U. S. Environmental Protection Agency | ||
Clean Ports Program | ||
Supplemental Application Template | ||
Burden Statement for EPA Form 5900-679 | ||
This collection of information is approved by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. (OMB Control No. 2060-NEW). Responses to this collection of information are voluntary (2 CFR 200 at 2 CFR 1500). An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The public reporting and recordkeeping burden for this collection of information is estimated to range from 2.2-6.1 hours per response. Send comments on the Agency’s need for this information, the accuracy of the provided burden estimates and any suggested methods for minimizing respondent burden to the Regulatory Support Division Director, U.S. Environmental Protection Agency (2821T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address. | ||
Instructions | ||
This optional supplemental application template may be submitted at the time of award application to summarize the overview of the proposed project. Please work with relevant parties (i.e., transportation contractor, port authority, etc.) to ensure information submitted is accurate if available. To complete this template, applicants may fill out shaded cells highlighted blue with a diagonal pattern (///). Cells highlighted yellow are simply for informative purposes and/or automated from other tabs in this spreadsheet. Additional fields may autopopulate with bold diagonal patterns (///), indicating that a response to those fields is not necessary, based on prior responses entered. Please complete tabs in this workbook according to the instructions below. Applicants applying to the Climate and Air Quality Planning Competition are invited to complete Tab 2. Applicants applying to the Zero-Emission Technology Deployment Competition are invited to complete Tabs 3, 4a., 4b. (if scrapping vehicles or equipment), and Tab 5. |
||
Excel Workbook Tab | Definition | |
1. Instructions | Basic instructions for all worksheets in this reporting workbook. | |
2. CAQP Supplemental Application | For applicants of the Clean Ports Program Climate and Air Quality Planning (CAQP) Competition, this is the only tab that should be completed. This tab provides an overview of the Participant Details, list of Project Partners, Project Location Information, and Proposed Climate and Air Quality Planning Project Activities. Please refer to the definitions on Tab 6 (Data Dictionary) for additional guidance on each field in this tab. | |
3. Cover Sheet for Application_ZE | For applicants of the Clean Ports Program Zero-Emission Technology Deployment Competition, this tab serves as a cover sheet, with space to provide an overview of the Participant Details, list of Project Partners, Project Location Information, and other key project details. Several fields and Table 4 of this tab will auto-populate based on responses entered into subsequent tabs. Please refer to the Cover Sheet for Application_ZE data definitions on Tab 6 (Data Dictionary) for additional guidance on each field. | |
4a. New Fleet Description | For applicants of the Clean Ports Program Zero-Emission Technology Deployment Competition, the New Fleet Description tab captures all new vehicles and mobile source equipment proposed under the project. Please only fill out shaded cells highlighted blue with a diagonal pattern (///). The sheet has capacity for 100 vehicles. Please refer to the New Fleet Description data definitions on Tab 6 (Data Dictionary) for additional guidance on each field. | |
4b. Scrappage Information | For applicants of the Clean Ports Program Zero-Emission Technology Deployment Competition, the Scrappage Information provides space for applicants whose proposed project includes plans to scrap vehicles and/or equipment. This data sheet is linked to the 'New Fleet Description' data table (Tab 4a.) to autopopulate the corresponding 'new' vehicle or equipment that is to be replaced. The sheet has capacity for 100 vehicles. Please refer to the Scrappage Information data definitions on Tab 6 (Data Dictionary) for additional guidance on each field. | |
5. Infrastructure | For applicants of the Clean Ports Program Zero-Emission Technology Deployment Competition, the Infrastructure Description should detail all electric vehicle supply equipment (EVSE), shore power, and other eligible zero emission supporting infrastructure proposed in the project. Please only fill out shaded cells highlighted blue with a diagonal pattern (///). Each table on this sheet has capacity for 50 units of infrastructure, however many of these additional rows have been hidden; to access these additional rows, right-click the left hand column and select 'Unhide'. Additional rows may also be added as needed to capture all supporting infrastructure. Please refer to the Infrastructure data definitions on Tab 6 (Data Dictionary) for data field definitions. Key Reminders: ►All Level 2 EVSEs and DC Fast Chargers must be ENERGY STAR certified. ►All zero emission supporting infrastructure must comply with Build America, Buy America (BABA) requirements. |
|
6. Data Dictionary | Please refer to the dictionary on this tab for support in completing the following tabs: CAQP Supplemental App. (Tab 2), Cover Sheet for Application_ZE (Tab 3), New Fleet Description (Tab 4a), Scrappage Information (Tab 4b), and Infrastructure (Tab 5). | |
U. S. Environmental Protection Agency | ||||||||||||||
Clean Ports Program | Climate and Air Quality Planning Competition | ||||||||||||||
Supplemental Application | ||||||||||||||
Instructions | ||||||||||||||
For applicants of the Climate and Air Quality Planning Competition: Complete this supplemental project application by entering in the requested information in the blue shaded cells for Tables 1, 2, 3a, 3b, and 4. This sheet details an overview of the Applicant and Project Details, the complete list of Project Partners, Project Location Information, and Climate and Air Quality Planning Project Details. Please refer to the definitions on Tab 6 (Data Dictionary) for additional guidance on each field in this tab. | ||||||||||||||
Table 1: Applicant & Project Details | ||||||||||||||
Applicant Name/Organization | Proposed Project Title | One descriptive sentence only | ||||||||||||
Applicant Address | Street | Project Period For Climate & Air Quality Planning projects, project periods may be up to three years. |
Project Start Date | |||||||||||
City | Project End Date | |||||||||||||
State (Select from dropdown) |
Short Project Description Briefly describe your project in one to three sentences only, especially noting the expected outputs and outcomes. |
|||||||||||||
Zip Code | ||||||||||||||
Primary Contact Information | Name | |||||||||||||
Title/Role | Project includes planning activities related to emissions inventory and accounting exercises? | Select Yes or No from Dropdown | ||||||||||||
Phone | Total EPA Funding Requested |
Use the definitions provided in Section IV.C., Section 7 “Budget” to fill out this budget summary. The amount listed in this summary should match the amounts listed in the budget table in Section 7. As noted in Section II.B. of the NOFO, each application can request between $200,000 and $3,000,000. | ||||||||||||
Other Federal Funding Sources | If the applicant has applied or plans to apply for funding for this project (or portions of this project) from another federal funding source, the applicant should list the potential funding source(s). Otherwise, enter N/A | |||||||||||||
Applicant Type (See NOFO Section III.A for details) |
Select from Dropdown | |||||||||||||
Affiliate Port Authority (if applicable) |
||||||||||||||
SAM.gov Unique Entity ID (UEI) | ||||||||||||||
Small Water Port Project? (See NOFO Section II.B for specifications) |
Select Yes or No from Dropdown | |||||||||||||
Dry Port Project? (See NOFO Section I.B. for specifications) |
Select Yes or No from Dropdown | |||||||||||||
Does the applicant use LOGINK or any other prohibited logistics platform as described in NOFO Section III.D.? | Select Yes or No from Dropdown | |||||||||||||
Table 2: Project Partners | ||||||||||||||
Project Partner Organization Name | Primary Contact Information for Project Partner(s) | Type of Organization | Nature of Partnership with Applicant | Role in Project | ||||||||||
Name | Title/Role | Phone | Select from Dropdown | If Other, describe | Select from Dropdown | Select from Dropdown | If Other, describe | |||||||
Example Partner Organization | Ali Raymond | Director of Advancement | Other | Non-governmental Organization | Collaborating Entity (non-statutory) | Other | Site Manager | |||||||
Table 3: Project Location(s) | ||||||||||||||
Table 3a: Port/Port Facility Location(s) | ||||||||||||||
Port/Port Facility Name If a port or port facility spans more than 1 county, please enter a new line for each unique county. |
Project Site ID | Port Authority Name (if applicable) | State (Select from dropdown) |
County (Select from dropdown) |
City | Description of Project Activity at Port/Port Facility (if known) |
Estimate of the Share of Overall Project Activity at this site (Enter a value between 0-1, where 1 is 100%) |
County FIPS Code | EPA Region | Does this county contains a PM2.5 or Ozone Nonattainment Area? | Does this county contains a Severe or Extreme Ozone Nonattainment Area? | Does this county contains a PM2.5 or Ozone Maintenance Area? | Does this county contain an area with High Ambient Diesel PM Concentration? | Does this county meet the Disadvantaged Community Definition in Section IV.C.2 of the NOFO? |
Port of Miami | Example Project ID | FL | Miami-Dade County | Miami | Mobile Source Emissions Inventory | 100% | 12086 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | |
Primary Place of Performance | please provide state first | |||||||||||||
2 | please provide state first | |||||||||||||
3 | please provide state first | |||||||||||||
4 | please provide state first | |||||||||||||
5 | please provide state first | |||||||||||||
6 | please provide state first | |||||||||||||
7 | please provide state first | |||||||||||||
8 | please provide state first | |||||||||||||
9 | please provide state first | |||||||||||||
10 | please provide state first | |||||||||||||
Table 3b: Additional Project Locations Use this table to identify additional project locations found outside of the ports and port facilities listed in Table 3a above. |
||||||||||||||
Site Name If an Additional Site spans more than 1 county, please enter a new line for each unique county. |
Project Site ID | Port(s)/Port Facilities Served by Location (separate additional ports by semicolon) |
State (Select from dropdown) |
County (Select from dropdown) |
City | Description of Project Activity at Site (if known) |
Estimate of the Share of Project Activity at this site (Enter a value between 0-1, where 1 is 100%) |
County FIPS Code | EPA Region | Does this county contains a PM2.5 or Ozone Nonattainment Area? | Does this county contains a Severe or Extreme Ozone Nonattainment Area? | Does this county contains a PM2.5 or Ozone Maintenance Area? | Does this county contain an area with High Ambient Diesel PM Concentration? | Does this county meet the Disadvantaged Community Definition in Section IV.C.2 of the NOFO? |
Hialeah Fueling Depot | Example Additional Site A | Port of Miami; Port Everglades | FL | Miami-Dade County | Miami | EV Infrastructure Planning | 100% | 12086 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? |
Additional Site 1 | please provide state first | |||||||||||||
Additional Site 2 | please provide state first | |||||||||||||
Additional Site 3 | please provide state first | |||||||||||||
Additional Site 4 | please provide state first | |||||||||||||
Additional Site 5 | please provide state first | |||||||||||||
Additional Site 6 | please provide state first | |||||||||||||
Additional Site 7 | please provide state first | |||||||||||||
Additional Site 8 | please provide state first | |||||||||||||
Additional Site 9 | please provide state first | |||||||||||||
Additional Site 10 | please provide state first | |||||||||||||
Table 4: Climate and Air Quality Planning Project Overview | ||||||||||||||
Planning Activity Type | Project includes this activity Select from Dropdown |
Requested EPA Funds for this Activity | Is it the intent that this Activity will be fully funded by EPA? (select from dropdown) | |||||||||||
Emissions Inventory and/or Accounting Practice | ||||||||||||||
Emissions Reduction Strategy Analysis | ||||||||||||||
Development of Emissions Reduction Target | ||||||||||||||
Plan for Reducing Future Port Emissions | ||||||||||||||
Port Resiliency Assessment | ||||||||||||||
Plan to Increase Resilience of Port | ||||||||||||||
Formal Stakeholder Engagement | ||||||||||||||
Workforce Planning Analysis | ||||||||||||||
Other Activities If project features other Planning Activities not listed, please provide here; additional rows hidden if needed. |
||||||||||||||
U. S. Environmental Protection Agency | ||||||||||||||
Clean Ports Program | Zero-Emission Technology Deployment Competition | ||||||||||||||
Supplemental Application Cover Sheet | ||||||||||||||
Instructions | ||||||||||||||
For applicants of the Clean Ports Program Zero-Emission Technology Deployment Competition: Please complete this cover sheet by entering in the requested information in the blue shaded cells for Tables 1, 2, 3a, and 3b. This sheet details an overview of the Applicant and Project Details, the complete list of Project Partners, Project Location Information, and will autopopulate key project details based on information supplied in other tabs. | ||||||||||||||
Table 1: Applicant & Project Details | ||||||||||||||
Applicant Name/Organization | Proposed Project Title | One descriptive sentence only | ||||||||||||
Applicant Address | Street | Project Period For Zero Emissions Technology projects, project periods may be up to 4 years. |
Project Start Date | |||||||||||
City | Project End Date | |||||||||||||
State (Select from dropdown) |
Short Project Description Briefly describe your project in one to three sentences only, especially noting the expected outputs and outcomes. |
|||||||||||||
Zip Code | ||||||||||||||
Primary Contact Information | Name | |||||||||||||
Title/Role | ||||||||||||||
Phone | Total EPA Funding Requested |
Use the definitions provided in Section IV.C., Section 7 “Budget” to fill out this budget summary. The amount listed in this summary should match the amounts listed in the budget table in Section 7. As noted in Section II.B. of the NOFO, each application can request between $200,000 and $3,000,000. | ||||||||||||
Total Applicant Costs | Use the definition provided in Section IV.C., Section 8 “Budget” to fill out this field. The amount listed in this summary should match the amounts listed in the budget table in Section | |||||||||||||
Applicant Type | Select from Dropdown | Total Project Costs | Sum of the EPA Funding Requested and Total Applicant Costs | $- | ||||||||||
Affiliate Port Authority (if applicable) |
Other Federal Funding Sources | If the applicant has applied or plans to apply for funding for this project (or portions of this project) from another federal funding source, the applicant should list the potential funding source(s). Otherwise, enter N/A | ||||||||||||
SAM.gov Unique Entity ID (UEI) | Total Funding for ZE Equipment This field will auto-populate upon completing 'Fleet Description' tab. |
$- | ||||||||||||
Small Water Port Project? (See NOFO Section II.B for specifications) |
Select from Dropdown | Total Funding for Charging and/or Fueling Infrastructure This field will auto-populate upon completing 'Infrastructure' tab |
$- | |||||||||||
Dry Port Project? (See NOFO section I.B. for specifications) |
Select from Dropdown | |||||||||||||
Does the applicant use LOGINK or any other prohibited logistics platform as described in NOFO Section III.D.? | Select from Dropdown | |||||||||||||
Table 2: Project Partners | ||||||||||||||
Project Partner Organization Name | Primary Contact Information for Project Partner(s) | Type of Organization | Nature of Partnership with Applicant | Role in Project | ||||||||||
Name | Title/Role | Phone | Select from Dropdown | If Other, describe | Select from Dropdown | Select from Dropdown | If Other, describe | |||||||
Example Partner Organization | Ali Raymond | Director of Advancement | Other | Non-governmental Organization | Collaborating Entity (non-statutory) | Other | Site Manager | |||||||
Table 3: Project Location(s) | ||||||||||||||
Table 3a: Port/ Port Facility Location(s) | ||||||||||||||
Port/ Port Facility Name If a port or port facility spans more than 1 county, please enter a new line for each unique county. |
Project Site ID | Port Authority Name (if applicable) | State (Select from dropdown) |
County (Select from dropdown) |
City | Description of Project Activity at Port/ Port Facility (if known) |
Estimate of the Share of Project Activity at this site (Enter a value between 0-1, where 1 is 100%) |
County FIPS Code | EPA Region | County Contains PM2.5 or Ozone Nonattainment Area? | County Contains Severe or Extreme Ozone Nonattainment Area? | County Contains PM2.5 or Ozone Maintenance Area? | County Contains High Ambient Diesel PM Concentration? | County Meets Disadvantaged Community Definition in Section IV.C.2, Section 4 in the NOFO? |
Port of Miami | 1 | FL | Miami-Dade County | Miami | Mobile Source Emissions Inventory | 100% | 12086 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | |
Primary Place of Performance | please provide state first | |||||||||||||
2 | please provide state first | |||||||||||||
3 | please provide state first | |||||||||||||
4 | please provide state first | |||||||||||||
5 | please provide state first | |||||||||||||
6 | please provide state first | |||||||||||||
7 | please provide state first | |||||||||||||
8 | please provide state first | |||||||||||||
9 | please provide state first | |||||||||||||
10 | please provide state first | |||||||||||||
Table 3b: Additional Project Locations Use this table to identify additional project locations found outside of the ports listed in Table 3a above. |
||||||||||||||
Site Name If an Additional Site spans more than 1 county, please enter a new line for each unique county. |
Project Site ID | Port(s)/Port Facilities Served by Location (separate additional ports by semicolon) |
State (Select from dropdown) |
County (Select from dropdown) |
City | Description of Project Activity at Site (if known) |
Estimate of the Share of Project Activity at this site (Enter a value between 0-1, where 1 is 100%) |
County FIPS Code | EPA Region | County Contains PM2.5 or Ozone Nonattainment Area? | County Contains Severe or Extreme Ozone Nonattainment Area? | County Contains PM2.5 or Ozone Maintenance Area? | County Contains High Ambient Diesel PM Concentration? | County Meets Disadvantaged Community Definition in Section IV.C.2, Section 4 in the NOFO? |
Hialeah Fueling Depot | Example Site 1 | Port of Miami; Port Everglades | FL | Miami-Dade County | Miami | EV Infrastructure Planning | 100% | 12086 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? |
Additional Site 1 | please provide state first | |||||||||||||
Additional Site 2 | please provide state first | |||||||||||||
Additional Site 3 | please provide state first | |||||||||||||
Additional Site 4 | please provide state first | |||||||||||||
Additional Site 5 | please provide state first | |||||||||||||
Additional Site 6 | please provide state first | |||||||||||||
Additional Site 7 | please provide state first | |||||||||||||
Additional Site 8 | please provide state first | |||||||||||||
Additional Site 9 | please provide state first | |||||||||||||
Additional Site 10 | please provide state first | |||||||||||||
Table 4: Zero-Emission Technology Deployment Project Overview | ||||||||||||||
Port Sectors Affected These fields will auto-populate with ✔ upon completing 'Fleet Description' tab. |
||||||||||||||
Onroad Vehicles | ||||||||||||||
Cargo Handling Equipment & Other Nonroad | ||||||||||||||
Locomotive | ||||||||||||||
Vessels | ||||||||||||||
Project Features Scrappage of Equivalent Equipment? This field will auto-populate with ✔ upon completing 'Scrappage Information' tab. | ||||||||||||||
Fueling Infrastructure Affected These fields will auto-populate with ✔ upon completing 'Infrastructure' tab. |
||||||||||||||
Electric Vehicle Supply Equipment (EVSE) | ||||||||||||||
Shore Power Infrastructure | ||||||||||||||
Hydrogen Fueling Infrastructure | ||||||||||||||
Solar and Wind Power Generation | ||||||||||||||
Battery Energy Storage System | ||||||||||||||
Other Infrastructure |
U. S. Environmental Protection Agency | |||||||||||||||||||||||||||||||||||||||||||||||
Clean Ports Program | Zero-Emission Technology Deployment Competition | |||||||||||||||||||||||||||||||||||||||||||||||
New Fleet Description | |||||||||||||||||||||||||||||||||||||||||||||||
Instructions | |||||||||||||||||||||||||||||||||||||||||||||||
The Fleet Description should detail all vehicles, vessels, and other mobile source equipment that will be purchased as part of the project. Please only fill out shaded cells highlighted blue with a diagonal pattern (///); field in yellow will be autopopulated, and some fields will be hashed out if they are not applicable based on the information entered. Please list ALL port and other locations where the project will take place in this worksheet. This Fleet Description is connected to the Scrappage Information table (Tab 4b). The sheet has capacity for 100 vehicles or equipment. Please refer to the Fleet Description data definitions on Tab 6 (Data Dictionary) for additional guidance on each field. | |||||||||||||||||||||||||||||||||||||||||||||||
Table 5. New Vehicle, Equipment, or Engine Information | |||||||||||||||||||||||||||||||||||||||||||||||
Table 5a: Vehicle/Equipment Overview | Table 5b: Place(s) of Performance | Table 5c: Details of New Vehicle, Vessel, and/or Equipment | Table 5d. Engine Replacement Details (only to be completed if 'Technology Type' selected is "New Engine") | ||||||||||||||||||||||||||||||||||||||||||||
Primary Place of Performance | Secondary Place of Performance (if applicable) | Additional Location Details (if applicable) | |||||||||||||||||||||||||||||||||||||||||||||
Vehicle or Equipment | Vehicle or Equipment Type (select from dropdown) |
Vehicle or Equipment Subtype (select from dropdown; must select a 'Vehicle or Equipment Type' first) |
Vocation (select from dropdown; onroad & vessels only) |
If 'Other' Subtype or Vocation selected, please describe (Onroad, Cargo Handling Equipment, and Vessels only) |
Technology Type (select from dropdown) |
If 'Other' selected for Technology Type, please describe | Vehicle or Equipment Total Battery Capacity, (kWh) | Fuel Cell Capacity (kW) | Fleet Owner | Vehicle or Equipment Operates in Multiple Performance Locations Within this project? (Yes/No) | Primary Port or Port Facility (select options from dropdown, based on Table 3a of this template) |
If Primary location of vehicle/equipment is not at a port or port facility listed in Table 3a, provide the Name of the Additional Project Location as listed in Table 3b (select from dropdown, based on Table 3b of this template) | Project Site ID | State | County | Percentage of Time operated in County (enter value 0-1, where 1= 100%) |
City | Zip Code | Secondary Port or Port Facility (select from dropdown, if applicable)_2 |
If Secondary location of vehicle/equipment is not at a port or port facility, provide the Name of the Additional Project Location (select from dropdown)_2 | Project Site ID_2 | State_2 | County_2 | Percentage of Time operated in County (enter value 0-1, where 1= 100%)_2 |
City_2 | Zip Code_2 | Additional Counties where Vehicle Operates | % of time operated in each Additional County | Vehicle Class (Onroad vehicles only) |
Vehicle GVWR (Onroad Vehicle Only) |
Vehicle or Equipment Manufacturer | Vehicle or Equipment Model | Vehicle or Equipment Model Year | Acquisition Cost per Vehicle or Equipment ($ of Cost per Unit) |
Total EPA Funds Requested Per Vehicle or Equipment for Acquisition ($ of Total Cost per Unit) |
New Engine Make | New Engine Model | New Engine Model Year | New Engine Horsepower | Number of New Propulsion Engines (Vessels Only) |
Number of New Auxiliary Engines (Vessels Only) |
Total Estimated Acquisition Cost per New Engine ($ of Cost per Unit) |
EPA Funds Requested for New Engine Acquisition ($ of Cost per Unit) |
Total Estimated Cost for Labor related to Engine Replacement | EPA Funds Requested for Labor Cost related to Engine Replacement | Total Combined Costs for New Engine Acquisition and Labor of Engine Replacement | Total EPA Funds Requested for New Engine Acquisition and Labor of Engine Replacement |
Example New Vehicle | Onroad | Short Haul - Combination | Drayage | New Vehicle - Battery Electric | 250 | NA | Sarah Smith | Yes | Port of Miami | Hialeah Fueling Depot | Example Site | FL | Miami-Dade County | 50% | Miami | 33032 | 45% | Broward County, FL; Monroe County, FL | 4% in Broward County; 1% in Monroe County | Class 7 | 12000 | Manufacturer Name | Model Name or # | 2023 | $150,000.00 | $112,000.00 | ZE Engine Co. | ZE 1000 | 2023 | 750 | 2 | 2 | $375,000.00 | $300,000.00 | $50,000.00 | $25,000.00 | $425,000.00 | $325,000.00 | |||||||||
Vehicle/ Equipment 1 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 2 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 3 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 4 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 5 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 6 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 7 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 8 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 9 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 10 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 11 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 12 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 13 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 14 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 15 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 16 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 17 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 18 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 19 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 20 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 21 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 22 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 23 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 24 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 25 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 26 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 27 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 28 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 29 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 30 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 31 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 32 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 33 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 34 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 35 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 36 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 37 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 38 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 39 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 40 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 41 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 42 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 43 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 44 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 45 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 46 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 47 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 48 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 49 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 50 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 51 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 52 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 53 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 54 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 55 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 56 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 57 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 58 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 59 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 60 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 61 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 62 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 63 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 64 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 65 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 66 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 67 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 68 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 69 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 70 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 71 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 72 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 73 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 74 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 75 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 76 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 77 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 78 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 79 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 80 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 81 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 82 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 83 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 84 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 85 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 86 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 87 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 88 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 89 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 90 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 91 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 92 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 93 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 94 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 95 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 96 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 97 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 98 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 99 | |||||||||||||||||||||||||||||||||||||||||||||||
Vehicle/ Equipment 100 |
U. S. Environmental Protection Agency | ||||||||||||||||||||||||||||||||||||||||||||||
Clean Ports Program | Zero-Emission Technology Deployment Competition | ||||||||||||||||||||||||||||||||||||||||||||||
Scrappage Information | ||||||||||||||||||||||||||||||||||||||||||||||
Instructions | ||||||||||||||||||||||||||||||||||||||||||||||
The Scrappage Information table should detail all vehicles and pieces of equipment that will be scrapped or otherwise replaced under the project. Please only fill out shaded cells highlighted blue with a diagonal pattern (///). This Scrappage and/or Disposal Information table is connected to the New Fleet Description table (Tab 4a), and fields in yellow will autopopulate with corresponding entries on previous page. The sheet has capacity for 100 vehicles or equipment. Please refer to the Data Dictionary (Tab 6) for additional guidance on each field. |
||||||||||||||||||||||||||||||||||||||||||||||
Table 6. Current Vehicle or Equipment Committed for Scrappage Information | ||||||||||||||||||||||||||||||||||||||||||||||
Table 6a. Basic Vehicle Information and Place(s) of Performance | Note: Yellow fields for the Basic Fleet Information will Automatically Populate upon selecting the corresponding new equipment. | Table 6b. Current Vehicle or Equipment Specifications | Table 6c. Current Engine Information (Only to be completed for engine replacement projects) | ||||||||||||||||||||||||||||||||||||||||||||
Primary Place of Performance | Secondary Place of Performance (if applicable) | Additional Location Details (if applicable) | ||||||||||||||||||||||||||||||||||||||||||||
Current Vehicle or Equipment | Corresponding New Vehicle, Equipment, or Engine (select from dropdown) |
Vehicle or Equipment Type | Vehicle or Equipment Subtype | Vocation | If 'Other' Vocation selected, please describe | Technology Type | If 'Other' selected for Technology Type, please describe | Vehicle or Equipment Total Battery Capacity, (kWh) | Fuel Cell Capacity (kW) | Fleet Owner | Vehicle or Equipment Operates in Multiple Performance Locations Within this project? (Yes/No) | Primary Port or Port Facility | If Primary location of vehicle/equipment is not at a port or port facility listed in Table 3a, provide the Name of the Additional Project Location as listed in Table 3b | Project Site ID | State | County | Percentage of Time operated in County | City | Zip Code | Secondary Port or Port Facility (select from dropdown, if applicable)_2 |
If Secondary location of vehicle/equipment is not at a port or port facility, provide the Name of the Additional Project Location_2 | Project Site ID_2 | State_2 | County_2 | Percentage of Time operated in County (enter value 0-1, where 1= 100%)_2 |
City_2 | Zip Code_2 | Additional Counties where Vehicle Operates | % of time operated in each Additional County | Current Vehicle Class (Onroad Current Vehicles only) |
Current Vehicle GVWR (Onroad Current Vehicle Only) |
Current Vehicle or Equipment Manufacturer | Current Vehicle or Equipment Model | Current Vehicle or Equipment Model Year | Current Fuel Type (Select from Dropdown) |
Estimated Remaining Life of Current Vehicle or Equipment (years): | Current Engine Make | Current Engine Model | Current Engine Model Year | Current Engine Tier (nonroad, locomotive, and marine only) | If Current Engine Tier is Tier 4, Provide Tier 4 Standards (Tier 4 only) | Current Engine After-Treatment Technology (Tier 4 nonroad only) |
Current Engine Horsepower | Current Engine Cylinder Displacement (liters/cylinder; marine only) |
Total # of Propulsion Engines (per vessel; marine only) | Total # of Auxiliary Engines (per vessel; marine only) |
Example Old Vehicle | Example New Vehicle | Onroad | Short Haul - Combination | Drayage | 0 | New Vehicle - Battery Electric | 0 | 250 | NA | Sarah Smith | Yes | Port of Miami | Hialeah Fueling Depot | Example Site | FL | Miami-Dade County | 50% | Miami | 33032 | 0 | 0 | 0 | 0 | 0 | 45% | 0 | 0 | Broward County, FL; Monroe County, FL | 4% in Broward County; 1% in Monroe County | Class 7 | 12000 | Manufacturer Name | Taurus | 1995 | ULSD (diesel) | 3 | ABC | ABC1000 | 1995 | Tier 2 | N/A | No DPF, Yes SCR | 660 | 5.0 <= size <15.0 | N/A | N/A |
Current Vehicle or Equipment 1 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 2 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 3 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 4 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 5 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 6 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 7 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 8 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 9 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 10 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 11 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 12 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 13 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 14 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 15 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 16 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 17 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 18 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 19 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 20 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 21 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 22 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 23 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 24 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 25 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 26 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 27 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 28 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 29 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 30 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 31 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 32 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 33 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 34 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 35 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 36 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 37 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 38 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 39 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 40 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 41 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 42 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 43 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 44 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 45 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 46 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 47 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 48 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 49 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 50 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 51 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 52 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 53 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 54 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 55 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 56 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 57 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 58 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 59 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 60 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 61 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 62 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 63 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 64 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 65 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 66 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 67 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 68 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 69 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 70 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 71 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 72 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 73 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 74 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 75 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 76 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 77 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 78 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 79 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 80 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 81 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 82 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 83 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 84 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 85 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 86 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 87 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 88 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 89 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 90 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 91 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 92 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 93 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 94 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 95 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 96 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 97 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 98 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 99 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | ||||||||||||||||||
Current Vehicle or Equipment 100 | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? | #NAME? |
U. S. Environmental Protection Agency | |||||||||||||||||||||||||||||||||||||
Clean Ports Program | Zero-Emission Technology Deployment Competition | |||||||||||||||||||||||||||||||||||||
Infrastructure Description | |||||||||||||||||||||||||||||||||||||
Instructions | |||||||||||||||||||||||||||||||||||||
Below are 5 tables (7-11), and one text response. Please complete all applicable tables. The electric vehicle supply equipment (EVSE) & other electric charging information (Table 7) should detail all EVSE and other charging equipment and supporting infrastructure purchased under the project. Table 8 focuses on shore power systems, Table 9 covers hydrogen fueling stations, Table 10 captures solar and wind power generation systems, Table 11 covers battery energy storage systems (BESS), and the bottom text response focuses on any other eligible infrastructure activity funded by this grant. Please only fill out shaded cells highlighted blue with a diagonal pattern (///); additional rows for each table are hidden and may be unhidden and completed be added as needed to capture all infrastructure components of this project. Please refer to the Data Dictionary (Tab 6) for additional guidance on each field. Key Reminders: ►All Level 2 EVSEs and DC Fast Chargers must be ENERGY STAR certified. ►All zero emission supporting infrastructure must comply with Build America, Buy America (BABA) requirements. |
|||||||||||||||||||||||||||||||||||||
Build America, Buy America (BABA) requirements | |||||||||||||||||||||||||||||||||||||
On August 16, 2022, the Inflation Reduction Act ("IRA"), Pub. L. No. 117-169, which includes the Build America, Buy America Act (BABA), Public Law 117-58, §§ 70901-52, was signed into law. BABA requires that on or after May 14, 2022, all of the iron, steel, manufactured products, and construction materials used in infrastructure project are produced in the United States. If award recipient will be installing, upgrading, or replacing “infrastructure,” then BABA requirements apply to the infrastructure project, regardless of whether or not the infrastructure project was the primary basis for the award. Additionally, BABA requirements apply even if the award recipient will be using another source of funding, whether in part or wholly, for the infrastructure project. For more information, please visit https://www.epa.gov/cwsrf/build-america-buy-america-baba. | |||||||||||||||||||||||||||||||||||||
Table 7. Electric Vehicle Supply Equipment (EVSE) & Other Electric Charging Equipment (not including vessel shore power) | |||||||||||||||||||||||||||||||||||||
Table 7a. EVSE & Charger Overview | Table 7b. Location of Charging Infrastructure | Table 7c. EVSE BABA Details | Table 7d. EVSE Cost Summary | ||||||||||||||||||||||||||||||||||
Type of Charger | If Level 2 or DC Fast Charging, is it ENERGY STAR certified? | EVSE or Other EV Charger Manufacturer | EVSE or Other EV Charger Model | EVSE or Other EV Charger Maximum Output Power (kW) | Number of EVSE or Other EV Charger Units | Port or Port Facility Where Infrastructure is Installed (select options from dropdown, based on Table 3a of this template) |
If Infrastructure is not at a port or port facility listed in Table 3a, provide the Name of the Additional Project Location as listed in Table 3b (select from dropdown, based on Table 3b of this template) | Project Site ID | State | County | City | Zip Code | Does the EVSE or Other EV Charger serve multiple port areas within this application? | Primary Port or Port Facility Served by EVSE and/or EV Charger (select options from dropdown, based on Table 3a of this template) | Secondary Port or Port Facilities served by EVSE and/or EV Charger (use semicolon to separate between multiple port locations) | Is the EVSE or Other EV Charger and associated Equipment, Housing, and all Accessories BABA Compliant? | If No, Partly Compliant, or Unsure, explain | Is the plan to use a waiver to fulfill BABA compliance for this infrastructure? (For more information on approved waivers, see Build America, Buy America (BABA) Approved Waivers US EPA) |
Does the Infrastructure Equipment Cost Include Installation? | Total Estimated Acquisition Cost for each EVSE or Other EV Charger Equipment: | Total EPA Funds Requested for Acquisition of each EVSE or Other EV Charger Unit | Total Estimated Acquisition Cost for EVSE or Other EV Chargers | Total EPA Funds Requested for Acquisition of EVSE or Other EV Chargers | Total Estimated Cost for Installation of EVSE or Other EV Chargers | Total EPA Funds Requested for Installation Cost of EVSE or Other EV Chargers | Total Estimated Cost for All other Eligible EVSE or Other EV Charger Related Expenses (e.g., Shipping) | Total EPA Funds Requested for All other Eligible EVSE or Other EV Charger Related Expenses (e.g., Shipping) | Description of Other Eligible EVSE or Other EV Charger Administrative Expenses | Total Estimated Cost on EVSE or Other EV Charger Equipment, Installation, and Other Eligible EVSE or Other EV Charger Related Expenses | Total EPA Funds Requested for EVSE or Other EV Charger Equipment, Installation, and Other Eligible EVSE or Other EV Charger Related Expenses | |||||||
Example EV Infrastructure | Level 2 | Yes | Manufacturer Name | Model Name | 24 | 2 | Port Facility A | Additional Site B | Example Site | VA | Arlington County | Alexandria | 22305 | Yes | Port Facility A | Port of Galveston; UP Englewood Yard | Yes - Equipment, Housing, Wiring, Cables, and All Accessories are BABA Compliant | No - Infrastructure meets all BABA requirements | No | $16,000.00 | $12,000.00 | $32,000.00 | $24,000.00 | $12,000.00 | $7,000.00 | $750.00 | $250.00 | shipping ($1000) | $44,750.00 | $31,250.00 | |||||||
EVSE Group 1 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
EVSE Group 2 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
EVSE Group 3 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
EVSE Group 4 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
EVSE Group 5 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
EVSE Group 6 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
EVSE Group 7 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
EVSE Group 8 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
EVSE Group 9 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
EVSE Group 10 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
Table 8. Shore Power Equipment Information | |||||||||||||||||||||||||||||||||||||
Table 8a. Shore Power Equipment Information & Demand Overview | Table 8b. Location of Shore Power Infrastructure | Table 8c. Shore Power BABA Details | Table 8d. Shore Power Cost Summary | ||||||||||||||||||||||||||||||||||
Type of Shore Power Connection | Total Voltage Service Provided (select from dropdown) |
Total Voltage Service Provided, if not listed | Manufacturer | Model | Estimated Number of Annual Vessel Calls to Berth where Shore Power is to be Installed | Estimated Average Hotel Hours per Vessel Call per Berth where Shore Power is to be Installed | Estimated Number of Vessel Berths that can be served by Shore Power Pedestal | Maximum Output Power (kW) | Estimated Annual Total Energy Dispersed in MW-h | Number of Shore Power Pedestals | Port or Port Facility Where Infrastructure is Installed (select options from dropdown, based on Table 3a of this template) |
Project Site ID | State | County | City | Zip Code | Are the Shore Power Equipment, Housing, and all Accessories BABA Compliant? | If No, Partly Compliant, or Unsure, explain | Is the plan to use a waiver to fulfill BABA compliance for this infrastructure? (For more information on approved waivers, see Build America, Buy America (BABA) Approved Waivers US EPA) |
Total Estimated Acquisition Cost for each Shore Power Pedestal: | Total EPA Funds Requested for Acquisition of each Shore Power Pedestal | Does the Infrastructure Equipment Cost Include Installation? | Total Estimated Cost for Installation of Shore Power Pedestals | Total EPA Funds Requested for Installation Cost for Shore Power Pedestals | Total Estimated Cost for All other Eligible Shore Power Acquisition & Installation Related Expenses | Total EPA Funds Requested for All other Eligible Shore Power Acquisition & Installation Related Expenses | Description of Other Eligible Shore Power Related Expenses | Total Estimated Cost for Shore Power Equipment Acquisition (total # of pedestals x Funds Expended/pedestal) |
Total EPA Funds Requested for Shore Power Equipment Acquisition (total # of pedestals x EPA Funds Expended/pedestal) |
Total Estimated Cost for Shore Power Equipment Acquisition, Installation, and Other Costs | Total EPA Funds Requested for Shore Power Equipment Acquisition & Installation, and Other Costs | ||||||
Example Shore Power Infrastructure | High voltage shore power connection (HVSC) | 6.6 kV | 10 kV | Manufacturer Name | Model Name | 500 | 72 | 1 | 24 | 1 MW-h | 2 | Port Facility A | Example Site | VA | Arlington County | Alexandria | 22305 | Yes - Equipment, Housing, Wiring, Cables, and All Accessories are BABA Compliant | No - Infrastructure meets all BABA requirements | $16,000.00 | $12,000.00 | No | $12,000.00 | $7,000.00 | $750.00 | $- | shipping ($500) | $32,000.00 | $24,000.00 | $44,750.00 | $31,000.00 | ||||||
Shore Power Group 1 | |||||||||||||||||||||||||||||||||||||
Shore Power Group 2 | |||||||||||||||||||||||||||||||||||||
Shore Power Group 3 | |||||||||||||||||||||||||||||||||||||
Shore Power Group 4 | |||||||||||||||||||||||||||||||||||||
Shore Power Group 5 | |||||||||||||||||||||||||||||||||||||
Shore Power Group 6 | |||||||||||||||||||||||||||||||||||||
Shore Power Group 7 | |||||||||||||||||||||||||||||||||||||
Shore Power Group 8 | |||||||||||||||||||||||||||||||||||||
Shore Power Group 9 | |||||||||||||||||||||||||||||||||||||
Shore Power Group 10 | |||||||||||||||||||||||||||||||||||||
Table 9. Hydrogen Fueling Station Information | |||||||||||||||||||||||||||||||||||||
Table 9a. Hydrogen Fueling Station Information Overview | Table 9b. Location of Hydrogen Fueling Station | Table 9c. H2 Fueling Infrastructure BABA Details | Table 9d. H2 Fueling Infrastructure Cost Summary | ||||||||||||||||||||||||||||||||||
Type of Station (Select from dropdown) |
Type of Hydrogen Storage (select from dropdown) | Total Hydrogen Storage Tank Capacity (kg) | H2 Dispenser Pedestal Manufacturer | H2 Dispenser Pedestal Model | H2 Storage Tank Manufacturer | H2 Storage Tank Model | H2 Compressor Manufacturer | H2 Compressor Model | H2 Cooling System Manufacturer | H2 Cooling System Model | Estimated Annual Total H2 to be Dispensed in kg | Hydrogen Generation Pathway (Select from dropdown menu) |
Port or Port Facility Where Infrastructure is Installed (select options from dropdown, based on Table 3a of this template) |
If Infrastructure is not at a port or port facility listed in Table 3a, provide the Name of the Additional Project Location as listed in Table 3b (select from dropdown, based on Table 3b of this template) | Project Site ID | State | County | City | Zip Code | Does the fueling station serve multiple port facilities within this application? | Primary Port or Port Facility Served by H2 Fueling station | Secondary Port or Port Facilities served by H2 fueling station (use a semicolon between facilities) |
Are the Hydrogen Fueling and related Equipment, Housing, and all Accessories BABA Compliant? | If No, Partly Compliant, or Unsure, explain | Is the plan to use a waiver to fulfill BABA compliance for this infrastructure? (For more information on approved waivers, see Build America, Buy America (BABA) Approved Waivers US EPA) |
Total Estimated Cost for Acquisition of H2 Fueling Pedestal(s): | Total EPA Funds Requested for Acquisition of H2 Fueling Pedestal(s): | Total Estimated Cost for All Additional H2 Supporting Infrastructure (e.g., tanks, pipes, compressors, cooling systems): | Total EPA Funds Requested for all Additional H2 Supporting Infrastructure (e.g., tanks, pipes, compressors, cooling systems): | Total Estimated Cost for Installation of H2 Fueling Infrastructure | Total EPA Funds Requested for Installation of H2 Fueling Infrastructure | Total Estimated Cost for All other Eligible H2 Fueling Infrastructure Acquisition & Installation Related Expenses | Total EPA Funds Requested for All other Eligible H2 Fueling Infrastructure Acquisition & Installation Related Expenses | Description of Other Eligible H2 Fueling Related Expenses | Total Estimated Cost for H2 Infrastructure Acquisition, Installation, and Other Eligible Expenses (Total cost of acquisition + supporting infrastructure + installation + other eligible expenses) |
Total EPA Funds Requested for H2 Infrastructure Acquisition, Installation, and Other Eligible Expenses (Funds requested for acquisition + supporting infrastructure installation + other eligible expenses) |
|
Example Hydrogen Fueling Station | Gas | Above Ground | 1,200 | H2 Hoses & Co. | Magic Hose 1 | H2 Super Tank | ST001 | Cool Engineering Co. | H2+HD | Cool and Beyond | Cool H2+ Mark I | 200,000 | Electrolysis - Electric Grid Mix | Port Facility A | Additional Site B | Example Site | VA | Arlington County | Alexandria | 22305 | Yes | Port Facility A | Port of Galveston; UP Englewood Yard | Yes - Equipment, Housing, Wiring, Cables, and All Accessories are BABA Compliant | No - Infrastructure meets all BABA requirements | $200,000.00 | $150,000.00 | $100,000.00 | $80,000.00 | $25,000.00 | $12,000.00 | $100.00 | $100.00 | Shipping | $325,100.00 | $242,100.00 | |
Hydrogen fueling station 1 | |||||||||||||||||||||||||||||||||||||
Hydrogen fueling station 2 | |||||||||||||||||||||||||||||||||||||
Hydrogen fueling station 3 | |||||||||||||||||||||||||||||||||||||
Hydrogen fueling station 4 | |||||||||||||||||||||||||||||||||||||
Hydrogen fueling station 5 | |||||||||||||||||||||||||||||||||||||
Hydrogen fueling station 6 | |||||||||||||||||||||||||||||||||||||
Hydrogen fueling station 7 | |||||||||||||||||||||||||||||||||||||
Hydrogen fueling station 8 | |||||||||||||||||||||||||||||||||||||
Hydrogen fueling station 9 | |||||||||||||||||||||||||||||||||||||
Hydrogen fueling station 10 | |||||||||||||||||||||||||||||||||||||
Table 10. Solar and Wind Power Generation Equipment Information | Note: If the solar and wind power generation system includes an energy storage system, information for such system needs to be documented in the table below this one (Table 11). | |||||||||||||||||||||||||||||||||||||
Table 10a. Solar and Wind Power Generation Equipment Information | Table 10b. Solar and Wind Power Generation System Location Details | Table 10c. Solar and Wind Power Generation BABA Details | Table 10d. Solar and Wind Power Generation System Cost Summary | ||||||||||||||||||||||||||||||||||
Type of energy generation | Manufacturer of Solar or Wind Power Generation System | Model of Solar or Wind Power Generation System | Generation Capacity of the System (please indicate kW or MW) | Port or Port Facility Where Infrastructure is Installed (select options from dropdown, based on Table 3a of this template) |
If Infrastructure is not at a port or port facility listed in Table 3a, provide the Name of the Additional Project Location as listed in Table 3b (select from dropdown, based on Table 3b of this template) | Project Site ID | State | County | City | Zip Code | Does the Solar or Wind Power Generation System serve multiple ports within this application? | Primary Port or Port Facility Served by Solar or Wind Power Generation System | Secondary Port or Port Facilities served by Solar or Wind Power Generation System (use a semicolon between facilities) | Is Solar or Wind Power Generation System and related Equipment, Housing, and all Accessories BABA Compliant? | If No, Partly Compliant, or Unsure, explain | Is the plan to use a waiver to fulfill BABA compliance for this infrastructure? (for more information on approved waivers, see Build America, Buy America (BABA) Approved Waivers US EPA) |
Total Estimated Acquisition Cost for Solar or Wind Power Generation System Equipment | Total EPA Funds Requested for Acquisition Cost of Solar or Wind Power Generation System Equipment | Total Estimated Cost for Installation of Solar or Wind Power Generation System Equipment | Total EPA Funds Requested for Installation of Solar or Wind Power Generation System Equipment | Total Estimated Cost for All other eligible Solar or Wind Power Generation System Related Expenses | Total EPA Funds Requested for All other eligible Solar or Wind Power Generation System Related Expenses | Description of Other Eligible Solar or Wind Power Generation System Related Expenses | Total Estimated Cost for Solar or Wind Power Generation Equipment, Installation, and other Eligible Expenses | Total EPA Funds Requested for Solar or Wind Power Generation Equipment, Installation, and other Eligible Expenses | ||||||||||||
Example solar and wind Power Generation | Solar | Manufacturer Name | Model Name | 15 kW | Port Facility A | Additional Site B | Example Site | VA | Arlington County | Alexandria | 22305 | Yes | Port Facility A | Port of Galveston; UP Englewood Yard | Yes - Equipment, Housing, Wiring, Cables, and All Accessories are BABA Compliant | No - Infrastructure meets all BABA requirements | $45,000.00 | $45,000.00 | $7,000.00 | $5,000.00 | $100.00 | $100.00 | shipping | $52,100.00 | $50,100.00 | ||||||||||||
Solar or Wind Power Generation 1 | |||||||||||||||||||||||||||||||||||||
Solar or Wind Power Generation 2 | |||||||||||||||||||||||||||||||||||||
Solar or Wind Power Generation 3 | |||||||||||||||||||||||||||||||||||||
Solar or Wind Power Generation 4 | |||||||||||||||||||||||||||||||||||||
Solar or Wind Power Generation 5 | |||||||||||||||||||||||||||||||||||||
Solar or Wind Power Generation 6 | |||||||||||||||||||||||||||||||||||||
Solar or Wind Power Generation 7 | |||||||||||||||||||||||||||||||||||||
Solar or Wind Power Generation 8 | |||||||||||||||||||||||||||||||||||||
Solar or Wind Power Generation 9 | |||||||||||||||||||||||||||||||||||||
Solar or Wind Power Generation 10 | |||||||||||||||||||||||||||||||||||||
Table 11. Battery Energy Storage System (BESS) Equipment Information | |||||||||||||||||||||||||||||||||||||
Table 11a. BESS Equipment Overview | Table 11b. Location of BESS Infrastructure | Table 11c. BESS BABA Details | Table 11d. BESS Cost Summary | ||||||||||||||||||||||||||||||||||
Type of Battery | Manufacturer of BESS | Model of BESS | Total Energy Capacity (please indicate unit; kWh or MWh) | Maximum Continuous Discharge AC Power (kW) | Maximum Continuous Discharge DC Power (kW) | Number of Units | Port or Port Facility Where Infrastructure is Installed (select options from dropdown, based on Table 3a of this template) |
If Infrastructure is not at a port or port facility listed in Table 3a, provide the Name of the Additional Project Location as listed in Table 3b (select from dropdown, based on Table 3b of this template) | Project Site ID | State | County | City | Zip Code | Does the BESS serve multiple port facilities within this application? | Primary Port or Port Facility Served by BESS | Secondary Port or Port Facilities served by BESS: Associated Port(s) (use a colon between facilities) | Is BESS and related Equipment, Housing, and all Accessories BABA Compliant? | If No, Partly Compliant, or Unsure, explain | Is the plan to use a waiver to fulfill BABA compliance for this infrastructure? (for more information on approved waivers, see Build America, Buy America (BABA) Approved Waivers US EPA). |
Total Estimated Acquisition Cost for each BESS Unit | Total EPA Funds Requested for each BESS Unit Acquisition | Total Estimated Cost for BESS Acquisition | Total EPA Funds Requested for BESS Acquisition | Total Estimated Cost for Installation of BESS | Total EPA Funds Requested for Installation of BESS | Total Estimated Cost for All other Eligible BESS Related Expenses | Total EPA Funds Requested for All other Eligible BESS Related Expenses | Description of Other Eligible BESS Related Expenses | Total Estimated Cost for BESS Equipment, Installation, and Other Eligible Expenses | Total EPA Funds Requested BESS Equipment, Installation, and Other Eligible Expenses | |||||||
BESS Example | Lithium-Ion | Manufacturer Name | Model Name | 36 kWh | 1200 | 2400 | 2 | Port Facility A | Additional Site B | Example Site | VA | Arlington County | Alexandria | 22305 | Yes | Port Facility A | Port of Galveston; UP Englewood Yard | Yes - Equipment, Housing, Wiring, Cables, and All Accessories are BABA Compliant | No - Infrastructure meets all BABA requirements | $48,000.00 | $20,000.00 | $96,000.00 | $40,000.00 | $12,000.00 | $10,000.00 | $100.00 | $100.00 | shipping | $108,100.00 | $50,100.00 | |||||||
BESS Group 1 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
BESS Group 2 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
BESS Group 3 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
BESS Group 4 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
BESS Group 5 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
BESS Group 6 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
BESS Group 7 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
BESS Group 8 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
BESS Group 9 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
BESS Group 10 | $- | $- | $- | $- | |||||||||||||||||||||||||||||||||
Are there any other infrastructure projects associated with this grant that are not listed above? (select Yes or No) | |||||||||||||||||||||||||||||||||||||
If no, please leave this section blank. If yes, please provide details in the box below on the infrastructure project and describe how BABA compliance was determined. | |||||||||||||||||||||||||||||||||||||
U. S. Environmental Protection Agency | |
Clean Ports Program | Data Dictionary | |
This data dictionary contains descriptions for all fields and detailed instructions for how to complete all fields found on Tabs 2, 3, 4a, 4b, and 5. | |
Tab 2. CAQP Supplemental Application | For applicants to the Climate and Air Quality Planning Competition, this is the only tab that needs to be completed. |
Table 1: Applicant & Project Details | |
Applicant Name/Organization | Enter Name of Applicant or Applying Organization |
Applicant Address – Street | Provide the street name and number of mailing address of Applicant or Applying Organization |
Applicant Address – City | Provide the city of mailing address of Applicant or Applying Organization |
Applicant Address – State (select from dropdown) | Provide the state of mailing address of Applicant or Applying Organization |
Applicant Address – Zip Code | Provide the Zip Code of mailing address of Applicant or Applying Organization |
Primary Contact Information– Name | Provide the name of the Primary Contact for this application |
Primary Contact Information– Title/Role | Provide the title or role of the Primary Contact for this application |
Primary Contact Information– Phone | Provide the phone number of the Primary Contact for this application |
Primary Contact Information– email | Provide the email address of the Primary Contact for this application |
Applicant Type (See NOFO Section III.A for details) | Select from dropdown which of the following options best describes the applicant: Port Authority; State Agency with jurisdiction over a port authority or port; Tribal agency with jurisdiction over a port authority or a port; Regional Agency with jurisdiction over a port authority or port; Local Agency with jurisdiction over a port authority or port; Air Pollution Control Agency; Eligible Private Entity |
Affiliate Port Authority (if applicable) | For applicants that are not Port Authorities or which have affiliated port authorities, provide the name(s) of the port authorities |
SAM.gov Unique Entity ID (UEI) | Enter the SAM.gov Unique Entity Identification Number for the applicant |
Small Water Port Project? See NOFO section II.B for specifications | Select Yes or No from Dropdown |
Dry Port Project? (See NOFO Section I.B. for specifications) |
Select Yes or No from Dropdown |
Does the applicant use LOGINK or any other prohibited logistics platform as described in NOFO Section III.D.? | Select Yes or No from Dropdown |
Proposed Project Title | One descriptive sentence only |
Project Period–Project start date | For Climate & Air Quality Planning projects, project periods may be up to three years. |
Project Period–Project end date | For Climate & Air Quality Planning projects, project periods may be up to three years. |
Short Project Description | Briefly describe your project in one to three sentences only, especially noting the expected outputs and outcomes. |
Does this project include planning activities related to emissions inventory and accounting exercises? | Select Yes or No from Dropdown |
Total EPA Funding Requested | Use the definitions provided in Section IV.C., Section 7 “Budget” to fill out this budget summary. The amount listed in this summary should match the amounts listed in the budget table in Section 7. As noted in Section II.B. of the NOFO, each application can request between $200,000 and $3,000,000. |
Other Federal Funding Sources | If the applicant has applied or plans to apply for funding for this project (or portions of this project) from another federal funding source, the applicant should list the potential funding source(s). Otherwise, enter N/A |
Table 2: Project Partners | |
Project Partner Organization Name | Provide the name(s) of the organizations working in partnership with the applicant on this project |
Primary Contact Information for Project Partner(s) – Name | Provide the name(s) of the primary contact at this partner organization |
Primary Contact Information for Project Partner(s) – Title/Role | Provide the title or role of the primary contact at this partner organization |
Primary Contact Information for Project Partner(s) – Email | Provide the email address of the primary contact at this partner organization |
Primary Contact Information for Project Partner(s) – Phone | Provide the phone number of the primary contact at this partner organization |
Type of Organization | Select from dropdown which of the following options best describes the applicant: Port Authority; State Agency with jurisdiction over a port authority or port; Tribal agency with jurisdiction over a port authority or a port; Regional Agency with jurisdiction over a port authority or port; Local Agency with jurisdiction over a port authority or port; Air Pollution Control Agency; Eligible Private Entity |
Type of Organization—If Other, describe | Enter in a brief description of the type of organization |
Nature of Partnership with Applicant | Select from Dropdown: Statutory Partner or Collaborating Entity (non-statutory) |
Role in Project—Select from dropdown | Select from the dropdown one of the following options: Recipient of funds; Other |
Role in Project – If Other, describe | Enter in a brief description of the role this project partner is expected to have |
Table 3: Project Location(s) | |
Table 3a: Port/Port Facility Location(s) | |
Port/Port Facility Name | If a port or port facility spans more than 1 county, please enter a new line for each unique county. |
Project Site ID | Prepopulated; used for looking up tables in other tables |
Port Authority Name (if applicable) | Enter in the Port Authority Name associated with this Port or Port Facility, if applicable. |
State | Select the state abbreviation from the dropdown list provided |
County | Select the county name from the dropdown list provided; note the dropdown menu will only work if the state field for that row is completed |
City | Enter in the name of the city in which the Port/Port Facility is located |
Description of Project Activity at Port/ Port Facility | Provide a brief comment about which project activity or activities are expected to be completed at this site |
Estimate of the Share of Overall Project Activity at this site | Enter a value between 0-1, where 1 is 100%. Values in this field for Tables 3a and 3b should total to 100% |
County FIPS Code | Autopopulates |
EPA Region | Autopopulates |
Does this county contains a PM2.5 or Ozone Nonattainment Area? | Autopopulates |
Does this county contains a Severe or Extreme Ozone Nonattainment Area? | Autopopulates |
Does this county contains a PM2.5 or Ozone Maintenance Area? | Autopopulates |
Does this county contain an area with High Ambient Diesel PM Concentration? | Autopopulates |
Does this county meet the Disadvantaged Community Definition in Section IV.C.2 of the NOFO? | Autopopulates |
Table 3b: Additional Project Locations: Use this table to identify additional project locations found outside of the ports and port facilities listed in Table 3a above. | |
Site Name | If an Additional Site spans more than 1 county, please enter a new line for each unique county. |
Project Site ID | Prepopulated; used for looking up tables in other tables |
Port(s)/Port Facilities Served by Location | Separate additional ports by semicolon |
State | Select the state abbreviation from the dropdown list provided |
County | Select the county name from the dropdown list provided; note the dropdown menu will only work if the state field for that row is completed |
City | Enter in the name of the city in which the Port/Port Facility is located |
Description of Project Activity at Site | Provide a brief comment about which project activity or activities are expected to be completed at this site |
Estimate of the Share of Project Activity at this site | Enter a value between 0-1, where 1 is 100%. Values in this field for Tables 3a and 3b should total to 100% |
County FIPS Code | Autopopulates |
EPA Region | Autopopulates |
Does this county contains a PM2.5 or Ozone Nonattainment Area? | Autopopulates |
Does this county contains a Severe or Extreme Ozone Nonattainment Area? | Autopopulates |
Does this county contains a PM2.5 or Ozone Maintenance Area? | Autopopulates |
Does this county contain an area with High Ambient Diesel PM Concentration? | Autopopulates |
Does this county meet the Disadvantaged Community Definition in Section IV.C.2 of the NOFO? | Autopopulates |
Table 4. Climate and Air Quality Planning Project Overview | |
Project Includes this Activity | For each of the listed Planning Activity Types in columns A & B, select whether this project features that activity using the dropdown menu provided |
Requested EPA Funds for this Activity | For each of the planned Activities selected in the previous column, enter the requested funds to support this specific activity |
Is it the intent that this Activity will be fully funded by EPA | For each of the planned Activities selected in the first column, use the dropdown menu to select whether or not it is the intent for this activity to be fully funded by the Clean Ports Program Climate and Air Quality Planning Competition. Options include: "Yes", "No", and "Unsure at this Time" |
Other Activities | If project features other Planning Activities not listed, please provide here; additional rows hidden if needed. |
Tab 3. Cover Sheet for App_ZE | For applicants to the Zero-Emission Technology Deployment Competition, this is the first of up to 4 tabs that may be completed. |
Table 1: Applicant & Project Details | |
Applicant Name/Organization | Enter Name of Applicant or Applying Organization |
Applicant Address – Street | Provide the street name and number of mailing address of Applicant or Applying Organization |
Applicant Address – City | Provide the city of mailing address of Applicant or Applying Organization |
Applicant Address – State (select from dropdown) | Provide the state of mailing address of Applicant or Applying Organization |
Applicant Address – Zip Code | Provide the Zip Code of mailing address of Applicant or Applying Organization |
Primary Contact Information– Name | Provide the name of the Primary Contact for this application |
Primary Contact Information– Title/Role | Provide the title or role of the Primary Contact for this application |
Primary Contact Information– Phone | Provide the phone number of the Primary Contact for this application |
Primary Contact Information– email | Provide the email address of the Primary Contact for this application |
Applicant Type | Select from dropdown which of the following options best describes the applicant: Port Authority; State Agency with jurisdiction over a port authority or port; Tribal agency with jurisdiction over a port authority or a port; Regional Agency with jurisdiction over a port authority or port; Local Agency with jurisdiction over a port authority or port; Air Pollution Control Agency; Eligible Private Entity |
Affiliate Port Authority (if applicable) | For applicants that are not Port Authorities or which have affiliated port authorities, provide the name(s) of the port authorities |
SAM.gov Unique Entity ID (UEI) | Enter the SAM.gov Unique Entity Identification Number for the applicant |
Small Water Port Project? See NOFO section II.B for specifications | Select Yes or No from Dropdown |
Dry Port Project? See NOFO section I.B. for specifications | Select Yes or No from Dropdown |
Does the applicant use LOGINK or any other prohibited logistics platform as described in Section III.D. of the NOFO? | Select Yes or No from Dropdown |
Proposed Project Title | One descriptive sentence only |
Project Period–Project start date | For Zero Emissions Technology projects, project periods may be up to 4 years. |
Project Period–Project end date | For Zero Emissions Technology projects, project periods may be up to 4 years. |
Short Project Description | Briefly describe your project in one to three sentences only, especially noting the expected outputs and outcomes. |
Total EPA Funding Requested | Use the definitions provided in Section IV.C., Section 7 “Budget” to fill out this budget summary. The amount listed in this summary should match the amounts listed in the budget table in Section 7. As noted in Section II.B. of the NOFO, each application can request between $200,000 and $3,000,000. |
Total Applicant Costs | Use the definition provided in Section IV.C., Section 8 “Budget” to fill out this field. The amount listed in this summary should match the amounts listed in the budget table in Section |
Total Project Costs | Autopopulates the sum of the EPA Funding Requested and Total Applicant Costs |
Other Federal Funding Sources | If the applicant has applied or plans to apply for funding for this project (or portions of this project) from another federal funding source, the applicant should list the potential funding source(s). Otherwise, enter N/A |
Total Funding for ZE Equipment | This field will auto-populate upon completing 'Fleet Description' tab. |
Total Funding for Charging and/or Fueling Infrastructure | This field will auto-populate upon completing 'Infrastructure’ tab |
Table 2: Project Partners | |
Project Partner Organization Name | Provide the name(s) of the organizations working in partnership with the applicant on this project |
Primary Contact Information for Project Partner(s) – Name | Provide the name(s) of the primary contact at this partner organization |
Primary Contact Information for Project Partner(s) – Title/Role | Provide the title or role of the primary contact at this partner organization |
Primary Contact Information for Project Partner(s) – Email | Provide the email address of the primary contact at this partner organization |
Primary Contact Information for Project Partner(s) – Phone | Provide the phone number of the primary contact at this partner organization |
Type of Organization – Select from dropdown | Select from dropdown which of the following options best describes the applicant: Port Authority; State Agency with jurisdiction over a port authority or port; Tribal agency with jurisdiction over a port authority or a port; Regional Agency with jurisdiction over a port authority or port; Local Agency with jurisdiction over a port authority or port; Air Pollution Control Agency; Eligible Private Entity |
Type of Organization—If Other, describe | Enter in a brief description of the type of organization |
Nature of Partnership with Applicant | Select from Dropdown: Statutory Partner or Collaborating Entity (non-statutory) |
Role in Project—Select from dropdown | Select from the dropdown one of the following options: Recipient of funds for ZE equipment deployment; Recipient of funds for ZE infrastructure deployment and/or installation; Other |
Role in Project – If Other, describe | If Other selected for previous field, supply a brief description of the Project Partner's Anticipated Role in Project |
Table 3: Project Location(s) | |
Table 3a: Port Location(s) | |
Port/Port Facility Name | Enter the name(s) of the Port or Port Facility where this project will take place. If a port spans more than 1 county, please enter a new line for each unique county |
Project Site ID | Prepopulated; used for looking up tables in other tables |
Port Authority Name (if applicable) | Enter the name of the Port Authority (if applicable to site) |
State | Select the state abbreviation from the dropdown list provided |
County | Select the county name from the dropdown list provided; note the dropdown menu will only work if the state field for that row is completed |
City | Enter in the name of the city in which the Port/Port Facility is located |
Description of Project Activity at Port | Provide a brief comment about which project activity or activities are expected to be completed at this site |
Estimate of the Share of Project Activity at this site | Enter a value between 0-1, where 1 is 100%. Values in this field for Tables 3a and 3b should total to 100% |
County FIPS | Autopopulates |
EPA Region | Autopopulates |
County Contains PM2.5 or Ozone Nonattainment Area? | Autopopulates |
County Contains Severe or Extreme Ozone Nonattainment Area? | Autopopulates |
County Contains PM2.5 or Ozone Maintenance Area? | Autopopulates |
County Contains High Ambient Diesel PM Concentration? | Autopopulates |
County Meets Disadvantaged Community Definition in Section IV.C.2, Section 4 in the NOFO? | Autopopulates |
Table 3b: Additional Project Locations: Use this table to identify additional project locations found outside of the ports listed in 3a above | |
Site Name | If an Additional Site spans more than 1 county, please enter a new line for each unique county. |
Project Site ID | Prepopulated; used for looking up tables in other tables |
Port(s) Served by Location | Separate additional ports by semicolon |
State | Select the state abbreviation from the dropdown list provided |
County | Select the county name from the dropdown list provided; note the dropdown menu will only work if the state field for that row is completed |
City | Enter in the name of the city in which the Port/Port Facility is located |
Description of Project Activity at Site | Provide a brief comment about which project activity or activities are expected to be completed at this site |
Estimate of the Share of Project Activity at this site | Enter a value between 0-1, where 1 is 100%. Values in this field for Tables 3a and 3b should total to 100% |
County FIPS | Autopopulates |
EPA Region | Autopopulates |
County Contains PM2.5 or Ozone Nonattainment Area? | Autopopulates |
County Contains Severe or Extreme Ozone Nonattainment Area? | Autopopulates |
County Contains PM2.5 or Ozone Maintenance Area? | Autopopulates |
County Contains High Ambient Diesel PM Concentration? | Autopopulates |
County Meets Disadvantaged Community Definition in Section IV.C.2, Section 4 in the NOFO? | Autopopulates |
Table 4: Zero-Emission Technology Deployment Project Overview | |
Port Sectors Affected- Onroad | These fields will auto-populate with ✔ upon completing 'Fleet Description' tab. |
Port Sectors Affected- Cargo Handling Equipment & Other Nonroad | These fields will auto-populate with ✔ upon completing 'Fleet Description' tab. |
Port Sectors Affected- Locomotive | These fields will auto-populate with ✔ upon completing 'Fleet Description' tab. |
Port Sectors Affected- Vessels | These fields will auto-populate with ✔ upon completing 'Fleet Description' tab. |
Project Features Scrappage | These fields will auto-populate with ✔ upon completing 'Scrappage Information' tab. |
Fueling Infrastructure Affected – Electric Vehicle Supply Equipment (EVSE) | These fields will auto-populate with ✔ upon completing 'Infrastructure' tab. |
Fueling Infrastructure Affected – Shore Power Infrastructure | These fields will auto-populate with ✔ upon completing 'Infrastructure' tab. |
Fueling Infrastructure Affected—Hydrogen Fueling Infrastructure | These fields will auto-populate with ✔ upon completing 'Infrastructure' tab. |
Fueling Infrastructure Affected—Solar or Wind Power Generation | These fields will auto-populate with ✔ upon completing 'Infrastructure' tab. |
Fueling Infrastructure Affected—Battery Energy Storage System | These fields will auto-populate with ✔ upon completing 'Infrastructure' tab. |
Tab 4a. New Fleet Description | For applicants to the Zero-Emission Technology Deployment Competition, this is the second of up to 4 tabs that may be completed. |
Table 5. New Vehicle, Equipment, or Engine Information | |
Table 5a: Vehicle/Equipment Overview | |
Vehicle or Equipment | Prepopulated. |
Equipment Type (select from dropdown) | Using the dropdown menu, select the equipment type sector from the following options: Onroad, Locomotive, Vessel, and Cargo_Handling_Equipment_and_Other_Nonroad |
Vehicle or Equipment Subtype | Select the subtype from dropdown menu. Note, you must select a 'Vehicle or Equipment Type' first. |
Vocation | Select the vocation from dropdown menu for Onroad and Vessels. This field will be automatically hatched out for Locomotives and Cargo Handling Equipment |
If 'Other' Subtype or Vocation selected, please describe | If ‘Other’ is selected for either Vehicle or Equipment Subtype or Vocation, provide a brief description of the vehicle and/or equipment subtype and its vocation related to this project. This field will be automatically hatched out for Locomotives. |
Technology Type (select from dropdown) | Using the dropdown menu, select the best description of the new technology; options include: New Vehicle - Battery Electric, New Vehicle - Fuel Cell, New Locomotive - Battery Electric, New Locomotive - Fuel Cell, New Vessel - Battery Electric, New Vessel - Fuel Cell, New Engine - Battery Electric, New Engine - Fuel Cell, New Cargo Handling Equipment - Battery Electric, New Cargo Handling Equipment - Fuel Cell, and Other |
If 'Other' selected for Technology Type, please describe | If ‘Other’ is selected for Technology Type, provide a brief description of the vehicle and/or equipment technology. This field will be automatically hatched out unless Other is entered into the prior field. |
Vehicle or Equipment Total Battery Capacity, (kWh) | For Battery Electric equipment, provide the estimated total battery capacity in kWh; this may also be calculated by multiplying the listed battery capacity per battery pack by the number of battery packs. |
Fuel Cell Capacity (kW) | For H2 Fuel Cell equipment, provide the estimated total fuel cell capacity in kW |
Equipment Owner (if known) | List the name and/or organization that will own the new ZE equipment |
Table 5b: Place(s) of Performance | |
Vehicle or Equipment Operates in Multiple Performance Locations Within this project? (Yes/No) | Select Yes/No from Dropdown menu |
Primary Port or Port Facility | Select options from dropdown which will be populated based on entries supplied into Table 3a of this template. |
If Primary location of vehicle/equipment is not at a port or port facility listed in Table 3a, provide the Name of the Additional Project Location as listed in Table 3b | Select options from dropdown which will be populated based on entries supplied into Table 3b of this template. |
Project Site ID | Autopopulates |
State | Autopopulates |
County | Autopopulates |
Percentage of Time operated in County (enter value 0-1, where 1= 100%) |
Enter the percentage of the time the vehicle or equipment will operate at the site listed by entering a value from 0 to 1, where 1 = 100%. |
City | Autopopulates |
Zip Code | Autopopulates |
Secondary Port or Port Facility | Select options from dropdown which will be populated based on entries supplied into Table 3a of this template. |
If Secondary location of vehicle/equipment is not at a port, provide the Name of the Additional Project Location (select from dropdown)_2 | Select options from dropdown which will be populated based on entries supplied into Table 3b of this template. |
(Secondary Port) Project Site ID_2 | Autopopulates |
(Secondary Port) State_2 | Autopopulates |
(Secondary Port) County_2 | Autopopulates |
Percentage of Time operated in County | Enter the percentage of the time the vehicle or equipment will operate at the site listed by entering a value from 0 to 1, where 1 = 100%. |
City_2 | Autopopulates |
Zip Code_2 | Autopopulates |
Additional Counties where Vehicle Operates | List the names of the additional counties where the vehicle operates; separate multiple counties using a semicolon |
% of time operated in each Additional County | List the relative share of time each vehicle or equipment operates in the additional counties listed in the field before |
Table 5c: Details of New Vehicle, Vessel, and/or Equipment | |
Vehicle Class | Select from the dropdown menu the Vehicle/Equipment Class for onroad vehicles, as appropriate. This field will be hatched out for all nonroad equipment |
Vehicle GVWR | Enter the onroad vehicle's gross vehicle weight rating. This field will be hatched out for all nonroad equipment |
Vehicle or Equipment Manufacturer | Enter the manufacturer of the New Vehicle |
Vehicle or Equipment Model | Enter the model of the New vehicle |
Vehicle or Equipment Model Year | Enter the model year of the new vehicle or equipment |
Acquisition Cost per Vehicle or Equipment | Enter the total cost anticipated for acquiring this vehicle or equipment |
Total EPA Funds Expended Per Vehicle or Equipment Acquisition | Enter the total EPA funds requested from this grant for acquiring this vehicle or equipment |
Table 5d. Engine Replacement Details (only to be completed if 'Technology Type' selected is "New Engine") | |
New Engine Make | Enter the manufacturer of the new Engine. |
New Engine Model | Enter the model of the new Engine. |
New Engine Model Year | Enter the model year of the new engine. |
New Engine Horsepower | Enter the average horsepower of the new engine . |
Number of Propulsion Engines (Vessels only) |
Enter the total number of new propulsion engines on the vessel. |
Number of Auxiliary Engines (Vessels only) |
Enter the total number of new auxiliary engines on the vessel. |
Total Estimated Acquisition Cost per New Engine | Enter the total cost anticipated for acquiring each engine |
EPA Funds Requested for New Engine Acquisition | Enter the total EPA funds requested from this grant for acquiring each engine |
Total Estimated Cost for Labor related to Engine Replacement | Enter the total cost anticipated for labor related to this engine replacement |
EPA Funds Expended for Labor Cost related to Engine Replacement | Enter the total EPA funds requested from this grant for labor related to this engine replacement |
Total Combined Costs for New Engine Acquisition and Labor of Engine Replacement | Autopopulates |
Total EPA Funds Requested for New Engine Acquisition and Labor of Engine Replacement | Autopopulates |
Fuel Cell Capacity (kW) | |
Tab 4b. Scrappage Information | For applicants to the Zero-Emission Technology Deployment Competition, this is the third of up to 4 tabs that may be completed, and only applicants with proposed scrappage should complete this tab |
Table 6. Current Vehicle or Equipment Committed for Scrappage Information | |
Table 6a. Basic Fleet Information and Place(s) of Performance | Note: Yellow fields for the Basic Fleet Information will Automatically Populate upon selecting the corresponding new equipment | |
Current Vehicle or Equipment | Prepopulated Field |
Corresponding New Vehicle, Equipment, or Engine (select from dropdown) | Dropdown menu with the Vehicle/Equipment IDs from Tab 4a, Table 5; select the vehicle or equipment that will be the 'Replacement' for each scrapped or disposed of vehicle you will describe in Table 6. |
Vehicle or Equipment Type | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Vehicle or Equipment Subtype | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Vocation | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
If 'Other' Vocation selected, describe | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Technology Type | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
If 'Other' selected for Technology Type, please describe | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Vehicle or Equipment Total Battery Capacity, (kWh) | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Fuel Cell Capacity (kW) | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Fleet Owner | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Vehicle or Equipment Operates in Multiple Performance Locations Within this project? (Yes/No) | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Primary Place of Performance | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Primary Port (select from dropdown, if applicable) | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Project Site Name | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Project Site ID | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
State | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
County | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Percentage of Time operated in County (enter value 0-1, where 1= 100%) | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
City | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Zip Code | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Secondary Place of Performance (if applicable) | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Secondary Port (select from dropdown, if applicable)_2 | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Project Site Name_2 | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Project Site ID_2 | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
State_2 | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
County_2 | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Percentage of Time operated in County (enter value 0-1, where 1= 100%)_2 | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
City_2 | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Zip Code_2 | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Additional Location Details (if applicable) | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Additional Counties where Vehicle Operates | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
% of time operated in each Additional County | No action needed; this field autopopulates based on responses entered in Tab 3a, Table 5 |
Table 6b. Current Vehicle or Equipment Specifications | |
Current Vehicle Class (Onroad Current Vehicles only) | Enter current vehicle's classification (only required for Onroad Vehicles) |
Current Vehicle GVWR (Onroad Current Vehicle Only) | Enter current vehicle's gross vehicle weight rating in lbs. (only required for Onroad Vehicles) |
Current Vehicle or Equipment Manufacturer | Enter the manufacturer of the existing vehicle or equipment |
Current Vehicle or Equipment Model | Enter the model of the existing vehicle or equipment |
Current Vehicle or Equipment Model Year | Enter the model year of the existing vehicle or equipment |
Current Fuel Type | Select fuel type of current vehicle or equipment from dropdown menu |
Estimated Remaining Life of Current Vehicle or Equipment (years): | Enter the estimated number of years of remaining life of the vehicle or equipment |
Table 6c. Current Engine Information (Only to be completed for engine replacement projects) | |
Current Engine Make | Enter the manufacturer of the existing Engine. |
Current Engine Model | Enter the model of the existing Engine. |
Current Engine Model Year | Enter the model year of this engine set. |
Current Engine Tier | Enter the engine tier using the dropdown menu |
If Current Engine Tier is Tier 4, Provide Tier 4 Standards | If you selected "Tier 4" for the previous answer, provide details about which Tier 4 standards the existing engine met |
Current Engine After-Treatment Technology | Describe any after-treatment technology |
Current Engine Horsepower | Enter the average horsepower of the engine/equipment. |
Current Engine Cylinder Displacement | Use the dropdown menu to select the current engine's cylinder displacement |
Total # of Propulsion Engines (per vessel; marine only) | Enter the number of propulsion engines |
Total # of Auxiliary Engines (per vessel; marine only) | Enter the number of auxiliary engines |
Tab 5. Infrastructure | For applicants to the Zero-Emission Technology Deployment Competition, this is the fourth and final of up to 4 tabs that may be completed. |
Table 7: Electric Vehicle Supply Equipment (EVSE) & Other Electric Charging Equipment (not including vessel shore power) | |
Table 7a. Electric Vehicle Supply Equipment (EVSE) Overview | |
Type of Charger | Enter the type of charger, either Level 2 (AC charging up to 19.2 kW), DC Fast Charging, or Other (including non-standard or megawatt charging system). |
If Level 2 or DC Fast Charging, is it ENERGY STAR certified? | Confirm and select yes if applicable. Please see https://www.energystar.gov/ |
EVSE or other EV charger Manufacturer | Enter the manufacturer of the charging equipment |
EVSE or other EV charger Model | Enter the model name of the charging equipment. |
EVSE Maximum Output Power (kW) | Enter the maximum power output of the charging equipment, measured in kilowatts. |
Number of EVSE or other EV Charger Units | |
Table 7b. Location of Charging Infrastructure | |
Port or Port Facility Where Infrastructure is Installed | Select from the dropdown menu, options which will be populated based on Table 3a of this template. |
If Infrastructure is not at a port or port facility listed in Table 3a, provide the Name of the Additional Project Location as listed in Table 3b | Select from the dropdown menu, options which will be populated based on Table 3b of this template. |
Project Site ID | Autopopulates |
State | Autopopulates |
County | Autopopulates |
City | Autopopulates |
Zip Code | Enter the zip code in which the charging equipment will be located. |
Does the EVSE or other EV charger serve multiple port areas within this application? | Select whether or not the charging equipment serve more than one port area within the project submitted in this application. |
Primary Port or Port Facility Served by EVSE and/or EV Charger | Select from the dropdown menu the port area which the charging equipment will primarily serve; options will be populated based on Table 3a of this template. |
Secondary Port or Port Facilities served by EVSE and/or EV Charger (use semicolon to separate between multiple port locations) | Enter the name of the other port areas in which the charging equipment will serve. If it will serve multiple secondary port areas, list all and separate with a semicolon (e.g., Port of Galveston; Port of Corpus Christi). |
Table 7c. EVSE BABA Details | |
Is the EVSE or Other EV Charger and associated Equipment, Housing, and all Accessories BABA Compliant? | Select from the dropdown menu which parts of the infrastructure project are BABA compliant. Options include: Yes - Equipment, Housing, Wiring, Cables, and All Accessories are BABA Compliant, Some Equipment, Housing, Wiring, Cables, and Accessories are BABA Compliant, No, and Not Sure |
If No, Partly Compliant, or Unsure, explain | For the previous column, explain which parts are not compliant or enter N/A. |
Is the plan to use a waiver to fulfill BABA compliance for this infrastructure? (for more information on approved waivers, see Build America, Buy America (BABA) Approved Waivers US EPA). | Select from the dropdown menu how BABA requirements are being met for the infrastructure project. Options include: No - Infrastructure meets all BABA requirements, Yes - EPA's De Minimis Waiver, Yes - EPA's Small Project Waiver, Yes - EPA's Pacific Island Territories General Applicability Waiver, Yes - Project-Level Waiver, and Unsure |
Table 7d. EVSE Cost Summary | |
Does the Infrastructure Equipment Cost Include Installation? | Select whether or not the equipment cost includes installation of the EVSE or other EV charger system. |
Total Estimated Acquisition Cost for each EVSE or Other EV Charger Equipment: | Enter the equipment cost for each unit of the charging infrastructure system. |
Total EPA Funds Requested for Acquisition of each EVSE or Other EV Charger Unit | Enter the EPA funds requested for the equipment in each unit of the EVSE or other EV charging system. |
Total Estimated Acquisition Cost for EVSE or Other EV Chargers | No action - autopopulated |
Total EPA Funds Requested for Acquisition of EVSE or Other EV Chargers | No action - autopopulated |
Total Estimated Cost for Installation of EVSE or Other EV Chargers | Enter the total amount of funds anticipated for installation of all the units in the charging infrastructure system. |
Total EPA Funds Requested for Installation Cost of EVSE or Other EV Chargers | Enter the total amount of EPA funds anticipated for installation of all the units in the charging infrastructure system. |
Total Estimated Cost for All other Eligible EVSE or Other EV Charger Related Expenses (e.g., Shipping) | Enter the total amount of funds anticipated for all other eligible expensed related to the charging infrastructure project in this application, including shipping, etc. |
Total EPA Funds Requested for All other Eligible EVSE or Other EV Charger Related Expenses (e.g., Shipping) | Enter the total amount of EPA funds anticipated for all other eligible expenses related to the charging infrastructure project in this application, including shipping, etc. |
Description of Other Eligible EVSE or Other EV Charger Administrative Expenses | Describe the items corresponding to the previous two columns. |
Total Estimated Cost on EVSE or Other EV Charger Equipment, Installation, and Other Eligible EVSE or Other EV Charger Related Expenses | No action - autopopulated |
Total EPA Funds Requested for EVSE or Other EV Charger Equipment, Installation, and Other Eligible EVSE or Other EV Charger Related Expenses | No action - autopopulated |
Table 8. Shore Power Equipment Information | |
Table 8a. Shore Power Equipment Information & Demand Overview | |
Type of Shore Power Connection | Select the type of shore power connection, either high-voltage (HVSC) or low-voltage (LVSC). |
Total Voltage Service Provided | Select the total voltage provided from the dropdown menu, if listed. |
Total Voltage Service Provided, if Not Listed | Enter the total voltage service provided if the amount is not listed in the dropdown menu. |
Manufacturer | Enter the manufacturer of the shore power system. |
Model | Enter the model name of the shore power system. |
Estimated Number of Annual Vessel Calls to Berth where Shore Power is to be Installed | Enter the estimated number of annual vessel calls per berth where the shore power system is to be installed. |
Estimated Number of Vessel Berths that can be served by Shore Power Pedestal | Enter the estimated average hotel hours per vessel call per berth where the shore power system is to be installed |
Number of Vessel Berths that can be served by Shore Power Pedestal | Enter the estimated number of vessel berths that may be served by the shore power system. |
Maximum Output Power (kW) | Enter the maximum power output of the shore power system, measured in kilowatts. |
Estimated Annual Total Energy Provided in MW-h | Enter the estimated total annual energy output of the shore power system in megawatt-hours. |
Number of Shore Power Pedestals | Enter the total number of shore power pedestals installed. |
Table 8b. Location of Shore Power Infrastructure | |
Port or Port Facility Where Infrastructure is Installed | Select from the dropdown menu, options which will be populated based on Table 3a of this template. |
If Infrastructure is not at a port or port facility listed in Table 3a, provide the Name of the Additional Project Location as listed in Table 3b | Select from the dropdown menu, options which will be populated based on Table 3b of this template. |
Project Site ID | Autopopulates |
State | Autopopulates |
County | Autopopulates |
City | Autopopulates |
Zip Code | Enter the zip code in which the charging equipment will be located. |
Table 8c. Shore Power BABA Details | |
Are the shore power equipment, Housing, and all Accessories BABA Compliant? | Select from the dropdown menu which parts of the infrastructure project are BABA compliant. Options include: Yes - Equipment, Housing, Wiring, Cables, and All Accessories are BABA Compliant, Some Equipment, Housing, Wiring, Cables, and Accessories are BABA Compliant, No, and Not Sure |
If No, Partly Compliant, or Unsure, explain | For the previous column, explain which parts are not compliant or enter N/A. |
Is the plan to use a waiver to fulfill BABA compliance for this infrastructure? (for more information on approved waivers, see Build America, Buy America (BABA) Approved Waivers US EPA). | Select from the dropdown menu how BABA requirements are being met for the infrastructure project. Options include: No - Infrastructure meets all BABA requirements, Yes - EPA's De Minimis Waiver, Yes - EPA's Small Project Waiver, Yes - EPA's Pacific Island Territories General Applicability Waiver, Yes - Project-Level Waiver, and Unsure |
Table 8d. Shore Power Cost Summary | |
Total Estimated Acquisition Cost for each Shore Power Pedestal | Enter the equipment cost for each unit of the shore power infrastructure system. |
Total EPA Funds Requested for Acquisition of each Shore Power Pedestal | Enter the EPA funds expended for the equipment in each shore power pedestal. |
Does the Infrastructure Equipment Cost Include Installation? | Select whether or not the equipment cost includes installation of the shore power equipment. |
Total Estimated Cost for Installation of Shore Power Pedestals | Enter the total estimated cost for installation of all the units in the shore power system. |
Total EPA Funds Requested for Installation Cost for Shore Power Pedestals | Enter the total amount of EPA funds requested installation of all the units in the shore power system. |
Total Estimated Cost for All other Eligible Shore Power Acquisition & Installation Related Expenses | Enter the total estimated cost for installation of all the units in the shore power system. |
Total EPA Funds Requested for All other Eligible Shore Power Acquisition & Installation Related Expenses | Enter the total amount of EPA funds requested installation of all the units in the shore power system. |
Description of Other Eligible Shore Power Related Expenses | Describe the items corresponding to the previous two columns. |
Total Estimated Cost for Shore Power Equipment Acquisition (total # of pedestals x Funds Expended/pedestal) |
No action - autopopulated |
Total EPA Funds Requested for Shore Power Equipment Acquisition (total # of pedestals x EPA Funds Expended/pedestal) |
No action - autopopulated |
Total Estimated Cost for Shore Power Equipment Acquisition, Installation, and Other Costs | No action - autopopulated |
Total EPA Funds Requested for Shore Power Equipment Acquisition & Installation, and Other Costs | No action - autopopulated |
Table 9. Hydrogen Fueling Station Information | |
Table 9a. Hydrogen Fueling Station Information Overview | |
Type of Station | Select from the dropdown menu what type of hydrogen fueling station is installed under this project. |
Type of Hydrogen Storage (select from dropdown) | Select from the dropdown menu what type of hydrogen storage is installed under this project. |
Total Hydrogen Storage Tank(s) Capacity (kg) | Enter the capacity of the hydrogen storage tank in kilograms. |
H2 Dispenser Pedestal Manufacturer | Enter the manufacturer of the hydrogen dispensing pedestal equipment. |
H2 Dispenser Pedestal Model | Enter the model name of the hydrogen dispensing pedestal equipment. |
H2 Storage Tank Manufacturer | Enter the manufacturer of the hydrogen storage tank. |
H2 Storage Tank Model | Enter the model name of the hydrogen storage tank. |
H2 Compressor Manufacturer | Enter the manufacturer of the compressor. |
H2 Compressor Model | Enter the model name of the compressor. |
H2 Cooling System Manufacturer | Enter the manufacturer of the cooling system. |
H2 Cooling System Model | Enter the model name of the cooling system. |
Estimated Annual Total H2 to be Dispensed in kg | Enter the estimated amount of total annual hydrogen dispensed from the fueling station in kilograms. |
Hydrogen Generation Pathway | Select the hydrogen generation pathway from the menu provided below. Options include: Steam Reforming - Natural Gas, Steam Reforming with Carbon Capture & Storage - Natural Gas, Methane cracking - Natural Gas, Gasification - Coal, Gasification with Carbon Capture & Storage - Coal, Gasification - Biomass, Gasification with Carbon Capture & Storage - Biomass, Electrolysis - Electric Grid Mix, Electrolysis - Renewable Energy, Fermentation - Biomass, Thermal water splitting - Nuclear, Thermal water splitting - Renewables, Purchased from Vendor, and Unknown |
Table 9b. Location of Hydrogen Fueling Infrastructure | |
Port or Port Facility Where Infrastructure is Installed | Select from the dropdown menu, options which will be populated based on Table 3a of this template. |
If Infrastructure is not at a port or port facility listed in Table 3a, provide the Name of the Additional Project Location as listed in Table 3b | Select from the dropdown menu, options which will be populated based on Table 3b of this template. |
Project Site ID | Autopopulates |
State | Autopopulates |
County | Autopopulates |
City | Autopopulates |
Zip Code | Enter the zip code in which the charging equipment hydrogen fueling station will be located. |
Does the fueling station serve multiple port facilities within this application? | Select whether or not the hydrogen fueling station serve more than one port area within the project submitted in this application. |
Primary Port or Port Facility Served by H2 Fueling station | Select from the dropdown menu the port area which the charging equipment will primarily serve; options will be populated based on Table 3a of this template. |
Secondary Port or Port Facilities served by H2 fueling station | Enter the name of the other port areas which the hydrogen fueling station will serve. If it will serve multiple secondary port areas, list all and separate with a semicolon (e.g., Port of Galveston; Port of Corpus Christi). |
Table 9c. H2 Fueling Infrastructure BABA Details | |
Are the Hydrogen Fueling and related Equipment, Housing, and all Accessories BABA Compliant? | Select from the dropdown menu which parts of the infrastructure project are BABA compliant. Options include: Yes - Equipment, Housing, Wiring, Cables, and All Accessories are BABA Compliant, Some Equipment, Housing, Wiring, Cables, and Accessories are BABA Compliant, No, and Not Sure |
If No, Partly Compliant, or Unsure, explain | For the previous column, explain which parts are not compliant or enter N/A. |
Is the plan to use a waiver to fulfill BABA compliance for this infrastructure? | Select from the dropdown menu how BABA requirements are being met for the infrastructure project. Options include: No - Infrastructure meets all BABA requirements, Yes - EPA's De Minimis Waiver, Yes - EPA's Small Project Waiver, Yes - EPA's Pacific Island Territories General Applicability Waiver, Yes - Project-Level Waiver, and Unsure |
Table 9d. H2 Fueling Infrastructure Cost Summary | |
Total Estimated Cost for Acquisition of H2 Fueling Pedestal(s): | Enter the total estimated cost for acquiring all hydrogen fueling pedestals needed for this project |
Total EPA Funds Requested for Acquisition of H2 Fueling Pedestal(s): | Enter the total EPA funds requested for acquiring all the hydrogen fueling pedestals needed for this project |
Total Estimated Cost for All Additional H2 Supporting Infrastructure (e.g., tanks, pipes, compressors, cooling systems): | Enter the total estimated cost for acquiring additional supporting infrastructure such as tanks, compressors, pipes, cooling systems, etc. |
Total EPA Funds Requested for all Additional H2 Supporting Infrastructure (e.g., tanks, pipes, compressors, cooling systems): | Enter the total EPA funds requested for acquiring additional supporting infrastructure such as tanks, compressors, pipes, cooling systems, etc. |
Total Estimated Cost for Installation of H2 Fueling Infrastructure | Enter the total estimated cost for installation of all the units in the hydrogen fueling station. |
Total EPA Funds Requested for Installation of H2 Fueling Infrastructure | Enter the total amount of EPA funds requested for installation of all the units in the hydrogen fueling station. |
Total Estimated Cost for All other Eligible H2 Fueling Infrastructure Acquisition & Installation Related Expenses | Enter the total estimated cost for acquisition and installation of all the units in the hydrogen fueling system. |
Total EPA Funds Requested for All other Eligible H2 Fueling Infrastructure Acquisition & Installation Related Expenses | Enter the total amount of EPA funds requested for acquisition and installation of all the units in the hydrogen fueling system. |
Description of Other Eligible H2 Fueling Related Expenses | Describe the items corresponding to the previous two columns. |
Total Estimated Cost for H2 Infrastructure Acquisition, Installation, and Other Eligible Expenses | No action - autopopulated |
Total EPA Funds Requested for H2 Infrastructure Acquisition, Installation, and Other Eligible Expenses | No action - autopopulated |
Table 10. Solar and Wind Power Generation System Equipment Information | |
Table 10a. Solar and Wind Power Generation System Equipment Information | |
Type of energy generation | Select from the dropdown menu the renewable source of energy for power generation: solar or wind. |
Manufacturer of Solar or Wind Power Generation System | Enter the name of the manufacturer of the solar or wind power generation system. |
Model of Solar or Wind Power Generation System | Enter the model name of the solar or wind power generation system. |
Generation Capacity of the System (please indicate kW or MW) | Enter the energy generation capacity of the solar or wind power generation system, including the appropriate units (kW or MW). |
Table 10b. Solar and Wind Power Generation System Location Details | |
Port or Port Facility Where Infrastructure is Installed | Select from the dropdown menu, options which will be populated based on Table 3a of this template. |
If Infrastructure is not at a port or port facility listed in Table 3a, provide the Name of the Additional Project Location as listed in Table 3b | Select from the dropdown menu, options which will be populated based on Table 3b of this template. |
Project Site ID | Autopopulates |
State | Autopopulates |
County | Autopopulates |
City | Autopopulates |
Zip Code | Enter the zip code in which the solar or wind power generation system will be located. |
Does the Solar or Wind Power Generation System serve multiple ports within this application? | Select whether or not the solar or wind power generation system serves more than one port area within the project submitted in this application. |
Primary Port or Port Facility Served by Solar or Wind Power Generation System | Enter the name of the port area in which the solar or wind power generation system will primarily serve. |
Secondary Port or Port Facilities served by Solar or Wind Power Generation System (use a semicolon between facilities) | Enter the name of the other port areas in which the solar or wind power generation system will serve. If it will serve multiple secondary port areas, list all and separate with a semicolon (e.g., Port of Galveston; Port of Corpus Christi). |
Table 10c. Solar and Wind Power Generation System BABA Compliance | |
Is Solar or Wind Power Generation System and related Equipment, Housing, and all Accessories BABA Compliant? | Select from the dropdown menu which parts of the infrastructure project are BABA compliant. Options include: Yes - Equipment, Housing, Wiring, Cables, and All Accessories are BABA Compliant, Some Equipment, Housing, Wiring, Cables, and Accessories are BABA Compliant, No, and Not Sure |
If No, Partly Compliant, or Unsure, explain | For the previous column, explain which parts are not compliant or enter N/A. |
Is the plan to use a waiver to fulfill BABA compliance for this infrastructure? (for more information on approved waivers, see Build America, Buy America (BABA) Approved Waivers US EPA) |
Select from the dropdown menu how BABA requirements are being met for the infrastructure project. Options include: No - Infrastructure meets all BABA requirements, Yes - EPA's De Minimis Waiver, Yes - EPA's Small Project Waiver, Yes - EPA's Pacific Island Territories General Applicability Waiver, Yes - Project-Level Waiver, and Unsure |
Table 10d. Solar and Wind Power Generation System Cost Summary | |
Total Estimated Acquisition Cost for Solar or Wind Power Generation System Equipment | Enter the total estimated cost for the acquisition of the solar or wind power generation infrastructure system(s) |
Total EPA Funds Requested for Acquisition Cost of Solar or Wind Power Generation System Equipment | Enter the EPA funds requested for the acquisition of the solar or wind power generation infrastructure system(s) |
Total Estimated Cost for Installation of Solar or Wind Power Generation System Equipment | Enter the total estimated cost for installation of the solar or wind power generation infrastructure system(s). |
Total EPA Funds Requested for Installation of Solar or Wind Power Generation System Equipment | Enter the total amount of EPA funds requested for installation of the solar or wind power generation infrastructure system(s). |
Total Estimated Cost for All other eligible Solar or Wind Power Generation System Related Expenses | Enter the total estimated cost for all other eligible expenses related to the solar or wind power generation system(s). |
Total EPA Funds Requested for All other eligible Solar or Wind Power Generation System Related Expenses | Enter the total amount of EPA funds requested for all other eligible expenses related to the solar or wind power generation system(s). |
Description of Other Eligible Solar or Wind Power Generation System Related Expenses | Describe the items corresponding to the previous two columns. |
Total Estimated Cost for Solar or Wind Power Generation Equipment, Installation, and other Eligible Expenses | No action - autopopulated |
Total EPA Funds Requested for Solar or Wind Power Generation Equipment, Installation, and other Eligible Expenses | No action - autopopulated |
Table 11. Battery Energy Storage System (BESS) Equipment Information | |
Table 11a. Battery Electric Storage System (BESS) Equipment Overview | |
Type of Battery | Select the type of battery from the dropdown menu; options include: Lithium-ion, lead-acid, Flow, Flywheels, Other, and Not Sure |
Manufacturer of BESS | Enter the manufacturer of the BESS equipment. |
Model of BESS | Enter the model name of the BESS equipment. |
Total Energy Capacity (please indicate unit; kWh or MWh) | Enter the total energy capacity of the BESS system and indicate the unit of energy (kWh or MWh) |
Maximum Continuous Discharge AC Power (kW) | Enter the maximum continuous discharge alternative current power in kW |
Maximum Continuous Discharge DC Power (kW) | Enter the maximum continuous discharge direct current power in kW |
Number of Units | Enter the number of BESS units installed in this infrastructure project. |
Table 11b. Location of BESS Infrastructure | |
Port or Port Facility Where Infrastructure is Installed | Select from the dropdown menu, options which will be populated based on Table 3a of this template. |
If Infrastructure is not at a port or port facility listed in Table 3a, provide the Name of the Additional Project Location as listed in Table 3b | Select from the dropdown menu, options which will be populated based on Table 3b of this template. |
Project Site ID | Autopopulates |
State | Autopopulates |
County | Autopopulates |
City | Autopopulates |
Zip Code | Enter the zip code in which the BESS equipment will be located. |
Does the BESS System serve multiple ports within this application? | Select whether or not the BESS system serves more than one port area within the project submitted in this application. |
Primary Port or Port Facility Served by BESS System | Enter the name of the port area in which the BESS system will primarily serve. |
Secondary Port or Port Facilities served by BESS System (use a semicolon between facilities) | Enter the name of the other port areas which the BESS system will serve. If it will serve multiple secondary port areas, list all and separate with a semicolon (e.g., Port of Galveston; Port of Corpus Christi). |
Table 11c. BABA Compliance | |
Is BESS and related Equipment, Housing, and all Accessories BABA Compliant? | Select from the dropdown menu which parts of the infrastructure project are BABA compliant. Options include: Yes - Equipment, Housing, Wiring, Cables, and All Accessories are BABA Compliant, Some Equipment, Housing, Wiring, Cables, and Accessories are BABA Compliant, No, and Not Sure |
If No, Partly Compliant, or Unsure, explain | For the previous column, explain which parts are not compliant or enter N/A. |
Is the plan to use a waiver to fulfill BABA compliance for this infrastructure? (for more information on approved waivers, see Build America, Buy America (BABA) Approved Waivers US EPA). | Select from the dropdown menu how BABA requirements are being met for the infrastructure project. Options include: No - Infrastructure meets all BABA requirements, Yes - EPA's De Minimis Waiver, Yes - EPA's Small Project Waiver, Yes - EPA's Pacific Island Territories General Applicability Waiver, Yes - Project-Level Waiver, and Unsure |
Table 11d. BESS Cost Summary | |
Total Estimated Acquisition Cost for each BESS Unit | Enter the equipment cost for each unit of the BESS. |
Total EPA Funds Requested for each BESS Unit Acquisition | Enter the EPA funds expended for the equipment in each BESS unit. |
Total Estimated Cost for BESS Acquisition | Autopopulates |
Total EPA Funds Requested for BESS Acquisition | Autopopulates |
Total Estimated Cost for Installation of BESS | Enter the total estimated cost for installation of BESS. |
Total EPA Funds Requested for Installation of BESS | Enter the total amount of EPA funds requested for installation of BESS. |
Total Estimated Cost for All other Eligible BESS Related Expenses | Enter the total estimated cost for all other eligible BESS-related expenses such as shipping of equipment, etc. |
Total EPA Funds Requested for All other Eligible BESS Related Expenses | Enter the total amount of EPA funds requested for all other eligible BESS-related expenses such as shipping of equipment, etc. |
Description of Other Eligible BESS Related Expenses | Describe the items corresponding to the previous two columns. |
Total Estimated Cost for BESS Equipment, Installation, and Other Eligible Expenses | No action - autopopulated |
Total EPA Funds Requested BESS Equipment, Installation, and Other Eligible Expenses | No action - autopopulated |
Are there any other infrastructure projects associated with this grant that are not listed above? (select Yes or No) | Select Yes or No from Dropdown |
If no, please leave this section blank. If yes, please provide details in the box below on the infrastructure project and describe how BABA compliance was determined. | If other infrastructure elements are part of this project, please provide details in the text field on the infrastructure components, cost, and describe how BABA compliance was determined. |