NATURAL GAS PROCESSING PLANT SURVEY
FORM EIA-757
Schedule B: Emergency Status Report
This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil
penalties and other sanctions as provided by law. For the sanctions and the provisions concerning the confidentiality of information submitted on this
form, see instructions. Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or
Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction.
PART 1. PLANT IDENTIFICATION DATA
PART 2. SUBMISSION INFORMATION
Form may be submitted using Secure File Transfer:
DATE:
-
- 2 0
https://signon.eia.doe.gov/upload/noticeoog.jsp
EIA ID NUMBER:
Questions?
If this is a resubmission, enter an "X" in the box:
If any Plant Identification Data has changed since the last report,
Please contact the EIA Survey Support Team using
the following communication methods:
enter an "X" in the box:
By email:
By phone:
Plant Name:
[email protected]
1-855-EIA-4USA (1-855-342-4872)
[Monday through Friday, 8:00 a.m. to 6:00 p.m. eastern time]
Plant Address 1:
Plant Address 2:
City:
County:
State:
Zip:
-
Plant Owner Companies (Top Three):
1
2
3
Operator Company:
PART 3. CONTACTS
Contact information during an emergency (such as a hurricane) :
Processing Plant Operations Contact:
Secondary Contact:
Contact Name:
Contact Name:
Title:
Title:
Company:
Company:
Primary Phone No.:
Ext:
Secondary Phone No.:
Ext:
Primary Phone No.:
Ext:
Secondary Phone No.:
Ext:
Fax Number.:
Fax Number.:
Email address:
Email address:
Comments: (To separate one comment from another, press ALT+ENTER)
Page 1
NATURAL GAS PROCESSING PLANT SURVEY
OMB No. 1905-0175
Expiration Date: 6/30/2024
Version No.: 2021.01
Burden: 1.5 hours
FORM EIA-757
Schedule B: Emergency Status Report
DATE:
-
- 2 0
Resubmission
EIA ID NUMBER:
PART 4. CURRENT POST-EMERGENCY PLANT OPERATIONAL STATUS
What is the plant’s current total capacity?
(Please enter the inlet capacity level at which the plant is able to operate.)
MMcf/Day
What is the current daily natural gas flow at the plant inlet?
MMcf/Day
Which functions is the plant able to perform currently? (Please check all that apply.)
Dehydration
Contamination Removal (for example, CO2, N2, H2S, Hg, …)
NGL Extraction
Fractionation
Other (please describe):
Which functions is the plant actually performing currently? (Please check all that apply.)
Dehydration
Contamination Removal (for example, CO2, N2, H2S, Hg, …)
NGL Extraction
Fractionation
Other (please describe):
What is the current storage level at the plant?
Natural Gas
MMcf
Natural Gas Liquids
Bbls
If the plant is partially or totally unable to operate, is there an alternate means of transporting the gas to market?
Yes
No
If yes, please explain the alternate means (for example, raw natural gas is able to bypass plant, or upstream natural gas can be
rerouted to another processing facility):
Page 2
NATURAL GAS PROCESSING PLANT SURVEY
FORM EIA-757
Schedule B: Emergency Status Report
DATE:
-
- 2 0
OMB No. 1905-0175
Expiration Date: 6/30/2024
Version No.: 2021.01
Burden: 1.5 hours
Resubmission
EIA ID NUMBER:
PART 5. CURRENT PLANT OPERATING CONSTRAINTS
Which of the following internal constraints currently apply? (Please check all that apply.)
Building infrastructure (including plant/facility, buildings)
Employee or operator availability, or access to plant
Damage to equipment (electronic, operational)
Communications (for example, SCADA, interpersonal devices)
Debris or foreign matter
Flooding
Other (please describe):
None
Which of the following external constraints currently apply? (Please check all that apply.)
Upstream supply
Downstream infrastructure
Downstream demand
Power source (for example, electricity)
Other (please describe):
None
Please explain your answers, if applicable:
PART 6. CURRENT ESTIMATE OF PLANT RESTORATION
(Please complete this only if you checked constraints in Part 5).
What is the expected restoration time for fully restoring the plant dehydration function?
(The time frame is relative to the date of this survey response.)
Up to two weeks
More than 2 weeks and up to 1 month
More than 1 month and up to 2 months
More than 2 months and up to 3 months
More than 3 months and up to 4 months
More than 4 months and up to 6 months
More than 6 months and up to one year
Other (please describe):
Please explain the reasons for the expected time frames for fully restoring, at least, the dehydration function.
Page 3
File Type | application/pdf |
File Title | NATURAL GAS PROCESSING PLANT SURVEY FORM EIA-757 Schedule B: Emergency Status Report - PROPOSED |
Subject | Schedule B: Emergency Status Report - PROPOSED |
Author | U.S. Energy Information Administration |
File Modified | 2024-04-18 |
File Created | 2023-05-10 |