
59
395

Recipient:
0
71
286
63
420

Blacksburg Transit
0
61
246
54
361

Flexible STP
FTA 5339
State
Local
Total Funds:

199
801
176
1,176

Title: Support Vehicles
0
90
0
360
0
80
530

Recipient:
9
35
8
52

Blacksburg Transit
0
0
0
0

FTA 5339
State
Local
Total Funds:

99
395
88
582

-

403

New River Valley

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

NEW RIVER VALLEY METROPOLITAN PLANNING ORGANIZATION
STIP ID:
FTA 5339
State
Local
Year Total:
Description:

BBT0028
11
20
2
33

Title: Radios
0
0
0
0

STIP ID:
FTA 5339
State
Local
Year Total:
Description:

BBT0029
11
28
2
41

STIP ID:
FTA 5339
Federal Stimulus
State
Local
Year Total:
Description:

BBT0037
-

FY 2027

FY2024 - FY2027

Total FY 2024-2027

Recipient:
5
20
5
30

Blacksburg Transit
5
20
5
30

FTA 5339
State
Local
Total Funds:

14
56
13
83

Title: Shop Equipment
0
51
0
204
0
45
0
300

Recipient:
51
204
45
300

Blacksburg Transit
55
221
49
325

FTA 5339
State
Local
Total Funds:

157
629
139
925

Title: Surveillance/Security Equipment
-

Recipient:
-

Blacksburg Transit
-

FTA 5339
Federal Stimulus
State
Local
Total Funds:

-

4
16
3
23

404

New River Valley

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

NEW RIVER VALLEY METROPOLITAN PLANNING ORGANIZATION
BBT0039
6
15
1
22

-

STIP ID:

BBT0040

Title: Construction Admin./Main Facility Recipient:

FTA 5339
State
Local
Year Total:
Description:
STIP ID:

7,816
8,590
775
17,181

STIP ID:
FTA 5339
State
Local
Year Total:

Title: Rehab/Renovation of Admin Bldg.Recipient:

-

-

FY 2027

FY2024 - FY2027

Total FY 2024-2027

Blacksburg Transit

-

FTA 5339
State
Local
Total Funds:

-

FTA 5339
State
Local
Total Funds:

-

FTA 5339
State
Local
Total Funds:

-

FTA 5339
State
State
Local
Total Funds:

319
1,275
282
1,876

FTA 5339
State
Local
Total Funds:

94
228
13
335

Description:

FTA 5339
State
Local
Year Total:
Description:

-

-

BBT0041

Title: A&E Admin./Maint. Facility

-

-

STIP ID:

BBT0042

FTA 5339
State
State
Local
Year Total:

586
1,719
490
295
3,090

-

Blacksburg Transit

-

-

Recipient:

Blacksburg Transit

-

-

Title: Other- Electric Bus On-Route
Charge
0
140
0
0
0
561
0
124
0
825

Recipient:

Blacksburg Transit

179
0
714
158
1,051

0
0
0
0
0

Description:
STIP ID:

BBT0043

Title: Infrastructure - Bus Pull-Offs

Recipient:

Blacksburg Transit

FTA 5339
State
Local
Year Total:

41
109
28
178

29
69
4
102

22
54
3
79

22
54
3
79

21
51
3
75

Description:

405

New River Valley

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

NEW RIVER VALLEY METROPOLITAN PLANNING ORGANIZATION
Recipient:

-

Title: Other-Building Facility Items and
Fixtures
77
187
11
275
-

-

-

STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:

BBT0045
-

5
12
1
18

Title: Design / A&E - Bus Pull-Offs
4
9
1
14

Recipient:
4
10
1
15

Blacksburg Transit
4
FTA 5339
10
State
1
Local
15
Total Funds:

CRAD001

Title: Operating Assistance

Recipient:

City of Radford

FTA 5307
FTA 5311
Federal Stimulus
State
Local

1,403
271
502
355

503
521
1,492

-

-

-

FTA 5307
FTA 5311
Federal Stimulus
State
Local

503
521
1,492

Revenues

-

10

-

-

-

Revenues

10

Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
Flexible STP
State
Local
Year Total:
Description:
STIP ID:
Flexible STP
State
Local
Year Total:
Description:

2,531

2,526

-

-

-

Total Funds:

2,526

CRAD004
-

Title: Replacement Rolling Stock
-

Recipient:
-

City of Radford
-

FTA 5339
State
Local
Total Funds:

-

CRAD005
-

Title: Hand Held Radios/IT
-

Recipient:
-

City of Radford
-

FTA 5339
State
Local
Total Funds:

-

CRAD006
-

Title: Engineering Design Transit Facility
-

Recipient:
-

City of Radford
-

Flexible STP
State
Local
Total Funds:

-

CRAD007
-

Title: Purchase Route Signage
-

Recipient:
-

City of Radford
-

Flexible STP
State
Local
Total Funds:

-

STIP ID:
FTA 5339
State
Local
Year Total:

BBT0044

Blacksburg Transit
FTA 5339
State
Local
Total Funds:

77
187
11
275

Description:

406

17
41
4
62

New River Valley

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

NEW RIVER VALLEY METROPOLITAN PLANNING ORGANIZATION

FY2024 - FY2027

Total FY 2024-2027

FY 2027

STIP ID:
FTA 5339
Federal Stimulus
State
Local
Year Total:
Description:
STIP ID:
Flexible STP
State
Local
Year Total:
Description:
STIP ID:
Flexible STP
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:

CRAD008
-

Title: Purchase Shop Equipment
6
13
1
20
-

Recipient:
-

City of Radford
-

FTA 5339
Federal Stimulus
State
Local
Total Funds:

6
13
1
20

CRAD010
-

Title: Purchase Expansion Vehicles
-

Recipient:
-

City of Radford
-

Flexible STP
State
Local
Total Funds:

-

CRAD012
-

Title: Purchase Spare Parts
40
8
2
50
-

Recipient:
-

City of Radford
-

Flexible STP
State
Local
Total Funds:

40
8
2
50

NRVC001
822
177
999

Title: Paratransit Vehicles
184
227
46
57

Recipient:
198
49

230

284

247

New River Valley Community Services
257
FTA 5310
64
State
Local
321
Total Funds:

866
216
1,082

STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:

NRVC002
-

Title: Technology
11
3
14

-

Recipient:
-

New River Valley Community Services
FTA 5310
State
Local
Total Funds:

11
3
14

NRVC003
-

Title: Operating
81
65
16
162

-

Recipient:
-

New River Valley Community Services
FTA 5310
State
Local
Total Funds:

81
65
16
162

Total FY 2024-2027

Blacksburg Transit

Previous Funding

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Federal Stimulus
Flexible STP
RSTP
Other Federal
State

2,139
10,239
2,173
4,960
28,388

2,174
2,259
756
19
8,508

2,239
1,972
10,912

2,306
539
5,267

2,375
2,528
13,323

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Federal Stimulus
Flexible STP
RSTP
Other Federal
State

9,094
7,298
756
19
38,010

Local
Revenues

9,983
93
57,975

8,246
115
22,077

9,879
118
25,120

8,859
122
17,093

10,867
126
29,219

Local
Revenues

37,851
481
93,509

FY 2024

FY 2025

FY 2026

407

FY 2027

New River Valley

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

NEW RIVER VALLEY METROPOLITAN PLANNING ORGANIZATION

City of Radford
FTA 5307

Previous Funding
1,403

503

-

-

-

FTA 5307

Total FY 2024-2027
503

FTA 5310

-

-

-

-

-

FTA 5310

-

FTA 5311

-

-

-

-

-

FTA 5311

-

FTA 5337
FTA 5339
Federal Stimulus
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals

271
502
355
2,531

6
40
542
1,495
10
2,596

-

-

-

FTA 5337
FTA 5339
Federal Stimulus
Flexible STP
RSTP
Other Federal
State
Local
Revenues

6
40
542
1,495
10
2,596

New River Valley
Community
Services
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals

FY 2024

Previous Funding

FY 2025

FY 2024

FY 2026

FY 2025

FY 2027

FY 2026

Total FY 2024-2027

FY 2027

822
-

276
-

227
-

198
-

257
-

FTA 5307
FTA 5310
FTA 5311

958
-

177
999

111
19
406

57
284

49
247

64
321

FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues

281
19
1,258

408

New River Valley

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY 2027

FY2024 - FY2027

Total FY 2024-2027

NEW RIVER VALLEY METROPOLITAN PLANNING ORGANIZATION
New River Valley
MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Federal Stimulus
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals

Previous Funding
3,542
822
10,239
2,444
4,960
28,890
10,515
93
61,505

FY 2024
2,677
276
2,265
756
59
9,161
9,760
125
25,079

FY 2025
2,239
227
1,972
10,969
9,879
118
25,404

FY 2026
2,306
198
539
5,316
8,859
122
17,340

409

FY 2027
2,375
257
2,528
13,387
10,867
126
29,540

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Federal Stimulus
Flexible STP
RSTP
Other Federal
State
Local
Revenues

9,597
958
7,304
756
59
38,833
39,365
491
97,363

New River Valley

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

METROPOLITAN WASHINGTON COUNCIL OF GOVERNMENTS
STIP ID:
ARL0009 (T21240)
Title: Commuter Assistance Program Recipient:

CMAQ
RSTP
State
Year Total:
Description:

4,317
1,080
5,397

339
363
176
878

-

STIP ID:

ARL0010 (T22443)

Title: Crystal City Metro Station East
Entrance

CMAQ
Other Federal
Other Federal
State
RSTP
Local
Year Total:
Description:

15,364
44,178
59,542

16,668
4,754
4,754
11,413
37,589

STIP ID:

ALX0005 (T21453)

CMAQ
State
Year Total:
Description:

-

Title: Transit Store Funding Alexandria

STIP ID:

ALX0009 (115668)

CMAQ
FTA 5309
State
Local
Year Total:
Description:

1,200
282
300
1,782

480
120
600

-

-

-

Recipient:

-

Arlington County

-

Arlington County

-

Title: Fairfax Countywide Transit StoresRecipient:

Fairfax County

520
130
650

-

CMAQ
Other Federal
Other Federal
RSTP
State
Local
Local
Year Total:
Description:

29,031
20,000
40,968
10,690
641
250,186
351,516

-

Title: US 1 Bus Rapid Transit

Recipient:

STIP ID:

PRTC0003 (PRTC0003)

Recipient:

PRTC

FTA 5309
FTA5337
State
Local
Year Total:
Description:

9,144
1,710
10,854

Title: Rehabilitate / Rebuild
OmniRide
Buses

-

-

FTA 5307
FTA 5337
FTA 5339
State
Local
Year Total:
Description:

3,163
791
3,954

STIP ID:

PRTC0004 (PRTC0004)

-

-

-

Title: PRTC - Preventive Maintenance Recipient:

3,163
791
3,954

3,163
791
3,954

3,163
791
3,954

410

CMAQ
State
Total Funds:

480
120
600

City of Alexandria
-

FFX0003 (T21448)

-

16,668
4,754
4,754
11,413
37,589

-

520
130
650

-

CMAQ
Other Federal
Other Federal
State
RSTP
Local
Total Funds:

City of Alexandria

STIP ID:

FFX0004 (115549)

339
363
176
878

Recipient:

-

CMAQ
State
Year Total:
Description:

STIP ID:

CMAQ
RSTP
State
Total Funds:

-

-

-

Total FY 2024-2027

FY 2027

-

Title: Crystal City Potomac Yard BRT Recipient:
Expansion

800
200
1,000

FY2024 - FY2027

Fairfax County

193,283
193,283

PRTC

-

CMAQ
FTA 5309
State
Local
Total Funds:

800
200
1,000

CMAQ
State
Total Funds:

520
130
650

CMAQ
Other Federal
Other Federal
RSTP
State
Local
Local
Total Funds:

193,283
193,283

FTA 5309
FTA5337
State
Local
Total Funds:

-

FTA 5307
FTA 5337
FTA 5339
State
Local
Total Funds:

9,489
2,373
11,862

NOVA MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

METROPOLITAN WASHINGTON COUNCIL OF GOVERNMENTS
STIP ID:
Title: PRTC - Bus
PRTC005 (T158)
Acquisition/Replacement Program

FTA 5307
FTA 5337
FTA 5339
State
Local
Year Total:
Description:

680
170
850

FTA 5307
State
Local
Year Total:
Description:

49
12
61

CMAQ
State
Year Total:
Description:

280
70
350

280
70
350

STIP ID:

PRTC008 (T21459)

STIP ID:

STIP ID:

CMAQ
State
Local
Year Total:

PRTC0006 (PRTC0006)

PRTC007 (T21457)

1,200
300
1,500

-

-

FY 2026

Recipient:

PRTC

-

-

Title: PRTC Security Enhancements

Recipient:

Title: PRTC Commuter Assistance

Recipient:

Title: Bus Replacement (OmniRide
Express Commuter Buses)

Recipient:

Title: WMATA Replacement Buses

Recipient:

-

1,200
300
1,500

-

280
70
350

-

FY 2027

-

280
70
350

-

PRTC

-

PRTC

-

PRTC

-

FY2024 - FY2027

Total FY 2024-2027

FTA 5307
FTA 5337
FTA 5339
State
Local
Total Funds:

-

FTA 5307
State
Local
Total Funds:

-

CMAQ
State
Total Funds:

840
210
1,050

CMAQ
State
Local
Total Funds:

1,200
300
1,500

CMAQ
FTA5337
State
Local
Total Funds:

2,960
740
3,700

FTA 5307
FTA 5337
State
Local
Total Funds:

7,218
1,025
779
9,022

RSTP
State
Local
Total Funds:

-

FTA 5307
FTA 5337
State
Local
Total Funds:

252
51
12
315

FTA 5307
State
Local
Total Funds:

1,560
390
1,950

Description:

STIP ID:

WMATA 01 (T21031, T21033)

-

2,960
740
3,700

STIP ID:

VRE0001 (VRE0001)

Title: Rolling Stock Modifications and Recipient:
Overhauls

NVTC - VRE

FTA 5307
FTA 5337
State
Local
Year Total:

3,035
607
152
3,794

-

Description:

8,290
2,769
2,212
553
13,824
DC/State is included in State

STIP ID:

VRE0002 (VRE0002)

Title: Fare Collection System/Comm. Recipient:
Improvements

NVTC - VRE

RSTP
State
Local
Year Total:
Description:

-

-

-

STIP ID:

VRE0003 (VRE0003)

FTA 5307
FTA 5337
State
Local
Year Total:
Description:

1,115
223
556
1,894

Title: Security Enhancements
Systemwide

STIP ID:

VRE0008 (VRE0008)

Title: Grant and Project ManagementRecipient:

NVTC - VRE

FTA 5307
State
Local
Year Total:

1,560

520
130
650

-

0

390
1,950

84
17
4
105

-

1,520
152
228
1,900

-

WMATA

CMAQ
FTA5337
State
Local
Year Total:
Description:

2,663
266
399
3,328

-

-

84
17
4
105

520
130
650

-

-

Recipient:

NVTC - VRE

84
17
4
105

-

520
130
650

Description:

411

NOVA MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

METROPOLITAN WASHINGTON COUNCIL OF GOVERNMENTS
Title: VRE Woodbridge Station
STIP ID:
VRE0009 (T18094)
Improvements

CMAQ
State
Local
Year Total:

1,616
404
2,020
Was PRTC009 (T18094) in last STIP.
DC/State is included in State

-

FTA 5307
FTA 5337
CMAQ
State
Local
Year Total:
Description:

22,249
26,157
17,872
18,236
84,514

6,200
3,400
441
10,041

FTA 5309
FTA 5337
State
Local
Year Total:
Description:

-

FTA 5307
FTA 5337
RSTP
State
Local
Year Total:

11,830
10,503
2,939
735
26,007
DC/State is included in State

Description:

STIP ID:

STIP ID:

STIP ID:

Description:

STIP ID:

CMAQ
FTA5337
State
Local
Year Total:
Description:

STIP ID:

VRE0011 (VRE0011)

VRE0012 (VRE0012)

VRE0013 (111654)

VRE0014 (113526)

295
74
369

New

CMAQ
FTA5337
State
Local
Year Total:
Description:

DC/State is included in State

STIP ID:

New

CMAQ
FTA5309
State
Local
Year Total:
Description:

DC/State is included in State

STIP ID:

New

CMAQ
FTA5307
State
Local
Year Total:
Description:

7,639
1,528
382
9,549
DC/State is included in State

723
181
904

Title: VRE Stations and Facilities
6,200
3,400
400
10,000

FY 2026

Recipient:

NVTC - VRE

-

-

Recipient:
-

Title: VRE Track Lease Improvements Recipient:

-

-

-

Title: Rolling Stock Acquisition

1,398
3,502
980
245
6,125

1,397
2,728
825
206
5,156

Title: VRE Manassas Line Capacity
Expansion

-

-

Title: VRE Franconia-Springfield
Station Improvements

9,881
494
1,976
12,351

-

Title: VRE Rolling Stock Acquisition NVCC

-

108,761
27,190
135,951

Title: VRE Rolling Stock Acquisition Expansion Coaches

10,129
2,206
326
12,661

-

412

FY 2027

Recipient:
1,398
1,957
671
168
4,194

Recipient:
-

Recipient:
-

Recipient:
-

Recipient:
-

NVTC - VRE

-

NVTC - VRE

-

NVTC - VRE

-

NVTC - VRE

-

NVTC - VRE

-

NVTC - VRE

-

NVTC - VRE

-

-

FY2024 - FY2027

Total FY 2024-2027

CMAQ
State
Local
Total Funds:

723
181
904

FTA 5307
FTA 5337
CMAQ
State
Local
Total Funds:

12,400
6,800
841
20,041

FTA 5309
FTA 5337
State
Local
Total Funds:

-

FTA 5307
FTA 5337
RSTP
State
Local
Total Funds:

4,193
8,187

CMAQ
FTA5337
State
Local
Total Funds:

-

CMAQ
FTA5337
State
Local
Total Funds:

9,881
494
1,976
12,351

CMAQ
FTA5309
State
Local
Total Funds:

108,761
27,190
135,951

CMAQ
FTA5307
State
Local
Total Funds:

10,129
2,206
326
12,661

2,476
619
15,475

NOVA MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

METROPOLITAN WASHINGTON COUNCIL OF GOVERNMENTS
Title: VRE Backlick Road Station
STIP ID:
New
Improvements

CMAQ
FTA5307
State
Local
Year Total:
Description:

2,000
500
2,500
DC/State is included in State

STIP ID:

New

CMAQ
FTA5307
State
Local
Year Total:

Title: VRE Alexandria Station
Improvements

Title: L'Enfant Station and Fourth
Track

VRE0015
3,284
11,209
27,249
31,725
73,467

STIP ID:

VPRA002

State
Local
Year Total:
Description:

81,614
81,614

-

-

NVTC - VRE

-

NVTC - VRE

-

VRE

-

-

Title: Franconia to Occoquan 3rd
Track
Project

Recipient:

VPRA

-

-

Title: Long Bridge VA - DC

Recipient:

-

-

Total FY 2024-2027

CMAQ
FTA5307
State
Local
Total Funds:

-

CMAQ
FTA5307
State
Local
Total Funds:

-

FTA 5307
FTA5337
State
Local
Total Funds:

2,864
6,034
1,780
445
11,123

State
Local
Total Funds:

-

CMAQ
Other Federal
State
Local
Total Funds:

20,000
1,375,673
104,411
1,500,084

CMAQ
Other Federal
Other Federal
State
Local
Total Funds:

56,000
40,817
90,065
186,882

FTA 5307
FTA5337
State
Local
Total Funds:

-

DC/State is included in State

DC/State is included in State
State/Local is included in State

VPRA003

-

24,824
12,605
37,429

Description:

FRA Earmark is included in Other Federal
DC/State is included in State

VPRA004 (T23436)

45,931
7,398
53,329

4,182
9,385
13,567

Description:

FRA Earmark is included in Other Federal
DC/State is included in State

-

-

20,000
253,091
7,505
280,596

360,901
7,501
368,402

Title: Alexandria 4th Track

CMAQ
Other Federal
Other Federal
State
Local
Year Total:

STIP ID:

-

FY 2027

Recipient:

2,864
6,034
1,780
445
11,123

CMAQ
Other Federal
State
Local
Year Total:

FTA 5307
FTA5337
State
Local
Year Total:
Description:

Recipient:

Recipient:

-

STIP ID:

STIP ID:

-

320
771
16
1,107

FTA 5307
FTA5337
State
Local
Year Total:
Description:
Description:

STIP ID:

-

FY 2026

FY2024 - FY2027

21,481
32,221
53,702

Title:

-

Recipient:

8,926
19,336
29,004
57,266

43,268
14,000
57,268

Recipient:

-

-

413

VPRA

715,750
82,007

797,757
VPRA

3,806
14,840
18,646

VPRA

-

-

NOVA MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

METROPOLITAN WASHINGTON COUNCIL OF GOVERNMENTS
Previous Funding

City of Alexandria

FY 2024

FY 2025

FY 2026

Total FY 2024-2027

FY 2027

FTA 5307
FTA 5309
FTA 5310

282
-

-

-

-

-

FTA 5307
FTA 5309
FTA 5310

-

FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals

1,200
300
1,782

1,280
320
1,600

-

-

-

FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues

1,280
320
1,600

Previous Funding

Arlington County

FY 2015

FY 2016

FY 2017

Total FY 2015-2018

FY 2018

FTA 5307
FTA 5310

-

-

-

-

-

FTA 5307
FTA 5310

-

FTA 5311
FTA 5339
Flexible STP
Other Federal
State
Local
Revenues
CMAQ
RSTP
Totals

16,444
4,317
44,178
64,939

9,508
11,589
17,007
363
38,467

-

-

-

FTA 5311
FTA 5339
Flexible STP
Other Federal
State
Local
Revenues
CMAQ
RSTP

9,508
11,589
17,007
363
38,467

Fairfax County
FTA 5307
FTA 5310
FTA 5311

-

FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals
NVTC VRE
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals

Previous Funding

29,551
10,690
60,968
771
250,186
-

352,166

48,328
39,429
3,911
53,772
52,593
-

198,033

FY 2024

FY 2026

FY 2027

Total FY 2024-2027
-

-

-

-

FTA 5307
FTA 5310
FTA 5311

520
130
-

-

-

193,283
-

FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues

650
Previous Funding

FY 2025

-

-

-

193,283

8,201
-

2,002
-

-

Total FY 2024-2027
FTA 5307
21,269
FTA 5310
FTA 5311
-

6,537
9,484
3,719
-

4,248
723
31,765
968
-

4,620
954
701
-

-

FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues

45,905

FY 2026

8,277

414

FY 2027

193,933

FY 2024
11,066
-

30,806

FY 2025

520
130
193,283
-

-

15,405
723
42,203
5,388
-

84,988

NOVA MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

METROPOLITAN WASHINGTON COUNCIL OF GOVERNMENTS
PRTC
Previous Funding
FY 2024

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals

3,212
680
1,480
2,092
961
8,425

VPRA
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals

4,182
115,823
12,605
-

WMATA
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals

-

Grand Totals-NoVa
MPO
FTA 5307
FTA 5309
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals

Previous Funding

132,610

-

757,955

FY 2025

Total FY 2024-2027

FY 2027

3,163
280
70
791
4,304

-

Total FY 2024-2027
FTA 5307
9,489
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
2,040
RSTP
Other Federal
State
510
Local
2,373
Revenues
Totals
14,412

FY 2024
21,481
78,152
7,398
-

FY 2025
8,926
39,336
282,095
7,505
-

FY 2026
43,268
374,901
7,501
-

FY 2027
3,806
730,590
82,007
-

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
56,000
RSTP
Other Federal
60,817
State
1,465,738
Local
104,411
Revenues
1,686,966

FY 2027

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
2,960
RSTP
Other Federal
State
740
Local
Revenues
3,700

337,862

FY 2024
2,960
740
-

188,058

-

FY 2025

11,364
4,248
9,929
39,336
313,930
9,264
-

FY 2026

5,165
4,620
43,548
375,925
8,993
-

388,071

438,251

415

816,403

FY 2026
-

FY 2024

425,670

FY 2025
-

14,229
6,537
23,247
363
30,989
100,785
11,908
-

FY 2026

FY 2027

3,163
280
70
791
4,304

3,700
Previous Funding

51,540
282
39,429
680
40,459
54,868
65,150
189,202
316,345
-

FY 2026

3,163
1,480
370
791
5,804

107,031
Previous Funding

FY 2025

FY2024 - FY2027

FY 2027
3,806
730,590
275,290
-

1,009,686

Total FY 2024-2027
FTA 5307
FTA 5309
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues

30,758
15,405
80,530
363
70,325
1,521,230
305,455
-

2,024,066

NOVA MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

RICHMOND REGIONAL TRANSPORTATION PLANNING ORGANIZATION

STIP ID:
CMAQ
State
Year Total:

T20113

FY 2027

FY2024 - FY2027

Total FY 2024-2027

Title: GRTC Replacement of Rolling Stock CNG Buses (FY22)
558
140
698
-

Recipient:
-

Greater Richmond Transit Company
CMAQ
State
Total Funds:

558
140
698

Title: Preventive Maintenance
6,650
6,650
1,662
1,662
8,312
8,312

Recipient:
6,650
1,662
8,312

Greater Richmond Transit Company
6,650
FTA 5307
1,662
Local
8,312
Total Funds:

26,600
6,648
33,248

Title: Replace Rolling Stock
1,344
3,024
3,264
7,344
192
432
4,800
10,800

Recipient:
4,032
9,792
576
14,400

Greater Richmond
672
1,632
96
2,400

Transit Company
FTA 5307
State
Local
Total Funds:

9,072
22,032
1,296
32,400

Title: Transit Amenities
28
28
68
68
4
4
100
100

Recipient:
28
68
4
100

Greater Richmond
28
68
4
100

Transit Company
FTA 5307
State
Local
Total Funds:

112
272
16
400

Title: Paratransit Vehicles
998
741
1799
2,424
106
143
2,646
3,565

Recipient:
483
1,173
69
1,725

Greater Richmond
998
2,424
143
3,565

Transit Company
FTA 5307
State
Local
Total Funds:

3,220
7,820
461
11,501

Title: Surveillance/Security Equipment
168
408
24
600
-

Recipient:

Greater Richmond Transit Company
FTA 5307
State
Local
Total Funds:

Title: Shop
Equipment
155
377
22
554

Recipient:

Greater Richmond Transit Company

154
374
22
550

143
347
20
510

Title: Computer Hardware
836
35
2,031
85
119
5
2,986
125

Recipient:
39
95
6
140

Greater Richmond
43
105
6
154

Transit Company
FTA 5307
State
Local
Total Funds:

953
2,316
136
3,405

GRTC034

Title: Computer Software
359
323
871
784
51
46
1,281
1,153

Recipient:
323
784
46
1,153

Greater Richmond
323
784
46
1,153

Transit Company
FTA 5307
State
Local
Total Funds:

1,328
3,223
189
4,740

GRTC035

-

Title: Support Vehicles
206
53
500
129
29
8
735
190

Recipient:
22
53
3
78

Greater Richmond
-

Transit Company
FTA 5307
State
Local
Total Funds:

281
682
40
1,003

GRTC056

Title: Renovation of Admin Maintenance Facility

Recipient:

Greater Richmond Transit Company

-

77
187
11
275

28
68
4
100

28
68
4
100

-

Description:
STIP ID:
FTA 5307
Local
Year Total:

GRTC003
-

Description:
STIP ID:
FTA 5307
State
Local
Year Total:

GRTC004

-

Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:

GRTC005

GRTC008

-

Description:
GRTC031

STIP ID:
FTA 5307
State
Local
Year Total:

-

Description:
STIP ID:

GRTC032

FTA 5307
State
Local
Year Total:

-

-

155
377
22
554

FTA 5307
State
Local
Total Funds:

168
408
24
600

607
1,475
86
2,168

Description:
STIP ID:
FTA 5307
State
Local
Year Total:

GRTC033

-

Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:

28
68
4
100

FTA 5307
State
Local
Total Funds:

161
391
23
575

Description:

416

Richmond TPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY 2027

FY2024 - FY2027

Total FY 2024-2027

RICHMOND REGIONAL TRANSPORTATION PLANNING ORGANIZATION
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Revenues
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Revenues
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:

GRTC065

Title: Articulated Vehicles

Recipient:

Greater Richmond Transit Company

-

672
1,632
96
2,400

-

-

Title: Mobility Management
60
48
12
120
-

Recipient:
-

Capital Area Agency on Aging, Senior Connections
FTA 5310
60
State
48
Local
12
Revenues
Total Funds:
120

Title: Operating Assistance
172
34
9
215
-

Recipient:
-

Capital Area Agency on Aging, Senior Connections
FTA 5310
172
State
34
Local
9
Revenues
Total Funds:
215

Title: Paratransit Vehicles
120
30
150
-

Recipient:
-

Chesterfield Mental Health Support Services
FTA 5310
120
State
Local
30
Total Funds:
150

Title: Operating Assistance
30
24
6
60
-

Recipient:
-

Chesterfield County Citizens Information & Services
FTA 5310
30
State
24
Local
6
Total Funds:
60

Title: Capital Cost of Contracting
400
80
20
500
-

Recipient:
-

Chesterfield Mental Health Support Services
FTA 5310
400
State
80
Local
20
Total Funds:
500

Title: Operating Assistance
35
28
7
70
-

Recipient:
-

Hanover County DASH
FTA 5310
State
Local
Total Funds:

35
28
7
70

Title: Capital Cost of Contracting
600
120
30
750
-

Recipient:
-

Hanover County DASH
FTA 5310
State
Local
Total Funds:

600
120
30
750

CAA0002

CAA0001

CHS0001

CHS0003

CHS0004

HCS0001

HCS0002

-

-

417

FTA 5307
State
Local
Total Funds:

672
1,632
96
2,400

Richmond TPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

RICHMOND REGIONAL TRANSPORTATION PLANNING ORGANIZATION

Greater Richmond
Transit Company

Previous Funding

FY 2024

FY 2025

FY 2026

Total FY 2024-2027

FY 2027

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339

-

11,236
-

11,294
-

11,759
-

8,885
-

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339

43,174
-

Flexible STP

-

-

-

-

-

Flexible STP

-

CMAQ
RSTP
Other Federal
State
Local

-

558
11,277
2,316

11,279
2,326

12,407
2,392

5,428
1,981

CMAQ
RSTP
Other Federal
State
Local

558
40,391
9,015

Revenues

-

-

-

-

-

Revenues

-

Totals

-

25,387

24,899

26,558

16,294

RideFinders
FTA 5307
FTA 5310

-

FTA 5311

-

-

-

-

FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP

-

-

-

Other Federal

-

-

State
Local
Revenues
Totals

-

-

Human Service
Transportation
Providers

Previous Funding

-

Previous Funding

FY 2024

FTA 5307
FTA 5310

Total FY 2024-2027
-

-

FTA 5311

-

-

-

FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP

-

-

-

-

Other Federal

-

-

-

-

State
Local
Revenues

-

-

FY 2024

FY 2025

-

FY 2025

FY 2026

93,138

-

FY 2026

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339

-

1,417
-

-

-

Flexible STP

-

-

-

CMAQ
RSTP
Other Federal
State
Local

-

334
114

-

Revenues

-

-

Totals

-

1,865

FY 2027

Total FY 2024-2027

FY 2027
-

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339

1,417
-

-

-

Flexible STP

-

-

-

CMAQ
RSTP
Other Federal
State
Local

334
114

-

-

-

Revenues

-

-

-

-

418

1,865

Richmond TPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

RICHMOND REGIONAL TRANSPORTATION PLANNING ORGANIZATION
City of Richmond

Previous Funding

FY 2024

FY 2025

FY 2026

Total FY 2024-2027

FY 2027

FTA 5307
FTA 5309
FTA 5310
FTA 5311
FTA 5314
FTA 5337
FTA 5339
FTA ADTAP

-

-

-

-

-

FTA 5307
FTA 5309
FTA 5310
FTA 5311
FTA 5314
FTA 5337
FTA 5339
FTA ADTAP

-

FTA DPF
FTA TIGER
FBD
Flexible STP
CMAQ
RSTP
FHWA TAP

-

-

-

-

-

FTA DPF
FTA TIGER
FBD
Flexible STP
CMAQ
RSTP
FHWA TAP

-

TIFIA
Other Federal
State
Local
Revenues
Totals

-

-

-

-

-

TIFIA
Other Federal
State
Local
Revenues

-

Richmond MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State

-

11,236
1,417
558
11,611

11,294
11,279

11,759
12,407

8,885
5,428

Local
Revenues
Totals

-

2,430
27,252

2,326
24,899

2,392
26,558

1,981
16,294

Previous Funding

FY 2024

FY 2025

FY 2026

419

FY 2027

Total FY 2024-2027
FTA 5307
43,174
FTA 5310
1,417
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
558
RSTP
Other Federal
State
40,725
Local
Revenues

9,129
95,003

Richmond TPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Previous Funding

FY 2024

FY 2025

FY 2026

FY 2027

FY2024 - FY2027

Total FY 2024-2027

ROANOKE VALLEY AREA TRANSPORTATION PLANNING ORGANIZATION
STIP ID:
GRT0001
Title: Operating Assistance

Recipient:

Greater Roanoke Transit Company

FTA 5307
FTA 5311
State
Local
Revenues
Year Total:

2,696
354
3,100
1,700
2,314
10,164

2,696
354
3,100
1,700
2,314
10,164

-

5,742
354
3,100
1,700
2,314
13,210

2,696
354
3,100
1,700
2,314
10,164

FTA 5307
FTA 5311
State
Local
Revenues
Total Funds:

13,830
1,416
12,400
6,800
9,256
43,702

Description:

STIP ID:

GRT0002

Title: Preventative Maintenance

Recipient:

Greater Roanoke Transit Company

FTA 5307
State
Local
Year Total:
Description:

-

719
180
899

719
180
899

719
180
899

STIP ID:

GRT0003

Title: Replacement Bus

Recipient:

Greater Roanoke Transit Company

FTA 5339
FTA 5307
RSTP
State
Local
Year Total:
Description:

-

4,768
1,192
5,960

1,036
2,516
148
3,700

1,036
2,516
148
3,700

719
180
899

97
248
14
359

FTA 5307
State
Local
Total Funds:

FTA 5339
FTA 5307
RSTP
State
Local
Total Funds:

STIP ID:

GRT0004

Title: Support Vehicles

Recipient:

Greater Roanoke Transit Company

FTA 5339
Flexible STP
State
Local
Year Total:

-

48
6
6
60

48
6
6
60

48
6
6
60

48
6
6
60

FTA 5339
Flexible STP
State
Local
Total Funds:

2,876
720
3,596

97
2,072
4,768
6,472
310
13,719

192
24
24
240

Description:

STIP ID:

GRT0005

Title: Bus Stop Enhancements

Recipient:

Greater Roanoke Transit Company

FTA 5339
State
Local
Year Total:

-

40
103
6
149

40
103
6
149

40
103
6
149

STIP ID:

GRT0006

Title: Construction Maintenance
Service Lot

Recipient:

Greater Roanoke Transit Company

FTA 5339
State
Local
Year Total:
Description:

-

-

-

-

STIP ID:

GRT0007

Title: ADP Hardware

FTA 5339
State
Local
Year Total:
Description:

-

4
1
5

STIP ID:

GRT0008

Title: Shop Equipment

Recipient:

Greater Roanoke Transit Company

FTA 5339
State
Local
Year Total:

-

5
14
1
20

5
14
1
20

5
14
1
20

40
103
6
149

FTA 5339
State
Local
Total Funds:

160
412
24
596

Description:

680
280
40
1,000

4
1
5

5
14
1
20

FTA 5339
State
Local
Total Funds:

Recipient:

Greater Roanoke Transit Company

4
1
5

4
1
5

FTA 5339
State
Local
Total Funds:

FTA 5339
State
Local
Total Funds:

680
280
40
1,000

16
4
20

20
56
4
80

Description:

STIP ID:

GRT0009

Title: Electric Charging Infrastructure

Recipient:

Greater Roanoke Transit Company

FTA 5307
State
Local
Year Total:
Description:

-

-

140
340
20
500

-

-

420

FTA 5307
State
Local
Total Funds:

140
340
20
500

Roanoke Valley

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Previous Funding

FY 2024

FY 2025

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

ROANOKE VALLEY AREA TRANSPORTATION PLANNING ORGANIZATION
STIP ID:
RAD0001
Title: Paratransit Vehicles

Recipient:

RADAR UHSTS, Inc. Roanoke County

FTA 5310
State
Local
Revenues
Year Total:

128
32
160

128
32
160

Description:

-

128
32
160

128
32
160

STIP ID:

ROA0001

Title: Capital Assistance

Recipient:

County of Roanoke

FTA 5310
State
Local
Year Total:

-

240
48
12
300

240
48
12
300

240
48
12
300

240
48
12
300

FTA 5310
State
Local
Revenues
Total Funds:

512
128
640

FTA 5310
State
Local
Total Funds:

960
192
48
1,200

Description:

Greater
Roanoke Transit
Company

Previous Funding

FY 2024

FY 2025

FY 2026

Total FY 2024-2027

FY 2027

FTA 5307
FTA 5310

-

6,461
-

3,415
-

4,591
-

4,451
-

FTA 5307
FTA 5310

18,918
-

FTA 5311

-

354

354

354

354

FTA 5311

1,416

FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal

-

97
4,768
-

874
-

97
-

97
-

FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal

1,165
4,768
-

State

-

4,415

3,751

6,079

5,739

State

19,984

Local
Revenues
Totals

-

1,894
2,314
20,303

1,948
2,314
12,656

2,062
2,314
15,497

2,042
2,314
14,997

Local
Revenues

7,946
9,256
63,453

Other Human
Service
Transportation
Providers
FTA 5307

-

-

-

-

-

FTA 5307

-

FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP

-

240
-

240
-

240
-

240
-

FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP

960
-

Other Federal
State
Local
Revenues
Totals

-

48
12
300

48
12
300

48
12
300

48
12
300

Other Federal
State
Local
Revenues

192
48
1,200

Previous Funding

FY 2024

FY 2025

FY 2026

421

FY 2027

Total FY 2024-2027

Roanoke Valley

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Previous Funding

FY 2024

FY 2025

FY2024 - FY2027

FY 2026

FY 2027

Total FY 2024-2027

FY 2026

FY 2027

Total FY 2024-2027

ROANOKE VALLEY AREA TRANSPORTATION PLANNING ORGANIZATION

RADAR UHSTS,
Inc. Roanoke
County
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339

-

128
-

128
-

128
-

128
-

FTA
FTA
FTA
FTA
FTA

Flexible STP
RSTP
Other Federal
State
Local

-

32

32

32

32

Flexible STP
RSTP
Other Federal
State
Local

128

Revenues

-

-

-

-

-

Revenues

-

Totals

-

160

160

160

160

Roanoke Valley
MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP

-

6,461
368
354
97
-

3,415
368
354
874
-

4,591
368
354
97
-

4,451
368
354
97
-

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP

18,918
1,472
1,416
1,165
-

RSTP
Other Federal

-

4,768
-

-

-

-

RSTP
Other Federal

4,768
-

State

-

4,463

3,799

6,127

5,787

State

20,176

Local
Revenues
Totals

-

1,938
2,314
20,763

1,992
2,314
13,116

2,106
2,314
15,957

2,086
2,314
15,457

Local
Revenues

8,122
9,256
65,293

Previous Funding

FY 2024

Previous Funding

FY 2025

FY 2024

FY 2025

FY 2026

422

5307
5310
5311
5337
5339

512
-

640
Total FY 2024-2027

FY 2027

Roanoke Valley

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION

FY 2027

FY2024 - FY2027

Total FY 2024-2027

STIP ID:
FTA 5307
FTA 5311
State
Local
Revenues
Year Total:

CSPDC01
668
284
686
340
61
2,039

Title: Operating Assistance
622
637
349
358
583
597
388
398
90
91
2,032
2,081

Recipient:
670
377
628
419
92
2,186

Central Shenandoah PDC
729
FTA 5307
410
FTA 5311
684
State
456
Local
93
Revenues
2,372
Total Funds:

2,658
1,494
2,492
1,661
366
8,671

Description:
STIP ID:
FTA 5307
FTA 5311
State
Local
Year Total:

CSPDC02
513
235
149
37
934

Title: Capital Cost of Contracting
590
605
331
340
184
189
46
47
1,151
1,181

Recipient:
650
366
203
50
1,269

Central Shenandoah PDC
736
FTA 5307
414
FTA 5311
230
State
57
Local
1,437
Total Funds:

2,581
1,451
806
200
5,038

CSPDC03
-

Title: Purchase Amenities
-

Recipient:
-

Central Shenandoah PDC
FTA 5307
State
Local
Total Funds:

-

CSPDC04
69
38
13
5
125

Title: Bike Racks, ITS or Misc Equipment
135
75
42
10
262

Recipient:
41
21
12
3
77

Central Shenandoah PDC
34
FTA 5307
15
FTA 5311
10
State
2
Local
61
Total Funds:

210
111
64
15
400

CSPDC05
-

Title: Bus Shelters
-

10
6
3
1
20

Recipient:
11
6
3
1
21

Central Shenandoah PDC
12
FTA 5307
6
FTA 5311
3
State
1
Local
22
Total Funds:

33
18
9
3
63

CSPDC07
-

Title: Signage
-

-

Recipient:
-

Central Shenandoah PDC
Flexible STP
State
Local
Total Funds:

-

Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
FTA 5311
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
FTA 5311
State
Local
Year Total:
Description:
STIP ID:
Flexible STP
State
Local
Year Total:
Description:

423

Staunton-Waynesboro

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION

STIP ID:
FTA 5339
FTA 5311
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:

FY2024 - FY2027

Total FY 2024-2027

FY 2027

CSPDC08
916
178
46
1,140

Title: Lewis Street Transit Hub
-

Recipient:
-

Central Shenandoah PDC
FTA 5339
FTA 5311
State
Local
Total Funds:

-

VCSB001
-

Title: Paratransit Vans
-

Recipient:
-

Valley Community Services Board
FTA 5310
State
Local
Total Funds:

-

VPA0001
-

Title: Paratransit Vans
62
16
78

Recipient:
62
16
78

Valley Program for Aging Services
62
FTA 5310
State
16
Local
78
Total Funds:

186
48
234

VPA0002
-

Title: Operating Assistance
-

Recipient:
-

Valley Program for Aging Services
FTA 5310
State
Local
Total Funds:

-

Description:

Central
Shenandoah PDC
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals
Human Service
Transportation
Providers
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals

Previous Funding

FY 2024

FY 2025

FY 2026

Total FY 2024-2027

FY 2027

1,250
557

1,212
680

1,387
779

1,372
770

1,511
845

FTA 5307
FTA 5310
FTA 5311

5,482
3,074

916
1,026
428
61
4,238

767
434
90
3,183

831
456
91
3,544

846
473
92
3,553

927
516
93
3,892

FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues

3,371
1,879
366
14,172

Previous Funding
-

FY 2024
-

FY 2025
62
16
78

FY 2026
62
16
78

424

FY 2027
62
16
78

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues

186
48
234

Staunton-Waynesboro

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)
Previous Funding

FY 2024

FY 2025

FY 2026

Previous Funding
1,250
557
916

1,212
680
-

Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals

1,026
428
61
4,238

767
434
90
3,183

FY 2024

1,387
62
779
831
472
91
3,622

FY 2025

1,372
62
770
846
489
92
3,631

425

FY 2026

Total FY 2024-2027

FY 2027

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION

SAWMPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339

FY2024 - FY2027

1,511
62
845
927
532
93
3,970

FY 2027

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339

Total FY 2024-2027
5,482
186
3,074
-

Flexible STP
RSTP
Other Federal
State
Local
Revenues

3,371
1,927
366
14,406

Staunton-Waynesboro

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Previous Funding

FY 2024

FY 2025

FY 2026

TRI-CITIES METROPOLITAN PLANNING ORGANIZATION

FY2024 - FY2027

Total FY 2024-2027

FY 2027

STIP ID:
FTA 5307
State
Local
Revenues
Year Total:

PAT0001
-

Title: Operating Assistance
700
925
639
639
740
740
394
394
2,473
2,698

Recipient:
925
639
740
394
2,698

Petersburg Area Transit
925
FTA 5307
639
State
740
Local
394
Revenues
2,698
Total Funds:

3,475
2,556
2,960
1,576
10,567

Description:
STIP ID:
FTA 5307
FTA 5339
State
Local
Year Total:

PAT0013
-

Title: Purchase Replacement Buses <30Recipient:
13
31
2
46
-

Petersburg Area Transit
FTA 5307
FTA 5339
State
Local
Total Funds:

13
31
2
46

PAT0018
-

Title: Purchase Radios (13)
7
16
1
24
-

Petersburg Area Transit
FTA 5339
State
Local
Total Funds:

7
16
1
24

Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:

Recipient:
-

STIP ID:

PAT0019

FTA 5339
State
Local
Year Total:
Description:

-

Title: Purchase Support Vehicles/Golf Recipient:
Car
13
31
2
46
-

-

STIP ID:
FTA 5339
State
Local
Year Total:

PAT0021
-

Title: Rehab/Renov Admin Bldg
56
136
8
200
-

Recipient:
-

Petersburg Area Transit
FTA 5339
State
Local
Total Funds:

56
136
8
200

STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:

PAT0023
-

Title: Design & Engineering Mtc Facility
140
340
20
500
-

Recipient:
-

Petersburg Area Transit
FTA 5339
State
Local
Total Funds:

140
340
20
500

PAT0035
-

Title: Preventive Maintenance
740
740
185
185
925
925

Recipient:
740
185
925

Petersburg Area Transit
740
FTA 5307
State
185
Local
925
Total Funds:

2,960
740
3,700

STIP ID:
FTA 5339
State
Local
Year Total:

PAT0044
-

Title: Replace Vehicles (7)
1,400
280
70
1,750

Recipient:
-

Petersburg Area Transit
FTA 5339
State
Local
Total Funds:

1,400
280
70
1,750

PAT0045
-

Title: Construct Maintenance Facility
2,400
480
120
3,000

Recipient:
-

Petersburg Area Transit
FTA 5339
State
Local
Total Funds:

2,400
480
120
3,000

PAT0046
-

Title: Purchase Shop Equipment
7
1
8

Recipient:
-

Petersburg Area Transit
FTA 5339
State
Local
Total Funds:

7
1
8

Petersburg Area Transit
FTA 5339
State
Local
Total Funds:

13
31
2
46

Description:

Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:

426

Tri-Cities MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Previous Funding

FY 2024

FY 2025

FY 2026

TRI-CITIES METROPOLITAN PLANNING ORGANIZATION

FY 2027

FY2024 - FY2027

Total FY 2024-2027

STIP ID:
FTA 5339
State
Local
Year Total:
Description:

PAT0047
-

Title: Replace Fixed Route Vehicles (5)
-

Recipient:
640
128
32
800

Petersburg Area Transit
FTA 5339
State
Local
Total Funds:

640
128
32
800

STIP ID:
FTA 5339
State
Local
Year Total:

PAT0048
-

Title: Replace 1 Support Vehicle
-

Recipient:
34
7
2
43

Petersburg Area Transit
FTA 5339
State
Local
Total Funds:

34
7
2
43

STIP ID:
FTA 5339
State
Local
Year Total:
Description:

PAT0049
-

Title: Replace Fixed Route Vehicles (2)
-

Recipient:
-

Petersburg Area Transit
640
FTA 5339
128
State
32
Local
800
Total Funds:

640
128
32
800

STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5339
State
Local
Year Total:

PAT0050
-

Title: Replace Paratransit Vehicles (2)
-

Recipient:
-

Petersburg Area Transit
240
FTA 5339
48
State
12
Local
300
Total Funds:

240
48
12
300

PAT0051
-

Title: Replace 1 Support Vehicle
-

Recipient:
-

Petersburg Area Transit
34
FTA 5339
7
State
2
Local
43
Total Funds:

34
7
2
43

PAT0052
-

Title: ADP Hardware
-

Recipient:
-

Petersburg Area Transit
24
FTA 5339
5
State
1
Local
30
Total Funds:

24
5
1
30

CDAA001
-

Title: Purchase Paratransit Vehicles
-

Recipient:
-

Crater District Area Agency on Aging
316
FTA 5310
State
79
Local
395
Total Funds:

316
79
395

Description:

Description:
STIP ID:
FTA 5339
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
Petersburg Area
Transit
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals

Previous Funding
-

FY 2024
1,440
216
1,162
956
394
4,168

FY 2025
1,665
3,820
1,431
1,117
394
8,427

FY 2026
1,665
674
774
959
394
4,466

427

FY 2027
1,665
938
827
972
394
4,796

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues

6,435
5,648
4,194
4,004
1,576
21,857

Tri-Cities MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC
TRANSPORTATION STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Previous Funding

FY 2024

FY2024 - FY2027

FY 2025

FY 2026

FY 2027

Total FY 2024-2027

FY 2025

FY 2026

FY 2027

Total FY 2024-2027

TRI-CITIES METROPOLITAN PLANNING ORGANIZATION
Human Service
Transportation
Providers

Previous Funding

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues
Totals

-

-

Tri-Cities MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal

Previous Funding
-

1,440
216
-

State
Local
Revenues
Totals

-

1,162
956
394
4,168

FY 2024
FY 2024

1,665
3,820
1,431
1,117
394
8,427

FY 2025

1,665
674
774
959
394
4,466

428

316
79
395
FY 2026

1,665
316
938
827
1,051
394
5,191

FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues

FY 2027

316
79
395

Total FY 2024-2027
FTA 5307
6,435
FTA 5310
316
FTA 5311
FTA 5337
FTA 5339
5,648
Flexible STP
CMAQ
RSTP
Other Federal
State
Local
Revenues

4,194
4,083
1,576
22,252

Tri-Cities MPO

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Previous Funding

FY 2024

FY 2025

WINCHESTER AREA METROPOLITAN PLANNING ORGANIZATION

STIP ID:
FTA 5307
State
Local
Revenues
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:

FY 2026

FY2024 - FY2027

Total FY 2024-2027

FY 2027

WIN0001
-

Title: Operating Assistance
427
427
-

Recipient:
-

Winchester Transit Service
FTA 5307
State
Local
Revenues
Total Funds:

427
427

WIN0002
-

Title: Rehab/Renovation of Yards &
-

Recipient:
-

Winchester Transit Service
FTA 5307
State
Local
Total Funds:

-

WIN0003

Recipient:

Winchester Transit Service

-

Title: Rehab/Renovation of
Maintenance
6,800
1,360
340
8,500
-

-

-

WIN0004
-

Title: Passenger Bus Shelters
-

Recipient:
20
3
2
25

Winchester Transit Service
FTA 5307
State
Local
Total Funds:

20
3
2
25

WIN0008
-

Title: ADP Software
-

Recipient:
-

Winchester Transit Service
FTA 5307
State
Local
Total Funds:

160
20
20
200

WIN0009
-

Title: ADP Hardware
60
8
7
75

Recipient:
-

Winchester Transit Service
FTA 5307
State
Local
Total Funds:

60
8
7
75

WIN0010
-

Title: Expansion Rolling Stock
336
42
42
420

Recipient:
-

Winchester Transit Service
FTA 5307
State
Local
Total Funds:

336
42
42
420

WIN0011
-

Title: Replacement Rolling Stock
336
42
42
420

Recipient:
272
34
34
340

Winchester Transit Service
272
FTA 5307
34
State
34
Local
340
Total Funds:

880
110
110
1,100

GRA0002
-

Title: Paratransit Vehicles
62
62
15
15
77
77

Recipient:
62
15
77

Grafton School, Inc.
62
FTA 5310
State
15
Local
77
Total Funds:

248
60
308

NCS0001
-

Title: Paratransit Vehicles
72
14
86

Recipient:
72
14
86

Northwestern Community Services
72
FTA 5310
State
14
Local
86
Total Funds:

216
42
258

160
20
20
200

FTA 5307
State
Local
Total Funds:

6,800
1,360
340
8,500

Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5307
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:

429

Winchester

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

Previous Funding

FY 2024

FY 2025

FY 2026

FY 2027

FY2024 - FY2027

Total FY 2024-2027

WINCHESTER AREA METROPOLITAN PLANNING ORGANIZATION
STIP ID:
FTA 5310
State
Local
Revenues
Year Total:
Description:
STIP ID:
FTA 5310
State
Local
Year Total:
Description:
Winchester
Transit Service
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals
Human Service
Transportation
Providers
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Revenues
Equity Bonus
Flexible STP
New Freedom
Totals
Winchester MPO
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues
Totals

SAA0002
110
185
22
317

Title: Operating Assistance
182
200
146
160
36
40
364
400

Recipient:
210
168
42
420

Shenandoah Area Agency on Aging
220
FTA 5310
176
State
44
Local
Revenues
440
Total Funds:

812
650
162
1,624

SAA0003
187
47
234

Title: Paratransit Vehicles
217
54
271

Recipient:
246
62
308

Shenandoah Area Agency on Aging
217
FTA 5310
State
54
Local
271
Total Funds:

680
170
850

Previous Funding
-

FY 2024
7,227
1,360
340
8,927

Previous Funding

FY 2025
892
112
111
1,115

FY 2024

297
-

244
-

Previous Funding
297
185
69
551

7,227
244
1,506
391
9,368

FY 2025
551
-

FY 2024

FY 2026
292
37
36
365

892
551
272
234
1,949

FY 2026
590
-

FY 2025

FY 2027
272
34
34
340

292
590
205
169
1,256

430

FY 2027
571
-

FY 2026

272
571
210
161
1,214

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
Local
Revenues

Total FY 2024-2027
FTA 5307
FTA 5310
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Revenues
Equity Bonus
Flexible STP
New Freedom

FY 2027

8,683
1,543
521
10,747

1,956
-

Total FY 2024-2027
FTA 5307
8,683
FTA 5310
1,956
FTA 5311
FTA 5337
FTA 5339
Flexible STP
RSTP
Other Federal
State
2,193
Local
955
Revenues
13,787

Winchester

VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION
STATEWIDE TRANSPORTATION
IMPROVEMENT PROGRAM SUMMARY
TRANSIT COSTS (in $1,000)

FY2024 - FY2027

Statewide (DRPT Recipient, Non-MPO)(in $1,000)

STIP ID:
FTA 5329
State
Local
Year Total:

Previous
Funding
DRPT001

-

FY 2024

FY 2025

FY 2026

FY 2027

Title: DRPT State Safety Oversight Program
529
529
529
132
132
132

529
132

661

661

661

661

Total FY 2021 - FY 2024
FTA 5329
State
Local
Total Funds:

528
-

2,116

2,644

Description:
STIP ID:
FTA 5311
State
Local
Local-in-Kind
Revenues
Year Total:
Description:
Totals - Statewide
(DRPT, Non-MPO)
FTA 5310
FTA 5311
FTA 5329
State
Local
Local-in-Kind
Revenues
Totals

DRPT002

-

Previous
Funding
-

Title: DRPT Intercity Bus Program
5,418
5,418
5,418

5,418

5,418

5,418

5,418

5,418

10,836

10,836

10,836

10,836

FY 2024
5,418
529
132
5,418
11,497

FY 2025
5,418
529
132
5,418
11,497

FY 2026
5,418
529
132
5,418
11,497

431

FY 2027
5,418
529
132
5,418
11,497

FTA 5311
State
Local
Local-in-Kind
Revenues
Total Funds:

-

21,672

21,672
43,344

Total FY 2021 - FY 2024
FTA 5310
FTA 5311
FTA 5329
State
Local
Local-in-Kind
Revenues
Total Funds:

-

528
-

21,672
2,116

21,672
45,988

Statewide

Rural (Non-urbanized less than 50,000 Population, Non-MPO)(in $1,000)

STIP ID:
FTA 5310
FTA 5311
FTA 5339
FTA ADTAP
FTA RTAP
State
Local
Revenues
Year Total:

Previous
Funding
DRPT003

FY 2024

FY 2025

FY 2026

FY 2027

Title: Operating
346
23,526

346
23,526

Recipient:
346
23,526

DRPT
346
23,526

386
277
23,596

386
277
23,596

386
277
23,596

386
277
23,596

-

48,131

48,131

48,131

48,131

DRPT004

Title: Capital
1,544
10,413

1,544
10,413

Recipient:
1,544
10,413

DRPT
1,544
10,413

1,540,123

1,784
2,616
837

1,784
2,616
837

1,784
2,616
837

1,784
2,616
837

1,540,123

17,195

17,195

17,195

17,195

Total FY 2021 - FY 2024

FTA 5310
FTA 5311
FTA 5339
FTA ADTAP
FTA RTAP
State
Local
Revenues
Total Funds:

1,384
94,105
1,544
1,107
94,382
192,523

FTA 5310
FTA 5311
FTA 5339
ADTAP
State
Local
Revenues
Total Funds:

6,176
41,654
1,547,260
10,463
3,349
1,608,901

Description:
STIP ID:
FTA 5310
FTA 5311
FTA 5339
FTA ADTAP
State
Local
Revenues
Year Total:
Description:
Totals - Rurals (NonPrevious
MPO)
Funding
FTA 5310
FTA 5311
FTA 5339
FTA ADTAP
FTA RTAP
State
Local
Revenues
Totals
-

FY 2024
1,890
33,940
1,784
386
2,893
24,433
65,325

FY 2025
1,890
33,940
1,784
386
2,893
24,433
65,325

FY 2026
1,890
33,940
1,784
386
2,893
24,433
65,325

432

FY 2027
1,890
33,940
1,784
386
2,893
24,433
65,325

Total FY 2021 - FY 2024
FTA 5310
FTA 5311
FTA 5339
ADTAP
FTA RTAP
State
Local
Revenues
Totals:

7,560
135,759
1,547,260
1,544
11,571
97,731
1,801,424

Statewide

COMMONWEALTH OF VIRGINIA

APPENDIX J

CIVIL RIGHTS
ACCOMPLISHMENTS

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

Appendix J: Civil Rights Accomplishments
Virginia's statewide self-certification process takes place every three years, in conjunction with
the submittal of the STIP to FHWA and FTA. As part of this process, as outlined in VDOT's
Self-Certification Procedural Guide, the STIP highlights VDOT's transportation planning
and programming processes and activities, including Title VI processes and activities,
since the previous self-certification. This appendix is not intended to represent all
VDOT Title VI accomplishments; additional and more specific details,
including district-specific accomplishments, are included in the Department’s Title VI
Accomplishments Report, submitted annually to FHWA.

The major program areas overall achievements related to Title VI of the Civil Rights Act of 1964
are captured through the annual questionnaire completed by each of the Major Program areas.
The questionnaires are designed to collect and record information about staff roles and the
lead responsibilities for Title VI matters, the efforts being put forth to ensure nondiscrimination
in each of the areas’ activities and the accomplishments that the Virginia Department of
Transportation Districts and Divisions have achieved in the area of Title VI. Following is
a summary and highlights of the information submitted by the planning program area:
Transportation and Mobility Planning Division (TMPD)
Central Office:
• Specific activities related to the participation of the TMPD during the STIP
Development Process between Oct. 1, 2021, and Sept. 30, 2022, were: TMPD is included
on the working group established by FPMD and kept abreast of progress on the statewide
STIP update and assists Environmental Division with any air quality conformity analyses.
• TMPD is the lead for congestion and accessibility scoring for the state’s project
selection process, known as SMART SCALE. However, other divisions are responsible
for other areas, such as safety (TED), reliability (Operations) and programming of
funds (IID) ; the districts are responsible for economic development/ land use; and the
Office of Intermodal Planning and Investment (OIPI) is responsible for the overall
scoring of applications for SMART SCALE. OIPI works with the Secretary’s
office and the Commonwealth Transportation Board (CTB) to develop a suggested
funding scenario for the CTB to adopt each SMART SCALE cycle. The Smart Scale
project selection process occurs biannually. Please see https://smartscale.org/ for more
information and details on the projects that have been selected by the CTB.
• No Constrained Long-Range Plan (CLRP) equity studies were carried out by TMPD.
This is a function of the MPOs across the state. Analysis at the statewide level was
conducted by the Office of Intermodal Planning and Investment as part of the
VTrans statewide multimodal plan update.
434

•

•
•

•
•
•
•

•

•
•
•
•

•

TMPD distributed public information that included Title VI of the Civil Rights Act of 1964
specific information as part of all corridor studies and public involvement activities.
TMPD’s public information meeting brochures all include Title VI information, which
includes details on how to get more information or special assistance for persons with
disabilities or limited English proficiency.
The federal funding received for the reporting period was $24,828,537. A list of the
distribution of funds for this reporting period can be found at the end of this report.
VDOT TMPD administers Virginia’s FHWA metropolitan planning (PL) funds for
MPO planning activities; State Planning and Research (SPR) funds for planning and
certain special planning study activities of the Department; as well as certain Safe
Routers to School (SRTS) program funds. Federal metropolitan planning funds (PLan 80% share federal program- see table at end of report) of $10,331,061 were
fully distributed to Virginia’s urbanized areas. Regarding State Planning and
Research (SPR), $1,160,000 were distributed to Virginia’s rural regional PDCs ($58,000
each).
VDOT distributed $354,000.00 to local communities to fund local Safe Route To Schools
(SRTS) non-infrastructure program.
There were 19 SRTS Quick Start mini-grants made available in awards, totaling $19,000.
A list of the impacted schools is included in tables at the end of this report.
No contracts were procured by TMPD during Oct. 1, 2021 - Sept. 30, 2022.
The Title VI/Nondiscrimination paragraph from the U.S. DOT Standard Title VI
Assurances was inserted into the solicitations for bid/ requests for proposal for the contracts
listed above and the contracts/agreements signed included the clauses of Appendix A and
E of the U.S. DOT Standard Title VI Assurances (USDOT 1050.2A) .
Following guidance provided in IIM-TMPD - 4.0: Public Participation / Public
Involvement in Transportation Planning Studies - TMPD continued to incorporate Virtual
Public Involvement into all planning studies with the goal of reaching a broader and more
diverse demographic to provide input on transportation projects.
During the reporting year, TMPD and VDOT districts conducted nearly 40 online surveys
including several second language versions of some surveys.
Additionally, public information materials and presentations were translated to second
languages for several planning studies.
TMPD also hosted virtual public meetings including live broadcast and pre-recorded
events.
TMPD has worked jointly with L&D, Environmental and Communications Divisions
to implement a new public engagement platform (PublicInput.com) which will enable
TMPD to capture demographic information about virtual meeting participants- race,
ethnicity and income information.
TMPD updated the statewide SE data of Accessibility tool by using the latest Census 2020
block and block group data, also, we cooperated with The Virginia Transportation
Research Council and U.S. Census to acquire the percent of the population meeting at least
435

one criterion or possible combination of criteria of “disadvantage population” ( low
income, LEP and minority) in each block group in Virginia, This allows Virginia to
accurately defined the disadvantage population for the statewide project prioritization
process.
•

•

•

•

•

TMPD used USDOT GIS mapping from Justice40 to highlight potentially impacted
populations for federal discretionary grant applications on Route 1 in Arlington, I-64 in
Richmond and Hampton Roads Districts, and Piedmont Avenue Bridge in Bristol. TMPD
also used this mapping in cooperation with the City of Richmond on a grant application for
the Reconnecting Communities Pilot grant.
All Strategically Targeted Affordable Roadway Solutions (STARS) studies utilized
some type of virtual public involvement which allowed the public to participate by
providing comments and selecting alternatives developed as part of the study.
Although TMPD cannot ensure/guarantee the participation of persons or representatives of
all discrimination-protected populations in MPO activities, the procedures in Public
Participation Plans are planned/designed to provide reasonable opportunities for their
participation, inclusion and involvement in the development of planning documents. Even
in events where such persons decline to participate, transportation planning and
programming requires providing accommodations for, extending outreach to and including
considerations for such persons in the development of transportation plans and programs.
VDOT District planning staff directly participated in and oversaw the activities of the
MPO s located within their respective VDOT District. This included the development
and documentation of the public involvement/participation process used by each MPO in
a Public Participation Plan. Years ago, under VDOT distribution of authority initiatives,
the VDOT Districts received authority and responsibilities for conducting transportation
planning activities with their MPO(s) . Each MPO is required to document its
process associated with outreach and notices of draft documents, meetings and related
activities in their MPO Public Participation Plan.
TMPD continued to provide policy guidance to District Planning offices across VDOT on
the metropolitan planning process. TMPD conducted monthly meetings with District
Planning Managers to discuss critical topics such as MPO long range plan and
transportation improvement program update schedules and supported districts with their
review of metropolitan planning work programs as well as rural scopes of work for the
Rural Transportation Planning Program.
Public meetings and hearings held by TMPD during FFY 2021-22 (Oct.1, 2021 – Sept.
30, 2022) were:

436

STARS Study Virtual Public Involvement – Total 91 surveys including one virtual public
meeting.
Details:

Meeting or Hearing

1
2
3

4

Little River Turnpike
Virtual Information
Meeting
Route 33 AMP
Rockingham County Public
Meeting 2/3/2022
Route 33 AMP
Rockingham County Public
Input Online Survey 9/7/21
– 10/24/21
Route 33 Study King and
Queen Online Survey
3/9/22 – 3/25/22

Location

Number
of
Attendee
s

Were there
any Title VI
issues
identified by
TMPD Y/N)
N

Online

More
than 30

Spotswood
High School

34

N

Online

916

N

Online

218

N

The mechanisms used to identify the communities that were represented at the public
meetings and hearings are described in the following table:

•

Meeting or Hearing
1

Little River Turnpike Virtual
Information Meeting

2

Route 33 AMP Rockingham
Co. Public Meeting
Route 33 AMP Rockingham
Co. Public Input Online
Route 33 Study King and
Queen Online Survey 3/9/22
– 3/25/22

3
4

Mechanism used to identify the
communities represented at the meeting
Google form English and Spanish
language) was used to depict alternatives
developed as part of the Little River
Turnpike STARS study. Social media
platforms such as Facebook and Instagram
were used to reach out to citizens of specific
zip codes identified by the Fairfax County.
Targeted Zip Codes / Social Media Blast
Targeted Zip Codes / Social Media Blast
Targeted Zip Codes / Social Media Blast

437

Among the efforts implemented by TMPD to ensure that recipients receiving federal funds were
aware of their Title VI/Nondiscrimination responsibilities are:
•
•

•

•

•

Inclusion of Title VI/Nondiscrimination paragraph from the U.S. DOT Standard Title VI
Assurances in all pass-through funding agreements for recipients of federal funds.
Ensured that the transportation planning entities (MPOs and PDCs) that VDOT works
with are aware of and will comply with the USDOT 1050.2A Title VI and
related nondiscrimination requirements.
Carrying out the Division’s process with planning entities through issuance of annual
letters of authorization and (PL and SPR) funding agreements, supported by a
master agreement. The annual funding agreement with a MPO or PDC transportation
planning entity requires the completion of several forms, including their completion of the
USDOT Order No. 1050.2A standard assurances form and applicable appendices.
Regular inclusion of USDOT’s Order No. 1050.2A and its applicable appendices in the
annual funding agreement packages for MPOs and PDCs; and by reviews verifying the
completion of the annual funding agreements, including completion of the USDOT’s Order
No. 1050.2A form and its applicable appendices, by Central Office transportation planning
staff.
MetroQuest surveys were provided in two languages English and Spanish to get public
feedback on most of the NOVA STARS studies. These requests came from localities in the
NOVA District. All of these surveys were advertised in social media platforms such as
Facebook and Instagram to have a wider reach.

Title VI Accomplishments by district include:
Bristol District
•
•
•

•

•

The District Planning Staff reviewed the STIP/TIP project list to ensure all applicable
projects are listed.
The District Planner did not receive any complaints during the reporting period.
Bristol District planning staff monitored and attended meetings and workshops held by the
MPOs and PDC RTCs in the District. These organizations have policies and procedures in
place to ensure appropriate public advertisement and access to meetings.
District planning staff consistently continued to work with MPO and PDC staff to design
planning efforts to ensure effective public participation and locality participation. District
planning staff emphasized the importance of outreach and education to MPO and PDC
partners in every planning effort.
The Bristol District Planning Division will continue its efforts in improving connectivity
and access to the transportation system for all people and freight. They will continue to
evaluate other modes of transportation, such as bicycle and pedestrian travel and
incorporate these into the planning process. They will also continue their efforts of working

438

•

with the MPO & PDC partners on all future projects.
Bristol District planning staff attended meetings and workshops held by the MPOs and
PDC RTCs in the District. Additionally, District planning staff consistently work with
MPO and PDC staff to design planning efforts to ensure effective public participation and
locality participation.

Culpeper District
•

No report.

Fredericksburg District
•

•

•

•
•

•

•
•
•

Fredericksburg District Planning program continued to assist Central Office and the
Fredericksburg Metropolitan Planning Organization (FAMPO), the regional MPO in
processing STIP Amendments and Modifications, as needed.
VDOT Fredericksburg Planning continued to coordinate activities in the workflow,
continued to participate in webinars, and continued to review draft lists/document
providing comments and edits, when appropriate.
VDOT Fredericksburg Planning is not responsible for the scoring and prioritization of
projects. However, a VDOT representative is on the Technical Advisory Committee and
Policy Board of the Fredericksburg Metropolitan Planning Organization (FAMPO)
that provides feedback and approval.
Planning did not receive any Title VI complaints during FY2021-2022.
VDOT Fredericksburg Planning received federal funding, which was used for staff time
on UPC #0000121462 and a budget of $530,000. FAMPO received $513,109.95. The
PDCs, George Washington Regional, Middle Peninsula and Northern Neck each received
$58,000.
VDOT Fredericksburg Planning did not procure any contracts procured during this fiscal
year; however, the division continued to be committed to ensuring Title VI compliance by
requiring submission of the Title VI Assurances and Appendices A and E. Furthermore,
subrecipient monitoring is coordinated at the Central Office level and/or the district staff.
VDOT Fredericksburg worked closely with the MPO, PDCs and VDOT District
Communications staff to ensure that Title VI requirements are being met.
Although VDOT Fredericksburg District does not perform mapping of LEP populations,
the planning district staff continued to provide oversight via FAMPO board participation.
VDOT Fredericksburg Planning continued to attend public meetings and cooperated with
FAMPO’s adoption of Public Participation Procedures.

439

Hampton Roads District
•

•

•

•

•

•
•

The District Planning Office coordinated with the Hampton Roads Transportation
Organization (HRTPO) to assess project data in development of the FY2024-2027
STIP. District staff reviewed district project information for inclusion into the new STIP
while the HRTPO staff reviewed the MPO area project data for inclusion in the TIP
document. Information contained within the STIP is first adopted at the local level
though the TIP. District Planning assists with monthly coordination for all amendments
and modifications required in the TIP and STIP as the documents are required to be
consistent.
Projects scoring and prioritization - District Planning Staff coordinates with TPO staff on
the committed and candidate project list. VDOT staff and others participate in the review
of the cost estimates, other information, and process of final prioritization. The final
approval of project selection rests with TPO policy board. VDOT also assists the CTB with
development and review of both Project Pipeline process and Smart Scale. Project Pipeline
is a performance-based planning program used to look at needs statewide and formalize
the connection with planning, funding and programming transportation solutions. The
District also participates in the implementation of the Smart Scale Process, which is in
place to fund transportation projects through a prioritization process that evaluates each
project’s merits using key factors, including improvements to safety, congestion reduction,
accessibility, land use, economic development, and the environment. Information on the
Project Pipeline is located at the following link https://vaprojectpipeline.org.
Certification Reviews - Federal law requires that the FHWA and the FTA certify that the
metropolitan transportation planning process in MPOs is carried out in accordance with
applicable provisions of federal law at least once every four years. The HRTPO’s most
recent Self Certification was approved in July 2020. The approval was for FY 2021-2024.
Therefore, no reviews were conducted from October 1, 2021, and September 30, 2022. No
corrective actions were required. Civil Rights conducts the review. However, District
planning does review work elements outlined in the UPWP and provides comment and
review during the public comment period regularly and as those UPWP task are completed.
LRTP Equity Studies - No analysis is conducted by the Planning District office. However,
the staff serves on the LRTP development subcommittee and reviewed demographic
information as presented in the Title VI – EJ Candidate Project Evaluation report of the
2045 LRTP. No complaints were received.
Procurements and Contract Administration - HRD Planning received approximately $1.2
Million in SPR funds to assist and Monitor TPO UPWP activities. Hampton Roads
Planning District Commission $72,500 State Planning and Research (SPR) fund
Accomack Northampton Planning District Commission $72,500 SPR Funds. HRD
Transportation Planning Organization $2.3M PL funds.
Hampton Roads Planning section provided oversight to several studies.
Planning and Public Involvement - The District planning team continued to follow
440

•

•

•

guidance set forth by our Central Office for public participation. Access to materials is
available on VDOT website. Surveys were conducted through the MetroQuest platform for
four projects.
District continued to participate in TPO activities such as the development of the TIP,
LRTP, Active Transportation Plan and technical studies, which have been presented in both
virtual and in person settings.
Leadership attendance at Policy board meetings and District staff attendance at the
Technical Transportation Advisory Committee (TTAC) meetings, Active Transportation
Programming Subcommittee, LRTP Subcommittee and other committees as needed. Staff
also attend Accomack Northampton Planning District Commission (ANPDC) and
subcommittee meetings.
Planning office held five online information sessions for ongoing STARS and PIPELINE
studies in accordance with the VDOT public participation guidelines. MetroQuest was used
to secure public feedback for the online forums and demographic information was
included. Number of visitors is in reference to those persons visiting the website where
number of participants is the number of persons who completed some type of survey on
the website. In addition, four Public Open Houses were held for James City regarding
HR05 Route 199 Humelsine Parkway.

Lynchburg District
•

Transportation and Mobility Planning did not submit their questionnaire.

Northern Virginia District
•

•

•

The Planning Division developed a new STIP in 2020. There were only amendments and
administrative modifications during FY 2021/2022. NOVA’s Planning staff members
were responsible for reviewing the documents and making the necessary corrections where
needed. The Planning staff also entered the project data in the MPO’s Transportation
Improvement Program (TIP) database and navigated the TIP revision through the
MPO adoption process. The MPO handled public involvement and notice issues in
conjunction with the MPO’s approved Public Involvement Plan.
DURING FY 2021/2022, there were only amendments and administrative modifications.
NOVA District Planning staff were responsible for (1) reviewing the draft STIP
Actions for the NOVA District and making corrections and (2) entering the project
data in the MPO’s Transportation Improvement Program TIP database and (3)
steering the TIP revisions through the MPO adoption. Public involvement and
notice activities were handled by the MPO in accordance with the MPO’s federally
approved Public Involvement Plan. The next update to the STIP will begin in 2023.
There were no federal certification reviews in this current fiscal year. However, the next
MPO certification review will be conducted in March of 2023 for the MPO National
441

Capitol Region Transportation Planning Board, or the TPB.
• Questions four (4) and five (5) are not applicable.
• NCRTPB certifications were reviewed in February and March of 2020. The NOVA
District Administrator signed the self-certification form in March of 2020. The signed selfcertification form was included in the adoption of a new TIP and Air Quality Conformity
determination on March 18, 2020. On February 25, 2021, the TPC certified to VDOT that
the metropolitan planning process is addressing the major issues in the metropolitan
planning area and is being conducted in compliance with all major applicable laws. The
Planning staff reviewed the MPO draft certifications, and the District Administrator signed
a form concurring with the TPBs self-certifications. Further, the Planning Division staff
engaged in several TPB committees, and the Board of Directors ensures that the District is
aware of the MPOs commitment to comply with all Federal Civil Rights, Environmental
and Transportation Planning requirements.
• With respect to the Dissemination of Title VI Information, the following is a sample of the
public notice that was included in a planning study public involvement process which
illustrates how the notice is given.
 Give your comments after the presentation, submit your written comments by October 19,
2022, vis the study website, by mail to Mr. Amir Shapar, P. E., Virginia Department of
Transportation, 4975 Alliance Drive, Fairfax, Virginia 22030 or email to meeting
comments @VDOT.virginia.gov. Please reference “Sheve Road Corridor Study” in the
subject line.
VDOT ensures nondiscrimination and equal employment in all Programs and Activities in
accordance with Title VI and Title VII of the Civil Rights Act of 1964, as amended. If you
need more information or special assistance for persons with disabilities or limited English
proficiency, contact VDOT Office of Civil Rights at 703-259-1775.
• The Planning Division did not receive any complaints during FY2021-2022.
• The following link provides an illustration of the information that was made available to
the public for STARS studies. https://www.virginiadot.org/projects/northernvirginia/route50arlingtonstudy.asp.
• The TPB Equity Emphasis Areas Study provided information to the public regarding lowincome-racial/ethnic minority populations broken down into GIS-mapped geographic
areas. The study provides information on relative access to transportation services in these
areas.
http://www.mwcog.org/transportation/planning-areas/fairness-and-accessiblity/environmentaljustice/equity-emphasis-areas.

•

•

Public involvement practices for STARS studies have been considerably enhanced Public
surveys using the MetroQuest online tool are conducted for each STARS study.
MetroQuest is being phased out as an involvement tool and replaced with
PublicInvolvement.Com.
Public notices and websites were used on STARS and other studies to make the public

442

•

•

•

aware of the project and to seek their input. Multilingual materials were available and
public notices were sent to foreign-language newspapers when needed.
The District Planner and other staff members participate in the MPO process and are part
of key committees, including the technical Committee, State Technical Working Group,
Steering Committee, and Access for All Committee. The TPB’s Title VI Plan was
developed with oversight from the Technical Committee and progress on the plan was
reported to other committees and the Board of Directors. The FHWA and the FTA made
positive comments concerning the development of the Equity Areas concept.
There were six (6) public meetings and hearings during the reporting period. Sign-in
lists, comment cards, and public meeting minutes allow the identification of
organized or informal groups present at meetings.
Print and websites were available for dissemination of non-English advertisements.

Richmond District
•

•
•
•

•

•
•

District Planning staff serves as the coordinator between the MPOs and Central Office
BFMD. District staff facilitated data reviews, coordinated feedback, assisted with public
comment, conducted reviews of data, communicated necessary guidance and timelines,
and provided updates to VDOT BFMD.
The district Planning section participated in the MPOs’ technical committee but was not
involved with project selection.
District Planning developed planning studies/documents in coordination with Central
Office TMPD who oversees the funding and ensures effective public participation.
District Planning staff reviewed MPO/PDC advertisements for public meetings and
actively participated in meetings and public events to monitor public involvement and
provide input to the MPOs, as needed.
District Planning staff actively participated in many of the MPO processes and committees
for both the Richmond and Tri-Cities MPOs. These included the Metropolitan Planning
Organization policy meetings (MPO), Citizens Transportation Advisory Committee
CTAC - Richmond only), Elderly and Disabilities Advisory Committee (EDAC
–Richmond only), Technical Advisory Committee (TAC), and special purpose
committees such as RSTPBG/CMAQ allocation plan committees.
Establishing a close and positive working relationship with MPO staff and member
localities continued to be a primary focus.
There was no need to provide bilingual or non-English advertisements, announcements or
notices. No interpreters were requested. There were no vital or significant documents
intended to be shared with the public or MPOs, that were translated into other languages
or Braille during the reporting period.

443

Salem District
•

•

•

•

•
•

•

•

•

•

•

Salem District Transportation and Mobility planning division’s participation during the
STIP Development process included reviewing draft and Final STIP/TIP documents,
working with the two MPO’s within the District to ensure they approve their TIP
documents, included their associated public involvement process. They also participate in
state public involvement efforts and act as the District point of contact for STIP/TIP issues.
Salem District Transportation and Mobility Planning division participated in the
development, verification, validation, and scoring of more than 40 SMART SCALE Round
5 projects.
The mechanisms used in the prioritization of the projects listed above and for distribution
of projects statewide included VTrans Mid-term Needs mapping and data sets including
the development of needs priorities , crash data sets and SMART SCALE scoring process.
Salem District Transportation and Mobility Planning staff participated in the 2020 FHWAFTA Joint Certification process for the Roanoke Valley TPO October 1, 2020, and
September 30, 2021.
Salem District Transportation and Mobility worked with RVTPO staff and committees to
implement actions identified during the Certification review process.
Salem District Transportation and Mobility office staff participated in the review of
certification with MPO staff, committees’ and boards. Throughout each planning cycle
(1-3yrs), they ensure MPO’s are addressing federal requirements outlined in the
certification documents.
Salem District Transportation and Mobility Planning worked with RVTPO staff in the
development and update of the Travel Demand Model for the area. RVTPO staff conduct
demographic analysis as part of their LRTP update for this reporting period.
Salem District Transportation and Mobility Planning participated in MPO/PDC public
involvement efforts associated with their planning activities in support of the federally
required regional planning processes effectively to include Title VI/ Nondiscrimination
populations in the development of planning documents.
Salem District Transportation and Mobility Planning Division ensured that all members of
the community are effectively participating in the development of planning documents by
participating in regular meetings and communication with MPO/PDC staff.
Salem District Transportation and Mobility Planning staff ensured that recipients receiving
federal funds through the planning division are aware of their Title VI/Nondiscrimination
responsibilities by participating regularly in the MPO planning processes, including public
involvement activities, training, and certification reviews.
Salem District Transportation and Mobility Planning staff verified that recipients who
received federal funds included the Title VI/Nondiscrimination paragraph from the U.S.
DOT Standard Title VI Assurances into all solicitations for bids and requests for proposals
was non-applicable.

444

•

Salem District Transportation and Mobility Planning staff verified that recipients who
received federal funds included the clauses of Appendix A and E of the U.S. DOT Standard
Title VI Assurances (USDOT 1050.2A) in all its contracts and consultant agreements was
non-applicable.

Staunton District
•

•

•

•

•
•

•
•

Staunton District Planning office assisted in the reconciliation and review of three MPO
TIP documents which are included in the STIP development. Staff reviewed each entry to
ensure that project descriptions and schedules are accurately reflected in the document. The
Planning office coordinated with MPO and PDC partners to ensure compliance.
While Staunton District Planning provided application development support to their
localities and regional planning bodies and assists with application scoring, all scoring and
selection of project funding through the various transportation funding programs is
managed by VDOT Central Office Transportation and Mobility Planning Division
(TMPD), the Office of Intermodal Planning and Investment (OIPI) and the
Commonwealth Transportation Board (CTB). Each of the various transportation
funding programs as managed by TMPD and OIPI have a unique procedure /
process for application prioritization and scoring. District Planning serves as the
technical resource to assist local governments in the development of project solutions and
applications.
Staunton District Planning continued to serve as the clearinghouse and technical resource
for three MPO’s. For FFY 2021-22, numerous technical analyses were performed. The
District Planning office assisted the MPO partners in equity analysis as part of their
ongoing LRTP update cycles.
All public outreach through public surveys or public information meetings developed by
District Planning included coordination with the Staunton District Civil Rights section.
Since COVID-19, the move by VDOT to conduct more online public surveys through the
MetroQuest platform has resulted in a significant increase in public participation and public
access / awareness in VDOT planning studies.
During the past year, District Planning also began formatting PDFs posted to VDOT public
planning website to be accessibility compliant.
Staunton District Planning office did not receive any complaints alleging violations of Title
VI of the Civil Rights Act of 1964 against our Division, against any of Virginia’s
MPOs/PDCs, and/or against any of the consultants/sub consultants performing on our
projects, during Oct. 1, 2021 – Sept. 30, 2022.
Locally, Staunton District Planning assisted our MPO/PDC partners with identifying and
supporting communication to non-English speaking populations.
Staunton District Planning continued to review all quarterly invoicing to ensure that
outreach strategies to non-English speaking populations are in fact represented in the
MPOs/PDCS reimbursement requests. Also, District Planning staff coordinated monthly
445

•
•

with MPO staff to discuss outreach strategies.
Public Meetings attendance records were used to identify what communities were
represented at public meetings and hearings.
Largely in the Harrisonburg/Rockingham area, monthly (and event) advertisement in area
newspapers targeting the non-English speaking segment of the population was provided.
District Planning coordinated with localities and stakeholders to identify when online
planning surveys require bilingual options based on the communities where public input is
being solicited. Over the past year, VDOT Pipeline Study Online Public Surveys were
developed in Spanish and Arabic in the Harrisonburg/Rockingham County region and
Spanish in the Winchester/Frederick County region to improve public outreach.
TRANSPORTATION AND MOBILITY PLANNING (TMPD)
SUB-RECIPIENTS INFORMATION
Metropolitan Planning (PL) Funding Distributed/Awarded to MPOs
URBAN AREA

FEDERAL

Bristol TN
Bristol VA
Charlottesville
Danville
Fredericksburg
Hampton Roads
Harrisonburg
Kingsport, TN
Lenowisco, VA
Lynchburg
New River Valley
Northern Virginia
Richmond
Roanoke
Staunton
Tri-Cities
Winchester

$43,306
$33,560
$168,947
$133,926
$426,445
$2,680,512
$246,289
$4,056
$46,004
$204,267
$164,032
$3,726,686
$1,311,767
$416,077
$210,190
$196,136
$318,861

Grand Total

$10,331,061

446

Federal State Planning Research (SPR) Funds Distributed/Awarded to PDCs
Through the Rural Transportation Planning Program
Rural Transportation Planning
Program

Federal

Accomack - Northampton
Central Shenandoah
Central VA Region 2000 Reg.
Comm.
Commonwealth Regional Council
Crater
Cumberland Plateau
George Washington Regional
Hampton Roads
Lenowisco
Middle Peninsula
Mount Rogers
New River Valley
Northern Neck
Northern Shenandoah
Rappahannock-Rapidan
Richmond Regional
Roanoke Valley-Alleghany
Southside
Thomas Jefferson
West Piedmont

$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000
$58,000

TOTAL

$1,160,000

447

FY21-22 Safe Routes to School Mini-Grants

FY 21-22 DRTS QuickStart Mini-Grants $1000 each
School Division
Prince William County Public Schools

School Impacted
Ashland Elementary

Loudoun County Public Schools

Cool Spring Elementary, Potomac Elementary

Charlottesville Public Schools

Clark Elementary School

Arlington County Public Schools

Oakridge Elementary School

Fairfax County Public Schools

Vienna Elementary School

Chesterfield County Public Schools

Salem Church Middle School

Hanover County Public Schools

Chickahominy Middle School

Manassas Park Public Schools

Manassas Park Middle School

Fairfax County Public Schools

Cunningham Park Elementary School

Loudoun County Public Schools

Seldens Landing Elementary

Loudoun County Public Schools
Williamsburg-James City County
Public Schools
Fairfax County Public Schools

Hamilton Elementary School
Laurel Lane Elementary, Matthew Whaley
Elementary
Hillside Elementary School, Sanders Corner
Elementary School
Lake Braddock Secondary School

Fairfax County Public Schools

Marshall Road Elementary School

Fairfax County Public Schools

Herndon Elementary School

Fairfax County Public Schools
Williamsburg-James City County
Public Schools

Lemon Road Elementary School
Laurel Lane Elementary, Matthew Whaley
Elementary

Loudoun County Public Schools

Creighton's Corner ES, Dominion Trail ES

Loudoun County Public Schools

448

Safe Routes to School Non-Infrastructure Grant Program - Federal Dollars

Safe Routes to School Program

Alexandria

$23,600

Arlington County Public Schools

$23,600

Charlottesville

$23,600

Chesterfield

$23,600

Fairfax County

$23,600

Sentara RMH (Harrisonburg

$23,600

Loudoun

$23,600

Newport News

$23,600

Norfolk

$23,600

Prince William

$23,600

Rockingham

$23,600

City of Waynesboro

$23,600

Williamsburg-JCC

$23,600

Chesapeake

$23,600

Greater Richmond F4K

$23,600

TOTAL Federal SRTS Funds

=

449

$354,000

Prior 2021-2024 STIP Finding
In a letter dated August 1, 2020, FTA and FHWA jointly approved the 2021-2024 STIP subject
to the following FHWA corrective action being taken by the Commonwealth:
•

VDOT’s Fiscal Year 2020 and 2021 Title VI/Nondiscrimination Implementation Plans
that were approved by FHWA require that VDOT conduct a compliance review of
metropolitan planning organizations (MPO) and/or planning district commissions
(PDC) at least every four years. Compliance reviews have not been conducted within the
last four years for the MPOs and most of the PDCs. Therefore, FHWA requests that
within two years VDOT conducts a comprehensive Title VI/Nondiscrimination review of
MPOs and PDCs in Virginia pursuant to 23 CFR 200.9(b)(7) and their FY 2020 and
2021 Title VI/Nondiscrimination Implementation Plans. Furthermore, we ask that
VDOT provide the FHWA Virginia Division with a copy of reports and approval
communications of all completed Title VI/Nondiscrimination reviews.

The following actions have been taken and more comprehensive details have been provided to
FHWA:
1. VDOT has conducted Title VI compliance reviews with all MPOs and PDCs as
required.
2. Where findings were identified, VDOT issued or will issue corrective action letters.
3. Where corrective action was resolved, closeout letters were provided to the MPO,
PDC and FHWA.
4. Where corrective action was not resolved, a second corrective action letter will be
issued in September 2023 with corrective action plans/responses due to VDOT
November 2023.

450

COMMONWEALTH OF VIRGINIA

APPENDIX K

Public Meeting Notices/Postings

July 2023

Prepared by the
Virginia Department of Transportation
in Cooperation with
Virginia Department of Rail and Public Transportation,
Federal Highway Administration–Virginia Division Office, and
Federal Transit Administration

Public Hearings

Funding the Right Transportation Projects
You are invited to share comments on transportation projects that have been recommended for funding in the FY2024-2029 Six-Year
Improvement Program (SYIP). Additionally, pursuant to §33.2-202, comments will be accepted for new projects valued in excess of $25
million. The Commonwealth Transportation Board will take your comments into consideration as it develops the FY2024-2029 SYIP. The
program allocates public funds to highway, road, bridge, rail, bicycle, pedestrian and public transportation projects. All federally eligible
projects in the SYIP will be included in the Statewide Transportation Improvement Program to document how Virginia will obligate its federal
funds.
Meeting materials will be available https://www.ctb.virginia.gov/planning/springmeetings2023/default.asp before April 20, 2023.
Public meetings begin at 4 p.m. in each of the locations except as noted below:
A formal comment period will be held at these meetings.
Thursday, April 20
Hampton Roads District
Hampton Roads District Auditorium
7511 Burbage Drive,
Suffolk, VA 23435

Monday, April 24
Richmond District
Richmond District Auditorium
2430 Pine Forest Drive
Colonial Heights, VA 23834

Monday, May 1
*Northern Virginia District
Potomac Conference Center
NOVA District Office
4975 Alliance Drive
Fairfax, VA 22030

Tuesday, May 2
Culpeper District
Culpeper District Auditorium
1601 Orange Road
Culpeper, VA 22701

Wednesday, May 3
Staunton District
Blue Ridge Community College
Plecker Center for Continuing
Education
One College Lane
Weyers Cave, VA 24486
Tuesday, May 16
Salem District
Salem Civic Center Community Room
1001 Roanoke Boulevard
Salem, VA 24153

Monday, May 8
Fredericksburg District
Germanna Community College
Workforce and Technology Center
10000 Germanna Point Drive
Fredericksburg, VA 22408

Monday, May 15
Bristol District
Southwest Virginia Higher
Education Center
One Partnership Circle
Abingdon, VA 24210

Wednesday, May 17
Lynchburg District
Lynchburg Grand Hotel
601 Main Street
Lynchburg, VA 24504

*The Northern Virginia District meeting will begin at 5 p.m. and serve as the required joint public meeting with the Northern Virginia
Transportation Authority, the Northern Virginia Transportation Commission, the Virginia Railway Express, and the CTB per § 33.2-214.3 of
the Code of Virginia. Need to note that this meeting only can be streamed online.
You can submit comments online, or by email or mail by May 24, 2023.
For roads and highways: [email protected], or Infrastructure Investment Director, Virginia Department of
Transportation 1401 East Broad St., Richmond, VA 23219.
For rail and public transportation: [email protected] , Public Information Office, Virginia Department of Rail and Public
Transportation 600 East Main Street, Suite 2102, Richmond VA, 23219.
The Commonwealth is committed to ensuring that no person is excluded from participation in or denied the benefits of its
services on the basis of race, color or national origin, as protected by Title VI of the Civil Rights Act of 1964. If you need
further information on these policies or special assistance for persons with disabilities or limited English proficiency, please
contact the Virginia Department of Transportation’s Title VI Compliance Officer at 804-786-2730 or the Virginia
Department of Rail and Public Transportation’s Title VI Compliance Officer at 804-786-4440 (TTY users call 711). –––––

July 31, 2023
Development of the Federal Fiscal Years 2024 – 2027 STIP
Virginia is currently in a STIP update cycle and in the process of preparing the next STIP for
Federal Fiscal Years 2024 – 2027. VDOT and DRPT are working with the MPOs to update
their TIPs and are in cooperation with transportation planning officials in nonmetropolitan areas
on the inclusion of federally funded projects in the nonmetropolitan areas of Virginia. Draft TIPs
will be included without change into Virginia’s new STIP along with projects in nonmetropolitan
areas.
Virginia provides many opportunities for the public to provide input on transportation projects
and priorities as part of the continuing transportation planning process for the development of the
STIP and the state required Six-Year Improvement Program.
Nonmetropolitan area project lists will be made available at the Spring Transportation Meetings.
Once preparation of the new STIP is complete, it will be made available here on VDOT’s website
for a minimum of 30 days.

453

Posted July 31, 2023
Draft Federal Fiscal Years 2024 -2027 STIP
The Virginia Department of Transportation (VDOT and the Department of Rail and
Public Transportation (DRPT have developed Virginia's Draft STIP for Federal Fiscal
Years 2024 - 2027.
VDOT and DRPT worked in cooperation with the MPOs to update their TIPs
which are included without change into Virginia's draft STIP.
VDOT and DRPT were also in cooperation with transportation planning officials in
nonmetropolitan areas on inclusion of federally funded projects in the nonmetropolitan
areas of Virginia.
Virginia provides many opportunities for the public to provide input on transportation
projects and priorities as part of the continuing transportation planning process for the
development of the STTP and the state required Six-Year Improvement Program.
The Draft Federal Fiscal Years 2024 – 2027 STIP is available here. (Posted 7/31/2023)
VDOT is requesting public review and input on the Draft Federal Fiscal Years
2024 – 2027 STIP. Comments may be submitted until August 30, 2023, to:
Federal Programs Management
Director Virginia Department of
Transportation 1401 E. Broad St.
Richmond, VA 23219
[email protected]
Note: One comment was received and evaluated during the public comment period of
the DRAFT 2024-2027 STIP. No changes were made to the Final 2024-2027 STIP as
a result of the comment.

454

