Supplementary burden spreadsheet for 10 CFR Part 52 information collection

Final burden spreadsheet for Part 52.xlsx

10 CFR Part 52, Licenses, Certifications and Approvals for Nuclear Power Plants

Supplementary burden spreadsheet for 10 CFR Part 52 information collection

OMB: 3150-0151

Document [xlsx]
Download: xlsx | pdf

Overview

reporting
recordkeeping
TOTALS


Sheet 1: reporting

TABLE 1
ANNUAL REPORTING BURDEN

LIGHT WATER REACTORS & NON-LIGHT WATER REACTORS (burden numbers combined below)
GENERAL PROVISIONS








Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $290/hr
52.7 (Respondent is same as in Subpart C below.) application for exemption 1 25 25 360 9000 $2,610,000
Regulatory Guide (RG) 1.206, "Applications for Nuclear Power Plants" conduct of pre-application activities 1 1 1 25,000 25000 $7,250,000
Subtotal: General Provisions
2
26
34000 $9,860,000








SUBPART A: EARLY SITE PERMITS (ESPs)
NRC expects 0 new ESP applications over the next 3 years. (0/3=0)
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $290/hr
52.17(a)(1) site safety analysis report 0 0 0 6000 0 $0
52.17(b)(1) submitting information on physical characteristics of the proposed site that could pose a significant impediment to the development of emergency plans 0 0 0 20 0 $0
52.17(b)(2)(i) and 52.17(b)(3) without ITAAC propose major features of the emergency plans in the site SAR 0 0 0 1000 0 $0
52.17(b)(2)(i) and 52.17(b)(3) with ITAAC propose major features of the emergency plans in the site SAR 0 0 0 2667 0 $0
52.17(b)(2)(ii) and 52.17(b)(3) propose complete and integrated emergency plans in the site SAR 0 0 0 2000 0 $0
52.17(b)(2)(i) and 52.17(b)(3), 50.160 without ITAAC ESP: Performance-Based Emergency Plan – Major Features without ITAAC application 0 0 0 900 0 $0
52.17(b)(2)(i) and 52.17(b)(3), 50.160 with ITAAC ESP: Performance-Based Emergency Plan – Major Features with ITAAC application 0 0 0 2,400 0 $0
52.17(b)(2)(ii), 52.17(b)(3), 50.160 ESP: Performance-Based Emergency Plan – Complete EP with ITAAC
Application
0 0 0 1,800 0 $0
52.17(b)(4) include a description of contacts and arrangements made with Federal, State, and local governmental agencies with emergency planning responsibilities 0 0 0 40 0 $0
52.29(a) requirements for a renewal application of any ESP 0 0 0 6000 0 $0
52.35 requires the holder to notify the agency of the non-nuclear use 0 0 0 40 0 $0
52.39(b) applicants for a CP, OL, or COL who have filed an application referencing an ESP to update their emergency preparedness information provided under 52.17(b) Burden covered under 10 CFR 52.79(b)
52.39(d) an applicant referencing an ESP may include in its application a request for a variance from one or more site characteristics, design parameters, or terms and conditions of the ESP, or from the site SAR 0 0 0 120 0 $0
Subtotal: Subpart A
0
0
0 $0
















SUBPART B: STANDARD DESIGN CERTIFICATIONS (DCs)
NRC expects 1 new NLWR DC applications and 0 new NLWR or LWR DC renewal applications over the next 3 years. (1/3=0.33)








Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $290/hr
52.45 an application for a DC may be filed even if an application for a CP or COL for such a facility has not been filed Burden covered under 10 CFR 52.46 and 52.47
52.47(a), except (a)(6) & (a)(27) requires that a DC application contain a Final Safety Analysis Report (FSAR) 0.33 1 0.33 35,300 11,649 $3,378,210
52.47(a)(27) requires a DC application to contain a FSAR that describes the design-specific probabilistic risk assessment (PRA) and its results 0.33 1 0.33 45,400 14,982 $4,344,780
52.47(b)(1) requires that a DC application contain proposed inspections, tests, analyses, and acceptance criteria (ITAAC) 0.33 1 0.33 25,300 8,349 $2,421,210
52.47(c)(1) requires that an application for certification of a nuclear power reactor design that is an evolutionary change from light-water reactor (LWA) designs of plants must provide an essentially complete NPP design except for site-specific elements. Burden covered under 10 CFR 52.47(a) and 52.47(b)
52.47(c)(2) requires that an application for certification of a nuclear power reactor design that differs significantly from the LWA designs described in paragraph (c)(1) or uses simplified, inherent, passive, or other innovative means to accomplish its safety functions must provide an essentially complete nuclear power reactor design except for site-specific elements and meet the requirements of 10 CFR 50.43(e). Burden covered under 10 CFR 52.47(a) and 52.47(b)
52.51 requires that applicants for DC must submit a design control document (DCD) prior to completing a proposed rule for certifying a standard design by rulemaking is essentially the same requirement of Section 52.47(a). Burden covered under 10 CFR 52.47(a)
52.57(a) provides a procedure for application for renewal of a DC 0 0 0 10,000 0 $0
52.63(b)(1) n/a Burden covered under 10 CFR 52.7
Subtotal: Subpart B
0.33
1
34,980 $10,144,200








[1] Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements.






















SUBPART C: COMBINED LICENSES (COLs)
NRC expects 1 new LWR COL application and 2 new NLWR COL applications over the next 3 years (3/3=1 responses/year)
0 new LWR or NLWR COLs referencing a DC application (0/3=0 responses/year)
1 LWR COLs under construction; 0 NLWR COLs under construction; 0 COLs decommissioning
NRC expects to receive a total of 1 LWR and 0 NLWR All ITAAC Complete Notifications over the next 3 years (1/3=0.33)
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $290/hr
52.79(a), except (a)(45) & (a)(46) - with deterministic Emergency Plan addresses a COL application that does not reference any other type of Part 52 license, certification, or approval, with deterministic, complete Emergency Plan 0.67 1 0.67 58,420 39,141 $11,351,006
52.79(a), except (a)(45) & (a)(46) - with performance-based Emergency Plan (50.160) addresses a COL application that does not reference any other type of Part 52 license, certification, or approval, with performance-based Emergency Plan 0 0 0 58,220 0 $0
52.79(a)(46) requires a COL application to contain a FSAR that describes the plant-specific probabilistic risk assessment or analysis (PRA) and its results 1 1 1 54,000 54,000 $15,660,000
52.79(b) addresses a COL application that references an ESP 0 0 0 102,368 0 $0
52.79(c) addresses a COL application that references a design approval 0.33 1 0.33 46,460 15,332 $4,446,222
52.79(d) addresses a COL application that references a DC 0 0 0 31,460 0 $0
52.79(e) addresses a COL application that references a manufactured reactor licensed under Subpart F of 10 CFR Part 52 0 0 0 36,460 0 $0
52.79(b) & (d) addresses a COL application that references both an ESP and DC 0 0 0 26,560 0 $0
52.80(a) – 40,000 hours for applications which do not reference a DC application requires that a COL application contain the proposed inspections, tests, and analyses, including those applicable to emergency planning, that the licensee shall perform 1 1 1 40,000 40,000 $11,600,000
52.80(a) - 10,000 hours for applications that do reference a certified design requires that a COL application contain the proposed inspections, tests, and analyses, including those applicable to emergency planning, that the licensee shall perform 0 0 0 10,000 0 $0
52.80(d) requires applicants for power reactor operating licenses under Part 52 to include in their applications information on the plan for implementing the requirements of 10 CFR 50.155(b), and the requirement and planned locations of the equipment on which the strategies and guidelines will rely. 1 1 1 300 300 $87,000
52.93(a) allows applicants for a COL under this subpart, or any amendment to a COL, to include in the application a request for an exemption from one or more of the Commission’s regulations.  Information submitted with an exemption request would be used to determine if the exemption is authorized by law, will not present an undue risk to public health and safety, and is consistent with the common defense and security, or if other special circumstances are present requiring consideration of the exemption request.  Burden covered under 10 CFR 52.7
52.93(b) allows applicants for a COL referencing an ESP to include in the application a request for a variance from one or more site characteristics, design parameters, or terms and conditions of the permit, or from the site SAR.  The NRC would use the information in an applicant’s request for a variance to determine if the information that did not conform to the ESP was in conformance with the NRC’s regulations.  Burden covered under 10 CFR 52.39
52.93(c) allows applicants for a COL referencing a nuclear power reactor manufactured under a ML to include in the application a request for a departure from one or more design characteristics, site parameters, terms and conditions, or approved design of the manufactured reactor.  The NRC would use the information in an applicant’s request for a departure to determine if the information that did not conform to the ML or approved design of the manufactured reactor was in conformance with the NRC’s regulations.  Burden covered under 10 CFR 52.171
52.99(a) requires licensees to submit to the NRC, no later than 1 year after issuance of a COL, a detailed schedule for completing the inspections, tests, or analyses in the ITAAC and provide updates to the ITAAC schedule every 6 months thereafter 0.33 1 0.33 20 7 $1,914
52.99(c)(1) requires that, after issuance of the COL, the licensee notify the NRC that the inspections, tests, or analyses in the ITAAC have been successfully completed and that the corresponding acceptance criteria have been met (ITAAC Closure Notification) 0.33 41 13.53 40 541 $156,948
52.99(c)(2) requires that the licensee notify the NRC in a timely manner of new information that materially alters the basis for determining that either inspections, tests, or analyses were performed as required, or that acceptance criteria are met (ITAAC Post-closure Notifications) 0.33 2 0.66 20 13 $3,828
52.99(c)(3) requires that, if the licensee has not provided, by the date 225 days before the scheduled date for initial loading of fuel, the notification required by paragraph (c)(1) of this section for all ITAAC, then the licensee must notify the NRC that the inspections, tests, or analyses for all uncompleted ITAAC will be successfully completed and all acceptance criteria will be met prior to operation (Uncompleted ITAAC Notifications) 0 1 0 40 0 $0
52.99(c)(4) requires that the licensee to notify the NRC that all ITAAC are complete (All ITAAC Complete Notification) 0.33 1 0.33 8 3 $766
52.99(d)(1) & 52.99(d)(2) These sections states that in the event that an activity is subject to an ITAAC derived from a referenced ESP or standard DC and the licensee has not demonstrated that the ITAAC has been met, the licensee may take corrective actions to successfully complete that ITAAC, request a variance from the ESP ITAAC, or request an exemption from the standard DC ITAAC, as applicable.  In the event that an activity is subject to an ITAAC not derived from a referenced ESP or standard DC and the licensee has not demonstrated that the ITAAC has been met, the licensee may take corrective actions to successfully complete that ITAAC or request a license amendment under ' 52.98(f).  The information submitted under this section would be used by the NRC to determine if the applicant met the NRC’s requirements related to the particular ITAAC that had not been successfully completed.  Burden covered under 10 CFR 52.39 (variances) and 52.7 (exemptions)
52.103(a) requires that the licensee shall notify the NRC of its scheduled date for initial loading of fuel no later than 270 days before the scheduled date and shall notify the NRC of updates to its schedule every 30 days thereafter 0.33 1 0.33 10 3 $957
52.110(a) requirements for when a licensee has determined to permanently cease operations 0 0 0 20 0 $0
52.110(d) requires that, before or within 2 years following permanent cessation of operations, the licensee submit a post shutdown decommissioning activities report 0 0 0 3,000 0 $0
52.110(g) requirements following submittal of the
post-shutdown decommissioning activities report
0 0 0 20 0 $0
52.110(h)(3) requires that within 2 years following permanent cessation of operations, if not already submitted, the licensee shall submit a site-specific decommissioning cost estimate 0 0 0 20 0 $0
52.110(h)(4) requirements for decommissioning activities 0 0 0 20 0 $0
Subtotal: Subpart C
1.33
19.18
149,340 $43,308,641
































SUBPART E: STANDARD DESIGN APPROVALS
NRC expects 0 new LWR and 1 new NLWR design approval applications over the next 3 years (1/3=0.33 responses per year)








Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $290/hr
52.137(a), except (a)(6) & (a)(25) requires that a design approval application contain a FSAR 0.33 1 0.33 42,000 13,860 $4,019,400
52.137(a)(25) requires a design approval application to contain a FSAR that describes the design-specific PRA and its results 0.33 1 0.33 54,000 17,820 $5,167,800
Subtotal: Subpart E
0.33
0.66
31,680 $9,187,200
















SUBPART F: MANUFACTURING LICENSES
NRC expects 0 LWR and 1 new NLWR manufacturing license applications over the next 3 years (1/3=0.33 responses per year).








Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $290/hr
52.157, except 52.157(f)(9) & (f)(31) requires that a ML application contain a FSAR 0.33 1 0.33 50,000 16,500
52.157(f)(31) requires a ML application to contain a FSAR that describes the design-specific PRA and its results 0.33 1 0.33 54,000 17,820 $5,167,800
52.158(a) require that a ML application contain the proposed inspections, tests and analyses that the licensee who will be operating the reactor shall perform, and the acceptance criteria 0.33 1 0.33 30,000 9,900 $2,871,000
52.177 contains requirements for renewal of an application for a ML previously issued by the NRC 0 0 0 10,000 0 $0
Subtotal: Subpart F
0.33
1
44,220 $8,038,800









APPENDIX A: ABWR DESIGN CERTIFICATION RULE
NRC expects 0 COL applicants referencing the ABWR Design Certification Rule over the next 3 years.
NRC expects 0 COL licensees referencing Appendix A NOT under construction over the next 3 years.
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $290/hr
X.A.2 requires an applicant or licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license.  Burden covered under 10 CFR 52.99(c)(1)
X.B.1 requires applicants or licensees who reference the DC to submit reports on plant-specific departures from the DCD 0 0 0 0 0 $0
X.B.2 requires applicants or licensees who reference this DC to submit updates to its DCD 0 0 0 0 0 $0
X.B.3.c states that after the Commission has authorized operation of the nuclear plant, the frequency for submitting reports and updates returns to the frequency required by 10 CFR 50.59 and 50.71, respectively. Burden covered under X.B.1 and X.B.2
Appendix A Total
0
0
0 $0
























APPENDIX B: SYSTEM 80+ DESIGN CERTIFICATION RULE
NRC expects 0 applicants to reference the System 80+ Design Certification Rule over the next 3 years.
NRC expects 0 COLs referencing Appendix B under construction over the next 3 years
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $290/hr
X.A.2 requires an applicant or licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license.  Burden covered under 10 CFR 52.99(c)(1)
X.B.1 requires applicants or licensees who reference the DC to submit reports on plant-specific departures from the DCD 0 0 0 8 0 $0
X.B.2 requires applicants or licensees who reference this DC to submit updates to its DCD 0 0 0 500 0 $0
X.B.3.c states that after the Commission has authorized operation of the nuclear plant, the frequency for submitting reports and updates returns to the frequency required by 10 CFR 50.59 and 50.71, respectively. Burden covered under X.B.1 and X.B.2
Appendix B Total
0
0
0 $0
















APPENDIX C: AP600 DESIGN CERTIFICATION RULE
NRC expects 0 applicants to reference the AP600 Design Certification Rule over the next 3 years.
NRC expects 0 COLs referencing Appendix C under construction over the next 3 years
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $290/hr
X.A.2 requires an applicant or licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license.  Burden covered under 10 CFR 52.99(c)(1)
X.B.1 requires applicants or licensees who reference the DC to submit reports on plant-specific departures from the DCD 0 0 0 8 0 $0
X.B.2 requires applicants or licensees who reference this DC to submit updates to its DCD 0 0 0 500 0 $0
X.B.3.c states that after the Commission has authorized operation of the nuclear plant, the frequency for submitting reports and updates returns to the frequency required by 10 CFR 50.59 and 50.71, respectively. Burden covered under X.B.1 and X.B.2
Appendix C Total
0
0
0 $0
















APPENDIX D: AP1000 DESIGN CERTIFICATION RULE
NRC expects 0 COL applicants to reference the AP1000 Design Certification Rule over the next 3 years.
NRC expects 0 COL licensees referencing Appendix D under construction over the next 3 years.
NRC expects 0 COL licensees referencing Appendix D NOT under construction over the next 3 years.
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $290/hr
X.A.2 requires an applicant or licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license.  Burden covered under 10 CFR 52.99(c)(1)
X.B.1 requires applicants or licensees who reference the DC to submit reports on plant-specific departures from the DCD 0 0 0 8 0 $0
X.B.2 requires applicants or licensees who reference this DC to submit updates to its DCD 0 0 0 500 0 $0
X.B.3.c states that after the Commission has authorized operation of the nuclear plant, the frequency for submitting reports and updates returns to the frequency required by 10 CFR 50.59 and 50.71, respectively. Burden covered under X.B.1 and X.B.2
Appendix D Total
0
0
0 $0
















APPENDIX E: ESBWR DESIGN CERTIFICATION RULE
NRC expects 0 COL applicants to reference the ESBWR Design Certification Rule over the next 3 years.
NRC expects 0 COL licensees referencing Appendix E NOT under construction over the next 3 years.
Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $290/hr
IV.A.2.a, c, h Section IV.A.2.a requires a plant-specific DCD as part of the COL application. This section partially fulfills the requirements for contents of applications for a COL (10 CFR 52.79) and ensures that the COL applicant commits to complying with the DCD. Section IV.A.2.c requires plant-specific technical specifications (10 CFR 50.36 and 50.36a) as part of the COL application. This information collection is the same as for 10 CFR 50.36, but the timing of the burden is earlier (10 CFR 52.79). Section IV.A.2.h requires information required by 10 CFR 52.47(a), that is not within the scope of this design certification, as part of the COL application. This section fulfills part of the requirements for a COL (10 CFR 52.79). Burden covered in 10 CFR 52.79
IV.A.2.b requires reports on departures from and updates to the DCD, under Section X.B of Appendix G, as part of the COL application.  This section ensures that the COL application is up-to-date.  Burden included in X.B below
X.B.1 requires applicants or licensees who reference the DC to submit reports on plant-specific departures from the DCD 0 0 0 0 0 $0
X.B.2 requires applicants or licensees who reference this DC to submit updates to its DCD 0 0 0 0 0 $0
X.B.3.a requires submittal of reports and updates to the generic DCD with the initial COL application.  This requirement ensures that the initial application is up-to-date and partially fulfills the requirements contents of applications in 10 CFR 52.79.  Burden covered in 10 CFR 52.79
X.B.3.b requires that during the period of review of the application and construction of a facility that references this design certification, summary reports on changes to the design must be submitted semi-annually.  These reports are needed to provide timely notification of design changes during the critical period of application review and facility construction.  Burden covered in X.B.1, X.B.2
X.B.3.c states that after the Commission has authorized operation of the nuclear plant, the frequency for submitting reports and updates returns to the frequency required by 10 CFR 50.59 and 50.71, respectively. Burden in 10 CFR 50.59(d) + 10 CFR 50.71(e)
Appendix E Total
0
0
0 $0








Subtotal: Appendices A through E
0
0
0 $0
[1] Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements.






















APPENDIX F: DESIGN CERTIFICATION FOR THE APR1400 DESIGN
NRC expects 0 combined license applicants to use Appendix F over the next 3 years.
Section Description of requirement No. of Respondents Responses / Respondent Total No. of Responses Burden per Response Total Annual Burden (Hrs) Cost @ $290/Hr
IV.A.2.a ) (COL applicant) requires a plant-specific DCD as part of the COL application. This section partially fulfills the requirements for contents of applications for a COL (10 CFR 52.79) and ensures that the COL applicant commits to complying with the DCD. Burden covered under 10 CFR 52.79
IV.A.2.b (COL applicant) requires reports on departures from and updates to the DCD, under Section X.B of Appendix G, as part of the COL application. This section ensures that the COL application is up-to-date Burden included in X.B below
IV.A.2.c (COL applicant) requires plant-specific technical specifications (10 CFR 50.36 and 50.36a) as part of the COL application. This information collection is the same as for 10 CFR 50.36, but the timing of the burden is earlier (10 CFR 52.79). Burden covered under 10 CFR 52.79
IV.A.2.d (COL applicant) requires information demonstrating compliance with site parameters and interface requirements as part of the COL application. This section fulfills part of the requirements for a COL (10 CFR 52.79). Burden covered under 10 CFR 52.79
IV.A.2.e (COL applicant) requires the COL applicant to address COL items in the generic DCD as part of the COL application. This section fulfills part of the requirements for a COL (10 CFR 52.79). Burden covered under 10 CFR 52.79
IV.A.2.f (COL applicant) requires information required by 10 CFR 52.47(a), that is not within the scope of this design certification, as part of the COL application. This section fulfills part of the requirements for a COL (10 CFR 52.79). Burden covered under 10 CFR 52.79
IV.A.2.g (COL applicant) requires information required by 10 CFR 52.47(a), that is not within the scope of this design certification, as part of the COL application. This section fulfills part of the requirements for a COL (10 CFR 52.79). Burden covered under 10 CFR 52.79
IV.A.2.h (COL applicant) requires information required by 10 CFR 52.47(a), that is not within the scope of this design certification, as part of the COL application. This section fulfills part of the requirements for a COL (10 CFR 52.79). Burden covered under 10 CFR 52.79
IV.A.3 (COL applicant) requires the COL applicant to include, in the plant-specific DCD, the proprietary and safeguards information referenced in the generic DCD to ensure that the applicant has actual notice of these requirements. This section fulfills part of the requirements for contents of applications for a COL (10 CFR 52.79). Burden covered under 10 CFR 52.79
X.B.1 (COL applicant) requires COL applicants or licensees who reference this design certification to submit reports on departures from the plant-specific DCD. This section is similar to the requirements in 10 CFR 50.59(d)(2). 0 1 0 8 0 $0
X.B.2 (COL applicant) requires COL applicants or licensees who reference this design certification to submit updates to its plant-specific DCD that reflect generic changes to and plant specific departures from the generic DCD. This section is similar to the requirements in 10 CFR 50.71(e). 0 1 0 500 0 $0
X.B.3.a requires submittal of reports and updates to the generic DCD with the initial COL application. This requirement ensures that the initial application is up-to-date and partially fulfills the requirements contents of applications in 10 CFR 52.79. Burden covered under 10 CFR 52.79
X.B.3.b requires that during the period of review of the application and construction of a facility that references this design certification, summary reports on changes to the design must be submitted semi-annually. These reports are needed to provide timely notification of design changes during the critical period of application review and facility construction. Burden covered under X.B.1, X.B.2
X.B.3.c states that after the Commission has authorized operation of the nuclear plant, the frequency for submitting reports and updates returns to the frequency required by 10 CFR 50.59 and 50.71, respectively. (Burden covered under 10 CFR 50.59(d) + 10 CFR 50.71(e))
Total
0
0
0 0
















APPENDIX G: DESIGN CERTIFICATION FOR THE NUSCALE DESIGN
NRC expects 0 combined license applicants to use Appendix G over the next 3 years.

Description of requirement No. of Respondents Responses / Respondent Total No. of Responses Burden per Response Total Annual Burden (Hrs) Cost @ $290/Hr
IV.A.2.a requires a plant-specific DCD as part of the COL application.  This section partially fulfills the requirements for contents of applications for a COL (10 CFR 52.79) and ensures that the COL applicant commits to complying with the DCD. (Burden covered under 10 CFR 52.79) (COL applicant)
IV.A.2.b requires reports on departures from and updates to the DCD, under Section X.B of Appendix G, as part of the COL application.  This section ensures that the COL application is up-to-date.  (Burden included in X.B below) (COL applicant)
IV.A.2.c requires plant-specific technical specifications (10 CFR 50.36 and 50.36a) as part of the COL application.  This information collection is the same as for 10 CFR 50.36, but the timing of the burden is earlier (10 CFR 52.79).  Burden covered under 10 CFR 52.79) (COL applicant)
IV.A.2.d requires information demonstrating compliance with site parameters and interface requirements as part of the COL application.  This section fulfills part of the requirements for a COL (10 CFR 52.79). (Burden covered under 10 CFR 52.79) (COL applicant)
IV.A.2.e requires the COL applicant to address COL items in the generic DCD as part of the COL application.  This section fulfills part of the requirements for a COL (10 CFR 52.79).  (Burden covered under 10 CFR 52.79) (COL applicant)
IV.A.2.f requires information required by 10 CFR 52.47(a), that is not within the scope of this design certification, as part of the COL application.  This section fulfills part of the requirements for a COL (10 CFR 52.79). (Burden covered under 10 CFR 52.79) (COL applicant)
IV.A.2.g requires information required by 10 CFR 52.47(a), that is not within the scope of this design certification, as part of the COL application.  This section fulfills part of the requirements for a COL (10 CFR 52.79). (Burden covered under 10 CFR 52.79) (COL applicant)
IV.A.2.h requires information required by 10 CFR 52.47(a), that is not within the scope of this design certification, as part of the COL application. This section fulfills part of the requirements for a COL (10 CFR 52.79). n/a (Burden covered under 10 CFR 52.79) (COL applicant)
IV.A.3 requires the COL applicant to include, in the plant-specific DCD, the proprietary and safeguards information referenced in the generic DCD to ensure that the applicant has actual notice of these requirements.  This section fulfills part of the requirements for contents of applications for a COL (10 CFR 52.79). (Burden covered under 10 CFR 52.79) (COL applicant)
IV.A.4 requires the COL applicant to include, as part of the COL application, information demonstrating that an entity other than NuScale Power is qualified to supply the NuScale design, unless NuScale Power supplies the design for the COL applicant’s use. (Burden covered under 10 CFR 52.79) (COL applicant)
X.B.1 (COL applicant) requires COL applicants or licensees who reference this design certification to submit reports on departures from the plant-specific DCD.  This section is similar to the requirements in 10 CFR 50.59(d)(2).  0 0 0 0 0 $0
X.B.2 (COL applicant) requires COL applicants or licensees who reference this design certification to submit updates to its plant-specific DCD that reflect generic changes to and plant specific departures from the generic DCD.  This section is similar to the requirements in 10 CFR 50.71(e).  0 0 0 0 0 $0
X.B.3.a requires submittal of reports and updates to the generic DCD with the initial COL application.  This requirement ensures that the initial application is up-to-date and partially fulfills the requirements contents of applications in 10 CFR 52.79. (Burden covered under 10 CFR 52.79)
X.B.3.b requires that during the period of review of the application and construction of a facility that references this design certification, summary reports on changes to the design must be submitted semi-annually.  These reports are needed to provide timely notification of design changes during the critical period of application review and facility construction.  (Burden covered under X.B.1, X.B.2)
X.B.3.c states that after the Commission has authorized operation of the nuclear plant, the frequency for submitting reports and updates returns to the frequency required by 10 CFR 50.59 and 50.71, respectively. (Burden covered under 10 CFR 50.59(d) + 10 CFR 50.71(e))
Total
0 0 0 0 0 $0
***The respondents in X.B.1 and X.B.2 are the same entity and should not be double counted in the total.






















APPENDIX N: STANDARDIZATION OF NUCLEAR POWER PLANT DESIGNS:
COMBINED LICENSES TO CONSTRUCT AND OPERATE NUCLEAR POWER REACTORS OF IDENTICAL DESIGN AT MULTIPLE SITES
NRC expects 0 combined license applicants to use Appendix N over the next 3 years.








Section Description of requirement Number of Respondents Annually Responses per Respondent Annually Total Responses Annually Burden per Response Total Annual Burden Hours Estimate Annual Cost @ $290/hr
Paragraph 2 requires that each COL application submitted pursuant to this appendix be submitted as specified in 52.75 and 10 CFR 2.101 and that each application state that the applicant wishes to have the application considered under 10 CFR Part 52, Appendix N 0 0 0 10 0 $0
Paragraph 3 requirements for what each application should include 0 0 0 40 0 $0
Paragraph 4 This paragraph requires that each COL application submitted pursuant to this appendix contain an ER as required by 52.80(b), and which complies with the applicable provisions of 10 CFR Part 51 and states that the application may incorporate by reference a single ER on the environmental impacts of the common design. Burden covered under 10 CFR 52.80©
Subtotal: Appendix N
0
0
0 $0
















Total Part 52 Reporting Burden
4
48
294,220 $80,538,841
















TABLE 3
ANNUAL REPORTING BURDEN UNDER 10 CFR 52.99(a)
10 CFR PART 52
NOTE: Bell Bend, Callaway, Calvert Cliffs, Comanche Peak, Grand Gulf, Nine Mile Point, River Bend, Lee, Shearon Harris, Bellefonte, and Victoria County COL applications are suspended or withdrawn; and therefore, have been removed from the table. Summer, Levy, and South Texas Project COLs were terminated at the request of the licensees; and therefore, have been removed from the table.
Applicant/Licensee Name Reporting Section 2024 2025 2026


NuScale DC application Subpart B A (Feb 2023)




NuScale SDA application (30 month review started March 2023) Subpart B N N N


CFPP/UAMPS COL application * Subpart C N N N


AP1000 DC renewal application * Subpart B
N N


Vogtle Unit 3 COL Subpart C & Appendix D Z




Vogtle Unit 4 COL Subpart C & Appendix D Z




COL A (non-LWR reactor)* Subpart C N N N


COL B (non-LWR reactor)* Subpart C

N


ML (non-LWR reactor)* Subpart F
N N


SDA (non-LWR reactor)* Subpart E
N N


DC (non-LWR reactor)* Subpart B
N N










Notes:
* = new application submitted during this reporting period
N = license/permit/design certification not yet issued; A = license/permit/design certification issued; Z = initial fuel load
Continue ITAAC complete notifications 12 per year until notification of all ITAAC met
For reporting purposes it is assume that each unit will submit a separate report

Sheet 2: recordkeeping

TABLE 2
ANNUAL RECORDKEEPING BURDEN
10 CFR PART 52






NRC expects 5 new NLWR applications (includes 1 DC, 2 COLs, 1 ML, a 1 SDA) and 1 new LWR COL application to be submitted over the next 3 years
NRC expects 0 new DC renewal applications to be submitted over the next 3 years.
Section Description of requirement Number of Record keepers Burden Hrs. per Record keeper Total Annual Burden Hours Estimate Annual Cost @ $290/hr
52.47 requirements for the contents of applications for the certification of a standard plant design 2 500 1,000 $290,000
Regulatory Guide (RG) 1.206, "Applications for Nuclear Power Plants" provides guidance on the format and content of applications and on the conduct of pre-application activities submitted under 10 CFR Part 52. 2 5000 10,000 $2,900,000
52.57(a)-renewals provides a procedure for application for renewal of a DC - requires updating any of the information that was submitted under Sections 52.46 and 52.47 0 500 0 $0
52.63(b)(2) requires that licensees who reference a standard DC must maintain records of all changes to the facility 1 1,500 1,500 $435,000
52.63(c) & 52.73(b) requires applicants for CPs, OLs, or COLs who reference standard DCs, SDAs, or MLs to acquire or complete, and make available for audit, detailed design-related information normally contained in procurement, construction, and installation specifications 1 500 500 $145,000
Subtotal
6
13,000 $3,770,000
Recordkeepers under 52.63(b)(2) and 52.63(b) are noted as the same record keeper and are only counted once.
















APPENDIX A: ABWR DESIGN CERTIFICATION RULE
NRC expects 0 applicant to maintain records for the ABWR Design Certification Rule over the next 3 years.
Section Description of requirement Number of Record keepers Burden Hrs. per Record keeper Total Annual Burden Hours Estimate Annual Cost @ $290/hr
X.A.1 requires that the applicant for the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced 1 34 34 $9,860
X.A.2 requires an applicant or licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license. Burden covered under 10 CFR 50.71(e)
X.A.3 requires an applicant or licensee who references this design certification to prepare and maintain the bases for its changes to this design certification throughout the period of the application and the term of the license. Burden covered under 10 CFR 50.59(d)
X.A.4.a Requires the applicant for the amendment to the U.S. ABWR design to maintain a copy of the aircraft impact assessment performed to comply with the requirements of 10 CFR 50.150(a) for the term of the certification (including any period of renewal)
0 1 0 $0
X.A.4.a Requires the applicant for the amendment to the ABWR design to maintain a copy of the aircraft impact assessment performed to comply with the requirements of 10 CFR 50.150(a) for the term of the certification (including any period of renewal)
0 1 0 $0
Appendix A Total
1
34 $9,860



















[1] Due to rounding, the total burden cost may not equal the sum of the costs of the individual requirements.
















APPENDIX B: SYSTEM 80+ DESIGN CERTIFICATION RULE
NRC expects 0 applicant to maintain records for the System 80+ Design Certification Rule over the next 3 years. (This certified design has expired)
Section Description of requirement Number of Record keepers Burden Hrs. per Record keeper Total Annual Burden Hours Estimate Annual Cost @ $290/hr
X.A.1 requires that the applicant for the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced 0 0 0 $0
X.A.2 requires an applicant or licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license. Burden covered under 10 CFR 50.71(e)
X.A.3 requires an applicant or licensee who references this design certification to prepare and maintain the bases for its changes to this design certification throughout the period of the application and the term of the license. Burden covered under 10 CFR 50.59(d)
Appendix B Total
0
0 $0






APPENDIX C: AP600 DESIGN CERTIFICATION RULE
NRC expects 0 applicant to maintain records for the AP600 Design Certification Rule over the next 3 years. (This certified design has expired)
Section
Number of Record keepers Burden Hrs. per Record keeper Total Annual Burden Hours Estimate Annual Cost @ $290/hr
X.A.1 requires that the applicant for the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced 0 0 0 $0
X.A.2 requires an applicant or licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license. Burden covered under 10 CFR 50.71(e)
X.A.3 requires an applicant or licensee who references this design certification to prepare and maintain the bases for its changes to this design certification throughout the period of the application and the term of the license. Burden covered under 10 CFR 50.59(d)
Appendix C Total
0
0 $0






APPENDIX D: AP1000 DESIGN CERTIFICATION RULE
NRC expects 1 applicant for two plants to maintain records for the AP1000 Design Certification Rule over the next 3 years
Section Description of requirement Number of Record keepers Burden Hrs. per Record keeper Total Annual Burden Hours Estimate Annual Cost @ $290/hr
X.A.1 requires that the applicant for the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced 1 34 34 $9,860
X.A.2 requires an applicant or licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license. Burden covered under 10 CFR 50.71(e)
X.A.3 requires an applicant or licensee who references this design certification to prepare and maintain the bases for its changes to this design certification throughout the period of the application and the term of the license. Burden covered under 10 CFR 50.59(d)
Appendix D Total
1
34 $9,860












APPENDIX E: ESBWR DESIGN CERTIFICATION RULE
NRC expects 1 applicant to maintain records for the ESBWR Design Certification Rule over the next 3 years.
Section Description of requirement No. of Recordkeepers Burden Hours per Recordkeeper Total Annual Burden Hours Cost @ $290/Hr
X.A.1 requires that the applicant for the DC maintain a copy of the generic DCD and maintain the proprietary and safeguards information referenced in the generic DCD for the period that the appendix may be referenced 1 34 34 $9,860
X.A.2 requires an applicant or licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license. Burden covered under 10 CFR 50.71(e)
X.A.3 requires an applicant or licensee who references this design certification to prepare and maintain the bases for its changes to this design certification throughout the period of the application and the term of the license. Burden covered under 10 CFR 50.59(d)
Appendix E Total
1
34 $9,860












APPENDIX F: APR1400 DESIGN CERTIFICATION RULE
NRC expects 1 applicant to maintain records for the APR1400 Design Certification Rule over the next 3 years
Section Description of requirement No. of Recordkeepers Burden Hours per Recordkeeper Total Annual Burden Hours Cost @ $290/Hr
X.A.1(similar burden to 10 CFR 50.71(e)) (DCD applicant) requires that the applicant for this appendix shall maintain a copy of the generic DCD that includes all generic changes that are made to Tier 1 and Tier 2, and the generic TS and other operational requirements. 1 34 34 $9,860
X.A.2 requires an applicant or licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license. Burden covered under 10 CFR 50.71(e)
X.A.3 requires an applicant or licensee who references this design certification to prepare and maintain the bases for its changes to this design certification throughout the period of the application and the term of the license. Burden covered under 10 CFR 50.59(d)
X.A.4.a (DCD applicant) requires that the applicant for the APR1400 design shall maintain a copy of the aircraft impact assessment performed to comply with the requirements of 10 CFR 50.150(a) for the term of the certification (including any period of renewal) 1 3 3 $870
X.A.4.b (COL applicant) requires that the applicant or licensee who references this appendix shall maintain a copy of the aircraft impact assessment performed to comply with the requirements of 10 CFR 50.150(a) throughout the pendency of the application and for the term of the license (including any periods 1 3 3 $870
Appendix F Total
1
40 $11,600












APPENDIX G: NUSCALE DESIGN CERTIFICATION RULE
NRC expects 1 applicant to maintain records for the Nuscale Design Certification Rule over the next 3 years.
Section Description of requirement No. of Recordkeepers Burden Hours per Recordkeeper Total Annual Burden Hours Cost @ $290/Hr
X.A.1(similar burden to 10 CFR 50.71(e)) (DCD applicant)
1 103 103.0 $29,870
X.A.2 requires an applicant or licensee who references this design certification to maintain the plant-specific DCD throughout the period of the application and for the term of the license. Burden covered under 10 CFR 50.71(e)
X.A.3 requires an applicant or licensee who references this design certification to prepare and maintain the bases for its changes to this design certification throughout the period of the application and the term of the license. Burden covered under 10 CFR 50.59(d)
X.A.4.a (DCD applicant) requires the applicant for this design certification to maintain a copy of the aircraft impact assessment (AIA) performed to comply with the requirements of 10 CFR 50.150(a) for the term of the certification (including any period of renewal). 0 3 0 $0
X.A.4.b (COL applicant) requires COL applicants or licensees who references this design certification to maintain a copy of the AIA performed to comply with the requirements of 10 CFR 50.150(a) throughout the pendency of the application and for the term of the license (including any period of renewal). 0 3 0 $0
Appendix G Total
1 109 103 $29,870












Total Part 52 Recordkeeping Burden
11.00
13,245 $3,799,580
Total Storage Cost



$1,536.42












TABLE 1



Applicant/Licensee Name Recordkeeping Section
From 2020 not in 2023
NuScale DC application 52.47
Oklo COL (non-LWR reactor) * Subpart C
NuScale SDA application 52.47
Summer Unit 2 COL Subpart C & Appendix D
UAMPS COL application* 52.47 and 52.63(c) & 52.73(b)
Summer Unit 3 COL Subpart C & Appendix D
AP1000 DC renewal application* 52.47
ABWR DC Renewal Subpart B
Vogtle Unit 3 COL 52.63(b)(2)
Bellefonte 1 COL Subpart C
Vogtle Unit 4 COL 52.63(b)(2)



COL A (non-LWR reactor)* 52.79



COL B (non-LWR reactor)* 52.73(b)



ML (non-LWR reactor)* 52.157



SDA (non-LWR reactor)* 52.137



DC (non-LWR reactor)* 52.47









Notes:




For reporting purposes it is assumed that each unit will submit a separate report.





Sheet 3: TOTALS


Burden Totals Part 52 Renewal

Hours Responses
Reporting 294,220 47.8
Recordkeeping 13,245 11.0
Total 307,465 58.8






Total cost @$290/hr $89,164,891






Additional costs (item #14) $1,536
File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy